PANEL MOUNTED SWITCH
MCC MOUNTED SWITCH
INSTRUMENTS SHARING
EQUIPMENT SYMBOLS
NOTE XX : CS = CONSTANT SPEED
PD : POSITIVE DISPLACEMENT
EXCHANGER
HEAT
TURBINE
SCREW PUMP
CENTRIFUGAL
(WET PIT)
PUMP
PUMP (PD)
(DRY PIT)
RECIPROCATING
PUMP (PD)
ROTARY
CENTRIFUGAL
PUMP
MCC PILOT LIGHT
2S = TWO SPEED
VS = VARIABLE SPEED
COMMON HOUSING
INTERIOR OF PANEL
MOUNTED
MOTOR CONTROL CENTER
INSTRUMENT & FUNCTION SYMBOLS
PILOT LIGHT
MOUNTED
MOUNTED
FACE OF PANEL
FIELD MOUNTED
INTERIOR OF MCC
MOUNTED
PANEL PILOT LIGHT
ROTARY
EJECTOR
MOTOR
COMPRESSOR (PD)
MIXER
RECIPROCATING
COMPRESSOR (PD)
CENTRIFUGAL COMPRESSOR
OR BLOWER
EXAMPLE OF
FIELD SWITCH
RESET
AND LOGIC
OR LOGIC
INTERLOCK LOGIC
PRIMARY ELEMENT SYMBOLS
TEMPERATURE
LEVEL
VENTURI
ROTAMETER
FLUME
WEIR
ORIFICE PLATE
PROPELLER OR TURBINE
PITOT TUBE
VORTEX
TARGET
ELECTROMAGNETIC
ULTRASONIC IN-LINE
ULTRASONIC CLAMP-ON
OR DOPPLER
FLOW
RUPTURE DISK
CAPACITANCE
AIR GAP
(PRESSURE RELIEF)
RUPTURE DISK
(VACUUM RELIEF)
VENT TO
ATMOSPHERE
TEMPERATURE ELEMENT
TEMPERATURE ELEMENT
SURFACE MOUNT
WITH WELL
OPTICAL
ELECTRODES
(WITH HOLDER)
FLOAT
L=LEVEL
NOTE X: F=FLUSHING WATER
L=LUBE OIL
S=SEAL WATER
PRESSURE GAUGE
SIGHT GLASS
ELECTRICAL
CONNECTION WITH
INTERLOCK
NOTE X:
F=FLOW
EQUIPMENT
STRAIGHTENER
TRAP
FLOW
MISCELLANEOUS SYMBOLS
DIAPHRAGM SEAL
ANNULAR DIAPHRAGM
BUBBLE TUBE
ULTRASONIC
AIR SUPPLY
W=WATER
NOTE X:
PURGE SET
A=AIR
SELF CONTAINED
GENERAL NOTES
YN ON DIGITAL INPUT INDICATES COMPUTER/HAND
FROM INSTRUMENT IDENTIFICATION TABLE
SWITCH STATUS
INPUTS & OUTPUTS TO SHARED OR
ANALOG OUTPUT
PULSE OUTPUT
X: BLANK = TIME DURATION
DIGITAL OUTPUT
X: BLANK = MAINTAINED
M = MOMENTARY
YY: MEASURED VARIABLE OR OUTPUT FUNCTION
PROGRAMMABLE LOGIC CONTROLLER
DIGITAL INPUT
NOTE:
ANALOG INPUT
PULSE INPUT
(MAGNETICALLY
OR MECHANICALLY
(ELECTRICALLY
HELD)
HELD)
L = LATCHED
(PULSE WIDTH)
F = PULSE TRAIN
T = TRIAC
PREFABRICATED SLIDE GATE
TELESCOPING VALVE
BALL VALVE
GATE, OR
CHECK VALVE
VALVE & GATE SYMBOLS
DAMPER OR LOUVER
ELECTROPNEUMATIC
MANUAL (SHOWN ONLY FOR HAND OPERATED VALVES
EQUIPPED WITH POSITION MONITORING
NOTE:
FI = FAIL TO INTERMEDIATE POSITION
DIAPHRAGM (SPRING OPPOSED)
DIAPHRAGM (PRESSURE BALANCED)
XX: FO = FAIL OPEN
FC = FAIL CLOSED
BLANK = FAIL TO LAST POSITION
INSTRUMENTS)
ELECTROHYDRAULIC
SOLENOID
PRESSURE OR VACUUM RELIEF
SPRING OR WEIGHT LOADED
ACTUATOR SYMBOLS
MOTOR
CYLINDER
PITOT TUBE
AVERAGING
COMPRESSOR
HYDRAMOTOR
DEVICE INTERFACE
FLOW NOZZLE
PLUG VALVE
GLOBE VALVE
KNIFE GATE
PRESSURE REGULATOR
(REGULATED SIDE)
XX
YY
YY
YY
YY
YY
YY
X
X
ELECTRIC
XX
E
(OTHER) IN-LINE VALVE
SLEEVE VALVE
TO/FROM RPU/PLC
CONNECTION
ACCESSIBLE TO OPERATOR
ON MAIN CONTROL CONSOLE
SHARED DISPLAY/ CONTROL
SUMP PUMP
X
XX: SEE PAGE 2 OF THE P&ID LEGEND
NOTE:
PRESSURE RELIEF VALVE
PINCH VALVE
SLUICE GATE
ON LOSS OF PRIMARY POWER (PNEUMATIC OR ELECTRICAL)
XG
X
T
XP
AS
XX
M
XX
E
P
E
H
S
XX
XX
XX
DD
NNN
TE
TE
M
FI
XX
XX
XX
XX
XX
XX
XX
XX
XX
I
R
A
OR
HS
XX
XX
HS
XX
HS
H
M
BACKFLOW PREVENTOR
PRESSURE REDUCINGBUTTERFLY VALVE,
DAMPER OR LOUVER
THREE WAY VALVE
(ARROW IF SHOWN
INDICATES FAIL OPEN
PATH)
STATIC MIXER
PROGRESSIVE
CAVITY PUMP
BALL CHECK VALVE
EXISTING OR FURNISHED BY OTHERS
NEW
1. THIS IS A GENERAL P & ID SYMBOL SHEET. SOME SYMBOLS OR
NOTATIONS MAY NOT BE USED ON THIS PROJECT.
2. MOTOR CONTROL (MC) & VARIABLE SPEED DRIVE (VSD) PANELS
ARE SHOWN WITH FACE OF PANEL MOUNTED INSTRUMENTS &
EXTERNAL INTERFACE SIGNALS ONLY.
3. A CONTROL PANEL (CP) PACKAGED WITH MECHANICAL
EQUIPMENT OR A SYSTEM IS SHOWN WITH FACE OF PANEL
MOUNTED INSTRUMENTS & EXTERNAL INTERFACE SIGNALS
SIMILAR TO MC & VSD PANELS.
4. CONTROL PANELS (CP) OTHER THAN THOSE PREVIOUSLY DE-
SCRIBED ARE SHOWN WITH FACE & INTERIOR OF PANEL
MOUNTED INSTRUMENTS.
5. SEE ELECTRICAL DRAWINGS FOR MC & VFD LOCATIONS WITHIN
THE MCC.
6. PIPING, EQUIPMENT & INSTRUMENTS WHICH ARE EXISTING OR
FURNISHED BY OTHERS ARE SHOWN LIGHT-LINED (HALF-TONE)
ROTARY
LOBE PUMP
XX
DP
SP
FC
DRAIN POINT
SAMPLE POINT
FLUSHING CONNECTION
COMBINDIATION
AIR/VACUUM VALVE
AUTO AIR RELEASE
VALVE
MUD VALVE
PIPE MATERIAL IDENTIFICATION
SS1 - 316L STAINLESS STEEL, SCH 10s
SS2 - 316L STAINLESS STEEL, SCH 40s
PVC - SCH 40 PVC
PVC80 - SCH 80 PVC
CPVC - SCH 80 CPVC
REFER TO SPECIFICATIONS FOR COMPLETE PIPE MATERIAL
DESIGNATION
250-CS-SS1
PIPE LINE DESCRIPTION KEY
PIPE MATERIAL
FLOW STREAM IDENTIFICATION
NOMINAL PIPE SIZE
FLAP GATE
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
LEGEND AND
GENERAL NOTES 1
SHEET NUMBER
DI601
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
FLOW STREAM & INSTRUMENT LINE SYMBOLS
DS
CEN
* IDENTIFICATION MAY BE FOLLOWED BY A NUMBER
TO DIFFERENTIATE AMONG SIMILAR FLOW STREAMS.
FOR EXAMPLE, CH1 & CH2 WOULD REPRESENT
TWO DIFFERENT CHEMICAL FLOW STREAMS.
VT
MOMENTARY
TIME RATE OF CHANGE
FLOW STREAM IDENTIFICATION
(2) WHEN USED, SYMBOL OR SIGNAL LINE IS ANNOTATED.
INTEGRATE, TOTALIZE
RATIO (FRACTION)
DIFFERENTIAL
INSTRUMENT IDENTIFICATION TABLE
EVENT, STATE, PRESENCEY
POSITION, DIMENSION
(1) USER'S CHOICE
Z
WEIGHT, FORCE
QUANTITY (2)
UNCLASSIFIED (2)
VIBRATION, MECHANICAL ANALYSIS
MULTIVARIABLE (2)
TEMPERATURE
SPEED, FREQUENCY
RADIATION
PRESSURE, VACUUM
MOTOR, MOTION (1)
TIME, TIME SCHEDULE
CURRENT (ELECTRICAL)
P
X
W
V
U
T
S
R
Q
L
N
O
M
J
K
I
H
LEVEL
POWER
HAND
FLOW RATE
VOLTAGE
BURNER, COMBUSTION
ANALYSIS (2)
MEASURED OR
INITIATING VARIABLE
C
G
F
E
D
LETTER
A
B
FIRST LETTER
HIGH (OPENED)
MOTOR (1)
PUMP (1)
CONTROL ELEMENT
UNCLASSIFIED FINAL
DRIVER, ACTUATOR,
RELAY, COMPUTE, CONVERT
UNCLASSIFIED (2)
VALVE, DAMPER, LOUVER
MULTIFUNCTION (2)
TRANSMIT
CONTROL STATION
*
UNCLASSIFIED (2)
MULTIFUNCTION (2)
RECORD
POINT (TEST) CONNECTION
ORIFICE, RESTRICTION
LIGHT
INDICATE
SAFETY
SCAN
WELL
UNCLASSIFIED (2)
MULTIFUNCTION (2)
OVERLOAD (1)
ON OR OPERATE (1)
MIDDLE OR INTERMEDIATE
LOW (CLOSED)
SWITCH
OPEN, START, INCREASE (1)
CONTROL
CLOSE, STOP, DECREASE (1)
SUCCEEDING LETTERS
OUTPUT FUNCTION
GLASS, VIEWING DEVICE
SENSOR (PRIMARY ELEMENT)
ALARM
READOUT OR
PASSIVE FUNCTIONMODIFIER
ISA-S5.1-1984
FAIL (1)
MODIFIER
L L L L HYDRAULIC SIGNAL
GENERAL NOTES
1. THIS IS A GENERAL P & ID LEGEND SHEET. SOME SYMBOLS OR
NOTATIONS MAY NOT BE USED ON THIS PROJECT.
NON-CONNECTING LINES
ON SAME DRAWING. X = 1,2,3,ETC.
FLOW STREAM TO OR FROM EQUIPMENT
NOT SHOWN ON OTHER DRAWINGS
INSTRUMENT SUPPLY OR CONNECTION TO PROCESS
SIGNAL CONTINUATION
FLOW STREAM NO. NN
TO SHEET NO. XX
SIGNAL NO. NN
FROM SHEET NO. XX
CAPILLARY TUBE
CONNECTING LINES
XX X X
IN-LINE
TAPPED OR SAMPLED
EXPOSED PROBE
OR GAS DETECTOR
OZONE GAS
SOLIDS DENSITY
SULPHUR DIOXIDE GAS
TOTAL ORGANIC CARBON
TURBIDITY
SUSPENDED SOLIDSSS
=
=
=
TRB
TOC
=
=
=
=
SD
SO2
OZG
PH pH
AMMONIA
CARBON DIOXIDE GAS
METHANE
CHLORINE GAS
CHLORINE RESIDUAL
CARBON MONOXIDE GAS
DISSOLVED OXYGEN
HYDROCARBONS
HUMIDITY
CONDUCTIVITY
NITRIC OXIDE GAS
NITROGEN GAS
OXYGEN GAS
OXIDATION REDUCTION POT.
OXYGEN UPTAKE RATE
COMBUSTIBLE GAS
HYDROGEN SULFIDE
HUM
=
=
=
=
ORP
OUR
N2G
OG
=
=
=
=
MHO
NH4
NOG
H2S
CLR =
=
=
=
=
DO
HC
COG
=
=
=
=
CH4
CLG
CDG
CG
EXPLANATORY NOTATIONS
2/3:
1:
LOGICAL INVERSION OF SIGNAL
SMALL CIRCLE SIGNIFIES
"A", WHEN ADDED TO NOTATION, INDICATES AUTO.
EXAMPLE: HOA = HAND/OFF/AUTO
"R", WHEN ADDED TO NOTATION, INDICATES REMOTE.
EXAMPLE: HOR = HAND/OFF/REMOTE
OPEN CHANNEL OR TANK FLOW STREAM
ELECTROMAGNETIC OR SONIC SIGNAL
NOTE XX: FLOW STREAM IDENTIFICATION
ELECTRIC SIGNAL
PNEUMATIC SIGNAL
XX
XX OTHER FLOW STREAM
XX
XX
MAIN FLOW STREAM
SECONDARY FLOW STREAM
ALTERNATE
FLOW STREAM)
2.
SPRING RETURN SWITCH
OR PUSHBUTTONS
(MOMENTARY
CONTACTS)
1.
CLOSED CONDUITS
(DASHED LINE
INDICATES
(MAINTAINED
CONTACTS)
SELECTOR
SWITCH
INSTRUMENT & FUNCTION TAGGING
NOTE
= MODULATE FASTER/SLOWERMFS
ON/OFF
OPEN/STOP/CLOSE
OPEN/CLOSE
START/STOP
MODULATE OPEN/CLOSE
ANALYSIS INSTRUMENTS
COLOURNOTE XX: =COL
=SS
=
=
=
=
OC
OO
OSC
MOC
AUTO/MANUAL
COMPUTER/MANUAL
COMPUTER/AUTO/MANUAL
COMPUTER/LOCAL
LOCAL/REMOTE
LOCKOUT STOP
HAND/OFF/AUTO
FORWARD/REVERSE
FORWARD/OFF/REVERSE
FAST/SLOW
FAST/OFF/SLOW
=CAM
=
=
=
=
LR
LOS
HOA
FOS
=
=
=
=
FR
FOR
FS
CL
HAND SWITCHES
NOTE XX: =
=
AM
CM
ELECTROMAGNETIC, SONIC
PROCESS OR INITIATING VARIABLE
VOLTAGE
FREQUENCY
HYDRAULIC
CURRENT
ANALOG
BINARY
DIGITAL
E
H
I
F
=
=
=
=
B
D
A
=
=
=
SIGNAL CONVERTERS
MOTOR
PNEUMATIC
PULSE FREQUENCY
PULSE DURATION
RESISTANCE
PF
=
=
=
R
PD
=
=
=O
P
M
NN/XX
NN/XX
X X
XX = ES-ELECTRICAL SUPPLY HS-HYDRAULIC SUPPLY
GS-GAS SUPPLY NS-NITROGEN SUPPLY
REFER TO FLOW STREAM IDENTIFICATION FOR OTHER TYPES
OF SUPPLY
XX XX XX
DENSITY
BWW
S-PPP
EEE ##
I I I
S = IF USED, ONE NUMERIC OR CHARACTER TO
IDENTIFY A FACILITY SECTION
PPP = IF USED, ONE TO THREE ALPHANUMERIC
CHARACTERS TO IDENTIFY BUILDING OR
PROCESS
EEE = LOOP NUMBER
= FUCTIONAL INSTRUMENT IDENTIFICATION
LETTERS FROM INSTRUMENT IDENTIFICATION
TABLE
I I I
HAND/OFF=HO
LOCAL/PLC=LP
OPEN/OFF/CLOSE=OOC
SOFTWARE LINE
STOP
EMERGENCY STOP=ES
=SP
START=ST
SUMP PUMP
FLOW METER
PRESSURE METER
TEMPERATURE METER
PRESSURE SWITCH
LEVEL SWITCH
BATTERY CHARGER
BUILDING SERVICES
AUTOMATIC TRANSFER SWITCH
UNINTERRUPTIBLE POWER SUPPLY
VALVE
GENERATOR
BLD
=
=
=
ATS
UPS
GEN
TPM =
=
=
=
=
LVS
BCH
PRS
=
=
=
=
FLM
PRM
SMP
VLV
EQUIPMENT DESCRIPTORS
PUMP=PMP
POWER FAIL RELAY=PFR
UNIVERSAL POWER METER=UPM
INSTRUMENT CONTROL PANEL=ICP
GENERATOR CONTROL PANEL=GCP
LOCAL/OFF/REMOTE=LOR
ABBREVIATIONS
ELECTRIC CHECK VALVE
INSTRUMENT AIR SUPPLY
FI FAIL INDETERMINATE
FAIL LOCKED
FULL PORT
FAIL OPEN
FORWARD
INPUT
FWD
I/P
FL
FO
FP
ELECTRICAL SUPPLY
FAIL CLOSE
FURNISHED
(F)
ES
FC
ECV
AS
RECIRCULATION VALVE
O/P OUTPUT
ORBIT VALVE
PROCESS VARIABLE
REVERSE
SET POINT
RV
SP
ORB
REV
PV
NOT FULLY OPEN
NOT FULLY CLOSED
NORMALLY OPEN
NORMALLY CLOSED
LITRES/SECOND
NC
NFC
NFO
NO
L/S
BACKWASH WASTE THICKENED SLUDGEBCS
BTS
SUPERNATANT
CLARIFIER THICKENED SLUDGECCS
CLARIFIER SLUDGE THICKENER
CTS
SUPERNATANT
CLARIFIED SLUDGE
CS
SLU BLENDED SLUDGE
POLYMER SOLUTIONPOL
UW UTILITY WATER
DEWATERED SLUDGE
CENTRATE
BACKWASH WASTE
BACKWASH WASTE THICKENER
VENT
STS SODIUM THIOSULPHATE
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
LEGEND AND
GENERAL NOTES 2
SHEET NUMBER
DI602
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
VS
M
VS
M
DI605
PI
VS
M
200-BWW-SS1
200-BWW-SS1400-BWW-SS1
900-BWW
DI605
DI608
DI606
DI604
BWT01_LT1_FAULT
BWT01_LT1_STAAI
LEVEL INDICATION
TRANSMITTER FAULT
BWT01_LT1
BWP02_PSH
BWP01_PSH
BWT02_LT1_FAULT
TRANSMITTER FAULT
BWT02_LT1_STAAI
LEVEL INDICATION
BWT02_LT1
BWP03_PSH
BWP03_VFD_FAULT
FAULT STATUS
BWP03_VFD_RUNNG
RUNNING STATUS
BWP03_VFD_REMOT
LOCAL/REMOTE STATUS
BWP03_VFD_START
START/STOP COMMAND
BWP02_VFD_RUNNG
RUNNING STATUS
BWP02_VFD_REMOT
LOCAL/REMOTE STATUS
BWP02_VFD_START
START/STOP COMMAND
BWP02_VFD_FAULT
FAULT STATUS
BWP01_VFD_FAULT
FAULT STATUS
BWP01_VFD_RUNNG
RUNNING STATUS
BWP01_VFD_REMOT
LOCAL/REMOTE STATUS
BWP01_VFD_START
START/STOP COMMAND
LCP22
BWP02_VFD_FEDBK
SPEED FEEDBACK
BWP02_VFD_SETPT
SPEED SETPOINT
BWP02_VFD_READY
READY STATUS
BWP01_VFD_FEDBK
SPEED FEEDBACK
BWP01_VFD_SETPT
SPEED SETPOINT
BWP01_VFD_READY
READY STATUS
BWP03_VFD_FEDBK
SPEED FEEDBACK
BWP03_VFD_SETPT
SPEED SETPOINT
BWP03_VFD_READY
READY STATUS
FROM SODIUM THIOSULPHATE
DOSING PUMPS
TO BACKWASH
WASTE
CLARIFIER
CLF01
TO BACKWASH
WASTE
CLARIFIER
CLF02
FROM SEDIMENTATION
SLUDGE EQ TANKS
FROM SEDIMENTATION
SLUDGE THICKENERS
FROM
CENTRIFUGES
FROM FILTERS
BACKWASH WASTE
CLARIFIER/THICKENER
FEED PUMP BWP03
BACKWASH WASTE
CLARIFIER/THICKENER
FEED PUMP BWP02
BACKWASH WASTE
CLARIFIER/THICKENER
FEED PUMP BWP01
CONNECTION TO
FUTURE PUMP
CONNECTION TO
FUTURE PUMP
DI615
DI615
AE
BWT01_AT1
AIT
AE
AIT
400-BWW-SS1
200-BWW-SS1
200-BWW-SS1
DI609
FROM CONVEYORS / TRUCK
LOADING STATIONS
DP
DP
DP
200x150
200x150
200x150
PSH
PI PSH
PI PSH
100x200
100x200
100x200
DP
DP
DP
CONNECTION TO
FUTURE PUMP
200-BWW-SS1
FROM SODIUM THIOSULPHATE
DOSING PUMPS
BACKWASH WASTE
EQUALIZATION
BASIN
BWT01
BACKWASH WASTE
EQUALIZATION
BASIN
BWT02
NOTE 2
NOTE 2
BWT02_AT1_FAULT
TRANSMITTER FAULT
BWT02_AT1_STAAI
ORP INDICATION
BWT01_AT1_FAULT
TRANSMITTER FAULT
BWT01_AT1_STAAI
ORP INDICATION
CONNECTION TO
FUTURE PUMP
ORP
I
BWP03_VFD_STAAI
MOTOR CURRENT
BWP02_VFD_STAAI
MOTOR CURRENT
BWP01_VFD_STAAI
MOTOR CURRENT
DE
VIC
EN
ET
DE
VIC
EN
ET
DE
VIC
EN
ET
LCP21
I
LCP20
I
NOTE 3
OV
ER
FLO
W
FROM SODIUM THIOSULPHATE
DOSING PUMPS
DI615
10-STS-CPVC
10-STS-CPVC
BWT02_AT1
ORP
VS
BACKWASH WASTE
MIXING PUMP
TITTE
400x200
400x200
400x200
400-BWW-SS1
DP
PSHPI
350-BWW-SS2
350x300
350x300
DP
300-B
WW
-S
S2
300-B
WW
-S
S2
DI607
FROM THICKENED
SLUDGE HOLDING TANK
10-STS-CPVC
BWT00_TT1_STAAI
TEMPERATURE INDICATION
BWT00_TT1
BWT00_PSH
BWT00_MX1
BWT00_MX1_FAULT
FAULT STATUS
BWT00_MX1_RUNNG
RUNNING STATUS
BWT00_MX1_REMOT
LOCAL/REMOTE STATUS
BWT00_MX1_START
START/STOP COMMAND
BWT00_MX1_FEDBK
SPEED FEEDBACK
BWT00_MX1_SETPT
SPEED SETPOINT
BWT00_MX1_READY
READY STATUS
BWT00_MX1_STAAI
MOTOR CURRENT
M
LCP23
I
DEVICENET
BWT01_V01_CLOSD
CLOSED STATUS
BWT02_V01_CLOSD
CLOSED STATUS
ZSL
ZSL
BWP03_PSH_ALMDI
HIGH PRESSURE
BWP02_PSH_ALMDI
HIGH PRESSURE
BWP01_PSH_ALMDI
HIGH PRESSURE
BWT00_PSH_ALMDI
HIGH PRESSURE
200-B
WW
-S
S1
FROM MAIN & 2nd FLOOR
PROCESS DRAINS
FROM LOWER FLOOR
PROCESS DRAINS
M M
100-PD-PVC
75-PD-PVC
50-P
D-P
VC
LSL LSH1 LSH2 LSHH
PROCESS DRAINS
SUMP PIT
SMT01
LCP
SMT01_LCP_ALMDI
GENERAL ALARM
4040
SMP01SMP02
SUBMERSIBLE SUMP
PUMPS
80-PD-PVC
900-BWW-CPP
200-CS-SS1
100-P
D-P
VC
300-CTS-SS1
150-SLU-SS1
250-CEN-SS1
350x200
400x200
200x350
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
BACKWASH WASTE EQUALIZATION
BASIN & TRANSFER PUMPS
SHEET NUMBER
DI603
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: PIPING LOCATED INSIDE TANKS TO BE 316L SS SCH40s.
NOTE 3: FLAP GATE TO BE INSTALLED AT THE OVERFLOW PIPE
ENTRANCE TO DISCHARGE MH.
DI618
M
M
SEDIMENTATION SLUDGE
DI606
VS
VS
200-CS-SS2
300-C
S-S
S2
M
VS
SEDIMENTATION SLUDGE
SEDIMENTATION SLUDGE
THICKENER FEED PUMP
RSP03
SEDIMENTATION SLUDGE
EQUALIZATION TANK
SED02
SEDIMENTATION SLUDGE
EQUALIZATION TANK
SED01
DI606
START/STOP COMMAND
FAULT STATUS
RUNNING STATUS
LOCAL/REMOTE STATUS
RSP01_VFD_START
RSP03_PSH
RSP02_PSH
RSP01_PSH
START/STOP COMMAND
RSP01_VFD_REMOT
RSP01_VFD_RUNNG
RSP01_VFD_FAULT
RSP02_VFD_START
RSP02_VFD_REMOT
RSP02_VFD_RUNNG
RSP02_VFD_FAULT
FAULT STATUS
RUNNING STATUS
LOCAL/REMOTE STATUS
START/STOP COMMAND
RSP03_VFD_START
RSP03_VFD_REMOT
RSP03_VFD_RUNNG
RSP03_VFD_FAULT
FAULT STATUS
RUNNING STATUS
LOCAL/REMOTE STATUS
RSP02_VFD_FEDBK
SPEED FEEDBACK
RSP02_VFD_SETPT
SPEED SETPOINT
RSP01_VFD_FEDBK
SPEED FEEDBACK
RSP01_VFD_SETPT
SPEED SETPOINT
RSP03_VFD_FEDBK
SPEED FEEDBACK
RSP03_VFD_SETPT
SPEED SETPOINT
DI603
TO
SEDIMENTATION
SLUDGE
THICKENER
CLF04
TO BACKWASH WASTE
EQUALIZATION BASIN
TO
SEDIMENTATION
SLUDGE
THICKENER
CLF03
FROM
SEDIMENTATION
BASINS
300-C
S-S
S2
200x150
200x150
200x150
200-CS-SS2
200-CS-SS2
DP
DP
DP
SED01_LT1_FAULT
TRANSMITTER FAULT
SED01_LT1_STAAI
LEVEL INDICATION
SED02_LT1
SED02_LT1_FAULT
TRANSMITTER FAULT
LEVEL INDICATION
SED02_LT1_STAAI
PI PSH
100x200
PI PSH
PI PSH
DP
DP
DP
200-CS-SS2
100x200
100x200
SED01_LT1
200-CS-SS2
300-CS-SS2
300-CS-SS2
RSP03_VFD_STAAI
MOTOR CURRENT
RSP03_VFD_READY
READY STATUS
RSP02_VFD_READY
READY STATUS
RSP02_VFD_STAAI
MOTOR CURRENT MOTOR CURRENT
READY STATUS
RSP01_VFD_READY
RSP01_VFD_STAAI
DE
VIC
EN
ET
DE
VIC
EN
ET
DE
VIC
EN
ET
LCP26
I
LCP25
I
LCP24
I
M
VS
SEDIMENTATION SLUDGE
MIXING PUMP
250-CS-SS2
DP
PI PSH
DP
300x200
CONNECTION TO
FUTURE PUMP
CONNECTION TO
FUTURE PUMP
300x200
300x200
300x250
TITTE
250x200250x200
250-CS-SS2
200-CS-SS1
250-C
S-S
S2
250-C
S-S
S2
SED00_TT1_STAAI
TEMPERATURE INDICATION
SED00_TT1
SED00_MX1
I
LCP27
DEVICENET
SED00_PSH
FAULT STATUS
RUNNING STATUS
LOCAL/REMOTE STATUS
SED00_MX1_START
START/STOP COMMAND
SED00_MX1_REMOT
SED00_MX1_RUNNG
SED00_MX1_FAULT
SED00_MX1_FEDBK
SPEED FEEDBACK
SED00_MX1_SETPT
SPEED SETPOINT
MOTOR CURRENT
READY STATUS
SED00_MX1_READY
SED00_MX1_STAAI
SED01_V01_CLOSD
CLOSED STATUS
SED02_V01_CLOSD
CLOSED STATUS
ZSL
ZSL
HIGH PRESSURE
SED00_PSH_ALMDI
RSP03_PSH_ALMDIRSP02_PSH_ALMDI
HIGH PRESSURE HIGH PRESSURE
RSP01_PSH_ALMDI
HIGH PRESSURE
TO PLANT DRAIN
VALVE CHAMBER
200-C
S-S
S1
250-C
S250-C
S-S
S
250-CS
NOTE 2
NOTE 2
LSH
SED00_LSH_ALMDI
80 D
RA
IN
TO PLANT DRAIN
FLOOD ALARM
200x150
100x250 250x200
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
SEDIMENTATION SLUDGE EQ
BASIN & TRANSFER PUMPS
SHEET NUMBER
DI604
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: PIPING LOCATED INSIDE TANKS TO BE 316L SS SCH40s
DI612
M
M
M
M
M
BACKWASH WASTE
THICKENER/CLARIFIER
CLF01
BACKWASH WASTE
THICKENER/CLARIFIER
CLF02
THICKENER
VENDOR PACKAGE
DI603
DI607
DI612
300-B
TS
-S
S1
300-BTS-SS1
100-BCS-SS2
20-POL-PVC80
20-POL-PVC80
200-BWW-SS1
200-BWW-SS1
DI603
SS
CLF01_AT2
CLF02_AT2
CLF02_FT1
CLF01_FT1
CLF01_MX1
CLF01_0C1
CLF02_0C1
CLF01_AT1_FAULT
TRANSMITTER FAULT
CLF01_AT1_STAAI
TSS INDICATION
CLF01_FT1_STAAI
FLOW INDICATION
CLF01_FT1_FAULT
TRANSMITTER FAULT
CLF02_FT1_STAAI
FLOW INDICATION
CLF02_FT1_FAULT
TRANSMITTER FAULT
CLF02_AT1
CLF01_AT1
RMF
FROM BACKWASH
WASTE TRANSFER
PUMP BWP03
FROM POLYMER
SYSTEM
FROM BACKWASH
WASTE TRANSFER
PUMP BWP01
FROM POLYMER
SYSTEM
TO
DISCHARGE
TO THICKENED
SLUDGE HOLDING
TANKS
M
M
200x250
200x250
M
M
400x300
SS
400x300
200x100
300x350
DI606
FROM SEDIMENTATION
SLUDGE THICKENERS
DISCHARGE
300-CTS-SS1
350-BTS-SS1
CLF02_AT1_FAULT
TRANSMITTER FAULT
CLF02_AT1_STAAI
TSS INDICATION
CLF01_IC1
CLF02_IC1
CLF01_IC1_FAULT
FAULT STATUS
CLF01_IC1_CLOSD
CLOSED STATUS
CLF01_IC1_OPEND
OPENED STATUS
CLF01_IC1_REMOT
LOCAL/REMOTE STATUS
CLF01_IC1_CLOSE
CLOSE COMMAND
CLF01_IC1_OPENN
OPEN COMMAND
CLF02_IC1_FAULT
FAULT STATUS
CLF02_IC1_CLOSD
CLOSED STATUS
CLF02_IC1_OPEND
OPENED STATUS
CLF02_IC1_REMOT
LOCAL/REMOTE STATUS
CLF02_IC1_CLOSE
CLOSE COMMAND
CLF02_IC1_OPENN
OPEN COMMAND
M
M M
CLF01_MX2
CLF02_MX1 CLF02_MX2
CLF02_SLC
THICKENER
VENDOR PACKAGE
SS
SS
CS CS CS
CS CS CS
VENDOR
CONTROL PANEL
SCP23
VENDOR
CONTROL PANEL
SCP24
CLF01_SLC
M
SS
M
SS
CLF02_FT2
CLF02_AT3
CLF01_FT2
CLF01_AT3
TO BWW
EQUALIZATION
BASIN
N/C
100-BCS-SS2
200x100
TO BWW
EQUALIZATION
BASIN
NOTE 2
NOTE 2
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
BACKWASH WASTE
THICKENING
SHEET NUMBER
DI605
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: PIPE FOR TESTING/COMMISSIONING
NOTE 3: DENOTES DEVICE PROVIDED BY CONTRACTOR,
CONNECTED AND CONTROLLED BY VENDOR'S PANEL
M
M
M
SEDIMENTATION
SLUDGE THICKENER
CLF03
SEDIMENTATION
SLUDGE THICKENER
CLF04
DI607
DI603
DI613
DI604
DI613
200-C
TS
-S
S1
200-CS-SS2
SS
DI604
CLF03_FT1_FAULT
TRANSMITTER FAULT
CLF03_FT1_STAAI
FLOW INDICATION
CLF04_FT1_FAULT
TRANSMITTER FAULT
CLF04_FT1_STAAI
FLOW INDICATION
CLF03_AT2
CLF04_OC1
CLF04_AT2
CLF04_FT1
CLF03_FT1
TO BACKWASH
WASTE EQUALIZATION
BASINS
TO THICKENED
SLUDGE HOLDING
TANKS
FROM POLYMER
SYSTEM
FROM SEDIMENTATION
SLUDGE PUMP RSP01
FROM POLYMER
SYSTEM
FROM SEDIMENTATION
SLUDGE PUMP RSP03
200x250
200x250
M
M
250x200
250x200
DI605
M
M
CLF04_AT1
CLF03_AT1
200x300
200x300
M
CLF03_MX1
M
CLF03_MX2
M M
CLF04_MX1 CLF04_MX2
CLF03_IC1_FAULT
FAULT STATUS
CLF03_IC1_CLOSD
CLOSED STATUS
CLF03_IC1_OPEND
OPENED STATUS
CLF03_IC1_REMOT
LOCAL/REMOTE STATUS
CLF03_IC1_CLOSE
CLOSE COMMAND
CLF03_IC1_OPENN
OPEN COMMAND
CLF04_IC1_FAULT
FAULT STATUS
CLF04_IC1_CLOSD
CLOSED STATUS
CLF04_IC1_OPEND
OPENED STATUS
CLF04_IC1_REMOT
LOCAL/REMOTE STATUS
CLF04_IC1_CLOSE
CLOSE COMMAND
CLF04_IC1_OPENN
OPEN COMMAND
CL04_IC1
CLF03_AT1_FAULT
TRANSMITTER FAULT
CLF03_AT1_STAAI
TSS INDICATION
CLF04_AT1_FAULT
TRANSMITTER FAULT
CLF04_AT1_STAAI
TSS INDICATION
THICKENER
VENDOR PACKAGE
THICKENER
VENDOR PACKAGE
SS
SS
SS
200-CCS-SS2
300-CTS-SS1
200-CCS-SS2
20-POL-PVC80
200-CS-SS2
20-POL-PVC80
200-CTS-SS1
VENDOR
CONTROL PANEL
SCP25
VENDOR
CONTROL PANEL
SCP26
CS CS CS
CS CS CS
CLF03_IC1
CLF03_SLC
CLF04_SLC
M
SS
CLF03_AT3
CLF03_FT2
CLF04_AT3
CLF04_FT2
M
M
SS
TO
SEDIMENTATION
SLUDGE TANKS
300-CTS-SS1
N/C
TO
SEDIMENTATION
SLUDGE TANKS
200-CCS-SS2
200-CCS-SS2
NOTE 2
NOTE 2
CLF03_OC1
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
SEDIMENTATION SLUDGE
THICKENING
SHEET NUMBER
DI606
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: PIPE FOR TESTING/COMMISSIONING
NOTE 3: DENOTES DEVICE PROVIDED BY CONTRACTOR,
CONNECTED AND CONTROLLED BY VENDOR'S PANEL
THICKENED SLUDGE
HOLDING TANK
SLT02
THICKENED SLUDGE
HOLDING TANK
SLT01
DI608
CENTRIFUGE
FEED PUMP
SFP01
DI616
PSH
DI606
PI
M
DI608
TRANSMITTER FAULT
SLT02_LT1_STAAI
LEVEL INDICATION
SLT02_LT1_FAULT
TRANSMITTER FAULT
SLT01_LT1_STAAI
LEVEL INDICATION
SLT01_LT1_FAULT
FAULT STATUS
SPEED SETPOINT
RUNNING STATUS
LOCAL/REMOTE STATUS
SFP02_VFD_START
START/STOP COMMAND
SPEED FEEDBACK
SFP02_VFD_REMOT
SFP02_VFD_RUNNG
SFP02_VFD_FAULT
SFP02_VFD_SETPT
SFP02_VFD_FEDBK
FAULT STATUS
SPEED SETPOINT
RUNNING STATUS
LOCAL/REMOTE STATUS
SFP03_VFD_START
START/STOP COMMAND
SPEED FEEDBACK
SFP03_VFD_REMOT
SFP03_VFD_RUNNG
SFP03_VFD_FAULT
SFP03_VFD_SETPT
SFP03_VFD_FEDBK
FAULT STATUS
SPEED SETPOINT
RUNNING STATUS
LOCAL/REMOTE STATUS
START/STOP COMMAND
SPEED FEEDBACK
READY STATUS
SFP01_VFD_READY
SFP01_VFD_FEDBK
SFP01_VFD_SETPT
SFP01_VFD_FAULT
SFP01_VFD_RUNNG
SFP01_VFD_REMOT
SFP01_VFD_START
READY STATUS
SFP03_VFD_READY
READY STATUS
SFP02_VFD_READY
TO CENTRIFUGE
CEN01
TO CENTRIFUGE
CEN02
TO PLANT DRAIN
UTILITY WATER
FROM
SEDIMENTATION
SLUDGE
THICKENERS
SLT02_LT1
DI605100-BCS-SS2
FROM BACKWASH
WASTE CLARIFIERS
SLT01_LT1
300-SLU-SS2
150-S
LU
-S
S1
250-S
LU
-S
S2
250x150
250x150
250x150
PSHPI
M
CENTRIFUGE
FEED PUMP
SFP02
PSHPI
150-SLU-SS2
M
CENTRIFUGE
FEED PUMP
SFP03
SFP01_PSH
SFP02_PSH
SFP03_PSH
150-SLU-SS2
150-SLU-SS2
200-CCS-SS2
150-SLU-SS2
300-SLU-SS2
MOTOR CURRENT
SFP03_VFD_STAAI
MOTOR CURRENT
SFP01_VFD_STAAI
MOTOR CURRENT
SFP02_VFD_STAAI
VS
VS
VS
DE
VIC
EN
ET
DE
VIC
EN
ET
DE
VIC
EN
ET
LCP30
I
LCP29
I
LCP28
I
PSHPI
250-SLU-SS2
M
THICKENED SLUDGE
HOLDING TANK
MIXING PUMP
SLT00_MX1
VS
250x200250x200
TITTE
CONNECTION TO
FUTURE PUMP
CONNECTION TO
FUTURE PUMP
250-SLU-SS2
200-S
LU
-S
S2
200-S
LU
-S
S2
TO BWW EQ BASIN
DI603
SLT01_V02_CLSD
CLOSED STATUS
SLT01_V01_CLSD
CLOSED STATUS
FAULT STATUS
SPEED SETPOINT
RUNNING STATUS
LOCAL/REMOTE STATUS
SLT00_MX1_START
START/STOP COMMAND
SPEED FEEDBACK
SLT00_MX1_REMOT
SLT00_MX1_RUNNG
SLT00_MX1_FAULT
SLT00_MX1_SETPT
SLT00_MX1_FEDBK
READY STATUS
SLT00_MX1_READY
MOTOR CURRENT
SLT00_MX1_STAAI
DE
VIC
EN
ET
SLT02_V01_CLSD
CLOSED STATUS
SLT02_V02_CLSD
CLOSED STATUS
I
SLT00_TT1_STAAI
SLT00_TT1
ZSL
ZSL
ZSL
ZSL
TEMPERATURE INDICATION
LCP31
80-UW-PVC80
HIGH PRESSURE ALARM
SFP01_PSH_ALMDI
HIGH PRESSURE ALARM
SFP02_PSH_ALMDI
HIGH PRESSURE ALARM
SFP03_PSH_ALMDI
HIGH PRESSURE ALARM
SLT01_PSH_ALMDI
M
SFP02_OC1
M
SFP02_OC2
SFP02_OC1_FAULT
FAULT STATUS
SFP02_OC1_CLOSD
CLOSED STATUS
SFP02_OC1_OPEND
OPENED STATUS
SFP02_OC1_REMOT
LOCAL/REMOTE STATUS
SFP02_OC1_CLOSE
CLOSE COMMAND
SFP02_OC1_OPENN
OPEN COMMAND
SFP02_OC2_FAULT
FAULT STATUS
SFP02_OC2_CLOSD
CLOSED STATUS
SFP02_OC2_OPEND
OPENED STATUS
SFP02_OC2_REMOT
LOCAL/REMOTE STATUS
SFP02_OC2_CLOSE
CLOSE COMMAND
SFP02_OC2_OPENN
OPEN COMMAND
NOTE 2
NOTE 2
SLT00_PSH
80-SLU-SS2
100-SLU-SS2
80-SLU-SS2
80-SLU-SS2
100-SLU-SS2
250x150
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
THICKENED SLUDGE HOLDING
TANK & CENTRIFUGE FEED PUMPS
SHEET NUMBER
DI607
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: PIPING LOCATED INSIDE TANKS TO BE 316L SS SCH40s
CHUTE
CONNECTION
DI614
DI603
VEVT
MTESE
CENTRIFUGE
CEN01
VEVT MTESE
M
M
DI607
DI614
DI607
DI609
MSE TE
250-CEN-SS1
150-SLU-SS2
150-SLU-SS2
65-UW-PVC80
DI609
CHUTE
CONNECTION
200-DS-SS
CEN01_VT1
CEN01_CO3
CEN01_FT1
CEN02_FT1
CEN02_VT1
CEN02_FT1_FAULT
TRANSMITTER FAULT
FLOW INDICATION
CEN02_FT1_STAAI
TO SLUDGE
CAKE
CONVEYOR
SCC02
TO BACKWASH
WASTE
EQUALIZATION
BASINS
TO SLUDGE
CAKE
CONVEYOR
SCC01
UTILITY WATER
FROM POLYMER
FEED SYSTEM
FROM CENTRIFUGE
FEED PUMP SFP01
FROM POLYMER
FEED SYSTEM
FROM CENTRIFUGE
FEED PUMP SFP03
M
FI
FI
PI
CEN01_AT1
200-DS-SS
M
FI
PI
MSE TE
CIP
FLUSHING
CIPFLUSHING
65x2565x25
65x25 65x25
65
x5
0
65
x5
0
65-POL-PVC
CEN02_AT1
NOTE 2
NOTE 2
NOTES:
1. ALL TAGS TO BE PREFIXED BY "EAW_".
2. THREE (3) POLYMER INJECTION LOCATIONS TO BE POSITIONED:
- AT CENTRIFUGE INLET
- 2m UPSTREAM OF INLET
- 10m UPSTREAM OF INLET
3. DENOTES DEVICE SUPPLIED BY CENTRIFUGE VENDOR. OTHER
DEVICES SUPPLIED BY CONTRACTOR
CEN02_CO1 CEN02_CO2
65-POL-PVC80
65-POL-PVC80
SS
CEN01_CO1 CEN01_CO2
GATE
FLUSH
GATE
FLUSH
SS
CEN02_OC1
CEN01_OC1
CEN02_AT1_FAULT
TRANSMITTER FAULT
TSS INDICATION
CEN02_AT1_STAAI
TRANSMITTER FAULT
CEN01_FT1_FAULT
FLOW INDICATION
CEN01_FT1_STAAI
TRANSMITTER FAULT
CEN01_AT1_FAULT
TSS INDICATION
CEN01_AT1_STAAI
CEN02
VENDOR
CONTROL PANEL
SCP22
CEN01
VENDOR
CONTROL PANEL
SCP21
CEN01_BDV
VS
250-C
EN
-S
S1
CEN02_CO3
CEN02_BDN
VS
VS
VS
CEN02_MDV
250-C
EN
-S
S1
CENTRIFUGE
CEN02
CEN01_MDV
65x5065x50
65x5065x50
FC
FC
FI
100x65
100x65
M M
M M
65-UW-PVC80
CEN02_LCP_DISBL
SLUDGE CONVEYANCE PATH
READY
FEED PUMP START
PERMISSIVE
CEN02_LCP_LKOUT
CEN01_LCP_DISBL
SLUDGE CONVEYANCE PATH
READY
FEED PUMP START
PERMISSIVE
CEN01_LCP_LKOUT
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
CENTRIFUGES
SHEET NUMBER
DI608
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
M
SCREW CONVEYOR
SCC01
CONVEYOR EXTENSION
FOR FUTURE CENTRIFUGE
MS
M
SCREW CONVEYOR
SCC02
MS
M
MS
SCC05_MS1
SCREW CONVEYOR
SCC03
M
MS
SCC04_MS1
OPEN BOTTOM
SCREW CONVEYOR
SCC04
OPEN BOTTOM
SCREW CONVEYOR
SCC05
MM
MM
SLUDGE TRAILER #1 SLUDGE TRAILER #2
SCC02_MS1SCC01_MS1
CONVEYOR EXTENSION
FOR FUTURE CENTRIFUGE
DI608
DI608
DI616
FROM CENTRIFUGE
CEN02
FROM CENTRIFUGE
CEN01
UTLITY WATERS
S
TELESCOPIC CHUTETELESCOPIC CHUTE
HOIST WINCH
CRN02
HOIST WINCH
CRN01
M
DI603
DRAIN TO BW
EQ BASIN
MS
SCC02
LOCAL CONTROL
PANEL
LCP36
SCC02_SV1
SCC01_SV1
SCC01
LOCAL CONTROL
PANEL
LCP35
FAULT STATUS
RUNNING STATUS
LOCAL / REMOTE STATUS
START / STOP COMMAND
SCC01_000_FAULT
SCC01_000_RUNNG
SCC01_000_REMOT
SCC01_000_START
READY STATUS
SCC01_000_READY
MOTION STATUS
SCC01_MS1_STADI
CLOSED STATUS
SCC01_SV1_CLOSD
OPENED STATUS
SCC01_SV1_OPEND
SCC03
LOCAL CONTROL
PANEL
LCP37
OPENED STATUS
CLOSE COMMAND
SCC03_OC1_OPENN
SCC03_OC1_CLOSE
SCC03_OC1_REMOT
SCC03_OC1_OPEND
SCC03_OC1_CLOSD
SCC03_OC1_FAULT
LOCAL / REMOTE STATUS
OPEN COMMAND
CLOSED STATUS
FAULT STATUS
FAULT STATUS
RUNNING STATUS
LOCAL / REMOTE STATUS
START / STOP COMMAND
SCC03_000_FAULT
SCC03_000_RUNNG
SCC03_000_REMOT
SCC03_000_START
READY STATUS
SCC03_000_READY
MOTION STATUS
SCC03_MSI_STADI
OPENED STATUS
CLOSE COMMAND
SCC03_OC2_OPENN
SCC03_OC2_CLOSE
SCC03_OC2_REMOT
SCC03_OC2_OPEND
SCC03_OC2_CLOSD
SCC03_OC2_FAULT
LOCAL / REMOTE STATUS
OPEN COMMAND
CLOSED STATUS
FAULT STATUS
SCC03_OC2SCC03_OC1
CS
CS CS
SCC03_MS1
SCC04
LOCAL CONTROL
PANEL
LCP38
MOTION STATUS
SCC04_MSI_STADI
FAULT STATUS
RUNNING STATUS
LOCAL / REMOTE STATUS
START / STOP COMMAND
SCC04_000_FAULT
SCC04_000_RUNNG
SCC04_000_REMOT
SCC04_000_START
READY STATUS
SCC04_000_READY
CS CS
UP
SLOW
UP
FAST
DOWN
SLOW
DOWN
FAST
UP
SLOW
UP
FAST
DOWN
SLOW
DOWN
FAST
CRN01
LOCAL CONTROL
PENDANT
FAULT STATUS
RUNNING STATUS
LOCAL / REMOTE STATUS
START / STOP COMMAND
SCC02_000_FAULT
SCC02_000_RUNNG
SCC02_000_REMOT
SCC02_000_START
READY STATUS
SCC02_000_READY
MOTION STATUS
SCC02_MS1_STADI
CLOSED STATUS
SCC02_SV1_CLOSD
OPENED STATUS
SCC02_SV1_OPEND
DE
VIC
EN
ET
SCC05
LOCAL CONTROL
PANEL
LCP39
FAULT STATUS
RUNNING STATUS
LOCAL / REMOTE STATUS
START / STOP COMMAND
SCC05_000_FAULT
SCC05_000_RUNNG
SCC05_000_REMOT
SCC05_000_START
READY STATUS
SCC05_000_READY
MOTION STATUS
SCC05_MS1_STADI
DE
VIC
EN
ET
G
Y
R
CRN02
LOCAL CONTROL
PENDANT
TRAFFIC
LIGHT
DE
VIC
EN
ET
DE
VIC
EN
ET
DE
VIC
EN
ET
MOTOR CURRENT
SCC03_000_STAAI
MOTOR CURRENT
SCC01_000_STAAI
MOTOR CURRENT
SCC02_000_STAAI
FORWARD COMMAND
SCC03_000_STARF
MOTOR CURRENT
SCC05_000_STAAI
MOTOR CURRENT
SCC04_000_STAAI
EMERGENCY STOP
SCC01_000_ESTOP
EMERGENCY STOP
SCC03_000_ESTOP
EMERGENCY STOP
SCC02_000_ESTOP
SCC03
LOCAL CONTROL
PANEL
LCP37
NOTE 2
SCC03
LOCAL CONTROL
PANEL
LCP37
NOTE 2
EMERGENCY STOP
SCC04_000_ESTOP
EMERGENCY STOP
SCC05_000_ESTOP
VENDOR
CONTROL PANEL
SCP29
FORWARD
BACKWARD
STOP
E E E E E E EE
RRRRRRRR
E E E E E E EE
RRRRRRRR
E E
R R
E E
R R
G
Y
R
TRAFFIC
LIGHT
FORWARD
BACKWARD
STOP
RRECEIVER
PHOTOELECTRIC SENSOR LEGEND
EEMITTER
FLOOR
FLOOR
50-UW-PVC80
80-PD-PVC
FLOOR FLOOR
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
DEWATERED SLUDGE
CONVEYOR SYSTEM
SHEET NUMBER
DI609
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: GATES SCC03_OC1 & SCC03_OC2 RELAY
TO SCC03 LCP
HIGH LEVEL ALARM
POP10_LSH_ALMDI
DI616
TEMPERED WATER
M
DI612
TO THICKENER
POLYMER
FEED SYSTEM
S
M
M
S
S
S
PI PSH
LIQUID POLYMER
TOTE
PDT11
WETTING
CHAMBER
POLYMER FEEDER
VACUUM
LOADER
RUN
DRY
M
40-UW-SS
25-POL-PVC
LSH
TO BWW EQ
BASIN
LSL
VENDOR
CONTROL PANEL
SCP27
FC
PDT11_WT1
PPP11_PI1 PPP11_PSH
ASL
VS
VS
CS
VAP11
PFR11
PPP12
PFR11_LSL
PPS10_SV1
PD
T1
2_
MX
1
PPS10_SV2
PPS10_SV3
PD
T1
2_
LT
1
PDT12_SV1
PDT13_LT1
AGING TANK
PDT12
FEED TANK
PDT13
25-POL-PVC
PPP11
PDT12_LSL
PDT12_LSH
PDT13_LSL
PDT13_LSH
RECIRCULATION
PPP11_SV1
HIGH LEVEL ALARM
PDT11_LSH_ALMDI
LSH
PDT11_LSH
TOTE SCALE
POP10_LSH
TO BWW EQ
BASIN
POLYMER PREPARATION
SYSTEM VENDOR
PACKAGE
NO
TE
2
S
PPP11_SV2
DI613
FROM FEED PUMP
PRESSURE RELIEF
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
THICKENER POLYMER
PREPARATION SYSTEM
SHEET NUMBER
DI610
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: POLYMER ACTIVATION MONITOR
LSL
LSH
M M
S
S
S
S
DI614
TO CENTRIFUGES
POLYMER FEED
SYSTEM
TEMPERED WATER
M
S
S
PI PSH
WETTING
CHAMBER
POLYMER FEEDER
RUN
DRY
M
LSL
50-POL-PVC
65-POL-PVC
VENDOR
CONTROL PANEL
SCP28
PDT21_WT1
FC
VSPPP21
VSPPP22
CS
PD
T2
2_
MX
1
CS
PD
T2
3_
MX
1
PPP21_PI1
PFR21_LSL
LIQUID POLYMER
TOTE
PDT21
PPP21_PSH
PDT23_SV3
PDT23_SV2PDT22_SV2
PDT22_SV3
PPS20_SV2
PPS20_SV1
ASL
BATCH TANK #1
PDT22
BATCH TANK #2
PDT23
PFR21
PDT23_LSL
PDT23_LSH
PD
T2
3_
LT
1
PDT22_LSH
PDT22_LSL
PD
T2
2_
LT
1
PDT22_SV1
25-POL-PVC
15-POL-PVC
HIGH LEVEL ALARM
POP20_LSH_ALMDI
LSH
TO BWW EQ
BASIN
RECIRCULATION
PPP21_SV1
TOTE SCALE
FROM UTILITY WATER
BOOSTER PUMP /
HEATERS
50-UW-SS
POP20_LSH
DI616
NO
TE
2
NO
TE
2
DI614
FROM FEED PUMP
PRESSURE RELIEF
S
PPP21_SV2
POLYMER PREPARATION
SYSTEM VENDOR
PACKAGE
PDT23_SV1
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
DEWATERING POLYMER
PREPARATION SYSTEM
SHEET NUMBER
DI611
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: POLYMER ACTIVATION MONITOR
DI610
DI616 DI613
FROM POLYMER
PREPARATION SYSTEM
FEED TANK
UTILITY WATER
CONNECTION TO
FUTURE POLYMER
DOSING PUMPS
UTILITY WATER
DI61325-POL-PVC
50-UW-PVC
TO SLUDGE
THICKENERS
POLYMER FEED
PUMPS
50x15
HIGH LEVEL ALARM
POP11_LSH_ALMDI
LSH
TO BWW EQ
BASIN
POP11_LSH
DI605
DI605
FE
FIT
FE
FIT
SPEED FEEDBACK
SPEED SETPOINT
FAULT STATUS
RUNNING STATUS
LOCAL/REMOTE STATUS
POP11_000_START
START/STOP COMMAND
POP11_000_REMOT
POP11_000_RUNNG
POP11_000_FAULT
POP11_000_SETPT
POP11_000_FEDBK
SPEED FEEDBACK
SPEED SETPOINT
FAULT STATUS
RUNNING STATUS
LOCAL/REMOTE STATUS
POP13_000_START
START/STOP COMMAND
POP13_000_REMOT
POP13_000_RUNNG
POP13_000_FAULT
POP13_000_SETPT
POP13_000_FEDBK
SPEED FEEDBACK
SPEED SETPOINT
FAULT STATUS
RUNNING STATUS
LOCAL/REMOTE STATUS
POP12_000_START
START/STOP COMMAND
POP12_000_REMOT
POP12_000_RUNNG
POP12_000_FAULT
POP12_000_SETPT
POP12_000_FEDBK
POP10_IC1_FAULT
FAULT STATUS
LOCAL/REMOTE STATUS
POSITION FEEDBACK
POSITION SETPOINT
POP10_IC1_REMOT
POP10_IC1_FEDBK
POP10_IC1_SETPT
POP10_IC2_FAULT
FAULT STATUS
LOCAL/REMOTE STATUS
POSITION FEEDBACK
POSITION SETPOINT
POP10_IC2_REMOT
POP10_IC2_FEDBK
POP10_IC2_SETPT
HIGH PRESSURE ALARM
POP11_PSH_ALMDI
HIGH PRESSURE ALARM
POP12_PSH_ALMDI
POP11_PI1
POP11_PSH
POP13_PSH
POP13_PI1
POP12_PSH
POP12_PI1
POP10_FT4_FAULT
TRANSMITTER FAULT
FLOW INDICATION
POP10_FT4_STAAI
POP10_FT2_FAULT
TRANSMITTER FAULT
POP10_FT2
POP10_FT4
POP10_IC1
POP10_IC2
POLYMER DOSING
PUMP POP12
POLYMER DOSING
PUMP POP13
POLYMER DOSING
PUMP POP11
RUN
DRY
M
PI PSH
FIT
RUN
DRY
M
PI PSH
FE
FIT
RUN
DRY
M
PI PSH
POP10_FT1
POP13_SV1
ASL
ASL
ASL
VS
VS
VS
TRANSMITTER FAULT
POP10_FT1_FAULT
HIGH PRESSURE ALARM
POP13_PSH_ALMDI
TRANSMITTER FAULT
POP10_FT3_FAULT
FLOW INDICATION
POP10_FT3_STAAI
15-POL-PVC
15-POL-PVC
TO BACKWASH
WASTE THICKENER
CLF01
TO BACKWASH
WASTE THICKENER
CLF02
LOCAL
CONTROL
PANEL
LCP32
LOCAL
CONTROL
PANEL
LCP32
LOCAL
CONTROL
PANEL
LCP32
NOTE 2
NOTE 2
NOTE 2
M
M
NOTE 3
NOTE 3
S
S
S
S
CONNECTION FOR
FUTURE PUMPS
15-U
W-P
VC
25-POL-PVC
25-POL-PVC
25-POL-PVC
15-POL-PVC
15-POL-PVC
15-POL-PVC
POP11_SV1
POP10_SV1
POP10_SV2
POP10_FT3
FE
OPEN COMMAND
POP13_SV1_OPENN
OPEN COMMAND
POP10_SV2_OPENN
M
M
M
M
POLYMER FEED SYSTEM
VENDOR PACKAGE
DI610
TO STORAGE TANK
FLOW INDICATION
POP10_FT2_STAAI
FLOW INDICATION
POP10_FT1_STAAI
OPEN COMMAND
POP10_SV1_OPENN
OPEN COMMAND
POP11_SV1_OPENN
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
BACKWASH WASTE THICKENING
POLYMER FEED SYSTEM
SHEET NUMBER
DI612
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP
NOTE 3: V-NOTCH BALL VALVES
DI612
DI616 DI614
FROM POLYMER
PREPARATION SYSTEM
UTILITY WATER
CONNECTION TO
FUTURE POLYMER
DOSING PUMPS
UTILITY WATER
25-POL-PVC
50-UW-PVC
DI606
DI606
20-POL-PVC
M
FE
FIT
FE
FIT
SPEED FEEDBACK
SPEED SETPOINT
FAULT STATUS
RUNNING STATUS
LOCAL/REMOTE STATUS
POP15_000_START
START/STOP COMMAND
POP15_000_REMOT
POP15_000_RUNNG
POP15_000_FAULT
POP15_000_SETPT
POP15_000_FEDBK
SPEED FEEDBACK
SPEED SETPOINT
FAULT STATUS
RUNNING STATUS
LOCAL/REMOTE STATUS
POP14_000_START
START/STOP COMMAND
POP14_000_REMOT
POP14_000_RUNNG
POP14_000_FAULT
POP14_000_SETPT
POP14_000_FEDBK
SPEED FEEDBACK
SPEED SETPOINT
FAULT STATUS
RUNNING STATUS
LOCAL/REMOTE STATUS
POP16_000_START
START/STOP COMMAND
POP16_000_REMOT
POP16_000_RUNNG
POP16_000_FAULT
POP16_000_SETPT
POP16_000_FEDBK
POP10_IC3_FAULT
FAULT STATUS
LOCAL/REMOTE STATUS
POSITION FEEDBACK
POSITION SETPOINT
POP10_IC3_REMOT
POP10_IC3_FEDBK
POP10_IC3_SETPT
POP10_IC4_FAULT
FAULT STATUS
LOCAL/REMOTE STATUS
POSITION FEEDBACK
POSITION SETPOINT
POP10_IC4_REMOT
POP10_IC4_FEDBK
POP10_IC4_SETPT
POP10_FT6_FAULT
TRANSMITTER FAULT
FLOW INDICATION
POP10_FT6_STAAI
POP10_FT8_FAULT
TRANSMITTER FAULT
FLOW INDICATION
POP10_FT8_STAAI
POP10_FT6
POP10_FT8
POP10_IC3
POP10_IC4
POLYMER DOSING
PUMP POP16
POLYMER DOSING
PUMP POP14
POLYMER DOSING
PUMP POP15
TO SEDIMENTATION
SLUDGE THICKENER
CLF03
TO SEDIMENTATION
SLUDGE THICKENER
CLF04
POP15_PSH
RUN
DRY
MM
FE
FIT
PI PSH
POP14_PI1
POP14_PSH
POP16_PI1
POP16_PSH
RUN
DRY
MM
FE
FIT
PI PSH
RUN
DRY
M
POP15_PI1
PI PSH
TRANSMITTER FAULT
POP10_FT5_FAULT
FLOW INDICATION
POP10_FT5_STAAI
TRANSMITTER FAULT
POP10_FT7_FAULT
FLOW INDICATION
POP10_FT7_STAAI
ASL
ASL
ASL
VS
VS
VS
POP10_FT5
POP16_SV1
20-POL-PVC
LOCAL
CONTROL
PANEL
LCP33
LOCAL
CONTROL
PANEL
LCP33
LOCAL
CONTROL
PANEL
LCP33
NOTE 2
NOTE 2
NOTE 2
HIGH PRESSURE ALARM
POP15_PSH_ALMDI
M
25-POL-PVC
25-POL-PVC
25-POL-PVC
15-POL-PVC
15-POL-PVC
15-POL-PVC
S
S
S
S
NOTE 3
NOTE 3
15x20
15x20
15-U
W-P
VC
POP10_SV4
POP10_FT7
POP14_SV1
POP10_SV3
HIGH PRESSURE ALARM
POP14_PSH_ALMDI
HIGH PRESSURE ALARM
POP16_PSH_ALMDI
OPEN COMMAND
POP16_SV1_OPENN
OPEN COMMAND
POP10_SV4_OPENN
OPEN COMMAND
POP14_SV1_OPENN
OPEN COMMAND
POP10_SV3_OPENN
M
M
DI610
TO FEED TANK
POLYMER FEED SYSTEM
VENDOR PACKAGE
15-POL-PVC
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
SED. SLUDGE THICKENING
POLYMER FEED SYSTEM
SHEET NUMBER
DI613
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP
NOTE 3: V-NOTCH BALL VALVES
DI611
DI61650-UW-PVC
PREPARATION SYSTEM
UTILITY WATER
CONNECTION TO
FUTURE POLYMER
DOSING PUMPS
65-POL-PVC
DI608
DI60865-POL-PVC
65-POL-PVC
FE
FIT
FE
FAULT STATUS
LOCAL/REMOTE STATUS
POP21_000_START
POP21_000_REMOT
POP21_000_RUNNG
POP21_000_FAULT
POP21_000_SETPT
POP21_000_FEDBK
RUNNING STATUS
START/STOP COMMAND
SPEED SETPOINT
SPEED FEEDBACK
FAULT STATUS
LOCAL/REMOTE STATUS
POP22_000_START
POP22_000_REMOT
POP22_000_RUNNG
POP22_000_FAULT
POP22_000_SETPT
POP22_000_FEDBK
RUNNING STATUS
START/STOP COMMAND
SPEED SETPOINT
SPEED FEEDBACK
FAULT STATUS
LOCAL/REMOTE STATUS
POP23_000_START
POP23_000_REMOT
POP23_000_RUNNG
POP23_000_FAULT
POP23_000_SETPT
POP23_000_FEDBK
RUNNING STATUS
START/STOP COMMAND
SPEED SETPOINT
SPEED FEEDBACK
POP23_PSH_ALMDI
HIGH PRESSURE ALARM
POP20_FT2_FAULT
TRANSMITTER FAULT
POP20_FT2_STAAI
FLOW INDICATION
POP20_FT4_FAULT
TRANSMITTER FAULT
POP20_FT4_STAAI
FLOW INDICATION
FIT
POP20_IC1_FAULT
FAULT STATUS
POP20_IC1_CLOSD
CLOSED STATUS
POP20_IC1_OPEND
OPENED STATUS
POP20_IC1_REMOT
LOCAL/REMOTE STATUS
POP20_IC1_FEDBK
POSITION FEEDBACK
POP20_IC1_SETPT
POSITION SETPOINT
POP20_IC2_FAULT
FAULT STATUS
POP20_IC2_CLOSD
CLOSED STATUS
POP20_IC2_OPEND
OPENED STATUS
POP20_IC2_REMOT
LOCAL/REMOTE STATUS
POP20_IC2_FEDBK
POSITION FEEDBACK
POP20_IC2_SETPT
POSITION SETPOINT
TO CENTRIFUGE CEN01
TO CENTRIFUGE CEN02
POLYMER DOSING
PUMP POP23
RUN
DRY
MM
PI PSH
POP23_PSH
RUN
DRY
MM
FE
FIT
PI PSH
POLYMER DOSING
PUMP POP21
POP21_PSH
RUN
DRY
M
PI PSH
POLYMER DOSING
PUMP POP22
POP22_PSH
TRANSMITTER FAULT
POP20_FT1_FAULT
FLOW INDICATION
POP20_FT1_STAAI
TRANSMITTER FAULT
POP20_FT3_FAULT
FLOW INDICATION
POP20_FT3_STAAI
POP22_PSH_ALMDI
HIGH PRESSURE ALARM
POP20_FT1
ASL
VS
ASL
VS
ASL
VS
POP21_SV1
POP20_FT3
POP20_FT2
POP20_IC1
POP21_PI1
POP22_PI1
POP23_PI1
POP20_IC2
POP20_FT4
LOCAL
CONTROL
PANEL
LCP34
LOCAL
CONTROL
PANEL
LCP34
LOCAL
CONTROL
PANEL
LCP34
NOTE 2
NOTE 2
NOTE 2
M
M
POP21_PSH_ALMDI
HIGH PRESSURE ALARM
65x40
65-U
W-P
VC
65x40
65x40
40-POL-PVC
40-POL-PVC
40-POL-PVC
S
S
S
S
32x65
32x65
32-POL-PVC
32-POL-PVC
NOTE 3
NOTE 3
POP23_SV1
POP20_SV2
POP20_SV1
M
M
OPEN COMMAND
POP23_SV1_OPENN
OPEN COMMAND
POP20_SV2_OPENN
OPEN COMMAND
POP20_SV1_OPENN
POP21_SV1_OPENN
FE
FIT
OPEN COMMAND
DI611
TO BATCH TANK
POLYMER FEED SYSTEM
VENDOR PACKAGE
32-POL-PVC
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
DEWATERING
POLYMER FEED SYSTEM
SHEET NUMBER
DI614
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP
NOTE 3: V-NOTCH BALL VALVES
VS
M
VS
M
15-STS-CPVC
10-STS-CPVC
VS
M
PI
PSH
PI
PSH
PI
PSH
10-STS-CPVC
DI603
DI603
SPEED FEEDBACK
SPEED SETPOINT
FAULT STATUS
RUNNING STATUS
LOCAL/REMOVE STATUS
TSP01_000_START
START/STOP COMMAND
TSP01_000_REMOT
TSP01_000_RUNNG
TSP01_000_FAULT
TSP01_000_SETPT
TSP01_000_FEDBK
SPEED FEEDBACK
SPEED SETPOINT
FAULT STATUS
RUNNING STATUS
LOCAL/REMOVE STATUS
TSP02_000_START
START/STOP COMMAND
TSP02_000_REMOT
TSP02_000_RUNNG
TSP02_000_FAULT
TSP02_000_SETPT
TSP02_000_FEDBK
SPEED FEEDBACK
SPEED SETPOINT
FAULT STATUS
RUNNING STATUS
LOCAL/REMOVE STATUS
TSP03_000_START
START/STOP COMMAND
TSP03_000_REMOT
TSP03_000_RUNNG
TSP03_000_FAULT
TSP03_000_SETPT
TSP03_000_FEDBK
HIGH PRESSURE ALARM
TSP01_PSH_ALMDI
HIGH PRESSURE ALARM
TSP03_PSH_ALMDI
HIGH PRESSURE ALARM
TSP02_PSH_ALMDI
TSP03_PI1
TSP03_PSH
TSP02_PI1
TSP02_PSH
TSP01_PI1
TSP01_PSH
SODIUM
THIOSULPHATE
SOLUTION
TST01
DOSING PUMP
TSP03
DOSING PUMP
TSP02
DOSING PUMP
TSP01
CONTAINMENT
TO BACKWASH
WASTE EQ BASIN
TO BACKWASH
WASTE EQ BASIN
BWT02
BWT01
TST01_WT1_FAULT
TRANSMITTER FAULT
TST01_WT1_STAAI
WEIGHT INDICATION
TST01_WT1
LOCAL
CONTROL
PANEL
LCP40
NOTE 2
LOCAL
CONTROL
PANEL
LCP40
NOTE 2
LOCAL
CONTROL
PANEL
LCP40
15x10
15x10
15x10
DI603
TO BACKWASH
WASTE EQ BASIN
OVERFLOW
NOTE 2
DECHLORINATION
SYSTEM VENDOR
PACKAGE
TO
SEDIMENTATION
SLUDGE TANK
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
RMF DISCHARGE
DECHLORINIZATION SYSTEM.
SHEET NUMBER
DI615
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: THREE PUMPS ON ONE SKID SHARE ONE LCP
FROM POTABLE
WATER SERVICE
M
150x32
150x100
150x80
TO BUILDING
SERVICES
SEE MECH
DRAWINGS
TO HOSE STATIONS
(LOWER LEVEL)
DI607
TO CENTRIFUGE
FEED PUMPS
DI609
TO CONVEYORS
BOOSTER PUMP
BSP01
VS
M
LCP41
PE PI
PIT
PUMP ENABLE/DISABLE
BSP01_VFD_DISBL
PRESSURE INDICATION
BSP01_VFD_STAAI
PRESSURE SETPOINT
BSP01_VFD_SETPT
GENERAL ALARM
BSP01_VFD_ALMDI
RUNNING STATUS
BSP01_VFD_RUNNG
LOCAL/REMOTE STATUS
BSP01_VFD_REMOT
BSP01_PT1
TRANSMITTER FAULT
UWH01_FT1_FAULT
FLOW INDICATION
UWH01_FT1_STAAI
UWH01_FT1
150-U
W-S
S
150-WP-PVC 150-WP-SS 150-WP-SS
DI608
TO
CENTRIFUGES
100x50
IN-PLANT PIPEYARD PIPE
DI612
TO POLYMER
FEED
80x50
50-UW-SS1
100-UW-SS1
80-UW-SS1
32-WP-CU
PWH01 PWH02 PWH03
TI
TE
TI
TEMPERATURE
CONTROLLER
80-UW-SS
DI611
TO DEWATERING
POLYMER
PREPARATION
DI610
TO THICKENING
POLYMER
PREPARATION
80x40
80x50
40-UW-SS
50-UW-SS
80x32
80x32
50-UW-SS1
100-UW-SS1
ON DEMAND WATER
HEATERS
BSP01_TE1
BSP01_CNV
BOOSTER PUMP
VENDOR PACKAGE
NOTE:
FOR ON DEMAND TANKLESS
WATER HEATERS REFER TO
DRAWING M610 FOR GAS AND
CONNECTION DETAILS
SEE MECHANICAL DRAWINGS
FOR CONTINUATION
100x80100x32
32-UW-PCV80
TO MAIN FLOOR
HOSE STATIONS
AND SAMPLE SINKS
80x32
32-UW-PVC80
150x80
NC NC
RTU1 SAC GENERAL ALARM
BLD06_CP1_ALMDI
RTU2 SAC GENERAL ALARM
BLD06_CP2_ALMDI
RTU3 SAC GENERAL ALARM
BLD06_CP3_ALMDI
PUMP GALLERY SAC
GENERAL ALARM
BLD06_CP4_ALMDI
SLUDGE THICKENER SAC
GENERAL ALARM
BLD06_CP5_ALMDI
TRUCK BAY SAC GENERAL
ALARM
BLD06_CP6_ALMDI
DECHLORINATION ROOM
SAC GENERAL ALARM
BLD06_CP7_ALMDI
CENTRIFUGE ROOM SAC
GENERAL ALARM
BLD06_CP8_ALMDI
SECURITY SYSTEM ARMED
ALP06_000_STADI
SECURITY SYSTEM
PROCESS ROOM ALARM
ALP06_604_ALMDI
SECURITY SYSTEM
ELECTRICAL ROOM ALARM
ALP06_607_ALMDI
SECURITY SYSTEM
CHEMICAL ROOM ALARM
ALP06_605_ALMDI
SECURITY SYSTEM
CENTRIFUGE ROOM ALARM
ALP06_617_ALMDI
SECURITY SYSTEM
CONTROL ROOM ALARM
ALP06_608_ALMDI
BUILDING HVAC ALARMS
SECURITY SYSTEM
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
RMF PLANT UTILITY WATER
AND MISCELLANEOUS
SHEET NUMBER
DI616
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: HYDRAULIC CYLINDERS AND COMPONENTS SHOWN
FOR SCHEMATIC PURPOSES ONLY. SCHEMATIC DOES NOT
REFLECT ACTUAL PHYSICAL LOCATION WITH RESPECT TO
TANKS/SCRAPERS.
NOTE 3: ALL INSTRUMENTS AND EQUIPMENT SHOWN WITH ARE
SUPPLED BY CONTRACTOR AND WILL BE
MONITORED/CONTROLLED BY THE VENDOR'S SLUDGE
SCRAPER PLC #1.
FROM EX
FLOCCULATION
TANK No 1
PSHPI
M
SEDIMENTATION SLUDGE
TRANSFER PUMP
RSP11
VS
I
150x250250x150
PSHPI
M
SEDIMENTATION SLUDGE
TRANSFER PUMP
RSP12
VS
I
150x250250x150
M
M
M
RSP10_FT1
SS
M
200-C
S-S
S
200-C
S-S
S2
300-SD-DI
TO PLANT DRAIN
HYDRAULIC POWER
UNIT No. 3
HPU30
HPU30_LSL
HPU30_TSH
M
HSHS
LORSS
50-C
S-S
S2
S
SED11_SV1
HYDRAULIC POWER
UNIT No. 1
HPU10
HPU10_LSL
HPU10_TSH
M
HSHS
LORSS
S
SED12_SV1
S
SED13_SV1
HYDRAULIC POWER
UNIT No 2 HPU20
DI618
DI618
SLC11_SV1
HYDRAULIC POWER
UNIT No 4 HPU40
DI618
DI618
S
SLC13_SV1
S
EX SEDIMENTATION BASIN No 1
SECTION 1
SED11
EX SEDIMENTATION BASIN No 1
SECTION 2
SED12
EX SEDIMENTATION BASIN No 1
SECTION 3
SED13
MAIN COLLECTOR No 1
MAIN COLLECTOR No 2
MAIN COLLECTOR No 3
DI618
TO SEDIMENTATION
SLUDGE TANKS
TO EX FILTERS
CR
OS
S C
OLLE
CT
OR
#2
CR
OS
S C
OLLE
CT
OR
#1
SED11_LT1
UTILITY WATER
CONTAINMENT
CONTAINMENT
(NOTE 2)
(NOTE 2)
(NOTE 2)
(NOTE 2)
(NOTE 2)
250x50
M
M
RSP11_PSH
RSP11_IC1
RSP11_SV1
RSP10_IC1
RSP12_SV1
RSP12_IC1
RSP12_PSH
RSP10_AT1
RSP10_OC1
Ø300
Ø300
NOTE:
DENOTES DEVICES TO BE SUPPLIED BY GENERAL
CONTRACTOR. CONTROLS ARE WIRED AND IMPLEMENTED
BY THE VENDOR PLC SCP30
RSP10_OC2
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
SEDIMENTATION BASIN No1
SLUDGE SCRAPER SYSTEM
SHEET NUMBER
DI617
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
SLC21_SV1
FROM EX
FLOCCULATION
TANK No 1
PSHPI
M
SEDIMENTATION SLUDGE
TRANSFER PUMP
RSP21
VS
I
150x250250x150
PSHPI
M
SEDIMENTATION SLUDGE
TRANSFER PUMP
RSP22
VS
I
150x250250x150
M
M
M
SS
M
200-C
S-S
S
200-C
S-S
S2
300-SD-DI
TO PLANT DRAIN
HYDRAULIC POWER
UNIT No. 4
HPU40
HPU40_LSL
HPU40_TSH
M
HSHS
LORSS
50-C
S-S
S2
S
SED21_SV1
HYDRAULIC POWER
UNIT No. 2
HPU20
HPU20_LSL
HPU20_TSH
M
HSHS
LORSS
S
S
HYDRAULIC POWER
UNIT No 1 HPU10
DI617
DI617
SED21_SV1
HYDRAULIC POWER
UNIT No 3 HPU30
DI617
DI617
S
S
EX SEDIMENTATION BASIN No 2
SECTION 1
SED21
EX SEDIMENTATION BASIN
No 2 SECTION 2
SED22
EX SEDIMENTATION BASIN No 2
SECTION 3
SED23
MAIN COLLECTOR No 4
MAIN COLLECTOR No 5
MAIN COLLECTOR No 6
DI604
TO SEDIMENTATION
SLUDGE TANKS
DI617
SLUDGE TRANSFER
LINE
250-CS-SS2
TO EX FILTERS
SED21_LT1
CR
OS
S C
OLLE
CT
OR
#4
CR
OS
S C
OLLE
CT
OR
#3
SLC23_SV1
SED22_SV1
SED23_SV1
CONTAINMENT
UTILITY WATER
CONTAINMENT
(NOTE 2)
(NOTE 2)
(NOTE 2)
(NOTE 2)
(NOTE 2)
M
250x50
M
RSP20_FT1
RSP21_PSH
RSP21_IC1
RSP21_SV1
RSP20_IC1
RSP22_SV1
RSP22_IC1
RSP22_PSH
RSP20_AT1
RSP20_OC1
NOTE:
Ø300
Ø300
DENOTES DEVICES TO BE SUPPLIED BY GENERAL
CONTRACTOR. CONTROLS ARE WIRED AND IMPLEMENTED
BY THE VENDOR PLC SCP31
RSP20_OC2
250-CS-SS2
NOTES:
NOTE 1: ALL TAGS TO BE PREFIXED BY "EAW_".
NOTE 2: HYDRAULIC CYLINDERS AND COMPONENTS SHOWN
FOR SCHEMATIC PURPOSES ONLY. SCHEMATIC DOES NOT
REFLECT ACTUAL PHYSICAL LOCATION WITH RESPECT TO
TANKS/SCRAPERS.
NOTE 3: ALL INSTRUMENTS AND EQUIPMENT SHOWN WITH ARE
SUPPLED BY CONTRACTOR AND WILL BE
MONITORED/CONTROLLED BY THE VENDOR'S SLUDGE
SCRAPER PLC #1.
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
P & I D
SEDIMENTATION BASIN No2
SLUDGE SCRAPER SYSTEM
SHEET NUMBER
DI618
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
01
_6
19
_P
ID
- R
EV
0-IS
SU
E F
OR
T
EN
DE
R.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUE FOR TENDER
CHEMICAL AREA
RESIDUALS MANAGEMENT AREA
Wireless AP
(Floor 1)
Centrifuge No. 1
Vendor OIT
IP: XXX.XXX.XXX.XX
Backwash Waste
Thickener No. 2
Vendor PLC
IP: XXX.XXX.XXX.XX
Sedimentation Thickener No. 2
Vendor PLC
IP: XXX.XXX.XXX.XX
Polymer (Dewatering)
Vendor PLC
IP: XXX.XXX.XXX.XX
C/F
Existing Fibre Optic
Patch Panel
EAW-FPP-01
Existing Media
Converters
Existing Cisco
Catalyst 2960
Ethernet Switch
ELGIN AREA WATER TREATMENT PLANT
Wireless AP
(Floor 2)
Wireless AP
(Floor 3)
F
EAW_SWI20
EAW_SWI30
C/F
F
RPU02
Polymer (Thickener)
Vendor PLC
IP: XXX.XXX.XXX.XX
RPA RPFM RPFM
F
F
FF F F F F
FF
F
FF
F F F F F F
F F F F F
F F F F F F F F
Existing Cisco
Catalyst 2960
Ethernet Switch
FF
F
F F F F F F
CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNETCNETCNET
CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET
RPU01
RPA RPFM RPFM RPFM
CNET CNET
CNET CNET CNET CNET CNET CNET CNET CNET
CN
ET
CN
ET
CN
ET
CN
ET
CN
ET
CN
ET
CN
ET
CN
ET
CNET CNET CNET CNET CNET CNET CNET CNET
CNET CNET CNET CNET CNET CNET CNET CNET CNET CNET
CNET CNET CNET CNET CNET CNET CNET CNET
CN
ET
CN
ET
CN
ET
CN
ET
CN
ET
CN
ET
F
F
F
F
F
F F
F F
F
F
FF
F
FF
F F
F
F
F F F F F F F F
F F F F F F F
F F F F F F F
F F F F F F
F F F F F F
F F F F F F
F F F F F
F F F F F
F F F F
F F F F F F F
F F F F F F F
F F F F F F F
F F F F F F F F
F F F F F F F F
F F F F F F F F
F F F F F F F F F
F F F F F F F F F
F F F F F F F F F
F
F
F
F
FF
F
C/F
F
EXISTING PLC NETWORK
COMMUNICATION PANEL No. 2
Centrifuge No. 1
Vendor PLC
IP: XXX.XXX.XXX.XX
Centrifuge No. 2
Vendor PLC
IP: XXX.XXX.XXX.XX
RPA RPFM ACN15
Centrifuge No. 2
Vendor OIT
IP: XXX.XXX.XXX.XX
Sedimentation Basin No. 1
Sludge Scraper System
Vendor PLC
IP: XXX.XXX.XXX.XX
F
F F F F F F
FF
F
F F F F F F F F
F
EAW_CPU20
EAW_PLC20
EAW-FPP-20
Existing Fibre Optic
Patch Panel
EAW-FPP-02
EAW_NCP20
EAW_NCP30
EAW_UPS20
EAW_UPS30
To Existing Wireless
Switches
F
DNET
DNET
CNET
DNET
To New MCC
F
F F F F F F F F F F F F F F F F
FF
F
FF
F
FF
F
FF
F
FF
F
FF
F
FF
F
FF
F
FF
F
FF
F
FF
CNET
EAW_SCP20
EAW_PLC30
EAW_PLC21 EAW_PLC22
EAW_PLC24 EAW_PLC26
EAW_PLC27
EAW_PLC28
EAW_OIT21EAW_OIT22
EAW_SWI21EAW_SWI22
IP: XXX.XXX.XXX.XX
IP: XXX.XXX.XXX.XX
IP: XXX.XXX.XXX.XX
EAW_SCP21 EAW_SCP22
EAW_SCP26
EAW_SCP27
EAW_SCP30
EAW_WAP20 EAW_WAP21 EAW_WAP22
RMF Plant PLC
RMF
Comms
Panel
Control Room
Workstation
Sedimentation Thickener No. 1
Vendor PLC
IP: XXX.XXX.XXX.XX
EAW_PLC25
Backwash Waste
Thickener No. 1
Vendor PLC
IP: XXX.XXX.XXX.XX
EAW_PLC23
EAW_SCP24
Truck Unloading System
Vendor PLC
IP: XXX.XXX.XXX.XX
EAW_PLC29
EAW_SCP23 EAW_SCP25 EAW_SCP29
EAW_SCP28
IP: XXX.XXX.XXX.XX
Main UPS
DeviceNet
CNET CNET
CN
ET
CN
ET
CNET CNET
CN
ET
CN
ET
CN
ET
CN
ET
CN
ET
CN
ET
CNET CNET
RACK1
RACK2
RACK0
Centrifuge No. 1
Vendor OIT
IP: XXX.XXX.XXX.XX
EAW_OIT30
F
EAW_CPU_21
BA
CN
ET
TO STANDALONE
CONTROLLERS
IP: XXX.XXX.XXX.XX
Control Room
Workstation
BACNET
EAW_SWI31
Sedimentation Basin No. 1
Sludge Scraper System
Vendor PLC
IP: XXX.XXX.XXX.XX
EAW_PLC31
EAW_SCP31
Centrifuge No. 1
Vendor OIT
IP: XXX.XXX.XXX.XX
EAW_OIT31
EAW_SWI32
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUED FOR TENDER
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
GENERAL SCADA
Network Architecture
SHEET NUMBER
DI620
Pro
je
ct M
ana
ge
me
nt In
itials:
De
sign
er:
Che
cke
d:
App
ro
ved
:__
__
__
__
__
__
__
_
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
20
-F
62
9_
PID
.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
22
86
m
m
2997 mm
150 mm
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUED FOR TENDER
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
RMF
CONTROL PANEL
SHEET NUMBER
DI621
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
20
-F
62
9_
PID
.D
WG
+
+
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUED FOR TENDER
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
CONTROL PANEL SCP-20
POWER DISTRIBUTION
SHEET NUMBER
DI622
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
20
-F
62
9_
PID
.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUED FOR TENDER
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
CONTROL PANEL SCP-20
POWER DISTRIBUTION
(CONTINUED)
SHEET NUMBER
DI623
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
20
-F
62
9_
PID
.D
WG
NOTES:
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUED FOR TENDER
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
CONTROL PANEL
SCP-20
RACK LAYOUT
SHEET NUMBER
DI624
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
20
-F
62
9_
PID
.D
WG
NOTES:
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUED FOR TENDER
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
CONTROL PANEL
SCP-20
RACK LAYOUT (CONTINUED)
SHEET NUMBER
DI625
Pro
je
ct M
ana
ge
me
nt In
itials:
De
sign
er:
Che
cke
d:
App
ro
ved
:__
__
__
__
__
__
__
_
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
20
-F
62
9_
PID
.D
WG
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUED FOR TENDER
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
TYPICAL LOOP
DRAWING EXAMPLES
SHEET NUMBER
DI626
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
20
-F
62
9_
PID
.D
WG
BLACK BOX
XMT RCV
100 Mbps
Cisco Systems3 41 2 5 6 7 8 9 10 11 12 15 1613 14 17 18 19 20 21 22 23 24 27 2825 26 29 36 31 32 33 34 35 36 39 4037 38 41 42 43 44 45 46 47 48
1
2
3
4
5
6
7
8
9
10
FRONT VIEW (DOOR REMOVED)SIDE VIEW
TOP VIEW
627
65
3
610
70
5
653
508
ITEM # DESCRIPTION
1WALL-MOUNT SWING OUT RACK
2LOCKABLE FRONT TINTED WINDOW DOOR
324 PORT MANAGED SWITCH
4RACK SHELF
5MEDIA CONVERTER
6FIBER HOUSING PANEL
7FIBER ADAPTER PLATES
8CABLE MANAGEMENT RACK
9POWER DISTRIBUTION UNIT/BAR
10PUNCHDOWN COPPER PATCH PANEL
NOTES:
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUED FOR TENDER
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
GENERAL SCADA
Residual Management Area
Network Panel Layout (EAW_NCP20)
SHEET NUMBER
DI627
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
20
-F
62
9_
PID
.D
WG
ITEM # DESCRIPTION
1
NEMA 4X FIBERGLASS REINFORCED PLASTIC (FRP)
2MEDIA CONVERTER
36 PORT MANAGED SWITCH
424VDC REDUNDANCY MODULE
524VDC POWER SUPPY
6MAIN CIRCUIT BREAKER
7120 VAC CIRCUIT BREAKERS
824VDC CIRCUIT BREAKERS
9SURGE PROTECTOR
10UTILITY DUPLEX RECEPTACLE
NOTES:
WALL-MOUNT HINGED DOOR
11UPS SIMPLEX RECEPTACLE
12GROUNDING BAR
132" x 3" DEEP PANDUIT
14PANEL LIGHT
15TOWER UPS
16STANDARD TERMINALS
17DIN RAIL
BLACK BOX
XM
TR
CV
100 Mbps
Allen-Bradley
Stratix 5700
1
2
3
4
5
1
Express
Setup
2
1
DC-
Pwr A
DC+
DC-
Pwr B
DC+
Com
IN2
Ref
IN1
1
2
4 5
6
7
8
9
10
11
12
3
13
15
16
17
825
10
25
329
275
345
10
84
FRONT VIEW (DOOR REMOVED)SIDE VIEW
740
93
9
TOP VIEW
14
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUED FOR TENDER
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
GENERAL SCADA
Settling / Sedimentation (Chemical Area)
Network Panel Layout (EAW_NCP30)
SHEET NUMBER
DI628
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
20
-F
62
9_
PID
.D
WG
5A
CB02
5A
LIGHT
FLUORESCENT
TO GND BUS
120 VAC FROM EXISTING LP
SWITCH
DOOR
#12 AWG BLUE
#12 AWG WHITE
#12 AWG GREEN
#12 AWG RED
#12 AWG WHITE
UTILITY
BRK01 (15A)
BKR03 (5A)
BKR02 (5A)
CB01
24 VDC
SUPPLY
+
POWER
24 VDC
SUPPLY
+
POWER
+V IN 1
+V IN 2
+V OUT
REDUNDANCY
MODULE
#14 AWG WHITE
#14 AWG BLACK
#14 AWG BLACK
BKR07 (5A)
BKR08 (5A)
24VDCPS1
24VDCPS2
#12 AWG RED
#12 AWG WHITE
UPS
BKR04 (15A)
UPS
UNIT
BKR05 (5A)
SPARE
BKR06 (5A)
MEDIA CONVERTER
NETWORK SWITCH
SPARE
Printed on ___% Post-Consumer
Recycled Content Paper
IS
O A
1 59
4m
m x 8
41
mm
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
250 York Street, Suite 410
London, Ontario N6A 6K2
519.673.0510 tel 519.673.5975 fax
www.aecom.com
CLIENT
ELGIN AREA WATER
SUPPLY SYSTEM
235 North Centre Road, Suite 200 London
Ontario N5X 4E7
519.930.3505 tel 519.474.00451 fax
www.watersupply.london.ca
PROJECT
RESIDUALS
MANAGEMENT
FACILITY
ELGIN AREA WATER TREATMENT PLANT
43665 Dexter Line
Central Elgin, Ontario N0L 2L0
PROJECT NUMBER
60246477
I/R DATE DESCRIPTION
ISSUE/REVISION
I/R DATE DESCRIPTION
ISSUE/REVISION
0 2013-10-09 ISSUED FOR TENDER
La
st sa
ve
d: (2
01
3-1
0-0
4) L
ast P
lo
tte
d: 2
01
3-1
0-0
4
SHEET TITLE
GENERAL SCADA
Settling/Sedimentation (Chemical Area)
NP Power Schematic (EAW_NCP30)
SHEET NUMBER
DI629
Pro
ject M
an
age
men
t Initia
ls:
Desig
ner:
Ch
ecked
:A
pp
ro
ve
d:
__
__
___
__
__
__
__
File
na
me
: P
:\6
02
46
47
7\0
00
-C
AD
D\0
40
C
AD
D-B
IM
W
IP
\0
2-S
HE
ET
S\D
I-P
RO
CE
SS
IN
ST
RU
ME
NT
AT
IO
N\6
02
46
47
7-S
HT
-3
0-0
00
0-D
I-6
20
-F
62
9_
PID
.D
WG