COJ: COUNCIL 2015-07-30 COJ: OFFICE OF THE EXECUTIVE MAYOR GROUP STRATEGY, POLICY COORDINATION AND RELATIONS
TABLING OF THE 2015/16 INSTITUTIONAL SERVICES DELIVERY
BUDGET AND IMPLEMENTATION PLAN (SDBIP)
1. STRATEGIC THRUST
1.1. Well Governed and Managed City.
2. OBJECTIVE
2.1. The objective of the report is to table 2015/16 Institutional Service
Delivery Budget and Implementation Plan (attached as Annexure A)
to Council for information and publication.
3. SUMMARY
3.1. The SDBIP is the legislative management tool that enables the
municipality to plan, implement and monitor performance. The
SDBIP is the tool that provides the strategic guidance to the
organisation and hold the Mayor, City Manager and Senior
Management accountable. It is the document that predetermine
planning for the duration of the financial year.
3.2. According to the Municipal Finance Management Act Circular 13
The SDBIP is essentially;
“the management and implementation tool which sets in-year
information, such as quarterly service delivery and monthly
budget targets, and links each service delivery output to the
budget of the municipality, thus providing credible management
information and a detailed plan for how the municipality will
provide such services and the inputs and financial resources to
be used.”
3.3. Furthermore the SDBIP is a consolidated priority implementation
plans of the City that are anticipated to be achieved for that
particular financial year period and to set the performance. The
SDBIP intent to commit the City to pursue the outcomes and targets
that are set-out.
Page | 1
3.4. The 2015/16 SDBIP is a reflection of the pronouncement adopted
by the Council to stretch out limited resources and accelerate
services delivery by changing challenges into opportunity. The
SDBIP is an extension of the 2015/16 Integrated Development Plan
(IDP) review to ensure that Key Performance Indicators (KPI) that
are set out are implemented and achieved. The implementation of
the KPI’s will be monitored to evaluate the performance against the
predetermine indicators. Monitoring of the indicators is primary to
assess the progress towards the attainment of the annual targets.
Therefore, the City’s monitoring framework will bridge the gap
between planning and implementation.
4. LEGAL AND CONSTITUTIONAL IMPLICATIONS
4.1. This report is in compliance with the provisions of the Municipal
Finance Management Act, 2003, Circular 13 of MFMA and the
Local Government: Municipal Planning and Performance
Management Regulations, 2001.
4.2. The process for approval and adoption of the SDBIP is regulated
by section 53(1)(c)(ii) read with regulation 19 of the Municipal
Budget and Reporting Regulations reading also with MFMA
Circular No.13 of MFMA.
4.3. The MFMA Circular No.13 of the MFMA further provides that “being
a management and implementation plan (and not a policy
proposal), the SDBIP is not required to be approved by the Council
– it is however tabled before Council and made public for
information and for purposes of monitoring”.
5. DEPARTMENT CONSULTED
5.1. All the City Departments and Municipal Entities.
5.2. The SDBIP was approved by the Executive Mayor and the Mayoral
Committee.
6. COMMUNICATION IMPLICATIONS
6.1. SDBIP made will be public for information and for purposes of
monitoring.
Page | 2
7. RECOMMENDATIONS
It is recommended that:
7.1. The Service Delivery and Budget Implementation Plan 2015/16 for
the City of Johannesburg, attached as Annexure A, be noted for
information and publication.
7.2. The Service Delivery and Budget Implementation Plan 2015/16 be
circulated to all section 79 committees as a strategic document that
will assist the committees to perform their oversight duties.
Author:
Sipho Madi
Office of the City Manager (GSPCR)
THE NEXT ITEM FOLLOWS THE ANNEXURES TO THIS ITEM
Page | 3
Annexure A
CITY OF JOHANNESBURG
2015/16
INSTITUTIONAL SERVICE DELIVERY AND
BUDGET IMPLEMENTATION PLAN
(SDBIP)
JULY 2015
Page | 4
TABLE OF CONTENT
ABBREVIATIONS 12
TABLES AND GRAPHS 14
MESSAGE FROM THE EXECUTIVE MAYOR 15
EXECUTIVE SUMMARY BY CITY MANAGER 18
1. INTRODUCTION 23
2. BUDGET IMPLEMENTATION PLAN FOR 2015/16 25
3. PRIORITY IMPLEMENTATION PLANS 34
3.1. Financial sustainability and resilience 38
3.2. Agriculture and food security 39
3.3. Sustainable human settlements 39
3.4. SMME and entrepreneurial support 40
3.5. Investment attraction, retention and expansion 41
3.6. Green economy 42
3.7. Engaged active citizenry 44
3.8. Resource sustainability 45
3.9. Smart city 46
3.10. Safer city 48
3.11. Priority Implementation Indicators 49
4. ALIGNMENT OF GDS, IDP AND SDBIP INDICATORS 95
5. 2015/16 CITY-WIDE CAPITAL PROJECTS 105
City wide 105
Region 213
Region A 271
Region B 280
Region C 293
Region D 300
Region E 314
Region F 326
Region G 343
6. CONCLUSION 352
Page | 5
ABBREVIATIONS
AIS Alien and Invasive Species
BRT Bus Rapid Transport
CAPEX Capital Budget
CIPA Capital Investment Framework
COF Corridors of Freedom
COJ City of Joburg
CRUM Citizen Relation and Urban Management
CBP Community Based Planning
DED Department of Economic Development
DP Development Planning
DTI Department of Trade and Industry
DSDM Development Service Delivery Model
EG Economic Growth
EISD Environment, Infrastructure Services Department
EPWP Expanded Public Work Services
ESKOM Electrical Supply Commission
GCSS Group Corporate Shared Services
GDS Growth Development Strategy
GHG Green House Gas
GIS Geographical Information System
GSPCR Group Strategy, Policy Coordination and Relation
GVA Gross Value Added
ICT Information and Communication System
IDP Integrated Development Plan
KPI Key Performance Indicator
Joburg Johannesburg
JBN Johannesburg Broadband Network
JDA Joburg Development Agency
JM Joburg Market
JMPD Johannesburg Metro Police Department
JOSHCO Joburg Social Housing Company
JPC Joburg Property Company
JRA Joburg Road Agency
JTC Joburg Theatre Company
GGDA Gauteng Growth Development Agency
LIS Legislative Information Systems
ME Municipal Entities
MFMA Municipal Financial Management Act
MSA Municipal System Act
NMT Non- Motorised Transport
Page | 6
OPEX Operational Budget
PIP Priority Implementation Plan
PMS Performance Management System
PMS Pavement Management System
UJ University of Johannesburg
SDBIP Services Delivery and Budget Implementation Plan
SDF Spatial Development Framework
SHSUP Sustainable Human Settlement Urbanisation Plan
SMME Small Medium Micro Enterprise
TISA Trade and Investment South Africa
Q Quarterly Target
Page | 7
TABLES AND GRAPHS
Graph 1: Split of revenue source
Graph 2: Revenue Projected per month
Graph 3: Revenue and expenditure monthly projections
Graph 4: 2015/16 Capital funding source
Graph 5: Projected Capital spending over quarterly period
Table 1: Summary of monthly projection per each revenue source
Table 2: Monthly operating expenditure and revenue projections
Table 3: Quarterly and monthly projection for 2015/16 each vote number
Table 4: Monthly Capital expenditure for per vote
Table 5: Priority Implementation Plan (PIP)
Table 6: Alignment of GDS, IDP and SDBIP
Table 7: 2015/16 City wide capital project
Table 8: 2015/16 Regional Capital project
Table 9: 2015/16 Capital project per Region per ward: Region A
Table 10: 2015/16 Capital project per Region per ward: Region B
Table 11: 2015/16 Capital project per Region per ward: Region C
Table 12: 2015/16 Capital project per Region per ward: Region D
Table 13: 2015/16 Capital project per Region per ward: Region E
Table 14 2015/16 Capital project per Region per ward: Region F
Table 15: 2015/16 Capital project per Region per ward: Region G
Figure 1: City Strategic Programmes “The House”
Page | 8
MESSAGE FROM THE EXECUTIVE MAYOR
It is with honour to present the 2015/16 Services
Delivery Budget Implementation Plan (SDBIP) for
the City of Johannesburg. The 2015/16 SDBIP is a
reflection of the priorities outlined in the State of City
Address (SOCA), and its budget allocations. During
this financial year, the City will accelerate service
delivery by achieving more with limited resources.
We have ensured that we prioritise the provision of
the basic services and strategic programmes that
will better the lives of our community.
Through our community-based planning approach, we have engaged our
communities in order to listen to their concerns and needs. As a result we
have integrated their views and concerns into our strategic planning
processes.
We are a City inspired by its people. Thus we have collectively adopted
flagship programmes that will advance the lives of the people. The Flagship
programmes have been conceptualised as the House. The house is the
strategic route to get the organisation thinking and moving into one direction –
to improve service delivery. These programmes are further explained below:
Service delivery: The 2015/16 SDBIP forms the foundation of the House and
advocate the principles of going back to the basics; i.e. good governance,
public participation: putting people first, creating conditions for decent living,
sound financial management and building capable institution and
administration. The City continues to strive to be amongst the best cities on
the global stage. It further endeavours to lead on socio-economic
transformation by turning challenges into opportunities.
Smart City: rolling out wi-fi hotspots to enable communities to have free
access to internet. This programme will assist communities by enabling
access to job opportunities and extend communication channels through
social networks. In this financial year, we intend to connect 35 libraries with
internet access.
Corridors of Freedom: addresses the spatial segregation left by the
apartheid legacy, particularly with the utilisation of the public space. It is within
Page | 9
the interest of the City to ensure that public land is utilised economically and
optimally by strategically positioning our residents closer to the working areas.
Jozi@work programme entails communities partnering with the City in
response to service delivery shortcomings that emanate from their
communities. Jozi@work has gained momentum, moving from just a
programme to become a progressive movement to enable the unemployed
community members to form part of the economic cycle.
Green and Blue Economy are special programmes aimed to support the
growth of a greener City bolstered by a cleaner, more inclusive economy –
with programmes focusing on the reduction of carbon emissions, minimisation
of waste impacts, protection of the natural environment and the sustainable
use of resources in economic activities.
Communication and stakeholder management: As the City we have
realised that many programmes are underway to change the lives of our
communities, and our residents are not aware, neither are they informed
thereof. We have taken it upon ourselves as a City to ensure that we improve
communication, stakeholder management and develop a good relationship
between the residents and the City, by creating awareness on the
programmes that are implemented in their communities and to enable them to
benefit thereof.
In addition, the 2015 State of the City Address indicated other critical projects
that will drive the institution to the end of the current administrative term,
which are the following:
Vulindlela e Jozi youth Development programme
Ward based planning intervention programme
Capacitation of the engineering Centre of excellence and Infrastructure
Programme management Office
Page | 10
The 2015/16 SDBIP also intends to keep the City consistently focused on the
10 priority implementation plans (PIPs), outlined in the Growth and
Development Strategy- Joburg 2040:
Priority 1: Financial sustainability and resilience;
Priority 2: Agriculture and food security
Priority 3: Sustainable human settlements
Priorities 4, 8 and 9: Economic Growth – as constituted of:
• Priority 4: SMME and entrepreneurial support
• Priority 8: Investment attraction, retention and expansion
• Priority 9: The green economy
Priority 5: Engaged and active citizenry
Priority 6: Resource sustainability
Priority 7: Smart City
Priority 10: Safer City
The SDBIP is a progressive document to monitor and evaluate performance
to determine the City progress in executing the priority plans.
The SDBIP will assist departments to track achievements through regular
collection of information to assist timely decision making, ensure
accountability, and provide the basis for evaluation.
The 10 priorities implementation plans will ensure that “Today is better than
yesterday and tomorrow is better than today”
CLR MPHO PARKS TAU
EXECUTIVE MAYOR
Page | 11
EXECUTIVE SUMMARY BY THE CITY MANAGER
The 2015/16 Institutional SDBIP encapsulates the
priorities that are a culmination of both the City's
strategic planning processes and community
consultations which have taken place. We have
undertaken a rigorous process to ensure that the
service delivery needs of our residents are catered
for, including the enhancement of organisational
efficiencies and improved planning.
Our concerted efforts have resulted in the achievement of unqualified audits
for three consecutive years, demonstrating how well the City is governed.
True to our commitment to the people, we have built houses for the
underprivileged and rental social houses for low to middle income earners.
The City has improved the quality of water and upgraded electrical
infrastructure to ensure that our residents are spared from the effects of load
shedding stage 1. Furthermore, the introduction of the 'load-limiting' approach
has contributed to the reduction of load shedding. Sound financial
management practices have also enabled the City to deliver on its objectives.
The 2015/16 SDBIP comprises of the ten (10) priority implementation plans
that will drive the organisation towards its goals for the remainder of the term
of office. In this financial year, we turn challenges into opportunities in order to
ensure that "tomorrow will be better than today”. The aim is to accelerate
implementation and advance service delivery towards the attainment of socio-
economic transformation. This will be achieved by focusing on the following:
Priority 1: Financial Sustainability and Resilience
• Collection of debtors book in respect of service billings
• Reduction in debtors book
• Capital spending on City infrastructure
• Achievement of selected profitability and liquidity ratios
• Unqualified audit opinion
Priority 2: Agriculture and Food Security
• Reduction in food security in most deprived areas
• Growth in market share of emerging producers at Johannesburg
Market
• Emerging farmers involved in diversified farming activities
supported through functional hubs, and establishment of local
markets and food empowerment zones
• Reduction in illness attributed to poor food management
Page | 12
Priority 3: Sustainable Human Settlements
• Increasing Rea Vaya Bus Rapid Transport ridership per day
• Roads resurfaced city-wide as per Pavement Management
system
• Kilometres of gravel roads upgraded to surfaced roads
• Expenditure spent on the coordination of R230 million CoF
capex allocation
• Housing units developed for the underprivileged
• Social Housing units developed
Priority 4, 8 & 9 Economic Growth (SMME and entrepreneur
support, Investment Attraction, retention and expansion and
green economy)
• EPWP opportunities created
• Employment opportunities created City wide
• Investment and business opportunities attracted to the City
• Small Medium Micro Enterprise supported by the City
Priority 5: Engage and Active Citizenry
• Improve citizenry satisfaction level
• Implementation of approved CBP community projects
• Dialogue and education sessions implemented in the
identified high risk areas for xenophobic attacks
• Media awareness about the City’s strategic direction
Priority 6: Resource Sustainability
• Km2/ hectares Alien and invasive species infested land
cleared
• Reduction in GHG emissions as a result of mitigation
projects
• Reduction in non-revenue water losses
• Schools within which Rainwater Harvesting Programme is
rolled out
• Increased participation rate in targeted areas where
separation at source is implemented
• Reduction in waste to landfill
Page | 13
Priority 7: Smart City
• Implementation of Smart City ICT Enablement Programme
• Connections to WiFi hotspots connectivity in City owned
facilities
• Connecting libraries with internet
Priority 10: Safer City
• Reduction of Common robbery, assault GBH, common
assault, theft of motor vehicles, burglary residential/business
• Reduction in mortalities linked to medical emergencies
• Increase in number of citations issued for illegal dumping in
order to improve compliance to City’s by-law.
• Implementation of substance abuse programme through
social (a 3 tier programme targeting youth at risk)
In addition to the 10 priorities, the City will continue to focus on the
implementation of its flagship programmes, which form part of the strategic
agenda of the organisation; i.e. “the House”. The flagship programmes are:
Corridors of Freedom
An urban revolution which seeks to build a new City along and around mass
transit movement lines to create housing, job and social opportunities in
proximity to each other. Corridors of freedom will be achieved through:
• The intensification of mixed land uses along and around mass transit
movement lines in selected areas of the City.
• Incentives to capture value and increase investment.
The primary output is to reorganise space in the City to increase overall
economic efficiency and productivity by bringing social facilities, jobs and
housing closer to each other.
Smart City
The Smart City objectives and outcomes include:
• An integrated approach across the City that guides smart city
programmes;
• Technology that works across the City;
• Increased service delivery efficiency and productivity;
• Active citizen participation;
• Economic development and competitiveness; and
Page | 14
• Eradicating the digital divide
Jozi@work
The programme works through the City paying co-operatives and community-
based companies for work packages which improve the delivery of services in
the region in which they live. Subsequently, jobs /livelihoods will be created for
those who are members of co-operatives, partners in micro-companies or
workers employed by the co-ops or companies doing the work.
Green and Blue Economy
The Green and Blue economy are methods aimed at resource preservation. It
recycle waste and turn what is perceived as unusable to a useful product. The
City is focusing on building greener City with an intention of reducing carbon
emissions, minimising waste impacts and protection of the natural
environment and related ecosystem goods and services.
• Implementation of capital works projects that green the city through
landscaping and tree planting:
• Fleet recapitalisation is currently underway – newer cleaner emission
plant;
• Biogas to Energy plant consisting
• WWWTW achieved reduction in greenhouse emission
• Energy Diversification - Installation of Solar Water Heaters
• Energy Efficient Building Retrofit still at tender stage
• Energy Diversification - Installation of Solar Water Heaters
• Energy Efficient Building Retrofit still at tender stage
The Blue Economy programme is a different approach for building capacity to
generate multiple benefits for the local economy, by transforming
technological breakthroughs into innovative and competitive business models
that are inclusive for those who belong to the marginalised part of society.
By embarking on a SCAN, SCREEN and IMPLEMENT methodology, the City
was able to identify a portfolio of initiatives that will ensure that by 2016, the
City will:
• Create jobs through informal business hubs.
• Create and identify jobs through generating power and ensuring
water efficiency.
• Contribute to health objectives and creating new industries by
converting tailing dams.
Page | 15
• Lower the risk of industries by responding to basic needs.
• Directing capital to livelihood initiatives.
Through the elevation of service delivery (the foundation of the House), the
City continues to focus on its core mandate – the provision of basic services
to its residents. The City strives to improve the quality of those services to the
highest possible standard that is characteristic of a world class African City.
Trevor Fowler
City Manager
Page | 16
1. INTRODUCTION
The Municipal Financial Management Act 56 of 2003 (MFMA) defines the
Service Delivery and Budget Implementation Plan (SDBIP) as "a detailed plan
approved by the Mayor of a municipality in terms of section 53(1)(c)(ii) for
implementing the municipality's delivery of services and the execution of its
annual budget".
The City has undertaken to accelerate implementation of its developmental
goals and consolidate gains made during the current term of office, in an effort
to ensure service delivery continuity for the next term. Through the 2015/16
Institutional SDBIP, the City has translated its strategic objectives into an
implementable plan that seeks to align its priorities, the service delivery needs
of communities, and the annual budget.
Circular 13 of the MFMA indicates that the SDBIP provides integration
between the Executive Mayor, Council and the Administration, by essentially
assisting to hold management accountable for its performance.
Furthermore, it states that the goals and objectives set by the municipality
must be quantifiable outcomes that can be measured to enable to monitor
performance and evaluate service delivery outcomes.
As an effective management tool, the 2015/16 SDBIP consolidates the
planning and performance management processes for the institution. It
outlines the key performance indicators and targets associated with the City's
ten priority implementation plans, as aligned to the 2015/16 IDP review. The
document is a critical part for planning, implementation and monitoring,
ensuring alignment between the City's long-term development strategy
(Joburg 2040 GDS), the IDP and the budget.
In terms of section 1 of the MFMA, it state that the SDBIP must include:
a) Projections for each month of -
• Revenue to be collected by source; and
• Operational and capital expenditure, by vote;
b) Service delivery targets and performance indicators for each quarter; and
c) Any other matters that may be prescribed.
Page | 17
In line with National Treasury Guidelines and Regulations, municipalities are
required to prepare the SDBIP comprising of the following:
• Budget Implementation plan;
• Capital Budget; and
• Service delivery breakdown including measurable performance
indicators.
Page | 18
2. BUDGET IMPLEMENTATION PLAN FOR 2015/16
The Budget Implementation component of the SDBIP, circular 13 requires a
breakdown by monthly projections of revenue for each source and monthly
projections of capital expenditure and operational expenditure and revenue for
each vote.
2.1 Monthly projections of revenue for each source
The anticipated revenue for the 2015/16 financial year amounts to R43.8
billion (excluding capital grants received and internal transfers).
Property rates17.2%
Electricity34.3%Water and
Sewerage19.1%
Refuse2.9%
Rental of facilities
0.7%
Interest earned0.9%
Fines2.5%
Operating grants14.1% Other revenue
8.3%
Graph 1: Split of revenue by source
Page | 19
As depicted below, the City anticipates receiving approximately between R3.3 billion to R6 billion revenue per month.
0
1 000 000
2 000 000
3 000 000
4 000 000
5 000 000
6 000 000
7 000 000
JULY 15 AUG 15 SEP 15 OCT 15 NOV 15 DEC 15 JAN 16 FEB 16 MAR 16 APR 16 MAY 16 JUNE 16
Graph 2: Revenue projected per month
Page | 20
Table 1: Summary of monthly projections per each revenue source
Description
R thousand July August Sept. October November December January February March April May JuneBudget Year
2015/16
Budget Year
+1 2016/17
Budget Year
+2 2017/18
Revenue By Source
Property rates 626 557 626 557 626 557 626 557 626 557 626 557 626 557 626 557 626 557 626 557 626 557 626 557 7 518 682 7 932 210 8 360 549
Property rates - penalties & collection charges 9 333 9 333 9 333 9 333 9 333 9 333 9 333 9 333 9 333 9 333 9 333 9 333 111 996 111 535 115 608
Serv ice charges - electricity rev enue 1 201 000 1 201 000 1 201 000 1 201 000 1 201 000 1 201 000 1 201 000 1 201 000 1 201 000 1 201 000 1 201 000 1 804 735 15 015 735 15 962 681 17 066 728
Serv ice charges - w ater rev enue 426 889 436 269 429 345 442 377 421 295 416 029 420 828 398 709 437 253 419 574 440 257 432 564 5 121 389 5 732 059 6 235 590
Serv ice charges - sanitation rev enue 270 047 275 981 271 601 279 845 266 509 263 177 266 213 252 221 276 603 265 419 278 503 273 636 3 239 755 3 366 447 3 662 172
Serv ice charges - refuse rev enue 105 648 105 648 105 648 105 821 105 648 103 702 103 875 105 648 105 132 105 132 105 132 106 055 1 263 088 1 345 189 1 431 281
Serv ice charges - other 35 275 35 567 36 037 36 087 35 698 38 411 37 722 36 891 41 156 42 862 42 783 60 776 479 266 505 156 533 331
Rental of facilities and equipment 24 788 24 771 24 977 25 226 25 565 25 118 24 951 24 725 24 401 24 401 24 900 27 589 301 412 331 082 352 495
Interest earned - ex ternal inv estments 32 985 33 089 33 089 32 989 32 960 32 940 32 849 32 809 32 799 32 794 32 789 32 775 394 865 399 355 400 858
Interest earned - outstanding debtors 14 035 14 197 14 077 14 302 13 938 13 847 13 930 13 548 14 214 13 908 14 266 13 733 167 989 132 487 142 564
Fines 77 847 78 598 79 692 80 660 81 531 82 701 84 374 85 401 86 451 87 701 88 761 199 290 1 113 002 1 018 537 934 515
Licences and permits 65 65 65 65 65 65 65 65 65 65 65 34 749 790 833
Agency serv ices 44 660 45 636 48 005 49 461 51 196 52 809 54 054 56 301 58 377 60 022 60 547 109 646 690 712 734 374 785 881
Transfers recognised - operational 468 973 408 973 442 427 575 456 408 973 437 027 494 573 461 215 437 427 486 173 414 578 1 149 594 6 185 385 6 421 601 6 989 830
Other rev enue 86 775 83 385 80 605 78 496 86 767 81 525 83 660 84 699 85 757 83 946 91 013 1 217 894 2 144 521 2 319 885 2 707 514
Total Revenue (excluding capital transfers and contributions)3 428 209 3 382 400 3 405 789 3 561 007 3 370 366 3 387 573 3 457 316 3 392 453 3 439 857 3 462 218 3 433 816 6 067 544 43 788 546 46 353 388 49 761 949
Expenditure By Type – – – – – – – – – – – – – – –
Employ ee related costs 752 560 752 560 752 560 752 560 1 283 647 771 549 752 560 752 560 752 560 752 560 752 560 752 560 9 580 796 10 193 032 10 809 700
Remuneration of councillors 12 028 12 028 12 028 12 028 12 028 12 028 12 028 12 028 12 028 12 028 12 028 12 028 144 331 153 714 162 945
Debt impairment 177 381 178 985 177 696 178 464 177 384 174 970 177 478 174 155 178 643 180 923 182 587 176 756 2 135 425 2 094 739 2 108 997
Depreciation & asset impairment 272 260 272 260 272 260 274 308 274 308 274 308 274 308 274 308 272 968 273 194 273 467 270 756 3 278 707 3 724 594 4 154 681
Finance charges 158 018 158 033 157 940 158 026 157 832 157 837 157 814 157 627 157 842 157 720 157 727 157 539 1 893 960 1 830 501 1 896 799
Bulk purchases 1 217 429 1 224 535 1 219 289 1 229 163 1 213 191 1 209 201 1 212 837 1 196 079 1 225 281 1 211 887 1 227 557 1 092 910 14 479 359 15 475 551 16 651 273
Other materials 4 056 4 056 4 056 4 056 4 056 4 056 4 056 4 056 4 056 4 056 4 056 4 053 48 669 50 951 56 810
Contracted serv ices 250 800 255 273 298 129 261 530 273 757 275 403 356 409 359 911 389 159 398 978 407 994 613 125 4 140 467 4 345 857 4 307 982
Transfers and grants 21 285 29 283 21 468 21 283 27 774 21 468 21 283 21 283 24 768 21 583 21 768 65 600 318 846 66 129 71 285
Other ex penditure 407 848 446 655 477 414 468 950 508 895 472 109 471 451 492 464 547 299 533 230 517 965 1 328 325 6 672 605 7 094 318 7 798 958
Loss on disposal of PPE 2 2 2 2 2 2 2 2 2 2 1 0 21 23 30
Total Expenditure 3 273 666 3 333 670 3 392 841 3 360 370 3 932 876 3 372 931 3 440 227 3 444 474 3 564 607 3 546 161 3 557 710 4 473 651 42 693 186 45 029 409 48 019 461
Surplus/(Deficit) 154 542 48 730 12 948 200 636 (562 510) 14 641 17 089 (52 021) (124 749) (83 943) (123 895) 1 593 892 1 095 360 1 323 979 1 742 488
Transfers recognised - capital 58 122 88 122 147 622 174 872 231 278 199 522 229 228 249 028 273 028 358 073 365 528 367 488 2 741 915 2 891 417 3 092 789
Contributions recognised - capital – 4 500 5 000 3 000 5 000 5 600 5 965 9 000 52 500 72 500 77 196 19 000 259 261 278 776 287 230
Surplus/(Deficit) after capital transfers &
contributions212 665 141 352 165 570 378 509 (326 232) 219 763 252 282 206 008 200 779 346 630 318 830 1 980 381 4 096 536 4 494 172 5 122 507
Tax ation 2 249 2 249 2 249 2 249 2 249 2 249 2 249 2 249 2 249 2 249 62 337 417 311 502 137 613 011 612 675
Surplus/(Deficit) 210 416 139 103 163 321 376 260 (328 481) 217 515 250 033 203 759 198 530 344 381 256 493 1 563 070 3 594 399 3 881 161 4 509 831
Budget Year 2015/16 Medium Term Revenue and Expenditure
Page | 21
2.2 Monthly projection of operating expenditure and revenue per vote
The consolidated operating expenditure for the 2015/16 financial year amounts to R42.7 billion (excluding internal transfers and
taxation)
The graph below demonstrates the month-by-month revenue and expenditure projections for the 2015/16 financial years. The City
is projecting surpluses for the months July to October, December to June. In the other months expenditure is slightly more than
revenue. Overall the revenue is more than expenditure by approximately R3.6 billion.
Graph 3: Adjusted revenue and expenditure monthly projections
0
1 000 000
2 000 000
3 000 000
4 000 000
JULY 15 AUG 15 SEP 15 OCT 15 NOV 15 DEC 15 JAN 16 FEB 16 MAR 16 APR 16 MAY 16 JUNE16
Adjusted Revenue & Expenditure Monthly projections
Revenue
Expenditure
Page | 22
Table 2: Summary of monthly operating expenditure and revenue projections for the City per vote
Description
R thousand July August Sept. October November December January February March April May JuneBudget Year
2015/16
Budget Year
+1 2016/17
Budget Year
+2 2017/18
Revenue by Vote
Vote 1 - Economic Dev elopment 1 574 1 574 1 574 1 574 1 574 1 574 1 574 1 574 1 574 1 574 1 576 1 595 18 915 – –
Vote 2 - Env ironment, Infrastructure and Serv ices 8 816 8 816 8 816 8 816 8 816 8 816 8 816 8 816 8 816 8 816 8 816 8 816 105 789 110 107 120 994
Vote 3 - Transport 71 112 12 594 56 020 128 520 77 872 83 123 162 775 82 224 87 594 237 927 165 057 128 049 1 292 867 1 368 769 1 744 443
Vote 4 - Community Dev elopment 1 663 1 663 2 163 22 487 5 413 2 163 5 439 7 788 9 788 9 288 6 788 4 985 79 632 88 256 76 306
Vote 5 - Health 65 65 1 065 82 276 8 065 8 265 10 065 69 507 15 065 8 065 7 065 12 534 222 102 201 241 224 472
Vote 6 - Social Dev elopment 20 22 56 259 71 85 – – – 262 – 53 828 716 754
Vote 7 - Office of the Ex ecutiv e May or 5 017 5 017 5 017 5 017 5 017 5 017 5 017 5 017 5 017 5 017 5 017 5 017 60 204 63 517 66 806
Vote 8 - Speaker: Legislativ e Arm of Council – – – – – – – – – – – – – – –
Vote 9 - Group Finance 1 094 395 1 094 395 1 094 395 1 094 395 1 094 395 1 094 395 1 094 395 1 094 395 1 094 395 1 094 395 1 094 395 1 683 600 13 721 948 14 651 809 15 639 249
Vote 10 - Group Corporate and Shared Serv ices 1 374 1 374 1 374 1 374 1 374 1 374 1 374 1 374 1 374 1 374 1 374 17 274 32 387 34 169 36 014
Vote 11 - Housing 5 645 25 645 41 145 50 645 74 551 35 645 80 051 74 551 74 551 74 551 80 056 360 357 977 395 964 090 1 196 713
Vote 12 - Dev elopment Planning 5 286 5 286 5 286 10 286 15 286 10 286 10 286 15 286 25 286 30 286 30 286 13 481 176 627 189 087 198 430
Vote 13 - Public Safety : EMS 4 620 4 750 32 734 4 700 4 600 29 654 5 700 4 950 32 154 4 000 4 000 31 783 163 645 169 550 178 549
Vote 14 - Public Safety : JMPD 98 368 99 739 101 892 103 750 105 573 107 213 110 175 111 930 114 265 116 085 118 265 229 742 1 416 997 1 325 298 1 257 846
Vote 15 - Municipal Entities Accounts 73 420 73 420 73 420 73 420 73 420 73 420 73 420 73 420 73 420 73 420 73 420 73 420 881 035 780 569 700 678
Vote 16 - City Pow er 1 217 841 1 224 341 1 225 841 1 223 841 1 225 341 1 223 441 1 230 306 1 229 841 1 260 841 1 281 341 1 289 037 2 800 840 16 432 853 17 580 509 18 626 704
Vote 17 - Johannesburg Water 704 313 727 789 718 365 741 866 710 084 711 895 702 813 675 820 758 912 739 743 783 868 779 835 8 755 303 9 390 253 10 298 521
Vote 18 - Pikitup 113 300 113 300 113 300 113 474 113 300 111 355 111 528 113 300 112 785 114 830 112 785 113 708 1 356 965 1 439 231 1 521 575
Vote 19 - Johannesburg Roads Agency 13 395 7 061 4 868 2 609 7 098 6 692 8 101 6 478 8 925 8 496 10 656 48 403 132 783 140 086 147 651
Vote 20 - Metrobus 15 046 15 046 15 046 15 046 15 046 15 046 15 046 15 046 15 046 15 046 15 046 15 046 180 549 190 875 206 813
Vote 21 - Johannesburg City Parks and Zoo 4 782 5 027 6 545 5 472 5 092 8 139 7 273 5 899 11 902 13 402 13 403 19 572 106 508 110 784 116 769
Vote 22 - Johannesburg Dev elopment Agency 959 1 675 3 066 3 478 4 305 4 874 4 893 6 770 8 042 9 262 8 987 19 257 75 569 79 801 84 111
Vote 23 - Johannesburg Property Company 1 568 1 568 1 568 1 568 1 568 1 568 1 568 1 568 1 568 1 568 1 568 1 571 18 820 18 689 19 698
Vote 24 - Joburg Market 31 258 31 258 31 258 31 258 31 258 31 258 31 258 31 258 31 258 31 258 31 258 72 801 416 635 453 856 494 471
Vote 25 - Johannesburg Social Housing Company 9 197 9 197 9 197 9 197 9 197 9 197 9 197 9 197 9 197 9 197 9 197 9 197 110 366 117 592 123 065
Vote 26 - Joburg City Theatres 3 296 4 400 4 400 3 550 8 327 8 201 1 439 4 471 3 611 3 588 4 621 3 096 53 000 54 727 61 336
Total Revenue by Vote 3 486 331 3 475 022 3 558 412 3 738 879 3 606 644 3 592 695 3 692 509 3 650 481 3 765 386 3 892 791 3 876 540 6 454 032 46 789 722 49 523 581 53 141 968
Expenditure by Vote to be appropriated
Vote 1 - Economic Dev elopment 5 679 5 679 5 679 5 679 16 456 6 679 5 679 5 679 21 179 5 679 5 679 97 620 187 361 182 447 192 603
Vote 2 - Env ironment, Infrastructure and Serv ices 19 085 19 085 19 085 19 085 24 182 19 085 19 085 19 085 19 085 19 085 19 085 19 085 234 115 248 182 262 604
Vote 3 - Transport 53 631 53 631 53 631 60 474 88 344 53 631 162 117 189 111 189 111 189 111 189 111 189 111 1 471 014 1 535 552 1 659 206
Vote 4 - Community Dev elopment 72 086 84 949 85 284 85 599 108 434 85 784 85 599 85 599 85 784 85 399 72 769 75 173 1 012 456 1 082 194 1 166 698
Vote 5 - Health 50 304 53 904 56 704 58 276 90 039 58 276 62 776 62 776 62 776 62 776 62 776 62 004 743 389 787 190 836 091
Vote 6 - Social Dev elopment 13 290 13 290 13 290 13 290 19 561 13 206 13 290 13 290 13 290 13 306 13 306 29 981 182 388 193 073 203 803
Vote 7 - Office of the Ex ecutiv e May or 104 372 104 372 104 372 104 372 129 663 104 372 104 372 104 372 104 372 104 372 104 372 104 372 1 277 755 1 254 176 1 253 338
Vote 8 - Speaker: Legislativ e Arm of Council 20 731 25 559 30 386 24 849 29 890 25 287 30 386 26 284 25 567 24 986 25 849 25 369 315 139 337 989 355 901
Vote 9 - Group Finance 285 633 285 633 285 633 285 633 326 962 285 633 285 633 285 633 285 633 285 633 285 633 315 738 3 499 033 3 674 057 3 615 182
Vote 10 - Group Corporate and Shared Serv ices 57 485 57 485 113 669 113 669 127 725 113 669 57 485 57 485 108 169 113 669 107 706 127 624 1 155 841 1 248 425 1 301 288
Vote 11 - Housing 66 413 72 763 72 980 74 413 80 339 67 413 72 723 74 193 71 723 68 513 71 413 71 531 864 416 670 600 753 724
Vote 12 - Dev elopment Planning 21 589 21 587 23 137 23 137 33 643 23 687 26 231 26 231 26 231 26 231 26 231 25 363 303 303 374 273 414 358
Vote 13 - Public Safety : EMS 65 363 65 563 67 763 68 463 117 066 65 463 66 126 64 163 63 763 63 763 63 263 63 561 834 319 898 020 953 270
Vote 14 - Public Safety : JMPD 200 457 210 664 208 180 184 149 268 962 187 694 198 424 207 399 209 080 215 852 217 120 224 949 2 532 934 2 549 187 2 573 611
Vote 15 - Municipal Entities Accounts 132 136 132 134 132 134 132 134 132 134 132 134 132 134 132 134 132 134 132 134 132 134 132 134 1 585 611 1 807 282 2 229 800
Vote 16 - City Pow er 1 148 903 1 148 903 1 148 903 1 148 903 1 235 256 1 148 903 1 148 903 1 148 903 1 148 903 1 148 903 1 208 991 2 125 899 14 910 276 15 871 908 16 973 810
Vote 17 - Johannesburg Water 554 128 562 183 556 155 567 413 583 079 563 627 548 729 529 581 562 836 547 560 565 296 556 187 6 696 774 7 215 667 7 819 585
Vote 18 - Pikitup 151 416 151 416 151 651 153 403 199 036 155 709 151 704 149 918 148 034 153 560 153 922 197 906 1 917 675 2 032 656 2 160 750
Vote 19 - Johannesburg Roads Agency 62 385 67 875 71 485 43 408 53 651 58 795 72 183 65 462 75 597 73 822 82 766 201 025 928 453 984 018 1 040 559
Vote 20 - Metrobus 46 817 46 817 46 817 46 817 61 884 46 817 46 817 46 817 46 817 46 817 46 817 44 818 574 873 594 371 621 633
Vote 21 - Johannesburg City Parks and Zoo 55 496 57 292 61 052 61 947 87 518 65 148 65 836 65 765 78 299 78 623 79 899 82 942 839 817 888 860 940 646
Vote 22 - Johannesburg Dev elopment Agency 6 372 6 373 6 373 6 373 10 922 6 373 6 373 6 373 6 373 6 373 6 372 10 324 84 972 90 208 95 509
Vote 23 - Johannesburg Property Company 36 408 36 408 36 408 36 408 47 621 36 408 36 408 36 408 36 408 36 408 36 408 42 989 454 692 488 970 523 216
Vote 24 - Joburg Market 24 913 24 913 24 913 24 913 30 152 24 913 24 913 24 913 24 913 24 913 24 913 46 272 325 549 356 174 391 036
Vote 25 - Johannesburg Social Housing Company 11 152 11 152 11 152 11 152 14 237 11 152 11 152 11 152 11 152 11 152 11 152 11 152 136 914 145 280 151 797
Vote 26 - Joburg City Theatres 9 672 16 289 8 254 8 660 18 369 15 322 7 398 7 997 9 626 9 769 7 065 7 832 126 254 131 660 142 118
Total Expenditure by Vote 3 275 915 3 335 919 3 395 090 3 362 619 3 935 125 3 375 180 3 442 476 3 446 723 3 566 855 3 548 410 3 620 047 4 890 962 43 195 323 45 642 419 48 632 136
Surplus/(Deficit) 210 416 139 103 163 321 376 260 (328 481) 217 515 250 033 203 759 198 530 344 381 256 493 1 563 070 3 594 399 3 881 161 4 509 831
Budget Year 2015/16Medium Term Revenue and Expenditure
Framework
Page | 23
2.3 Monthly Projections of Capital Spending by Vote
The City envisages a spending of R9.9 billion on the capital budget for
2015/16 financial year, R9.9 billion and R9.3 billion for 2016/17 and 2017/18
respectively. The Capital Budget will be funded from a combination of loans
and surplus cash, grants allocations and other public contributions as
indicated in the graph 4 below.
Graph 4: Funding Sources for 2015/16
COJ -Loans39.8%
COJ -Cash29.9%
National10.2%
USDG17.5%
Other2.6%
Page | 24
Graph 5: Projected capital spending over a quarterly period
0%
20%
40%
60%
80%
100%
Quarter 1 Quarter 2 Quarter 3 Quarter 4
10%27%
59%
100%
The City anticipates to spend 10% of its budgeted capital in the first quarter,
this increases to 27% in the second quarter, 59% in the third quarter and
100% for the quarter ending 30 June 2016.
Page | 25
Table 3: Quarterly projections for the 2015/16 financial year per vote
Details Quarter Quarter Quarter Quarter Total
1 2 3 4
CORE ADMINISTRATION
Economic Development 5 000 21 470 26 470
Environment, Infrastructure and Services 4 930 19 950 17 500 42 380
Transportation 57 000 204 397 277 000 529 941 1 068 338
Community Development 1 500 19 991 38 989 50 537 111 017
Health 1 900 22 000 46 500 41 574 111 974
Social Development 4 870 9 489 8 717 9 324 32 400
Office of the Executive Mayor 54 050 54 120 132 306 135 904 376 380
Speaker: Legislative Arm of Council 60 194 60 388 84 388 36 000 240 970
Group CFO: Finance and Revenue 1 500 1 500 499 3 499
Group Corporate and Shared Services 212 460 459 459 824 920 494
Housing 50 000 147 170 209 984 262 940 670 094
Development Planning 40 000 140 000 229 907 409 907
Emergency Management Services 4 120 12 120 53 180 84 171 153 591
Johannesburg Metropolitan Police Department 7 600 17 250 13 070 13 932 51 852
TOTAL CORE ADMINISTRATION 246 234 593 567 1 486 043 1 893 523 4 219 366
MUNICIPAL ENTITIES
City Power 278 500 344 100 508 465 603 415 1 734 480
Johannesburg Water 103 000 202 500 194 000 292 560 792 060
Pikitup 2 500 26 500 43 500 36 445 108 945
Johannesburg Roads Agency 169 363 268 639 433 233 544 006 1 415 241
Metrobus 78 200 56 750 47 700 98 720 281 370
Johannesburg City Parks and Zoo 6 000 24 500 31 000 33 500 95 000
Johannesburg Development Agency 3 000 43 000 106 000 147 500 299 500
Johannesburg Property Company 16 536 49 608 49 608 66 048 181 800
Joburg Market 25 000 45 000 85 000 104 738 259 738
Johannesburg Social Housing Company 42 953 35 302 158 859 266 289 503 403
Johannesburg Theatre Management Company 1 000 2 500 2 000 450 5 950
TOTAL ME's 726 051 1 098 399 1 659 365 2 193 671 5 677 487
TOTAL 972 285 1 691 966 3 145 408 4 087 194 9 896 853
2015/16
Page | 26
Table 4: Summary of monthly capital expenditure per vote
Description
R thousand July August Sept. October Nov. Dec. January Feb. March April May JuneBudget Year
2015/16
Budget Year
+1 2016/17
Budget Year
+2 2017/18
Multi-year expenditure to be appropriated
Vote 1 - Economic Dev elopment – 5 000 – – – – – – – – – 21 470 26 470 13 466 12 019
Vote 2 - Env ironment, Infrastructure and Serv ices – – – – 430 4 500 7 500 7 500 4 950 7 500 10 000 – 42 380 48 730 39 800
Vote 3 - Transport – – 57 000 51 799 67 488 85 110 99 000 82 000 96 000 173 000 187 000 169 941 1 068 338 1 183 569 1 336 254
Vote 4 - Community Dev elopment – – 1 500 6 750 11 241 2 000 3 000 16 750 19 239 24 300 18 000 8 237 111 017 136 427 163 192
Vote 5 - Health – 205 1 695 4 800 9 000 8 200 11 500 17 000 18 000 13 000 12 000 16 574 111 974 98 404 105 050
Vote 6 - Social Dev elopment – 1 980 2 890 3 629 2 960 2 900 3 449 2 268 3 000 3 376 2 902 3 046 32 400 10 500 8 943
Vote 7 - Office of the Ex ecutiv e May or – 27 050 27 000 27 075 27 045 – 42 000 42 068 48 238 42 500 50 000 43 404 376 380 114 395 68 595
Vote 8 - Speaker: Legislativ e Arm of Council – 60 194 – 388 60 000 – 388 60 000 24 000 – – 36 000 240 970 844 –
Vote 9 - Group Finance – – – 500 500 500 500 500 500 499 – – 3 499 3 047 –
Vote 10 - Group Corporate and Shared Serv ices – – – 71 71 71 153 486 153 486 153 486 153 486 153 486 152 851 920 494 786 261 371 235
Vote 11 - Housing – 20 000 30 000 46 088 69 994 31 088 69 994 69 994 69 996 68 906 68 906 125 128 670 094 941 127 1 116 060
Vote 12 - Dev elopment Planning – – – 10 000 20 000 10 000 10 000 35 000 95 000 115 000 100 000 14 907 409 907 448 692 474 232
Vote 13 - Public Safety : EMS – 1 060 3 060 5 060 5 060 2 000 10 060 18 060 25 060 25 060 20 060 39 051 153 591 135 460 122 150
Vote 14 - Public Safety : JMPD 1 000 3 200 3 400 7 200 7 450 2 600 3 200 4 640 5 230 3 860 7 002 3 070 51 852 42 217 57 147
Vote 16 - City Pow er 50 000 100 500 128 000 126 000 142 500 75 600 182 465 138 000 188 000 213 500 202 196 187 719 1 734 480 1 517 970 1 424 870
Vote 17 - Johannesburg Water – 48 000 55 000 57 000 65 000 80 500 53 500 63 000 77 500 77 500 92 500 122 560 792 060 999 934 1 207 394
Vote 18 - Pikitup – – 2 500 10 500 16 000 – 34 000 8 333 1 167 17 445 – 19 000 108 945 116 676 97 100
Vote 19 - Johannesburg Roads Agency 24 035 36 070 109 258 116 701 133 943 17 996 117 068 150 791 165 374 167 821 191 232 184 953 1 415 241 1 375 230 1 277 295
Vote 20 - Metrobus 5 000 70 000 3 200 5 400 30 350 21 000 11 500 21 000 15 200 30 850 20 500 47 370 281 370 231 610 90 000
Vote 21 - Johannesburg City Parks and Zoo – – 6 000 4 000 5 500 15 000 5 000 6 000 20 000 6 000 8 000 19 500 95 000 76 970 51 500
Vote 22 - Johannesburg Dev elopment Agency – – 3 000 10 000 27 000 6 000 6 000 50 000 50 000 60 000 60 000 27 500 299 500 282 800 247 000
Vote 23 - Johannesburg Property Company – – 16 536 16 536 16 536 16 536 16 536 16 536 16 536 16 536 16 536 32 976 181 800 289 200 110 300
Vote 24 - Joburg Market – 10 000 15 000 15 000 20 000 10 000 25 000 25 000 35 000 35 000 30 000 39 738 259 738 294 547 261 429
Vote 25 - Johannesburg Social Housing Company 7 651 17 651 17 651 17 651 17 651 – 52 953 52 953 52 953 121 812 52 953 91 525 503 403 698 277 663 800
Vote 26 - Joburg City Theatres – – 1 000 1 000 1 500 – 1 000 500 500 450 – – 5 950 4 997 5 930
Total Capital Expenditure 87 686 400 910 483 690 543 148 757 218 391 600 919 099 1 041 380 1 184 929 1 377 401 1 303 273 1 406 520 9 896 853 9 851 350 9 311 295
Budget Year 2015/16Medium Term Revenue and Expenditure
Framework
Page | 27
3. PRIORITY IMPLEMENTATION PLANS
The City's Priority Implementation Plans (PIPs) outlined in this section of the SDBIP
include indicators, set targets and key interventions in order to achieve the outcomes
of these plans. These plans are articulated against the backdrop of the City's
strategic direction, as informed by the Joburg 2040 Strategy, and flagship
programmes which have been adopted to advance the transformational agenda.
The City’s 2015/16 SDBIP details ten priority implementation plans, which are the
following:
• Priority 1: Financial sustainability and resilience;
• Priority 2: Agriculture and food security
• Priority 3: Sustainable human settlements
• Priorities 4, 8 and 9: Economic Growth – as constituted of:
o Priority 4: SMME and entrepreneurial support
o Priority 8: Investment attraction, retention and expansion
o Priority 9: The green economy
• Priority 5: Engaged and active citizenry
• Priority 6: Resource sustainability
• Priority 7: Smart City
• Priority 10: Safer City
These priority implementation plans are concise programmes of action for each of
the City’s ten priorities and include information such as the IDP programmes, overall
objectives and outcomes of the priority, projects, role-players, baseline, key
performance indicators, annual and quarterly targets.
This section of the 2015/16 SDBIP tabulates the projections of service delivery
targets and performance indicators that will be tracked for the financial year of
2015/16, linked to the priority implementation plans outlined in the City’s 2014/15
review of its IDP. The 2015/16 SDBIP further expands from the programmes and
indicators outlined in the priority implementation plans as contained in the IDP.
Page | 28
Flagship Programmes
The strategic direction has been approved by Council. It is geared focus the
organisation on accelerating and consolidating implementation of key programmes
towards "changing challenges into opportunities", as illustrated in the house
Figure 1: “The House”
Communication and development illustrates the City's commitment to improving its
customer-centric approach; fostering developmental partnerships with our
communities, and lastly, building trust and confidence in the City by its residents.
The Corridors of Freedom (CoF) project is founded on the concept of ‘re-stitching
the City’ into an inclusive and accessible city for all. It is about amending the spatial
frame to reverse the impact of apartheid’s policy of exclusion. Through this
programme, emphasis is being placed on knitting together the disparate parts of the
City through people-oriented development that will lead to benefits of urban
agglomeration.
The CoF approach is also founded on the understanding that the City has to manage
its increasing population growth in a way that lays the foundation for improved
sustainability in future years. Social infrastructure, schools, clinics, police stations
Page | 29
and government offices will be strategically located to support the growing
population, based on this premise.
In 2015/16, the City would have implemented 80% of the CoF programmes, which
includes the priority corridors of Portland Perth, Louis Botha, and Alexandra
corridors, and the compact, integrated living spaces programme.
The Jozi@Work programme encourages communities to take charge of their own
development, by working with the City to provide basic services. This partnership
works through the City paying co-operatives and community-based companies for
work packages, which improve the delivery of the City's services in local
communities. As such, jobs and livelihoods are created for those who are members
of co-operatives, partners in micro-companies or workers employed by the co-ops or
companies doing the work.
The City’s Green and Blue Economy programme focuses on a set of interlinked
developmental outcomes for its economy – including:
Resource stability focusing on testing alternative energy methods such
reducing the GHG emissions from the council-owned fleet.
The growth of green economic activities that foster improved investment, jobs
and competitiveness in the green economy sector.
The establishment of a shift in the economy as a whole towards cleaner
industries and sectors with low environmental impact.
Through this programme, the City aims to support the growth of a greener City
bolstered by the growth of a cleaner, inclusive economy – with programmes focusing
on the reduction of carbon emissions, minimisation of waste impacts, protection of
the natural environment and the sustainable use of resources in economic activities.
In the short to medium term, the blue economy programme will focus on local
communities in Joburg and ensure that these communities become beneficiaries of
29 incubated Blue Economy projects that have moved beyond concepts and
research proposals. These projects are geared to force the City to work differently in
order to fast track implementation that will assist the City to deliver better services.
These projects are listed below:
1. Introduce healthy bread that has fruit trimmings as a flour replacement into
the bread-making process. This will feed a vast new community production
sector selling cheaper, healthier bread citywide.
2. Enable new micro mushroom farms that will turn nutrition into a viable
business for thousands of community-based operators.
Page | 30
3. Incentivise and regulate the installation of low-flush toilets and water-
saving urinals as a standard feature in Joburg homes, offices and
commercial sites.
4. Harness energy from the water flowing through our pipe system citywide
using in-pipe turbines. Taking advantage of the opportunities presented by
our investments in waste separation.
5. Divert organic waste to bio-digesters in order to harvest gas for fuel and
energy, adding material from the sewerage system.
6. Convert most of the 250 000 tons of rubble we collect from illegal
dumpsites into a new form of stone paper. Using this approach we will
unlock value in such rubble and subsidise the cost of removing it.
This programme is also a complementary PIP, and has been elevated to flagship
status, based on the significant impact it aims to achieve for this term of office in
creating a more sustainable, liveable and resilient society.
The Smart City programme is aimed at growing the City’s ability to provide affordable
and universal access to communication services to its residents. The implementation
of this programme will assist the City to enhance service delivery through
interventions such as smart-metering for water and electricity services, E-services
and widespread access to broadband); improve decision-making (e.g. through the
integration of City-wide data into a single view); and increase economic activity (e.g.
through providing the necessary technology and connectivity for businesses and
entrepreneurs to thrive).
In 2015/16, the City will have achieved 100% access to affordable internet services
across City-owned buildings, and significant rollout of broadband access at
household levels.
The elevation of the City's core mandate is about providing basic services, (such as
cleanliness and waste collection in all areas at least once a day) to all communities,
i.e. getting the basics right. It is also about ensuring that basic maintenance issues
are addressed such as grass cutting, public light maintenance and basic road
infrastructure maintenance (pothole fixing and resurfacing). Lastly, it is about
enforcing by-laws (e.g. preventing illegal advertisements) and dealing with health
hazards.
Page | 31
3.1 Priority One: Financial Sustainability and Resilience
Ensuring long-term financial stability, sustainability and resilience is a key enabler for
the organisation to maintain ongoing delivery and the funding of initiatives towards
the realisation of the City's strategic vision. One such initiative is the City’s R 100
billion capital infrastructure investment programme, envisaged to deliver the
necessary foundation for spatial transformation, as a step towards the establishment
of a more inclusive, liveable and sustainable City for all.
The fundamental principle of this priority includes a focus on optimising the use of
the City’s resources; and stabilising the City’s revenue base.
This priority is intended to achieve the following:
• Stable and sustainable finances that are able to withstand internal
and external risks and increased delivery pressures.
• Maximised revenue through billing accuracy and completeness,
optimal revenue collection, a reduction in the City’s debtors book,
diversified funding programmes and identification and accessing of
new revenue sources.
• Disciplined expenditure management – the elimination of
unnecessary over or under-expenditure.
• A significantly improved credit rating.
• Ongoing and impactful infrastructure expenditure that enables the
City to meet its development objectives, while also protecting the
City’s revenue base.
• Attainment of year-on-year unqualified audit opinions.
• Strategic procurement spend, to promote the attainment of value for
money while advancing economic transformation.
Despite the prevailing macro-economic challenges, the City remains in a positive
financial shape. In 2015/16, the following will have been achieved:
• Optimal revenue collection, at a level of 95% of service billings;
• Achievement of the City's other core commitments as per its 15
point FDP – including:
100% accuracy in respect of service billings;
Elimination of unnecessary expenditure through full
roll-out of zero based budgeting and prudent
management; and
An unqualified audit opinion.
Page | 32
3.2 Priority Two: Agriculture and Food Security
The 2014 Quality of Life survey, 10% of the households who were interviewed
indicated that a child / children in their household had skipped a meal in the past
year due to lack of finance, and 13% said an adult had had the same experience.
Food security is critical to socio-economic development and poverty alleviation;
without food, people cannot lift themselves out of poverty, while poverty in turn fuels
food insecurity, creating a destructive cycle of abject poverty. Through the
implementation of this priority, a City where none go hungry is envisaged.
The rollout of a combination of interventions is necessary for this outcome to be
realised; i.e. targeting improved food safety and nutrition, increasing domestic food
production and trading, and enhancing job creation and income generation
associated with agriculture and food production (all of which are elements of the
Integrated Food Security Strategy).
In 2015/16, the City would have achieved 60% reduction in food insecure
households in areas identified as highly food insecure; and the promotion of healthier
lifestyles and healthier eating amongst the City’s residents.
3.3 Priority Three: Sustainable Human Settlements
This priority is focused on the establishment of resilient, sustainable and liveable
communities that support social cohesion, improved integration and enhanced
access to socio-economic opportunities for all who live and work in the City. To
achieve this, the SHS priority recognises the need to reorganise spaces within the
City, with emphasis placed on locating social facilities, economic and housing
opportunities in closer proximity to each other, as a way of improving economic
efficiencies, productivity and the quality of life.
This priority aims to achieve the following:
• Accessibility – a City within which people, goods and information move with
ease around the urban system (e.g. via an affordable integrated public
transportation system).
• Integrated living spaces – the establishment of living environments that
support as many aspects of daily life (e.g. work, play and learning) as
possible, with mixed-use and mixed-income developments implemented
through more efficient and intense use of space.
• Economic opportunities – with nodes and geographic regions planned,
developed and managed in a way that supports a range of employment
opportunities, for as many people as possible (with appropriate application
Page | 33
of the City’s role within the urban space, as enabler, facilitator, regulator
and sponsor).
• Variety in the range of housing options available – with choice in terms of
accommodation size, configuration and tenure options (with appropriate
provision beyond affordable housing alone, to transcend housing market
failures and trends in market-led housing solutions).
• Social and open space amenities – with emphasis placed on the
establishment of well-located and maintained social amenities as spaces
through which to improve quality of life, foster social cohesion and invest in
human development.
• Social cohesion – with emphasis placed on the urban environment as a
mechanism through which to consciously nurture the evolution of a more
cohesive society.
In 2015/16, the following will have been achieved:
• A modal shift from private to public transport.
• The establishment of non-motorised transport (NMT) infrastructure
(including 15 km of cycle lanes).
• The acquisition of land parcels to implement social housing and mixed land
use development along the corridors, an increase in gross residential
densities and land use mix, and an increase in affordable rental
accommodation in the City.
• A locally-based support mechanism that empowers owners to improve their
accommodation and rental income.
3.4 Priority Four: SMME and Entrepreneurial Support
This priority is focused on improving the reach, coordination and effectiveness of
SMME and entrepreneurial development activities throughout the City, while also
ensuring the necessary conditions and support for SMMEs and entrepreneurs to
flourish. Closely aligned to this is the City’s emphasis on the informal sector, and the
need to provide opportunities in this regard, e.g. township economy initiatives.
This would be achieved through the establishment of conditions that enable SMMEs
and entrepreneurs to easily access markets, earn a sustainable livelihood, expand
and with this, contribute to economic growth and increase employment opportunities
within the City and beyond. The informal sector would be supported, serving as a
foundation for the growth of further entrepreneurialism, and with this, improved self-
sustainability and job creation.
Page | 34
Key interventions associated with delivery on this priority include:
• SMME Hubs – with the City establishing its first SMME Hub in the inner city
by April 2014, with a second hub planned for Alexandra. These hubs will
serve as centres for the provision of support and development services for
SMMEs and entrepreneurs.
• SMME and entrepreneurship development programme – providing support to
SMMEs (e.g. via the Absa enterprise development centre) and increasing the
number of permanent jobs created.
• Linear market development – serving to promote and support small
businesses, while providing a link into the green economy.
• EPWP and Jozi@Work – supporting the creation of decent jobs and providing
access to economic opportunity, through service delivery initiatives.
The City will have achieved the following for this financial year:
• Improved access to support and development services for SMMEs and
entrepreneurs in Johannesburg, alongside better access to opportunities –
recognising the potential of leveraging the City’s capital investment
commitments, its regulatory and administrative powers, and its place as a key
player in the city’s economy.
• Together with efforts undertaken in respect of Priority 8 and 9, the
establishment of 200 000 jobs (inclusive of green jobs).
• Partnering of linear market cooperatives and SMMEs with the green economy
sector – in this way widening opportunities.
3.5 Priority Five: Engaged Active Citizenry
This priority is key to ensuring sound and ongoing community participation and the
establishment of sufficient capacity and resources to enable this to take place. To
support citizen engagement, the Community Based Planning (CBP) has been
adopted, with a multi-centric model providing the platform for improved
understanding of residents’ needs and issues, in this way promoting the
establishment of a more active and participative citizenry.
While City structures such as ward-based committees promote community
engagement, their full potential needs to be realised through adequate capacitation
so that they are better enabled in their roles relating to development advocacy,
communication and reporting, and through engagement in critical activities such as
public education and ensuring accessibility of public engagement platforms.
Page | 35
The outcomes associated with this priority include:
• The establishment of a City supported by an active and fully-
engaged citizenry that reflects inspirational leadership at all levels
of society.
• Enlisting community based structures to re-energise the City and
grow interest, shared responsibility and values supportive of the
development of the City and its neighbourhoods.
• Promotion of the values of responsible citizenship and solidarity;
• Creation of a social compact that supports effective urban
governance.
• Enhancement of the vision of a caring municipality through practice
and daily interactions.
• Meaningful state-society engagement.
• Mobilisation of communities to take charge of their futures and
assume mutual responsibility for outcomes.
The City is determined to achieve the following by the end of the financial year:
• A 90% achievement of the Customer Service Charter Standards.
• Increased community participation and engagement through CBP.
• Facilitate social cohesion dialogues that will focus on xenophobia.
• Increase in media awareness to change the communication
perceptions about the City.
3.6 Priority Six: Resource Sustainability
In addition to increasing population growth and rising pressure on the City's limited
natural resources, the City also faces a range of challenges that impact liveability,
resource quality and long-term city sustainability. These challenges are:
• Limited water resources, increasing water demand and sizeable resource
risks (e.g. Acid Mine Drainage);
• Substantial Green House Gas (GHG) emissions and high levels of air
pollution, worsened by coal burning, dust from mine dumps and vehicle
emissions;
• The need to shift from coal-dependencies, despite electricity distribution
forming a core revenue base for the City – and a parallel recognition of the
potentially significant decline in revenue from electricity sales with the
adoption of alternative energy sources;
• Increasing levels of waste and significantly reduced landfill space;
Page | 36
• Heightened loss of biodiversity and the associated ecological goods and
services (flood attenuation, pollination, prevention of heat island effects,
climate change resilience); and
• A recognised need to improve the state of river health (e.g. water quality,
aquatic life, erosion, sedimentation and alien vegetation, habitat integrity,
riparian vegetation) and to reduce fragmentation and degradation of open
space networks and associated ecological infrastructure.
Prioritising ‘resource sustainability’ focuses primarily on the use of the City’s natural
resources, and the rollout of socio-economic and human development initiatives that
support the survival and prosperity of the City's residents, in an ecologically
sustainable manner. This priority seeks to ensure that Johannesburg and its citizens
will benefit from the following:
• Identification and application of innovative measures through which to
protect the city’s life-sustaining ecosystems, while enhancing the quality of
life of its citizens.
• Promotion of and investment in sustainable and resilient low-carbon
infrastructure, resource-efficient technologies and retrofitting.
• Improved mitigation of climate change impacts and the associated risks
(e.g. through the supply of a diversified energy mix), and the roll out of
appropriate adaptation measures.
• Improvements in air quality, water security and water resource
management – e.g. via advancements in the protection and quality of
water courses, and emphasis on demand side management (DSM),
protection and enhancement of the city’s biodiversity levels and the
establishment of ecologically functional open space systems.
• The large-scale adoption of alternative renewable energy sources,
integrated waste management and waste reduction measures.
• An equitable provision of green recreational environments and open
spaces, in support of improved quality of life and human development; and
• The promotion of behavioural changes that support improved DSM and
environmental sustainability.
The City will attain the following for 2015/16 financial year:
• Ensure adequate water supply for urban use through DSM approaches,
thereby maintaining supply volumes at the approved extraction quantum
(in support of the 2020 target of 1570 Ml/ day).
• Reduce unaccounted for water to 22%.
• Deliver reduction in atmospheric GHG emissions and an improvement in
the city’s carbon footprint through climate change efforts such as
retrofitting council-owned buildings, the conversion of the City’s fleet
Page | 37
(including the Metrobus and BRT fleet) to green fuel, harvesting of landfill
gas to energy, delivery of solar water heaters and planting of trees.
• Reduce waste to landfill by 20%, in support of the City’s plan to achieve a
70% reduction of waste to landfill by 2020.
• Identify opportunities and revenue streams created by Clean Development
Mechanisms (CDM) under the Kyoto Protocol – and be better positioned to
adapt to the impacts of climate change by increasing resilience.
• Ensure 5% of the city’s geography is protected under the Protected Areas
Act, as a way of enhancing biodiversity.
3.7 Priority Seven: Smart City
A 'Smart City' provides services that are easy to access and use, while being
efficient and responsive in a transparent way. A ‘smarter’ City also supports
improved social development (e.g. through the provision of internet access in places
of learning), service delivery efficiency, better decision making, economic activity,
active citizen participation and the creating of a sustainable and liveable
environment.
The envisaged outcomes of this priority include:
• A technologically competent 'smart' institution (cutting edge SMART
technology, innovation and knowledge, skills generators, research and
business intelligence).
• Enhanced service efficiencies and productivity maintained as the norm;
• ICT systems and services to support and enhance citizen active
involvement and engagement.
• Sustained provision of municipal services to households utilising
broadband infrastructure.
• Job creation through improved economic development environment; and
• Achieved green economy (resilience and resource sustainability).
The City will achieve the following in respect of this priority:
• 100% access to affordable internet services across City-owned buildings
(e.g. across all libraries and clinics) – and significant roll out of broadband
access at a household level.
• The establishment of a smart institution, through delivery of a real-time
platform that supports business process integration in terms of matters
relating to data governance, ICT architecture and skills development;
change management and communications.
Page | 38
• Enhanced citizen engagement through the provision of City-specific
applications that promote active engagement and communication with
citizens as co-creators of city solutions.
3.8 Priority Eight: Investment Attraction, Retention and Expansion
This priority contributes to economic growth through ‘investment attraction, retention
and expansion’, and is geared towards developing the City as an attractive
destination for investors. Key areas of focus include the identification and packaging
of city-wide investment projects, facilitation of investment activities (e.g. through
establishing investment engagement opportunities), provision of aftercare services,
investment policy advocacy and fostering positive partnerships with stakeholders
involved in the promotion and facilitation of investments.
This priority envisages the following:
• Greater competitiveness and attractiveness for local, regional and
international investors.
• An increase in the Rand value of exports and investments associated with the
City’s and the wider region’s economy.
• Improved, varied and sustainable investment attraction in line with the
objectives reflected in the NDP and SDGs.
• Enhanced contributions towards critical and strategic economic infrastructure
development across all regions within the city, in this way supporting further
Foreign Direct Investment, while driving equitable spatial economic
development.
• Ultimately, improved skills acquisition, job creation and the necessary inputs
for the establishment of a more inclusive, growing and diverse economy.
Key to ongoing and increased attraction, retention and expansion of investments is
the establishment of an environment in which potential investors feel confidence in
relation to the potential for sustainable returns in the long-term. With the 10-year
capital investment programme the R110 billion, the City has the leverage to boost
investor confidence, while also being well-positioned to package and promote
investment opportunities.
In 2015/16, the City aims to significantly leverage off its infrastructure investment
programme – using this as a key driver of inclusive economic growth and improved
conditions for ‘doing business’, through various key interventions.
Page | 39
3.9 Priority Nine: Green and Blue Economy
This priority has been elevated to flagship status, based on the significant impact it
aims to achieve for this term of office in creating a more sustainable, liveable and
resilient society. Through this priority, the City aims to support the growth of a
greener city bolstered by the growth of a cleaner, inclusive economy – with
programmes focusing on the reduction of carbon emissions, minimisation of waste
impacts, protection of the natural environment and the sustainable use of resources
in economic activities.
The following is envisaged in respect of this priority:
• An economy with reduced impact in terms of climate change and pollution;
• A City with a cleaner environment and enhanced resource sustainability,
despite economic growth – e.g. acceptable levels of clean air, reduced
waste going to landfill sites, improved and protected water courses,
enhanced conservation of and reduction in demand for water, improved
protection of fauna and flora (biodiversity) and the establishment of an
ecologically functional open space system.
• Reforms to green procurement in a manner that empowers and
encourages the use of green oriented services.
• Economic practices that reflect behavioural change focused on improved
demand side management (DSM) and environmental sustainability.
• Ongoing delivery of research in respect of emerging green sectors – and
application of this research in a way that promotes the green economy,
supports role-players and encourages growth and the creation of decent
jobs within new areas (e.g. alternative fuel).
• The growth of new green economy industries and services – and the
establishment of conditions for SMME, entrepreneur and informal sector
involvement therein.
While a range of private sector entities play a key role in green economy initiatives,
there is significant room for growth in this sector. The City is currently undertaking
research and preparing for delivery in respect of alternative fuel sources and the
conversion of the City’s Metrobus fleet to bio fuel. Focus is also being placed on the
identification, planning and implementation of green initiatives in core areas of
service delivery. The City recognises that green economy initiatives provide a
valuable and attractive platform through which to access and leverage both public
and private sector funding, including innovative partnership funding instruments
available from the development finance institutions. Emphasis is therefore currently
being placed in optimising these opportunities.
Page | 40
In October 2014, the Mayoral Committee approved the Green Challenge Fund, the
objectives of which are the following:
• To open a channel for new ideas from outside the circle of existing
partners.
• Seed fund a handful of ideas, including potential game-changers.
• Use funding to enhance cooperation among key stakeholders.
• To replicate successful projects City-wide, nationally and internationally.
The City aims to achieve the following:
• The establishment of green financing mechanisms.
• Development of green industries through capital investment initiatives,
support provided to cooperatives and approaches to delivery such as
Jozi@Work.
• Conversion of the City’s fleet to green fuel.
• Reduced resource use and environmental harm.
• Create jobs through informal business hubs.
• Create and identify jobs through generating power and ensuring water
efficiency.
• Contribute to health objectives and creating new industries.
• Lower the risk of industries by responding to basic needs.
• Directing capital to livelihood initiatives.
Page | 41
3.10 Priority Ten: Safer City
Creating a ‘safer City’ implies the establishment of safe, secure, healthy, and
environmentally sound City that is able to support improved quality of life and
resilience for all, including the vulnerable, women and young children. Community
and city-wide safety is about a multitude of factors at the level of the individual and
the community that contribute to general wellbeing and liveability – including issues
such as traffic safety, the mitigation of hazards such as fire and weather-related or
environmental factors, countering conditions of deprivation, and fostering more
supportive family systems and community networks.
This priority envisages a City within which all citizens1, regardless of where they live
or work:
• Are safe from crime.
• Feel safe while travelling – be it as drivers, passengers or pedestrians.
• Feel safe in public spaces.
• Are safe from fires and other emergencies, and the effects of natural
and unnatural disasters.
• Behave in a manner that limits harm – to themselves and others.
• Experience a greater degree of resilience when faced with possible
risk.
In order to achieve this priority, the City should include a focus in investing in public
safety through community development, mobilisation and partnerships; improved
urban design and management; the protection of vulnerable groups; infrastructure
upgrades; improvements to by-law compliance and enforcement and with this, the
promotion of behavioural change; enhanced responsiveness to emergency and
disaster situations.
In 2015/16, the City will have achieved the following outcomes:
• Improved ward-based visible law enforcement focusing on by-laws and
municipal matters through implementation of Joburg 10 Plus.
• Enhanced responsiveness by the City to ‘safer city’ issues – including
matters relating to disaster mitigation and management, and the
enforcement of safety.
• A marked shift in environmental and behavioural safety practices
through improved by-law enforcement, urban management, and an
increase in community engagement and partnerships with stakeholders
across society.
1 Used in the broader sense, to refer to those who reside, work and partake in life within the city.
Page | 42
Priority
Implementation
plans
Indicators
2015/16
Page | 43
PRIORITY 1: FINANCIAL SUSTAINABILITY AND RESILIENCE
Table 5 Priority implementation plan
NATIONAL OUTCOME 9: A RESPONSE, ACCOUNTABLE, EFFECTIVE AND EFFICIENT LOCAL GOVERNMENT SYSTEM
Joburg 2040 outcome 4: A high performing metropolitan government that pro-actively contributes to and builds a sustainable, social inclusive, local integrate and globally competitive Gauteng City Region.
Related Output: Financial and administration sustainable and resilient City
IDP programme
Key Performance Indicator
Baseline Target 2015/16
Key Interventions
2015/16 Budget estimates per programme (R)
2015/16 Quarterly target Means of verification
Cluster / Dept./ entity
Capex Opex Q1 Q2 Q3 Q4
A. Optimal revenue collection
1) % collection of debtors in respect of service billings
93.7% collection of debtors in respect of service billings
95% collection of debtors in respect of service billings2
Improved meter management
0 129,892,000
95% collection of debtors in respect of service billings
95% collection of debtors in respect of service billings
95% collection of debtors in respect of service billings
95% collection of debtors in respect of service billings
System Application product (SAP) extract Report
Cluster: Good Governance
Lead: Group Finance
Supporting: Development Planning Joburg Water City Power
Customer (loyal and non-loyal) incentives
All billable properties on LIS
Revenue Stakeholder Forum
2 Calculations excluding LTA, ESP Deceased Estates and estimations longer than 6 months
Page | 44
NATIONAL OUTCOME 9: A RESPONSE, ACCOUNTABLE, EFFECTIVE AND EFFICIENT LOCAL GOVERNMENT SYSTEM
Joburg 2040 outcome 4: A high performing metropolitan government that pro-actively contributes to and builds a sustainable, social inclusive, local integrate and globally competitive Gauteng City Region.
Related Output: Financial and administration sustainable and resilient City
IDP programme
Key Performance Indicator
Baseline Target 2015/16
Key Interventions
2015/16 Budget estimates per programme (R)
2015/16 Quarterly target Means of verification
Cluster / Dept./ entity
Capex Opex Q1 Q2 Q3 Q4
Skills gap analysis and training Technology, systems stability and capacity development
Pikitup
2) % reduction in the debtors book 3
5% reduction in the debtors’ book
3.5 % reduction of R20.1 billion in the debtors’ book
Analysis of accounts in which deposits are raised and had an impact on the debtors’ book
0 49,836,000 3.5%% reduction of the debtors book as at financial year end 2014/15
3.5 % reduction of the debtors book as at financial year end 2014/15
3.5 % reduction of the debtors book as at financial year end 2014/15
3.5 % reduction of the debtors book as at financial year end 2014/15
Billing and Collections report
Cluster: Good Governance
Lead: Group Finance
Write offs and offer 50% write offs following stringent assessment
3 Accelerated revenue collection initiatives e.g. ring-fence old debt
Page | 45
NATIONAL OUTCOME 9: A RESPONSE, ACCOUNTABLE, EFFECTIVE AND EFFICIENT LOCAL GOVERNMENT SYSTEM
Joburg 2040 outcome 4: A high performing metropolitan government that pro-actively contributes to and builds a sustainable, social inclusive, local integrate and globally competitive Gauteng City Region.
Related Output: Financial and administration sustainable and resilient City
IDP programme
Key Performance Indicator
Baseline Target 2015/16
Key Interventions
2015/16 Budget estimates per programme (R)
2015/16 Quarterly target Means of verification
Cluster / Dept./ entity
Capex Opex Q1 Q2 Q3 Q4
Issuing of pre termination notices for r all defaulting accounts timeously
Accelerate external collections for accounts handed over to ATCOL (for accounts over 90 days.)
Debtors book split
Payment propensity model
Page | 46
NATIONAL OUTCOME 9: A RESPONSE, ACCOUNTABLE, EFFECTIVE AND EFFICIENT LOCAL GOVERNMENT SYSTEM
Joburg 2040 outcome 4: A high performing metropolitan government that pro-actively contributes to and builds a sustainable, social inclusive, local integrate and globally competitive Gauteng City Region.
Related Output: Financial and administration sustainable and resilient City
IDP programme
Key Performance Indicator
Baseline Target 2015/16
Key Interventions
2015/16 Budget estimates per programme (R)
2015/16 Quarterly target Means of verification
Cluster / Dept./ entity
Capex Opex Q1 Q2 Q3 Q4
B. Capital project management
3) % budget spent on city-wide infrastructure
92% budget spent on city-wide infrastructure
95% budget spent on city-wide infrastructure
10 year capital expenditure programme for engineering and infrastructure
9, 896,853,000
0 10.7% budget spent on city-wide infrastructure
30.6% budget spent on city-wide infrastructure
58.4% budget spent on city-wide infrastructure
95% budget spent on city-wide infrastructure
System Applications and Products (SAP) management Report
Cluster: Good Governance
Lead: Office of the City Manager
Supporting: Development Planning
Page | 47
NATIONAL OUTCOME 9: A RESPONSE, ACCOUNTABLE, EFFECTIVE AND EFFICIENT LOCAL GOVERNMENT SYSTEM
Joburg 2040 outcome 4: A high performing metropolitan government that pro-actively contributes to and builds a sustainable, social inclusive, local integrate and globally competitive Gauteng City Region.
Related Output: Financial and administration sustainable and resilient City
IDP programme
Key Performance Indicator
Baseline Target 2015/16
Key Interventions
2015/16 Budget estimates per programme (R)
2015/16 Quarterly target Means of verification
Cluster / Dept./ entity
Capex Opex Q1 Q2 Q3 Q4
C. Disciplined expenditure management
4) Achievement of selected profitability and liquidity ratios
Current ratio: 1:1
Current ratio: 1:1
Financial Development Plan implementation and monitoring
0 1,041,000 Current ratio: 1:1
Current ratio: 1:1
Current ratio: 1:1
Current ratio: 1:1
Monthly Finance Dashboard Monthly management reporting Annual Financial Statements
Cluster: Good Governance
Lead: Group finance
Solvency ratio: 2:1
Solvency ratio: 2.2:1
Solvency ratio: 2.2:1
Solvency ratio: 2.2:1
Solvency ratio: 2.2:1
Solvency ratio: 2.2:1
Debt to Revenue: 49.7%
Debt to Revenue: below 45%
Debt to Revenue: below 45%
Debt to Revenue: below 45%
Debt to Revenue: below 45%
Debt to Revenue: below 45%
Remuneration to Expenditure: 36.6%
Remuneration to Expenditure: below 35%
Remuneration to Expenditure: below 35%
Remuneration to Expenditure: below 35%
Remuneration to Expenditure: below 35%
Remuneration to Expenditure: below 35%
Maintenance to Expenditure: 3.6.6%
Maintenance to Expenditure: 5.3%
Maintenance to Expenditure: 5.3%
Maintenance to Expenditure: 5.3%
Maintenance to Expenditure: 5.3%
Maintenance to Expenditure: 5.3%
Interest to Expenditure: 5%
Interest to Expenditure: 5%
Interest to Expenditure: 5%
Interest to Expenditure: 5%
Interest to Expenditure: 5%
Interest to Expenditure: 5%
Page | 48
NATIONAL OUTCOME 9: A RESPONSE, ACCOUNTABLE, EFFECTIVE AND EFFICIENT LOCAL GOVERNMENT SYSTEM
Joburg 2040 outcome 4: A high performing metropolitan government that pro-actively contributes to and builds a sustainable, social inclusive, local integrate and globally competitive Gauteng City Region.
Related Output: Financial and administration sustainable and resilient City
IDP programme
Key Performance Indicator
Baseline Target 2015/16
Key Interventions
2015/16 Budget estimates per programme (R)
2015/16 Quarterly target Means of verification
Cluster / Dept./ entity
Capex Opex Q1 Q2 Q3 Q4
Net Operating Margin: 10%
Net Operating Margin: 13%
Net Operating Margin: 13%
Net Operating Margin: 13%
Net Operating Margin: 13%
Net Operating Margin: 13%
Cash coverage (days): 74.1 days
Cash coverage (days): 50 days
Cash coverage (days): 50 days
Cash coverage (days): 50 days
Cash coverage (days): 50 days
Cash coverage (days): 50 days
Page | 49
NATIONAL OUTCOME 9: A RESPONSE, ACCOUNTABLE, EFFECTIVE AND EFFICIENT LOCAL GOVERNMENT SYSTEM
Joburg 2040 outcome 4: A high performing metropolitan government that pro-actively contributes to and builds a sustainable, social inclusive, local integrate and globally competitive Gauteng City Region.
Related Output: Financial and administration sustainable and resilient City
IDP programme
Key Performance Indicator
Baseline Target 2015/16
Key Interventions
2015/16 Budget estimates per programme (R)
2015/16 Quarterly target Means of verification
Cluster / Dept./ entity
Capex Opex Q1 Q2 Q3 Q4
D. Enhanced corporate governance, through 100% compliance with financial, risk and performance management guidelines
5) Unqualified audit opinion
Unqualified audit opinion with matters of emphasis
Unqualified audit opinion with at least 85% of external and internal audit findings resolved
Audit issue redress/ mitigation initiative
N/A 332,200,000
10% of AG internal and external audit findings resolved of the previous financial year 4 resolved
35% of AG internal and external audit findings of the previous financial year is resolved
60% of AG internal and external audit findings of the previous financial year is resolved
85% of internal and external audit findings of the previous financial year is resolved.
Annual financial statement AG Report
Cluster: Good Governance
Lead: Group Risk and Assurance
Supporting: All departments
Internal control improvement process
Mitigation of top-16 city-wide risks
4 The findings as contained in the management letter of the previous Financial year .
Page | 50
PRIORITY 2: FOOD SECURITY AND AGRICULTURE
NATIONAL OUTCOMES (2, 7 & 13): A LONG AND HEALTHY LIFE FOR ALL SOUTH AFRICANS
COMPREHENSIVE RURAL DEVELOPMENT AND LAND REFORM
AN INCLUSIVE AND RESPONSIVE SOCIAL PROTECTION SYSTEM
Joburg 2040 outcome 1: Improved quality of life and development-driven resilience for all. Related Output: Food security that is both improved and safeguarded; reduce poverty and dependence and City characterized by social inclusivity and enhanced social cohesion.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimate per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
E. Access
to food
6) %
reduction
of food
insecure
household
s in all
deprived
areas5
40%
reduction in
food insecure
households
in the
deprived
areas(as
outline in the
Dept. of
Social
Development
20% (29 280)
reduction in
food insecure
households in
the most
deprived areas
(23 wards)
(cumulative
target)
Food Gardens
0 12,409,000
5%(7320)
reduction
in food
insecure
households
in the most
deprived
areas (23
wards)
10% (14640)
reduction in
food insecure
households
in the most
deprived
areas (23
wards)
15% (21960)
reduction in
food insecure
households
in the most
deprived
areas (23
wards)
20% (29280)
reduction in
food insecure
households in
the most
deprived areas
(23 wards)
Database of
the food
insecure
households
Cluster:
Human
and
Social
Developm
ent
Lead:
Social
Developm
ent
Food Bank
(Food parcels
4 food
empowerment
zones
Seed donation
for production
purposes
(5000)
5 39 of the City’s Wards are ranked as most deprived areas (rank 8-10 on the City’s poverty index) with a total population of 1 556 744 citizens (1 127 533 working age): 72% of each ward on
average under age of 35. 23 of these wards (selected according to highest levels of deprivation and highest population) account for the 60 % most deprived areas to be targeted over remainder
of mayoral term. The total population living in these 60 % targeted wards is 897 577 – with 146 398 households accounting for 441 191 individuals estimated to be food insecure. 60 % of this
food insecure target group is 87 839 food insecure households (an estimated 264 714 individuals). This target group is to be assisted over the remainder of the mayoral term, in 3 equal annual
tranches of 29 280 households per year (88 238 individuals assisted annually). (as outline in the Dept. of Social Development deprivation index report).
Page | 51
NATIONAL OUTCOMES (2, 7 & 13): A LONG AND HEALTHY LIFE FOR ALL SOUTH AFRICANS
COMPREHENSIVE RURAL DEVELOPMENT AND LAND REFORM
AN INCLUSIVE AND RESPONSIVE SOCIAL PROTECTION SYSTEM
Joburg 2040 outcome 1: Improved quality of life and development-driven resilience for all. Related Output: Food security that is both improved and safeguarded; reduce poverty and dependence and City characterized by social inclusivity and enhanced social cohesion.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimate per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
deprivation
index report)
Blue Economy
F. Urban
farmers
support
7) % growth
in market
share of
emerging
producers
at
Johannes
burg
Market
6% growth in
market share
of emerging
producers at
Johannesbur
g Market
8 % growth in
market share
of emerging
producers at
Johannesburg
Market
Development
of distribution
centres (fresh
hubs in PDAs)
0 2,500,000 8% growth in
market share
of emerging
producers at
Johannesbur
g Market
8% growth in
market share
of emerging
producers at
Johannesbur
g Market
8% growth in
market share
of emerging
producers at
Johannesbur
g Market
8% growth in
market share of
emerging
producers at
Johannesburg
Market
Financial
statements
Cluster:
Economic
Growth
Lead:
Joburg
Market
Pack house
establishment
at JM to
support
emerging
farmers
8) Number of
emerging
farmers
involved in
diversified
farming
activities
77 emerging
farmers
involved in
diversified
farming
activities
91 additional
farmers
involved in
diversified
farming
activities
Training of
informal
traders
regarding
distribution
centres;
emerging
12,000,000 5,158,000 23 additional
farmers
involved in
diversified
farming
activities
46 additional
farmers
involved in
diversified
farming
activities
69 additional
farmers
involved in
diversified
farming
activities
91 additional
farmers
involved in
diversified
farming
activities
Profiles of
emerging
farmers
Cluster:
Human
and
Social
Developm
ent
Page | 52
NATIONAL OUTCOMES (2, 7 & 13): A LONG AND HEALTHY LIFE FOR ALL SOUTH AFRICANS
COMPREHENSIVE RURAL DEVELOPMENT AND LAND REFORM
AN INCLUSIVE AND RESPONSIVE SOCIAL PROTECTION SYSTEM
Joburg 2040 outcome 1: Improved quality of life and development-driven resilience for all. Related Output: Food security that is both improved and safeguarded; reduce poverty and dependence and City characterized by social inclusivity and enhanced social cohesion.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimate per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
farmers
regarding JM
operations
Lead:
Social
Developm
ent farmer-
business
contracting
support
JM-linked
cooperative
system for
emerging
producers
Emerging
JM-linked
cooperative
system for
emerging
producers
Emerging
Page | 53
NATIONAL OUTCOMES (2, 7 & 13): A LONG AND HEALTHY LIFE FOR ALL SOUTH AFRICANS
COMPREHENSIVE RURAL DEVELOPMENT AND LAND REFORM
AN INCLUSIVE AND RESPONSIVE SOCIAL PROTECTION SYSTEM
Joburg 2040 outcome 1: Improved quality of life and development-driven resilience for all. Related Output: Food security that is both improved and safeguarded; reduce poverty and dependence and City characterized by social inclusivity and enhanced social cohesion.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimate per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
Hub
establishment
(Processing &
packaging &
cold storage)
Emerging
farmer support
Blue economy
mushroom
farming
supporting
Partnership
with
commercial
farms
Page | 54
NATIONAL OUTCOMES (2, 7 & 13): A LONG AND HEALTHY LIFE FOR ALL SOUTH AFRICANS
COMPREHENSIVE RURAL DEVELOPMENT AND LAND REFORM
AN INCLUSIVE AND RESPONSIVE SOCIAL PROTECTION SYSTEM
Joburg 2040 outcome 1: Improved quality of life and development-driven resilience for all. Related Output: Food security that is both improved and safeguarded; reduce poverty and dependence and City characterized by social inclusivity and enhanced social cohesion.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimate per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
G. Long
and
healthy
life for all
9) % of
hypertensi
ve patients
controlled
28% of
hypertensive
patients
controlled
70% of
hypertensive
patients
controlled
Medication,
nutritional
counselling
and support
Detection
medication,
nutritional
council annual
130,498,00
0
0 N/A 6 N/A 7 N/A 8 70% of
hypertensive
patients control
List of
hypertensive
controlled
patients
Cluster :
Human
and
Social
Developm
ent
Lead:
Health
6 This is an annual survey and progress will be reported quarterly to provide evidence of progress to stakeholders. 7 This is an annual survey and progress will be reported quarterly to provide evidence of progress to stakeholders. 8 This is an annual survey and progress will be reported quarterly to provide evidence of progress to stakeholders.
Page | 55
PRIORITY 3: SUSTAINABLE HUMAN SETTLEMENT
NATIONAL OUTCOME 6 & 8: AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE
Joburg 2040 Outcome 3: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Eco-mobility
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity Capex Opex
Q1 Q2 Q3 Q4
H. Improve
d
mobility
10) Number of
Rea Vaya
Bus Rapid
Transport
passenger
trips per
working
day
32 000 Rea
Vaya BRT
passenger
trips per
working day
45,250
passenger trips
per average
working day9
Rea Vaya
BRT: (Phase 1
A & B)
0 632,000,00
0
40 000
passenger
trips per
average
working day
43 000
passenger
trips per
average
working day
47 000
passenger
trips per
average
working day
51 000
passenger
trips per
average
working day
Tickets sales
Cluster:
Economic
Growth
Lead:
Transport
11) Number of
kilometres
of
walkway
and cycle
lanes
completed
5 km of
kilometres of
walkway and
cycle lanes
completed
10 km
kilometres of
walkway and
cycle lanes
completed
Non-motorised
transport
infrastructure
implemented
(e.g. NMT
projects
implemented
at Rosebank to
40,000,000 0 0 km of
kilometres of
walkway
and cycle
lanes
completed
2 kms
kilometres of
walkway and
cycle lanes
completed
5 kms
kilometres of
walkway and
cycle lanes
completed
10 kms
kilometres of
walkway and
cycle lanes
completed
Completion of
certificate
Economic
Growth
Cluster
Lead:
Transport
9 Average for all four quarters are added together and divided by four to determine the average for the year. This is the passenger trip for all working days in a month divided
by a number of working days. The total for the three in a quarter are added together and divided three to determine the average for the quarter.
Page | 56
NATIONAL OUTCOME 6 & 8: AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE
Joburg 2040 Outcome 3: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Eco-mobility
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity Capex Opex
Q1 Q2 Q3 Q4
Sandton, Ivory
Park, UJ /Wits
etc.)
I. Transit
Oriented
Develop
ment -
Priority
areas
12) Number of
lane km of
roads
resurfaced
323.51 lane
km of roads
resurfaced
1200 lane km
of roads
resurfaced city-
wide as per
Pavement
Management
system (PMS)
Resurfacing
road M1 motor
way
733,821,00
0
138,000,00
0
300 lane km
of roads
resurfaced
city-wide as
per
Pavement
Managemen
t system
(PMS)
600 lane km of
roads
resurfaced
city-wide as
per Pavement
Management
system (PMS)
900 lane km of
roads
resurfaced
city-wide as
per Pavement
Management
system (PMS)
1200 lane km
of roads
resurfaced
city-wide as
per Pavement
Management
system (PMS)
Visual
commission
index report
Cluster:
Economic
Growth
Lead:
Johannes
burg
Roads
Agency
Resurfacing
SOWETO high
way
13) Kilometres
of gravel
roads
upgraded
to
surfaced
43.8 km of
gravel roads
upgraded to
surfaced
roads
47,90 km of
gravel roads
upgraded to
surfaced roads
Upgrading of
gravel roads to
surfaced roads
programme
Bram
Fishersvill,
310,800,00
0
0 10 km of
gravel roads
upgraded to
surfaced
roads
20 km of
gravel roads
upgraded to
surfaced roads
34 km of
gravel roads
upgraded to
surfaced roads
47,90 km of
gravel roads
upgraded to
surfaced roads
Completion
certificate
Cluster:
Economic
Growth
Lead:
Johannes
burg
Page | 57
NATIONAL OUTCOME 6 & 8: AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE
Joburg 2040 Outcome 3: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Eco-mobility
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity Capex Opex
Q1 Q2 Q3 Q4
roads Diepsloot,
Doornkop/Thul
ani, Driezik,
Ivory Park,
Lawley,
Orange Farm,
Protea South
and
Tshepisong
Roads
Agency
14) Kilometres
of Open
drains into
undergrou
nd at
specified
areas
5.8 km of
open drains
into
underground
at specified
areas
7.3 km of open
drains into
underground at
specified areas
Conversion of
open drains to
underground,
Bram
Fischerville,
Diepsloot,
Ivory Park and
Orange Farm.
52,500,000 0 2.3 km of
open drains
into
underground
at specified
areas
3.3 km of
open drains
into
underground
at specified
areas
5.3 km of open
drains into
underground
at specified
areas
7.3 km of open
drains into
underground
at specified
areas
Completion
certificate
Cluster:
Economic
Growth
Lead:
Johannes
burg
Roads
Agency
Page | 58
NATIONAL OUTCOME 6 & 8: AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE
Joburg 2040 Outcome 3: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Eco-mobility
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity Capex Opex
Q1 Q2 Q3 Q4
J. Compact
,
integrate
d and
liveable
urban
form and
spaces
15) %
expenditur
e spent on
the
coordinati
on of
R230
million
CoF capex
allocation
95%
expenditure
spent on the
coordination
of R130
million CoF
capex
allocation
95%
expenditure
spent on the
coordination of
R 230 million
CoF capex
allocation
Regulatory
incentives
230,000,00
0
0 10%
expenditure
spent on the
coordination
of R 230
million CoF
capex
allocation
30%
expenditure
spent on the
coordination of
R230 million
CoF capex
allocation
60%
expenditure
spent on the
coordination of
R230 million
CoF capex
allocation
95%
expenditure
spent on the
coordination of
R230 million
CoF capex
allocation
Completion
certificate
SAP
management
report on capex
spent.
Cluster:
Economic
Growth
Lead:
Developm
ent
Planning
Supportin
g:
Health
Transport
Environm
ent.
Infrastruct
ure and
Service
Departme
nt
Housing
Public
Capital
investment per
2 Strategic
Area
Frameworks (6
of which 3 is
completed)
Development
facilitation
(catalytic
public
investment) by
JDA in key
nodes
Page | 59
NATIONAL OUTCOME 6 & 8: AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE
Joburg 2040 Outcome 3: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Eco-mobility
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity Capex Opex
Q1 Q2 Q3 Q4
Safety
Communit
y Dev
Johannes
burg
Roads
Agency
Joburg
Market
Johannes
burg
Developm
ent
Agency
Johannes
burg
Social
Housing
Company
Page | 60
NATIONAL OUTCOME 6 & 8: AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE
Joburg 2040 Outcome 3: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Eco-mobility
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity Capex Opex
Q1 Q2 Q3 Q4
Joburg
Water
City
Power
Johannes
burg City
Parks and
Zoo
K. Mix of
housing
options3
16) Number of
CoJ
housing
units
developed
for the
underprivil
eged10
3750 COJ
housing units
developed
for the
underprivileg
ed
3484 COJ
housing units
developed for
the
underprivileged
Integrated
residential
development
programme:
Mixed tenure,
income and
typology
housing
developments
156,000,00
0
229,000,00
0
484 COJ
housing
units
developed
for the
underprivile
ged
1000 COJ
housing units
developed for
the
underprivilege
d
2500 COJ
housing units
developed for
the
underprivilege
d
3484 COJ
housing units
developed for
the
underprivilege
d
Completion
certificate
Cluster:
Sustainab
le
services
Lead:
Housing
10 Underprivileged refers to beneficiaries captured in the housing database, compiled under the housing regime.
Page | 61
NATIONAL OUTCOME 6 & 8: AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE
Joburg 2040 Outcome 3: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Eco-mobility
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity Capex Opex
Q1 Q2 Q3 Q4
Corridor
Housing
Development
17) Number of
social
housing
units
developed
1000 social
housing units
developed11
1558 social
housing units
developed
Development
of a new
housing
standard to
create
alternative
rental stock
503,000,00
0
0 N/A12 N/A N/A 1558 social
housing units
developed
Completion
certificate
Cluster:
Sustainab
le
services
Lead:
Johannes
burg
Social
Housing
Company
11 These developments refer to the Construction of quality social housing and rentals places.
12 Planning and construction takes place during Q1 to Q3. Counting the number of development happens in Q4.
Page | 62
PRIORITY 4, 8 AND 9: ECONOMIC GROWTH
NATIONAL OUTCOMES (4 & 5):
DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
A SKILLED AND CAPABLE WORKFORCE TO SUPPORT AN INCLUSIVE GROWTH PATH
Joburg 2040 Outcome 3: An inclusive, job intensive, resilient and competitive economy that harness the potential of citizen. Related Output: Job-intensive economic growth, Promotion and support to small businesses.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
L. City wide
job
creation
program
me –
250 000
jobs by
2016
18) Number of
EPWP
opportuniti
es
created13
55 082
EPWP
opportunities
created
50 000 EPWP
opportunities
created
citywide
EPWP
Programme
0 38,477,000 10 000
EPWP
opportunitie
s created
20000 EPWP
opportunities
created
35000 EPWP
opportunities
created
50000 EPWP
opportunities
created
Signed
confirmation
letters by
implementing
agency
EPWP
database
Cluster:
Economic
Growth
Lead:
Economic
Developm
ent
Supportin
g:
Health
Housing
Joburg
13 13 Paid work for an individual for any period of time, the same individual can be employed on different projects and each period of employment will be counted as work
opportunity. The definition as per national employment indicator.
Page | 63
NATIONAL OUTCOMES (4 & 5):
DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
A SKILLED AND CAPABLE WORKFORCE TO SUPPORT AN INCLUSIVE GROWTH PATH
Joburg 2040 Outcome 3: An inclusive, job intensive, resilient and competitive economy that harness the potential of citizen. Related Output: Job-intensive economic growth, Promotion and support to small businesses.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
Market
Communit
y
Developm
ent
Social
Developm
ent
Johannes
burg
Parks and
Zoo
Johannes
burg
Property
Company
Johannes
Page | 64
NATIONAL OUTCOMES (4 & 5):
DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
A SKILLED AND CAPABLE WORKFORCE TO SUPPORT AN INCLUSIVE GROWTH PATH
Joburg 2040 Outcome 3: An inclusive, job intensive, resilient and competitive economy that harness the potential of citizen. Related Output: Job-intensive economic growth, Promotion and support to small businesses.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
burg
Roads
Agency
Pikitup
Johannes
burg
Social
Housing
Company
Metro Bus
Joburg
Theatre
Environm
ent.
Infrastruct
ure and
Service
Page | 65
NATIONAL OUTCOMES (4 & 5):
DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
A SKILLED AND CAPABLE WORKFORCE TO SUPPORT AN INCLUSIVE GROWTH PATH
Joburg 2040 Outcome 3: An inclusive, job intensive, resilient and competitive economy that harness the potential of citizen. Related Output: Job-intensive economic growth, Promotion and support to small businesses.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
Departme
nt
19) Number of
jobs
created
city-wide14
13 329 jobs
created city-
wide
50 000 jobs
created city-
wide
Conduct due
diligence of
fast-tracked
investments
into the City
tbc tbc 10 000jobs
created city
wide
20 000jobs
created city
wide
35 000 jobs
created city
wide
50 000 jobs
created city
wide
Signed
appointment
letters of
employment by
implementing
agency
Employee
database
Cluster
Economic
Growth
Lead:
Economic
Growth
Supportin
g:
All
departme
nts and
entities
Feasibility
studies and
impact
assessments
of large City
economic
projects
14 Paid work for an individual for any period of time, the same individual can be employed on different projects and each period of employment will be counted as work
opportunity. The definition as per national employment indicator.
Page | 66
NATIONAL OUTCOMES (4 & 5):
DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
A SKILLED AND CAPABLE WORKFORCE TO SUPPORT AN INCLUSIVE GROWTH PATH
Joburg 2040 Outcome 3: An inclusive, job intensive, resilient and competitive economy that harness the potential of citizen. Related Output: Job-intensive economic growth, Promotion and support to small businesses.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
Jozi@work
programmes
Blue economy
projects
Vulindlela e
Jozi youth
Development
programme
M. Enterpris
e
Develop
ment
20) Number of
SMMEs
supported
by the
City15
1000 SMMEs
supported by
the City
2000 SMMEs
supported by
the City
Business
support to
SMMEs
0 5,000,000 500 SMMEs
supported
by the City
1000 SMMEs
supported by
the City
1500 SMMEs
supported by
the City
2000 SMMEs
supported by
the City
Database of
SMME’s
supported
Cluster:
Economic
growth
Lead:
Economic
developm
ent
15 Support entails business development services, access to funding through partnership with Nedbank and ABSA, product development, provision of managed work spaces
and general business training (soft skills).
Page | 67
NATIONAL OUTCOMES (4 & 5):
DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
A SKILLED AND CAPABLE WORKFORCE TO SUPPORT AN INCLUSIVE GROWTH PATH
Joburg 2040 Outcome 3: An inclusive, job intensive, resilient and competitive economy that harness the potential of citizen. Related Output: Job-intensive economic growth, Promotion and support to small businesses.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
21) Rand
value
investment
and/ or
business
transactio
ns
attracted
and
retained
within the
City
R 1 billion
value of
investment
and/ or
business
transactions
facilitated
R 3 billion
value of
investment
and/ or
business
transactions
facilitated
40 exporters
developed
(with product
to be export
ready)
Investment
Incentives
Policy
development
and
implementation
0 6,000,000 500 million
value of
investment
and/ or
business
transactions
facilitated
1 billion value
of investment
and/ or
business
transactions
facilitated
R 2 billion
value of
investment
and/ or
business
transactions
facilitated
R 3 billion
value of
investment
and/ or
business
transactions
facilitated
Financial value
of investment
attracted
Investment
schedule with
date,
description and
amount
Cluster:
Economic
Growth
Lead:
Economic
Developm
ent
Facilitate
exporter
development
programmes in
collaboration
with key
stakeholders
(GGDA, the
Page | 68
NATIONAL OUTCOMES (4 & 5):
DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
A SKILLED AND CAPABLE WORKFORCE TO SUPPORT AN INCLUSIVE GROWTH PATH
Joburg 2040 Outcome 3: An inclusive, job intensive, resilient and competitive economy that harness the potential of citizen. Related Output: Job-intensive economic growth, Promotion and support to small businesses.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
dti, TISA etc.)
Page | 69
PRIORITY 5: ENGAGE CITIZENRY
NATIONAL OUTCOMES (12 & 14):
AN EFFICIENT, EFFECTIVE AND DEVELOPMENT-ORIENTED PUBLIC SERVICE
NATION BUILDING AND SOCIAL COHESION
Joburg 2040 Outcome 4: A high performing metropolitan government that pro-actively contributes to and builds a sustainable,
socially inclusive, locally integrated and globally competitive Gauteng City Region. Related Output: An active and effective citizen focused GCR, meaningful citizen participation and empowerment and guaranteed customer and citizen care and services.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
N. Citizen
participat
ion,
empowe
rment
and
custome
r care
22) Improvem
ent in
citizen
satisfactio
n levels
57% rating
in
satisfaction
index
satisfaction
index at 65% 16
Customer Care
Survey
0 1,3000,000 Annual target Annual target Annual target Satisfaction
index at 65%
Satisfaction
survey index
Cluster:
Good
Governan
ce
Lead:
Group
Strategy,
Policy
Coordinati
on and
Relation
Supportin
g:
All
16 Including Water (85% satisfaction: 95.8% access); electricity (79% satisfaction: 90% access); sanitation (78.9% satisfaction: 95.9% access); and refuse collection (82.3% satisfaction: 96.5%)
access)
Page | 70
NATIONAL OUTCOMES (12 & 14):
AN EFFICIENT, EFFECTIVE AND DEVELOPMENT-ORIENTED PUBLIC SERVICE
NATION BUILDING AND SOCIAL COHESION
Joburg 2040 Outcome 4: A high performing metropolitan government that pro-actively contributes to and builds a sustainable,
socially inclusive, locally integrated and globally competitive Gauteng City Region. Related Output: An active and effective citizen focused GCR, meaningful citizen participation and empowerment and guaranteed customer and citizen care and services.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
departme
nt and ME
O. Custome
r Service
Charter
23) %
achieveme
nt Service
Level
Standard17
41.07%
achievement
of service
level
standards
90%
achievement
Service Level
Standards
Area based
service
standards
turnaround
time
improvements
0 0 90%
achievement
Service Level
Standards
90%
achievement
Service Level
Standards
90%
achievement
Service Level
Standards
90%
achievement
Service Level
Standards
Service level
standard
Call centre
records
Cluster:
Good
Governan
ce
Lead:
Group
Governan
ce
Supportin
g:
Citizens
17 The City has 139 service level standards. The following departments and entities contribute to the 139 service level standards: City Power (9); Joburg Water (9); Pikitup (10);
Johannesburg Road Agency (9); City Parks and Zoo (9); Johannesburg Social Housing Company (7); Johannesburg Property Company (8); Joburg Market ((7); Metro Bus (7);
Joburg Theatre (7); Emergency Services (8); Joburg Metropolitan Police (10); Health (8); Housing (5); Community Development (8); Development Planning (10).
Page | 71
NATIONAL OUTCOMES (12 & 14):
AN EFFICIENT, EFFECTIVE AND DEVELOPMENT-ORIENTED PUBLIC SERVICE
NATION BUILDING AND SOCIAL COHESION
Joburg 2040 Outcome 4: A high performing metropolitan government that pro-actively contributes to and builds a sustainable,
socially inclusive, locally integrated and globally competitive Gauteng City Region. Related Output: An active and effective citizen focused GCR, meaningful citizen participation and empowerment and guaranteed customer and citizen care and services.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
Relations
and
Urban
Managem
ent
P. Engaged
, active
citizenry
24) % of 47
approved
CBP
community
projects
implement
ed
New 90%
of 47 approved
CBP
community
projects 18
implemented
Approved ward
plans
Blue Economy
programme
Jozi@work
programme
160,000,00
0
50,000,000 20 % of 47
approved
CBP
community
projects
implemented
50 % of 47
approved
CBP
community
projects
implemented
projects
implemented
75 % of 47
approved CBP
community
projects
implemented
implemented
90% of 47
approved CBP
community
projects
implemented
Service level
agreement
Completion
certificates
Cluster:
Good
Governan
ce
Lead:
Group
Strategy,
Policy
Coordinati
on and
Relation
18 As outlined in the CBP priority projects report adopted by Mayoral committee in 2015.
Page | 72
NATIONAL OUTCOMES (12 & 14):
AN EFFICIENT, EFFECTIVE AND DEVELOPMENT-ORIENTED PUBLIC SERVICE
NATION BUILDING AND SOCIAL COHESION
Joburg 2040 Outcome 4: A high performing metropolitan government that pro-actively contributes to and builds a sustainable,
socially inclusive, locally integrated and globally competitive Gauteng City Region. Related Output: An active and effective citizen focused GCR, meaningful citizen participation and empowerment and guaranteed customer and citizen care and services.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
Supportin
g:
All
departme
nts and
entities
25) Number of
dialogue
and
education
sessions
implement
ed in the
identified
high risk
areas for
xenophobi
c attacks
Regional
workshops
7 Regional
dialogue and
education
sessions
implemented in
the identified
high risk areas
for xenophobic
attacks
Migrant
dialogue
0 0 Regional
Dialogue and
education
sessions
implemented
in the
identified
high risk
areas for
xenophobic
attacks in 2
Regions
Regional
Dialogue and
education
sessions
implemented
in the
identified high
risk areas for
xenophobic
attacks in 4
Regions
Regional
dialogue and
education
sessions
implemented
in the
identified high
risk areas for
xenophobic
attacks in 6
Regions
7 Regional
dialogue and
education
sessions
implemented
in the
identified high
risk areas for
xenophobic
attacks in 7
Regions
Minutes of the
Dialogue
Attendance
register
Cluster:
Human
and
Social
Developm
ent
Lead:
Social
Developm
ent
Supportin
g:
Page | 73
NATIONAL OUTCOMES (12 & 14):
AN EFFICIENT, EFFECTIVE AND DEVELOPMENT-ORIENTED PUBLIC SERVICE
NATION BUILDING AND SOCIAL COHESION
Joburg 2040 Outcome 4: A high performing metropolitan government that pro-actively contributes to and builds a sustainable,
socially inclusive, locally integrated and globally competitive Gauteng City Region. Related Output: An active and effective citizen focused GCR, meaningful citizen participation and empowerment and guaranteed customer and citizen care and services.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
Communit
y
Developm
ent
26) %
increase
media
awareness
of the City
Strategic
direction
New 80% media
awareness of
the City
strategic
direction
Media
Partnership
CoJ events
Social media
presents
CoJ Website
Implementatio
n of
communication
strategy
0 45,000,000 10% media
awareness of
the City
strategic
direction
80% media
awareness of
the City
strategic
direction
80% media
awareness of
the City
strategic
direction
80% media
awareness of
the City
strategic
direction
Media
monitoring
report
Cluster:
Good
Governan
ce
Lead:
Group
Communi
cations
and
Marketing
Supportin
g:
All depts.
and
Page | 74
NATIONAL OUTCOMES (12 & 14):
AN EFFICIENT, EFFECTIVE AND DEVELOPMENT-ORIENTED PUBLIC SERVICE
NATION BUILDING AND SOCIAL COHESION
Joburg 2040 Outcome 4: A high performing metropolitan government that pro-actively contributes to and builds a sustainable,
socially inclusive, locally integrated and globally competitive Gauteng City Region. Related Output: An active and effective citizen focused GCR, meaningful citizen participation and empowerment and guaranteed customer and citizen care and services.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
entities
Page | 75
PRIORITY 6: RESOURCE SUSTAINABILITY
NATIONAL OUTCOMES (6&10):
AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
PROTECT AND ENHANCE OUR ENVIRONMENTAL ASSETS AND NATURAL RESOURCES
Joburg 2040 Outcome 2: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Sustainable and Integrated delivery water, sanitation, energy and waste; climate change resilience and environmental protection.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
Q. Biodiver
sity
conserva
tion
27) Km2 /
hectares
alien and
invasive
species
infested
land
cleared19
300 ha of
alien and
invasive
species (AIS)
infested land
cleared
700 ha of alien
and invasive
species (AIS)
Infested land
cleared
Literature
review
Data collection
from other role
players
Mapping of
Alien and
Invasive
Species
Infestation
Implementatio
n of AIS
Control
Measures
0 5,000,000 0 ha of alien
and invasive
species
(AIS)
Infested
land cleared
300 ha of alien
and invasive
species (AIS)
Infested land
cleared
500 ha of alien
and invasive
species (AIS)
Infested land
cleared
700 ha of alien
and invasive
species (AIS)
Infested land
cleared
Completion
certificate
Cluster:
Sustainab
le service
Lead:
Environm
ent.
Infrastruct
ure and
Service
Departme
nt
19 The total area in km2 ha of infested land to be confirmed.
Page | 76
NATIONAL OUTCOMES (6&10):
AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
PROTECT AND ENHANCE OUR ENVIRONMENTAL ASSETS AND NATURAL RESOURCES
Joburg 2040 Outcome 2: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Sustainable and Integrated delivery water, sanitation, energy and waste; climate change resilience and environmental protection.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
R. Climate
Change
and Air
Quality
28) %
reduction
in GHG
emissions
as a result
of
mitigation
projects
10 %
reduction in
GHG
emissions as
a result of
mitigation
projects
15% reduction
in GHG
emissions as a
result of
mitigation
projects
Installation of
biogas plant at
other WWTWs
(Johannesburg
Water)
0 0 Annual
target
Annual target Annual target 15% reduction
in GHG
emissions as a
result of
mitigation
projects
Annual report
on emission
reduction
Cluster:
Sustainab
le
Services
Lead:
Environm
ent
Infrastruct
ure
services
Departme
nt
Supportin
Page | 77
NATIONAL OUTCOMES (6&10):
AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
PROTECT AND ENHANCE OUR ENVIRONMENTAL ASSETS AND NATURAL RESOURCES
Joburg 2040 Outcome 2: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Sustainable and Integrated delivery water, sanitation, energy and waste; climate change resilience and environmental protection.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
g:
Pikitup
City
power
Transport
Joburg
Market
S. Urban
Water
manage
ment
29) %
reduction20
in water
losses
35.7% non-
revenue
water losses
35 % reduction 21in non-
revenue water
loses
Interventions
to reduce non-
revenue water
losses
281,000,00
0
0 39%
reduction in
non-revenue
water loses
37% reduction
in non-
revenue water
36 reduction in
non-revenue
water loses
35 %
reduction in
non-revenue
Bulk water
purchase and
financial
statement
Cluster:
Sustainab
le service
Lead
20 (NRW) is water that has been produced and is “lost” before it reaches the customer. Losses can be real losses (through leaks, sometimes also referred to as physical
losses) or apparent losses (losses that result through theft or metering inaccuracies). 21 The reduction in non-revenue water loses is from 35.7% to 35%
Page | 78
NATIONAL OUTCOMES (6&10):
AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
PROTECT AND ENHANCE OUR ENVIRONMENTAL ASSETS AND NATURAL RESOURCES
Joburg 2040 Outcome 2: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Sustainable and Integrated delivery water, sanitation, energy and waste; climate change resilience and environmental protection.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
program
me
Blue economy
project
loses water loses s Joburg
Water
30) number of
schools
within
which
Rainwater
Harvesting
Programm
e is rolled
out
150 schools
within which
rainwater
harvesting
programme
is rolled out
300 schools
within which
Rainwater
Harvesting
Programme is
rolled out
Rain Water
Harvesting
Programme
0 0 75 schools
within which
Rainwater
Harvesting
Programme
is rolled out
150 schools
within which
Rainwater
Harvesting
Programme is
rolled out
225 schools
within which
Rainwater
Harvesting
Programme is
rolled out
300 schools
within which
Rainwater
Harvesting
Programme is
rolled out
Database of
school
Completion
report
Cluster:
Sustainab
le service
Lead
Joburg
Water
T. Integrate
d Waste
Manage
31) Increased
participatio
n rate in
20%
participation
rate in
70%
participation
rate in targeted
Waste to
Energy
0 50,000,000 70%
participation
rate in
70%
participation
rate in
70%
participation
rate in
70%
participation
rate in
Separation at
source
participants
Cluster:
Sustainab
le
Page | 79
NATIONAL OUTCOMES (6&10):
AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
PROTECT AND ENHANCE OUR ENVIRONMENTAL ASSETS AND NATURAL RESOURCES
Joburg 2040 Outcome 2: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Sustainable and Integrated delivery water, sanitation, energy and waste; climate change resilience and environmental protection.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
ment
Program
me
targeted
areas
where
separation
at source
is
implement
ed
targeted
areas where
separation at
source is
implemented
areas where
separation at
source is
implemented
Office waste
recycling
targeted
areas where
separation
at source is
implemente
d
targeted areas
where
separation at
source is
implemented
targeted areas
where
separation at
source is
implemented
targeted areas
where
separation at
source is
implemented
database
Attendance
register/s
services
Lead
Pikitup
U. Integrate
d Waste
Manage
ment
Program
32) %
reduction
in waste to
landfill
8 %
reduction in
waste to
landfill
20 % 22
reduction in
waste to landfill
Waste to
Energy
30,000,000 57,000,000 5 %
reduction in
waste to
landfill
10 %
reduction in
waste to
landfill
15 %
reduction in
waste to
landfill
20 %
reduction in
waste to
landfill
Data on waste
Waste
information
system
Cluster:
Sustainab
le
services
Lead
Recycling by
private sector
22 Combined target focusing reflecting government and the private sector’s contribute to the 20% target. This SDBIP focuses on Pikitup’s contribution of reduction of waste to landfills.
Page | 80
NATIONAL OUTCOMES (6&10):
AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
PROTECT AND ENHANCE OUR ENVIRONMENTAL ASSETS AND NATURAL RESOURCES
Joburg 2040 Outcome 2: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Sustainable and Integrated delivery water, sanitation, energy and waste; climate change resilience and environmental protection.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
me Blue Economy
project
Environm
ent
Infrastruct
ure
services
Departme
nt
Supportin
g
Pikitup
Page | 81
PRIORITY 7: SMART CITY
NATIONAL OUTCOME (6): AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
Joburg 2040 Outcome 2: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Sustainable and Integrated delivery water, sanitation, energy and waste; climate change resilience and environmental protection.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
V. Smart
Institutio
n
Program
me
33) %
implement
ation of
Smart City
ICT
Enableme
nt
Programm
e
75%
implementati
on of Smart
City ICT
Enablement
Programme23
100%
implementation
of Smart City
ICT
Enablement
Programme
Applications
(SAP Upgrade 24)
272,500,00
0
0 25%
implementati
on of Smart
City ICT
Enablement
Programme
50%
implementatio
n of Smart City
ICT
Enablement
Programme
75%
implementatio
n of Smart City
ICT
Enablement
Programme
100%
implementatio
n of Smart City
ICT
Enablement
Programme
SAP
management
report
Cluster:
Good
Governan
ce
Lead
dept:
Group
Corporate
and
Shared
Services
Supportin
g::
Group
Strategy,
E-services
Mobile
Solutions
Infrastructure:
Telecommunic
ation
Blue economy
projects
23 Enablement programme as outline in the Smart City strategy.
24 Integration of systems and processes.
Page | 82
NATIONAL OUTCOME (6): AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
Joburg 2040 Outcome 2: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Sustainable and Integrated delivery water, sanitation, energy and waste; climate change resilience and environmental protection.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
Policy
Coordinati
on and
Relations
Public
Safety
W. Access
and
connecti
vity
34) Number of
connection
s to WiFi
hotspots
connectivit
y in City
owned
facilities25
500 WiFi
Hotspots
connectivity
at City-
owned
facilities
1000 WiFi
Hotspots
connectivity at
City-owned
facilities
Joburg
Broadband
Network (JBN)
50,000,000 0 250 WiFi
Hotspots
connectivity
at City-
owned
facilities
500 WiFi
Hotspots
connectivity at
City-owned
facilities
750 WiFi
Hotspots
connectivity at
City-owned
facilities
1000 WiFi
Hotspots
connectivity at
City-owned
facilities
Internet
connectivity
report
Cluster:
Good
Governan
ce Cluster
Lead
Economic
Developm
ent
Supportin
g:
Group
Corporate
Linked to Wi-Fi
Hotspots
Public Access
to e-Learning
25 Affordable internet connectivity refers to internet access accessed through the City-wide hotspots.
Page | 83
NATIONAL OUTCOME (6): AN EFFICIENT, COMPETITIVE AND RESPONSIVE ECONOMIC INFRASTRUCTURE NETWORK
Joburg 2040 Outcome 2: Provide a resilience, liveable, sustainable urban environment-underpinned by infrastructure
supportive of a low-carbon economy. Related Output: Sustainable and Integrated delivery water, sanitation, energy and waste; climate change resilience and environmental protection.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
and
Shared
Services
X. Smart
Citizen
Program
me
35) Number of
libraries
with
internet
connection
3 libraries
with internet
connection
30 additional
libraries with
internet
connection
ICT Hubs
5,000,000 1,400,000 2 additional
libraries with
internet
connection
12 additional
libraries with
internet
connection
20 additional
libraries with
internet
connection
30 additional
libraries with
internet
connection
Internet
connectivity in
Libraries
Cluster:
Good
Governan
ce
Lead:
Group
Corporate
and
Shared
Services
Supportin
g:
Communit
y
Public Access
to e-learning
Joburg App
development
Page | 84
PRIORITY 10: SAFER CITY
NATIONAL OUTCOME (3): ALL PEOPLE IN SOUTH AFRICA ARE AND FEEL SAFE
Joburg 2040 Outcome 1: Improve the quality of life and development-driven resilience for all. Related Output: Safe and secure City.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
Y. Policing
and
manage
ment of
public
spaces
36) %26
reduction
of
common
robbery,
assault
GBH,
common
assault,
theft of
motor
vehicles,
burglary
residential
/business
5 %
reduction of
common
robbery,
assault GBH,
common
assault, theft
of motor
vehicles,
burglary
residential/bu
siness
5% reduction
of Common
robbery,
assault GBH,
common
assault, theft of
motor vehicles,
burglary
residential/busi
ness
Implementatio
n of ward
based policing
plans with
identified crime
reduction
intervention
0 320,000,00
0
1%
reduction of
Common
robbery,
assault
GBH,
common
assault,
theft of
motor
vehicles,
burglary
residential/b
usiness
2% reduction
of Common
robbery,
assault GBH,
common
assault, theft
of motor
vehicles,
burglary
residential/bus
iness
3.5% of
reduction
of Common
robbery,
assault GBH,
common
assault, theft
of motor
vehicles,
burglary
residential/bus
iness
5% reduction
of Common
robbery,
assault GBH,
common
assault, theft
of motor
vehicles,
burglary
residential/bus
iness
South African
police crime
statics report
Cluster:
Human
and
Social
Developm
ent
Lead:
Public
Safety
26 The total is 4 208 less incidents of common robbery, assaults, theft of motor vehicles and burglary.
Page | 85
NATIONAL OUTCOME (3): ALL PEOPLE IN SOUTH AFRICA ARE AND FEEL SAFE
Joburg 2040 Outcome 1: Improve the quality of life and development-driven resilience for all. Related Output: Safe and secure City.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
37) %
reduction
in
mortalities
linked to
medical
emergenci
es
5% reduction
in the
mortality rate
in fire and
pedestrian
accidents
through
rendering
emergency
quality
15% reduction
in the mortality
rate in fire and
pedestrian
accidents
through
rendering
emergency
quality
EMS
capacitation
(recruitment;
purchasing of
additional
medical
equipment)
102,000,00
0
900,000,00
0
15%
reduction in
the mortality
rate in fire
and
pedestrian
accidents
through
rendering
emergency
quality
15% reduction
in the mortality
rate in fire and
pedestrian
accidents
through
rendering
emergency
quality
15% reduction
in the mortality
rate in fire and
pedestrian
accidents
through
rendering
emergency
quality
15% reduction
in the mortality
rate in fire and
pedestrian
accidents
through
rendering
emergency
quality
Incidents
reports
Cluster:
Human
and
Social
Developm
ent
Lead:
Public
Safety
38) increase
in number
of citations
issued for
illegal
dumping
in order to
improve
complianc
e to City’s
895 Citations
issued
985 citations
issued in
citations
issued for
illegal dumping
in order to
improve
compliance to
City’s by-law
Implementatio
n multi agency
reforms and
reaction to
resolve
complains on
illegal dumping
issues
0 tbc 245 citations
issued in
citations
issued for
illegal
dumping in
order to
improve
compliance
to City’s by-
law
500 citations
issued in
citations
issued for
illegal
dumping in o
drains into
underground
at specified
areas rder to
improve
700 citations
issued in
citations
issued for
illegal
dumping in
order to
improve
compliance to
City’s by-law
985 citations
issued in
citations
issued for
illegal
dumping in
order to
improve
compliance to
City’s by-law
Citations
issued
Cluster:
Human
and
Social
Developm
ent
Lead::
Public
Safety
Page | 86
NATIONAL OUTCOME (3): ALL PEOPLE IN SOUTH AFRICA ARE AND FEEL SAFE
Joburg 2040 Outcome 1: Improve the quality of life and development-driven resilience for all. Related Output: Safe and secure City.
IDP
programme
Key
Performance
Indicator
Baseline Target
2015/16
Key
Interventions
2015/16 Budget
estimates per
programme (R)
2015/16 Quarterly target Means of
verification
Cluster /
Dept./
entity
Capex Opex Q1 Q2 Q3 Q4
by-law
compliance to
City’s by-law
39) %
implement
ation of
substance
abuse
programm
e through
social
programm
es27
100%
implementati
on of the
substance
abuse
programme.
100%
implementation
of 3 tier
programme
targeting youth
at risk.
Local drug
action
committees
100%
implementat
ion of 3 tier
programme
targeting
youth at
risk.
100%
implementatio
n of 3 tier
programme
targeting
youth at risk.
100%
implementatio
n of 3 tier
programme
targeting
youth at risk.
100%
implementatio
n of 3 tier
programme
targeting
youth at risk.
Social
Development
Quarterly
report
Cluster:
Human
and
Social
Developm
ent
Lead:
Social
Developm
ent
Supportin
g:
Public
Safety
27 Local action drug committee, youth programme, case work, positive lifestyle programme
Page | 87
4. ALIGNMENT OF GDS, IDP AND SDBIP INDICATORS
For monitoring and evaluation purposes and for measuring progress against long-term organisational strategy, the table below
contains alignment between GDS impact indicators, medium term IDP outcome indicators and SDBIP activity indicators. The table
also contains indicator descriptions and appropriate means of verification to support verification of performance as well as
alignment of indicators. Table 6 alignment of GDS, IDP and SDBIP
GDS
Institutional
Impact
Indicator
Indicator Description IDP Outcome Indicator Institutional SDBIP
Activity/Output Indicator
Indicator Description Means of
Verification
Municipal credit
rating
The municipal credit rating
provides an objective
assessment of financial
systems, stability and
sustainability. It is
internationally recognised
and used to compare
different city’s performance.
It has a bearing on
investment perceptions and
thus on the ability of the city
to attract investment.
Percentage achievement of selected
financial position, financial
performance and budget
implementation ratios
1) Percentage collection of debtors
in respect of service billings
The indicator measures the accuracy
of bills against services received
Capital
expenditure
Reports
2) Percentage reduction in the
debtors book
The ratio indicates the collection rate,
i.e. level of payment. It measures
increase of decreases in debtors
relative to annual billed revenue. In
addition, in order to determine the
real collection rate bad debts written-
off is taken into consideration
Annual Financial
Statements
3) Percentage budget spent on city-
wide infrastructure
This ratio is used to assess the level
of capital expenditure to total
expenditure, which indicates the
prioritisation of expenditure towards
current operations versus future
capacity in terms of municipal
services
SAP
Management
Report
Page | 88
GDS
Institutional
Impact
Indicator
Indicator Description IDP Outcome Indicator Institutional SDBIP
Activity/Output Indicator
Indicator Description Means of
Verification
4) Achievement of selected
profitability and liquidity ratios
The ratio measures the extent of
achievement of selected profitability
and liquidity ratios.
SAP
Management
Report
Transparency
index,
Participation
Index,
(compliance;
budget
Compliance, financial
management, ability to roll
out projects; Capacity
constraints
Improvement in corporate
governance, through 100%
compliance with financial, risk and
performance management guidelines
5) Unqualified audit opinion This indicator measures the audit
opinion of the Auditor General on the
financial and non-financial
performance of the City.
Auditor General
Report and
Management
Household and
business
satisfaction
index
The indicator indicates rates
of confidence in the City
being able to provide the a
good quality of life and as an
investment destination
Percentage improvement in levels of
citizen satisfaction
22) Percentage improvement in
citizen satisfaction levels
The indicator measures a statistically
valid public perception of the delivery
of services in Johannesburg.
Citizen
satisfaction
survey
Citizen participation, empowerment
and customer care
23) Percentage achievement of
service level standards
The indicator measures the
percentage adherence to city-wide
service standards as defined in the
city customer service charter
Service level
standards
24) % of 47 approved CBP
community projects
implemented
This indicator measures the number
of CBP projects implemented
Service level
agreements
andcompletion
certification
25) Increased media awareness of
the City’s strategic direction
This indicator measures the
awareness and advertisement of the
strategic programmes of the City to
the media, social network, print
media, radio, billboards and televiosn
Media
monitoring
report
Page | 89
GDS
Institutional
Impact
Indicator
Indicator Description IDP Outcome Indicator Institutional SDBIP
Activity/Output Indicator
Indicator Description Means of
Verification
Household Gini
Co-efficient
The Gini coefficient indicates
wealth gap, it is a key means
of measuring whether or not
the City’s economic growth
is shared and benefits all
Creation of jobs citywide 19) Number of jobs created This indicator measure the number of
jobs created City wide
Signed
appointment
letters of
employment by
implementing
agency
Percentage increase in EPWP
opportunities created
18) Number of Extended Public
Works Programme (EPWP)
opportunities created
This indicator measures the number
of work opportunities created through
the Expanded Public Works
Programme (EPWP)
Signed
confirmation
letters by
implementing
agency
EPWP database
Gross Value
Add (GVA)
growth per
annum
GVA provides an indication
of the overall economic
production within an area. It
is useful as an indicator of
overall economic growth in
the City
Rand value investment attracted into
the City
21)Rand value investment or
business transactions attracted into
the City
This indicator tracks the value of
potential investment facilitated by the
City
Financial value
investment
attracted
Investment
schedule with
date, description
and amount
Enterprise development program 20) Number of SMMEs supported
by the City
This indicator measures support to
SMMEs and Cooperatives in the form
of training provided, hubs and
incubators established
Database
SMME’s
supported
Page | 90
GDS
Institutional
Impact
Indicator
Indicator Description IDP Outcome Indicator Institutional SDBIP
Activity/Output Indicator
Indicator Description Means of
Verification
19) Number of jobs created This indicator measure the number of
jobs created City wide
Signed
appointment
letters of
employment by
implementing
agency
Percentage growth in market share
for emerging producers
7) Percentage growth in market
share of emerging producers at
Joburg Market
This indicator measures how much of
Joburg Market is procured from
emerging farmers as a percentage of
total produce procured by JFM
Financial
Statement
8) Number of emerging farmers
involved in diversified farming
activities support through functional
hubs and establishments of local
markets and empowerment zones
This indicator tracks the number of
farmers organized into farming hubs
Profiles of the
emerging
farmers
Page | 91
GDS
Institutional
Impact
Indicator
Indicator Description IDP Outcome Indicator Institutional SDBIP
Activity/Output Indicator
Indicator Description Means of
Verification
Total City
ecological
footprint
This indicator allows the City
to track its demand for
natural resources and
compare that with the
amount of natural resources
available
Percentage reduction in Green House
Gas emissions
28) Percentage reduction in GHG
emissions as a result of various
mitigation projects
This indicator measures the reduction
in greenhouse gas emissions as a
result of purchasing less electricity
from coal-base sources.
This indicator measures the reduction
in greenhouse gas emissions in
council owned fleet.
This indicator measures the reduction
in greenhouse gas emissions in the
City’s Waste Water Treatment Works
(WWTW).
This indicator measures the reduction
in greenhouse gas emissions as a
result of conversion of waste to
energy
GHG emission
reduction report
27) km2/ hectares Alien and
invasive species infested land
cleared (total area in km2 ha. of
invested land to be confirmed)
This indicator measures the square
kilometers per hectare of land cleared
of alien and invasive species
Completion
Certificate by
contractor
Page | 92
GDS
Institutional
Impact
Indicator
Indicator Description IDP Outcome Indicator Institutional SDBIP
Activity/Output Indicator
Indicator Description Means of
Verification
Unaccounted
for water per
annum
It is an important progress
indicator, as improvement in
the amount of unaccounted
for water amounts can be
equated to improvement in
the level of management of
water.
Percentage reduction in Non-
Revenue Water
29) % reduction in water losses
(non-revenue water)
This indicator measures whether the
City is maintaining unaccounted for
water at less than 29% of all bulk
water procured.
Bulk water
purchase and
financial
statement
30) Number of schools with which
rainwater harvesting programme is
rolled out
This indicator measures the number
of schools that benefit from the
rainwater harvesting programme.
Joburg Water
quarterly report
Percentage of
people
travelling by
public transport
This indicator provides an
indication of effectiveness of
urban land use management
and planning system
adopted as people need to
be well located with respect
to public transport routes in
order to adopt public
transport as their preferred
mode of transport
Percentage implementation of Spatial
Area Frameworks to support
Corridors of freedom
15) % expenditure spent on the
coordination of R 230 million CoF
capex allocation
This indicators measures the rand
value spent in establishing
infrastructure requirements in the
“Corridors of Freedom”. It further
measures the implementation of
interventions for each strategic
corridor (Louis Botha, Empire Perth
and Turffontein) as outlined in the
Strategic Area
Development
Planning
quarterly reports
CoF
Implementation
plan
Improve mobility 10) Increase in Rea Vaya Bus
Rapid Transport ridership per day
The indicator measures the Rea Vaya
Bus Rapid transport ridership per day
Customer
survey report
Page | 93
GDS
Institutional
Impact
Indicator
Indicator Description IDP Outcome Indicator Institutional SDBIP
Activity/Output Indicator
Indicator Description Means of
Verification
11) Number of kilometres of
walkway and cycle lanes completed
The indicators measure the
kilometers of walkway and cycle lane
completed
Completion
certificate
Number and
percentage of
households with
access to basic
services
The number and percentage
of households with access to
basic water services
demonstrates the city’s
success in providing access
to services for all of its
citizens. It is a constitutional
obligation to provide citizens
with basic services such as
water, sanitation, electricity
etc
Improvement of roads 12) Number of lane kilometre of
roads resurfaced
This indicator measures the number
of km roads resurfaced
Visual
commission
index
13) Kilometres of gravel roads
upgraded to surfaced roads
Measure the road upgraded from the
gravel road to surfaced roads
Completion
certificate
14) Kilometres of open drains into
underground at specified areas
This indicator measures the number
of kilometres of channels converted to
underground system at specified
areas e.g. Diepsloot, Ivory Park,
Kliptown
Completion
certificate
Percent waste
to landfill as a
proportion of
waste
generated
This indicator is related to
environmental and financial
sustainability and overall
management of resources.
A sustainable society is one
which minimises waste and
recycles and reuses as
% Reduction in waste generation 32) Percentage reduction in waste
to landfill
This indicator measures the tonnage
of waste diverted from landfills as a
percentage of total waste generated
Data on waste
from the Waste
Information
System as
submitted by
Pikitup and the
Industry
Page | 94
GDS
Institutional
Impact
Indicator
Indicator Description IDP Outcome Indicator Institutional SDBIP
Activity/Output Indicator
Indicator Description Means of
Verification
much as possible.
31) Increase participation in
targeted areas where separation at
source is implemented
This indicator measures the number
of house that participate in the waste
to separation programme
Participant
database
Attendance
register
Food Security The indicator assesses the
status of food security
including access to food,
food availability and food
utilisation
Percentage reduction in food
insecurity
6) Percentage reduction of food
insecurity households in all deprived
areas (as outlined in the deprivation
index report)
This indicator measures reduction in
food security as determined by the
food insecurity index in identified
areas
Database of the
food insecure
households
Total number of
housing
opportunities
created by the
City of
Johannesburg
This indicator illustrates the
level of provision of housing
for the poor
Total number of housing opportunities
created by the City of Johannesburg
16) Number of housing Units built
for underprivileged.
This indicator measures the total
number of housing opportunities
created
Completion
certificate
Database of the
beneficiaries
17) Number of social housing units
developed
This indicator measure the number of
social rental stock to create
alternative rental stock.
Completion
certificate
Page | 95
GDS
Institutional
Impact
Indicator
Indicator Description IDP Outcome Indicator Institutional SDBIP
Activity/Output Indicator
Indicator Description Means of
Verification
Human
Development
Index (HDI)
The HDI combines life
expectancy, adult literacy
rate, combined primary,
secondary and tertiary gross
enrolment ratio and GDP per
capita. It focuses on wider
aspects of development to
monitor development of the
city’s population.
Long and healthy life for all 9) Hypertensive patients controlled
as a percentage of diagnosed
patients
This indicator measures the rate of
control of identified hypertensive
patience
List of
hypertensive
controlled
patients
Public safety
Indicators of crime levels can
have a positive impact on
people’s perceptions of, or
fear of crime (if it is
decreasing over time). In
addition, crime has
economic influence and
leads to increased costs for
businesses, households and
the city, and reduced
investment.
Percentage reduction in crime rates 36) Percentage reduction in crime This indicator measures the reduction
in crime in the following categories of
crimes: common robbery, assaults,
theft of motor vehicle and burglary
residential/business
South African
Police Crime
statistics report
37) Percentage reduction in road
accident fatalities
This indicator tracks the reduction in
fatalities as a results of road
accidents
Public Safety
quarterly report
Reduction of law
enforcement breakers and
the violation of bylaws such
as illegal dumping, unlawful
advertisement
Reduction in by law violation 38) Citations issued for illegal
dumping in order to improve
compliance to City’s by-law
Measuring the number of citation
issued to the residents that are
violating by laws
Citations issued
Page | 96
GDS
Institutional
Impact
Indicator
Indicator Description IDP Outcome Indicator Institutional SDBIP
Activity/Output Indicator
Indicator Description Means of
Verification
Reduction is use of
intoxication substance that
may danger the health and
the wellbeing being our
society particular young
people.
Reduction in utilization of substance
drug abuse by youth
39)Implementation of substance
abuse programme through social (a
3 tier programme targeting youth
Measure the implementation of the
substance abuse programme
Implementation
Plan
Marketing and advertisement
of the City of Joburg
strategic programmes that
have been declared Mayoral
flagship.
Create awareness on the strategic
programme of the City for the
Residents
26) Increase media awareness of
the City Strategic direction
The indicator measure the awareness
and advertisement of the strategic
programmers of the City to media,
social networks, print media, radio,
billboards, radio and television.
Media
monitoring
report
Page | 97
5. 2015/16 CITY WIDE CAPITAL PROJECTS
Citywide capital projects are presented below. The projects are further outlined by Region and Ward based. Table 7 below provides
city wide capital projects.
City wide
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33831 Brixton Park
Upgrade
(Empire/Perth
Corridor of
Freedom) New
Park BRIXTON B
City Wide
Establishment of New Parks in
the Empire/Perth Corridor of
Freedom
R 3 000 000.00 R 0.00 R 0.00 New
32570 JHB Botanical
Gardens
Infrastructure
upgrade in
Emmarentia
Renewal Park
EMMARENTIA B
Botanical Gardens scientific
research centre
Community Parks &
gardens
R 4 000 000.00 R 2 000 000.00 R 2 000 000.00 Renewal
Page | 98
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
City Wide
33825 Patterson Park
Renewal Park
ORANGE GROVE
E City Wide
Redevelopment of Patterson Park R 6 000 000.00 R 4 000 000.00 R 4 000 000.00 Renewal
31077 Road islands and
Town Entrances
developments &
Beautification New
Park
JOHANNESBURG
F City Wide
Development of road islands and
town entrances
Community Parks &
gardens
R 0.00 R 1 000 000.00 R 2 000 000.00 New
32781 Upgrade of
existing parks to
Occupational
health and safety
standards New
Park
Upgrade of Parks developed in
the last five year period to comply
with new health and safety
regulations
Community Parks &
gardens
R 2 000 000.00 R 2 000 000.00 R 2 000 000.00 New
Page | 99
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
JOHANNESBURG
F City Wide
33834 Upgrading of
Pieter Roos Park
Renewal Park
PARKTOWN F
City Wide
Upgrading of Pieter Roos Park R 0.00 R 0.00 R 1 500 000.00 Renewal
32877 Zoo - Animal
hospital upgrade
Renewal Bulk
engineering
services
SAXONWOLD E
City Wide
Upgrade of hospital infrastructure Community Recreational
facilities
R 3 500 000.00 R 0.00 R 0.00 Renewal
33571 Zoo - Animal
Purchases New
Operational Capex
SAXONWOLD E
City Wide
Purchase of new animals for Zoo Community Parks &
gardens
R 2 000 000.00 R 2 000 000.00 R 2 000 000.00 New
Page | 100
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
31161 Zoo Conservation
and research farm
accommodation -
Safari Park
Development New
Building
Alterations
SAXONWOLD G
City Wide
Accommodation for researchers
at Parys facility
Community Cemeteries R 2 000 000.00 R 0.00 R 0.00 New
33620 Alarm monitoring
devices for
Miniature Sub
Stations New
Security
Equipment
REUVEN F City
Wide
Install alarm/monitoring devices in
high risk miniature substations
Infrastructure Electricity
Reticulation
R 2 500 000.00 R 2 500 000.00 R 5 000 000.00 New
27696 Acquire servitudes
and substation
sites New
Acquisition of servitudes for
transmission lines and substation
sites.
Investment
Property
Other R 5 000 000.00 R 5 000 000.00 R 5 000 000.00 New
Page | 101
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Transmission Line
REUVEN F City
Wide
26387 Build new 275kV
Intake Station to
replace Orlando
88kV switch yard.
New Bulk
Infrastructure
RIVASDALE D
City Wide
Orlando - replace 88kv
switchgear and introduce 275 kV.
Infrastructure Electricity
Reticulation
R 80 000 000.00 R 80 000 000.00 R 50 000 000.00 New
27008 Capital Program to
replace aged and
critical switchgear
Renewal Bulk
Infrastructure
REUVEN F City
Wide
Switchgear Capital Program to
replace aged and critical
switchgear
Infrastructure Electricity
Reticulation
R 0.00 R 0.00 R 1 000 000.00 Renewal
Page | 102
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
31129 Emergency work
on the
transmission
network Renewal
Bulk Infrastructure
REUVEN F City
Wide
Emergency work on the
transmission network
Infrastructure Electricity
Reticulation
R 30 000 000.00 R 30 000 000.00 R 15 000 000.00 Renewal
28800 Emergency work
Renewal Medium
Voltage Network
REUVEN F City
Wide
Carry out emergency work of a
capital nature. Southern Region
Infrastructure Electricity
Reticulation
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
30702 Emergency work
Renewal SCADA
REUVEN F City
Wide
Telecommunications related
emergency work
Other Assets Plant &
equipment
R 0.00 R 0.00 R 500 000.00 Renewal
33364 Eskom payments.
New Bulk
Infrastructure
REUVEN F City
Eskom payments for feasibility
quotes.
Infrastructure Electricity
Reticulation
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 New
Page | 103
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Wide
30998 Establish Control
and Outage
Management
Centre New
SCADA REUVEN
F City Wide
Establish outage Management
Centre
Infrastructure Other R 0.00 R 0.00 R 500 000.00 New
33633 Establish Outage
Management
System New
Computer
Software REUVEN
F City Wide
ICT: Establish Outage
Management System
Intangibles Computers -
software and
programming
R 10 000 000.00 R 5 000 000.00 R 0.00 New
33634 ICT Network
upgrade for smart
grids to
substations
New Load
Management
REUVEN F City
ICT Network upgrade for smart
grids to substations
Intangibles Computers -
software and
programming
R 5 000 000.00 R 10 000 000.00 R 15 000 000.00 New
Page | 104
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Wide
33636 Implementation of
SharePoint Portal
New Computer
Software REUVEN
F City Wide
Implementation of SharePoint
Portal
Intangibles Computers -
software and
programming
R 3 000 000.00 R 3 000 000.00 R 0.00 New
30697 Install new IED's in
substations
Renewal
Protection
REUVEN F City
Wide
Install new IED's in substations
with grading problems
Infrastructure Electricity
Reticulation
R 5 000 000.00 R 4 810 000.00 R 10 000 000.00 Renewal
30696 Install public lights
in informal areas
New Public
Lighting REUVEN
F City Wide
Install public lights in informal
areas based on petitions received
Infrastructure Street Lighting R 10 000 000.00 R 55 625 000.00 R 10 000 000.00 New
Page | 105
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
32820 Install statistical
meters on all
distributors New
Load Management
REUVEN F City
Wide
Install statistical meters at all
substations
Infrastructure Electricity
Reticulation
R 50 000 000.00 R 50 000 000.00 R 50 000 000.00 New
27025 Integrated
security, fire
detection &
suppression
systems for major
substations.
Including fibre
optic links (+- 50
% of budget).
New Security
Equipment
REUVEN F City
Wide
Integrated security, fire detection
& suppression system for major
sub stations
Infrastructure Electricity
Reticulation
R 10 000 000.00 R 10 000 000.00 R 20 000 000.00 New
Page | 106
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33643 IT Business
Continuity New
Computer
Software REUVEN
F City Wide
Mandatory requirements as per
policy
Intangibles Computers -
software and
programming
R 5 000 000.00 R 8 000 000.00 R 1 750 000.00 New
33772 Louis Botha (City
Power) Renewal
Corridors of
Freedom
Intervention
ORANGE GROVE
E City Wide
Implementation of City Power
Interventions to realise the
Corridors of Freedom
Infrastructure Electricity
Reticulation
R 20 000 000.00 R 25 000 000.00 R 30 000 000.00 Renewal
24060 Metering;
Replacement of
obsolete pre-paid
meters.
New Metering
Equipment
REUVEN F City
Wide
Replace obsolete pre-paid meters
- Turn Around Strategy
Infrastructure Electricity
Reticulation
R 72 956 250.00 R 50 000 000.00 R 0.00 New
Page | 107
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
30105 Operating Capital
New Operational
Capex REUVEN F
City Wide
Operating Capital Intangibles Computers -
software and
programming
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 New
33774 Perth/Empire (City
Power) Renewal
Corridors of
Freedom
Intervention
WESTBURY B
City Wide
Implementation of City Power
Projects to realise the Corridors
of Freedom
Infrastructure Electricity
Generation
R 20 000 000.00 R 25 000 000.00 R 30 000 000.00 Renewal
29830 Pre-engineering
design of sub
stations New Bulk
Infrastructure
REUVEN F City
Wide
Pre Engineering design of sub
stations
Infrastructure Electricity
Reticulation
R 5 000 000.00 R 5 000 000.00 R 5 000 000.00 New
33635 Procurement of IT
hardware
New Computer
Procurement of IT hardware Intangibles Computers -
software and
R 5 000 000.00 R 5 000 000.00 R 11 340 000.00 New
Page | 108
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Hardware
REUVEN F City
Wide
programming
33622 Protection, Supply
and delivery of
Secondary Plant
equipment
Renewal
Protection
REUVEN F City
Wide
Replacement of secondary plant
equipment of old technology
Infrastructure Electricity
Reticulation
R 0.00 R 5 000 000.00 R 500 000.00 Renewal
32822 Refurbish
distribution
transformers and
miniature
substations.
Renewal Medium
Voltage Network
REUVEN F City
Wide
Refurbish distribution
transformers and miniature
substations.
Infrastructure Electricity
Reticulation
R 5 000 000.00 R 5 000 000.00 R 5 000 000.00 Renewal
Page | 109
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
32821 Refurbish MV
switchgear
Renewal Medium
Voltage Network
REUVEN F City
Wide
Refurbish MV switchgear Infrastructure Electricity
Reticulation
R 0.00 R 0.00 R 500 000.00 Renewal
30698 Refurbish obsolete
protection relays
Renewal
Protection
REUVEN F City
Wide
Refurbish obsolete protection
relays in various sub stations
Infrastructure Electricity
Reticulation
R 5 000 000.00 R 5 000 000.00 R 0.00 Renewal
27007 Refurbish
transformers and
switchgear
Renewal Bulk
Infrastructure
REUVEN F City
Wide
Transformer Capital Program to
eliminate high risk transformers.
Infrastructure Electricity
Reticulation
R 0.00 R 0.00 R 500 000.00 Renewal
Page | 110
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
25887 Refurbishment of
MV
infrastructure(Swit
chgear and
transformers)
Renewal Medium
Voltage Network
NORTH RIDING
EXT.30 C City
Wide
Refurbish MV infrastructure in
Northern Region.
Infrastructure Electricity
Reticulation
R 10 000 000.00 R 5 000 000.00 R 10 000 000.00 Renewal
30670 Replace batteries
in sub stations
Renewal Bulk
Infrastructure
REUVEN F City
Wide
Replace batteries in sub and
switching stations
Infrastructure Electricity
Reticulation
R 2 000 000.00 R 3 000 000.00 R 3 000 000.00 Renewal
32808 Replace obsolete
energy meters
with prepaid units
Renewal Service
Replace obsolete energy meters
with prepaid units
Infrastructure Electricity
Reticulation
R 0.00 R 0.00 R 500 000.00 Renewal
Page | 111
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Connections
REUVEN F City
Wide
28792 Replace open LV
conductors with
ABC Renewal Low
Voltage REUVEN
F City Wide
Turnkey project to replace bare
OH mains in problematic areas
with ABC.
Infrastructure Electricity
Reticulation
R 20 000 000.00 R 10 000 000.00 R 30 000 000.00 Renewal
32812 Replace service
cables Renewal
Service
Connections
REUVEN F City
Wide
Replace service cables Infrastructure Electricity
Reticulation
R 0.00 R 0.00 R 500 000.00 Renewal
26224 Replacement of
aged and/or
faulting MV cables
Renewal Medium
Voltage Network
NORTH RIDING
Replace obsolete MV cables
Northern Region
Infrastructure Electricity
Reticulation
R 0.00 R 0.00 R 500 000.00 Renewal
Page | 112
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
EXT.30 C City
Wide
31141 Revenue
Generation
Efficiency Project.
Pre-paid system
installation of
semi-automated
pre-paid &
automated pre-
paid (smart
meters) Renewal
Service
Connections
REUVEN F City
Wide
Revenue Generation Efficiency
Project. Pre-paid system
installation of semi-automated
pre-paid & automated pre-paid
(smart meters)
Other Assets Other R 243 726 000.00 R 45 314 750.00 R 176 274 851.00 Renewal
32837 Roll out of smart
grid to all
substations New
Protection
Roll out of smart grid to all
substations
Infrastructure Other R 2 500 000.00 R 8 000 000.00 R 25 000 000.00 New
Page | 113
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
REUVEN F City
Wide
24054 RTU installations
New SCADA
REUVEN F City
Wide
Scada RTU installations Infrastructure Electricity
Reticulation
R 5 000 000.00 R 10 000 000.00 R 13 000 000.00 New
26934 Sebenza
Substation. Build a
new 88kV GIS
(30circuits) yard.
New Bulk
Infrastructure
SEBENZA EXT.6
E City Wide
Transmission: Sebenza - Build a
new 275/88kV GIS (30circuits)
yard and demolish existing yard
Infrastructure Electricity
Reticulation
R 292 000 000.00 R 231 065
250.00
R 74 999 681.00 New
33621 Telecommunicatio
ns, Multiplexer and
network
management
system Renewal
Upgrade Multiplexers at
substations
Infrastructure Electricity
Reticulation
R 5 000 000.00 R 5 000 000.00 R 5 000 000.00 Renewal
Page | 114
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Plant and
Equipment
REUVEN F City
Wide
25856 Tetra Radio
system New Tools
and Loosegear
REUVEN F City
Wide
Mobile radio system with dispatch
capability
Other Assets Plant &
equipment
R 0.00 R 500 000.00 R 500 000.00 New
30840 Transformer
capital program to
eliminate high risk
transformers
Renewal Bulk
Infrastructure
REUVEN F City
Wide
Transformer capital program to
eliminate high risk transformers
Infrastructure Electricity
Reticulation
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
26983 Upgrade MV
Network. Northern
Region. Replace
Replace obsolete bare overhead
lines with insulated aerial bundle
Infrastructure Electricity
Reticulation
R 20 000 000.00 R 10 000 000.00 R 30 000 000.00 Renewal
Page | 115
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
bare OH lines in
problematic areas
with ABC Renewal
Network
Development
NORTH RIDING
EXT.30 C City
Wide
conductor (ABC)
33638 Upgrade of
Virtualization
Infrastructure
New Computer
Software REUVEN
F City Wide
Upgrade of Virtualization
Infrastructure
Intangibles Computers -
software and
programming
R 5 000 000.00 R 5 000 000.00 R 20 000 000.00 New
31118 Upgrade Training
Centre Renewal
Building
Alterations
REUVEN F City
Wide
Upgrade Basic Training Centre Other Assets Other
Buildings
R 0.00 R 0.00 R 1 000 000.00 Renewal
Page | 116
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
32459 Upgrading of 88
kV overhead lines
Renewal Bulk
Infrastructure
REUVEN F City
Wide
Upgrade 88 kV overhead lines Infrastructure Electricity
Reticulation
R 40 000 000.00 R 40 000 000.00 R 40 000 000.00 Renewal
27694 Upgrading of Load
Centres
Renewal Medium
Voltage Network
NORTH RIDING
EXT.30 C City
Wide
Upgrade load centres in existing
townships - Northern Region
Infrastructure Electricity
Reticulation
R 10 000 000.00 R 0.00 R 0.00 Renewal
27695 Upgrading of Load
Centres
Renewal Medium
Voltage Network
REUVEN F City
Wide
Upgrade load centres in the
Southern Region
Infrastructure Electricity
Reticulation
R 10 000 000.00 R 0.00 R 0.00 Renewal
Page | 117
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
34041 Access to the
internet in
Recreation
Centres (Cyber
Rooms) New Plant
and Equipment
BRAAMFONTEIN
WERF F City Wide
Access to the internet in
Recreation Centres (Cyber
Rooms)
R 1 000 000.00 R 2 000 000.00 R 0.00 New
33877 Aqua - Heating of
swimming pools
City Wide
Renewal
Community Centre
BRAAMFONTEIN
WERF F City Wide
Doming and Heating of pools Community Swimming
pools
R 0.00 R 0.00 R 5 000 000.00 Renewal
32553 Aqua - Minor
upgrading of
Swimming Pools
Renewal
Community Centre
Upgrading of filtration system and
pumps in the city
Community Swimming
pools
R 2 000 000.00 R 0.00 R 3 000 000.00 Renewal
Page | 118
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
JOHANNESBURG
F City Wide
34039 Installation of
CCTV cameras
New Plant and
Equipment
BRAAMFONTEIN
WERF F City Wide
Installation od CCTV cameras R 2 000 000.00 R 3 000 000.00 R 0.00 New
34042 Installation of
electronic signage
New Plant and
Equipment
BRAAMFONTEIN
WERF F City Wide
Installation of electronic signage R 1 500 000.00 R 0.00 R 0.00 New
34040 Installation of
turnstiles in
facilities New Plant
and Equipment
BRAAMFONTEIN
Installation of turnstiles in facilities R 1 770 000.00 R 1 000 000.00 R 0.00 New
Page | 119
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
WERF F City Wide
33848 Pennyville Sports
Fields New Sports
field PENNYVILLE
B City Wide
Rec-Construction of Sports
Facilities for Pennyville
R 0.00 R 0.00 R 2 000 000.00 New
33342 Rec - Stabilisation
of soccer fields
New Community
Centre
JOHANNESBURG
F City Wide
Construction of Clay soccer fields Community Recreational
facilities
R 2 000 000.00 R 1 500 000.00 R 2 100 000.00 New
33371 Rec - Upgrading of
Braamfontein
Conference and
Recreational
Centre Renewal
Community Centre
JOHANNESBURG
Upgrading of the Braamfontein
Conference and Recreational
Centre
Community Recreational
facilities
R 0.00 R 0.00 R 3 000 000.00 Renewal
Page | 120
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
F City Wide
33849 Rec-Pennyville
Multi-purpose
Centre New
Community Centre
PENNYVILLE
EXT.1 B City Wide
Construction of Pennyville Multi-
purpose Centre
R 0.00 R 10 000 000.00 R 10 000 000.00 New
24598 Redevelopment of
Patterson Park
Recreation Facility
Renewal Sports
Centre ORANGE
GROVE E City
Wide
Construction of new library and
swimming pool, and
redevelopment of Sports Centre
and associated Sports Fields
R 17 500 000.00 R 0.00 R 0.00 Renewal
29624 Operating Capital:
DPUM Renewal
Operational Capex
BRAAMFONTEIN
operating capital Other Assets Surplus
Assets -
(Investment or
Inventory)
R 580 000.00 R 610 000.00 R 640 000.00 Renewal
Page | 121
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
WERF F City Wide
33600 Public Transport
Corridor
Development
(TOD) New
Operational Capex
JOHANNESBURG
F City Wide
Corridor Development Infrastructure Other R 180 000 000.00 R 180 000
000.00
R 200 000 000.00 New
29399 Corridor of
Freedom
Economic
Development
Initiatives New
Economic
Infrastructure
CORONATIONVIL
LE B City Wide
Stimulate Economic Activity along
the Corridors
R 0.00 R 0.00 R 2 019 000.00 New
Page | 122
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
34057 Green R&D
Testbeds New
Economic
Infrastructure
JOHANNESBURG
F City Wide
Project establishes Green R&D
testbeds for resource efficient
technology in affordable housing
and the township economy.
R 38 477 000.00 R 0.00 R 0.00 New
29027 Operational
Capital (DED)
Renewal
Operational Capex
JOHANNESBURG
F City Wide
Monies required to ensure
ongoing operation of projects
Other Assets Surplus
Assets -
(Investment or
Inventory)
R 470 000.00 R 500 000.00 R 0.00 Renewal
33822 Green Energy
Initiative New
Green
Infrastructure
JOHANNESBURG
F City Wide
Project for green energy Infrastructure Other R 10 000 000.00 R 0.00 R 0.00 New
Page | 123
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
29048 Operational
Capital (EISD)
Renewal
Operational Capex
BRAAMFONTEIN
WERF EXT.1 F
City Wide
To ensure ongoing maintenance
of existing capital
Other Assets Surplus
Assets -
(Investment or
Inventory)
R 880 000.00 R 930 000.00 R 0.00 Renewal
33499 ICT-infrastructure
renewal and
optimisation
renewal ICT
hardware
Johannesburg F
city wide for Non-
SAP New
Computer
Hardware
JOHANNESBURG
F City Wide
Renewal of existing computer
hardware in the city
Other Assets Computers -
hardware/equi
pment
R 200 000 000.00 R 175 000
000.00
R 80 000 000.00 New
Page | 124
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33556 ICT: Infrastructure
end-user
Computer
Hardware
JOHANNESBURG
F City Wide New
Computer
Hardware
JOHANNESBURG
F City Wide
Purchase of new computers and
other hardware for the City
Intangibles Computers -
software and
programming
R 24 000 000.00 R 20 761 000.00 R 17 000 000.00 New
33482 IT Equipment
Refresh Renewal
Computer
Upgrades
JOHANNESBURG
F City Wide
Ongoing purchase of computer
hardware for the City
administration
Other Assets Computers -
hardware/equi
pment
R 2 000 000.00 R 2 000 000.00 R 0.00 Renewal
33488 LIS Stabilisation
Renewal
Computer
Software
LIS Stabilisation Intangibles Computers -
software and
programming
R 0.00 R 7 000 000.00 R 0.00 Renewal
Page | 125
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
JOHANNESBURG
F City Wide
33487 Migration from
Lotus Notes to
Microsoft Outlook
New Computer
Upgrades
JOHANNESBURG
F City Wide
Migration from Lotus Notes to
Microsoft Outlook
Intangibles Computers -
software and
programming
R 15 800 000.00 R 6 800 000.00 R 3 000 000.00 New
33955 Non Sap
Application(Johan
nesburg)
Modernization &
0ptimization
JOHANNESBURG
F City Wide
Renewal
Computer
Software
JOHANNESBURG
Non Sap Application
implementation (Johannesburg)
Other Assets Computers -
hardware/equi
pment
R 0.00 R 20 000 000.00 R 20 000 000.00 Renewal
Page | 126
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
F City Wide
34012 Non-SAP Support
Tools-
JOHANNESBURG
F City Wide
Renewal
Computer
Upgrades
JOHANNESBURG
F City Wide
Non-SAP Upgrade-Support Tools Intangibles Computers -
software and
programming
R 2 000 000.00 R 2 000 000.00 R 2 000 000.00 Renewal
29039 Operational
Capital - GICT &
IM New
Operational Capex
JOHANNESBURG
F City Wide
Operational Capital Other Assets Surplus
Assets -
(Investment or
Inventory)
R 494 000.00 R 560 000.00 R 635 000.00 New
Page | 127
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33501 Personal Cost
Planning and PFM
New Computer
Software
JOHANNESBURG
F City Wide
Personal Cost Planning & PFM Intangibles Computers -
software and
programming
R 0.00 R 0.00 R 2 000 000.00 New
33553 Procurement of
Fleet vehicles New
Operational Capex
JOHANNESBURG
F City Wide
Contract for vehicles for use of
Council
Other Assets Plant &
equipment
R 346 200 000.00 R 346 200
000.00
R 146 000 000.00 New
33507 Project
Management
Office/Professional
Fees New Building
Alterations
JOHANNESBURG
F City Wide
Establishment of SAP & Non-SAP
PMO
Infrastructure Other R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 New
Page | 128
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33491 Risk &
Compliance
Solution and Tools
New Computer
Software
JOHANNESBURG
F City Wide
Risk and Compliance solution
and tools
Intangibles Computers -
software and
programming
R 0.00 R 4 000 000.00 R 0.00 New
33498 SAP & Non-SAP
Archiving New
Computer
Software
JOHANNESBURG
F City Wide
Hardware, solution &
Implementation
Intangibles Computers -
software and
programming
R 0.00 R 20 000 000.00 R 0.00 New
33956 Sap Advanced
Centre of
Excellence (COE)
Support
management tool
requirements
Renewal
Sap Advanced Centre of
Excellence (COE) Support
Other Assets Computers -
hardware/equi
pment
R 8 000 000.00 R 5 000 000.00 R 5 600 000.00 Renewal
Page | 129
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Computer
Upgrades
JOHANNESBURG
F City Wide
33503 SAP Infrastructure
Upgrade Renewal
Computer
Upgrades
JOHANNESBURG
F City Wide
Upgrade of Infrastructure Infrastructure Other R 4 500 000.00 R 0.00 R 30 000 000.00 Renewal
33951 Sap software
Upgrade/re-
implementation to
latest SAP version
Renewal
Computer
Software
JOHANNESBURG
F City Wide
Upgrading/implementation of SAP Other Assets Computers -
hardware/equi
pment
R 250 000 000.00 R 150 000
000.00
R 50 000 000.00 Renewal
Page | 130
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33508 Smart City
Enablement (Wi-
Fi) New Computer
Software
JOHANNESBURG
F City Wide
Smart City Enabling Intangibles Computers -
software and
programming
R 50 000 000.00 R 5 000 000.00 R 5 000 000.00 New
31128 Upgrading of
Security Hardware
New Plant and
Equipment
JOHANNESBURG
F Ward
Provision of CCTV cameras and
security control equipment at
Metro Centre
Other Assets Plant &
equipment
R 0.00 R 4 440 000.00 R 0.00 New
33500 WAN & LAN
Upgrade Renewal
Computer
Upgrades
JOHANNESBURG
F City Wide
Installation of upgraded WAN &
LAN
Intangibles Computers -
software and
programming
R 7 500 000.00 R 7 500 000.00 R 0.00 Renewal
Page | 131
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
29030 Operational
Capital
Renewal
Operational Capex
BRAAMFONTEIN
WERF F City Wide
operational capital inclusive of
Comprehensive Infrastructure
Plan
Other Assets Surplus
Assets -
(Investment or
Inventory)
R 3 499 000.00 R 3 047 000.00 R 0.00 Renewal
32941 AIRCONDITIONE
RS: Supply, install
and repair air
conditioners in
Health Facilities
across the city
New Clinic
JOHANNESBURG
F City Wide
Supply, installations and repairs
of air conditioners in clinics
across the CITY
Community Clinics R 300 000.00 R 300 000.00 R 500 000.00 New
32387 BULK FILING
SYSTEMS FOR
RECORDS,
supply and
installation in
Acquisition of Bulk Filing Systems
for Health Facilities across the
City for keeping patient records
safe, confidential and in
accordance with legislation
Other Assets Furniture and
other office
equipment
R 500 000.00 R 1 000 000.00 R 1 000 000.00 New
Page | 132
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Health facilities
and offices New
Office Equipment
JOHANNESBURG
A City Wide
32943 Electricity
Upgrade,Solar
Generators and
Back-up Electricity
for health facilities
across the city
New Clinic
JOHANNESBURG
F City Wide
Electricity upgrade for health
facilities across the city
Community Clinics R 3 000 000.00 R 3 000 000.00 R 5 000 000.00 New
30339 MINOR WORKS
at various clinics
across the City
Renewal Clinic
JOHANNESBURG
F City Wide
MINOR WORKS across the City
Of Johannesburg, design and
layout of Clinics, construction of
buildings and carports, furniture
and equipment, landscaping,
paving and signage.
Community Clinics R 2 000 000.00 R 2 900 000.00 R 3 500 000.00 Renewal
Page | 133
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
30328 Operational
Capital Spend for
Health Renewal
Operational Capex
JOHANNESBURG
F City Wide
Operational Capital Spend Community Clinics R 1 400 000.00 R 1 730 000.00 R 2 000 000.00 Renewal
33852 Orchards Clinic
New Clinic
ORCHARDS E
City Wide
Design and layout of clinic,
construction of buildings and
carports, furniture, fittings and
medical equipment, landscaping,
paving and signage in compliance
with Norms and Standards
Community Clinics R 19 000 000.00 R 0.00 R 0.00 New
33855 Pharmacy Depot
Langlaagte
Upgrading
Renewal Building
Alterations
LANGLAAGTE B
City Wide
Upgrading of the Langlaagte
Pharmacy Depot and associated
offices to facilitate improved
distribution of supplies to the
City's Clinics. Design and layout
of Pharmacy Depot, construction
of buildings and carports,
furniture, fittings, medical and
Community Clinics R 23 000 000.00 R 0.00 R 0.00 Renewal
Page | 134
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
pharmacy equipment,
landscaping, paving and signage
in compliance with Norms and
Standards
32419 Tools of trade,
specialised
equipment, fittings
and furniture for
Environmental
Health and
Vector/Pest
Control Function
Renewal
Operational Capex
JOHANNESBURG
F City Wide
Purchase of equipment to
implement Municipal Health
Services and to prevent the
spread of diseases by controlling
Vectors/Pests
Other Assets Plant &
equipment
R 200 000.00 R 200 000.00 R 400 000.00 Renewal
30693 Formalisation of
informal
settlements across
the City. Renewal
Formalisation of Informal
Settlements within the City of
Johannesburg Administration
Regions A-G
Investment
Properties
Housing
development
R 12 864 200.00 R 25 000 000.00 R 40 000 000.00 Renewal
Page | 135
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Bulk Infrastructure
JOHANNESBURG
F City Wide
34067 Land Acquisition
for Housing New
Bulk Infrastructure
JOHANNESBURG
F City Wide
Purchasing of Land for Housing
developments
R 40 000 000.00 R 10 149 000.00 R 0.00 New
29041 Operational capital
(HS) New
Operational Capex
BRAAMFONTEIN
WERF F City Wide
Operational Capital for
maintenance of Housing Stock
Other Assets Surplus
Assets -
(Investment or
Inventory)
R 530 000.00 R 560 000.00 R 2 300 000.00 New
33601 SHSUP
Interventions New
Operational Capex
JOHANNESBURG
F City Wide
SHSHUP Interventions Infrastructure Other R 5 000 000.00 R 5 000 000.00 R 10 000 000.00 New
Page | 136
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33751 Balfour Park
Transit Precinct
Development
(Louis Botha
Corridor) Renewal
Precinct
Redevelopment
SAVOY ESTATE
E City Wide
Development of the Balfour Park
precinct as a transit node on the
Louis Botha Corridor of Freedom
Infrastructure Other R 0.00 R 0.00 R 5 000 000.00 Renewal
33857 Development of
'pocket places' for
the public as part
of the Louis Botha
Corridor of
Freedom New
Precinct
Redevelopment
KEW E City Wide
Development of hard open
spaces (squares) at strategic
locations along the Louis Botha
Rea Vaya route
R 0.00 R 0.00 R 2 000 000.00 New
Page | 137
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
30488 Development of
open Space New
Precinct
Redevelopment
ALEXANDRA
EXT.53 E
Open space development for
recreation
Community Parks &
gardens
R 5 000 000.00 R 0.00 R 0.00 New
33858 Knowledge
Precinct: Auckland
Park Pedestrian
Crossing New
Precinct
Redevelopment
AUCKLAND
PARK B City Wide
Construction of Auckland Park
pedestrian crossing
R 45 000 000.00 R 100 000
000.00
R 0.00 New
33906 Operational Capex
New Operational
Capex
NEWTOWN F City
Wide
Computer hardware and
software, furniture and equipment
and building fittings
Intangibles Other R 15 000 000.00 R 10 000 000.00 R 10 000 000.00 New
Page | 138
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33859 Pennyville
Precinct Renewal
Precinct
Redevelopment
PENNYVILLE
EXT.1 B City Wide
Upgrade of the public
environment at Pennyville
R 0.00 R 0.00 R 5 000 000.00 Renewal
33748 Westbury
Development
Renewal Precinct
Redevelopment
WESTBURY B
City Wide
Public environment upgrading
including road, sidewalk and
storm water upgrading. Bulk
infrastructure upgrades to support
higher density residential.
Community facility investments
including parks, community halls,
sport and recreation facilities,
libraries and clinics. Developed
as a residential transit node on
the Empire Perth Corridor of
Freedom.
Infrastructure Other R 11 200 000.00 R 15 000 000.00 R 5 000 000.00 Renewal
Page | 139
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
24116 Corporate
Requirements of
Johannesburg
Water New
Corporate Service
Assets
JOHANNESBURG
F City Wide
Corporate Requirements Intangibles Other R 35 000 000.00 R 6 400 000.00 R 7 500 000.00 New
30321 Information
Technology New
Customer Service
Assets
MARSHALLS
TOWN F City
Wide
Information Technology Other Assets Computers -
hardware/equi
pment
R 11 000 000.00 R 16 880 000.00 R 22 000 000.00 New
22334 Operation Gcin
amanzi - water
conservation New
Operate and
Maintenance
Unaccounted for water initiative Infrastructure Sewerage
Purification &
Reticulation
R 200 000 000.00 R 426 854
000.00
R 376 854 000.00 New
Page | 140
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Assets
JOHANNESBURG
D City Wide
23819 Operations and
Maintenance
Renewal Operate
and Maintain
Assets
JOHANNESBURG
F City Wide
Operations and Maintenance of
Water and Sewer networks
across the City
Infrastructure Other R 36 000 000.00 R 23 600 000.00 R 45 000 000.00 Renewal
23791 Planning and
engineering
studies for
Johannesburg
Water New
Operate and
Maintain Assets
MARSHALLS
TOWN F City
Wide
Planning and Engineering Studies Intangibles Other R 13 000 000.00 R 18 200 000.00 R 23 000 000.00 New
Page | 141
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
29010 Provision for
Emergency Work
Renewal Operate
and Maintain
Assets
MARSHALLS
TOWN F City
Wide
Provision: for Emergency Work Infrastructure Other R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
26902 Unplanned bulk
water & sewer
connections to
new townships
New Basic Water
and Sewer
Services
JOHANNESBURG
F City Wide
Unplanned bulk water & sewer
connections to new townships.
Infrastructure Other R 1 000 000.00 R 1 000 000.00 R 1 000 000.00 New
33563 Installation of
Lights in Halls
1,2,9,10 Renewal
Replacement of existing lights/
Electrical Infrastructure
Other Assets Markets R 0.00 R 5 000 000.00 R 0.00 Renewal
Page | 142
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Operational Capex
CITY DEEP
EXT.22 G City
Wide
33548 Promusica
Theatre -
Information
Technology New
Computer
Software
FLORIDA PARK
EXT.9 C City Wide
Installation of hardware and
software for the new ticketing
system
Community Other R 200 000.00 R 150 000.00 R 0.00 New
33355 Soweto Theatre -
Upgrading of
Technical
Equipment
Renewal Building
Alterations
JABULANI D City
Wide
Purchase of technical equipment
and related infrastructure for the
Soweto Theatre
Other Assets Other R 350 000.00 R 400 000.00 R 0.00 Renewal
Page | 143
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33693 Bothlabella
Housing Project
Renewal
Operational Capex
ALEXANDRA
EXT.12 E City
Wide
Upgrading and planned
maintenance of council stock
Investment
Properties
Housing
development
R 2 500 000.00 R 2 500 000.00 R 2 500 000.00 Renewal
33865 Corridors of
Freedom / TOD
Developments
Louis Botha
(MALBORO
SOUTH) New
Corridors of
Freedom
Intervention
ORANGE GROVE
E City Wide
Social Housing Development Investment
Properties
Housing
development
R 0.00 R 5 000 000.00 R 30 000 000.00 New
Page | 144
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33610 Golden highway
Social Housing
project New
Housing
Development
DEVLAND EXT.9
D City Wide
The development of 580 Social
Housing Rental units consisting of
2 and 3 storey buildings. Units
will be one and two bedroom
units to accommodate tenants
and families earning between
R2500 and R7500 around
Devland
Investment
Properties
Housing
development
R 75 000 000.00 R 47 500 000.00 R 62 500 000.00 New
33918 Inner City
Conversion/Constr
uction Renewal
Housing
Development
JOHANNESBURG
F City Wide
Conversion/Construction of
Acquired buildings in the inner
city.
R 0.00 R 30 000 000.00 R 70 000 000.00 Renewal
28146 Inner City Various
Renewal Housing
Development
JOHANNESBURG
F City Wide
Acquisition and planning of
various inner city properties.
Projects will involve
refurbishment, conversion and
upgrading of existing buildings
Investment
Properties
Housing
development
R 10 000 000.00 R 50 000 000.00 R 30 000 000.00 Renewal
Page | 145
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33154 Ivory Park Social
Housing New
Building IVORY
PARK EXT.10 A
City Wide
Development of affordable rental
stock in region A
R 0.00 R 0.00 R 2 000 000.00 New
33162 Kliptown Golf
Course New
Building
Alterations
PIMVILLE ZONE 1
EXT B City Wide
Requirement of more social
housing in the are
Community Social Renting
Housing
R 2 000 000.00 R 2 000 000.00 R 2 000 000.00 New
33484 MBV Innercity
Rental Housing
Renewal Housing
Development
JOHANNESBURG
F City Wide
Redevelopent and upgrading of
the MBV building in the inner city
to increase the rental stock
Investment
Properties
Housing
development
R 500 000.00 R 500 000.00 R 500 000.00 Renewal
33718 Pennyville New
Canada
Corridor/TOD New
Mixed use housing development
next to the BRT and New Canada
Investment
Properties
Housing
development
R 0.00 R 70 000 000.00 R 70 000 000.00 New
Page | 146
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Housing
Development
PENNYVILLE C
City Wide
Station
33914 Perth Empire
Corridor of
Freedom New
Housing
Development
AUCKLAND
PARK B City Wide
Corridors of Freedom Programme R 0.00 R 5 000 000.00 R 30 000 000.00 New
33483 Princess Plots
Social
HousingProject
New Housing
Development
PRINCESS
EXT.22 C City
Wide
Development of 600 social
housing units
Investment
Properties
Housing
development
R 20 000 000.00 R 30 000 000.00 R 30 000 000.00 New
Page | 147
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33913 Turffontein
Corridor New
Housing
Development
TURFFONTEIN E
City Wide
Corridors Of Freedom
Programme
R 0.00 R 5 000 000.00 R 30 000 000.00 New
30364 Computer
Equipment New
Computer
Upgrades
BRAAMFONTEIN
WERF EXT.1 F
City Wide
Purchasing computers, furniture
and leasehold
Other Assets Computers -
hardware/equi
pment
R 4 000 000.00 R 4 000 000.00 R 0.00 New
33550 Land
Regularisation
Renewal
Operational Capex
JOHANNESBURG
F City Wide
Add value to existing City Owned
Property by formalising tenure
and land rights and then
distributing land to benficiaries in
Orange Farm and Ivory Park
Community Social Renting
Housing
R 4 900 000.00 R 0.00 R 0.00 Renewal
Page | 148
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33991 Office Space
Optimisation
Program New
Precinct
Redevelopment
JOHANNESBURG
F City Wide
OSOP Project Implementation
planning, Stakeholder
Consultation & Budget Planning
for Integrated Mixed Use
Precincts - OSOP Implementation
Infrastructure Other R 30 000 000.00 R 10 000 000.00 R 10 000 000.00 New
33797 Purchase &
Development of
land in Perth
Empire, Louis
Botha and
Turffontein
Corridors New
Corridors of
Freedom
Intervention
CORONATIONVIL
LE F City Wide
Purchase and Development of
Land in Perth/Empire, Louis
Botha and Turffontein Corridors
of Freedom as defined in the
relevant Strategic Area
Frameworks
Community Social Renting
Housing
R 0.00 R 0.00 R 2 000 000.00 New
Page | 149
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33692 Site Development
Projects New Land
Preparation
JOHANNESBURG
F City Wide
land preparation of various site
within the City of Johannesburg
Other Assets Civic Land &
Buildings
R 15 000 000.00 R 8 700 000.00 R 13 000 000.00 New
32802 BRID 10 - Bridge
Expansion Joints.
Renewal Bridges
(Pedestrian and
Vehicles)
JOHANNESBURG
F City Wide
Ongoing improvements to bridge
expansion joints: Chilvers Str
Bridge; Bridge 6 Heidelberg I/C;
Crown I/C; Heidelberg I/C EB +
WB; Treu Rd Bridge.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 0.00 R 0.00 R 2 000 000.00 Renewal
28344 BRID 11 - Bridge
Rehabilitation.
Renewal Bridges
(Pedestrian and
Vehicles)
JOHANNESBURG
F City Wide
Bridge Management System
(BMS): Detailed inspections
completed for urgent work to be
done as part of Motorway and
District Bridge Rehabilitation
Programme including ongoing
make safe items in the following
bridges: Rockridge Rd Bridge;
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 12 500 000.00 R 3 000 000.00 R 12 500 000.00 Renewal
Page | 150
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Treu Rd Bridge; M1 Double Deck;
Killarney Bridge; Jan Smuts Av
Bridge.
32804 BRID 11 - Bridges:
Visual and
Detailed
(Principal)
Inspections. New
Bridges
(Pedestrian and
Vehicles)
JOHANNESBURG
F City Wide
Ongoing visual inspections of all
bridges, major culverts, retaining
walls, gantries and other
structures for inclusion in BMS
on: M1 Bridge over Empire Rd;
M1 Bridge over Booysens Rd; M1
over Oxford Rd; M2 Kazerne
Viaduct; Mandela Bridge.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 5 000 000.00 R 5 000 000.00 R 3 000 000.00 New
32803 BRID 12 -
Motorway
Gantries.
Renewal Roads:
Rehabilitation
JOHANNESBURG
F City Wide
Urgent and ongoing replacement
and/or improvements of overhead
motorway sign gantries in: M1 N
1st Ave; M2 W Heidelberg I/C;
M2 W Benrose; 9 others.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 5 000 000.00 R 0.00 R 1 000 000.00 Renewal
Page | 151
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
32805 BRID 20 - Bridges:
Overtopping
(Flooding).
Renewal Bridges
(Pedestrian and
Vehicles)
JOHANNESBURG
F City Wide
Ten major bridges (and 10 minor
structures also) that overtop in
large storms because of their low
capacity need to be upsized.
Investigate reasons for
overtopping and safety problems
and provide solutions. Bridges
also need upgrade and
rehabilitation. The major ones
are: Canada Rd over river;
Gertrude St over river (2) in
Fontainebleau; Bridge St over
river in Dhlamini; Nirvana Dr East
over river in Lenasia; Stone
Haven St over river in Paulshof;
and Nxumalo St, Kinini-
Leselinyana St, Zulu-Mahalefele
Rd, and Mzilikatzi St over river in
Dube-Mofolo.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 80 000 000.00 R 20 000 000.00 R 1 000 000.00 Renewal
Page | 152
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
34018 CS - Asphalt Plant
Upgrade. Renewal
Plant and
Equipment
OPHIRTON F City
Wide
Green Economy. R 6 000 000.00 R 5 000 000.00 R 3 000 000.00 Renewal
31034 CS - Capital
Equipment. New
Plant and
Equipment
JOHANNESBURG
F City Wide
Fleet and Plant required
equipment
Other Assets Plant &
equipment
R 5 000 000.00 R 5 000 000.00 R 5 000 000.00 New
33478 CS - Construction
of Archiving
Facility. New
Operational Capex
JOHANNESBURG
F City Wide
Construction of storage in
suitable location to comply with
regulations.
Other Assets Other R 10 000 000.00 R 0.00 R 0.00 New
Page | 153
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
32871 CS - Depot
Upgrading and
Standarization.
Renewal
Operational Capex
JOHANNESBURG
F City Wide
Renewal of JRA's 18 Depots and
Head Office including demolition
and new construction to comply
with regulations
Other Assets Other
Buildings
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
29922 CS - Operational
Capex. Renewal
Operational Capex
JOHANNESBURG
F City Wide
Continue upgrading of lifts; OHSA
compliance; furniture; training
facilities; laboratory upgrade;
disaster/emergency equipement.
Other Assets Surplus
Assets -
(Investment or
Inventory)
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
33741 CS - Upgrade of
Head Office
Facilities. Renewal
Building
Alterations
JOHANNESBURG
F City Wide
Upgrading of JRA's Head Office:
electrical; plumbing; air
conditioning; generator, etc.
Other Assets Other
Buildings
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
Page | 154
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
32906 IT - ERP
Migration. New
Computer
Software
JOHANNESBURG
F City Wide
Replace current Enterprise
Resource Planning (ERP) system
in place at Head Office by a SAP
ERP integrated system to
enhance security and
performance required for
financials, HR and workflow
management.
Intangibles Computers -
sofware and
programming
R 20 000 000.00 R 0.00 R 0.00 New
33489 IT - IT Security.
New Computer
Software
JOHANNESBURG
F City Wide
Replace JDE and Hansen with
SAP ERP (Enterprise Resource
Planning) System to enhance
security and performance at the
Head Office.
Intangibles Computers -
sofware and
programming
R 1 000 000.00 R 1 000 000.00 R 0.00 New
32234 MISCL - Dam
Safety
Rehabilitation
Renewal
Stormwater
Management
Projects
Updating of inspections and
urgent rehabilitation work to
comply with statutory legislation
and ensure public safety. Dams
are moving to EISD; however
there is nothing in writting
confirming the movement.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 20 000 000.00 R 5 000 000.00 R 5 000 000.00 Renewal
Page | 155
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
JOHANNESBURG
F City Wide
30729 MISCL -
Emergency
Stormwater
Interventions.
Renewal
Stormwater
Management
Projects
JOHANNESBURG
F City Wide
Emergency stormwater
improvements to damaged
infrastructure: Erosion protection;
installation of water control
measures; stormwater
infrastructure reconstruction
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 5 000 000.00 R 5 000 000.00 R 5 000 000.00 Renewal
27825 MISCL -
Emergency,
Critical and Urgent
Depot Stormwater
Improvements.
New Stormwater
Management
Projects
Emergency stormwater
interventions too large that have
been put on hold by OPEX and
require CAPEX funding for
implementation
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 40 000 000.00 R 20 000 000.00 R 20 000 000.00 New
Page | 156
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
JOHANNESBURG
F City Wide
28002 MISCL -
Environmental
Compliance. New
Operational Capex
JOHANNESBURG
F City Wide
Preliminary planning for
legislative requirements in
relation to environmental aspects
(EIA, WUL).
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 1 500 000.00 R 1 500 000.00 R 1 500 000.00 New
28162 MISCL -
Integrated Roads
and Stormwater
Master planning.
New Stormwater
Management
Projects
JOHANNESBURG
F City Wide
Determination of flood lines and
all the roads and storm water
studies as part of master planning
throughout the City of
Johannesburg.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 6 000 000.00 R 6 000 000.00 R 3 000 000.00 New
Page | 157
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
28119 MISCL -
Investigate and
Design Future
Schemes. New
Operational Capex
JOHANNESBURG
F City Wide
Ongoing.
Investigate and design future
schemes as required.
Intangibles Other R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 New
31473 MOB - Alternative
Energy:
Alternative Power
Sources (LED).
New Mobility:
Intelligent
Transportation
System &
Networks
JOHANNESBURG
F City Wide
Energy efficiency: Light Emitting
Diodes(LED)installation at traffic
signals.
Infrastructure Other R 5 000 000.00 R 6 000 000.00 R 6 000 000.00 New
Page | 158
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
31827 MOB - Alternative
Energy:
Alternative Power
Sources (UPS).
New Mobility:
Intelligent
Transportation
System &
Networks
JOHANNESBURG
F City Wide
Installation of Uninterruptible
Power Supply (UPS) at critical
identified intersections.
Infrastructure Other R 13 000 000.00 R 35 000 000.00 R 35 000 000.00 New
32161 MOB - CCTV
Cameras. New
Mobility: Intelligent
Transportation
System &
Networks
JOHANNESBURG
F City Wide
Install 50 CCTV cameras to
monitor intersections and roads.
Infrastructure Other R 2 500 000.00 R 4 000 000.00 R 2 900 000.00 New
Page | 159
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33515 MOB - City Deep
Freight Hub.
Renewal Roads:
Construction and
Upgrades CITY
DEEP F City Wide
Road and traffic management
interventions in the City
Deep/Kaserne area to solve
mobility issues in this major
freight traffic hub.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 30 000 000.00 R 20 000 000.00 R 0.00 Renewal
29905 MOB - Complete
Streets (Streets
Alive). New
Roads:
Construction and
Upgrades
JOHANNESBURG
F City Wide
Upgrade streets to the complete
streets principles programme that
started in 2013/14 in Soweto; in
2014/15 will cover Soweto,
Braamfischer, Orange Farm,
Ivory Park and Diepsloot. In
2015/16 it will expand to cover all
9 priority townships including
Tshepisong, Doornkop/Thulani,
Lawley, Driezik. In 2016/17 the
programme will expand “Citywide”
as the demands for road calming
interventions are all over the City
not only in the above townships.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 30 000 000.00 R 50 000 000.00 R 50 000 000.00 New
Page | 160
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
31516 MOB - Geometric
Improvements.
Renewal Mobility:
Intelligent
Transportation
System &
Networks
JOHANNESBURG
F City Wide
Planning, design &
construction/implementation of
geometric improvements at: 3rd
Av & 1st St, Linden (Region B);
2nd Av & 3rd St, Linden (Region
B); Paul Kruger and Amplifier St
(Region C); Jim Fouche and
Constantia/Wilhelmina Av
(Region C); and Rivonia & Marion
St (Region E).
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 10 000 000.00 R 10 000 000.00 R 8 000 000.00 Renewal
30733 MOB - Installation
of New Warranted
Traffic Signals in
All Wards City
Wide. New
Mobility: Intelligent
Transportation
System &
Networks
JOHANNESBURG
F City Wide
Installation of new traffic signals
at existing stop controlled
intersections identified through
the CBP process.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 5 000 000.00 R 5 000 000.00 R 5 000 000.00 New
Page | 161
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
28875 MOB - Intelligent
Transport Systems
(ITS) Projects.
New Mobility:
Intelligent
Transportation
System &
Networks
JOHANNESBURG
F City Wide
This is a broad range of
advanced communications
technologies applied to the
transportation system to make it
safe, efficient and reliable without
necessarily altering the existing
transport infrastructure.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 22 000 000.00 R 25 000 000.00 R 10 000 000.00 New
32846 MOB - Recabling
of Old Redundant
Cables at
Signalized Traffic
Intersections.
Renewal Mobility:
Intelligent
Transportation
System &
Networks
JOHANNESBURG
Replacement of old cables at
signalized intersections.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 15 000 000.00 R 10 000 000.00 R 3 000 000.00 Renewal
Page | 162
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
F City Wide
31619 MOB - Remote
Monitoring: Urban
Traffic Control
(UTC). New
Mobility: Intelligent
Transportation
System &
Networks
JOHANNESBURG
F City Wide
The Project aims to enhance
security & safety of people and
assets; maximize efficiency and
reliability; ensure fast and co-
ordinated response; support co-
ordination and co-operation
accross geographic
organizational and institutional
boundaries.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 3 000 000.00 R 7 000 000.00 R 4 000 000.00 New
31457 MOB - SARTSM:
Upgrade of
Existing Signalised
Intersections.
Renewal Mobility:
Intelligent
Transportation
System &
Upgrade of JRA's signalised
intersections as stipulated by law
and according to the SARTSM
(South African Road Traffic
System Manual).
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 2 000 000.00 R 5 000 000.00 R 5 750 000.00 Renewal
Page | 163
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Networks
JOHANNESBURG
F City Wide
32075 MOB - Traffic
Management
Centre. Renewal
Mobility: Intelligent
Transportation
System &
Networks
JOHANNESBURG
F City Wide
Upgrading and increase capacity
in the operations of the existing
JRA's Traffic Management
Centre.
Other Assets Other R 2 300 000.00 R 3 000 000.00 R 2 645 000.00 Renewal
32313 MOB - Traffic
Signal Adaptive
Control (TSAC).
New Mobility:
Intelligent
Transportation
System &
Networks
The Project is about installation of
(TSAC) devices and configuration
of signal plan at intersections to
enhance visibility; decrease
accidents; reduce traffic
congestion; enhance mobility.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 5 000 000.00 R 5 000 000.00 R 5 000 000.00 New
Page | 164
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
JOHANNESBURG
F City Wide
31925 MOB - Upgrading
Controllers and
Phasing. Renewal
Mobility: Intelligent
Transportation
System &
Networks
JOHANNESBURG
F Regional
New phasing to be installed in
Inner City where many controllers
are old / outdated; and the
equipment is neither compatible
nor interchangeable.
Infrastructure Transportation R 5 000 000.00 R 6 000 000.00 R 17 500 000.00 Renewal
33490 RAMS - GIS
Improvement. New
Computer
Software
JOHANNESBURG
F City Wide
Group of support audit
management system for RAMS
(Road Assets Management
System) including various GIS
tools (BMS, PMS).
Intangibles Computers -
sofware and
programming
R 20 000 000.00 R 5 000 000.00 R 500 000.00 New
Page | 165
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33742 RAMS - Storm
water Asset
Monitoring
System. New
Computer
Software
JOHANNESBURG
F City Wide
Asset audit system. Intangibles Computers -
software and
programming
R 5 000 000.00 R 5 000 000.00 R 0.00 New
33743 REHAB -
Rehabilitation of
Open Channels
City Wide.
Renewal Storm
water
Management
Projects
JOHANNESBURG
F City Wide
This project is exclusive of the
Conversion of Open Drains
programme; and entails the
rehabilitation of storm water open
channels City Wide in former old
storm water structures.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 10 000 000.00 R 10 000 000.00 R 20 000 000.00 Renewal
Page | 166
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
28057 REHAB - Road
Rehabilitation and
Reconstruction
Programme.
Renewal Roads:
Construction and
Upgrades
JOHANNESBURG
F City Wide
Roads in very poor condition all
over the City that require urgent
intervention according to PMS to
improve VCI (Visual Condition
Index).
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 140 000 000.00 R 140 000
000.00
R 140 000 000.00 Renewal
33511 RESUR -
Resurfacing of M1
Motorway.
Renewal Roads:
Rehabilitation
MELROSE E City
Wide
Resurfacing work is required to
prolong the life of the road and
improve the VCI (Visual
Conditions Index).
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 50 000 000.00 R 65 230 000.00 R 80 000 000.00 Renewal
33512 RESUR -
Resurfacing of M2
Motorway.
Renewal Roads:
Resurfacing work is required to
prolong the life of the road and to
improve the VCI (Visual
Conditions Index).
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 10 000 000.00 R 40 000 000.00 R 80 000 000.00 Renewal
Page | 167
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Rehabilitation
JOHANNESBURG
F City Wide
32626 RESUR -
Resurfacing of
Gravel Roads
Including Tarring
of Gravel Roads in
Deprived Areas in
the North :
Rehabilitation
JOHANNESBURG
F City Wide
According to PMS resurfacing
work is urgently required to
prolong the life of roads in poor
condition between 5 to 6 years
depending on type of surface
treatment. It includes all regions
plus access to motorways.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 221 941 000.00 R 150 000
000.00
R 50 000 000.00 Renewal
33513 RESUR -
Resurfacing of
Soweto Highway.
Renewal Roads:
Rehabilitation
ORLANDO D City
Wide
Resurfacing work is required to
prolong the life of the road and to
increase the VCI (Visual
Conditions Index).
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
Page | 168
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
32783 Anti-Fraud and
Anti-Corruption
Programme New
Computer
Software
JOHANNESBURG
F City Wide
Purchase of IT system to assist in
the implementation of City
programme to ensure fraud and
corruption awareness
Other Assets Computers -
hardware/equi
pment
R 500 000.00 R 500 000.00 R 500 000.00 New
34058 Blue Economy
Capital Project
New Operational
Capex
JOHANNESBURG
F City Wide
Blue Economy Intervention (Ring-
fenced amount)
R 150 000 000.00 R 0.00 R 0.00 New
33823 Broad Band Base
Stations New
Plant and
Equipment
JOHANNESBURG
F City Wide
The construction of Base Station
with speed WiFi connection link
by the city's Broadband network
Intangibles Computers -
software and
programming
R 10 000 000.00 R 10 000 000.00 R 0.00 New
Page | 169
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
32784 Combined
assurance
planning and
monitoring system
Renewal
Computer
Software
JOHANNESBURG
F City Wide
Integrate enterprise risk
management, internal audit, risk
finance, performance monitoring,
forensic investigations and
compliance through the purpose
of the updated Information
Technology system, and
therefore enable combined
assurance planning management
and reporting
Other Assets Computers -
hardware/equi
pment
R 500 000.00 R 750 000.00 R 1 750 000.00 Renewal
33866 Corridors of
Freedom
Facilitation/ PMU
Renewal
Operational Capex
JOHANNESBURG
F City Wide
Capacitation of City Departments
to facilitate the implementation of
the Corridors of Freedom
R 20 000 000.00 R 20 000 000.00 R 0.00 Renewal
26432 E Marketing
Platform and JTC
Website Renewal
Joburg Tourism website -
Business Tourism Website -
online delegate boosting toolkit-
Intangibles Computers -
software and
programming
R 1 311 700.00 R 1 526 000.00 R 0.00 Renewal
Page | 170
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Computer
Software
ROSEBANK B
City Wide
Sports Tourism website
medical Tourism website
Youth portal
Other niche tourism sites
Mobile applications and social
media interaction
touch screen kiosks-
Digital trade stand equipment and
social media interactions
Trade R media extranet-
Interactive E-learning platform for
trade-
Interactive media creation
Multilingual websites and digital
platforms-
Backend intergration into route
planning systems-
Market segmentation and data
warehousing software-
Back end integration into
payment - systems (touch pay,
sms payment, credit card, banks
Page | 171
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
etc.)- Integration into Joburg
Connect Call Centre
32782 Group compliance
with laws, rules,
codes and
standards
Renewal
Operational Capex
JOHANNESBURG
F City Wide
Purchase of tools of trade
required to ensure the City's
compliance with MFMA
regulations, and to accommodate
additional staff
Other Assets Computers -
hardware/equi
pment
R 90 000.00 R 30 000.00 R 280 000.00 Renewal
33545 Insurance Claims
Administration
software New
Computer
Software
BRAAMPARK F
City Wide
Insurance Claims Administration
software
Intangibles Computers -
software and
programming
R 500 000.00 R 500 000.00 R 500 000.00 New
Page | 172
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33598 Integrated
Disaster
Management
Centre New
Building
Alterations
JOHANNESBURG
F City Wide
Integrated Disaster Management
Centre
Infrastructure Other R 4 077 000.00 R 24 874 000.00 R 10 000 000.00 New
29028 Operational
Capital New
Operational Capex
JOHANNESBURG
F City Wide
Other Assets Other R 1 903 000.00 R 940 000.00 R 0.00 New
33599 Ward-based
Planning
Interventions New
Operational Capex
JOHANNESBURG
F City Wide
CBP interventions Community Other R 100 000 000.00 R 50 000 000.00 R 50 000 000.00 New
Page | 173
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
30345 Building - various
upgrades New
Building
Alterations
BRAAMFONTEIN
WERF EXT.1 F
City Wide
Building alterations Heritage
Assets
Buildings R 15 000 000.00 R 1 200 000.00 R 2 500 000.00 New
33759 Conversion of
existing fleet to run
on Gas and Diesel
New Operational
Capex
BRAAMFONTEIN
WERF EXT.1 F
City Wide
Conversion of existing Fleet to
run on Gas and Diesel
Community Buses R 27 000 000.00 R 0.00 R 23 000 000.00 New
29609 Engine + gear box
New Vehicle
BRAAMFONTEIN
WERF F Ward
Replacement of engines and
gearboxes
Community Buses R 8 620 000.00 R 2 610 000.00 R 4 000 000.00 New
Page | 174
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
22393 Furniture and
office equipment
New Office
Equipment
BRAAMFONTEIN
WERF EXT.1 F
Ward
Computers, Furniture, Equipment Other Assets Furniture and
other office
equipment
R 400 000.00 R 400 000.00 R 500 000.00 New
30344 It equipment, new
computers and
hardware New
Computer
Hardware
BRAAMFONTEIN
WERF EXT.1 F
City Wide
IT infrastructure and system
implementation.
Other Assets Computers -
hardware/equi
pment
R 3 300 000.00 R 300 000.00 R 1 000 000.00 New
26197 Purchasing of New
Busses New Plant
and Equipment
JOHANNESBURG
F City Wide
Recap of Buses Community Buses R 226 500 000.00 R 226 500
000.00
R 58 000 000.00 New
Page | 175
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
22292 1 Bins Skip -
Refuse waste
collection New
Plant and
Equipment
WATERVAL
ESTATE B City
Wide
Supply of bulk containers to
commercial customers to create
revenue
Infrastructure Refuse R 1 500 000.00 R 1 000 000.00 R 1 000 000.00 New
32695 10 Facilities to
facilitate
separation at
source city wide
New waste
collection
JOHANNESBURG
F City Wide
To facilitate waste minimisation
across the city
Infrastructure Refuse R 11 000 000.00 R 10 000 000.00 R 21 000 000.00 New
22301 12 (a) New garden
Sites - Fourways
New Plant and
Equipment
Redirect garden refuse to garden
sites and then remove to
composting facility
Infrastructure Refuse R 0.00 R 0.00 R 500 000.00 New
Page | 176
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
FOURWAYS A
City Wide
22299 12 (c) New garden
Sites Cosmo City
New waste
collection COSMO
CITY EXT.2 B City
Wide
Build garden sites for the
collection of garden waste to
send to composting plant and
increase life of landfills
Infrastructure Refuse R 0.00 R 0.00 R 500 000.00 New
33642 13 Garden Side
Recyling New
waste collection
JOHANNESBURG
F City Wide
Implementation of recyclable
waste facilities and various side
Infrastructure Refuse R 3 000 000.00 R 2 000 000.00 R 4 000 000.00 New
30758 14 Landfill -
Ennerdale New
waste collection
ENNERDALE
EXT.6 D City Wide
To maintain and upgrade facilities
to conform to standard and
regulations-(Compliance, cell
developments and landfill
recycling)
Infrastructure Refuse R 4 850 000.00 R 500 000.00 R 500 000.00 New
Page | 177
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
30755 15 Landfill -
Goudkoppies New
Building
Alterations ZONDI
D City Wide
To maintain and upgrade facilities
to conform to standard and
regulations - (Compliance, cell
developments and landfill
recycling)
Infrastructure Refuse R 4 850 000.00 R 500 000.00 R 500 000.00 New
22305 17 Landfill - Marie
Louise New waste
collection RAND
LEASES EXT.11
D City Wide
To maintain and upgrade facilities
to conform to standards and
regulations - (Compliance, cell
developments and landfill
recycling)
Infrastructure Refuse R 4 850 000.00 R 4 850 000.00 R 500 000.00 New
30656 18 Landfill -
Robinson deep
New waste
collection
TURFFONTEIN D
City Wide
Landfill compliance and water
pond development
Infrastructure Refuse R 4 850 000.00 R 4 850 000.00 R 500 000.00 New
32799 19 Street Furniture
in Marginalised
Areas and the
Inner City New
Purchase of infrastructure for
street litter collection
Other Assets Other R 1 000 000.00 R 1 000 000.00 R 500 000.00 New
Page | 178
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
waste collection
JOHANNESBURG
F City Wide
30352 2 Branding of
Facilities Renewal
Branding &
Marketing
JOHANNESBURG
F City Wide
Erection and placement of
signage for landfill sites, depots,
garden sites and compost plant
Other Assets Civic Land &
Buildings
R 500 000.00 R 1 000 000.00 R 500 000.00 Renewal
32787 20 (a) Transfer
station New waste
collection LINBRO
PARK EXT.1 C
City Wide
Construction of a transfer
stations/material recovery facility
Infrastructure Refuse R 500 000.00 R 10 000 000.00 R 10 000 000.00 New
27488 21 Bins
Underground and
240l New Plant
and Equipment
JOHANNESBURG
Underground waste receptacles
for the Inner City and high
pedestrian volume areas such as
taxi ranks. The bins also has the
advantage for waste separation at
Infrastructure Refuse R 12 000 000.00 R 11 476 000.00 R 5 000 000.00 New
Page | 179
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
F City Wide source
30654 22 Waste
Treatment - Waste
treatment facilities
New Plant and
Equipment
DIEPSLOOT A.H.
A City Wide
Construction of Waste Treatment
facilities for waste conversion
Infrastructure Refuse R 0.00 R 0.00 R 200 000.00 New
33535 23 Depot Midrand
New Depots
HALFWAY
GARDENS
EXT.80 A
Regional
Pikitup Depot in Midrand Infrastructure Refuse R 0.00 R 0.00 R 500 000.00 New
30349 25 Facility for
compliance
renewal building
alterations
Upgrade of existing Facilities to
comply with the OHS Act. Depots
are increasingly posing a risk to
staff in terms of health,
Infrastructure Refuse R 27 000 000.00 R 27 000 000.00 R 14 900 000.00 Renewal
Page | 180
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
including HR
academy and
assessment
center. Renewal
Building
Alterations
JOHANNESBURG
F City Wide
electrocution and serious injury to
the Community and Pikitup staff.
This project will also include the
Provision of Pikitup Learning
centre and the assessment
centre.
33537 3 Bulldozers,
Compactors and
Graders New
Plant and
Equipment
JOHANNESBURG
F City Wide
To purchase 7 Bulldozers,
Compactors and Graders
Infrastructure Refuse R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 New
30650 30 Garden Sites,
Buy Back Centres
and Sorting
Facilities Renewal
waste collection
Development of separation at
source facilities and waste
collection methods
Infrastructure Refuse R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
Page | 181
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
BRAAMPARK F
City Wide
22316 4 IT Hardware and
Software New
Computer
Hardware
BRAAMFONTEIN
WERF EXT.1 F
City Wide
Upgrade I T software and
hardware in order for staff to
perform better.
Other Assets Computers -
hardware/equi
pment
R 5 000 000.00 R 5 000 000.00 R 4 000 000.00 New
22290 5 Composting
Organic Waste
New Plant and
Equipment
ORANGE FARM
EXT.8 G City Wide
Waste reduction, collection
methods and interventions, as
well as supply of bins to
new/developing areas.
Infrastructure Refuse R 1 044 800.00 R 1 000 000.00 R 0.00 New
30753 6 Depot Haylon
Hill New Plant and
Equipment
HAYLON HILL
Construction of new depots to
service Glenridge, Honeydew,
Ivory Park and Midrand Randburg
communities
Infrastructure Refuse R 0.00 R 0.00 R 500 000.00 New
Page | 182
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
A.H. C Ward
32694 8 EIA for all
Pikitup's waste
facilities (including
Depots, landfills,
Garden sites)
New waste
collection
JOHANNESBURG
F City Wide
Waste collection method Infrastructure Refuse R 1 000 000.00 R 1 000 000.00 R 1 500 000.00 New
22315 9 Incinerator
Health Care
Renewal Building
Alterations
SPRINGFIELD F
City Wide
Refurbishment of the incinerator
plant in phases.
Other Assets Civic Land &
Buildings
R 1 500 000.00 R 2 000 000.00 R 10 000 000.00 Renewal
Page | 183
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33286 Air Conditioners in
all EMS Buildings
New Building
Alterations
MARTINDALE C
City Wide
Air conditioners for the regions Investment
Property
Other R 250 000.00 R 250 000.00 R 400 000.00 New
32602 Ambulance
equipment
replacement
Programme
Renewal Plant and
Equipment
MARTINDALE B
City Wide
Equipping ambulances with
required medical supplies
Community Fire, safety &
emergency
R 4 000 000.00 R 8 000 000.00 R 8 000 000.00 Renewal
32608 Building of EMS
and commercial
training academy
for the City of
Johannesburg
New Building
development of a multipurpose
training academy for EMS and
the City
Other Specialised
Vehicles
R 0.00 R 0.00 R 1 000 000.00 New
Page | 184
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
LEHAE EXT.1 G
City Wide
32618 E-Learning system
for Training
Academy New
Computer
Hardware
MARTINDALE B
City Wide
Computer Hardware at Brixton,
Florida and Rietfontein Training
Centres
Community Fire, safety &
emergency
R 3 500 000.00 R 0.00 R 0.00 New
23407 Equipment cheche
for Urban Search
and Rescue
RESCUE(jaws of
life, breathers for
Gautrain)and Air
lifting equipment
New Plant and
Equipment
MARTINDALE B
Purchase of specialised search
and rescue equipment
Other Assets Plant &
equipment
R 2 000 000.00 R 3 500 000.00 R 1 500 000.00 New
Page | 185
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
City Wide
33283 Fire and Rescue
Equipment New
Plant and
Equipment
MARTINDALE C
City Wide
Rescue equipment Other Assets Other R 3 000 000.00 R 8 000 000.00 R 8 000 000.00 New
32603 Fire and Rescue
Medical
Equipment
Tracking System
New Plant and
Equipment
MARTINDALE B
City Wide
Equipment and Related software
to monitor the condition of EMS
equipment and whether the
equipment is lost or not
Community Fire, safety &
emergency
R 3 000 000.00 R 1 800 000.00 R 4 800 000.00 New
23412 Fire protective
clothing for
firefighters New
Fire Protective clothing Other Assets Other R 2 000 000.00 R 2 200 000.00 R 2 200 000.00 New
Page | 186
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Operational Capex
MARTINDALE C
City Wide
30943 Furniture and
office equipment,
work stations New
Furniture
MARTINDALE B
City Wide
Furniture for new staff appointees
and new fire stations
Other Assets Furniture and
other office
equipment
R 3 000 000.00 R 2 000 000.00 R 10 000 000.00 New
30938 IT Needs New
Computer
Hardware
MARTINDALE B
City Wide
Computer equipment required to
equip new staff with tools of
trade.
Other Assets Computers -
hardware/equi
pment
R 2 000 000.00 R 1 500 000.00 R 1 500 000.00 New
29044 Operational
Capital (EMS):
New Operational
Capex
MARTINDALE F
Fire Equipment Other Assets Surplus
Assets -
(Investment or
Inventory)
R 1 000 000.00 R 1 000 000.00 R 1 000 000.00 New
Page | 187
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
City Wide
33390 Operational Fire
Extinguishers New
Operational Capex
MARTINDALE B
City Wide
Purchase of Fire Extinguishers for
operations
R 600 000.00 R 600 000.00 R 600 000.00 New
23411 STANDBY
GENERATORS
for current fire
stations and
replacement New
Plant and
Equipment
MARTINDALE C
City Wide
Standby Generators Other Assets Plant &
equipment
R 1 000 000.00 R 5 000 000.00 R 0.00 New
32617 Telephone System
and Alarm bell
system New
Installation of security system at
the entrances of fire stations
across the City.
Other Assets Computers -
hardware/equi
pment
R 600 000.00 R 0.00 R 0.00 New
Page | 188
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Operational Capex
MARTINDALE B
City Wide
33285 USAR Equipment
New Computer
Upgrades
MARTINDALE C
City Wide
New equipments Other Assets Computers -
hardware/equi
pment
R 300 000.00 R 300 000.00 R 300 000.00 New
32433 Wash Bay Project
New Building
Alterations
MARTINDALE F
City Wide
wash bays for EMS Other Assets Other
Buildings
R 8 350 000.00 R 8 350 000.00 R 0.00 New
34047 Breathaliser for
Alcohol Testing
New Operational
Capex
JOHANNESBURG
A City Wide
Traffic Management Other Assets Computers -
hardware/equi
pment
R 0.00 R 0.00 R 3 000 000.00 New
Page | 189
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
28531 By-Law
Management Unit
(CCTV Cameras)
New Office
Equipment
MARTINDALE B
City Wide
Closed Circuit Television
cameras for security of
impounded goods.
Other Assets Other R 0.00 R 2 800 000.00 R 0.00 New
34048 Computers for
Regional
Commnders New
Operational Capex
JOHANNESBURG
E City Wide
JHB TEN PLUS Other Assets Furniture and
other office
equipment
R 0.00 R 0.00 R 2 000 000.00 New
26830 Dube Holding
Facility New
Building
Alterations DUBE
D Ward
Holding facility for confiscated
goods from the public in
contravention of COJ's by laws at
Marlboro and Dube
Other Assets Other
Buildings
R 3 200 000.00 R 2 200 000.00 R 2 000 000.00 New
Page | 190
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
34049 Furniture for
Regional Offices in
the Wards New
Office Equipment
JOHANNESBURG
D City Wide
Office Furniture Other Assets Furniture and
other office
equipment
R 5 000 000.00 R 0.00 R 0.00 New
29443 Installation of
CCTV cameras at
JMPD HQ, Dube,
Licensing HQ &
Langlaagte for
Internal control
New Plant and
Equipment
MARTINDALE B
City Wide
Install CCTV cameras in all JMPD
facilities for internal control.
Other Assets Other R 3 600 000.00 R 3 800 000.00 R 4 000 000.00 New
29045 Operational
Capital (JMPD)
New Operational
Capex
New operational capex Other Assets Surplus
Assets -
(Investment or
Inventory)
R 949 000.00 R 740 000.00 R 780 000.00 New
Page | 191
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
BRAAMFONTEIN
WERF F City Wide
34050 Road block
equipment New
Operational Capex
JOHANNESBURG
C City Wide
Traffic Management Community Security &
policing
R 0.00 R 0.00 R 5 000 000.00 New
34052 Speed Trapping
Cameras and
Equipment New
Plant and
Equipment
JOHANNESBURG
E City Wide
Traffic Management Other Assets Other R 0.00 R 0.00 R 6 000 000.00 New
30431 Supply Firearms to
the JMPD new
recruits Renewal
Plant and
Equipment CITY
Supply new hand guns to JMPD
Officers
Other Assets Other R 2 822 000.00 R 2 800 000.00 R 3 000 000.00 Renewal
Page | 192
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
AND SUBURBAN
EXT.6 F City Wide
34051 Tazer Guns for
apprehension of
offenders New
Operational Capex
JOHANNESBURG
F City Wide
FOR SAFETY AND SECURITY Community Security &
policing
R 0.00 R 0.00 R 2 000 000.00 New
26816 Upgrade Shooting
Range with new
obstacle Course
Renewal Plant and
Equipment
ROODEPOORT C
City Wide
Upgrade Shooting Range with
new obstacle course.
Other Assets Plant &
equipment
R 3 200 000.00 R 0.00 R 0.00 Renewal
26858 Upgrading and
improving security
at JMPD Cash
Sites. Renewal
Upgrading and improving security
for the various pay points of
JMPD
Other Assets Other
Buildings
R 3 000 000.00 R 3 500 000.00 R 2 000 000.00 Renewal
Page | 193
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Building
Alterations
MARLBORO E
City Wide
33541 Construction of
Golden Harvest
Drug and Rehab
Centre New Plant
and Equipment
GOLDEN
HARVEST A.H. C
City Wide
To construct a drug rehabilitation
centre
Community Community
halls
R 23 000 000.00 R 0.00 R 0.00 New
33542 Operational
Capital Renewal
Skills
Development
Centre
BRAAMPARK F
City Wide
Operational capital for the
department
Other Assets Plant &
equipment
R 1 400 000.00 R 5 500 000.00 R 3 000 000.00 Renewal
Page | 194
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33343 Shelters for
Displaced People
New Skills
Development
Centre
JOHANNESBURG
F City Wide
Design, layout and construction of
buildings, carports, furniture and
equipment, landscaping, paving
and signage in Regions
A,B,C,D,E,G
Community Other R 2 000 000.00 R 0.00 R 0.00 New
32854 COMPL: Cycling
Lanes: UJ - Wits
Route
New Complete
Streets
AUCKLAND
PARK F City Wide
Non-Motorised transport (Cycle
paths, footways)to service
students living around Uni. of Jhb
& Wits.
Ontdekkers/Main/Perth/Kingsway/
Empire/St
Andrew/Rareigh/Saratoga/Wolma
rans/Smit/Solomon/Annet/Henley/
Symons/High/Ripley
Infrastructure Transportation R 20 000 000.00 R 0.00 R 0.00 New
33788 Louis Botha - Watt
Street Public
Transport/NMT
Interchange
Transport Related Interventions
to realise the Corridors of
Freedom
R 0.00 R 0.00 R 0.00 Renewal
Page | 195
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Renewal Corridors
of Freedom
Intervention
ORANGE GROVE
E City Wide
32511 MAN: Dedicated
Public Transport
Lanes:
Johannesburg
CBD: New
Managed Lanes
JOHANNESBURG
F City Wide
Extension of dedicated public
transport lanes in the
Johannesburg CBD
Infrastructure Transportation R 10 000 000.00 R 0.00 R 0.00 New
29533 Operational
Capital New
Operational Capex
JOHANNESBURG
F City Wide
Purchase of computer equipment
(not covered under Masana
Agreement), furniture, and office
machines, intended for new and
certain existing staff
Other Assets Surplus
Assets -
(Investment or
Inventory)
R 470 000.00 R 500 000.00 R 530 000.00 New
Page | 196
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33790 Perth/Empire
(Transport)
Renewal Corridors
of Freedom
Intervention
WESTBURY B
City Wide
Implementation of Transportation
related interventions in the
Corridors of Freedom
R 0.00 R 0.00 R 0.00 Renewal
33973 PTF Small public
transport facilities
Design and
Construction of
Laybys New
Laybys
JOHANNESBURG
F City Wide
Construction of Laybys City Wide Infrastructure Transportation R 2 000 000.00 R 2 000 000.00 R 2 000 000.00 New
32492 PTF: Small Public
Transport
Facilities: Drieziek
New Public
Transport Facility
Public Transport Facility: Drieziek Infrastructure Transportation R 15 000 000.00 R 15 000 000.00 R 0.00 New
Page | 197
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
DRIEZIEK EXT.3
G City Wide
33671 PTF: Small Public
Transport
Facilities: Laybys:
Turfontein New
Nodal Transport
Facilities
TURFFONTEIN F
Regional
Public transport laybys Infrastructure Transportation R 0.00 R 0.00 R 2 000 000.00 New
32493 PTF: Small Public
Transport
Facilities: Lehae
New Public
Transport Facility
LEHAE G City
Wide
Lehae Public transport facility Infrastructure Transportation R 4 000 000.00 R 0.00 R 0.00 New
Page | 198
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
33666 PTF: Small Public
Transport
Facilities: Orange
Farm Ext 7 New
Nodal Transport
Facilities
ORANGE FARM
EXT.7 G Regional
"Superstop" Infrastructure Transportation R 0.00 R 2 000 000.00 R 30 000 000.00 New
32483 PTF: Small Public
Transport
Facilities:
Tshepisong
Ebumnandini New
Public Transport
Facility
TSHEPISONG C
City Wide
Design and Construction of Taxi
rank
Infrastructure Transportation R 0.00 R 0.00 R 1 500 000.00 New
32892 PTF: Transfer
Facility: Scholar
Transport
Scholar transport interchange
including NMT
Infrastructure Transportation R 11 500 000.00 R 0.00 R 0.00 New
Page | 199
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Interchange-
Lenasia New
Public Transport
Facility LENASIA
G City Wide
34010 PTF:NMT
Facilities Linking
(Roodepoort,
Lenasia, Lehae,
Slovoville,
Doornkop,
Poortjie,
Tshepisong,
Orange Farm and
Drieziek New
Cycle
Paths/Pedestrian
Walks
ROODEPOORT C
City Wide
Design of NMT Links to
(Roodepoort, Lenasia, Lehae,
Slovoville, Doornkop, Poortjie,
Tshepisong, Orange Farm and
Drieziek
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 4 000 000.00 R 30 000 000.00 R 0.00 New
Page | 200
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
30886 Rea Vaya New
Bus Rapid Transit
JOHANNESBURG
F City Wide
Bus Rapid Transit (BRT) System:
roads and ancillary works,
depots, termini, land, Intelligent
Transport System (Automatic
Public Transport Management
System & Automated Fare
Collection System). Also NMT
links feeding Rea Vaya Stations
Infrastructure Transportation R 864 368 000.00 R 916 569
000.00
R 1 018 724
000.00
New
30555 City Parks House -
IT Equipment New
Computer
Hardware
New Computer
Hardware
JOHANNESBURG
F Ward
IT Equipment New Computer
Hardware
Intangibles Computers -
sofware and
programming
R 1 500 000.00 R 1 500 000.00 R 1 500 000.00 New
34024 Operational
Capital Sports and
Recreation New
Operational Capital Budget R 432 000.00 R 463 000.00 R 486 000.00 New
Page | 201
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Information
Technology
JOHANNESBURG
F
26220 Revamping of the
Informal Trading
Stalls within the
Inner City
Renewal
Operational Capex
JOHANNESBURG
F Ward
Revamping of the Informal
Trading Stalls within the Inner
City
Other Assets Markets R 7 400 000.00 R 13 000 000.00 R 1 300 000.00 Renewal
30991 HAZMAT UNIT
New Operational
Capex
MARTINDALE B
Ward
Purchase of a mobile command
and control centre to
accommodate 12 EMS officers to
manage a disaster on site
Community Fire, safety &
emergency
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
30367 Operational
Capital (Speaker's
Office) Renewal
Purchasing of laptops and
furniture
Other Assets Furniture and
other office
R 970 000.00 R 844 000.00 R 0.00 Renewal
Page | 202
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
Operational Capex
JOHANNESBURG
F Ward
equipment
34075 Electrification of
various Informal
Settlements (Plot
8 Lindhaven,
Kliptown Ext11,
Princess Plot 61,
Freedom Charter
Square, Ruimsig
Portion 77,
Westgate
development
Princess Plot)
New Electrification
JOHANNESBURG
F City Wide
electrification of informal
settlements
Infrastructure Electricity
Reticulation
R 200 000 000.00 R 0.00 R 0.00 New
34073 Ombudsman New
Office Equipment
Appointed to receive and
investigate complaints made by
Intangibles Other R 5 000 000.00 R 5 275 000.00 R 5 565 000.00 New
Page | 203
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
JOHANNESBURG
F City Wide
individuals against City of Jourg
34072 Vulindlela -
Harambee New
Office Equipment
JOHANNESBURG
F City Wide
Job creation initiative by the
Honourable Mayor
Intangibles Other R 22 500 000.00 R 0.00 R 0.00 New
34074 The
implementation of
phase II of the
Integrated
Operational
Centre (IOC) New
Computer
Software
JOHANNESBURG
F City Wide
The Integrated Operation Centre
to assist the City with the
reduction of crime etc.
Infrastructure Other R 70 000 000.00 R 70 000 000.00 R 70 000 000.00 New
34070 Jozi-TV New
Furniture
JOHANNESBURG
Jozi Tv for broadcasting of Joburg
events
Other Assets Other R 3 800 000.00 R 4 009 000.00 R 4 229 000.00 New
Page | 204
CIMS
Numb
ers
Project Name
Description
Assets Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Informati
on
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
City Wide
F City Wide
34071 Procurement of
Health Information
System New
Computer
Software
JOHANNESBURG
F City Wide
To assist the Clinics Intangibles Computers -
sofware and
programming
R 16 574 000.00 R 36 574 000.00 R 30 000 000.00 New
Page | 205
2015/16 Capex Project per Region
TABLE 8
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
32571 Bird Sanctuary - City wide
Renewal Park
JOHANNESBURG F
Regional
Bird Sanctuary -
Ablution facility
Community Parks &
gardens
R 0.00 R 0.00 R 500 000.00 Renewal
33689 Innercity Parks Development
and Upgrading New Park
JOHANNESBURG F
Regional
Park Development
and Upgrading to
link with Metro Park
Community Recreational
facilities
R 4 000 000.00 R 6 000 000.00 R 0.00 New
32730 Kliprivier Nature Reserve
Upgrade Renewal
Educational Centre
finalisation
Renewal Park
KLIPRIVIERSBERG F
Regional
Peggy Vera Road,
Kibler Park
Community Parks &
gardens
R 2 000 000.00 R 0.00 R 0.00 Renewal
Page | 206
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33835 Upgrading of Pioneer Park
Renewal Park
TURFFONTEIN F Regional
Upgrade Pioneer
Park
R 8 500 000.00 R 5 000 000.00 R 5 000 000.00 Renewal
30767 Cleveland Substation,
Reconfigure busbar, replace
high risk transformer, add
additional 45 MVA
transformer andfeeder
board. Renewal Bulk
Infrastructure HERIOTDALE
EXT.10 F Regional
Reconfigure busbar,
replace high risk
transformer, add 45
MVA transformer
and feeder board.
Infrastructur
e
Electricity
Reticulation
R 40 000 000.00 R 44 500 000.00 R 50 000 000.00 Renewal
32534 New 88/11 kV substation
near Park station. New Bulk
Infrastructure NEWTOWN F
Regional
New 88/11 kV
substation near Park
station
Infrastructur
e
Electricity
Reticulation
R 0.00 R 0.00 R 500 000.00 New
32535 New 88/11 kV substation
near Westgate. New Bulk
Infrastructure FERREIRAS
DORP F Regional
New 88/11 kV
substation near
Westgate.
Infrastructur
e
Electricity
Reticulation
R 0.00 R 0.00 R 40 000 000.00 New
Page | 207
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
22490 New service connections
New Service Connections
BEREA F Regional
New service
connections in the
Siemert Road area
Infrastructur
e
Electricity
Reticulation
R 9 375 000.00 R 9 375 000.00 R 8 500 000.00 New
25069 New service connections
New Service Connections
REUVEN F Regional
Provision of new
service connections
Infrastructur
e
Electricity
Reticulation
R 9 500 000.00 R 9 500 000.00 R 7 250 000.00 New
24930 Prepare mini subs and load
centres for 11 kV conversion
Renewal Township
Reticulation JEPPESTOWN
SOUTH F Regional
11 kV Conversion Infrastructur
e
Electricity
Reticulation
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
32460 Refurbish TSS's as required
by Area Maintanance
Renewal Medium Voltage
Network JOHANNESBURG
F Regional
Refurbish TSS's in
the Siemert Rd
depot area
Infrastructur
e
Electricity
Reticulation
R 5 000 000.00 R 5 000 000.00 R 5 000 000.00 Renewal
27028 Refurbishment of LV
infrastructure
Renewal Low Voltage
Refurbish LV
infrastructure.
Infrastructur
e
Electricity
Reticulation
R 5 000 000.00 R 5 000 000.00 R 5 000 000.00 Renewal
Page | 208
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
REUVEN F Regional
27030 Refurbishment of MV
infrastructure(Switchgear
and transformers)
Renewal Medium Voltage
Network REUVEN F
Regional
Refurbishment of
MV infrastructure
(switchgear and
transformers)
Infrastructur
e
Electricity
Reticulation
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
27031 Replacement of aged and/or
faulting MV cables
Renewal Medium Voltage
Network REUVEN F
Regional
replace aged and/or
faulting MV cables
Southern Region.
Infrastructur
e
Electricity
Reticulation
R 10 000 000.00 R 10 000 000.00 R 5 000 000.00 Renewal
31121 Telecommunications, Fibre
optic installations and
upgrades Renewal SCADA
REUVEN F Regional
Fibre optic
installations and
upgrades
Infrastructur
e
Other R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
Page | 209
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33770 Turffontein (City Power)
Renewal Corridors of
Freedom Intervention
TURFFONTEIN F Regional
City Power related
interventions to
realise the Corridors
of Freedom Initiative
Infrastructur
e
Electricity
Generation
R 8 000 000.00 R 14 400 000.00 R 10 000 000.00 Renewal
33763 Inner City (Comm Dev: S&R)
Renewal Inner City
Intervention
JOHANNESBURG F
Regional
Amount for
undertaking capital
Projects in the Inner
City
Community Recreational
facilities
R 2 000 000.00 R 1 500 000.00 R 0.00 Renewal
34038 Modular Containers in
informal settlements New
Community Centre
BRAAMFONTEIN WERF F
Regional
Modular Containers
in informal
settlements
R 2 000 000.00 R 1 200 000.00 R 0.00 New
33765 Inner City (Dev Planning)
Renewal Inner City
Intervention
JOHANNESBURG F
Regional
Amount for
undertaking capital
projects in the Inner
City
Infrastructur
e
Other R 120 000 000.00 R 150 000 000.00 R 150 000 000.00 Renewal
Page | 210
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
27736 BPO Inner City Zone
Renewal Small Business
Hub JOHANNESBURG F
Regional
Business Process
Services Unit
Investment
Property
Other R 5 000 000.00 R 5 000 000.00 R 5 000 000.00 Renewal
31108 Inner City Property Scheme
Renewal Building/s
JOHANNESBURG F
Regional
property acquisition
for economic
development and
area revitalisation
Other Assets Civic Land &
Buildings
R 5 000 000.00 R 7 966 000.00 R 0.00 Renewal
33766 Inner City Roadmap
Economic Development
Initiatives Renewal Inner City
Intervention
JOHANNESBURG F
Regional
Amount for
undertaking capital
projects in the Inner
City
R 0.00 R 0.00 R 5 000 000.00 Renewal
29543 Inner City Upgrading
(Transitional/Emergency and
Rental Stock) Renewal
Rental Flats
JOHANNESBURG F
Regional
Upgrading of rental
accommodation
within the Inner City
Investment
Properties
Housing
development
R 15 000 000.00 R 20 000 000.00 R 20 000 000.00 Renewal
Page | 211
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33775 Turffontein Corridor
(Housing) Renewal Corridors
of Freedom Intervention
TURFFONTEIN F Regional
Amount for the
undertaking of
capital projects in
the corridor
Infrastructur
e
Other R 1 000 000.00 R 30 000 000.00 R 30 000 000.00 Renewal
33800 Rotunda Park Precinct
Turffontein Corridor (JDA)
New Precinct
Redevelopment
TURFFONTEIN F Regional
implementation of
capital projects in
development
corridor
R 15 000 000.00 R 20 000 000.00 R 45 000 000.00 New
33794 Turffontein Corridor (JW:
Sewer) Renewal Corridors of
Freedom Intervention
TURFFONTEIN F
capital projects in
the corridor
Infrastructur
e
Sewerage
Purification
&
Reticulation
R 5 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
33086 Roodepoort/ Diepsloot: Main
Reef 20Ml, 30Ml, Tower 2Ml
New Reservoirs
JOHANNESBURG C
Regional
Main Reef Tower Infrastructur
e
Water,
Reservoirs &
Reticulation
R 0.00 R 0.00 R 500 000.00 New
Page | 212
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33089 Southdale/ Laaglaagte:
Crown Gardens Reservoir
New Reservoirs CROWN
GARDENS D Regional
Reservoir 16.3Ml Infrastructur
e
Water,
Reservoirs &
Reticulation
R 0.00 R 0.00 R 8 000 000.00 New
33090 Southdale/ Langlaagte:
Aeroton Direct/ Tower New
Reservoirs AEROTON D
Regional
Tower 1.1Ml Infrastructur
e
Water,
Reservoirs &
Reticulation
R 5 000 000.00 R 0.00 R 0.00 New
33789 Turffontein Corridor (JW:
Water) Renewal Corridors of
Freedom Intervention
TURFFONTEIN F Regional
capital projects in
the corridor
Infrastructur
e
Water,
Reservoirs &
Reticulation
R 5 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
32937 Civil Resurfacing of all
platforms within the Market
New Building Alterations
CITY DEEP EXT.22 F
Regional
Resurfacing of all
platforms of the
halls( 1-10)
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 7 000 000.00 R 5 000 000.00 R 12 000 000.00 New
29940 Computer Equipment
Renewal Computer
Upgrades CITY DEEP EXT.2
Computer Hardware Other Assets Markets R 5 000 000.00 R 10 000 000.00 R 0.00 Renewal
Page | 213
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
F Regional
33707 Computer Hardware
New/Renewal Renewal
Computer Hardware CITY
DEEP EXT.22 F Regional
Computer Hardware Other Assets Computers -
hardware/eq
uipment
R 5 000 000.00 R 10 000 000.00 R 0.00 Renewal
32884 Installation of sprinkler
systems New Building
Alterations CITY DEEP
EXT.22 F Regional
installation of
sprinkler systems
Other Assets Markets R 5 600 000.00 R 6 200 000.00 R 11 800 000.00 New
30022 Main Building
Refurbishments Renewal
Building Alterations CITY
DEEP EXT.22 F Regional
Refurbishment of
ageing offices
Other Assets Markets R 4 500 000.00 R 2 000 000.00 R 0.00 Renewal
32895 Main Building Renewal
Building Alterations CITY
DEEP EXT.22 F Regional
Renovation in the
main building at the
Market
Other Assets Markets R 8 000 000.00 R 3 000 000.00 R 2 000 000.00 Renewal
Page | 214
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
30759 Main market signage New
Building Alterations CITY
DEEP EXT.22 F Regional
Improving the
ascetic value of the
building.
Other Assets Markets R 5 000 000.00 R 0.00 R 0.00 New
32916 Market of the Future New
Building CITY DEEP EXT.22
F Regional
Upgrading Market
facilities to enable
new legislation,
maintain Market
relevance, and
enhance Food
Safety & Security
Other Assets Markets R 133 435 000.00 R 169 273 000.00 R 165 000 000.00 New
29946 New Rocker Bins Renewal
Plant and Equipment CITY
DEEP EXT.22 F Regional
Rocker Bins Infrastructur
e
Refuse R 500 000.00 R 1 000 000.00 R 0.00 Renewal
32914 Office equipment
New/Renewal New Office
Equipment CITY DEEP
EXT.22 F Regional
new office
equipment
Other Assets Furniture
and other
office
equipment
R 3 000.00 R 120 000.00 R 0.00 New
Page | 215
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
32925 Pallet Pool New Bulk
engineering services CITY
DEEP EXT.22 F Regional
Creation of Pallet
Pool
Other Assets Markets R 3 000 000.00 R 1 000 000.00 R 500 000.00 New
30470 Potable water to halls and
washbasins New Building
Alterations CITY DEEP
EXT.22 F Regional
Potable water to
halls and
washbasins
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 0.00 R 0.00 R 0.00 New
30016 Provision of new
Transformers New Building
Alterations CITY DEEP
EXT.2 F
Provision of new
transformers for
electric supply to
future extensions in
the southern side of
the Market
Infrastructur
e
Electricity
Generation
R 5 400 000.00 R 0.00 R 0.00 New
32922 Refurbishments/
Construction of ablution
facilities Renewal Building
Alterations CITY DEEP
EXT.22 F Regional
Ablution Facilities Infrastructur
e
Sewerage
Purification
&
Reticulation
R 4 000 000.00 R 5 000 000.00 R 2 000 000.00 Renewal
Page | 216
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
29943 Replacement of Ammonia
Plant Renewal Plant and
Equipment CITY DEEP
EXT.22 F Regional
Replacement of
Ammonia
Compressor
Other Assets Markets R 6 000 000.00 R 5 000 000.00 R 0.00 Renewal
30761 Replacement of Assets
New/Renewal New Plant and
Equipment CITY DEEP
EXT.22 F Regional
Plant and equipment Other Assets Markets R 6 500 000.00 R 5 000 000.00 R 6 500 000.00 New
32933 Replacement of the roof at
trading halls New Building
Alterations CITY DEEP
EXT.22 F Regional
Replacement of the
roof at the trading
halls
Other Assets Markets R 5 000 000.00 R 5 000 000.00 R 7 000 000.00 New
30435 Revamp sewer and drainage
system New Drainage
System CITY DEEP EXT.22
F Regional
Sewer and drainage
upgrade for the
whole of the market
Infrastructur
e
Sewerage
Purification
&
Reticulation
R 6 000 000.00 R 5 000 000.00 R 2 000 000.00 New
32919 Road Rehabilitation Project
New Bulk engineering
services CITY DEEP
EXT.22 F Regional
Upgrade of the road Other Assets Markets R 9 000 000.00 R 12 000 000.00 R 9 000 000.00 New
Page | 217
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
29615 Standby Generator upgrade
Renewal Building Alterations
CITY DEEP EXT.22 F
Regional
Standby Power
Generators for the
Market
Other Assets Markets R 0.00 R 0.00 R 0.00 Renewal
30020 Temperature Control
Systems Renewal Building
Alterations CITY DEEP
EXT.22 F Regional
Cold stores, Banana
ripening, instrument
for central
temperature logging.
Other Assets Markets R 0.00 R 1 500 000.00 R 0.00 Renewal
32903 Trading System Archiving
New Computer Software
CITY DEEP EXT.22 F
Regional
Archiving of trading
system
Other Assets Markets R 0.00 R 1 000 000.00 R 0.00 New
32928 Trading System at other
markets New Computer
Software CITY DEEP
EXT.22 F Regional
Software system for
other markets
Other Assets Markets R 0.00 R 0.00 R 400 000.00 New
26012 Upgrade CCTV Renewal
Computer Software CITY
DEEP EXT.22 F Regional
Upgrade CCTV
&Security
R 2 500 000.00 R 0.00 R 5 000 000.00 Renewal
Page | 218
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
29200 Upgrade Hall 9 Renewal
Building Alterations CITY
DEEP EXT.22 F Regional
Upgrade of existing
hall to bring in line
with HACCP
requirements
Other Assets Markets R 5 000 000.00 R 5 000 000.00 R 5 000 000.00 Renewal
32932 Upgrade of Electrical HVAC
New Bulk engineering
services CITY DEEP
EXT.22 F Regional
Upgrade of electrical
HVAC
R 7 000 000.00 R 8 000 000.00 R 9 000 000.00 New
27719 Upgrade of Exit and
entrance gates Renewal
Building Alterations CITY
DEEP EXT.22 F Regional
Upgrade Exit Gate Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 2 000 000.00 R 1 000 000.00 R 750 000.00 Renewal
26020 Upgrade of Hall 1 and 2
Renewal Building Alterations
CITY DEEP EXT.22 F
Regional
Refurbishing 23 000
m2 into a Value
Added Services
Centre to attract
Retailers back to the
Market.
Other Assets Other
Buildings
R 6 000 000.00 R 4 000 000.00 R 10 000 000.00 Renewal
Page | 219
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
30889 Joburg Theatre - Building
Renovations and upgrades
New Building Alterations
JOHANNESBURG F Ward
Renovation of
existing public
bathrooms; building
of scenery door to
the Fringe Theatre;
replacement of
building
management
system; renovation
of backstage
dressing rooms;
extended 28 bay
parking facility;
upgrade of two
public lifts; wrapping
and insulating the
stage tower; water
proofing of all roofs;
replacement of
Gamma Zenith on
exterior.
Community Recreational
facilities
R 3 100 000.00 R 1 442 000.00 R 5 330 000.00 New
Page | 220
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33817 Joburg Theatre - Technical
Equipment New Operational
Capex JOHANNESBURG F
Regional
Purchasing of
Technical
Equipment
Other Assets Furniture
and other
office
equipment
R 700 000.00 R 750 000.00 R 0.00 New
32502 Joburg Theatre - Upgrade of
stage machinery Renewal
Plant and Equipment
JOHANNESBURG F Ward
UPS Protection for
Mandela and Fringe
Theatres; Drives on
wagons and lifts of
the Mandela
Theatre; Steel
cables for the
Mandela front tabs.
Community Recreational
facilities
R 500 000.00 R 1 155 000.00 R 0.00 Renewal
33863 27 Hoek Street New Inner
City Intervention
JOHANNESBURG F Ward
Social Housing R 15 000 000.00 R 0.00 R 0.00 New
33813 Anthea Renewal Building
Alterations
JOHANNESBURG F
Regional
Upgrading of
existing social
housing stocke
Community Social
Renting
Housing
R 1 000 000.00 R 1 000 000.00 R 1 000 000.00 Renewal
Page | 221
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33723 Bertrams Social Housing
Units New Housing
Development BERTRAMS F
Regional
Development of
social housing
projects on different
infill council sites in
Bertrams
Investment
Properties
Housing
development
R 20 000 000.00 R 15 000 000.00 R 15 000 000.00 New
33814 Casamia Renewal Building
Alterations
JOHANNESBURG F
Regional
Upgrading to
existing social
housing stock
Community Social
Renting
Housing
R 5 000 000.00 R 5 000 000.00 R 5 000 000.00 Renewal
33694 Citrine Court Building
Renewal Operational Capex
BELLAVISTA ESTATE F
Regional
Upgrading of the
Bellavista Building
Investment
Properties
Housing
development
R 503 000.00 R 900 000.00 R 900 000.00 Renewal
33815 La Rosabel Renewal
Building Alterations
JOHANNESBURG F
Regional
Upgrading of
existing social
housing stock
Community Social
Renting
Housing
R 500 000.00 R 500 000.00 R 500 000.00 Renewal
33691 Neibourhood Development
for Bertrams Priority Block
New Building Alterations
Delivery of an asset
worth R100 million
on COJ Land
Investment
Property
Other R 0.00 R 1 000 000.00 R 500 000.00 New
Page | 222
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
BERTRAMS F Regional
33941 Rissik Street Post Office
Restoration Project New
Heritage JOHANNESBURG
F Regional
Restoration of the
Rissik Post Office
Heritage
Assets
Buildings R 20 000 000.00 R 10 000 000.00 R 15 000 000.00 New
33785 CORR - Turffontein Corridor
of Freedom Traffic Impact
Assessment (TIA),
Stormwater Masterplan and
New Construction and
Upgrading Renewal
Corridors of Freedom
Intervention Renewal
Stormwater Management
Projects JOHANNESBURG
F Regional
Capital Projects in
the Corridor
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
Page | 223
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
31898 MOB - Guardrails. Renewal
Roads: Construction and
Upgrades JOHANNESBURG
F Regional
Installation/replacem
ent of guardrails
along main roads.
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
33740 MOB - M2 Motorway at Main
Reef Road Intersection. New
Roads: Construction and
Upgrades CROWN EXT.2 E
Regional
Congestion relief. Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 13 000 000.00 R 10 000 000.00 R 0.00 New
31925 MOB - Upgrading Controllers
and Phasing. Renewal
Mobility: Intelligent
Transportation System &
Networks JOHANNESBURG
F Regional
New phasing to be
installed in Inner
City where many
controllers are old /
outdated; and the
equipment is neither
compatible nor
interchangeable.
Infrastructur
e
Transportati
on
R 5 000 000.00 R 6 000 000.00 R 17 500 000.00 Renewal
22300 12 (b) New Garden Sites -
Northern Works, Southdale
& Randburg
New Garden Sites
Provide dumping
facilities for garden
refuse to increase
life of landfill and to
make saleable
Infrastructur
e
Refuse R 0.00 R 0.00 R 500 000.00 New
Page | 224
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
SOUTHDALE F Regional compost
33379 Fire Stations - Central
Museum Establishment
Renewal Building Alterations
JOHANNESBURG A
Regional
Establishment of
Museum
Community Fire, safety
&
emergency
R 0.00 R 0.00 R 5 950 000.00 Renewal
33669 COMPL: Cycling Lanes:
Turffontein New Nodal
Transport Facilities
TURFFONTEIN F Regional
Cycle lanes Infrastructur
e
Transportati
on
R 0.00 R 0.00 R 30 000 000.00 New
33668 COMPL: Sidewalk
Improvements: Turffontein
New Nodal Transport
Facilities TURFFONTEIN F
Regional
Sidewalk
Improvements
Infrastructur
e
Transportati
on
R 0.00 R 3 000 000.00 R 30 000 000.00 New
Page | 225
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33975 PTF Small Public Transport
Facility in Zakariya Park New
Nodal Transport Facilities
ZAKARIYYA PARK G
Regional
Design and
Construction of
Public Trasnport
Facility at Zakariya
park
Infrastructur
e
Transportati
on
R 3 000 000.00 R 20 000 000.00 R 10 000 000.00 New
33671 PTF: Small Public Transport
Facilities: Laybys: Turfontein
New Nodal Transport
Facilities TURFFONTEIN F
Regional
Public transport
laybys
Infrastructur
e
Transportati
on
R 0.00 R 0.00 R 2 000 000.00 New
30953 Upgrade MV supply to and in
Kya Sands. Renewal
Medium Voltage Network
KYA SAND A Regional
Upgrade MV supply
to and in Kya Sands.
Infrastructur
e
Electricity
Reticulation
R 0.00 R 0.00 R 500 000.00 Renewal
30841 Vorna Valley. Upgrade sub
station Renewal Bulk
Infrastructure VORNA
VALLEY EXT.7 A Regional
Upgrade Vorna
Valley sub station to
2 X 40 MVA
transformers and
new feeder board
Infrastructur
e
Electricity
Reticulation
R 0.00 R 0.00 R 500 000.00 Renewal
Page | 226
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
34034 Construction of a new MPC
in Kaalfontein New
Community Centre
KAALFONTEIN EXT.1 A
Regional
Construction of a
new MPC in
Kaalfontein
R 1 562 500.00 R 9 250 000.00 R 0.00 New
34037 Contruction of a new
swimming pool in Ivory Park
New Community Centre
IVORY PARK EXT.2 A
Regional
Construction od a
new swimming pool
un Ivory Park
R 2 000 000.00 R 12 087 000.00 R 0.00 New
30330 Reconstruction of Ngonyama
Road Renewal Precinct
Redevelopment
DIEPSLOOT WES A
Regional
NDPG project to be
implemented by JDA
Infrastructur
e
Other R 54 386 500.00 R 54 420 000.00 R 60 000 000.00 Renewal
33067 Diepsloot Redevelopment
Northern Farms New Bulk
Infrastructure DIEPSLOOT
A.H. A Regional
Construction of Bulk
Services
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 75 000 000.00 R 200 000 000.00 R 350 000 000.00 New
Page | 227
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
32758 LA: Module 1 New Bulk
Waste Water LANSERIA
EXT.17 C Regional
Construction of
Lanseria Waste
Water Treatment
Works: Module 1
Infrastructur
e
Water,
Reservoirs &
Reticulation
R 10 000 000.00 R 60 000 000.00 R 245 000 000.00 New
26871 Northern Works: Belt
Presses New Bulk Waste
Water DIEPSLOOT WES
EXT.5 A Regional
Belt
Presses:Northern
Works
Infrastructur
e
Sewerage
Purification
&
Reticulation
R 10 000 000.00 R 0.00 R 0.00 New
28721 Northern Works: Unit 2
Digesters refurbish #2
Renewal Bulk Waste Water
DIEPSLOOT WES EXT.5 A
Regional
Refurbish digesters
at Northern Works
Infrastructur
e
Sewerage
Purification
&
Reticulation
R 15 000 000.00 R 2 000 000.00 R 0.00 Renewal
33078 Midrand: Carlswald
Reservoir New Reserviors
CARLSWALD A.H. A
Regional
Reservoir 10Ml Infrastructur
e
Water,
Reservoirs &
Reticulation
R 15 000 000.00 R 0.00 R 0.00 New
33163 Midrand: Planned
replacement: watermains
Renewal Water Mains BLUE
replacement
watermains
Infrastructur
e
Water,
Reservoirs &
Reticulation
R 35 000 000.00 R 15 000 000.00 R 20 000 000.00 Renewal
Page | 228
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
HILLS A.H. A Regional
33739 BRID 05 - Le Roux Avenue
Widening. New Roads:
Construction and Upgrades
HALFWAY HOUSE ESTATE
A Regional
Widening of Le
Roux Ave between
Bekker/Janadel
Street and Old
Pretoria Main as a
result of the
doubling of Le Roux
Ave Bridge and
traffic congestion.
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 2 000 000.00 R 0.00 R 0.00 New
30756 11 Landfill New Cell
Development Works -
Potential New development
New waste collection
DIEPSLOOT A.H. A
Regional
Feasibility, Design
and construction of
a new landfill site for
the North of the city
Infrastructur
e
Refuse R 4 500 000.00 R 8 500 000.00 R 0.00 New
Page | 229
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33535 23 Depot Midrand New
Depots HALFWAY
GARDENS EXT.80 A
Regional
Pikitup Depot in
Midrand
Infrastructur
e
Refuse R 0.00 R 0.00 R 500 000.00 New
32857 COMPL: Cycling Lanes:
Diepsloot - Fourways Route
(W Nicol - W Bypass) New
Complete Streets
DIEPSLOOT A.H. A
Regional
Cycle paths:
Diepsloot Fourways
route (W Nicol to W
Bypass)
Infrastructur
e
Transportati
on
R 0.00 R 3 000 000.00 R 32 000 000.00 New
33801 Westdene Dam park
development New Park
WESTDENE B Regional
Development of
Westdene Park
Community Parks &
gardens
R 10 000 000.00 R 11 970 000.00 R 0.00 New
30047 Zoo - Parking Area
Development(Zoo & Zoo
lake Prencinct) New Bulk
engineering services
SAXONWOLD E Regional
Establishment of
new parking lot for
the Zoo and Zoo
lake park upgrade
Community Parks &
gardens
R 12 000 000.00 R 20 000 000.00 R 0.00 New
Page | 230
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
31156 Zoo - Water Saving project
Renewal Internal Water
Reticulation SAXONWOLD E
Regional
Replacement of
steel water line
Infrastructur
e
Water,
Reservoirs &
Reticulation
R 0.00 R 0.00 R 0.00 Renewal
33840 Hurst Hill Sub-station
refurbishment Renewal Bulk
Infrastructure HURST HILL B
Regional
Refurbishment of
Hurst Hill Sub
Station
R 25 000 000.00 R 25 000 000.00 R 0.00 Renewal
25065 New service connections
New Service Connections
FERNDALE EXT.25 B
Regional
Provision of new
service connections
in Randburg
Infrastructur
e
Electricity
Reticulation
R 18 800 000.00 R 18 800 000.00 R 17 050 000.00 New
25070 New Service connections
New Service Connections
HURST HILL B Regional
Provision of new
service connections
Infrastructur
e
Electricity
Reticulation
R 4 685 000.00 R 4 685 000.00 R 4 260 000.00 New
30765 Replace 30 MVA
transformers with 45 MVA
units Renewal Bulk
Infrastructure PARKHURST
B Regional
Replace 30 MVA
transformers with 45
MVA units and new
11 kV feederboard
Infrastructur
e
Electricity
Reticulation
R 0.00 R 0.00 R 500 000.00 Renewal
Page | 231
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33631 Rooseveldt Park:Replace 2
X 45 MVA transformers and
replace 11kV switchgear
New Bulk Infrastructure
LINDEN E Regional
Replace 2 X 45
MVA transformers
and replace 11kV
switchgear
Infrastructur
e
Electricity
Reticulation
R 0.00 R 0.00 R 500 000.00 New
28357 Upgrade John Ware sub
station Renewal Bulk
Infrastructure FORDSBURG
F Regional
Install an additional
88/11 kV
transformer and
feeder board
Infrastructur
e
Electricity
Reticulation
R 0.00 R 0.00 R 20 000 000.00 Renewal
33680 Bosmontspruit Rehabilitation
Renewal Ecological
Infrastructure BOSMONT C
Regional
Rehabilitation of the
wetlands including
ecological
infrastructure as
recommended in the
State of the River
study in 2009/10,
CoJ Bioregional
plan,CoJ Wetland
management plan
(2009). To conserve
and protect City's
natural heritage and
Infrastructur
e
Other R 3 000 000.00 R 10 000 000.00 R 15 000 000.00 Renewal
Page | 232
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
resourses,
promoting River
health through
integrated
catchment
management
33911 Klip Bosmontspruit Water
Management New Ecological
Infrastructure BOSMONT C
Regional
Rehabilitation of
watercourses
Intangibles Other R 0.00 R 15 000 000.00 R 10 000 000.00 New
33803 Milpark Precinct (Empire
Perth Corridor) - Owl Street
New Precinct
Redevelopment RICHMOND
B Regional
Development of the
Milpark Precinct on
Owl Street
R 0.00 R 0.00 R 30 000 000.00 New
23485 Randburg CBD regeneration
Renewal Precinct
Redevelopment FERNDALE
B Regional
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 30 000 000.00 R 7 500 000.00 R 30 000 000.00 Renewal
Page | 233
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33860 Westbury Pedestrian Bridge
New Precinct
Redevelopment WESTBURY
EXT.3 B Regional
Construction of
Pedestrian Bridge
and associated
walkway to allow
access to the
existing BRT station.
R 10 000 000.00 R 0.00 R 0.00 New
33590 Johannesburg Central: Perth
- Empire BRT and Rail
Corridor Interventions
Renewal Water Mains
JOHANNESBURG D
Regional
Upgrade of water
infrastructure to
support the corridor
R 0.00 R 0.00 R 0.00 Renewal
24751 Johannesburg
Central:planned replacement
watermains Renewal Water
Mains MAYFAIR F Regional
Planned
replacement:Water
main
Infrastructur
e
Water,
Reservoirs &
Reticulation
R 5 000 000.00 R 10 000 000.00 R 15 000 000.00 Renewal
33787 Perth Empire Corridor (JW:
Water) Renewal Corridors of
Freedom Intervention
WESTBURY B Regional
ring-fenced amount
for undertaking
capital projects in
the corridor
Infrastructur
e
Water,
Reservoirs &
Reticulation
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
Page | 234
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33208 Roodepoort/ Diepsloot:
Whiteridge North - Little Falls
-Constantia water upgrade
New Water Mains
WHITERIDGE C Regional
water upgrade Infrastructur
e
Water,
Reservoirs &
Reticulation
R 5 000 000.00 R 0.00 R 0.00 New
26887 Sandton/ Alexandra :
Kensington Reservoir 15Ml
New Reservoirs
KENSINGTON B Regional
Kesington B District
upgrading water
infrastructure
Infrastructur
e
Water,
Reservoirs &
Reticulation
R 0.00 R 0.00 R 5 000 000.00 New
33547 Promusica Theatre - Building
renovations and upgrades
Renewal Building Alterations
FLORIDA PARK EXT.9 C
Regional
Upgrading of the
theatre auditorium,
catering facilities
and re-branding of
the theatre
Community Recreational
facilities
R 500 000.00 R 500 000.00 R 0.00 Renewal
26167 Promusica Theatre -
Upgrading of technical
equipment (sound and
lighting) Renewal Theatre
redevelopment FLORIDA
PARK EXT.9 C Regional
Infrastructural and
upgrading of
facilities
Other Assets Plant &
equipment
R 0.00 R 600 000.00 R 600 000.00 Renewal
Page | 235
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33698 Pennyville Communal
Rooms Renewal Operational
Capex PENNYVILLE EXT.1
C Regional
Upgrading and
repairs of
Communal rooms
Community Social
Renting
Housing
R 1 000 000.00 R 1 000 000.00 R 4 000 000.00 Renewal
25002 Randburg CBD Renewal
Building Alteration Renewal
Building Alterations
FERNDALE B Regional
Upgrading of
Randburg CBD -
Hilltop taxi rank site
and Selkirk precinct
Other Assets Civic Land &
Buildings
R 1 000 000.00 R 5 000 000.00 R 10 300 000.00 Renewal
33988 Rosebank Linear Park
ReDevelopment New
Precinct Redevelopment
ROSEBANK B Regional
Redevelopment of
Public Library, clinic
and Linear Park
Community Libraries R 2 000 000.00 R 4 000 000.00 R 3 000 000.00 New
33783 CORR - Perth Empire
Corridor of Freedom Traffic
Impact Assessment (TIA),
Stormwater Masterplan and
New Constriction and
Upgrading Renewal
Corridors of Freedom
Intervention WESTBURY B
Regional
Capital projects in
the Corridor
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
Page | 236
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
31321 RNP013_Jan Smuts Dualling
Renewal Roads:
Construction and Upgrades
PARKWOOD B Regional
Dualling of Jan
Smuts Avenue from
7th Avenue to
Bompass Road.
Design only. To be
part of Ten Year
Plan.
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 3 000 000.00 R 0.00 R 1 000 000.00 Renewal
33795 Perth Empire Corridor Co -
Production Zone for Social
Development Renewal of
Corridors of Freedom
Intervention (Social
Development One Stop
Centre) Renewal Corridors
of Freedom Intervention
WESTBURY B Regional
Amount for
undertaking capital
project in the
corridor
Community Community
halls
R 6 000 000.00 R 5 000 000.00 R 0.00 Renewal
33974 PTF Small Public Transport
facility Design and
Construction of Park n Ride
in Greenside New Park
GREENSIDE E Regional
Installation of
shelters, Paving of
the area, fencing,
ladscaping
Infrastructur
e
Transportati
on
R 0.00 R 0.00 R 5 000 000.00 New
Page | 237
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33024 Convert Wilro Park
substation to 88/11 kV
Renewal Bulk Infrastructure
WILROPARK EXT.1 C
Regional
Convert Wilro Park
substation to 88/11
kV
Infrastructur
e
Electricity
Reticulation
R 35 000 000.00 R 50 000 000.00 R 50 000 000.00 Renewal
28698 Emergency Work Renewal
Medium Voltage Network
NORTH RIDING EXT.30 C
Regional
Execute emergency
work of a capital
nature in the
Northern Region.
Infrastructur
e
Electricity
Reticulation
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
32810 New 88/11 kV substation at
Fourteenth Ave. New Bulk
Infrastructure QUELLERINA
C Regional
New 88/11 kV
substation at
Fourteenth Ave
Infrastructur
e
Electricity
Reticulation
R 0.00 R 0.00 R 500 000.00 New
25066 New service connections
New Service Connections
ROODEPOORT EXT.2 C
Regional
Provision of new
service connections
Infrastructur
e
Electricity
Reticulation
R 8 300 000.00 R 8 300 000.00 R 6 400 000.00 New
25914 Refurbishment of LV
infrastructure
Renewal Low Voltage
NORTH RIDING EXT.54 C
Northern Region,
Refurbish LV
infrastructure in the
Infrastructur
e
Electricity
Reticulation
R 5 000 000.00 R 5 000 000.00 R 5 000 000.00 Renewal
Page | 238
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
Regional Northern Region.
33068 Repair damage to substation
and convert to 88/11/6.6 kV.
Extend 88 kV busbar at
Roodetown to supply
Roodepoort.
Renewal Bulk Infrastructure
ROODEPOORT C Regional
Repair damage to
substation and
convert to 88/11/6.6
kV. Extend 88 kV
busbar at
Roodetown to
supply Roodepoort.
Infrastructur
e
Electricity
Reticulation
R 30 000 000.00 R 0.00 R 0.00 Renewal
30923 Replace 20 MVA
transformers with 2X40 MVA
units Refurbish breakers,
CT's VT's Links etc and
convert 33kV to 88kV.
Renewal Bulk Infrastructure
KLOOFENDAL C Regional
Replace 20 MVA
transformers with
2X40 MVA units
Infrastructur
e
Electricity
Reticulation
R 40 000 000.00 R 40 000 000.00 R 50 000 000.00 Renewal
25790 Replace feeder cables and
6.6kV load centres with dual
ratio mini's
Renewal Medium Voltage
Replace cables &
mini subs with dual
ratio
Infrastructur
e
Electricity
Reticulation
R 0.00 R 0.00 R 500 000.00 Renewal
Page | 239
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
Network BRYANSTON
EXT.77 E Regional
33023 Vlei, upgrade the supply
from Eskom and build new
switching station. Renewal
Bulk Infrastructure
TSHEPISONG D Regional
Vlei, upgrade the
supply from Eskom
and build new
switching station.
Infrastructur
e
Other R 15 000 000.00 R 0.00 R 0.00 Renewal
34033 Construction of a new MPC
in Matholesville New
Community Centre
MATHOLESVILLE C
Regional
Construction of a
new MPC in
Matholesville
R 2 259 500.00 R 6 937 000.00 R 0.00 New
33066 COSMO CITY PHASE 2 (
MALIBONGWE RIDGE) New
Bulk Infrastructure COSMO
CITY C Regional
CONSTRUCTION
OF ROADS AND
STORMWATER
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 40 000 000.00 R 35 990 120.00 R 18 000 000.00 New
Page | 240
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
32572 Leratong Village Implement
Preliminary Design Report
for Roads and Related
Stormwater infrastructure
Renewal Bulk Infrastructure
LERATONG VILLAGE C
Regional
Review of existing
Water and Sewer
PDR and New PDR
for Roads and
Stormwater
Investment
Properties
Housing
development
R 2 500 000.00 R 1 000 000.00 R 5 000 000.00 Renewal
33060 PRINCESS PLOT New Bulk
Infrastructure PRINCESS C
Regional
Construction of
Roads and
stormwater
Investment
Properties
Housing
development
R 11 000 000.00 R 20 000 000.00 R 10 000 000.00 New
33206 Roodepoort water upgrade
New Water Mains
ROODEPOORT C Regional
Water Upgrade Infrastructur
e
Water,
Reservoirs &
Reticulation
R 5 000 000.00 R 30 000 000.00 R 15 000 000.00 New
27674 Roodepoort/Diepsloot:
Bushkop Honeydew District
Upgrade Water Infrastructure
New Water Mains
HONEYDEW EXT.5 C
Regional
Honeydew
Boschkop District
Upgrade water
Infrastructure Phase
2
Infrastructur
e
Water,
Reservoirs &
Reticulation
R 5 000 000.00 R 0.00 R 0.00 New
Page | 241
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
27666 Sandton/Alexandra:
Bryanston Water Upgrade
Infrastructure New Water
Mains DOUGLASDALE
EXT.96 E Regional
Brynston District
Upgrade Water
Infrastrure Phase
Infrastructur
e
Water,
Reservoirs &
Reticulation
R 15 000 000.00 R 0.00 R 2 000 000.00 New
33820 Penny Flats Social Housing
New Building Alterations
PENNYVILLE B Regional
Social Housing
development in
Pennyville
Community Social
Renting
Housing
R 3 000 000.00 R 2 000 000.00 R 0.00 New
33809 Roodepoort Social Housing
Upgrades Renewal Building
Alterations ROODEPOORT
C Regional
Upgrading of two
social housing
facilities in
Roodepoort
Community Social
Renting
Housing
R 2 000 000.00 R 1 000 000.00 R 4 000 000.00 Renewal
31328 MISCL - Gravel Roads:
Agricultural Holdings.
Renewal Gravel Road
NORTH RIDING EXT.22 F
Regional
Re-gravelling of
gravel & dirt roads in
poor conditions by
blading, shaping,
gravelling, etc City
Wide including:
Blue Hills (Mercury
& Tambotie Rd);
Buccleuch (Engela
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 5 000 000.00 R 25 000 000.00 R 2 500 000.00 Renewal
Page | 242
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
Place, Gibson, John
& Wendy Rd);
Chartwell AH
(Runnymead, Forest
& Second Rd);
Douglasdale
(Hornbill Rd);
Ennerdale
(Zirconium Cl);
Farmall AH (1st Rd);
Glen Austin
(Hampton, Dale,
Milner & Donovan
Rd); Halfway
Gardens (Sturgess
Av & Vermaak Rd);
Honeydew (Plein,
Glover, Coleen,
Bothma & Flora
Haase Rd); Kyalami
AH (Cactus Rd);
Lombardy West
(Dublin, Pitt and
Page | 243
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
Birmingham Rd);
Northriding (Derby,
Reier, Kraanvoel,
Spionkop, Felstead,
Off Boundary Rd
into Constantia and
Carmen St also
Quorn Dr); President
Park x 14 (Brand,
Steyn & Boshoff St);
Randpark Ridge
(Bush Hill &
Redwood St);
Sunninghill
(Katumba Rd);
Witpoort (Rose,
23rd, Shetland,
Lourens Dr &
Springfield Rd);
Zonnehoewe
(Cypress, Chestnut
& Walnut Rd); and
roads in Limbro
Page | 244
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
Park.
31029 RNP003_Westlake Road
Extension New Roads:
Construction and Upgrades
RAND LEASES EXT.1 C
Regional
Extension of
Westlake Road from
Main Reef Road to
Odendaal Road in
Meadowlands East,
Soweto accross the
Mining Belt.
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 20 000 000.00 R 10 000 000.00 R 20 000 000.00 New
33049 Renovation and extention of
Randburg DLTC Renewal
Building Alterations
DOUGLASDALE EXT.37 F
Regional
Renovation and
extention of
Randburg DTLC
Other Assets Other
Buildings
R 556 000.00 R 2 294 000.00 R 1 312 000.00 Renewal
33963 PTF Holding Facility: Design
and Construction of
Roodepoort New Nodal
Transport Facilities
ROODEPOORT C Regional
Paving of the area,
fencing, ladscaping,
ablution facilities.
Infrastructur
e
Transportati
on
R 0.00 R 1 500 000.00 R 15 000 000.00 New
Page | 245
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
34026 PTF:Small Public Transport
Facility,Design and
Construction of Cosmo City
Superstop New Nodal
Transport Facilities COSMO
CITY A Regional
Small Public
Transport Facility,
Superstop in Cosmo
City
Infrastructur
e
Transportati
on
R 2 000 000.00 R 20 000 000.00 R 0.00 New
32679 Pimville Koppies
Conservation Ecom Tourism
Upgrade Renewal Park
PIMVILLE ZONE 1 EXT D
Regional
Upgrade koppies Community Parks &
gardens
R 0.00 R 0.00 R 1 000 000.00 Renewal
25135 New public lights New Public
Lighting ORLANDO
EKHAYA D Regional
Public Lighting Infrastructur
e
Street
Lighting
R 5 000 000.00 R 5 000 000.00 R 0.00 New
33851 Rec-Noordgesig Recreation
Centre Renewal Community
hall NOORDGESIG D
Regional
Upgrade Noordgesig
Recreation Centre
R 0.00 R 0.00 R 3 000 000.00 Renewal
Page | 246
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33853 Noordgesig Clinic New Clinic
NOORDGESIG D Regional
Design and layout of
clinic, construction
of buildings and
carpots, furniture,
fittings and medical
equipment,
landscaping, paving
and signage in
compliance with
Norms and
Standards
Community Clinics R 15 000 000.00 R 0.00 R 0.00 New
33065 JABULANI HOSTEL New
Bulk Infrastructure
JABULANI D Regional
UPGRADE OF
BULKWATER LINK
PIPE
Investment
Properties
Housing
development
R 200 000.00 R 1 000 000.00 R 1 000 000.00 New
29832 Lufhereng Mixed
Development (Bulk
Infrastructure Roads,
Stormwater Management
Systems, Sewer & Water for
24 000 houses) New Bulk
Infrastructure DOORNKOP
Land=R10m,
planning=R3.5m
and
bulk=71,631,491.00.
The project involves
the provision of bulk,
link and internal
roads, sewer, water
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 65 000 000.00 R 10 000 000.00 R 12 000 000.00 New
Page | 247
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
EXT.1 C Regional & stormwater to the
Doornkop
Greenfields Project
(a mixed housing
scheme consisting
of 25,000 subsidies)
being implemented
by the Gauteng
Department of
Housing under its
incremental housing
programme.
33040 Oldviasta New Bulk
Infrastructure ORLANDO D
Regional
Construction of
Roads and
Stormwater
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 0.00 R 15 000 000.00 R 17 000 000.00 New
33037 Sector 2 New Bulk
Infrastructure KLIPSPRUIT
D Regional
Construction of
Roads and
Stormwater
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 5 000 000.00 R 10 000 000.00 R 30 000 000.00 New
Page | 248
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
32539 Jabulani Station Renewal
Nodal Transportation
Facilities JABULANI D
Regional
upgrading of streets,
public spaces,
development of
public properties
and the
encouragement of
investment in the
Jabulani precinct
Infrastructur
e
Other R 18 500 000.00 R 30 000 000.00 R 40 000 000.00 Renewal
32414 Nancefield Station Precinct
Development New Precinct
Redevelopment
KLIPSPRUIT D Regional
Provision of bulk
infrastructure to
support the
development of a
mixed land use
development
supporting a range
of housing
typologies to benefit
from the transit
options currently
available within the
precinct
Infrastructur
e
Other R 30 000 000.00 R 5 000 000.00 R 20 000 000.00 New
Page | 249
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
32878 Audio in trading halls New
Computer Software CITY
DEEP EXT.22 F Regional
Audio systems for
the halls
Other Assets Markets R 3 000 000.00 R 0.00 R 0.00 New
32920 Building Management
Software New Bulk
engineering services CITY
DEEP EXT.22 F Regional
Software for bulk
building services
Intangibles Computers -
sofware and
programmin
g
R 3 000 000.00 R 9 000 000.00 R 9 000 000.00 New
33708 Computer Software
New/Renewal New
Computer Software CITY
DEEP EXT.22 F Regional
Computer Software Intangibles Computers -
sofware and
programmin
g
R 2 500 000.00 R 4 000 000.00 R 0.00 New
32898 IT Software upgrade New
Computer Software CITY
DEEP EXT.22 F Regional
New IT software Other Assets Markets R 0.00 R 570 000.00 R 1 150 000.00 New
26025 Two Way Radios New
Operational Capex CITY
DEEP EXT.22 F Regional
Two-way radios Other Assets Markets R 65 000.00 R 65 000.00 R 65 000.00 New
Page | 250
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33697 Chelsea Residential Building
Renewal Operational Capex
JOHANNESBURG F
Regional
Upgrading of the
residential property,
major repairs on
plumbing, plastering
and painting
Investment
Properties
Housing
development
R 2 000 000.00 R 2 000 000.00 R 2 000 000.00 Renewal
33695 City Deep Upgrading
Renewal Operational Capex
CITY DEEP F Regional
Upgrading of
Existing stock
Investment
Properties
Housing
development
R 2 000 000.00 R 1 000 000.00 R 0.00 Renewal
34056 Kliptown Housing Project
New Housing Development
KLIPSPRUIT EXT.11 D
Regional
Social Housing
around the Kliptown
Walter Sisulu
Square
R 5 000 000.00 R 30 000 000.00 R 40 000 000.00 New
33696 Kliptown Walter Sisulu
Square Housing Estate
Renewal Operational Capex
KLIPRIVIERSOOG D
Regional
Upgrading of the
Kliptown property
security and painting
Investment
Properties
Housing
development
R 1 000 000.00 R 1 000 000.00 R 1 000 000.00 Renewal
Page | 251
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
29391 Orlando Ekhaya Waterfront
Development Renewal Park
ORLANDO EKHAYA D
Regional
Infrastructur
e
Other R 7 000 000.00 R 15 000 000.00 R 10 000 000.00 Renewal
29919 BRID 05 - Naledi/Protea
Bridge (Between Wards 20
and 14). New Bridges
(Pedestrian and Vehicles)
NALEDI D Regional
Construction of a
linkage across the
railway line to
provide safety for
pedestrians and
eventually shorten
the vehicular
movement in the
area.
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 18 500 000.00 R 0.00 R 0.00 New
34015 CATCH - Implementation of
CBP Stormwater
Masterplanning: Soweto.
New Stormwater
Management Projects
ORLANDO WEST D
Regional
Implementation R 0.00 R 0.00 R 5 000 000.00 New
Page | 252
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
29912 CATCH 10 - Emergency
Stormwater Improvement
(Multi year): Protea Glen Ext
1-4 (Phase 1-5). New
Stormwater Catchments
PROTEA GLEN D Ward
Upgrading of
stormwater drainage
network to eliminate
ponding of the area.
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 15 000 000.00 R 15 000 000.00 R 15 000 000.00 New
33284 Fire Station - Protea Glen
New Building New Building
Alterations PROTEA GLEN
EXT.1 D Regional
Building of 3
Stations
Investment
Property
Other R 15 000 000.00 R 0.00 R 0.00 New
33972 PTF Small Public Transport
Facility Design and
Construction of Emndeni
Public Transport Facility
New Nodal Transport
Facilities EMDENI D
Regional
Installation of
shelters, Paving of
the area, fencing,
ladscaping, ablution
facilities.
Infrastructur
e
Transportati
on
R 0.00 R 0.00 R 2 000 000.00 New
33971 PTF Small Public Trasnport
Facility Design and
Construction of Doornkop
Superstop New Nodal
Transport Facilities
Installation of
shelters, Paving of
the area, fencing,
ladscaping, ablution
Infrastructur
e
Transportati
on
R 0.00 R 0.00 R 2 500 000.00 New
Page | 253
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
DOORNKOP D Regional facilities.
33966 PTF Trasnport Facility
Design and Construction of
Naledi Intermodal Facility
New Nodal Transport
Facilities NALEDI D
Regional
Installation of
shelters, Paving of
the area, fencing,
ladscaping, ablution
facilities.
Infrastructur
e
Transportati
on
R 0.00 R 2 000 000.00 R 30 000 000.00 New
33952 PTF: NMT Facilities Linking
Railway station Dube,
Naledi, Marafi,Ihlanzeni,
Ikhwezi, Phefeni,
Phumulong, mzimhlophe and
Roodepoort New Cycle
Paths/Pedestrian Walks
DUBE D Regional
Design and
Construction of
sidewalks, cycle
lanes, landscaping
linking to Railways
stations (Dube,
Naledi,
Marafi,Ihlanzeni,
Ikhwezi, Phefeni,
Phumulong,
mzimhlophe and
Roodepoort
Infrastructur
e
Transportati
on
R 0.00 R 4 000 000.00 R 20 000 000.00 New
Page | 254
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
28543 Allandale Substation:
Upgrade 2 X 10 MVA
transformers to 40 MVA
Renewal Bulk Infrastructure
COMMERCIA EXT.11 A
Regional
At Allandale,
upgrade the existing
10 MVA
transformers to 20
MVA each.
Infrastructur
e
Electricity
Reticulation
R 200 000.00 R 30 000 000.00 R 0.00 Renewal
22486 Installation of new service
connections
New Service Connections
ALEXANDRA EXT.63 E
Regional
new service
connections
Infrastructur
e
Electricity
Reticulation
R 1 495 000.00 R 1 495 000.00 R 995 000.00 New
25064 Installation of new service
connections
New Service Connections
HALFWAY HOUSE EXT.74
E Regional
Provision of new
service connections
Infrastructur
e
Electricity
Reticulation
R 11 000 000.00 R 14 600 000.00 R 13 300 000.00 New
32811 New 88/11 kV substation at
Sandringham New Bulk
Infrastructure
SANDRINGHAM E Regional
New 88/11 kV
substation at
Sandringham
Infrastructur
e
Electricity
Reticulation
R 40 000 000.00 R 50 000 000.00 R 50 000 000.00 New
Page | 255
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
26032 New public lights Midrand
New Public Lighting IVORY
PARK EXT.2 A Regional
Public Lighting
Midrand
Infrastructur
e
Other R 2 000 000.00 R 2 000 000.00 R 0.00 New
29467 Normalisation Renewal
Medium Voltage Network
ALEXANDRA EXT.42 E
Regional
Normalisation of
Alexandra
Infrastructur
e
Electricity
Reticulation
R 20 000 000.00 R 0.00 R 0.00 Renewal
33640 Public Lighting Alexandra
West Bank New Public
Lighting ALEXANDRA EXT.4
E Regional
Public Lighting
Alexandra West
Bank
Infrastructur
e
Street
Lighting
R 1 000 000.00 R 500 000.00 R 0.00 New
32809 Service connections
Modderfontein New Service
Connections
MODDERFONTEIN A.H. E
Regional
Service connections
Modderfontein
Infrastructur
e
Electricity
Reticulation
R 0.00 R 0.00 R 1 000 000.00 New
33905 Upgrade Orchards
Substation New Bulk
Infrastructure ORCHARDS F
Regional
Upgrade Orchards
Substation
Infrastructur
e
Electricity
Reticulation
R 0.00 R 0.00 R 40 000 000.00 New
Page | 256
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33961 Rec - Upgrading of
Wanderers Cricket Stadium
Renewal Stadium ILLOVO E
Regional
Rec - Upgrading of
Wanderers Cricket
Stadium
R 0.00 R 0.00 R 6 800 319.00 Renewal
33582 Construction of Industrial
Facilities New Building
IVORY PARK EXT.7 A
Regional
Construction of
Industrial Nodes in
order facilitate
entrepreneurial
enterprise at
Bambanani - Ivory
Park and at
Marlboro
Infrastructur
e
Other R 54 940 500.00 R 63 662 000.00 R 63 592 000.00 New
33675 Jukskie Alexandra Water
Management Unit New
Ecological Infrastructure
ALEXANDRA EXT.36 E
Regional
Rehabilitation of the
wetlands including
ecological
infrastructure as
recommended in the
State of the River
study in 2009/10,
CoJ Bioregional
plan,CoJ Wetland
management plan
Infrastructur
e
Other R 15 000 000.00 R 10 000 000.00 R 5 000 000.00 New
Page | 257
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
(2009). To conserve
and protect City's
natural heritage and
resourses,
promoting River
health through
integrated
catchment
management
23381 River Park Clinic Far
Eastbank Ext 9 New Clinic
FAR EAST BANK EXT.9 A
Regional
R 6 500 000.00 R 0.00 R 0.00 New
33771 Louis Botha Corridor
(Housing) Renewal Corridors
of Freedom Intervention
ORANGE GROVE E
Regional
(Housing
Projects)capital
project in the
corridor
Infrastructur
e
Sewerage
Purification
&
Reticulation
R 1 000 000.00 R 5 000 000.00 R 5 000 000.00 Renewal
33786 Louis Botha Corridor (JW:
Water) Renewal Corridors of
Freedom Intervention
ORANGE GROVE E
capital projects in
the corridor
Infrastructur
e
Water,
Reservoirs &
Reticulation
R 10 000 000.00 R 20 000 000.00 R 10 000 000.00 Renewal
Page | 258
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
Regional
33166 Midrand: Pretoriusrand water
upgrade New Water Mains
PRESIDENT PARK A.H. A
Regional
Water upgrade Infrastructur
e
Water,
Reservoirs &
Reticulation
R 1 000 000.00 R 0.00 R 0.00 New
30551 Midrand:President park:
Reservoir 50Ml and water
Upgrade New Reservoirs
PRESIDENT PARK A.H. A
Regional
50Ml Reservoir Infrastructur
e
Water,
Reservoirs &
Reticulation
R 1 000 000.00 R 0.00 R 0.00 New
32881 Directional signage within
market premises New
Building Alterations CITY
DEEP EXT.22 F Regional
installation of
directional signage
within the market
premises
Infrastructur
e
Other R 1 500 000.00 R 0.00 R 0.00 New
32885 Emergency evacuation alarm
New Plant and Equipment
CITY DEEP EXT.22 F
Regional
installation of
emergency
evacuation alarms
Other Assets Other R 235 000.00 R 249 000.00 R 264 000.00 New
Page | 259
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
32889 Emergency evacuation
chairs New Plant and
Equipment CITY DEEP
EXT.22 F Regional
Emergency
evacuation chairs
Other Assets Markets R 0.00 R 70 000.00 R 0.00 New
32890 Equipment for safety
surveillance New Plant and
Equipment CITY DEEP
EXT.22 F Regional
Equipment to
conduct safety
surveillance for
wellness
Other Assets Markets R 0.00 R 1 500 000.00 R 0.00 New
32929 Foodbank sorting centre
New Building Alterations
CITY DEEP EXT.22 F
Regional
Sorting centre for
foodbank
Other Assets Markets R 0.00 R 2 000 000.00 R 3 000 000.00 New
27709 General and QA Inspection
Trolleys New Plant and
Equipment CITY DEEP
EXT.22 F Regional
Trolleys for quality
inspection, for
security and other
departments
Other Assets Markets R 1 000 000.00 R 0.00 R 0.00 New
32923 Humidifiers New Bulk
engineering services CITY
DEEP EXT.22 F Regional
Installation of
humidifiers
Other Assets Plant &
equipment
R 2 000 000.00 R 0.00 R 0.00 New
Page | 260
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33944 Erf 43-46 Victoria Ext
3(Paterson Park Node) New
Housing Development
VICTORIA EXT.3 E Regional
Residential
Development
Investment
Property
Other R 10 000 000.00 R 20 000 000.00 R 10 000 000.00 New
33987 Watt Street Inter-change
New Housing Development
WYNBERG E Regional
Office and
Residential
Development above
the Bus inter-change
Investment
Properties
Housing
development
R 39 000 000.00 R 151 000 000.00 R 0.00 New
33782 CORR - Louis Botha
Corridor of Freedom Traffic
Impact Assessment (TIA),
Stormwater Masterplan and
New COnstriction and
Upgrading Renewal
Corridors of Freedom
Intervention ORANGE
GROVE E Regional
capital projects in
the corridor
R 10 000 000.00 R 10 000 000.00 R 10 000 000.00 Renewal
31051 RNP017_Ballyclaire Drive
Widening Renewal Roads:
Construction and Upgrades
RIVER CLUB EXT.2 E
The widening of
Ballyclaire Drive and
Bridge from William
Nichol to Outspan
Drive to improve
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 2 000 000.00 R 0.00 R 1 000 000.00 Renewal
Page | 261
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
Regional mobility and traffic
relief.
31012 RNP022_Richards Drive
Upgrading Renewal Roads:
Construction and Upgrades
HALFWAY HOUSE EXT.95
A Regional
The upgrading of
Richards Drive in
Halfway House
Estate AH. To be
part of Ten Year
Plan.
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 2 000 000.00 R 0.00 R 1 000 000.00 Renewal
32594 Fire Station - Alexandra and
'Be Safe Centre' New
Building ALEXANDRA
EXT.25 E Regional
Reconstruction of
existing Alexandra
Firestation with the
addition of a 'Be
Safe Centre'
Community Fire, safety
&
emergency
R 0.00 R 0.00 R 2 000 000.00 New
33552 Marlboro Holding Facility
Renewal Building Alterations
MARLBORO E Regional
Upgrading of
Marlboro JMPD
facility to include a
vehicle pound
Community Fire, safety
&
emergency
R 5 000 000.00 R 0.00 R 0.00 Renewal
Page | 262
CIMS
Numbers
Project Name
REGIONAL
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Location
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
New Or
Renewal
33798 Louis Botha - Co -
Production zone for social
interventions Renewal
Corridors of Freedom
Intervention ORANGE
GROVE E Regional
Refurbishment and
future construction
of Social
Development centre
Community Community
halls
R 0.00 R 0.00 R 5 934 000.00 Renewal
Page | 263
2015/16 CAPITAL PROJECTS PER REGION PER WARDS: REGION A
TABLE 9
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget
Year
2017/2018
Ward
Location
New Or
Renewal
REGION A
32491 Diepsloot river -wetland
rehabilitation studies/Eco
Park development New
Park DIEPSLOOT WES
A Ward
New Park
development
Community Parks &
gardens
R 0.00 R 1 000
000.00
R 0.00 95 New
28370 Upgrade Noodwyk
substation by replacing 2
x 20 MVA transformers
(two of the three) with 40
MVA (Eskom). Build new
switch room and install
two new feeder boards.
Renewal Bulk
Infrastructure
NOORDWYK EXT.19 A
Upgrade Noordwyk
substation by
replacing 3 X 20 MVA
transformers with 3 X
40 MVA (Eskom).
Build new switch room
and install two new
feeder boards.
Infrastructure Electricity
Reticulation
R 0.00 R 0.00 R 500
000.00
92 Renewal
33288 Lib - Construction of the
new Diepsloot Library
(forms part of the
multipurpose centre at
Constuction of a new
Library in Diepsloot
West Ext 2 Region A
Community Libraries R 10 700
000.00
R 10 000
000.00
R 5 763
000.00
113 New
Page | 264
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget
Year
2017/2018
Ward
Location
New Or
Renewal
Diepsloot) in Diepsloot
West Ext 2 New Library
DIEPSLOOT WES
EXT.2 A
30749 Rec - Construction of the
multipurpose centre at
Diepsloot New
Community Centre
DIEPSLOOT WES A
Ward
Development of the
soccerfields, hard-core
courts, multipurpose
courts, Hall, Library,
Youth Hall, wellness
centre, athletic track
Community Community
halls
R 4 886
000.00
R 2 000
000.00
R 2 000
000.00
95 New
30988 Diepsloot East River
Side Park New
Ecological Infrastructure
DIEPSLOOT WES A
Ward
Design and
development of
riverside eco park
including wetland
protection as part of
Diepsloot East
Development
Community Parks &
gardens
R 1 500
000.00
R 3 000
000.00
R 1 500
000.00
113 New
32386 EBONY PARK Renewal
Clinic EBONY PARK A
Ward
Ebony Park Clinic -
Professional Services,
Building Construction,
Carports, Signage,
Landscaping and
Beatification
Community Clinics R 1 000
000.00
R 20 000
000.00
R 0.00 111 Renewal
Page | 265
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget
Year
2017/2018
Ward
Location
New Or
Renewal
32598 Ivory Park Ext 2
KwaGreen New Bulk
Infrastructure IVORY
PARK EXT.2 A Ward
Formalisation and
Costruction of Bulk
Services
Investment
Properties
Housing
development
R 0.00 R 0.00 R 100
000.00
79 New
32583 Ivory Park Ext 8 Hlophe
New Bulk Infrastructure
IVORY PARK EXT.8 A
Ward
Formalisation and
Construction of Bulk
Services
Investment
Properties
Housing
development
R 0.00 R 0.00 R 100
000.00
78 New
32585 Ivory Park Ext 9(
Goniwe) New Bulk
Infrastructure IVORY
PARK EXT.9 A Ward
Construction of Bulk
Services
Investment
Properties
Housing
development
R 0.00 R 0.00 R 100
000.00
77 New
32591 Ivory Park Thabo Mbeki
New Bulk Infrastructure
IVORY PARK EXT.10 A
Ward
Formalisation and
Construction of Bulk
Services and Low
Cost Houses
Investment
Properties
Housing
development
R 0.00 R 0.00 R 100
000.00
111 New
32377 Biogas to electricity at
NW, GK ,BK Waste
Water Treatment Works
New Bulk Waste Water
DIEPSLOOT WES
EXT.5 C
Biogas to electricity at
Northern Works,
Goudkoppies and
Bushkoppies Waste
Water Treatment
Works
Infrastructure Sewerage
Purification &
Reticulation
R 5 000
000.00
R 20 000
000.00
R 20 000
000.00
113 New
Page | 266
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget
Year
2017/2018
Ward
Location
New Or
Renewal
33712 Northern Works:
Desludge and line Dam
02 Renewal DIEPSLOOT
WES A
Desludge and line
Dam 02
Infrastructure Water,
Reservoirs &
Reticulation
R 0.00 R 0.00 R 500
000.00
95 Renewal
28977 Northern Works:
desludge Dam 01
Renewal DIEPSLOOT
WES EXT.5 A
Northern Works:
Desludge Dam 01
Infrastructure Sewerage
Purification &
Reticulation
R 30 000
000.00
R 25 000
000.00
R 0.00 113 Renewal
33713 Northern Works: Unit 3
electro mech/ cabling
bios 1 and 3 Renewal
DIEPSLOOT WES A
Unit 3 electro mech/
cabling bios 1 and 3
Infrastructure Sewerage
Purification &
Reticulation
R 15 000
000.00
R 15 000
000.00
R 0.00 95 Renewal
33710 Northern Works: Unit 4
liquor treatment New
DIEPSLOOT WES A
Unit 4 liquor treatment Infrastructure Sewerage
Purification &
Reticulation
R 10 000
000.00
R 0.00 R 0.00 95 New
33654 Sandton/ Alexandra:
Diepsloot sewer
pipelines and bridge
Renewal DIEPSLOOT
WES B
Sewer Upgrade Infrastructure Sewerage
Purification &
Reticulation
R 10 000
000.00
R 27 000
000.00
R 0.00 95 Renewal
Page | 267
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget
Year
2017/2018
Ward
Location
New Or
Renewal
33605 Midrand: Carlswald
Water Infrastructure
Upgrade Renewal
CARLSWALD A.H. A
Upgrade of existing
water infrastructure
Infrastructure Water,
Reservoirs &
Reticulation
R 6 000
000.00
R 0.00 R 0.00 112 Renewal
28733 Roodepoort/Diepsloot:
Diepsloot Reservoir New
Reserviors DIEPSLOOT
WES A Ward
New Diepsloot
reservoir
Infrastructure Water,
Reservoirs &
Reticulation
R 25 000
000.00
R 0.00 R 5 000
000.00
113 New
29388 Roodepoort/Diepsloot:
Lanseria Reservoir New
Reservoirs LANSERIA
EXT.21 A Ward
Lanseria Reservoir Infrastructure Water,
Reservoirs &
Reticulation
R 0.00 R 5 000
000.00
R 0.00 96 New
33154 Ivory Park Social
Housing New Building
IVORY PARK EXT.10 A
City Wide
Development of
affordable rental stock
in region A
R 0.00 R 0.00 R 2 000
000.00
111 New
34013 BRID - Bridge Upgrade:
Ivory Park Renewal
Bridges (Pedestrian and
Vehicles) IVORY PARK
EXT.10 A Ward
Bridge Upgrade R 0.00 R 0.00 R 1 000
000.00
111 Renewal
Page | 268
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget
Year
2017/2018
Ward
Location
New Or
Renewal
28044 CATCH 220 - Jukskei
Catchment: Fourways
Mall Dam and
Downstream Works. New
Stormwater Catchments
FOURWAYS EXT.16 A
Ward
Implementation of
study to arrest
hydraulic and
environmental
degradation of
Fourways Stream from
upstream of Monte
Casino to Jukskei
River, Dainfern.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 1 000
000.00
R 3 000
000.00
R 3 000
000.00
94 New
32126 CATCH 240 - Jukskei
Catchment - Vorna
Valley Stream New
Stormwater Catchments
VORNA VALLEY EXT.13
A Ward
Embarkment shaping
and erosion control
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 0.00 R 0.00 R 5 000
000.00
112 New
33474 CONV - Conversion of
Open Drains to
Underground/Covered
Drains in Diepsloot.
Renewal Stormwater
Management Projects
DIEPSLOOT WES A
Ward
Conversion of open
drains to
underground/covered
drains in Diepsloot.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 0.00 R 0.00 R 1 000
000.00
95 Renewal
Page | 269
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget
Year
2017/2018
Ward
Location
New Or
Renewal
30534 CONV - Conversion of
Open Drains to
Underground/Covered
Drains in Ivory Park and
surrounding areas.
Renewal Stormwater
Management Projects
IVORY PARK EXT.7 A
Ward
Conversion of open
drains to
underground/covered
drains in Ivory Park.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 10 000
000.00
R 10 000
000.00
R 10 000
000.00
79 Renewal
28045 MISCL - Gravel Roads:
Diepsloot. New Roads:
Construction and
Upgrades DIEPSLOOT
WEST EXT.3 A Ward
Gravel Roads
Upgrade, IDP priority.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 37 000
000.00
R 30 000
000.00
R 30 000
000.00
113 New
27966 MISCL - Gravel Roads:
Ivory Park and
Surrounding Areas. New
Gravel Road IVORY
PARK EXT.9 A Ward
Gravel Roads
Upgrade as per IDP
priority.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 37 000
000.00
R 30 000
000.00
R 30 000
000.00
77 New
34016 MISCL - Gravel Roads:
Kaalfontein. New Roads:
Construction and
Upgrades
KAALFONTEIN EXT.2 A
Ward
Gravel Roads
Upgrade. IDP Priority.
R 3 000
000.00
R 40 000
000.00
R 50 000
000.00
92 New
Page | 270
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget
Year
2017/2018
Ward
Location
New Or
Renewal
31210 MISCL - Pedestrian
Bridge in Diepsloot (No.
4) New Bridges
(Pedestrian and
Vehicles) DIEPSLOOT
WES EXT.2 A Ward
Construction of one
pedestrian bridge
across the wetland in
Ward 96, to link
Diepsloot West Ext 5
and Adelaide Tambo
informal settlement to
Diepsloot West Ext 2
to get access to social
and commercial
facilities and to William
Nicol road as well.
R 1 000
000.00
R 0.00 R 1 000
000.00
113 New
31042 MISCL - Pedestrian
Bridge in Kaalfontein
New Bridges (Pedestrian
and Vehicles)
KAALFONTEIN EXT.2 A
Ward
Walkway across a
wetland between
Kaalfontein Ext 2 and
Ext 5 in Ward 92 that
is a threat for children
as well as adults
crossing in both
directions.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 1 000
000.00
R 0.00 R 1 000
000.00
92 New
33652 Roodepoort/Diepsloot:
Diepsloot Sewer upgrade
New ROODEPOORT C
Sewer Upgrade Infrastructure Sewerage
Purification &
Reticulation
R 3 000
000.00
R 0.00 R 0.00 113 New
Page | 271
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget
Year
2017/2018
Ward
Location
New Or
Renewal
32757 Roodepoort/Diepsloot:
Lion Park Reservoir 15ml
New Water Mains
ROODEPOORT C
Regional
Bulk infrastructure Infrastructure Water,
Reservoirs &
Reticulation
R 0.00 R 10 000
000.00
R 0.00 96 New
34075 Rabie Ridge Ptn 1075 &
1345 New Bulk
Infrastructure RABIE
RIDGE A Ward
Formalisation and
Construction of Bulk
Services
Investment
Properties
Housing
development
R 50 000
000.00
R 10 000
000.00
R 10 000
000.00
110 New
Page | 272
2015/16 CAPITAL PROJECTS PER REGION PER WARDS: REGION B
TABLE 10
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locat
ion
New Or
Renewal
REGION B
32687 Rietfontein Nature
Reserve and EE centre
upgrade in Bryanston
Renewal Park
BRYANSTON EXT.5 E
Ward
Bryanston
wards 106
Community Parks &
gardens
R 0.00 R 0.00 R 1 000 000.00 102 Renewal
33607 Zoo - Zoo Infrastructure
Renewal Building
Alterations SAXONWOLD
F Ward
zoo
infrastructure
Community Parks &
gardens
R 5 000 000.00 R 4 000 000.00 R 5 000 000.00 117 Renewal
33881 Lib - Contruction of a new
Libarary in Blackheath
Region B New Library
BLACKHEATH EXT.3 B
Construction of
a new Library in
Blackheath
R 0.00 R 0.00 R 1 500 000.00 88 New
33804 Lib. Brixton Library
Renewal Library Renewal
Corridors of Freedom
Intervention WESTBURY
Libraries in the
Corridors of
Freedom
Community Libraries R 0.00 R 3 000 000.00 R 14 999
532.00
82 Renewal
Page | 273
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locat
ion
New Or
Renewal
REGION B
B
33407 Aqua - Coronationville
Public Swimming Pool
Renewal Community
Centre
CORONATIONVILLE B
Ward
Upgrading of
the pool
Community Recreational
facilities
R 1 500 000.00 R 0.00 R 0.00 68 Renewal
33409 Aqua - Newclare
Swimming Pool Renewal
Community Centre
NEWCLARE B Ward
Upgrading of
the pool
Community Recreational
facilities
R 0.00 R 0.00 R 1 000 000.00 82 Renewal
33848 Pennyville Sports Fields
New Sportsfield
PENNYVILLE B City
Wide
Rec-
Construction of
Sports Facilities
for Pennyville
R 0.00 R 0.00 R 2 000 000.00 68 New
Page | 274
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locat
ion
New Or
Renewal
REGION B
33850 Rec-Brixton Recreation
Centre Renewal
Sportsfield MAYFAIR
WEST B Ward
Rec-Upgrade of
Brixton
Recraetion
Centre
R 0.00 R 2 000 000.00 R 3 000 000.00 58 Renewal
33450 Union Stadium Renewal
Building Alterations
WESTBURY EXT.3 B
Ward
Upgrading of
the courts
Community Recreational
facilities
R 9 781 000.00 R 12 351
000.00
R 0.00 69 Renewal
33530 Bosmont Renewal Clinic
BOSMONT B Ward
Design and
layout of clinic,
construction of
buildings and
carports,
furniture and
equipment,
landscaping,
paving and
signage.
Community Clinics R 0.00 R 0.00 R 1 000 000.00 82 Renewal
Page | 275
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locat
ion
New Or
Renewal
REGION B
33529 Claremont Renewal
Clinic CLAREMONT B
Ward
Design and
layout of clinic,
construction of
buildings and
carpots,
furniture, fittings
and medical
equipment,
landscaping,
paving and
signage in
compliance with
Norms and
Standards
Community Clinics R 1 000 000.00 R 22 000
000.00
R 0.00 82 Renewal
30077 Parkhurst Renewal Clinic
PARKHURST B Ward
Design and
layout of clinic,
construction of
buildings and
carpots,
furniture, fittings
and medical
equipment,
Community Clinics R 1 000 000.00 R 0.00 R 0.00 117 Renewal
Page | 276
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locat
ion
New Or
Renewal
REGION B
landscaping,
paving and
signage in
compliance with
Norms and
Standards
29345 Sophia Town Clinic New
Clinic TRIOMF B Ward
Design and
layout of clinic,
construction of
buildings and
carports,
furniture and
equipment,
landscaping,
paving and
signage.
Community Clinics R 0.00 R 0.00 R 1 000 000.00 86 New
33792 Perth Empire Corridor
(JW: Sewer) Renewal
Corridors of Freedom
Intervention WESTBURY
B
capital projects
in the corridor
Infrastructure Sewerage
Purification
&
Reticulation
R 0.00 R 10 000
000.00
R 10 000
000.00
68 Renewal
Page | 277
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locat
ion
New Or
Renewal
REGION B
26167 Promusica Theatre -
Upgrading of technical
equipment (sound and
lighting) Renewal Theatre
redevelopment FLORIDA
PARK EXT.9 C Regional
Infrastructural
and upgrading
of facilities
Other Assets Plant &
equipment
R 0.00 R 600 000.00 R 600 000.00 85 Renewal
27572 Selkirk Social Housing
project New Housing
Development
BLAIRGOWRIE B Ward
Development of
300 medium
density housing
within Randburg
CBD which will
assist in
attracting
investors in the
area
Investment
Properties
Housing
development
R 0.00 R 75 000
000.00
R 35 000
000.00
102 New
31514 BRID 20 - Bridge
Upgrade: Noordgesig and
Industria West Renewal
Bridges (Pedestrian and
Vehicles) NOORDGESIG
B Ward
Urgent need for
bridge
improvement
was identified at
New Canada
Road Bridge,
R 0.00 R 0.00 R 1 000 000.00 29; 68 Renewal
Page | 278
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locat
ion
New Or
Renewal
REGION B
Noordgesig
(size
3x2400x2500
Insitu box
culvert); and
Commando
Road Bridge,
Industria West
(size
2x2400x1400).
Within
Empire/Perth
Corridor.
27940 CATCH 200 -
Braamfontein Spruit
Catchment: Erosion
Protection: Conrad Drive
to Rustenburg Road New
Stormwater Catchments
BRAAMFONTEIN WERF
B Ward
Erosion
protection
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 2 500 000.00 R 0.00 R 0.00 87 New
Page | 279
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locat
ion
New Or
Renewal
REGION B
29184 CATCH 200 -
Braamfontein Spruit
Catchment: Upgrade to
Culvert, Millpark Renewal
Roads: Construction and
Upgrades
BRAAMFONTEIN WERF
EXT.1 B Ward
Upgrade to
Culvert between
Owl St and Gas
Works on Annet
Rd.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 0.00 R 0.00 R 5 000 000.00 60 Renewal
29920 CATCH 205 - Robinson
Canal Catchment
Structural Improvement:
Robinson Canal Sub 4
Renewal Stormwater
Catchments ROBIN
ACRES F Ward
Structural
intervention on
existing holes in
the floor, deck,
and exposed
steel
reinforcing.
Project needs
prioritization.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 2 000 000.00 R 0.00 R 0.00 99 Renewal
27954 CATCH 205 - Robinson
Canal Catchment:
Structural Improvement:
Robinson Canal Sub 10
Structural
intervention on
existing holes in
the floor, deck,
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 2 000 000.00 R 0.00 R 0.00 58 Renewal
Page | 280
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locat
ion
New Or
Renewal
REGION B
Renewal Stormwater
Catchments ROBINDALE
F Ward
and exposed
steel reinforcing
27980 CATCH 210 - Bosmont
Catchment: Stormwater
Drainage: Central Areas
New Stormwater
Catchments BOSMONT F
Ward
Stormwater
Drainage
Upgrade.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 5 000 000.00 R 15 000
000.00
R 15 000
000.00
City
Wide
New
27960 CATCH 210 - Klein
Jukskei Catchment:
(CBP) Stormwater
Control: Willows
Development - Windsor
New Stormwater
Catchments JUKSKEI
PARK B Ward
Upgrading of
culvert under
Willow Crescent
and the arrest
of erosion in the
vicinity.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 5 000 000.00 R 0.00 R 0.00 102 New
Page | 281
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locat
ion
New Or
Renewal
REGION B
28097 CATCH 210 - Klein
Jukskei Catchment: Bond
Stream Relief System,
Ferndale. New
Stormwater Catchments
FERNDALE B Ward
Construction of
a new
stormwater
relief system to
augment the
existing culvert
which is over
capacity due to
increasing
runoff.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 5 000 000.00 R 0.00 R 0.00 104 New
31283 CORR - MISCL:
Pedestrian Bridge in
Slovo Park (also Ashanti).
New Bridges (Pedestrian
and Vehicles)
CORONATIONVILLE B
Ward
Safe walkway
required across
the railway line
in Ward 68, to
facilitate access
to Coronation
and Helen
Joseph
Hospitals; to
High School;
Industria and
the residential
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 5 000 000.00 R 5 000 000.00 R 5 000 000.00 68 New
Page | 282
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locat
ion
New Or
Renewal
REGION B
areas around;
as well as to the
Croesus
Railway Station.
29609 Engine + gear box New
Vehicle BRAAMFONTEIN
WERF F Ward
Replacement of
engines and
gearboxes
Community Buses R 8 620 000.00 R 2 610 000.00 R 4 000 000.00 87 New
26240 Plant and machinery -
Metro bus New Plant and
Equipment
BRAAMFONTEIN WERF
EXT.1 F Ward
MB Office
equipment
Other Assets Plant &
equipment
R 300 000.00 R 300 000.00 R 500 000.00 58 New
28534 By-law management unit -
Unit ugrade for building
Fennel Road pound
Renewal Building
Alterations MARTINDALE
B Ward
Other Assets Other
Buildings
R 2 600 000.00 R 2 800 000.00 R 3 000 000.00 86 Renewal
Page | 283
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locat
ion
New Or
Renewal
REGION B
26799 Langlaagte One Stop
Shop - Licensing Renewal
Building Alterations
LANGLAAGTE NORTH F
Ward
One Stop shop
(new
building)for
JMPD Licensing
and Metro
Police activities
at Langlaagte.
Other Assets Other
Buildings
R 6 350 000.00 R 7 350 000.00 R 4 350 000.00 58 Renewal
32862 COMPL: Sidewalk
Improvements: Rosebank
- Tyrwhitt & Cradock
Avenues New Complete
Streets ROSEBANK B
Ward
Semi
pedestianisation
of Tywhitt Ave:
Bath to
Cradock, and
Cradock from
Tywritt to
Bierman
Infrastructure Transportati
on
R 10 000 000.00 R 60 000
000.00
R 0.00 117 New
29184 CATCH 200 -
Braamfontein Spruit
Catchment: Upgrade to
Culvert, Millpark Renewal
Roads: Construction and
Upgrades
Upgrade to
Culvert between
Owl St and Gas
Works on Annet
Rd.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 0.00 R 0.00 R 5 000 000.00 60 Renewal
Page | 284
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locat
ion
New Or
Renewal
REGION B
BRAAMFONTEIN WERF
EXT.1 B Ward
Page | 285
2015/16 CAPITAL PROJECTS PER REGION PER WARDS; REGION C
TABLE 11
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION C
27461 lutz: Establish new 88/11
kV substation New Bulk
Infrastructure
HONEYDEW MANOR
EXT.11 C Ward
Lutz, New
88/11kV
3x45MVA
substation
including 2 x
200MVA cables
and 2 x 160MVA
OHL's
Infrastructur
e
Electricity
Reticulation
R 30 000 000.00 R 40 000
000.00
R 20 000 000.00 97 New
33732 Florida clinic New Clinic
FLORIDA EXT C Ward
Construction of a
new clinic,
professional
services,
equipment,
furniture
Community Clinics R 700 000.00 R 8 000
000.00
R 15 000 000.00 70 New
32391 PRINCESS Renewal
Clinic PRINCESS C
Ward
Princess Clinic -
Professional
Services,
Building
Construction,
Community Clinics R 0.00 R 0.00 R 750 000.00 71 Renewal
Page | 286
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION C
Furniture,
Fittings,
Equipment,
Carports,
Signage,
Landscaping and
Beautification
30014 Zandspruit New Clinic
ZANDSPRUIT EXT.4 C
Ward
Acquisition of
land, layout and
design of
buildings,
construction of
buildings and
carports,
landscaping and
paving, furniture,
equipment and
signage.
Community Clinics R 300 000.00 R 1 000
000.00
R 23 000 000.00 100 New
Page | 287
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION C
30424 Fleurhof Mixed
Development (Bulk and
internal infrastructure)
New Bulk Infrastructure
FLEURHOF C Ward
The provision of
bulk
infrastructure
including
reticulation for
the following:
Water, Sewer,
Roads and
Stormwater
Management
Systems. R500k
for planning and
R20m for bulk
infra.
Infrastructur
e
Sewerage
Purification
&
Reticulation
R 50 000 000.00 R 70 000
000.00
R 91 860 000.00 70 New
31053 Goudrand Rental
Development New Bulk
Infrastructure
GOUDRAND C Ward
The Construction
of Bulk Services
and Internal
Reticulation.
Investment
Properties
Housing
development
R 3 000 000.00 R 5 000
000.00
R 5 000 000.00 127 New
Page | 288
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION C
32628 Lindhaven Plot 6,8&10
New Bulk Infrastructure
LINDHAVEN EXT.1 C
Ward
Construction of
Bulk Services
Investment
Properties
Housing
development
R 2 000 000.00 R 7 500
000.00
R 15 000 000.00 71 New
31055 Matholesville New Bulk
Infrastructure
MATHOLESVILLE C
Ward
Construction of
Roads and
Stormwater
including Water
and Sewer.
Investment
Properties
Housing
development
R 12 000 000.00 R 0.00 R 0.00 127 New
32578 Sol Plaatjies New Bulk
Infrastructure
ROODEPOORT EXT.2 C
Ward
Construction of
Bulk Roads &
Stormwater and
Internal Roads &
Stormwater
Investment
Properties
Housing
development
R 15 000 000.00 R 0.00 R 0.00 84 New
33115 Driefontein Works:
Infrastructure Renewal
Plan Renewal Bulk
Waste Water LITTLE
FALLS EXT.1 A
Infrastructure
renewal plan
Infrastructur
e
Sewerage
Purification
&
Reticulation
R 0.00 R 0.00 R 1 040 000.00 97 Renewal
Page | 289
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION C
33230 Roodepoort sewer
upgrade Renewal Bulk
Waste Water
ROODEPOORT C
Sewer upgrade Infrastructur
e
Sewerage
Purification
&
Reticulation
R 0.00 R 0.00 R 500 000.00 84 Renewal
33213 Roodepoort/ Diepsloot:
Planned replacement
sewer mains Renewal
Bulk Waste Water
ROODEPOORT C
Sewer
replacement
Infrastructur
e
Sewerage
Purification
&
Reticulation
R 9 000 000.00 R 5 000
000.00
R 10 000 000.00 84 Renewal
33237 Roodepoort/ Diepsloot:
Witpoortjie Sewer
upgrade Renewal Bulk
Waste Water
WITPOORTJIE C
sewer upgrade Infrastructur
e
Sewerage
Purification
&
Reticulation
R 0.00 R 2 000
000.00
R 0.00 71 Renewal
30421 FLEURHOF JUNCTION
SOCIAL HOUSING
PROJECT New Housing
Development
FLEURHOF C Ward
Development of
600 rental
housing units
Investment
Properties
Housing
development
R 0.00 R 500 000.00 R 0.00 70 New
Page | 290
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION C
30418 Roodepoort Extension 2
New Building Alterations
ROODEPOORT EXT.2 C
Ward
Development of
additional 150
social housing
units
Investment
Properties
Housing
development
R 35 000 000.00 R 0.00 R 0.00 84 New
33476 CONV - Conversion of
Open Drains to
Underground/Covered
Drains in Bram
Fischerville. Renewal
Stormwater Management
Projects BRAM
FISCHERVILLE C Ward
Conversion of
open drains to
underground/cov
ered drains in
Bram
Fischerville.
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 10 000 000.00 R 2 500
000.00
R 9 500 000.00 44 Renewal
30753 6 Depot Haylon Hill New
Plant and Equipment
HAYLON HILL A.H. C
Ward
Construction of
new depots to
service
Glenridge,
Honeydew, Ivory
Park and Midrand
Randburg
communities
Infrastructur
e
Refuse R 0.00 R 0.00 R 500 000.00 97 New
Page | 291
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION C
28827 Fire Station - Cosmo City
New Cosmo City Land
acquisition COSMO CITY
C Ward
Fire station to be
build in the
Cosmo City
Development
Community Fire, safety
&
emergency
R 30 000 000.00 R 5 000
000.00
R 0.00 100 New
33026 Refurbishment of
Roodepoort drivers
Testing Station Renewal
Building Alterations
FLORIDA LAKE C Ward
Renovation of
Roodepoort
Testing Station
Other Assets Other
Buildings
R 520 000.00 R 2 290
000.00
R 1 310 000.00 84 Renewal
Page | 292
2015/16 CAPITAL PROJECT PER REGION PER WARDS: REGION D
TABLE 12
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION D
32654 Park development in
Moletsane New Park
MOLETSANE D Ward
Park development Community Parks &
gardens
R 0.00 R 1 000 000.00 R 0.00 21 New
31140 Bulk infrastructure for the
electrification of Elias
Motswaledi New
Electrification POWER
PARK D Ward
Bulk infrastructure
for the
electrification of
Elias Motswaledi
Infrastructur
e
Electricity
Reticulation
R 4 000 000.00 R 20 000 000.00 R 0.00 24 New
32474 Electrification of Elias
Motswaledi. New
Electrification POWER
PARK G Ward
Electrification of
Elias motswaledi
Infrastructur
e
Electricity
Reticulation
R 20 000 000.00 R 20 000 000.00 R 15 000
000.00
24 New
31143 Electrification of
Lufhereng New
Electrification
LUFHERENG D Ward
Electrification of
Lufhereng
Infrastructur
e
Electricity
Reticulation
R 7 000 000.00 R 15 000 000.00 R 0.00 53 New
Page | 293
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION D
29892 Lufhereng Substation.
Establish new 88/11 kV
sub station. New Bulk
Infrastructure
LUFHERENG D Ward
Establish new
88/11 kV sub
station
Infrastructur
e
Electricity
Reticulation
R 0.00 R 0.00 R 500 000.00 53 New
33883 Lib - Construction of
Library in Chiawelo New
Library CHIAWELO D
Construction of a
new Libarary in
Chiawelo
R 0.00 R 0.00 R 1 500
000.00
11 New
34036 Construction of a new
MPC in Phiri New
Community Centre PHIRI
D Ward
Construction of a
new MPC in Phiri
R 1 562 000.00 R 9 250 000.00 R 0.00 15 New
32540 Rec - Construction of the
Orlando Ekhaya New
Community Centre
ORLANDO EKHAYA D
Ward
Construction of a
new Orlando
Ekhaya
multipurpose
centre and sport
facility
Community Community
halls
R 4 000 000.00 R 11 156 000.00 R 2 050
000.00
25 New
Page | 294
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION D
30985 Mshenguville wetland
rehabilitation New
Ecological Infrastructure
MOFOLO NORTH D
Ward
Wetland
rehabilitation and
park development
to protect water
resources and
restore
recreational
amenity for
community.
Community Parks &
gardens
R 2 500 000.00 R 3 300 000.00 R 3 300
000.00
36 New
32400 Klipspruit West Clinic
Renewal Clinic
KLIPSPRUIT WEST D
Ward
Upgrade of
Klipspruit Clinic
Community Clinics R 5 000 000.00 R 0.00 R 0.00 11 Renewal
32396 Naledi clinic New
Building NALEDI D
Naledi Clinic -
Professional
Services, Building
Construction,
Furniture, Fittings,
Equipment,
Carports,
Signage,
Community Clinics R 0.00 R 0.00 R 1 000
000.00
20 New
Page | 295
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION D
Landscaping and
Beautification
29831 Braamfischerville Ext
12&13:Roads and
Stormwater Management
Systems including a
Pedestrian Bridge New
Bulk Infrastructure BRAM
FISCHERVILLE EXT.13
C Ward
Construction of
Roads and
Stormwater
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 50 000 000.00 R 30 000 000.00 R 30 000
000.00
49 New
32660 Devland Ext
1,27,30,31&33 Roads
and Related Stormwater
New Bulk Infrastructure
DEVLAND EXT.1 D
Ward
The Upgrading of
Roads and
Related
Stormwater
System
Investment
Properties
Housing
development
R 60 000 000.00 R 35 000 000.00 R 40 000
000.00
24 New
Page | 296
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION D
31058 Diepkloof Hostel
Renewal Bulk
Infrastructure
DIEPKLOOF EXT.10 D
Ward
Construction of
Bulk Services.
Investment
Properties
Housing
development
R 2 500 000.00 R 30 000 000.00 R 50 000
000.00
29 Renewal
32663 Elias Motsoaledi New
Bulk Infrastructure
DIEPKLOOF EXT.10 D
Ward
Construction of
Bulk and Internal
Roads and
Culvert Bridge
Investment
Properties
Housing
development
R 35 000 000.00 R 35 000 000.00 R 30 000
000.00
24 New
30683 Jabulani Flats Renewal
Building Alterations
JABULANI D Ward
Upgrading of
Hostel
Investment
Properties
Housing
development
R 0.00 R 500 000.00 R 500 000.00 34 Renewal
32666 Klipspruit/Kliptown New
Bulk Infrastructure
KLIPSPRUIT D Ward
Construction of
Link and Internal
Roads and
Stormwater
including Water
and Sewer
Investment
Properties
Housing
development
R 50 000 000.00 R 59 927 880.00 R 30 000
000.00
25 New
Page | 297
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION D
30680 Mapetla Hostel Renewal
Building Alterations
TLADI D
Upgrading of
Hostel
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 1 000 000.00 R 1 500 000.00 R 1 500
000.00
21 Renewal
30682 Meadowlands Hostel
Renewal Building
Alterations
MEADOWLANDS D
Ward
Upgrading of
Hostel including
the bulk services
Investment
Properties
Housing
development
R 5 000 000.00 R 10 000 000.00 R 10 000
000.00
43 Renewal
31057 Orlando Womens Hostel
Renewal Bulk
Infrastructure ORLANDO
D Ward
The construction
of Bulk Services
Investment
Properties
Housing
development
R 5 000 000.00 R 5 000 000.00 R 6 000
000.00
39 Renewal
29584 Kliptown Renewal
Precinct Redevelopment
KLIPSPRUIT EXT.4 D
Ward
The area-based
regeneration
programme
undertaken in
Greater Kliptown
has intended to
build an economic
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 30 000 000.00 R 50 000 000.00 R 14 000
000.00
25 Renewal
Page | 298
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION D
base in this area.
29191 Orlando East Station
Precinct New Precinct
Redevelopment
ORLANDO EAST D
Ward
BRT route Section
1&2 runs from
Dobsonville to
Fuel/Price
intersection. It
runs along the
Klipspruit Valley
Road. The funding
would be required
for a BRT station
precinct
development in
Orlando East and
proximate to
Orlando Stadium
which would be
developed as a
strategic node
Community Sportsfields
& stadia
R 25 000 000.00 R 10 000 000.00 R 30 000
000.00
31 New
Page | 299
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION D
thereby building
on the potential of
the existing
economic and
community
infrastructure.
33102 Goudkoppies Works:
Infrastructure Renewal
Plan Renewal Bulk
Waste Water POWER
PARK D
Infrastructure
renewal
Infrastructur
e
Sewerage
Purification
&
Reticulation
R 29 060 000.00 R 0.00 R 10 000
000.00
24 Renewal
33266 Soweto: Devland sewer
upgrade Renewal Bulk
Waste Water DEVLAND
E
sewer upgrade Infrastructur
e
Sewerage
Purification
&
Reticulation
R 500 000.00 R 0.00 R 0.00 24 Renewal
33267 Soweto: Diepkloof
Corridor sewer upgrade
Renewal Bulk Waste
Water DIEPKLOOF E
sewer upgrade Infrastructur
e
Sewerage
Purification
&
Reticulation
R 0.00 R 5 000 000.00 R 0.00 26 Renewal
Page | 300
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION D
30024 IT support system New
Computer Upgrades
CITY DEEP EXT.2 F
Ward
Integration to
stake holders,
virtual market
supprt, logistic
support
Intangibles Computers -
sofware and
programmin
g
R 0.00 R 4 000 000.00 R 0.00 53 New
33546 Soweto Theatre -
Building Renovations and
upgrades JABULANI D
Addition of a
restuarant and
catering facilities,
provision of
parking,
compliance with
health and safety
regulations as well
as signage and
branding of the
theatre
R 500 000.00 R 0.00 R 0.00 35 Not
Applicabl
e
30405 Dobsonville Social
Housing Project New
Building DOBSONVILLE
EXT.2 D Ward
Dobsonville
Housing
development
Investment
Properties
Housing
development
R 75 000 000.00 R 20 000 000.00 R 20 000
000.00
48 New
Page | 301
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION D
30419 IKWEZI RENTAL
HOUSING PROJECT
New Housing
Development JABULANI
D
ZOLA RENTAL
HOUSING
Investment
Properties
Housing
development
R 2 000 000.00 R 20 000 000.00 R 60 000
000.00
34 New
30423 JABULANI RENTAL
HOUSING Renewal
Housing Development
JABULANI EXT.1 D
Ward
DEVELOPMENT
OF 750
HOUSING UNITS
Investment
Properties
Housing
development
R 15 000 000.00 R 40 000 000.00 R 35 000
000.00
34 Renewal
26897 LUFHERENG SOCIAL
HOUSING PROJECT
New Housing
Development
LUFHERENG D Ward
DEVELOPMENT
OF HOUSING
UNITS IN
LUFHERENG(DO
ORNKOP).
PROJECT IS
LOCATED WEST
OF
JOHANNESBUR
G
Investment
Properties
Housing
development
R 10 000 000.00 R 40 000 000.00 R 40 000
000.00
53 New
Page | 302
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION D
27584 NANCEFIELD STATION
HOUSING/KLIPSPRUIT
STAFF HOSTEL
REDEVELOPMENT
Renewal Housing
Development
KLIPSPRUIT EXT.11 D
Ward
Redevelopment
and conversion of
Council staff
Hostel into rental
family units
Investment
Properties
Housing
development
R 60 000 000.00 R 65 000 000.00 R 0.00 25 Renewal
29392 Jabulani CBD Precinct
development New
Operational Capex
JABULANI D Ward
Investment
Property
Other R 10 000 000.00 R 10 000 000.00 R 0.00 53 New
29917 BRID 30 -
Jabulani/Molapo Bridge.
New Bridges (Pedestrian
and Vehicles) JABULANI
D Ward
New bridge over
the railway to
provide access to
development
zone. Requires
investigation and
preliminary work.
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 5 000 000.00 R 30 000 000.00 R 0.00 46 New
Page | 303
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION D
29912 CATCH 10 - Emergency
Stormwater Improvement
(Multi year): Protea Glen
Ext 1-4 (Phase 1-5). New
Stormwater Catchments
PROTEA GLEN D Ward
Upgrading of
stormwater
drainage network
to eliminate
ponding of the
area.
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 15 000 000.00 R 15 000 000.00 R 15 000
000.00
13 New
30535 CATCH 240 - Klipriver
Catchment: Upgrading of
Stormwater Drainage
System in Mogaseview
Renewal Stormwater
Catchments
KLIPSPRUIT D Ward
Upgrading of
Stormwater
drainage system
in Mogaseview
area (Diepkloof
Zone 4)
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 1 000 000.00 R 0.00 R 0.00 25 Renewal
28135 MISCL - Gravel Roads:
Doornkop/Thulani. New
Roads: Construction and
Upgrades DOORNKOP
D Ward
Gravel roads
upgrade as per
IDP priority. It also
includes required
interventions in
Protea (R5m).
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 23 000 000.00 R 30 000 000.00 R 30 000
000.00
53 New
Page | 304
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION D
33744 MISCL - Gravel Roads:
Protea South. New
Roads: Construction and
Upgrades PROTEA
SOUTH EXT.1 G Ward
Gravel roads
upgrade.
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 20 000 000.00 R 15 000 000.00 R 0.00 12 New
33916 MISCL - Gravel Roads:
Slovoville New Roads:
Construction and
Upgrades SLOVOVILLE
D Ward
Gravel roads
upgrade to
surface standards.
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 3 000 000.00 R 30 000 000.00 R 46 000
000.00
53 New
31353 MISCL - Pedestrian
Bridge in Klipspruit West.
New Bridges (Pedestrian
and Vehicles)
KLIPSPRUIT WEST D
Ward
Pedestrian railway
crossing at Fuscia
Road in Ward 11
(eventually
vehicular) to
safely connect
Klipspruit West
and Chiawelo at
Fuscia and
Foxglove Rd.
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 6 000 000.00 R 7 000 000.00 R 0.00 19 New
Page | 305
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION D
26830 Dube Holding Facility
New Building Alterations
DUBE D Ward
Holding facility for
confiscated goods
from the public in
contravention of
COJ's by laws at
Marlboro and
Dube
Other Assets Other
Buildings
R 3 200 000.00 R 2 200 000.00 R 2 000
000.00
38 New
29064 MISCL - Gravel Roads:
Bram Fischerville. New
Roads: Construction and
Upgrades BRAM
FISCHERVILLE D Ward
Gravel road
upgrade, IDP
priority
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 30 000 000.00 R 30 000 000.00 R 30 000
000.00
44 New
33514 MISCL - Gravel Roads:
Tshepisong. New Roads:
Construction and
Upgrades TSHEPISONG
C Ward
Gravel Roads
Upgrade as per
IDP priority.
Infrastructur
e
Roads,
Pavements,
Bridges &
Storm Water
R 22 000 000.00 R 20 000 000.00 R 20 000
000.00
128 New
Page | 306
2015/16 CAPITAL PROJECTS PER REGION PER WARDS: REGION E
Table 13
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget Year
2017/2018
Ward
Location
New Or
Renewal
REGION E
32831 Suppy AEL Factory
from Westfield. New
Medium Voltage
Network
MODDERFONTEIN
EXT.2 E Ward
Suppy AEL Factory
from Westfield.
Infrastructure Electricity
Reticulation
R 25 000
000.00
R 25 000
000.00
R 0.00 32 New
25123 Upgrade existing 44kV,
10 MVA transformer to
a 88kV, 30 MVA
transformer with
associated feeder board
Renewal Bulk
Infrastructure
KLIPFONTEIN VIEW
EXT.3 E
Bulk Infrastructure Infrastructure Electricity
Reticulation
R 0.00 R 0.00 R 5 000
000.00
32 Renewal
30793 Upgrade overhead lines
in Athol Renewal
Medium Voltage
Upgrade overhead
lines in Atho
Infrastructure Electricity
Reticulation
R 0.00 R 0.00 R 500 000.00 91 Renewal
Page | 307
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget Year
2017/2018
Ward
Location
New Or
Renewal
REGION E
Network ATHOLL E
33329 Lib - Construction of
Mayibuye Library in
Alexandra New
Community Centre
Alexandra Ext 33
ALEXANDRA EXT.33 E
Contruction of the new
Library in Alexandra
Community Libraries R 0.00 R 0.00 R 1 500
000.00
105 Not
Applicable
29882 Rec - Construction of
the new sports centre
New Community Centre
RABIE RIDGE EXT.1 A
Ward
Construction of the
new sports facility in
Region A
Community Sportsfields &
stadia
R 9 000
000.00
R 8 000
000.00
R 10 000
000.00
110 New
33538 Construction of linear
market (informal trading
shelter) at the Pan
Africa Facility in
Alexandra New Informal
trading Stalls
To formalise about
340 trading stalls in
and around the Pan
Africa Mall.
Other Assets Markets R 8 000
000.00
R 0.00 R 0.00 76 New
Page | 308
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget Year
2017/2018
Ward
Location
New Or
Renewal
REGION E
ALEXANDRA EXT.4 E
Ward
33539 Construction of linear
market (informal trading
shelter) in Kopanong -
Ivory Park New Informal
trading Stalls IVORY
PARK EXT.2 A Ward
To formalise about
240 informal trading
stalls in Ivory Park
Other Assets Markets R 8 000
000.00
R 0.00 R 0.00 110 New
30981 Far Eastbank New
Ecological Infrastructure
ALEXANDRA EXT.31 E
Ward
Bank stabilisation to
reduce erosion and
restore functionality
and recreational
amenity to east bank
riparian zone.
Infrastructure Other R 1 500
000.00
R 1 500
000.00
R 3 000
000.00
105 New
26719 Kaalspruit
Rehabilitation
Programme New
Drainage System
HALFWAY HOUSE
Specialist studies and
environmental
approvals and
implementation
ofKaalspruit
Infrastructure Other R 3 000
000.00
R 5 000
000.00
R 2 000
000.00
110 New
Page | 309
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget Year
2017/2018
Ward
Location
New Or
Renewal
REGION E
EXT.74 A Ward Rehabilitation Plan to
arrest erosion,
improve water quality
and restore riverine
amenity for local
communities.
33852 Orchards Clinic New
Clinic ORCHARDS E
City Wide
Design and layout of
clinic, construction of
buildings and carpots,
furniture, fittings and
medical equipment,
landscaping, paving
and signage in
compliance with
Norms and Standards
Community Clinics R 19 000
000.00
R 0.00 R 0.00 74 New
30750 Helen Josephs
Refurbishment and
Upgrading of Women's
Hostel Renewal
Building Alterations
ALEXANDRA EXT.52 E
Upgrading of
Infrastructure and
Services
Infrastructure Other R 3 000
000.00
R 9 000
000.00
R 10 000
000.00
91 Renewal
Page | 310
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget Year
2017/2018
Ward
Location
New Or
Renewal
REGION E
Ward
33771 Louis Botha Corridor
(Housing) Renewal
Corridors of Freedom
Intervention ORANGE
GROVE E Regional
(Housing
Projects)capital
project in the corridor
Infrastructure Sewerage
Purification &
Reticulation
R 1 000
000.00
R 5 000
000.00
R 5 000
000.00
73 Renewal
30262 Alfred Nzo road
widening New Bulk
Infrastructure
ALEXANDRA EXT.24 E
Ward
Road to be made
ready for the
implementation of Bus
Rapid Transit Route
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 0.00 R 8 000
000.00
R 4 000
000.00
91 New
33751 Balfour Park Transit
Precinct Development
(Louis Botha Corridor)
Renewal Precinct
Redevelopment SAVOY
ESTATE E City Wide
Development of the
Balfour Park precinct
as a transit node on
the Louis Botha
Corridor of Freedom
Infrastructure Other R 0.00 R 0.00 R 5 000
000.00
74 Renewal
Page | 311
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget Year
2017/2018
Ward
Location
New Or
Renewal
REGION E
30517 Banakekelen Hospice
New Clinic
ALEXANDRA EXT.38 E
Ward
The constuction of a
Hospices Clinic as
well as bulk
contribution from CoJ
Community Clinics R 2 500
000.00
R 0.00 R 0.00 105 New
30506 Clinic 4th Avenue
Renewal Clinic
ALEXANDRA EXT.42 E
Ward
The refurbishment
and up grading of the
4 th Avenu Clinic.This
is a specilist female
clinic
Community Clinics R 25 000
000.00
R 0.00 R 0.00 116 Renewal
30488 Development of open
Space New Precinct
Redevelopment
ALEXANDRA EXT.53 E
Open space
development for
recreation
Community Parks &
gardens
R 5 000
000.00
R 0.00 R 0.00 108 New
26708 Jukskei River
Environmental
Upgrading
andRehabilitation
Renewal Bulk
Infrastructure
ALEXANDRA EXT.1 E
Jukskei River
Environmental
Upgrading and
Rehabilitation
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 0.00 R 0.00 R 7 000
000.00
75 Renewal
Page | 312
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget Year
2017/2018
Ward
Location
New Or
Renewal
REGION E
32450 Old Ikage housing
development New
Building Alterations
ALEXANDRA EXT.57 E
Ward
Development of 85
housing in old
Alexandra
Investment
Properties
Housing
development
R 18 000
000.00
R 20 000
000.00
R 0.00 108 New
31009 Pedestrian Bridge
Vincent Tshabalala
Road New Bulk
Infrastructure FAR
EAST BANK EXT.9 E
pedestrian bridge
across vincent
tshabalala road
(London Road)
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 4 000
000.00
R 5 000
000.00
R 0.00 81 New
32490 Peoples's Court, 7th
Avenue (Old Alexandra)
New Heritage
ALEXANDRA EXT.4 E
Ward
Restoration of
Historical Site
Community Other R 0.00 R 2 000
000.00
R 0.00 76 New
31010 Refuse Bins New Bulk
Infrastructure FAR
EAST BANK EXT.9 E
purchase of 80l refuse
bins for new housing
developments
Infrastructure Refuse R 300
000.00
R 300
000.00
R 0.00 105 New
Page | 313
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget Year
2017/2018
Ward
Location
New Or
Renewal
REGION E
30505 Thoko Mngoma Clinic
Marlboro Renewal
Clinic ALEXANDRA
EXT.53 E
The refurbishment
and upgrading of the
Marlboro Clinic
Community Clinics R 15 000
000.00
R 0.00 R 0.00 108 Renewal
33791 Louis Botha Corridor
(JW: Sewer) Renewal
Corridors of Freedom
Intervention ORANGE
GROVE E
capital projects in the
corridor
Infrastructure Water,
Reservoirs &
Reticulation
R 5 000
000.00
R 10 000
000.00
R 10 000
000.00
72 Renewal
33185 Sandton/ Alexandra:
Planned replacement:
sewer mains Renewal
Bulk Waste Water
ALEXANDRA EXT.4 B
Sewer main Infrastructure Sewerage
Purification &
Reticulation
R 6 000
000.00
R 5 000
000.00
R 10 000
000.00
76 Renewal
33786 Louis Botha Corridor
(JW: Water) Renewal
Corridors of Freedom
Intervention ORANGE
GROVE E Regional
capital projects in the
corridor
Infrastructure Water,
Reservoirs &
Reticulation
R 10 000
000.00
R 20 000
000.00
R 10 000
000.00
72 Renewal
Page | 314
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget Year
2017/2018
Ward
Location
New Or
Renewal
REGION E
27561 KELVIN RENTAL
STOCK New Building
Alterations KELVIN
VIEW E Ward
Taking over some
rental units projects
from the Alex
Renewal Programme,
Develop and manage
the stock
Investment
Properties
Housing
development
R 0.00 R 1 000
000.00
R 40 000
000.00
109 New
27567 LOMBARDY EAST
HOUSING PROJECT
New Housing
Development
LOMBARDY EAST E
Ward
Development of 350
medium density
housing units between
Lombardy East and
Alex.
Investment
Properties
Housing
development
R 75 000
000.00
R 42 977
000.00
R 0.00 81 New
29337 Sandown Extension 49
Erf 575RE Renewal
Building Alterations
SANDOWN EXT.49 E
Investment
Property
Other R 25 000
000.00
R 30 000
000.00
R 35 000
000.00
103 Renewal
34014 BRID - Bridge Upgrade:
River Park. Renewal
Bridges (Pedestrian and
Vehicles) FAR EAST
Bridge Upgrade. R 0.00 R 0.00 R 1 000
000.00
81 Renewal
Page | 315
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget Year
2017/2018
Ward
Location
New Or
Renewal
REGION E
BANK EXT.9 E Ward
28006 CATCH 200 -
Braamfontein Spruit
Catchment: Erosion
Protection - Sub 07,
Morningside Manor to
George Lea Park. New
Stormwater Catchments
MORNINGSIDE
EXT.77 E Ward
Erosion protection Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 1 000
000.00
R 0.00 R 0.00 103 New
28082 CATCH 240 - Jukskei
Catchment: Upgrade
Bridge Street Bridge,
Buccleuch Renewal
Stormwater Catchments
BUCCLEUCH E Ward
The project entails the
investigation of the
Jukskei/Modderfontein
catchment to provide
guidelines for the
review, evaluation and
management of
natural and man-
made waterways with
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 0.00 R 0.00 R 5 000
000.00
32 Renewal
Page | 316
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget Year
2017/2018
Ward
Location
New Or
Renewal
REGION E
regards to their status
and development.
34020 MISCL - Gravel Roads:
Mayibuye. New Roads:
Construction and
Upgrades
COMMERCIA A Ward
Gravel Roads
Upgrade. IDP Priority.
R 15 000
000.00
R 30 000
000.00
R 30 000
000.00
110 New
31013 RNP021_Outspan
Road Upgrading
Renewal Roads:
Construction and
Upgrades
LITTLEFILLAN E Ward
Upgrading of Outspan
Road from Rivonia
Road to 15th Street in
Parkmore to improve
local connectivity.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 2 000
000.00
R 0.00 R 1 000
000.00
103 Renewal
31359 RNP085_Upgrading of
Katherine Road
Renewal Roads:
Construction and
Upgrades SANDOWN
E Ward
Upgrading of
Katherine Road from
Grayston Drive to
Amalinda St and
Roosevelt South.
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 20 000
000.00
R 40 000
000.00
R 40 000
000.00
109; 91 Renewal
Page | 317
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue &
Expenditure Framework
Project Information
Budget
Year
2015/2016
Budget
Year
2016/2017
Budget Year
2017/2018
Ward
Location
New Or
Renewal
REGION E
29183 CATCH 200 -
Braamfontein Spruit
Catchment: Erosion
Protection, East of
George Lea Park to
Marie Str. New
Stormwater Catchments
BRAAMFONTEIN
WERF EXT.1 E Ward
Braamfontein Spruit
Catchment: Erosion
Protection,East of
George Lea Park to
Marie Str (173 m
length).
Infrastructure Roads,
Pavements,
Bridges &
Storm Water
R 1 500
000.00
R 0.00 R 0.00 60 New
30547 Johannesburg Central:
Bruma Upgrade sewers
New Sewer Mains
BRUMA E Ward
Upgrade sewers Infrastructure Sewerage
Purification &
Reticulation
R 6 000
000.00
R 10 000
000.00
R 0.00 118 New
Page | 318
2015/16 CAPITAL PROJECTS PER REGION PER WARDS: REGION F
Table 14
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
30556 City Parks House –
Building upgrade New
Building Alterations
JOHANNESBURG F
Ward
Buildings upgrade Infrastructure Other R 1 000 000.00 R 1 000 000.00 R 10 000 000.00 60 New
25827 Convert PPC cement and
Haggie Rand from 20.5kV
to 11kV
Renewal Bulk
Infrastructure
HERIOTDALE F Ward
Convert from 20.5
kV to 11 kV
Infrastructure Electricity
Reticulatio
n
R 31 942 750.00 R 55 000 000.00 R 50 000 000.00 57 Renewal
29881 Earthing and lightning
protection at Major sub
stations Renewal Bulk
Infrastructure REUVEN F
Earthing and
Lightning protection
at all major sub
stations
Infrastructure Electricity
Reticulatio
n
R 0.00 R 0.00 R 1 000 000.00 124 Renewal
Page | 319
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
31142 Electrification of Lehae
phase 2 New
Electrification LEHAE G
Ward
Electrification of
Lehae phase 2
Infrastructure Electricity
Reticulatio
n
R 10 000 000.00 R 20 000 000.00 R 15 000 000.00 122 New
30764 Establish new 88/11 kV
sub station in Oakdene
New Bulk Infrastructure
OAKDENE EXT.2 F Ward
Establish new
88/11 kV sub
station in Oakdene
Infrastructure Electricity
Reticulatio
n
R 0.00 R 0.00 R 40 000 000.00 23; 56 New
26940 Load Management:
Reciever audit and
replacement
Renewal Load
Management REUVEN F
Load management
receivers excluding
expansion areas
Infrastructure Other R 0.00 R 0.00 R 500 000.00 124 Renewal
24060 Metering; Replacement of
obsolete pre-paid meters.
New Metering Equipment
REUVEN F City Wide
Replace obsolete
pre paid meters -
Turn Around
Strategy
Infrastructure Electricity
Reticulatio
n
R 72 956 250.00 R 50 000 000.00 R 0.00 124 New
Page | 320
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
29481 Mulbarton Sub - Install
additional 45MVA
transformer,refurbishment
and bus bar
reconfiguration.
New Bulk Infrastructure
LIEFDE EN VREDE
EXT.1 F Ward
Mulbarton Sub -
Install additional
45MVA
transformer,refurbis
hment and bus bar
reconfiguration.
Infrastructure Electricity
Reticulatio
n
R 40 000 000.00 R 40 000 000.00 R 0.00 23 New
29291 Newtown Eliminate MV
pillar boxes Renewal
Medium Voltage Network
NEWTOWN EXT.1 F
Ward
Eliminate MV pillar
boxes
Infrastructure Electricity
Reticulatio
n
R 2 500 000.00 R 0.00 R 0.00 60 Renewal
30780 Purchase mobile feeder
boards New Medium
Voltage Network REUVEN
F
Purchase mobile
feeder boards
Infrastructure Electricity
Reticulatio
n
R 0.00 R 0.00 R 500 000.00 124 New
31071 ACH - Refurbishment of
the Joburg Art Gallery
Renewal Heritage Area
Upgrade
Major
refurbishment of
the Joburg Art
Gallery including
Community Recreation
al facilities
R 2 000 000.00 R 0.00 R 50 000 000.00 60 Renewal
Page | 321
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
JOHANNESBURG F structural repairs
and waterproofing
the entire centre
34043 ACH- Construction of new
Monuments City Wide
New Heritage Area
Upgrade
BRAAMFONTEIN WERF
ACH- Construction
of new Monuments
City Wide
R 1 500 000.00 R 1 000 000.00 R 0.00 60 New
33762 Inner City (Comm Dev:
ACH) Renewal Inner City
Intervention
JOHANNESBURG F
Inner City ring-
fenced amount for
undertaking capital
projects
Community Recreation
al facilities
R 2 000 000.00 R 2 000 000.00 R 750 000.00 60 Renewal
33344 Rec - People with
disabilities access
JOHANNESBURG F
PWD access Community Recreation
al facilities
R 1 500 000.00 R 600 000.00 R 600 000.00 60 Not
Applicabl
e
34045 Lib- Purchase of Furniture
New Library
BRAAMFONTEIN WERF
Lib-Purchase of
Furniture- various
libraries
R 1 000 000.00 R 0.00 R 0.00 60 New
Page | 322
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
F
33010 Lib.Acess to the internet in
Community Development
Facilities New Library
BRAAMFONTEIN WERF
EXT.1 F
Upgrade of internet
to various facilities
Community Libraries R 3 000 000.00 R 2 000 000.00 R 1 000 000.00 60 New
33012 Lib.Installation of book
security system in
Libraries New Library
BRAAMFONTEIN WERF
F
Installation of book
security to various
libraries
Community Libraries R 1 000 000.00 R 1 000 000.00 R 2 500 000.00 60 New
32998 Lib.Murray Park Library
New Library
JEPPESTOWN SOUTH F
Upgrading of the
facility
Community Libraries R 0.00 R 5 000 000.00 R 1 000 000.00 65 New
Page | 323
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
33011 Lib.RFID asset tagging for
books New Library
BRAAMFONTEIN WERF
F
Installation of asset
tag for books
Community Libraries R 949 000.00 R 0.00 R 0.00 60 New
33438 Aqua - Ellis Park
Swimming Pool Renewal
Building Alterations
DOORNFONTEIN F Ward
Upgrading of the
pool
Community Recreation
al facilities
R 0.00 R 0.00 R 6 000 000.00 123 Renewal
30558 Aqua - Murray Park Public
Swimming Pool Renewal
Community Centre
JEPPESTOWN F Ward
Upgrading of the
swimming pool
Community Community
halls
R 0.00 R 0.00 R 1 500 000.00 61 Renewal
32980 Aqua - Upgrading of the
Turfontein Swimming Pool
TURFFONTEIN F
Upgrading the
public swimming
pool in Turfontein
R 0.00 R 2 000 000.00 R 0.00 124 Not
Applicabl
e
33469 Upgrading of Wembly
Sports Centre Renewal
Community Centre
TURFFONTEIN F Ward
Upgrading of the
facility
Community Recreation
al facilities
R 0.00 R 0.00 R 2 000 000.00 124 Renewal
Page | 324
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
33540 Rehabilitation of Princess
Mine Dump Renewal
Resource Rehabilitation
STAFFORD EXT.4 F
Ward
Stabilise Mine
Dump through
erosion control
measures to
address dust
pollution and
seepage on City
owned land.
Infrastructure Other R 5 000 000.00 R 0.00 R 0.00 124 Renewal
30046 Bezuidenhout Valley
Clinic, Furniture and
Equipment Renewal Clinic
BEZUIDENHOUT
VALLEY E Ward
Design and layout
of Clinic,
construction of
buildings and
carports, furniture
and equipment,
landscaping, paving
and signage.
Community Clinics R 0.00 R 0.00 R 1 000 000.00 118 Renewal
23345 Malvern Clinic Renewal
Clinic MALVERN F Ward
Acquisition of land,
layout and design
of buildings,
construction of
buildings and
Community Clinics R 4 000 000.00 R 0.00 R 0.00 118 Renewal
Page | 325
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
carports,
landscaping and
paving, furniture,
equipment and
signage.
32619 Glenesk IR Portion 7of Erf
1 (1320 Unit) New Bulk
Infrastructure GLENESK F
Ward
Formalisation,
Construction of
Bulk Services and
Low Cost Houses
Investment
Properties
Housing
developme
nt
R 0.00 R 0.00 R 3 000 000.00 124 New
32607 Moffat View Ext 6 New
Bulk Infrastructure
MOFFAT VIEW EXT.6 F
Ward
Formalisation Investment
Properties
Housing
developme
nt
R 1 000 000.00 R 1 000 000.00 R 1 000 000.00 57 New
32621 Rem 163/100-Turffontein
New Bulk Infrastructure
TURFFONTEIN F Ward
Formalisation,
construction of bulk
services and Low
cost Houses
Investment
Properties
Housing
developme
nt
R 0.00 R 0.00 R 4 500 000.00 55 New
Page | 326
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
30370 South Hills Housing Mixed
Development New RDP
Houses SOUTH HILLS F
Ward
South Hills Investment
Properties
Housing
developme
nt
R 50 000 000.00 R 60 000 000.00 R 50 000 000.00 57 New
33100 Bushkoppies Works:
Infrastructure renewal
plan Renewal Bulk Waste
Water ELDORADO
ESTATE F
Infrastructure
renewal
Infrastructure Sewerage
Purification
&
Reticulatio
n
R 0.00 R 0.00 R 10 000 000.00 122 Renewal
33254 Soweto: Planned
replacement sewer mains
THETA E
sewer replacement Infrastructure Sewerage
Purification
&
Reticulatio
n
R 10 000 000.00 R 0.00 R 15 000 000.00 54 Not
Applicabl
e
33794 Turffontein Corridor (JW:
Sewer) Renewal Corridors
of Freedom Intervention
TURFFONTEIN F
capital projects in
the corridor
Infrastructure Sewerage
Purification
&
Reticulatio
n
R 5 000 000.00 R 10 000 000.00 R 10 000 000.00 124 Renewal
Page | 327
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
30016 Provision of new
Transformers New
Building Alterations CITY
DEEP EXT.2 F
Provision of new
transformers for
electric supply to
future extensions in
the southern side of
the Market
Infrastructure Electricity
Generation
R 5 400 000.00 R 0.00 R 0.00 57 New
30889 Joburg Theatre - Building
Renovations and
upgrades New Building
Alterations
JOHANNESBURG F
Ward
Renovation of
existing public
bathrooms; building
of scenery door to
the Fringe Theatre;
replacement of
building
management
system; renovation
of backstage
dressing rooms;
extended 28 bay
parking facility;
upgrade of two
public lifts;
wrapping and
Community Recreation
al facilities
R 3 100 000.00 R 1 442 000.00 R 5 330 000.00 60 New
Page | 328
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
insulating the stage
tower; water
proofing of all roofs;
replacement of
Gamma Zenith on
exterior.
32502 Joburg Theatre - Upgrade
of stage machinery
Renewal Plant and
Equipment
JOHANNESBURG F
Ward
UPS Protection for
Mandela and
Fringe Theatres;
Drives on wagons
and lifts of the
Mandela Theatre;
Steel cables for the
Mandela front tabs.
Community Recreation
al facilities
R 500 000.00 R 1 155 000.00 R 0.00 60 Renewal
33863 27 Hoek Street New Inner
City Intervention
JOHANNESBURG F
Ward
Social Housing R 15 000 000.00 R 0.00 R 0.00 60 New
Page | 329
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
33864 80 Plein Street New Inner
City Intervention
JOHANNESBURG F
Ward
Social Housing R 25 000 000.00 R 10 000 000.00 R 0.00 60 New
27576 BELLAVISTA ESTATE
INFILLS New Housing
Development
BELLAVISTA ESTATE F
Ward
upgrading and
maintenance of
Council Housing
stock which is in a
poor condition
Investment
Properties
Housing
developme
nt
R 0.00 R 0.00 R 0.00 55 New
33821 Rachers Social Housing
New Building Alterations
JOHANNESBURG F
Ward
Upgrade to existing
social housing
stock
Community Social
Renting
Housing
R 900 000.00 R 900 000.00 R 900 000.00 60 New
27574 Turffontein rental housing
development New
Housing Development
TURFFONTEIN F Ward
Development of
400 affordable
rental units in the
Turfontein area
Investment
Properties
Housing
developme
nt
R 37 500 000.00 R 75 000 000.00 R 0.00 55 New
Page | 330
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
26423 FMMU - Public
Conveniences New Public
toilets JOHANNESBURG
F Ward
Construction of
Public
Conveniences at
various sites over
the city
Community Other R 6 500 000.00 R 7 500 000.00 R 0.00 60 New
33494 Salisbury House Erf 1052
and 1053 Renewal
Heritage JEPPESTOWN
F Ward
The upgrade of
Heritage Precinct
Area
Other Assets Civic Land
& Buildings
R 0.00 R 0.00 R 200 000.00 61 Renewal
30088 CATCH 212 - Bez Valley
Catchment: Recon Sub 6;
Rehab Main, Sub 1&4.
Renewal Stormwater
Catchments
BEZUIDENHOUT
VALLEY F Ward
This is a
combination of
stormwater
structures that are
in urgent need of
rehabilitation, open
channels, culverts
and natural river.
Infrastructure Roads,
Pavements
, Bridges &
Storm
Water
R 5 000 000.00 R 0.00 R 0.00 66 Renewal
22393 Furniture and office
equipment New Office
Equipment
BRAAMFONTEIN WERF
Computers,
Furniture,Equipmen
t
Other Assets Furniture
and other
office
R 400 000.00 R 400 000.00 R 500 000.00 60 New
Page | 331
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
EXT.1 F Ward equipment
30346 Replace vehicle fleet
(Cars and bakkies) New
Vehicle BRAAMFONTEIN
WERF EXT.1 F Ward
Depots vehicle
replacement
Community Buses R 250 000.00 R 300 000.00 R 500 000.00 60 New
30396 Fire Station - Central Fire
Station Renewal Building
Alterations MARSHALLS
TOWN F Ward
New Central Fire
Station for the
central business
district to facilitate
emergency
response in the
inner city
Community Fire, safety
&
emergency
R 9 000 000.00 R 15 000 000.00 R 6 000 000.00 124 Renewal
26821 Dog Kennel Hospital
New Building Alterations
GLENESK F Ward
Hospital for the
JMPD dogs that
take ill
Other Assets Other
Buildings
R 85 000.00 R 90 000.00 R 95 000.00 124 New
Page | 332
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
28533 By-law managment unit -
Upgrade of Wemmer
Pound New Building
Alterations SELBY
EXT.11 F Ward
Upgrading of
building for the
storage of
impounded goods
at Wemmer
complex.
Other Assets Other
Buildings
R 2 600 000.00 R 2 800 000.00 R 3 000 000.00 124 New
29969 Cold Storage for Wemmer
Pound New Building
Alterations GLENESK F
Ward
Install Cold Storage
at the Wemmer
pound
Other Assets Other
Buildings
R 2 100 000.00 R 2 100 000.00 R 2 300 000.00 124 New
27503 Horse Building for
additional JMPD horses
New Building Alterations
SPRINGFIELD EXT.4 F
Buildings -
equipment, feed,
farrier, clinic to be
built for the
additional horses
that are needed
Other Assets Other
Buildings
R 3 260 000.00 R 3 320 000.00 R 0.00 56 New
29445 New Radio
Communication system
New Plant and Equipment
CITY AND SUBURBAN
Supply 2000 new
Tetra radios to
JMPD officers
(Phase 2).
Intangibles Other R 7 010 000.00 R 3 333 000.00 R 12 000 000.00 59 New
Page | 333
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
EXT.6 F
33572 Council Chamber Building
Programme Renewal
Building Alterations
JOHANNESBURG F
Ward
Investigation to
establish the
upgrade needs for
the council
chambers
Heritage
Assets
Buildings R 240 000
000.00
R 0.00 R 0.00 60 Renewal
32503 COMPL: Parking
Solutions for small nodes
New Complete Streets
JOHANNESBURG F
Ward
Improvements to
address parking
issues at
problematic small
nodes. Involves
creation of loading
bays and other
parking facilities for
private / freight
vehicles
Infrastructure Transporta
tion
R 2 000 000.00 R 4 000 000.00 R 5 000 000.00 60 New
Page | 334
CIMS
Numbers
Project Name
Description
Assets Class
Asset
Sub-Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project
Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Locati
on
New Or
Renewal
REGION F
30451 PTF: Holding Facilities:
Kazerne Redevelopment
New Public Transport
Facility NEWTOWN EXT.1
F Ward
Redevelopment of
Kazerne Public
Transport Holding
Facility, including
securing of the
existing site,
creation of
temporary facilities
and demolition
Infrastructure Transporta
tion
R 100 000
000.00
R 100 000
000.00
############# 60 New
33121 WWTW: Upgrade and
Refurbish New Inner City
Intervention BERTRAMS
F
Install flume Infrastructure Sewerage
Purification
&
Reticulatio
n
R 21 000 000.00 R 0.00 R 20 000 000.00 32 New
30028 Electricity Reticulation
Upgrade Renewal
Building Alterations
JOHANNESBURG F
Ward
Upgrade and
replacement of light
in hall 1 & 2 and
Hall 9 &10
Infrastructure Electricity
Reticulatio
n
R 5 000 000.00 R 3 000 000.00 R 0.00 57 Renewal
Page | 335
2015/16 CAPITAL PROJECTS PER REGION PER WARDS: REGION G
Table 15
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Loca
tion
New Or
Renewal
REGION G
33175 New Parks Development
in Strettford (Orange
Farm) New Park
STRETFORD EXT.5 G
Ward
Orange Farm
ext. 5
Community Parks & gardens R 3 000 000.00 R 4 000 000.00 R 4 000 000.00 4 New
33301 Lib - Construction of a
new Library in Kanana
KANANA PARK EXT.1 G
Construction of
a new Project in
Kanana
R 0.00 R 0.00 R 1 500 000.00 6 Not
Applicable
33303 Lib - Construction of a
new Library in Lawley Ext
1 LAWLEY EXT.1 G
Construction of
a new Library in
Lawley
Community Libraries R 0.00 R 0.00 R 1 500 000.00 121 Not
Applicable
33330 Lib - Construction of the
new Library Finetown
Regional FINETOWN G
Construction of
the new Library
in Finetown
R 0.00 R 0.00 R 1 500 000.00 6 Not
Applicable
Page | 336
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Loca
tion
New Or
Renewal
33458 Lib - Stretford Library
New Library
STRETFORD EXT.3 G
Construction of
the new Library
Community Libraries R 0.00 R 0.00 R 6 000 000.00 2 New
34028 Rec - Lenasia
Soccer/Cricket Stadium
New Stadium LENASIA
G Ward
Soccer and
Cricket Stadium
R 1 500 000.00 R 0.00 R 0.00 10 New
27595 Eldorado Park Ext 9
Renewal Clinic
ELDORADO PARK
EXT.9 G Ward
Acquisition of
land, layout and
design of
buildings,
construction of
buildings and
carports,
landscaping
and paving,
furniture,
equipment and
signage.
Community Clinics R 0.00 R 1 000 000.00 R 15 000
000.00
17
18
24
Renewal
32409 Mountainview Clinic New
Clinic FINETOWN G
Ward
upgrade /
renewal
Community Clinics R 0.00 R 0.00 R 1 000 000.00 7 New
Page | 337
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Loca
tion
New Or
Renewal
29446 Protea South Clinic
Renewal Clinic PROTEA
SOUTH EXT.1 G Ward
Comprehensive
Primary health
care facility,
furniture and
Medical
equipment
Community Clinics R 0.00 R 700 000.00 R 3 900 000.00 120 Renewal
32714 Drieziek Ext.3 (2989)
New Bulk Infrastructure
DRIEZIEK EXT.3 G Ward
Formalisation Investment
Properties
Housing
development
R 2 000 000.00 R 30 000
000.00
R 15 000
000.00
5 New
32715 Drieziek Ext.5 (1540)
New Bulk Infrastructure
DRIEZIEK EXT.5 G Ward
Formalisation Investment
Properties
Housing
development
R 2 000 000.00 R 40 000
000.00
R 15 000
000.00
5 New
32750 Eldorado Park
Infills(1350) New Bulk
Infrastructure
ELDORADO PARK G
Ward
Formalisation of
Land Portions
Investment
Properties
Housing
development
R 0.00 R 7 000 000.00 R 10 000
000.00
18 New
32718 Ennerdale South (1902
stands) (Formerly
Finetown Proper) New
Bulk Infrastructure
ENNERDALE G Ward
Preliminary
Design Report
Investment
Properties
Housing
development
R 1 000 000.00 R 10 000
000.00
R 20 000
000.00
7 New
Page | 338
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Loca
tion
New Or
Renewal
32743 Finetown North 495 New
Bulk Infrastructure
FINETOWN G Ward
Formalisation
and Land
Portions
Infrastructu
re
Other R 1 000 000.00 R 10 000
000.00
R 13 000
000.00
7 New
32710 Finetown Proper (1878
stands) New Bulk
Infrastructure
FINETOWN G Ward
Preliminary
Design Report
Formalisation
Investment
Properties
Housing
development
R 1 000 000.00 R 0.00 R 10 000
000.00
7 New
32699 Kanana Park Ext 1 (788)
New Bulk Infrastructure
KANANA PARK EXT.1 G
Ward
Preliminary
Design Reports
Roads and
Storm water
Investment
Properties
Housing
development
R 3 000 000.00 R 5 000 000.00 R 5 000 000.00 6 New
32711 Kanana Park Ext 3,4 & 5
New Bulk Infrastructure
KANANA PARK EXT.3 G
Ward
Formalisation Investment
Properties
Housing
development
R 4 000 000.00 R 12 000
000.00
R 13 000
000.00
6 New
32716 Orange Farm Ext. 9 (935)
New Bulk Infrastructure
ORANGE FARM EXT.9
G Ward
Construction
Engineering
Services
(R&SW)
Investment
Properties
Housing
development
R 9 000 000.00 R 0.00 R 0.00 4 New
Page | 339
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Loca
tion
New Or
Renewal
32748 Poortjie Dark City (3000)
New Bulk Infrastructure
POORTJIE G Ward
Formalisation
and Land
Portions
Infrastructu
re
Other R 1 000 000.00 R 4 000 000.00 R 18 000
000.00
5 New
33120 Ennerdale Works:
Infrastructure renewal
plan Renewal Bulk Waste
Water ENNERDALE G
Infrastructure
renewal plan
Infrastructu
re
Sewerage
Purification &
Reticulation
R 2 000 000.00 R 0.00 R 10 000
000.00
7 Renewal
33099 Olifantsvlei Works:
Infrastructure Renewal
Plan Renewal Bulk
Waste Water
KLIPRIVIERSOOG
ESTATE D
Infrastructure
renewal
Infrastructu
re
Sewerage
Purification &
Reticulation
R 10 000 000.00 R 0.00 R 10 000
000.00
119 Renewal
33147 Orange Farm/ Deep
South: Lehae Sewer
Upgrade Renewal Bulk
Waste Water LEHAE G
Sewer Upgrade Infrastructu
re
Sewerage
Purification &
Reticulation
R 0.00 R 1 000 000.00 R 5 000 000.00 122 Renewal
33142 Orange Farm/ Deep
south: Planned
replacement sewer mains
Renewal Bulk Waste
Water ORANGE FARM G
Sewer
Replacement
Infrastructu
re
Water,
Reservoirs &
Reticulation
R 5 000 000.00 R 5 000 000.00 R 10 000
000.00
3 Renewal
Page | 340
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Loca
tion
New Or
Renewal
33148 Orange Farm/ Deep
South: Stretford Sewer
upgrade Renewal Bulk
Waste Water
STRETFORD EXT.9 G
Sewer upgrade Infrastructu
re
Sewerage
Purification &
Reticulation
R 0.00 R 0.00 R 5 000 000.00 1 Renewal
30322 Orange Farm/Deep
South:Lenasia South
East Basin:Upgrade
sewer Infrastructure
Renewal ORANGE
FARM EXT.6 G
Upgrade sewer
infrastructure
Infrastructu
re
Street Lighting R 5 000 000.00 R 0.00 R 500 000.00 2 Renewal
33606 Orange Farm: deep
south - Lawley water
infrastructure upgrade
Renewal LAWLEY EXT.1
G
Upgrade of
existing water
infrastructure
Infrastructu
re
Sewerage
Purification &
Reticulation
R 0.00 R 10 000
000.00
R 0.00 121 Renewal
31412 CATCH 10 -
Implementation of CBP
Stormwater
Masterplanning: Orange
Farm New Stormwater
Catchments ORANGE
FARM G Ward
Total cost to
Implement
Stormwater
Masterplanning
proposals is
R340m. Move
to Gravel
Roads
R 0.00 R 0.00 R 5 000 000.00 1 New
Page | 341
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Loca
tion
New Or
Renewal
Upgrading.
27884 CATCH 215 - Kliptown
Stormwater Upgrade
(Phase 10): Low Level
Bridge. Renewal
Stormwater Management
Projects KLIPSPRUIT
WEST EXT.1 D Ward
Raise the low
level Bridge
Road above the
100 year flood
level.
Infrastructu
re
Roads,
Pavements,
Bridges & Storm
Water
R 7 000 000.00 R 20 000
000.00
R 0.00 17 Renewal
33475 CONV - Conversion of
Open Drains to
Underground/Covered
Drains in Orange Farm
and Surrounding Areas.
Renewal Stormwater
Management Projects
ORANGE FARM G Ward
Conversion of
open drains to
underground/co
vered drains in
Orange Farm.
Infrastructu
re
Roads,
Pavements,
Bridges & Storm
Water
R 20 000 000.00 R 15 000
000.00
R 15 000
000.00
2 Renewal
33745 MISCL - Gravel Roads:
Drieziek. New Roads:
Construction and
Upgrades DRIEZIEK G
Ward
Gravel roads
upgrade.
Infrastructu
re
Roads,
Pavements,
Bridges & Storm
Water
R 25 000 000.00 R 30 000
000.00
R 30 000
000.00
5 New
Page | 342
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Loca
tion
New Or
Renewal
31548 MISCL - Gravel Roads:
Lawley. New Roads:
Construction and
Upgrades LAWLEY
EXT.1 G Ward
Gravel Roads
upgrade in low
cost housing
development as
per Office of the
Speaker
Infrastructu
re
Roads,
Pavements,
Bridges & Storm
Water
R 35 000 000.00 R 30 000
000.00
R 20 000
000.00
121 New
27903 MISCL - Gravel Roads:
Orange Farm and
Surrounding Areas. New
Roads: Construction and
Upgrades ORANGE
FARM G Ward
Gravel roads
upgrade as per
IDP priority.
Infrastructu
re
Roads,
Pavements,
Bridges & Storm
Water
R 38 000 000.00 R 30 000
000.00
R 30 000
000.00
3 New
33915 MISCL - Gravel Roads:
Poortjie. New Roads:
Construction and
Upgrades POORTJIE G
Ward
Gravel roads
upgrade to
surface
standards
Infrastructu
re
Roads,
Pavements,
Bridges & Storm
Water
R 3 000 000.00 R 40 000
000.00
R 42 000
000.00
5 New
32519 COMPL: Cycling Lanes:
Orange Farm: Priority
Schools Zones New
Complete Streets
ORANGE FARM EXT.4
G Ward
Non Motorised
Transport
Orange Farm to
provide access
to, inter alia,
large schools
Infrastructu
re
Transportation R 20 000 000.00 R 0.00 R 0.00 3 New
Page | 343
CIMS
Numbers
Project Name
Description
Assets
Class
Asset Sub-
Class
2015/2016 Medium Term Revenue & Expenditure
Framework
Project Information
Budget Year
2015/2016
Budget Year
2016/2017
Budget Year
2017/2018
Ward
Loca
tion
New Or
Renewal
32705 Vlakfontein Ext 2 (872)
New Bulk Infrastructure
VLAKFONTEIN EXT.2 G
Ward
Formalisation Investment
Properties
Housing
development
R 5 000 000.00 R 20 000
000.00
R 15 000
000.00
122 New
32707 Vlakfontein Ext 3 (2045)
New Bulk Infrastructure
VLAKFONTEIN EXT.3 G
Ward
Preliminary
Design Report
Formalisation
Investment
Properties
Housing
development
R 5 000 000.00 R 15 000
000.00
R 12 000
000.00
122 New
Page | 344
6. CONCLUSION
The 2015/16 SDBIP is the City’s planning tool that holds the City accountable for its
services. The indicators are an illustration that the City is determined to achieve
more with less resources and to ensure that the residents of the City benefit by all
means.
The SDBIP will monitor the performance of the organisation and account to the
residents of the City. Furthermore the Executive Mayor and City Manager will hold
the official responsible for any poor performance against the Key performance
indicators that are set out on the SDBIP. The City priorities were inspired by the
people of Joburg and the Growth Development Plan (GDS) 2040. The intention of
the priorities is to ensure that the City reach to the vision that was layout on GDS.
The City will persist to focus on delivering the desires of community and improve
relationship with the residents to ensure that today is better than yesterday and
tomorrow will be better than today.