Surviving the Economic Tsunamiin Transit
Surviving the Economic Tsunamiin Transit
Overview
possibilities opportunities
survival through private sector partnering.
how contracting can help:
optimizing the benefits
Challenges
Identifying what to contract
Optimizing the cost efficiency of contracting.
Leveraging private sector capabilities
a function or multiple functions within a portion of the system
an entire division of the system
multiple functions within the entire system
the entire system
Finding the Correct
Contracting model
Contract
OPTIONS
Private Sector
Advantages
efficiency, cost savings and accountability 25-30%
innovation and flexibility
broad and multi-faceted experience
new alternatives for capital investment
Maximize Contracting Efficiencies
Share Risk
Include supply and/or financing of equipment
Collaborate on identification of opportunity to realize savings
Include incentives and penalties
Increase Scope and Term
What it looks like when it works
Large scope of work combining four separate contracts.
Contract term of 5 + 3
Enabled Veolia to find staffing efficiencies and make sizable investment – 26 OTR Coaches
Ongoing collaboration
Service Alternatives
For Low Demand
Using private provider capacity late night and weekends
Broker to serve an established market.
Issues:
Industry Profile – capacityRegulatory Environmentfare elasticity Alignment with contractual requirements
Keys to Success deep commitment
by all partners
Willingness to re-define roles
Recognition of differing sector needs
Inclusion, Collaboration
mutual accountability, mutual respect