The LHCb Outer Tracker Front End, what does it look like and what is the status lk for the LHCb Electronics Working Group 5-2-2003/ A Collaboration of: Nikhef Heidelberg Krakow Warsaw Beijing

The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

Embed Size (px)

Citation preview

Page 1: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

The LHCb Outer Tracker Front End,what does it look like and what is the status

Talk for the LHCb Electronics Working Group 5-2-2003/TS

A Collaboration of:

NikhefHeidelbergKrakowWarsawBeijing

Page 2: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

What part is on the Detector

ASDTDC

L0 BufferL1 Buffer

bias L0 BX L150 fC

DAQ

chamber counting room

~100m

The Front End on the detector

GOL

Electronics Service Box

LVHV TFC ECS Cooling

Page 3: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

Inside of a straw module prototype

Alu shieldingStraws without alu outside

Gas volume Feedtrough Board

Page 4: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

Feed-trough board grounding and shielding

Alu straw wall for crosstalk shieldingAnd transmission of fast signals

Faraday cage Shielding alu foil inside chamber boxwire

Chamber Feed-trough board (gas tight by gluing)

Aluminum soldering after copper plating not reliablecan be pulled of.

Aluminum connection developments

Page 5: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

•Alu straw wall for crosstalk shielding And transmission of fast signals •Soldering of all alu parts to end PCB

Grounding and shielding of the critical detector sensor part

ALU

Gas

Carbon / epoxy plates

Air filled material

Kapton foil for gas tightness

Alu coating shield

GLUE (isolating)

Alu coating shield

Kapton foil for gas tightness

Conductive Kapton (for aging protection)

Page 6: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

Module Module Module Module

Tight packing of 4 module layers in 1 station demands packed electronics and cooling

4 cm

GasLV

HVECS DATA-out

TFC

25 cm

Water

Page 7: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

Mechanical model of detector electronics without shielding box

Page 8: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

Dissipation and cooling- Airco hall can cool only 80 kW in total, so no dumping in hall !

-our Detector electronics Heat production = 10-15KW

- if using air cooling should be closed circuit with water coolerBut air gives dust on HV boards

-Water cooling ok for HV board leakage currents, if above dewpoint (13 degr garanteed?)

Page 9: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

module support barFeed-through board

cooling bar

cooling plates and blocks

plates of shielding box

The Detector Electronics box

Outside box

Page 10: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

X 1

X 2

X 4X 8

Front-end cards:

• have to fit inside a closed metal shielding box: 22 x 30 x 4 cm

• excellent ground connection to straw-tubes and module reference ground

• power dissipation of cards is about 25 W / box → water cooling

• easy access should be maintained

GOL/Aux Board

TDC boards

HV boardsASD boards

The Boards inside the box

Page 11: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

R=1.1MΩ

C=300pF

32 channels per board

Capacitors embedded in PCB:Company xyz in GB

Capacitors:

JOHANSON 302R29W331KV4E

Max. Volt.: 4kV

Size: 5x4x2 mm3

eventual. used as fuse

HV boards

Page 12: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

We want much less then 50 on 50000 channels broken, less then 0.1%With 32 caps in a board we have to throw away too much.Must be reliable over the years.Thorough testing and thermal cycling neededHV caps Johanson come tested to 4KV

Typical need 1500V

RESULTS UPTO NOW:

-14 days tested at 2.5 KV: 1 “shorted capacitor 100k ohm”then high current burnout, then sawn open, noting to see

After this 14 days cycling from 25 to 65 degr C1 open connection, broken by stress? Still to be investigated.

Further investigation needed

Second revision will be made

Results HV Board tests

Page 13: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

ASDBLR boards

ASDBLR chip:

ATLAS DMILL version

Older prototype (98) with asdblr,HV caps, and regulators on backside,No tdc yet

Page 14: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

OTIS card

TDC board:

• radiation hard OTIS TDC chip

• provides bias voltage for ASD

• power rooting for ASDBLR card

• test pulses for ASDBLR

Page 15: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

GOL/AUX CARD the interface to the outside world

Page 16: The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group 5-2-2003/TS A Collaboration

Conclusion

• Design: what we want seems clear. (in collaboration)

• Pre-designs have done well in beam-tests in 1998-2000

• Detector Electronics still to be finalized– Cooling construction, prototype boards, pre-production boards

• Some parts already in Mass Production Ordering – ASDBLR (with ATLAS)

– RAD hard regulators

– TTC components TTCrx

– GOL