Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
KARNATAKA STATE ROAD TRANSPORT CORPORATION
ITS Project for Mysore City Transport ITS Project for Mysore City Transport Progress ReportProgress Report
H earty W elcom e to M ysore ITSH earty W elcom e to M ysore ITS
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Structure of PresentationStructure of Presentation
2
� Business Needs & Key Objectives
� ITS Master Plan
� Project Implementation Stakeholders
� Project Scope
� Project Component – Current Status
� Key Issues & Actions
� Pending Activities & Deliverables
� Open Key Issues
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Business NeedsBusiness Needs
3
CHALLENGES:
� Growing number of vehicles
� Insufficient road development
� Opportunity to improve
efficiency in bus operations
� Challenging to build enough
new roads or to meet the
demand
IMPLICATIONS:
� Traffic congestion
� Low speed, increased fuel
consumption – low driver
performance
� Increased accident rates
� Increased pollution
� Passenger inconvenience
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Key ObjectivesKey Objectives
4
� To establish an intelligent system to improve quality & convenience
of public transport system in Mysore city and ensure the delivery of
safe, fair, reliable and environment-friendly transport system
� To promote use of sustainable transport modes and enable
commuters to make informed choices on travel modes by developing
an integrated network in an effort to reduce passenger wait times
� To optimize operations , improve fleet utilization, schedules, and
vehicle availability with accurate information
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
ITS ITS –– MASTER PlanMASTER Plan
5
VisionHaving the Intelligent Transport System that conform to International
Standard & Support Transport Agency in providing efficientOperation & management of Transportation System for Mysore City
Objective
Improved
Transport
Efficiency
& Productivity
Tracking, Data acquisition
& Transmission of Data for
Improved Road
Traffic Management & Security
Better Services
Mobility &
Access to
Commuters
Reduced
Energy use,
emissions & noise
Concept of
ITS
Strategy
Target Level – Improve Operation & Management of Intelligent Transport System by use of Target Level – Improve Operation & Management of Intelligent Transport System by use of
GPS,GPRS and data center for dissemination of information for transport management.
Strategy Level – To provide efficient ,clean safe and commuter friendly solutions.Action Level – Implement GPS based vehicle tracking & monitoring system & passenger
information system.
Strategic Agenda
Passenger
Information
Transport
Management
Bus information Electronic
Payment
Centralized Data Center for ITS
Environment, Safety & Security
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Project Stakeholders Project Stakeholders –– Implementation TeamImplementation Team
6
MD, KSRTC
CME, KSRTC PIU Head (Project Implementation Unit)
PIU Team ,
KSRTC
Project
Implementation
Agency
Project
Management
Consultant
Monitoring &
EvaluationCSOA
KSRTC CMC Ltd IBI Group ICT
Dy.COSP
Dy.CAO
DC-MCTD
ME (Env)
CSM
DME-MCTD
Stat. Officer
Delivery Head
RSBU Head
Project Manager
Account Manager
System Architect
IT Specialist
Tech. Support
Manager
Project Manager
Site Team Leader
ITS Specialist
IT Specialist
Procurement Specialist
Financial
Specialist
Project Manager
Site Team
Leader
Statistical
Specialist
Survey Lead
Project Manager
Site Team
Leader
Transport
Specialist
Business Analyst
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Project Scope (Solution View)Project Scope (Solution View)
7
Components� AVL
� Real time PIS
(ETA/ ETD)� In-bus Display
� AVA
� CCS
� MIS reports� EMS
� Training
� SMS & IVRS
� Fleet Mgmt� Commuter
portal
Scope� 500 buses
� 167 display
boards at bus stops
� 2400+ bus
stops
� 6 Terminals
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Project Scope (SubProject Scope (Sub --component View)component View)
8
Components� AVL
� Real time PIS
(ETA/ ETD)� In-bus Display
� AVA
� CCS
� MIS reports� EMS
� Training
� SMS & IVRS
� Fleet Mgmt� Commuter
portal
Scope� 500 buses
� 167 display
boards at bus stops
� 2400+ bus
stops
� 6 Terminals
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Core TechnologiesCore Technologies
9
VMU
GPRS / GSM
PIS
VTMS
JAVA
GIS
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
ITS Solution Deployment Approach ITS Solution Deployment Approach -- Phases Phases
10
PlanningPlanning Design & BuildDesign & Build ProcurementProcurement ImplementationImplementation Test
ing
Op
era
tio
ns
Op
era
tio
ns
• Kick off meeting
• Site Survey
• Route Survey
• Bus Stop Survey
• Site Plan Sign-off
• SRS
• Project Plan
• Implementation
Plan
• Reviews &
Iterations
• Finalize
• Power calculations
• CCS room design
• Communication ,
Database sizing
• S/w specifications
• H/w specifications
• Design document
for VMU and PIS
• Test plans for
VMU, PIS, & SFAT
• ETA algorithm
• EMS
• S/w Development
& customization
• FAT for custom
hardware (VMU
and PIS )
• Software FAT
• Procurement of
off-the-shelf and
custom hardware
• Software
procurement
• Deliveries for full
system
• Full system
hardware
installation
• Full system
software
installation
• ITS Application
configuration
• Training
• System Integration
• POP & WIR
• System
Acceptance
• Roll out
Launch
(17th Nov 2012)
Program
Management
Regular Reviews
Risk Management
Quality Management
Key Activities
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Data Centre & Control StationData Centre & Control Station
11
� Data Centre
� Servers – all configured in cluster mode (fault tolerance)
� Communication
� GIS
� ITS Application
� SMS/ IVRS Applications
� PIS Display Board Applications
� Network & Firewall components
� Internet connectivity 5 Mbps x 2 (redundancy)
� 2 x 20 KVA online UPS for failover
� 85 KVA Diesel Generator Backup
� Central Control Station
� Video Wall in Control Room
� Dispatcher Workstations
� Access Control
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
ITS Integrated Applications ITS Integrated Applications –– Key FeaturesKey Features
12
Tracking
Route Settings
VMU Management
MIS Reports
Administration
- Dynamic status reports – GIS map tracking- Schedule replay- Line diagram - Alerts monitoring
- VMU ID configurations- GSM/GPRS Parameters- VMU health check- Send command messaged to VMU
- Add, delete, cancel trips- Reschedule trips- Reason for breakdowns- Create and upload files to VMU
required for scheduling
- Generate various MIS reports- TC/ KSRTC supervisors can analyze and
enhance operational efficiencies- Reports are downloadable in different
formats
- User creations and management- Role based access - Master data management- Alert configurations
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Project SubProject Sub --components components -- CommissionedCommissioned
13
Data Centre Central Control Station Video Wall (CCS)
PIS Display Board PIS Display Board (LED) In-Bus Display (LED)
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Project SubProject Sub --components components -- CommissionedCommissioned
14
Dynamic Status Report Real Time Bus Tracking Bus Details
Commuter Portal(English)
GIS Bus TrackingCommuter Portal
(Kannada)
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Project SubProject Sub --components components –– Commissioned StatusCommissioned Status
15
99% 99% 99% 99% 100% 100% 100% 100% 100% 100% 100%
VMU
Audio Solution
In-Bus Display
Routes Identified (556)
Routes Deployed
Servers
Video Wall
Network
Firewall
ITS
GIS
Geo-Fencing
Commuter Portal
SMS
IVRS
EMS
10 Line
16 Line
2 & 4 Lines
Crew (1493)
Officials
In-B
us
Eq
uip
me
nts
Ro
ute
s
Da
ta C
en
tre
Eq
uip
me
nts
Ap
pli
cati
on
sP
IS B
oa
rds
Tra
inin
g � In-Bus equipments available & commissioned = 420 (out of 500)
� All 556 Routes are validated and deployed in all buses
� 1 LED board deployment is in progress
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
� Components
� High end Video Wall
� Higher capacity UPS
� Higher capacity DG Set
� Air Conditioners
� Full fledged world class SMS and IVRS functionality
� Passenger Friendly Commuter Website – http://mitra.ksrtc.in
� Instructions Manual for Crew and Staff
� Capacity Development – Exposure to KSRTC officers and staff for handling
Project Management professionally
� MIS Reports
� Multi-functioning of CCS
Project Value AdditionProject Value Addition
16
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
� Components
� High end Video Wall
� Higher capacity UPS
� Higher capacity DG Set
� Air Conditioners
� Full fledged world class SMS and IVRS functionality
� Passenger Friendly Commuter Website – http://mitra.ksrtc.in
� Instructions Manual for Crew and Staff
� Capacity Development – Exposure to KSRTC officers and staff for handling
Project Management professionally
� MIS Reports
� Multi-functioning of CCS
Project Value AdditionProject Value Addition
17
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Lessons Learned & Key Issues FacedLessons Learned & Key Issues Faced
18
• No historical information / lessons learned available as Mysore ITS is the first project
in the country with this magnitude and complexities involved
• Business Processes
• More time taken to understand and adopt the technologies involved, and map it
against existing business processes
• Adhering to daily schedules and related changes and reflect in the system
• Communication challenges - multi-level monitoring, co-ordination and
correspondences across various stakeholders, organizations & commuter society
• Time gap between DPR preparation, RFP Preparation and Awarding Contract leading
to many changes in business requirements and technology
• Delay in finalizing scope/ requirements due to late engagement of PMC (project
management consulting) and M&E (monitoring & evaluation) agencies
• Lack of single test facility to test all types of LED boards as per expected requirements
• Impractical to standardize in-bus equipments installation procedures – different bus
designs, non-standard cabling needs, issues of batteries, VMU and relay placement
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Lessons Learned (continued..)Lessons Learned (continued..)
19
• Manage English and Kannada (local language) font in the given display board real-
estate
• Availability of local language font to meet all the requirement specifications
• Availability of power supply at all bus-shelters
• Non-standard bus shelters in Mysore city
• Security of ITS equipment deployed in public places
• Challenging to integrate existing in-bus display boards with ITS equipments
• Excessive vibrations in rural routes than anticipated are affecting in-bus equipment
performance
• Availability of 100% GPRS signal throughout the Mysore city roads
• Scope change control process not adequately defined
• Lack of flexibility in the contract to deal with field realities and changes
• Learn World Bank procurement practices and align with existing procedures – goods &
services, consultancy services
• Residual ambiguity in RFP - Missing / inadequate clarity on GIS scope, back-up power
requirement
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Project Acceptance (Current Status)Project Acceptance (Current Status)
20
1. ??
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Operational ActivitiesOperational Activities
21
CMC Management
(Project Owner)
KSRTC Management
Representative
CMC Onsite Operations
Manager
Data Center TeamIn Bus Equipment
Team
Helpdesk and
Dispatchers Team
Network Engineer
Server Engineer
Desktop & PIS
Engineer
Bannimantapa
Depot
Kuvempunagara
Depot
Satgalli Depot
EMS Alerts
Monitoring Team
(Shared Team)
KSRTC OPERATIONS & MAINTENANCE – TEAM STRUCTURE
KSRTC
Operations Team
Software & Application
Support Engineer
KSRTC OPERATIONS
AND MAINTENANCE TEAM
KEY ROLES
Operations Manager
• Own complete operations
• Conduct review meetings
• Issue and escalations
management
• Implement & maintain
standard SOP
• Monitor & control SLA
Dispatchers / Helpdesk
• Monitor & track buses
through ITS applications
• Engage Crew through
audio mechanisms
• Support TC decisions
• Answer queries
• Schedule & routes
• Ticket management
• EMS alert monitoring
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Operational Activities (continued…)Operational Activities (continued…)
22
� Operations & Maintenance Processes
• System Monitoring
• Datacenter – Hardware, Network, UPS,
• Datacenter – Software (ITS, GIS, SMS, IVRS, Web Portal, Communications)
• In-Bus Equipments
• VMU
• In-Bus display
• PIS Display Boards
• Samsung display boards
• Samsung display network box
• LED display boards
� Manual health checks
� Help Desk Operations
• Incident / Problem Management process
• Automatic ticket management process
• Call escalation process
� Help Desk reports
� Update Master Data – adding and scrapping bus, inter-depot bus transfers
� Route Schedule & updates
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Operational Activities (continued…)Operational Activities (continued…)
23
� Managing Crew Operations
• Route deviations
• Bus breakdown
• Managing emergency messages
• Changing & transfer crew
� KSRTC Operations Team
• DC
• DTO
• DME
• ITS In-Charge
• Depot Managers
• Assistant Work Supervisors
• Assistant Traffic Superintendent / Traffic Inspector (ATS/TI)
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
ITS Expected Benefits ITS Expected Benefits –– Post OperationsPost Operations
24
� Timely help during emergency
� Real time ETA information
� Reduced wait time
� Safe, fare & Reliable public transport
� Improved fleet utilization
� Information accuracy/ better decisions
� Quality, convenience – audio, displays
� Real time vehicle tracking
� Replay of tracking
� Monitoring through GIS maps
� Real time MIS reports
� Online rescheduling
� Better performance (HSD - KMPL)
� Avoid bunching of buses (better collection)
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
� �
�
�
Co
mm
ute
rsC
om
mu
ters
Cre
wC
rew
Su
pe
rvis
ors
Su
pe
rvis
ors
Me
cha
nic
sM
ech
an
ics
ITS
Use
rsIT
S U
sers
Sy
s A
dm
inS
ys
Ad
min
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Conclusion & Next StepsConclusion & Next Steps
25
� Mysore city has an intelligent transport system that will improve quality &
convenience of public transport system
� Post ITS operational activities, it will help optimize operations, improve fleet
utilization, schedules, and vehicle availability with accurate information
� ITS benefits for key stakeholders : KSRTC crew, supervisor
staff, commuters, operations
� Core components
� VMU – vehicle mounted unit
� GPRS / GSM / GPS / GIS maps
� ITS Application software, servers
� Central control station located at CBS, Mysore
� CMC are implementation partner to support for next 3 years
Confidential – © 2013. All rights reserved Mysore - Intelligent Transport System
Thank You!Thank You!