Phase Location of Phase What do the works entail? Anticipated start date and end date Impacts and restrictions 1b Left half of Berkeley Square (inner square) Installation of Granite sett motorcycle bays, new Yorkstone footway slab and Mackenzie lighting columns COMPLETED 2a Opposite Bruton Place The removal of the traffic island opposite Bruton Place COMPLETED 3a 18-22 Berkeley Square Installation of new Granite kerb and Yorkstone footway creating a larger pedestrian area outside 18-22 Berkeley Square. Installation of two parking bays finished in Granite Setts, and five cycle stands. COMPLETED 1c Right half of Berkeley Square (inner circle) Installation of new Yorkstone footway and seven Granite sett parking bays Nov 2018 Jan 2019 Temporary parking bay suspensions and footway closures during works. 1d Outside the Phillips Gallery (30 Berkeley Square) Installation of a new pedestrian crossing outside Phillips, connecting the northern entrance to Berkeley Square Jan - Feb 2019 A temporary give way line will be installed for duration of works. Parking suspensions in place outside 30 Berkeley Square to allow traffic movement 2b Motorcycle island in the corner of Berkeley Square and Davies Street Permanent removal of the motorcycle island Jan 2019 Permanent removal of motorcycle parking bays in island. The loss of parking at this location is compensated by bays being re-provided elsewhere around the square 2c Traffic island at the Davies Street and Mount Street junction Permanent removal of the traffic island Feb 2019 Cycle stands will be removed. 3b Davies Street carriageway Construction of a new carriageway including new pedestrian crossing Feb - Apr 2019 There will be no access to Davies Street from Berkeley Square throughout these works. A diversion will be in place via Mount Street (see page 3). Taxi and motorcycle bays outside 40 Berkeley Square will be suspended The table below details the phasing plan for public realm improvements to Berkeley Square north. Please note that the dates below are approximate and could be subject to change. This document will be updated if any changes are made. (Document is accurate as of January 2019)

The table below details the phasing plan for public realm

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Phase Location of Phase What do the works entail? Anticipated start date and end date

Impacts and restrictions

1b Left half of Berkeley Square (inner square)

Installation of Granite sett motorcycle bays, new Yorkstone footway slab and Mackenzie lighting columns

COMPLETED

2a Opposite Bruton Place The removal of the traffic island opposite Bruton Place

COMPLETED

3a 18-22 Berkeley Square Installation of new Granite kerb and Yorkstone footway creating a larger pedestrian area outside 18-22 Berkeley Square. Installation of two parking bays finished in Granite Setts, and five cycle stands.

COMPLETED

1c Right half of Berkeley Square (inner circle)

Installation of new Yorkstone footway and seven Granite sett parking bays

Nov 2018 – Jan 2019 Temporary parking bay suspensions and footway closures during works.

1d Outside the Phillips Gallery (30 Berkeley Square)

Installation of a new pedestrian crossing outside Phillips, connecting the northern entrance to Berkeley Square

Jan - Feb 2019 A temporary give way line will be installed for duration of works. Parking suspensions in place outside 30 Berkeley Square to allow traffic movement

2b Motorcycle island in the corner of Berkeley Square and Davies Street

Permanent removal of the motorcycle island

Jan 2019 Permanent removal of motorcycle parking bays in island. The loss of parking at this location is compensated by bays being re-provided elsewhere around the square

2c Traffic island at the Davies Street and Mount Street junction

Permanent removal of the traffic island

Feb 2019 Cycle stands will be removed.

3b Davies Street carriageway Construction of a new carriageway including new pedestrian crossing

Feb - Apr 2019 There will be no access to Davies Street from Berkeley Square throughout these works. A diversion will be in place via Mount Street (see page 3). Taxi and motorcycle bays outside 40 Berkeley Square will be suspended

The table below details the phasing plan for public realm improvements to Berkeley Square north. Please note that the dates below are approximate and could be subject to change. This document will be updated if any changes are made. (Document is accurate as of January 2019)

4a Directly outside Phillips Gallery (30 Berkeley Square)

Construction of a new Yorkstone footway with Granite setts creating a wider pedestrian area.

Apr - Aug 2019 No road closures. Traffic will run on a new carriageway set up. Existing parking and motorcycles bays will be suspended during works then relocated to new bays

4b Outside 31 - 41 Berkeley Square

Construction of a new Yorkstone footway with Granite setts creating a wider pedestrian area.

Sept - Nov 2019 No road closures. Traffic will run on a new carriageway set up. Existing parking and motorcycles bays will be suspended during works then relocated to new bays

5 Carriageway at the Davies Street and Mount Street junction

Construction of a new carriageway

Oct 2019 - Jan 2020 A diversion will be in place during this period. Local businesses and residents will be advised beforehand

6a Outside the Porsche garage Installation of a new Yorkstone footway with Granite setts

Nov - Dec 2019 No major impacts

6b Small section of carriageway on Mount Street

Construction of new carriageway at the entrance to Mount Street

Nov - Dec 2019 A diversion will be in place during this period. Local businesses and residents will be advised beforehand

7 Outside 25 Berkeley Square Construction of a new Yorkstone footway with Granite setts

Aug- Oct 2019 Bruton Place will not be accessible whilst the works are underway

8 Full northern half of Berkeley Square

Resurfacing the carriageway

Jan 2020 Overnight road closures will be in place for the duration of works

SC

SC

SC

SC

SC

SC SC

SC

RS

RS

RS

RS

RS

RS

RS

RS

SV

SV

SVSV SV

SV

SV

SV

SV

SV

SV

SV

SV

SV

SV

SV

SV

SV SVSV

SV

GV

GV

GV

GV

GV

GP

GV

GV

GV

GV

WP

Ligh

t

B

B

B

B

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

THL

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

ER

RW

P

RW

P

RW

P

RW

P

RW

P

RW

P

RW

P

RW

P

SVP SV

P

SOF

B.S

Phon

e Bo

x's

IRF

1.05m

ht

Bric

khou

se

Met

al

BB

BTM

HM

etal

BTM

HM

etal

BTM

H

LEB

Met

al

Met

al

Conc

rete

Pavi

ngB.

S

B.S

Concrete

B.S

MFS

CM

etal

Broa

dsM

etal

Broa

ds

B

B

BB

B.S

B.S

BTM

HM

etal

Met

al

Concrete

Conc

rete

Con

cret

e

LE P

LCM

etal

B.S

IRF 1.45ht

Concrete

BTM

HM

etal

BTM

HM

etal

Coal Chute

B.S

Concre

te

Metal

City

of W

estm

inst

er

BTM

HM

etal

Concrete

LE P

LCM

etal

LE P

LCM

etal BT

MH

Met

al

Concrete

Met

al

ECB

Concrete

FH Met

al

Cab

le a

nd W

irele

ss

Cab

le &

Wire

less

Met

al

Concrete

BTM

H

Concrete

LE P

LCM

etal

Concre

te Elec

tric

Met

al

Conc

reteB.

S

LE P

LCM

etal

Concre

te

Conc

rete

BTM

HM

etal

LE P

LCM

etal

Pavi

ng

Conc

reteBT

MH

Met

al

LE P

LCM

etal C

oncr

ete

B.S

B.S

B.S

BTM

HM

etal

B.S

Met

al

Met

er M

edia

Met

al

Unk

now

nM

etal

B.S

B.S

B

Brea

k In

Wal

l

TCSU

Met

al

MFS

CM

etal

LP

BAT

E

Tarm

ac

LE P

LCM

etal

Concrete

B.S

Conc

rete

LE P

LCM

etal

Smok

e Ou

tlet

Cobb

les

Smok

e Out

let

Concre

te Til

es

LE P

LCM

etal

Concrete

Smoke O

utlet

Cobble

s

Smok

e Out

let

LE P

LCM

etal

Concrete

LE P

LCM

etal

Conc

reteConcre

te

BTM

HM

etal

Concrete

Pavi

ng T

iles

Concrete

LE P

LCM

etal

Tacti

le Pav

ing

IRF 1.16ht

Unk

now

nM

etal

BTM

HM

etal

Smok

e O

utle

t

Broa

dsM

etal

TSR

F 0.

90ht

Bike

Rac

ks

G.P

.OM

etal

BTM

HM

etal

TCSU

Met

al

Met

al

Met

al

Tele

com

Met

al

BTM

HM

etal

Mer

cury

Com

mun

icat

ions

Met

al

BTM

HM

etal

BTM

HM

etal

LE P

LCM

etal

Tarm

ac

York

Sto

ne

Unk

now

n

Met

al

Coa

l Chu

te

Unk

now

nM

etal

BTM

HM

etal

Smok

e Outl

et

Unk

now

nM

etal

Unk

now

nM

etal

Unk

now

nM

etal

Unk

now

nM

etal

ECB

ECB

TCSU

Met

al

B

Bloc

k Pav

ing

FH

FH

Elec

tric

Met

alBT

MH

Met

alEl

ectri

cM

etal

FH

Tacti

le Pa

ving

Unk

now

nM

etal

IRF

1.00

m h

t

Unk

now

n

Met

al

Ston

e W

all 1

.0ht

Elec

tric

Met

al

BTM

HM

etal

York

Sto

ne

Unk

now

nM

etal

Elec

tric

Met

al

Unk

now

nM

etal

Smok

e Ou

tlet

Smok

e Out

let

Smok

e Out

let

TCSU

Met

al

Mos

aic

tiles

Unk

now

nM

etalC

olt

Met

al

BTM

HM

etal

B.S

Elec

tric

Met

al

B.S

B.S

Smok

e Ou

tlet

Con

cret

e Pa

ving

Luxc

rete

Smoke Outlet

Smoke Outlet

Smoke Outlet

Smoke Outlet

Furn

iture

Tarm

ac

Elec

tric

Met

al

Pavin

gConc

rete

Con

cret

e

BTM

HM

etal

Dea

con

Met

er

Met

al

Conc

rete

Unk

now

n

Met

al

Conc

rete

EDF

Met

al

Conc

rete

Col

tM

etal

Unk

now

nM

etal

Com

mun

icat

ions

Met

al

MFS

CM

etal

Mer

cury

Com

mun

icat

ions

Met

al

Tarm

acU

nkno

wn

Met

al

Unk

now

nM

etal

BTM

HM

etal

Unk

now

nM

etal

Tactile Paving

TFL

Met

al

Unk

now

nM

etal

Unk

now

n

Met

al

Concrete

ConcreteBl

ock

Pavi

ng

Mer

cury

Com

mun

icat

ions

Met

al

Unk

now

n

Met

al Conc

rete

Conc

rete

Stone Wall 0.2m ht

IRF 1.29ht

BTM

HM

etal

Elec

tric

Met

al

BTM

HM

etal

Met

alFH

IRF 0.90

ht

BT Hou

se

BTM

HM

etal

ECB

Concre

te

Concre

te

WC

CM

etal

Concre

te

WC

CM

etal

Concre

te

Con

cret

e

Pavi

ng

WC

CM

etal

Concre

te

Unk

now

nM

etal

WC

CM

etal

Concre

teBT

MH

Met

al

Park

ing

Met

er

Her

as F

ence

1.9

ht

UTS

No

Acce

ss

LE Met

al

Concre

te

Brick SettsB.S

B.S

B.S

B.S

Unk

now

n

Met

al

Con

cret

e

IRF

1.1m

ht

GS

Unk

now

nM

etal

Concre

te

B

Col

tM

etal

Unk

now

nM

etal

Ligh

t

Ligh

t

Ston

e Wall

Box

TSR

F 0.

9m h

t

Bike

Rac

ks

Concre

te

Cab

le &

Wire

less

Met

al

Concrete

Con

cret

e Pa

ving

BTM

HM

etal

Concrete

Concrete B

B

Unk

now

nM

etal

BTM

HM

etal

BTM

HM

etal

Unk

now

nM

etal

Smoke O

utlet

FH Met

al

BTM

HM

etal

Con

cret

eU

nkno

wn

Met

al

Con

cret

eEl

ectri

cM

etal

Con

cret

e

B.S

Elec

tric

Plas

tic

Concre

te

BTM

HM

etal

BT Cabinet

Con

cret

e

B.S

Concre

teBTM

HM

etalB.S

B.SB.S

Mer

cury

Com

mun

icat

ions

Met

al

Cab

le &

Wire

less

Met

alC

olt

Met

al

Site

Cab

in

B.S

Elec

tric

Met

alConcreteIR

F 1.3

5m ht

Unk

now

nM

etal

Con

cret

e

B.S

B.S

Concre

te

Ston

e Wall

0.14

ht

Elec

tric

Met

al

Elec

tric

Met

al BTM

HM

etal

Concre

te

Smoke Outlet

Tarm

ac

Unk

now

nM

etal

Concrete

Elec

tric

Plas

tic

Concrete

BTM

HM

etalCon

crete

Unk

now

nM

etal

Unk

now

n

Met

al

Coal

Chu

te Coal

Chut

eB.S

B.S

Conc

rete

Mer

cury

Com

mun

icat

ions

Met

al

Unk

now

nM

etal

Concre

te

Unk

now

nM

etal

Conc

rete

Conc

reteFH

MFS

CM

etal

Unk

now

nM

etalMeta

l

Concre

te

Tele

com

ms

Met

al

Unk

now

nM

etal

Con

cret

e

G

BTM

HM

etalCon

crete

Unk

now

nM

etal

Unk

now

nM

etal

BTM

HM

etal

Unk

now

nM

etal

Unk

now

nM

etal

G

B.SU

nkno

wn

Met

al

Concrete

BTM

HM

etal Concre

te

B.S

Smok

e O

utle

t

Met

al

IRF 1.0m ht

B.S

Unk

now

nM

etal

Concrete

Unk

now

n

Met

al

Concrete

Elec

tric

Met

al

Conc

rete

Elec

tric

Plas

tic

Con

cret

e Concrete

Tele

com

Met

al

Sign

ICC

L 19

.78

ICC

L 19

.90

ICC

L 19

.75

ICC

L 19

.99

ICC

L 20

.22

ICC

L 20

.01

ICC

L 19

.98

ICC

L 19

.78

ICC

L 19

.84

ICC

L 19

.92

ICC

L 19

.66

ICC

L 19

.61

ICC

L 19

.49

ICC

L 20

.35

ICC

L 20

.16

ICC

L 20

.23

ICC

L 20

.44

ICC

L 20

.62

ICC

L 20

.51

ICC

L 20

.84

ICC

L 21

.05

ICC

L 21

.21

ICC

L 21

.37

ICC

L 21

.56

ICC

L 21

.73

ICC

L 21

.72

ICC

L 21

.80

ICC

L 21

.93

ICC

L 21

.88

ICC

L 21

.86

ICC

L 22

.14

ICC

L 22

.13

ICC

L 22

.15

ICC

L 22

.15

ICC

L 22

.01

ICC

L 22

.20

ICC

L 22

.30

ICC

L 22

.32

ICC

L 22

.41

ICC

L 22

.27

ICC

L 22

.12

ICC

L 22

.11

ICC

L 22

.04

ICC

L 22

.02

ICC

L 21

.95

ICC

L 22

.20

ICC

L 22

.05

ICC

L 22

.12 IC

CL

22.0

9

ICC

L 22

.11

ICC

L 21

.59

ICC

L 21

.71

ICC

L 21

.27

ICC

L 20

.73

ICC

L 20

.74

ICC

L 21

.56

ICC

L 21

.43

ICC

L 21

.61

ICC

L 21

.78

ICC

L 21

.79

ICC

L 21

.82

ICC

L 21

.90

ICC

L 21

.87

ICC

L 21

.95

ICC

L 21

.88

ICC

L 22

.00

ICC

L 22

.14

ICC

L 22

.13

ICC

L 22

.28

ICC

L 22

.42

ICC

L 22

.36

ICC

L 22

.22

ICC

L 22

.31

ICC

L 22

.35

ICC

L 22

.47

ICC

L 22

.24

ICC

L 22

.21

ICC

L 22

.33

ICC

L 21

.38

ICC

L 21

.32

ICC

L 21

.27

ICC

L 21

.18

ICC

L 21

.00

ICC

L 20

.91

ICC

L 20

.77

ICC

L 20

.78

ICC

L 20

.21

ICC

L 20

.02

ICC

L 19

.24

ICC

L 19

.15IC

CL

19.2

7

ICC

L 19

.26

ICC

L 18

.75

ICC

L 18

.83

ICC

L 18

.87

ICC

L 18

.86

ICC

L 18

.73

ICC

L 18

.90

ICC

L 18

.97

ICC

L 19

.13

ICC

L 19

.13

ICC

L 19

.16

ICC

L 19

.19

ICC

L 19

.52

ICC

L 19

.71

ICC

L 19

.86

ICC

L 20

.15

ICC

L 20

.50

ICC

L 20

.61

ICC

L 20

.29

ICC

L 20

.45

ICC

L 20

.50

ICC

L 20

.59

ICC

L 20

.48

ICC

L 20

.49

ICC

L 20

.55

ICC

L 20

.62

ICC

L 20

.66

ICC

L 20

.91

ICC

L 22

.22

ICC

L 21

.88

ICC

L 22

.00

ICC

L 22

.11

LE P

LC

B.S

ICC

L 19

.90

ICC

L 21

.37

ICC

L 22

.06

ICC

L 21

.86

ICC

L 22

.23

ICC

L 21

.57

ICC

L 21

.63

ICC

L 20

.66

ICC

L 20

.71

ICC

L 19

.23

ICC

L 19

.24

ICC

L 19

.00

ICC

L 18

.80

ICC

L 19

.70

ICC

L 19

.83

ICC

L 20

.07

ICC

L 20

.22

2 x

Han

ging

2 x

Han

ging

2 x

Han

ging

2 x

Han

ging

2 x

Han

ging

2 x

Han

ging

Bask

ets

Bask

ets

Bask

ets

2 x

Han

ging

Bask

ets

PL

2 x

Han

ging

PL

Bask

ets

ICC

L 20

.23

ICC

L 20

.25

ICC

L 21

.86

1.2/

25

1.4/

29

1.3/

23Lond

on P

lane

Lond

on P

lane

Lond

on P

lane

1.2/

24

Lond

on P

lane

Bask

ets

Met

al

Ligh

t

Ligh

t

Ligh

t

Ligh

t

Bask

ets

Scul

ptur

e

Bask

ets

Bask

ets

Larg

e C

oncr

ete

2 x

Han

ging

PL

PL

B.S

Large Planters

FB

Bask

ets

Concrete

2 x

Han

ging

2 x

Han

ging

Bask

ets

B.S

Large Planters

Bask

ets

Edge of Kerb Stone

Edge of Kerb Stone

Edge of Kerb Stone

Smok

e Out

let

Smok

e Out

let

Smok

e Out

let

Smok

e Out

let

Smok

e Out

let

Smok

e Out

let

Smok

e Out

let

24.7

4

Smoke Outlet

to B

asem

ent

Step

s D

own

ICC

L 22

.40

Min

iatu

re S

treet

ICC

L 22

.03

Smoke Outlet

Drop

Ker

b

PL

PL

Conc

rete

Edge

of K

erb

Ston

e

Edge

of K

erb

Ston

e

Edge

of K

erb S

tone

Edge

of K

erb S

tone

Edge

of K

erb S

tone

B.S

Edge

of K

erb S

tone

Edge

of K

erb S

tone

Edge of Kerb Stone

Basement Levels

Base

men

t Lev

els

Dro

p Ke

rb

Drop

Ker

b

Edge

of K

erb S

tone

Drop K

erb

2 x

Han

ging

Ora

nge

Com

mun

icat

ions

Unk

now

n

Met

al

ICC

L 19

.90

Smoke O

utlet

Smoke O

utlet

Smoke O

utlet

Smoke O

utlet

Pavi

ng

Edge o

f Ker

b Ston

e

Edge

of K

erb S

tone

2 x

Han

ging

Bask

ets

Edge

of K

erb

Ston

e

Edge of Kerb Stone

Edge of Kerb Stone

Edge of Kerb Stone

Edge of Kerb Stone

Edge of Kerb Stone

Edge of Kerb Stone

Edge o

f Kerb

Stone

Edge o

f Kerb

Stone

Edge of Kerb Stone

Edge

of K

erb S

tone

B

B

Step

Slab

50mm

Tarm

ac

Con

cret

e

Step

s D

own

B.S

B.S

to B

asem

ent

Step

Sla

b

30m

m

Bask

ets

Tile

sM

arbl

e

Marble

Smok

e O

utle

tC

oncr

ete

Concrete

Paving

Concrete

Paving

Edge of Kerb Stone

B.S

Earth

Concrete

Smoke Outlet

Con

cret

e

Pavi

ng

Tarmac

Concrete

Smoke Outlet

Edge of Kerb Stone

Concre

te

Con

cret

e

Pavi

ng

Tarm

ac

IRF

1.05

htCo

ncre

te W

all 0

.14h

t

B.S

B.S

Concre

tePa

ving

Concre

tePa

ving

Tarm

ac

B.S

IRF

1.05

htCon

crete

Wall

0.12

ht

Con

cret

eEd

ge o

f Ker

b St

one

Tarm

ac

B.S

Edge

of K

erb S

tone

Edge

of K

erb S

tone

Edge

of K

erb

Ston

e

ICC

L 19

.20

BEdge

of K

erb

Ston

e

Concre

tePa

ving

Tarm

ac

Conc

rete

Pavin

g

Edge

of K

erb

Ston

e

Step

Sla

b

50m

m

Pavi

ng

Con

cret

ePa

ving

Con

cret

ePa

ving

Smok

e Outl

ets

Con

cret

ePa

ving

Edge

of K

erb S

tone

Con

cret

ePa

ving

Edge

of K

erb S

tone

Edge

of K

erb S

tone

Step

Sla

b

50m

m

Con

cret

e

Pavi

ng

Smoke O

utlet

Concre

tePa

ving

Tarmac

Concrete W

all 0.47ht

IRF 1.36ht

IRF

1.05

ht

Conc

rete

Wall

0.1

2ht

Tarm

ac

Tarm

ac

Tarm

ac

Step

Sla

b

70m

m

THL

Con

cret

ePa

ving

Con

cret

ePa

ving

Concrete

Wall 0.22ht

B.S

B.S

B.S

IRF 1.53ht

B.S

Con

cret

ePa

vingSt

ep S

lab

50m

m

IRF 1.53ht

IRF 1.53ht

Step

Sla

b30

mm

ICC

L 20

.66

B.S

Marble

Base

ment L

evels

Con

cret

ePa

ving

Step

s D

own

to B

asem

ent

Con

cret

e

Con

cret

ePa

ving

IRF 0.94m ht

IRF 0.94m ht

IRF 0.94m ht

0.97h

t

B.S

Con

cret

ePa

ving

Tarm

ac

Tarm

ac

Tarm

ac

Tarm

ac

York

Sto

ne

Pavi

ng

York

Sto

ne

Pavi

ng

Concre

te Pav

ing

IRF

1.02

ht

Wal

l 0.2

3ht

Step

Sla

b50

mm

IRF 0

.95ht

York

Sto

ne

Pavi

ng

Step

Sla

b50

mm

Steps D

own

to Bas

emen

t

Steps D

own

to Bas

emen

t

IRF

0.90

ht Planter

s 0.90

ht

PL

IRF

0.90

ht

York

Sto

ne

Pavi

ng

York

Sto

ne

Pavi

ng

York

Sto

ne

Pavi

ng

York

Sto

ne

Pavi

ng

York

Sto

ne

Pavi

ng

THL

York

Sto

ne

Pavi

ng Drop Kerb

Drop K

erb

ICC

L 21

.92

York

Sto

ne

Pavi

ng

Drop

Ker

b

Dro

p Ke

rb

Drop Kerb

Drop

Ker

b

Con

cret

e Pa

ving

TSR

F 0.

9m h

t

Bike

Rac

ks

Edge

of K

erb S

tone

Edge

of K

erb

Ston

e

Bloc

k Pa

ving

Tacti

le Pa

ving

York

Sto

ne

Pavi

ngYo

rk S

tone

Pavi

ng

IRF 1.27ht

Edge

of K

erb

Ston

e

IRF 1.28ht

Belo

w G

roun

dBa

sem

ent L

evel

s

IRF 1.29ht

Con

cret

ePa

ving

CL

22.3

9IC

B.S

B.S

Conc

rete

Pavin

gCo

ncre

te

Pavin

g

Smoke Outlet

Step

Sla

b30

mm

Conc

rete

Pavin

g

Conc

rete

Pavin

g

Conc

rete

Pavin

g

Con

cret

e

Con

cret

e

York

Sto

ne

Pavi

ng

Conc

rete

Conc

rete

Pavi

ng

Base

men

t Lev

els

Step

s D

own

to B

asem

ent

Conc

rete

Wall

0.1

2ht

York

Sto

ne

Pavi

ng

York

Sto

ne

Pavi

ng

Bric

k Pa

ving

Steps Down

to Basement

IRF 0.76ht

IRF 0.76ht

York

Sto

ne

Pavi

ng Smok

e Out

let

THL

York

Sto

ne

Pavi

ng

Conc

rete

Bloc

k Pav

ing

Drop K

erb

Drop

Ker

b

Dro

p Ke

rb

Tact

ile P

avin

g

Tact

ile P

avin

g

Con

cret

e

Mas

tic

Tarm

ac

TSR

F 0.

90ht

Bike

Rac

ks

Mas

tic

25.5

1SO

FBa

sem

ent L

evel

Step

s D

own

to B

asem

entCon

crete

Wall

0.21

ht

IRF

1.16h

t

Brick W

all0.64ht

Brick W

all0.64ht

Base

men

t Lev

els

Pavi

ng T

iles

Larg

e C

oncr

ete

PL

PLStep

Sla

b30

mm

Concre

te W

all 0.

7ht

IRF 1.39ht

IRF 1.39ht

Step

Sla

b25

mm

Step

Sla

b40

mm

Mar

ble

Mar

ble

Pavi

ng S

labs

Con

cret

ePa

ving

Wall

Mou

nted

Plan

ter

Wall

Mou

nted

Plan

ter

Step

Sla

b40

mm

THL

Con

cret

ePa

ving

Pavi

ng S

labs

B.S

B.S

Con

cret

ePa

ving

Mar

ble

Wall

Mou

nted

Plan

ter

Wall

Mou

nted

Plan

ter

Step

Sla

b40

mm

Marble

IRF 1.25ht

Concrete

Conc

rete

Conc

rete

Wall

0.2

1ht

IRF

1.25h

t

Base

men

t Lev

els

Con

cret

ePa

ving

THL

Conc

rete

Wall

0.2

1ht

IRF

1.25

ht

Concre

te

Base

men

t Lev

el

Base

men

t Lev

els

Base

men

t Lev

els

Base

men

t Lev

els

Con

cret

ePa

ving

Con

cret

ePa

ving

Con

cret

ePa

ving

Concrete W

all 0.30ht

IRF 1.33ht

Con

cret

e Ti

les

Step

Sla

b30

mm

Pavi

ngC

oncr

ete

B.S

Pavi

ngC

oncr

ete

B.S

B.S

Pavi

ngC

oncr

ete

B.S

B.S

B.S

IRF

1.45

ht

Conc

rete

Wall

0.2

3ht

Base

men

t Lev

els

B.S

SVP

25.0

7

ICC

L 22

.31

Unk

now

nM

etal

Conc

rete

SOF

Canopy

Step

s D

own

to B

asem

ent

IRF

1.05

ht

Conc

rete

Wall

0.1

6ht

IRF

1.05

htCo

ncre

te W

all 0

.19h

t

IRF

1.06h

tCon

crete

Wall

0.18

ht

IRF 1.06htConcrete Wall 0.14ht

IRF 1.05htConcrete Wall 0.11ht

2 x

Han

ging

B.S

Pavi

ng

Con

cret

e

Pavi

ng

Con

cret

e

Pavi

ng

Con

cret

e

Pavi

ng

Con

cret

e

Pavi

ng

Con

cret

e

Pavi

ng

Con

cret

e

Pavi

ng

Con

cret

e

Pavi

ng

Con

cret

e

Pavi

ng

Con

cret

e

Pavi

ng

Tact

ilePa

ving

Basement Levels

Edge

of K

erb

Ston

e

Edge

of K

erb S

tone

Edge of Kerb Stone

Edge of Kerb Stone

Edge of Kerb Stone

Edge

of K

erb S

tone

Edge

of K

erb S

tone

1.4/

25

1.0/

24

Lond

on P

lane

1.6/

23

Lond

on P

lane

Lond

on P

lane

Lond

on P

lane0.

9/23

IRF

1.16h

t

Con

cret

ePa

ving

Lond

on P

lane

0.65

/16

Lond

on P

lane

1.1/

23

Lond

on P

lane

0.7/

17

Smok

e Outl

ets

IRF 0.95m htIRF 0.95m ht

Met

al p

in

Met

al p

in

Met

al p

in

Met

al p

in

Met

al p

in

Met

al p

in

Met

al p

in

Met

al p

in

Met

al p

in

Met

al p

in

Met

al p

in

21.2

16

BT

ELEC

21.0

65

21.0

72

GV

21.1

50

21.1

30

21.1

0

WV

20.9

29

21.1

11

CO

LT

21.0

11

21.0

37

21.188

21.280

21.292

21.234

21.214

21.102

21.05

6

20.99

0

20.9

49

21.29

7

ELEC

21.4

1TH

L

21.19

8

21.09

9

21.0

57

21.05

7

21.13

7

21.16

7

21.16

2

21.21

5

WV

21.26

2

21.23

5

21.26

8

BT

21.30

4

21.25

4

ELEC

21.28

6

ELEC

21.33

5

ELEC

21.0

5

RS

21.2

92

FH 21.28

7

21.2

47

ELEC

WV

21.20

5

21.1

62

21.359

21.3

76

21.3

1221.2

6221

.137

21.0

38 21.1

65

21.0

34

21.2

27

20.9

68

20.8

60

20.7

48

20.8

53

21.1

2

20.9

19

BT

IC C

L

20.7

73

20.7

97

20.6

57

21.1

4G

WV

21.22

7

21.23

5

CPS

CPS

SO

SO

SO

TMAC

TMAC

CPS

CO

NC

SO

20.8

6

20.8

2

21.0

5

21.3

2

21.1

121

.15

21.2

1

21.2

2

DP

VP

VP

VP

VP

20.8

3

21.1

8

ELEC

21.0

7

MH

J01

MH

J02

MH

J03

MH

J04

MH

J09

MH

J07

MH

J08

MH

J05

MH

J06

MH

G01

MH

G02

TWU

L

MH

CL

20.8

0

20.8

2

21.1

621.1

5

21.1

3

21.1

521

.1621

.14

21.9

0

21.9

1

21.9

2

21.9

0

20.8

3

20.8

6

20.8

8 20.8

5

21.1

4

21.1

3 21.3

221

.29

21.3

021

.28

21.1

7

21.1

621

.14

21.1

6

21.1

6

21.1

5

21.1

3

21.1

3

21.1

8

21.1

521

.14

21.1

121.0

9

21.0

6

20.9

9

21.0

0

21.1

0

21.1

121

.09

21.1

0

21.0

7

21.0

5

21.0

5

21.0

8

21.1

421

.19

21.2

1

21.2

2

21.2

0

21.2

2

21.2

3

20.8

7

20.8

320

.86

20.8

9

20.8

8

20.8

5

SO

SO

CO

NC

CO

NC

CONC

CO

NCSW

+IRF

1.4

H

CPS

BP

CO

NC

CPS

21.0

04

21.2

08

21.2

42

21.096

SO

21.30

1

GV

BT

GV

FH

SV

WM

GV

GV

GV

BT

IC

SV

LC

TS

TS

BTS

SP

SP

BB

BB

LC

SP

LC

LC

G

LC

TSG

G

SP

LC

G

SP

SP

SP

SP

G

SP

LC

G

SP

SP

SP

LC

SP

SP

LC

BB

LC

LC

LC

LC

SP

G

SP

G

G

BT

BT

Smoke Outlet

CH

CH

CH

TS

LC

BB

BB

BBBB

LC

LC

LC

LC

LC

PS

PS

PS

PS

PS

PS

PS

PS

G

WM

MFS

CM

etal

ICC

L 21

.59

2 x

Han

ging

Bask

ets

G

Tactile PavingDrop Kerb

H

H

SP

Pors

che

20 B

erke

leySq

uare

JeromeDreyfu

ss

No 21Mille

r Harris

David

Aaro

n

Ancie

nt Ar

ts

Jack Barcla

y Bentley

No 2

Dav

ies

Stre

et

Mou

nt S

treet

Oscan

de

la Re

nta

130

Mou

nt

Stre

et

UP 17

0

IC

ICER

BT

GGA

S

GAS

W

WGA

S

IC W

WGA

S

G

IC

WIC

P/O

GIC

IC

BTFH

W

IC

IC

IC

IC

J O

N E

S

S T

R E

E T

SMOK

E OU

TLET

IC

IC

P/L

P

SP

SP

STN

53

OPEN

TO

BELO

W

ASPH

ALT

IC

IC

W

IC

P/L

P/L

P/L

IC

IC

TARM

AC

PAVI

NG S

LABS

TARM

AC

TARM

AC

TARM

AC

UP 80

UP 80

UP 80

BT

ROLL

ER S

HUTT

ER

BRIC

KPA

VING

KERB

STO

NE

CPS

RWP

PARK

ING

SPAC

E

UP

CONC

RETE

CONC

RETE

CPS

SMOK

EOU

TLET

RAILI

NG

RAILI

NG

RAILI

NG

RAILI

NG

HT. 1

590

CONC

RETE

CONC

RETE

1 2

ELEC

T. B

OX

ACCE

SS C

ONTR

OLB

B

OUTL

ET

HT. 6

10

HT. 6

10

HT. 6

10

HT. 6

10

GATE

GATE

RAILI

NG

ASPH

ALT

SLOP

E

PAVI

NG S

LABS

Concre

te Pav

ingW

all 0

.23h

t

24 B

erke

leySq

uare

23 B

erke

leySq

uare

25 Berkeley

Square

27 Berk

eley

Square

28 Berk

eley

Square

Alfre

d Du

nhill

Entra

nce

to

Alfre

d Du

nhill

Turn

bull &

Asse

r

Wes

tewo

od

Hedo

nism

Wine

s

Blut

hner

Pian

o

Cent

re Conn

augh

t

Hous

e

4 M

ount

Stre

et

34 B

erke

leySq

uare

35 B

erke

leySq

uare

Alfre

d

Spee

lman

Mar

ks

36-3

8 Ber

ger

House

40 B

erke

leySq

uare

41 B

erke

leySq

uare

Phillip

s

30 Berk

eley

Square

Berk

eley

Squ

are

Gar

dens

Berk

eley

Squ

are

Gar

dens

MOUN

T ST

REET

DAVIES STREET

MOU

NT

ROW

BRUTON PLACE

BRUTON STREET

HILL STREET

JONES S

TREET

BOUR

DON

STRE

ET

BERK

ELEY

SQUA

RE

BERKELEY

SQUARE

BERKELEY

SQUARE

1b

3b4a

4b

2b

2c

5

6a

6b

3

7

8

3a

1c

LC

LC

LC

LC

LCLC

LC

LC

LC

LC

LC

PB

CH

GC

5xCS

5xCS

5xC

S

5xC

S

3xC

S

4xC

S

BB

BB

LC

BBBB

SB

LC

SP

SP

SP

PS

PS

PS

PS

PS

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

G

GC

SP

SPSP

SP

LC

LC

LL

LC

LCLC

BB

SP

CH

CH

2a

1d

KEY

PHAS

E 1b

PHAS

E 1c

PHAS

E 1d

PHAS

E 2

PHAS

E 3a

PHAS

E 3b

PHAS

E 4a

PHAS

E 4b

PHAS

E 5

PHAS

E 6A

PHAS

E 6

PHAS

E 7

- 25

BER

KELE

Y SQ

UAR

ED

EVEL

OPM

ENT

AREA

PHAS

E 8

- RES

UR

FAC

ING

- 3

WEE

KS

NO

TES:

A1A1PROJECT-1 TITLE-3TITLE-1 DATECHKDJOB

PROJ

ECT

APPR

OVED

DRAW

ING

No.

JOB

No.

SCAL

E @

A1

DATE

TITLE

DESI

GN/D

RAW

NCH

ECKE

D

REV.

SHEE

T

CLIE

NT

DRAW

ING

STAT

US

REV

DATE

DESC

RIPT

ION

BYAP

DCH

K

BRIE

F/DSB

No.

This

map i

s rep

roduc

ed fro

m Or

dnan

ce S

urvey

mate

rial w

ith th

e perm

ission

of O

rdnan

ce S

urvey

on be

half o

f the C

ontro

ller o

f Her

Majes

ty's S

tation

ery O

ffice

©Cr

own c

opyri

ght.

Unau

thoris

ed re

produ

ction

infrin

ges C

rown c

opyri

ght a

nd m

ay le

ad to

pros

ecuti

on or

civil

proc

eedin

gs. (W

CC)(L

A 10

0095

97)

A1

25 M

ande

la W

ay, L

ondo

n, SE

1 5SZ

www.

fmco

nway

.co.uk

www

.wsp

group

.com

FMC

PROJ

ECT N

o.

DRAWING-NO.REVPROJECT-2TITLE-2 SCALED/DAPPDBRIEF_NOA1PROJECT-1 TITLE-1TITLE-2PROJECT-2TITLE-3 SCALEDATED/DCHKDAPPDJOBBRIEF_NODRAWING-NO.REV

SKET

CH

BERK

ELEY

SQU

ARE

NORT

HPU

BLIC

REA

LM

CONS

TRUC

TION

PHAS

ING

PLAN

1:25

011

.07.

2018

JB

7003

1208

WW

ESA1

854

BR 3

5255

7003

1208

-05-P

H-01

BA1