Engineering I Construction I Steel Fabrication I Hot-Dip Galvanization
Telecommunication
Power & Energy
Construction
Our 3 Prime Sectors
Engineering Enterprises For Civil & Steel Constructions S.A.E.
www.eecegypt.com
Page 2EEC Group | Corporate Presentation _ 2018_Q3
EEC Group is a major regional company offering Engineering,Construction and Manufacturing Services on a full turnkey basisfor three main sectors: Telecommunication, Power & Energy andConstructions
Throughout its journey that started in 1975 with theestablishment of EEC as a general contracting company, the ideaof offering full turnkey services for the contracting sector wasEEC’s main target and approach.
This goal was achieved on several steps that started in 1982 withthe establishment of our steel fabrication factories in Cairo,followed by the cladding factories in 1990 and finally inauguratedin 2008 with the establishment of our own Hot Dip Galvanizationfacilities in El-Obour City.
Since then EEC has become an integrated turnkey constructioncompany offering full turnkey solutions.
FOCUSED, HARD
WORK IS THE
KEY TO
SUCCESS.“SUCCESS IS
NOT FINAL”
HISTORY
Page 3EEC Group | Corporate Presentation _ 2018_Q3
FACTS & FIGURES
Our team of more than 2000 (+ 1000
temporary) professionals enables us
to extend our geographic footprint
delivering diverse projects and
connecting us with clients in Middle
East ,Asia, Europe, America.
Over 2000 Employees
over 27 countries Africa, Mid. East & Europe had our
services and products
6 Steel factories, Cladding factory, 3
Galvanization Factories.
Roxtec Sweden
Over 40 years of Experience
Over 300 Clients
Over 1500 Projects in all sectors
Page 4EEC Group | Corporate Presentation _ 2018_Q3
COMPETITIVE ADVANTAGE
EEC took the decision to stick to high quality measures
in all services offered to its clients.
This was conducted through a complete Integrated
Management System (IMS) program that combines all
related components of a business into one system for
easier management and operations.
• Quality Management System: ISO 9001:2008
• Environmental Management System :ISO14001:2004
• Occupational Health & Safety Management System:
OHSAS18001:2007
• Lean Six Sigma
• NTRA license to own, construct, lease and
operate telecom sites all over Egypt.
• EETC Egyptian Electricity Transmission Company
authorization to supply and install high voltage
& ultra high voltage (66Kv-220kv-500Kv) steel
transmission towers.
• 1st grade company at the Egyptian Federation
for Construction & Building Contractors.
MANAGEMENT CERTIFICATES CERTIFICATES
Page 5EEC Group | Corporate Presentation _ 2018_Q3
MANUFACTURING DIVISION
MANUFACTURING DIVISION SUPPLY SCOPE
• Power Transmission Towers & Gantries for Power Sector
• Commercial & Industrial Steel Structures
• Telecom Towers & Equipment Shelters
• Caravans, Cold Rooms, Prefab units & Camps
• Control rooms (Transformer, SCADA,…etc)
• Cladding Systems
• Mobile units (Trailer & Truck mounted)
• Semi trailers & Special Trailers
• Hot-Dip Galvanization Services
Page 6EEC Group | Corporate Presentation _ 2018_Q3
SERVICES DIVISION
SERVICES DIVISION TURNKEY & CONSTRUCTION SCOPE
• Design & Engineering Services
• Site and Soil Assessments
• Project & Construction Management
• Electro-Mechanical Layouts and Implementation
• Site Civil and Steel Works Execution
• Installation and Commissioning
Page 7EEC Group | Corporate Presentation _ 2018_Q3
EEC GROUP FACTORIES"STEEL FACTORIES"
A-STEEL FACTORIES:Steel structures factory form part of a manufacturing complex spanning 140,000 m2 producing the highest quality structures according to international standards and specifications.
Our facilities employ the latest CNC technologies from Europe and USA to deliver Telecom and Transmission Towers .
Automatic welding beam machine BWM to deliver built-up and standard sections, girders, beams and columns for the following industries: Industrial Complexes , Commercial Malls, Bridges. EEC’s total capacity 5500 tons/month
Page 8EEC Group | Corporate Presentation _ 2018_Q3
EEC GROUP FACTORIES"SANDWICH PANELS & CLADDING FACTORIES"
B- SANDWICH PANELS & CLADDING FACTORIES:
• Single-skin corrugated sheets Capacity 200,000 m/month
• Sandwich panel 60,000 m2/month
Page 9EEC Group | Corporate Presentation _ 2018_Q3
C- HOT-DIP GALVANIZATION FACTORIES
EEC Galva was established in 2007 with kettle dimension 7*1.1*1.7m, Currently we have a second
line with kettle dimension 12.5*1.5*2.7m the with a capacity (due to the product mix) of around
8000 tons per month of steel galvanized.
We have highly skilled and experienced galvanizing professionals serving your needs.
Furthermore through the International Zinc Association (IZA), EEC Galva has access to the latest
thinking and technologies for the hot-dip galvanizing industry.
EEC GROUP FACTORIES" HOT-DIP GALVANIZATION"
Page 10EEC Group | Corporate Presentation _ 2018_Q3
TELECOMMUNICATION SECTOR
Page 11EEC Group | Corporate Presentation _ 2018_Q3
TELECOMMUNICATION
EEC Group is one of the leading full turnkey service providers in the
Middle East and Africa with over 20 years experience serving top-
class multi-national customers (operators and equipment suppliers)
for their wireless networks (GSM, CDMA, 3G, 4G, WiMax).
Turnkey Services covering …..:
a) Engineering and Design
b) Site Acquisition and LOS
c) Site Survey
d) Site Construction
e) Erection of telecom towers and fully equipped shelters
f) Installation and commissioning of telecom equipments & rigging (BTS, MW, etc)
g) Maintenance and Repair
EEC has been authorized and certified by the NTRA, on 2nd March 2011, to own, construct, lease and operate telecom sites all over Egypt
Page 12EEC Group | Corporate Presentation _ 2018_Q3
TELECOMMUNICATION
Self Supported Steel Towers
Our manufacturing facilities support our turnkey services through the provision of the
following products:
We also provide …
Managed Services & Tower Leasing
Ground Rapid DeploymentSites GRDs
Equipment Shelters
Rooftop,Poles & Masts
Page 13EEC Group | Corporate Presentation _ 2018_Q3
SOLUTIONS ON WHEELS
(MOBILITY)
TOWERWRKS EGYPT IS PART OF THE EEC GROUP OF COMPANIES WE HAVE BEEN DESIGNING,
MANUFACTURING AND DEPLOYING MOBILE TOWER SOLUTIONS SINCE 2010 TO SEVERAL PRESTIGIOUS
CUSTOMERS IN THE REGION.
We manufacture heavy & light trailers according to the customer transportation needs:
• Tower Mounted Trailers
• Tower Mounted Truck
We use the highest standard of accessories and components from Europe & USA.
Page 14EEC Group | Corporate Presentation _ 2018_Q3
TELECOMMUNICATION
PROJECTS
EEC is a full turnkey solutions provider in Telecom Sector in Egypt and more than 26 countries inAfrica and the Middle East.
EEC is the main Full Turnkey Serviceprovider for the 3 Main Operators(Orange, Vodafone and Etisalat) as wellas the Signal Department – MOD.Summary of the awarded projects:Tower Supply: over 1560 Towers ofvarious types and heights up to 120 mGRDU Solution: over 425 UnitsRDU Solution: over 60 UnitsShelters Supply: over 1950 SheltersTK Sites: over 1020 SitesTE Installation: 980 SitesCW & Repair Scope: 1140 Sites
EEC has the biggest selling share inthe Sudanese market, we cooperatedwith MTN, Zain, SudaniVivacell,Canartel either direct or throughEquipment Vendors (i.e. Ericsson,NSN, Huawei & ZTE)Summary of the awarded projects:Tower Supply: over 2580 Towers ofvarious types and heights up to 70 mShelters Supply: over 590 SheltersTE Installation: 780 SitesCW Scope: 520 Sites
SudanEgypt
Page 15EEC Group | Corporate Presentation _ 2018_Q3
TELECOMMUNICATION
PROJECTS
EEC has cooperated with all theLibyan operators i.e. Libyana, LTT,Wimax, GPTC either through directcontract or through EquipmentVendors (i.e. Huawei & Alcatel)
Summary of the awarded projects:
Tower Supply: over 960 Towers ofvarious types and heights up to 70 m
Shelters Supply: over 250 Shelters
TE Installation: 440 Sites
CW Scope: 280 Sites
EEC has cooperated with thebiggest operators (i.e. Djezzy,Lacom, Mobilis, Nedjma as wellas Equipments providers such asNSN, Huawei & Siemens)Summary of the awardedprojects:Tower Supply: over 1450 Towersof various types and heights upto 80 m.Shelters Supply: over 2640SheltersTE Installation: 1890 SitesCW Scope: 1310 SitesMaintenance Scope: 1080 Sites
Algeria MoroccoLibya
Page 16EEC Group | Corporate Presentation _ 2018_Q3
TELECOMMUNICATION
PROJECTS
Africa
EEC Invaded the African Market as weworked in Eastern ; Western andCentral African Countries ….
(i.e. Ethiopia, Mauritania, Kenya,Somalia, Senegal, Mali, Guinea,Ghana, Benin, Sierra Leone, IvoryCoast, Gambia, Liberia, Zambia,Burundi, Congo & South Africa)
Summary of the awarded projects:
Tower Supply: over 1,250 Towers ofvarious types and heights up to 80 m
Shelters Supply: over 130 Shelters
TE Installation: 310 Sites
CW Scope: 235 Sites
GRDU Solution: over 75 Units
RDU Solution: over 10 Units
Asia & Middle East
EEC has succeeded to prove itspresence in Asia and the middle East
Region (i.e. Iraq, Lebanon,Bangladesh, Korea, Jordon &Oman)
Summary of the awarded projects :
Tower Supply: over 490 Towers ofvarious types and heights up to 120 m
Shelters Supply: over 160 Shelters
CW Installation: over 170 Sites
RDU Solution: over 35 Units
Page 17EEC Group | Corporate Presentation _ 2018_Q3
TELECOMMUNICATION
CLIENTS
Page 18EEC Group | Corporate Presentation _ 2018_Q3
POWER & ENERGY SECTOR
Page 19EEC Group | Corporate Presentation _ 2018_Q3
POWER & ENERGY
EEC now is one of the few companies authorized from “EETC” Egyptian Electricity Transmission Company to supply and install high voltage & ultra high voltage (66Kv-220kv-500Kv) steel transmission towers
Since 2009, EEC began building its capability within the Power & Energy sectors.
Power
• Power Station & Sub-Station• Transmission Towers (up to 500kvA)• Gantry Structures• Control Rooms
Energy
• Steel Structure • Trailer Mounted Towers• Camps, Caravans & Prefabricated Units• Hot-Dip Galvanization• Roxtec – Mechanical Sealing Products
(Supply and Installation)
Page 20EEC Group | Corporate Presentation _ 2018_Q3
POWER & ENERGY
PROJECTS
Major Transmission Projects:
• EETC:
- Beni Suif East / El Koum El Ahmar 66kv OHTL:
Design & testing & Supply of transmission 158 towers Beni
Swif East / El Koum El Ahmar 66kv OHTL (double conductor
2*380/50mm²), including River Nile crossing mega towers
with height 158m.
- Beni Suif East / El Koum El Ahmar 66kv OHTL:
Manufacture & Supply of 222 transmission towers Assuit
East and Malwei west (double conductor 2*380/50mm²)
- Raoof El Nakrah Line / elmalak 66kv OHTL:
Manufacture & Supply of 380 transmission towers 66KV
Raoof Elnakrah/ karam eldeab / tawlid elshabab / elgaafary
/elmalak) (double circuit 2*380/50mm²)
- Transmission Towers “Double Circuit “:
Manufacture & Supply of 141 transmission towers 66KV
(double circuit)
Page 21EEC Group | Corporate Presentation _ 2018_Q3
POWER & ENERGY
PROJECTS
• China Electric Power Equipment & Technology Co., LTD.:
Manufacture & Supply for EETC 121 transmission towers 500kV.
• MAN International Contracting:
Manufacture & Supply for EETC 87 transmission towers 220KV.
• Giza Power Industry:
Manufacture & Supply of 114 Sets of transmission towers 220KV and 135 Sets of 66KV
Page 22EEC Group | Corporate Presentation _ 2018_Q3
POWER & ENERGY
PROJECTS
Major Substations Projects :
• Siemens PTD (Extension of Naga Hammadi
500/220kV AIS S/S):
Supply of two 500kv transfer gantries (custom design).
• Siemens PTD (El Zaafarana II 22/220kV AIS S/S):
Supply of Equipment Steel Supports (28 various types).
• Siemens PTD & VATech (Sharm EL Sheikh III
4x40MVA, 66/22KV AIS Electrical S/S):
Awarded the Civil works contract for the substation
including RC Structures, Finishing and Landscaping.
• Siemens PTD & VATech (WADI EL -NILE 2x40 MVA,
66/11KV AIS ELECTRICAL S/S):
Awarded the Civil works contract for the substation
including RC Structures, Finishing and Landscaping.
Page 23EEC Group | Corporate Presentation _ 2018_Q3
POWER & ENERGY
CLIENTS
Page 24EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS SECTOR
Page 25EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
The Industrial Construction Field has become one of EEC main objectives.
We do provide full civil works, steel structures and industrial cladding:
a) Factories & Warehouses
b) Shopping Malls
c) Administration Buildings
d) All the industrial construction services, including, but not limited to: Roads, Fences, Sewage, Electricity and Public Lighting, Water Supply..etc
e) Freezers & Cold Store complexes
f) Temporary accommodation (Caravans & Prefabricated)
Classified as a 1st grade company at the Egyptian Federation for Construction and Building Contractors
Page 26EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS
NATIONAL AGRICULTURAL PROJECT "ONE MILLION CATTLE”
Location: Nobaria
Scope Of Work: Design, Manufacture & Installation of Housing Structures / Sheds
Area: 220,000 m2
Page 27EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS
• Badr Industrial City
Location Badr City
Area: 78,000 m2
• Domiat’s Furniture City
Location: Domiat
Area: 44,000 m2
INDUSTRIAL COMPLEX - SMALL & MEDIUM ENTERPRISE
Scope Of Work: Design, Supply and install of Steel System for 26 factories and Civil Activities.
Page 28EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS
Location: New Administrative Capital
Scope Of Work: Design Steel Manufacture & Installation of steel sheds car parks.
Area: 11,000 m2
Page 29EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS "GALALA RESORT"
Location: Zaafarana Rd Ain Sukhna
Scope Of Work: Survey, Earth Work, Foundations, Civil Construction, Electrical, Mechanical &
Finishing Activities.
El Galala Resort is considered the atom for a new city which is located on El Soukhna – El Zaafarana
road. The city’s area will exceed 48,000 m2 acre on different levels from the sea level to 700m
above sea level on El Galala hill.
The food court which is considered the diamond of the resort is assigned to EEC on turnkey bases.
Page 30EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS "GALALA RESORT"
Food Court (Building H) Components:
Basement , Ground Floor & Food Court
• Basement Area is: 48,000 m2
Including: Parking
Area, 35 store, 40 Warehouse, 18 services
area and public & services areas.
• Ground Floor Area is: 22,000 m2
Including: 72 store , 50 restaurants
• Food Court Area is: 26,000 m2
Including: 15,000 m2 (Open Air), 11,000
m2 (Covered with space frame)
Page 31EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS "FUELS STATIONS & MOTEL COMPLEX"
Location: El Soukhna – El Zaafarana new road
Scope Of Work: Survey, Earth Work, Foundations, Civil Construction & Finishing Activities.
(Motel, Food Court, Shopping Mall, Market, Workshops, Soldiers Shelter & Mosque.
Totally assigned for EEC on turnkey bases).
Page 32EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS "FUELS STATIONS & MOTEL COMPLEX"
Includes a Motel, Food Court, Shopping Mall,
Market, Workshops, Soldiers Shelter & Mosque.
Totally assigned for EEC on turnkey bases.
• Restaurants + Food Court:(Floor Area is: 800 m2)
Two floors including: 22 store,
4 restaurants, 2 dining halls
• Motel: (24 Rooms)- 3 Floor
• Workshops: for all activities that are related to
vehicles services.
• Market: (Floor Area is: 160 m2) Ground Floor
Page 33EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS
EL Malha: Location El Soukhna – El Zaafarana new road
Scope Of Work: Survey, Earth Work, Foundations, Civil Construction & Finishing Activities.
Total Area is: 8028m2 . Includes a Market, Workshops, Soldiers Shelter , Car Care Services,
Tank, Generator rooms, Mosque and Fuel Station.
Page 34EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS
Marina Service Building “Zaafarana Rd Ain Sukhna – Galala”
Scope Of Work: Survey, Earth Work, Foundations, Civil Construction & Finishing Activities.
Includes arrival Terminal, Lounge, VIP Lounge, Passports Services & Lighthouse “which
will be a landmark for the project”
Page 35EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS
Admin Building “EL Obour City”
• Commercial/Offices Areas or floors.• A+ Full finishing for exterior & interior common areas (main Entrance, Corridors, ….).• Concrete floor and ceiling + Plastered walls.• Optional Finishing/Furnishing of open space (private offices, partitions & large team rooms.• Security, safety, Fire fighting and alarm systems Also Backup generators for common areas.• IT & Electricity network services.• HVAC chiller system with a control unit for each floor.• ATM machines ….. Drivers room.
Page 36EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS "QURONFEL COMPOUND"
Location 5th settlement – New Cairo
Scope Of Work: Survey, Earth Work, Foundations, Civil Construction & Finishing Activities.It’s a residential compound located between Cairo – Suez road and the 90th street (5th settlement –New Cairo) contains residential buildings, villas and many public areas such like: mosque, basinscompound and a club.
Page 37EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS "QURONFEL COMPOUND"
Separate Villas are assigned to EEC on turnkey
bases:
– Villas Area: 600 m2
– Basement Area: 388 m2
– Ground & First Floors Area: 180 m2 (each)
– Penthouse Area: 65 m2
Page 38EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS EGYPT JAPAN UNIVERSITY OF SCIENCE AND TECHNOLOGY (E-JUST)
Location New Borg EL Arab
Scope Of Work: Survey, Earth Work, Foundations, Civil Construction, MEP Preparations & Finishing
Activities.
Phase 1 – Construction
Tunnels:
That runs along the spine of the university, it is a key element to making its overall pedestrian nature
possible. Services accessible via the tunnel include all fiber optic and technology-related wiring, major
electrical conduits and plumbing for hot water, domestic water and chilled water for air conditioning. All
other pipes for sewage, natural gas, irrigation and fire fighting are buried on the campus, outside the
tunnel, around buildings as needed for their purposes
Page 39EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS EGYPT JAPAN UNIVERSITY OF SCIENCE AND TECHNOLOGY (E-JUST)
– Main tunnel: with dimension 7.0m * 5.17m & length
1050 m and four junctions at area 8500 m2
– Service trench: with dimension 3.0m * 2.0m & length
1300 m
Underground Water Tanks:
Irrigation water tank: Area 1385 m2 & storage capacity
5865 m3
Chilled water tank : Area 680 m2 & storage capacity
2615 m3
Domestic water tank : Area 1280 m2 & storage capacity
3016 m3
Substations:
Chilled water substation : Area 1875 m2
Electrical power backup generators substation : 550 m2
Medium voltage distributor substation : 275 m2
Low voltage distributor substation : 120 m2
Central control room : 200 m2
Page 40EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS "LG"
LG Electronics Egypt (LGEEG) New Factory in Egypt
• Location: N2 Plot, Al Tajamouat Industrial Park, 10th of Ramadan City, Cairo, Egypt.
EEC Scope of Works: Civil work, Steel Works, Infrastructure, SOG, Landscape
Page 41EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
PROJECTS "SAMSUNG ELECTRONICS COMPLEX"
Samsung Electronics (SEEG) Complex in Egypt.
• Location: Kom Abu Radi, Beni Suef, Egypt
EEC Scope of Works: Civil work Samsung Factory, Fences, Road Construction, 5 Water
Tanks (Fire- 2 injection- Boiler and cooling tanks), Concrete floors , Foundations of five
utility Buildings & Cladding for waste warehouse
Page 42EEC Group | Corporate Presentation _ 2018_Q3
CONSTRUCTIONS
CLIENTS
www.eecegypt.com
EEC Tower: 19 Markaz El Maalomat St., Sheraton Residences, Heliopolis, Cairo, Egypt
Tel .: +20 2 22669002Fax : +20 2 22679151