Thundering Waters Transportation Master Plan Technical Appendix Paradigm Transportation Solutions Limited July 2016

Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Thundering Waters Transportation Master Plan

Technical Appendix Paradigm Transportation Solutions Limited

July 2016

Page 2: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Thundering Waters Transportation Master Plan | 151385 | July 2016

Paradigm Transportation Solutions Limited | Appendices

Contents

Appendix A Terms of Reference

Appendix B Public and Agency Involvement

Appendix C Existing Traffic Operations Reports

Appendix D Existing Traffic Operations with Improvements Reports

Appendix E Internal Capture Calculation

Appendix F Future Background Traffic Operations Reports

Appendix G Future Total Traffic Operations Reports

Appendix H Future Total Traffic Operations with Improvements Reports

Appendix I Future Total Traffic Operations with OPG Canal Crossing Reports

Appendix J Future Total Traffic Operations with Welland River Crossing Reports

Appendix K Future Total Traffic Operations with OPG Canal Crossing and Improvements Reports

Appendix L Future Total Traffic Operations with Welland River Crossing and Improvements Reports

Appendix M Future Total Traffic Operations with Roundabouts on Stanley Avenue Reports

Page 3: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Thundering Waters Transportation Master Plan | 151385 | July 2016

Paradigm Transportation Solutions Limited | Appendices

Appendix A

Terms of Reference

Page 4: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 5: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 6: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 7: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 8: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 9: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 10: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 11: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 12: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 13: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 14: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 15: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 16: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 17: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Transportation Study AreaFigure 1Thundering Waters Secondary Plan Transportation Study

151385

Do

rchester R

d

Dru

mm

on

d R

d

Oldfield Rd

ChippawaPkwy

Page 18: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Thundering Waters Transportation Master Plan | 151385 | July 2016

Paradigm Transportation Solutions Limited | Appendices

Appendix B

Public and Agency Involvement

Page 19: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Thundering Waters Transportation Master Plan | 151385 | July 2016

Paradigm Transportation Solutions Limited | Appendices

Appendix C

Existing Traffic Operations Reports

Page 20: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 81 520 15 25 418 183 16 44 58 150 40 70Future Volume (vph) 81 520 15 25 418 183 16 44 58 150 40 70Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 0 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 0.99Frt 0.850 0.954 0.850 0.904Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1525 3197 1390 1484 3006 0 1471 1606 1250 1614 1437 0Flt Permitted 0.404 0.278 0.681 0.726Satd. Flow (perm) 647 3197 1390 434 3006 0 1055 1606 1250 1233 1437 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 77 120 77 76Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 4 4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 4% 7% 12% 5% 4% 13% 9% 19% 3% 5% 13%Adj. Flow (vph) 88 565 16 27 454 199 17 48 63 163 43 76Shared Lane Traffic (%)Lane Group Flow (vph) 88 565 16 27 653 0 17 48 63 163 119 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 21: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 2 2 6Detector Phase 4 4 4 3 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.3 39.3 39.3 12.5 51.8 37.3 37.3 37.3 37.3 37.3Total Split (%) 44.1% 44.1% 44.1% 14.0% 58.1% 41.9% 41.9% 41.9% 41.9% 41.9%Maximum Green (s) 33.0 33.0 33.0 9.5 45.5 31.0 31.0 31.0 31.0 31.0Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 16.6 16.6 16.6 25.8 25.8 15.0 15.0 15.0 15.0 15.0Actuated g/C Ratio 0.34 0.34 0.34 0.53 0.53 0.31 0.31 0.31 0.31 0.31v/c Ratio 0.40 0.52 0.03 0.08 0.40 0.05 0.10 0.14 0.43 0.24Control Delay 19.4 15.2 0.1 6.8 6.6 13.8 13.8 4.3 18.7 8.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.4 15.2 0.1 6.8 6.6 13.8 13.8 4.3 18.7 8.1LOS B B A A A B B A B AApproach Delay 15.4 6.6 9.1 14.2Approach LOS B A A BQueue Length 50th (m) 5.6 19.7 0.0 1.0 11.8 1.0 2.9 0.0 11.1 2.6Queue Length 95th (m) 18.8 39.0 0.0 4.6 27.7 5.1 10.3 5.8 29.9 13.6Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 476 2354 1044 415 2869 733 1115 891 856 1021Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.18 0.24 0.02 0.07 0.23 0.02 0.04 0.07 0.19 0.12

Intersection SummaryArea Type: OtherCycle Length: 89.1Actuated Cycle Length: 49Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.52Intersection Signal Delay: 11.4 Intersection LOS: BIntersection Capacity Utilization 54.1% ICU Level of Service AAnalysis Period (min) 15

Page 22: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 3

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 23: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 4

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 88 565 16 27 653 17 48 63 163 119v/c Ratio 0.40 0.52 0.03 0.08 0.40 0.05 0.10 0.14 0.43 0.24Control Delay 19.4 15.2 0.1 6.8 6.6 13.8 13.8 4.3 18.7 8.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.4 15.2 0.1 6.8 6.6 13.8 13.8 4.3 18.7 8.1Queue Length 50th (m) 5.6 19.7 0.0 1.0 11.8 1.0 2.9 0.0 11.1 2.6Queue Length 95th (m) 18.8 39.0 0.0 4.6 27.7 5.1 10.3 5.8 29.9 13.6Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 476 2354 1044 415 2869 733 1115 891 856 1021Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.18 0.24 0.02 0.07 0.23 0.02 0.04 0.07 0.19 0.12

Intersection Summary

Page 24: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 5

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 81 520 15 25 418 183 16 44 58 150 40 70Future Volume (vph) 81 520 15 25 418 183 16 44 58 150 40 70Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 0.95 1.00 1.00 0.85 1.00 0.90Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1523 3197 1390 1484 3010 1471 1606 1250 1614 1437Flt Permitted 0.40 1.00 1.00 0.28 1.00 0.68 1.00 1.00 0.73 1.00Satd. Flow (perm) 647 3197 1390 435 3010 1054 1606 1250 1233 1437Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 88 565 16 27 454 199 17 48 63 163 43 76RTOR Reduction (vph) 0 0 11 0 56 0 0 0 44 0 53 0Lane Group Flow (vph) 88 565 5 27 597 0 17 48 19 163 66 0Confl. Peds. (#/hr) 4 4Heavy Vehicles (%) 9% 4% 7% 12% 5% 4% 13% 9% 19% 3% 5% 13%Turn Type Perm NA Perm pm+pt NA Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 2 2 6Actuated Green, G (s) 14.3 14.3 14.3 23.5 23.5 12.6 12.6 12.6 12.6 12.6Effective Green, g (s) 16.6 16.6 16.6 22.5 25.8 14.9 14.9 14.9 14.9 14.9Actuated g/C Ratio 0.34 0.34 0.34 0.46 0.53 0.31 0.31 0.31 0.31 0.31Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 220 1089 473 312 1594 322 491 382 377 439v/s Ratio Prot c0.18 0.01 c0.20 0.03 0.05v/s Ratio Perm 0.14 0.00 0.03 0.02 0.02 c0.13v/c Ratio 0.40 0.52 0.01 0.09 0.37 0.05 0.10 0.05 0.43 0.15Uniform Delay, d1 12.2 12.9 10.6 7.6 6.7 11.9 12.1 11.9 13.5 12.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.9 0.3 0.0 0.1 0.1 0.0 0.1 0.0 0.6 0.1Delay (s) 13.1 13.2 10.6 7.7 6.8 12.0 12.2 12.0 14.1 12.4Level of Service B B B A A B B B B BApproach Delay (s) 13.1 6.9 12.0 13.4Approach LOS B A B B

Intersection SummaryHCM 2000 Control Delay 10.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.48Actuated Cycle Length (s) 48.7 Sum of lost time (s) 12.0Intersection Capacity Utilization 54.1% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 25: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 694 1 53 461 0 0 0 0 241 88 206Future Volume (vph) 0 694 1 53 461 0 0 0 0 241 88 206Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 0.91 0.91 1.00 0.95 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 1.00 1.00 1.00 1.00 0.99Frt 0.850Flt Protected 0.950 0.950 0.977Satd. Flow (prot) 0 4638 0 1662 3197 0 0 0 0 1519 1523 1430Flt Permitted 0.231 0.950 0.977Satd. Flow (perm) 0 4638 0 404 3197 0 0 0 0 1515 1521 1412Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 224Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 17.0 64.2 88.8Travel Time (s) 9.7 1.2 4.6 6.4Confl. Peds. (#/hr) 2 2 3 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 3% 0% 0% 4% 0% 0% 0% 0% 4% 9% 4%Adj. Flow (vph) 0 754 1 58 501 0 0 0 0 262 96 224Shared Lane Traffic (%) 33%Lane Group Flow (vph) 0 755 0 58 501 0 0 0 0 176 182 224Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 2 1 2 1Detector Template Thru Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0Turn Type NA pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 8 6 6

Page 26: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 12.5 36.3 36.3 36.3 36.3Total Split (s) 36.3 12.5 48.5 36.5 36.5 36.5Total Split (%) 42.6% 14.7% 56.9% 42.8% 42.8% 42.8%Maximum Green (s) 30.0 9.5 42.2 30.2 30.2 30.2Yellow Time (s) 4.1 3.0 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 0.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag LeadLead-Lag Optimize? Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 16.5 27.7 27.7 15.1 15.1 15.1Actuated g/C Ratio 0.32 0.54 0.54 0.30 0.30 0.30v/c Ratio 0.50 0.15 0.29 0.39 0.40 0.39Control Delay 15.4 7.1 7.2 17.9 18.0 4.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 15.4 7.1 7.2 17.9 18.0 4.8LOS B A A B B AApproach Delay 15.4 7.2 12.9Approach LOS B A BQueue Length 50th (m) 19.6 2.1 10.9 13.6 14.2 0.0Queue Length 95th (m) 35.2 7.9 24.7 32.0 33.0 12.8Internal Link Dist (m) 110.1 0.1 40.2 64.8Turn Bay Length (m)Base Capacity (vph) 2988 433 2840 982 985 994Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.25 0.13 0.18 0.18 0.18 0.23

Intersection SummaryArea Type: OtherCycle Length: 85.3Actuated Cycle Length: 51Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.50Intersection Signal Delay: 12.2 Intersection LOS: BIntersection Capacity Utilization 42.2% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 27: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 8

Lane Group EBT WBL WBT SBL SBT SBRLane Group Flow (vph) 755 58 501 176 182 224v/c Ratio 0.50 0.15 0.29 0.39 0.40 0.39Control Delay 15.4 7.1 7.2 17.9 18.0 4.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 15.4 7.1 7.2 17.9 18.0 4.8Queue Length 50th (m) 19.6 2.1 10.9 13.6 14.2 0.0Queue Length 95th (m) 35.2 7.9 24.7 32.0 33.0 12.8Internal Link Dist (m) 110.1 0.1 64.8Turn Bay Length (m)Base Capacity (vph) 2988 433 2840 982 985 994Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.25 0.13 0.18 0.18 0.18 0.23

Intersection Summary

Page 28: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 9

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 694 1 53 461 0 0 0 0 241 88 206Future Volume (vph) 0 694 1 53 461 0 0 0 0 241 88 206Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 1.00 0.95 0.95 0.95 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 0.95 1.00 0.95 0.98 1.00Satd. Flow (prot) 4638 1662 3197 1516 1522 1412Flt Permitted 1.00 0.23 1.00 0.95 0.98 1.00Satd. Flow (perm) 4638 405 3197 1516 1522 1412Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 754 1 58 501 0 0 0 0 262 96 224RTOR Reduction (vph) 0 0 0 0 0 0 0 0 0 0 0 157Lane Group Flow (vph) 0 755 0 58 501 0 0 0 0 176 182 67Confl. Peds. (#/hr) 2 2 3 1Heavy Vehicles (%) 0% 3% 0% 0% 4% 0% 0% 0% 0% 4% 9% 4%Turn Type NA pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 8 6 6Actuated Green, G (s) 14.3 25.4 25.4 12.8 12.8 12.8Effective Green, g (s) 16.6 24.4 27.7 15.1 15.1 15.1Actuated g/C Ratio 0.33 0.48 0.55 0.30 0.30 0.30Clearance Time (s) 6.3 3.0 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1515 370 1743 450 452 419v/s Ratio Prot c0.16 0.02 c0.16v/s Ratio Perm 0.05 0.12 0.12 0.05v/c Ratio 0.50 0.16 0.29 0.39 0.40 0.16Uniform Delay, d1 13.8 7.5 6.2 14.2 14.2 13.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 0.2 0.1 0.6 0.6 0.2Delay (s) 14.0 7.7 6.3 14.8 14.8 13.3Level of Service B A A B B BApproach Delay (s) 14.0 6.5 0.0 14.2Approach LOS B A A B

Intersection SummaryHCM 2000 Control Delay 11.9 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.43Actuated Cycle Length (s) 50.8 Sum of lost time (s) 12.0Intersection Capacity Utilization 42.2% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 29: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 736 0 0 483 46 95Future Volume (vph) 736 0 0 483 46 95Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00Ped Bike Factor 0.99 0.98Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3260 0 0 3167 3162 1430Flt Permitted 0.950Satd. Flow (perm) 3260 0 0 3167 3144 1398Right Turn on Red Yes YesSatd. Flow (RTOR) 103Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Confl. Peds. (#/hr) 4 13Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 5% 2% 4%Adj. Flow (vph) 800 0 0 525 50 103Shared Lane Traffic (%)Lane Group Flow (vph) 800 0 0 525 50 103Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2

Page 30: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT EBR WBL WBT NBL NBRDetector Phase 4 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.0 35.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7%Maximum Green (s) 28.7 28.7 18.7 18.7Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 16.9 16.9 12.4 12.4Actuated g/C Ratio 0.45 0.45 0.33 0.33v/c Ratio 0.54 0.37 0.05 0.19Control Delay 8.8 7.3 10.0 4.4Queue Delay 0.0 0.0 0.0 0.0Total Delay 8.8 7.3 10.0 4.4LOS A A B AApproach Delay 8.8 7.3 6.2Approach LOS A A AQueue Length 50th (m) 17.8 10.5 1.0 0.0Queue Length 95th (m) 28.0 17.4 4.0 7.6Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 2722 2644 1788 835Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.29 0.20 0.03 0.12

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 37.4Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.54Intersection Signal Delay: 8.0 Intersection LOS: AIntersection Capacity Utilization 36.2% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 31: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 12

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 800 525 50 103v/c Ratio 0.54 0.37 0.05 0.19Control Delay 8.8 7.3 10.0 4.4Queue Delay 0.0 0.0 0.0 0.0Total Delay 8.8 7.3 10.0 4.4Queue Length 50th (m) 17.8 10.5 1.0 0.0Queue Length 95th (m) 28.0 17.4 4.0 7.6Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 2722 2644 1788 835Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.29 0.20 0.03 0.12

Intersection Summary

Page 32: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 13

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 736 0 0 483 46 95Future Volume (vph) 736 0 0 483 46 95Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 0.95 0.97 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3260 3167 3162 1397Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 3260 3167 3162 1397Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 800 0 0 525 50 103RTOR Reduction (vph) 0 0 0 0 0 69Lane Group Flow (vph) 800 0 0 525 50 34Confl. Peds. (#/hr) 4 13Heavy Vehicles (%) 2% 0% 0% 5% 2% 4%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 14.6 14.6 10.1 10.1Effective Green, g (s) 16.9 16.9 12.4 12.4Actuated g/C Ratio 0.45 0.45 0.33 0.33Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1477 1434 1051 464v/s Ratio Prot c0.25 0.17 0.02v/s Ratio Perm c0.02v/c Ratio 0.54 0.37 0.05 0.07Uniform Delay, d1 7.4 6.7 8.4 8.5Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.2 0.0 0.1Delay (s) 7.8 6.8 8.5 8.6Level of Service A A A AApproach Delay (s) 7.8 6.8 8.5Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 7.5 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.34Actuated Cycle Length (s) 37.3 Sum of lost time (s) 8.0Intersection Capacity Utilization 36.2% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 33: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 57 556 218 115 556 21 87 3 79 13 2 19Future Volume (vph) 57 556 218 115 556 21 87 3 79 13 2 19Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 15.0 0.0Storage Lanes 1 1 1 0 1 1 1 0Taper Length (m) 40.0 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.98 1.00 0.98 0.99Frt 0.850 0.994 0.850 0.863Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3260 1458 1630 3240 0 1630 1716 1458 1630 1481 0Flt Permitted 0.414 0.266 0.742 0.756Satd. Flow (perm) 710 3260 1435 456 3240 0 1273 1716 1424 1281 1481 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 228 7 86 21Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 5 5 12 12Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 62 604 237 125 604 23 95 3 86 14 2 21Shared Lane Traffic (%)Lane Group Flow (vph) 62 604 237 125 627 0 95 3 86 14 23 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm pm+pt NA Perm NA Perm Perm NA

Page 34: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 2 2 6Detector Phase 4 4 4 3 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 32.0 32.0 32.0 32.0 32.0Total Split (s) 36.0 36.0 36.0 12.5 48.5 32.0 32.0 32.0 32.0 32.0Total Split (%) 44.7% 44.7% 44.7% 15.5% 60.2% 39.8% 39.8% 39.8% 39.8% 39.8%Maximum Green (s) 29.7 29.7 29.7 9.5 42.2 25.7 25.7 25.7 25.7 25.7Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 16.4 16.4 16.4 26.3 26.3 11.8 11.8 11.8 11.8 11.8Actuated g/C Ratio 0.35 0.35 0.35 0.57 0.57 0.25 0.25 0.25 0.25 0.25v/c Ratio 0.25 0.52 0.36 0.31 0.34 0.29 0.01 0.20 0.04 0.06Control Delay 14.1 13.9 4.1 6.9 5.9 18.1 15.0 6.0 15.2 8.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 14.1 13.9 4.1 6.9 5.9 18.1 15.0 6.0 15.2 8.7LOS B B A A A B B A B AApproach Delay 11.4 6.1 12.4 11.2Approach LOS B A B BQueue Length 50th (m) 3.4 19.3 0.5 3.8 11.4 6.3 0.2 0.0 0.9 0.1Queue Length 95th (m) 12.2 38.2 12.1 11.2 23.8 19.3 1.9 8.7 4.8 4.8Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 15.0Base Capacity (vph) 500 2296 1078 478 3029 784 1057 910 789 920Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.12 0.26 0.22 0.26 0.21 0.12 0.00 0.09 0.02 0.03

Intersection SummaryArea Type: OtherCycle Length: 80.5Actuated Cycle Length: 46.3Natural Cycle: 80Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.52Intersection Signal Delay: 9.3 Intersection LOS: AIntersection Capacity Utilization 50.3% ICU Level of Service AAnalysis Period (min) 15

Page 35: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 16

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 36: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 62 604 237 125 627 95 3 86 14 23v/c Ratio 0.25 0.52 0.36 0.31 0.34 0.29 0.01 0.20 0.04 0.06Control Delay 14.1 13.9 4.1 6.9 5.9 18.1 15.0 6.0 15.2 8.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 14.1 13.9 4.1 6.9 5.9 18.1 15.0 6.0 15.2 8.7Queue Length 50th (m) 3.4 19.3 0.5 3.8 11.4 6.3 0.2 0.0 0.9 0.1Queue Length 95th (m) 12.2 38.2 12.1 11.2 23.8 19.3 1.9 8.7 4.8 4.8Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 15.0Base Capacity (vph) 500 2296 1078 478 3029 784 1057 910 789 920Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.12 0.26 0.22 0.26 0.21 0.12 0.00 0.09 0.02 0.03

Intersection Summary

Page 37: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 18

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 57 556 218 115 556 21 87 3 79 13 2 19Future Volume (vph) 57 556 218 115 556 21 87 3 79 13 2 19Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.98 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 1.00Frt 1.00 1.00 0.85 1.00 0.99 1.00 1.00 0.85 1.00 0.86Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1630 3260 1437 1630 3242 1630 1716 1431 1619 1481Flt Permitted 0.41 1.00 1.00 0.27 1.00 0.74 1.00 1.00 0.76 1.00Satd. Flow (perm) 710 3260 1437 456 3242 1274 1716 1431 1288 1481Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 62 604 237 125 604 23 95 3 86 14 2 21RTOR Reduction (vph) 0 0 147 0 3 0 0 0 64 0 16 0Lane Group Flow (vph) 62 604 90 125 624 0 95 3 22 14 7 0Confl. Peds. (#/hr) 5 5 12 12Turn Type Perm NA Perm pm+pt NA Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 2 2 6Actuated Green, G (s) 14.1 14.1 14.1 24.0 24.0 9.5 9.5 9.5 9.5 9.5Effective Green, g (s) 16.4 16.4 16.4 23.0 26.3 11.8 11.8 11.8 11.8 11.8Actuated g/C Ratio 0.36 0.36 0.36 0.50 0.57 0.26 0.26 0.26 0.26 0.26Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 252 1159 511 377 1849 326 439 366 329 379v/s Ratio Prot c0.19 0.04 c0.19 0.00 0.00v/s Ratio Perm 0.09 0.06 0.12 c0.07 0.02 0.01v/c Ratio 0.25 0.52 0.18 0.33 0.34 0.29 0.01 0.06 0.04 0.02Uniform Delay, d1 10.5 11.7 10.2 6.8 5.3 13.8 12.8 13.0 12.9 12.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.3 0.1 0.4 0.1 0.4 0.0 0.1 0.0 0.0Delay (s) 10.9 12.1 10.3 7.2 5.3 14.2 12.8 13.0 12.9 12.8Level of Service B B B A A B B B B BApproach Delay (s) 11.5 5.6 13.6 12.9Approach LOS B A B B

Intersection SummaryHCM 2000 Control Delay 9.4 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.42Actuated Cycle Length (s) 46.1 Sum of lost time (s) 12.0Intersection Capacity Utilization 50.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 38: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 121 405 44 57 438 55 124 74 67 48 64 130Future Volume (vph) 121 405 44 57 438 55 124 74 67 48 64 130Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 1.00 1.00 0.99 0.99 1.00Frt 0.985 0.983 0.928 0.900Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1525 3032 0 1599 3008 0 1630 1536 0 1630 1510 0Flt Permitted 0.268 0.468 0.393 0.660Satd. Flow (perm) 426 3032 0 784 3008 0 674 1536 0 1129 1510 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 11 12 46 102Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 12 5 5 12 4 4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 7% 14% 4% 8% 9% 2% 4% 6% 2% 3% 5%Adj. Flow (vph) 132 440 48 62 476 60 135 80 73 52 70 141Shared Lane Traffic (%)Lane Group Flow (vph) 132 488 0 62 536 0 135 153 0 52 211 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 39: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 20

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Detector Phase 7 4 3 8 5 2 1 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0Minimum Split (s) 9.5 30.4 9.5 30.4 9.5 37.7 9.5 37.7Total Split (s) 25.0 30.4 25.0 30.4 12.0 37.7 12.0 37.7Total Split (%) 23.8% 28.9% 23.8% 28.9% 11.4% 35.9% 11.4% 35.9%Maximum Green (s) 22.0 24.0 22.0 24.0 9.0 31.0 9.0 31.0Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1All-Red Time (s) 0.0 2.3 0.0 2.3 0.0 2.6 0.0 2.6Lost Time Adjust (s) 1.0 -2.4 0.0 -2.4 1.0 -2.7 1.0 -2.7Total Lost Time (s) 4.0 4.0 3.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead LagLead-Lag Optimize? Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 28.9 20.9 25.5 18.1 22.5 15.3 19.1 13.6Actuated g/C Ratio 0.46 0.33 0.40 0.29 0.35 0.24 0.30 0.21v/c Ratio 0.39 0.49 0.16 0.62 0.39 0.38 0.14 0.52Control Delay 13.5 18.7 10.3 23.5 18.1 19.2 15.1 18.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 13.5 18.7 10.3 23.5 18.1 19.2 15.1 18.3LOS B B B C B B B BApproach Delay 17.6 22.2 18.7 17.7Approach LOS B C B BQueue Length 50th (m) 8.5 23.6 3.7 28.7 10.4 10.5 3.8 11.5Queue Length 95th (m) 20.4 42.9 10.5 53.0 26.8 30.6 12.3 35.0Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 577 1335 678 1294 373 860 452 871Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.23 0.37 0.09 0.41 0.36 0.18 0.12 0.24

Intersection SummaryArea Type: OtherCycle Length: 105.1Actuated Cycle Length: 63.5Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.62Intersection Signal Delay: 19.3 Intersection LOS: BIntersection Capacity Utilization 57.2% ICU Level of Service BAnalysis Period (min) 15

Page 40: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 21

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 41: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT WBL WBT NBL NBT SBL SBTLane Group Flow (vph) 132 488 62 536 135 153 52 211v/c Ratio 0.39 0.49 0.16 0.62 0.39 0.38 0.14 0.52Control Delay 13.5 18.7 10.3 23.5 18.1 19.2 15.1 18.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 13.5 18.7 10.3 23.5 18.1 19.2 15.1 18.3Queue Length 50th (m) 8.5 23.6 3.7 28.7 10.4 10.5 3.8 11.5Queue Length 95th (m) 20.4 42.9 10.5 53.0 26.8 30.6 12.3 35.0Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 577 1335 678 1294 373 860 452 871Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.23 0.37 0.09 0.41 0.36 0.18 0.12 0.24

Intersection Summary

Page 42: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 23

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 121 405 44 57 438 55 124 74 67 48 64 130Future Volume (vph) 121 405 44 57 438 55 124 74 67 48 64 130Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 3.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.99 1.00 0.98 1.00 0.93 1.00 0.90Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1523 3034 1596 3012 1630 1537 1628 1509Flt Permitted 0.27 1.00 0.47 1.00 0.39 1.00 0.66 1.00Satd. Flow (perm) 429 3034 786 3012 675 1537 1131 1509Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 132 440 48 62 476 60 135 80 73 52 70 141RTOR Reduction (vph) 0 7 0 0 9 0 0 35 0 0 80 0Lane Group Flow (vph) 132 481 0 62 527 0 135 118 0 52 131 0Confl. Peds. (#/hr) 12 5 5 12 4 4Heavy Vehicles (%) 9% 7% 14% 4% 8% 9% 2% 4% 6% 2% 3% 5%Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Actuated Green, G (s) 27.7 18.5 22.1 15.7 20.7 12.5 17.3 10.8Effective Green, g (s) 25.7 20.9 22.1 18.1 18.7 15.2 15.3 13.5Actuated g/C Ratio 0.41 0.33 0.35 0.29 0.30 0.24 0.24 0.21Clearance Time (s) 3.0 6.4 3.0 6.4 3.0 6.7 3.0 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2Lane Grp Cap (vph) 317 1006 358 865 309 370 318 323v/s Ratio Prot c0.05 0.16 0.02 c0.18 c0.05 0.08 0.01 c0.09v/s Ratio Perm 0.12 0.04 0.08 0.03v/c Ratio 0.42 0.48 0.17 0.61 0.44 0.32 0.16 0.41Uniform Delay, d1 12.6 16.7 13.8 19.4 17.1 19.6 18.7 21.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.6 0.2 0.2 0.9 0.7 0.3 0.2 0.4Delay (s) 13.2 16.9 14.0 20.3 17.9 19.9 18.8 21.7Level of Service B B B C B B B CApproach Delay (s) 16.1 19.7 18.9 21.1Approach LOS B B B C

Intersection SummaryHCM 2000 Control Delay 18.5 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.49Actuated Cycle Length (s) 63.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 57.2% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 43: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 24

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 120 368 34 0 282 92 77 51 9 83 18 107Future Volume (vph) 120 368 34 0 282 92 77 51 9 83 18 107Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 0 0 0 0 0 0 1 0Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 0.95 0.95 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 0.99 1.00 1.00Frt 0.990 0.963 0.991 0.872Flt Protected 0.989 0.973 0.950Satd. Flow (prot) 0 3034 0 0 2942 0 0 1652 0 1630 1453 0Flt Permitted 0.776 0.766 0.757Satd. Flow (perm) 0 2377 0 0 2942 0 0 1301 0 1298 1453 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 12 71 5 116Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 5 3 3 5 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 7% 7% 9% 0% 9% 5% 1% 2% 11% 2% 5% 5%Adj. Flow (vph) 130 400 37 0 307 100 84 55 10 90 20 116Shared Lane Traffic (%)Lane Group Flow (vph) 0 567 0 0 407 0 0 149 0 90 136 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 44: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Detector Phase 4 4 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 27.1 27.1 27.1 27.1 33.1 33.1 33.1 33.1Total Split (s) 47.0 47.0 47.0 47.0 40.2 40.2 40.2 40.2Total Split (%) 53.9% 53.9% 53.9% 53.9% 46.1% 46.1% 46.1% 46.1%Maximum Green (s) 40.9 40.9 40.9 40.9 34.1 34.1 34.1 34.1Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 13.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 16.9 16.9 12.7 12.7 12.7Actuated g/C Ratio 0.45 0.45 0.34 0.34 0.34v/c Ratio 0.53 0.30 0.34 0.21 0.24Control Delay 9.8 6.3 12.8 11.6 4.9Queue Delay 0.0 0.0 0.0 0.0 0.0Total Delay 9.8 6.3 12.8 11.6 4.9LOS A A B B AApproach Delay 9.8 6.3 12.8 7.6Approach LOS A A B AQueue Length 50th (m) 11.7 6.2 6.6 3.9 0.8Queue Length 95th (m) 27.7 15.5 21.3 14.0 10.1Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 25.0Base Capacity (vph) 2308 2859 1199 1196 1348Starvation Cap Reductn 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.25 0.14 0.12 0.08 0.10

Intersection SummaryArea Type: OtherCycle Length: 87.2Actuated Cycle Length: 37.9Natural Cycle: 65Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.53Intersection Signal Delay: 8.7 Intersection LOS: AIntersection Capacity Utilization 59.0% ICU Level of Service BAnalysis Period (min) 15

Page 45: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 26

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 46: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBT WBT NBT SBL SBTLane Group Flow (vph) 567 407 149 90 136v/c Ratio 0.53 0.30 0.34 0.21 0.24Control Delay 9.8 6.3 12.8 11.6 4.9Queue Delay 0.0 0.0 0.0 0.0 0.0Total Delay 9.8 6.3 12.8 11.6 4.9Queue Length 50th (m) 11.7 6.2 6.6 3.9 0.8Queue Length 95th (m) 27.7 15.5 21.3 14.0 10.1Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 25.0Base Capacity (vph) 2308 2859 1199 1196 1348Starvation Cap Reductn 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.25 0.14 0.12 0.08 0.10

Intersection Summary

Page 47: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 120 368 34 0 282 92 77 51 9 83 18 107Future Volume (vph) 120 368 34 0 282 92 77 51 9 83 18 107Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 0.95 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00Frt 0.99 0.96 0.99 1.00 0.87Flt Protected 0.99 1.00 0.97 0.95 1.00Satd. Flow (prot) 3032 2947 1652 1629 1453Flt Permitted 0.78 1.00 0.77 0.76 1.00Satd. Flow (perm) 2379 2947 1301 1298 1453Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 130 400 37 0 307 100 84 55 10 90 20 116RTOR Reduction (vph) 0 7 0 0 39 0 0 3 0 0 77 0Lane Group Flow (vph) 0 560 0 0 368 0 0 146 0 90 59 0Confl. Peds. (#/hr) 5 3 3 5 1 1Heavy Vehicles (%) 7% 7% 9% 0% 9% 5% 1% 2% 11% 2% 5% 5%Turn Type Perm NA NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 14.7 14.7 10.5 10.5 10.5Effective Green, g (s) 16.8 16.8 12.6 12.6 12.6Actuated g/C Ratio 0.45 0.45 0.34 0.34 0.34Clearance Time (s) 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1068 1323 438 437 489v/s Ratio Prot 0.12 0.04v/s Ratio Perm c0.24 c0.11 0.07v/c Ratio 0.52 0.28 0.33 0.21 0.12Uniform Delay, d1 7.4 6.5 9.3 8.8 8.6Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.5 0.1 0.4 0.2 0.1Delay (s) 7.9 6.6 9.7 9.1 8.7Level of Service A A A A AApproach Delay (s) 7.9 6.6 9.7 8.8Approach LOS A A A A

Intersection SummaryHCM 2000 Control Delay 7.9 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.44Actuated Cycle Length (s) 37.4 Sum of lost time (s) 8.0Intersection Capacity Utilization 59.0% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 48: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 29 231 3 4 309 152 1 1 2 125 3 20Future Volume (vph) 29 231 3 4 309 152 1 1 2 125 3 20Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 50.0 25.0 50.0 25.0 0.0 0.0 0.0Storage Lanes 1 1 1 1 1 0 1 0Taper Length (m) 75.0 50.0 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.850 0.850 0.900 0.868Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1511 3228 1488 1662 3137 1365 1662 1575 0 1525 1342 0Flt Permitted 0.362 0.596 0.950 0.950Satd. Flow (perm) 576 3228 1488 1043 3137 1365 1662 1575 0 1525 1342 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 80 165 2 22Link Speed (k/h) 50 50 50 50Link Distance (m) 310.8 136.7 108.4 168.0Travel Time (s) 22.4 9.8 7.8 12.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 3% 0% 0% 6% 9% 0% 0% 0% 9% 0% 15%Adj. Flow (vph) 32 251 3 4 336 165 1 1 2 136 3 22Shared Lane Traffic (%)Lane Group Flow (vph) 32 251 3 4 336 165 1 3 0 136 25 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 2Detector Template Left Thru Right Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm Perm NA Perm Split NA Split NAProtected Phases 7 4 8 2 2 6 6

Page 49: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 4 8 8Detector Phase 7 4 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 6.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 10.5 38.1 38.1 38.1 38.1 38.1 36.1 36.1 36.1 36.1Total Split (s) 15.0 53.1 53.1 38.1 38.1 38.1 36.1 36.1 36.1 36.1Total Split (%) 12.0% 42.4% 42.4% 30.4% 30.4% 30.4% 28.8% 28.8% 28.8% 28.8%Maximum Green (s) 12.0 47.0 47.0 32.0 32.0 32.0 30.0 30.0 30.0 30.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) 1.0 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.3 2.5 2.5 2.5 2.5 2.5 4.0 4.0 4.0 4.0Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 23.3 23.3 23.3 13.7 13.7 13.7 10.2 10.2 14.0 14.0Actuated g/C Ratio 0.39 0.39 0.39 0.23 0.23 0.23 0.17 0.17 0.23 0.23v/c Ratio 0.10 0.20 0.00 0.02 0.47 0.38 0.00 0.01 0.38 0.08Control Delay 12.7 12.8 0.0 19.0 22.6 6.8 24.0 19.7 23.2 10.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 12.7 12.8 0.0 19.0 22.6 6.8 24.0 19.7 23.2 10.2LOS B B A B C A C B C BApproach Delay 12.6 17.4 20.8 21.2Approach LOS B B C CQueue Length 50th (m) 2.2 9.5 0.0 0.4 17.1 0.0 0.1 0.1 12.8 0.3Queue Length 95th (m) 7.3 18.2 0.0 2.6 31.6 13.4 1.4 2.4 29.4 5.6Internal Link Dist (m) 286.8 112.7 84.4 144.0Turn Bay Length (m) 50.0 50.0 25.0 50.0 25.0Base Capacity (vph) 399 2686 1251 602 1813 858 903 858 829 740Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.08 0.09 0.00 0.01 0.19 0.19 0.00 0.00 0.16 0.03

Intersection SummaryArea Type: OtherCycle Length: 125.3Actuated Cycle Length: 59.6Natural Cycle: 125Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.47Intersection Signal Delay: 16.6 Intersection LOS: BIntersection Capacity Utilization 38.5% ICU Level of Service AAnalysis Period (min) 15

Page 50: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 31

Splits and Phases: 107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)

Page 51: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 32

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBTLane Group Flow (vph) 32 251 3 4 336 165 1 3 136 25v/c Ratio 0.10 0.20 0.00 0.02 0.47 0.38 0.00 0.01 0.38 0.08Control Delay 12.7 12.8 0.0 19.0 22.6 6.8 24.0 19.7 23.2 10.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 12.7 12.8 0.0 19.0 22.6 6.8 24.0 19.7 23.2 10.2Queue Length 50th (m) 2.2 9.5 0.0 0.4 17.1 0.0 0.1 0.1 12.8 0.3Queue Length 95th (m) 7.3 18.2 0.0 2.6 31.6 13.4 1.4 2.4 29.4 5.6Internal Link Dist (m) 286.8 112.7 84.4 144.0Turn Bay Length (m) 50.0 50.0 25.0 50.0 25.0Base Capacity (vph) 399 2686 1251 602 1813 858 903 858 829 740Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.08 0.09 0.00 0.01 0.19 0.19 0.00 0.00 0.16 0.03

Intersection Summary

Page 52: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 33

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 29 231 3 4 309 152 1 1 2 125 3 20Future Volume (vph) 29 231 3 4 309 152 1 1 2 125 3 20Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.90 1.00 0.87Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1511 3228 1488 1662 3137 1365 1662 1575 1525 1342Flt Permitted 0.36 1.00 1.00 0.60 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (perm) 575 3228 1488 1043 3137 1365 1662 1575 1525 1342Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 32 251 3 4 336 165 1 1 2 136 3 22RTOR Reduction (vph) 0 0 2 0 0 127 0 2 0 0 17 0Lane Group Flow (vph) 32 251 1 4 336 38 1 1 0 136 8 0Heavy Vehicles (%) 10% 3% 0% 0% 6% 9% 0% 0% 0% 9% 0% 15%Turn Type pm+pt NA Perm Perm NA Perm Split NA Split NAProtected Phases 7 4 8 2 2 6 6Permitted Phases 4 4 8 8Actuated Green, G (s) 21.2 21.2 21.2 11.6 11.6 11.6 8.1 8.1 11.9 11.9Effective Green, g (s) 20.2 23.3 23.3 13.7 13.7 13.7 10.2 10.2 14.0 14.0Actuated g/C Ratio 0.34 0.39 0.39 0.23 0.23 0.23 0.17 0.17 0.24 0.24Clearance Time (s) 3.0 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 2.3 2.5 2.5 2.5 2.5 2.5 4.0 4.0 4.0 4.0Lane Grp Cap (vph) 283 1264 582 240 722 314 284 270 358 315v/s Ratio Prot 0.01 c0.08 c0.11 0.00 c0.00 c0.09 0.01v/s Ratio Perm 0.03 0.00 0.00 0.03v/c Ratio 0.11 0.20 0.00 0.02 0.47 0.12 0.00 0.00 0.38 0.03Uniform Delay, d1 13.5 11.9 11.0 17.7 19.7 18.1 20.4 20.4 19.1 17.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.1 0.0 0.0 0.3 0.1 0.0 0.0 0.9 0.0Delay (s) 13.6 12.0 11.0 17.7 20.1 18.3 20.4 20.5 20.0 17.5Level of Service B B B B C B C C C BApproach Delay (s) 12.2 19.5 20.4 19.6Approach LOS B B C B

Intersection SummaryHCM 2000 Control Delay 17.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.30Actuated Cycle Length (s) 59.5 Sum of lost time (s) 16.0Intersection Capacity Utilization 38.5% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 53: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 261 146 14 336 170 25Future Volume (vph) 261 146 14 336 170 25Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 75.0 50.0 0.0 50.0Storage Lanes 1 1 2 1Taper Length (m) 50.0 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 3107 1365 1458 3107 2780 1430Flt Permitted 0.578 0.950Satd. Flow (perm) 3107 1365 887 3107 2780 1430Right Turn on Red Yes YesSatd. Flow (RTOR) 159 27Link Speed (k/h) 50 50 50Link Distance (m) 140.7 332.8 68.6Travel Time (s) 10.1 24.0 4.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 7% 9% 14% 7% 16% 4%Adj. Flow (vph) 284 159 15 365 185 27Shared Lane Traffic (%)Lane Group Flow (vph) 284 159 15 365 185 27Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 1 1 2 1 1Detector Template Thru Right Left Thru Left RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA Perm Perm NA Prot PermProtected Phases 4 8 2

Page 54: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group EBT EBR WBL WBT NBL NBRPermitted Phases 4 8 2Detector Phase 4 4 8 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 8.0 8.0Minimum Split (s) 24.5 24.5 24.5 24.5 38.1 38.1Total Split (s) 41.5 41.5 41.5 41.5 38.1 38.1Total Split (%) 52.1% 52.1% 52.1% 52.1% 47.9% 47.9%Maximum Green (s) 35.4 35.4 35.4 35.4 32.0 32.0Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.9 2.9 2.9 2.9 2.8 2.8Recall Mode Min Min Min Min Min MinWalk Time (s) 12.0 12.0Flash Dont Walk (s) 20.0 20.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 12.2 12.2 12.2 12.2 10.3 10.3Actuated g/C Ratio 0.40 0.40 0.40 0.40 0.34 0.34v/c Ratio 0.23 0.25 0.04 0.29 0.20 0.05Control Delay 6.7 2.6 6.1 7.0 7.9 3.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 6.7 2.6 6.1 7.0 7.9 3.8LOS A A A A A AApproach Delay 5.2 7.0 7.4Approach LOS A A AQueue Length 50th (m) 4.4 0.0 0.4 5.8 3.1 0.0Queue Length 95th (m) 8.8 5.3 2.1 11.2 6.9 2.4Internal Link Dist (m) 116.7 308.8 44.6Turn Bay Length (m) 75.0 50.0 50.0Base Capacity (vph) 3107 1365 887 3107 2780 1430Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.09 0.12 0.02 0.12 0.07 0.02

Intersection SummaryArea Type: OtherCycle Length: 79.6Actuated Cycle Length: 30.5Natural Cycle: 65Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.29Intersection Signal Delay: 6.3 Intersection LOS: AIntersection Capacity Utilization 26.0% ICU Level of Service AAnalysis Period (min) 15

Page 55: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 36

Splits and Phases: 108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49)

Page 56: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBT EBR WBL WBT NBL NBRLane Group Flow (vph) 284 159 15 365 185 27v/c Ratio 0.23 0.25 0.04 0.29 0.20 0.05Control Delay 6.7 2.6 6.1 7.0 7.9 3.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 6.7 2.6 6.1 7.0 7.9 3.8Queue Length 50th (m) 4.4 0.0 0.4 5.8 3.1 0.0Queue Length 95th (m) 8.8 5.3 2.1 11.2 6.9 2.4Internal Link Dist (m) 116.7 308.8 44.6Turn Bay Length (m) 75.0 50.0 50.0Base Capacity (vph) 3107 1365 887 3107 2780 1430Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.09 0.12 0.02 0.12 0.07 0.02

Intersection Summary

Page 57: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 38

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 261 146 14 336 170 25Future Volume (vph) 261 146 14 336 170 25Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00Frt 1.00 0.85 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 3107 1365 1458 3107 2780 1430Flt Permitted 1.00 1.00 0.58 1.00 0.95 1.00Satd. Flow (perm) 3107 1365 887 3107 2780 1430Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 284 159 15 365 185 27RTOR Reduction (vph) 0 95 0 0 0 18Lane Group Flow (vph) 284 64 15 365 185 9Heavy Vehicles (%) 7% 9% 14% 7% 16% 4%Turn Type NA Perm Perm NA Prot PermProtected Phases 4 8 2Permitted Phases 4 8 2Actuated Green, G (s) 10.1 10.1 10.1 10.1 8.2 8.2Effective Green, g (s) 12.2 12.2 12.2 12.2 10.3 10.3Actuated g/C Ratio 0.40 0.40 0.40 0.40 0.34 0.34Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 2.9 2.9 2.9 2.9 2.8 2.8Lane Grp Cap (vph) 1242 546 354 1242 938 482v/s Ratio Prot 0.09 c0.12 c0.07v/s Ratio Perm 0.05 0.02 0.01v/c Ratio 0.23 0.12 0.04 0.29 0.20 0.02Uniform Delay, d1 6.0 5.8 5.6 6.2 7.2 6.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.1 0.0 0.1 0.1 0.0Delay (s) 6.1 5.8 5.6 6.3 7.3 6.7Level of Service A A A A A AApproach Delay (s) 6.0 6.3 7.2Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.4 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.25Actuated Cycle Length (s) 30.5 Sum of lost time (s) 8.0Intersection Capacity Utilization 26.0% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 58: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 121 3 92 0 0 50Future Volume (vph) 121 3 92 0 0 50Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.997Flt Protected 0.953Satd. Flow (prot) 3162 0 3260 0 0 3260Flt Permitted 0.953Satd. Flow (perm) 3162 0 3260 0 0 3260Right Turn on Red Yes YesSatd. Flow (RTOR) 3Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 132 3 100 0 0 54Shared Lane Traffic (%)Lane Group Flow (vph) 135 0 100 0 0 54Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch PhaseMinimum Initial (s) 8.0 8.0 8.0

Page 59: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 40

Lane Group WBL WBR NBT NBR SBL SBTMinimum Split (s) 24.2 22.5 22.5Total Split (s) 28.2 22.5 22.5Total Split (%) 55.6% 44.4% 44.4%Maximum Green (s) 23.0 17.0 17.0Yellow Time (s) 3.2 3.5 3.5All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -1.2 -1.5 -1.5Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 9.2 9.5 9.5Actuated g/C Ratio 0.34 0.36 0.36v/c Ratio 0.12 0.09 0.05Control Delay 6.2 6.0 5.8Queue Delay 0.0 0.0 0.0Total Delay 6.2 6.0 5.8LOS A A AApproach Delay 6.2 6.0 5.8Approach LOS A A AQueue Length 50th (m) 1.8 1.3 0.7Queue Length 95th (m) 4.0 3.2 2.1Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2866 2258 2258Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.05 0.04 0.02

Intersection SummaryArea Type: OtherCycle Length: 50.7Actuated Cycle Length: 26.7Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.12Intersection Signal Delay: 6.1 Intersection LOS: AIntersection Capacity Utilization 20.0% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 60: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group WBL NBT SBTLane Group Flow (vph) 135 100 54v/c Ratio 0.12 0.09 0.05Control Delay 6.2 6.0 5.8Queue Delay 0.0 0.0 0.0Total Delay 6.2 6.0 5.8Queue Length 50th (m) 1.8 1.3 0.7Queue Length 95th (m) 4.0 3.2 2.1Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2866 2258 2258Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.05 0.04 0.02

Intersection Summary

Page 61: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 42

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 121 3 92 0 0 50Future Volume (vph) 121 3 92 0 0 50Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 1.00 1.00 1.00Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 3163 3260 3260Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 3163 3260 3260Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 132 3 100 0 0 54RTOR Reduction (vph) 2 0 0 0 0 0Lane Group Flow (vph) 133 0 100 0 0 54Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.0 8.0 8.0Effective Green, g (s) 9.2 9.5 9.5Actuated g/C Ratio 0.34 0.36 0.36Clearance Time (s) 5.2 5.5 5.5Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1089 1159 1159v/s Ratio Prot c0.04 c0.03v/s Ratio Perm 0.02v/c Ratio 0.12 0.09 0.05Uniform Delay, d1 6.0 5.7 5.6Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.0 0.0 0.0Delay (s) 6.0 5.7 5.6Level of Service A A AApproach Delay (s) 6.0 5.7 5.6Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 5.8 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.11Actuated Cycle Length (s) 26.7 Sum of lost time (s) 9.5Intersection Capacity Utilization 20.0% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 62: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 77 0 0 93 227 108Future Volume (vph) 77 0 0 93 227 108Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Ped Bike Factor 0.99Frt 0.952Flt Protected 0.950Satd. Flow (prot) 1614 0 0 2969 2992 0Flt Permitted 0.950Satd. Flow (perm) 1614 0 0 2969 2992 0Right Turn on Red Yes YesSatd. Flow (RTOR) 117Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 12% 7% 1%Adj. Flow (vph) 84 0 0 101 247 117Shared Lane Traffic (%)Lane Group Flow (vph) 84 0 0 101 364 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2

Page 63: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 44

Lane Group EBL EBR NBL NBT SBT SBRDetector Phase 4 2 2 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 31.3 42.0 42.0 42.0Total Split (%) 42.7% 57.3% 57.3% 57.3%Maximum Green (s) 25.0 35.0 35.0 35.0Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.9 2.9 2.9Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 10.3 13.0 13.0Actuated g/C Ratio 0.33 0.42 0.42v/c Ratio 0.16 0.08 0.28Control Delay 8.4 5.8 4.7Queue Delay 0.0 0.0 0.0Total Delay 8.4 5.8 4.7LOS A A AApproach Delay 8.4 5.8 4.7Approach LOS A A AQueue Length 50th (m) 3.0 1.5 3.8Queue Length 95th (m) 7.8 3.6 8.2Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1614 2969 2992Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.05 0.03 0.12

Intersection SummaryArea Type: OtherCycle Length: 73.3Actuated Cycle Length: 31.3Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.28Intersection Signal Delay: 5.4 Intersection LOS: AIntersection Capacity Utilization 24.3% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 64: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL NBT SBTLane Group Flow (vph) 84 101 364v/c Ratio 0.16 0.08 0.28Control Delay 8.4 5.8 4.7Queue Delay 0.0 0.0 0.0Total Delay 8.4 5.8 4.7Queue Length 50th (m) 3.0 1.5 3.8Queue Length 95th (m) 7.8 3.6 8.2Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1614 2969 2992Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.05 0.03 0.12

Intersection Summary

Page 65: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 46

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 77 0 0 93 227 108Future Volume (vph) 77 0 0 93 227 108Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95Frpb, ped/bikes 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 1.00 0.95Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1614 2969 2992Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 1614 2969 2992Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 84 0 0 101 247 117RTOR Reduction (vph) 0 0 0 0 68 0Lane Group Flow (vph) 84 0 0 101 296 0Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 3% 0% 0% 12% 7% 1%Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 8.0 10.0 10.0Effective Green, g (s) 10.3 13.0 13.0Actuated g/C Ratio 0.33 0.42 0.42Clearance Time (s) 6.3 7.0 7.0Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 531 1233 1242v/s Ratio Prot c0.05 0.03 c0.10v/s Ratio Permv/c Ratio 0.16 0.08 0.24Uniform Delay, d1 7.4 5.5 5.9Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.1Delay (s) 7.5 5.6 6.0Level of Service A A AApproach Delay (s) 7.5 5.6 6.0Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.1 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.20Actuated Cycle Length (s) 31.3 Sum of lost time (s) 8.0Intersection Capacity Utilization 24.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 66: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 20 83 0 0 103 1 0 0 0 12 0 2Future Volume (vph) 20 83 0 0 103 1 0 0 0 12 0 2Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1667 0 1750 1716 1488 0 1750 0 2041 1488 0Flt Permitted 0.477 0.950Satd. Flow (perm) 835 1667 0 1750 1716 1488 0 1750 0 2041 1488 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 126 907Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 5% 0% 0% 2% 0% 0% 0% 0% 58% 0% 0%Adj. Flow (vph) 22 90 0 0 112 1 0 0 0 13 0 2Shared Lane Traffic (%)Lane Group Flow (vph) 22 90 0 0 112 1 0 0 0 13 2 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 67: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 48

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 12.5 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 18.0 52.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (%) 13.9% 40.5% 26.6% 26.6% 26.6% 29.7% 29.7% 29.7% 29.7%Maximum Green (s) 15.0 45.0 27.0 27.0 27.0 31.0 31.0 31.0 31.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.7 24.7 13.7 13.7 13.5 13.5Actuated g/C Ratio 0.40 0.40 0.22 0.22 0.22 0.22v/c Ratio 0.05 0.13 0.29 0.00 0.03 0.00Control Delay 11.6 12.4 22.4 0.0 19.5 0.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 11.6 12.4 22.4 0.0 19.5 0.0LOS B B C A B AApproach Delay 12.3 22.2 16.9Approach LOS B C BQueue Length 50th (m) 1.5 6.6 11.2 0.0 0.6 0.0Queue Length 95th (m) 5.3 14.5 23.6 0.0 2.6 0.0Internal Link Dist (m) 44.3 88.7 25.3 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 521 1309 848 799 1140 1231Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.04 0.07 0.13 0.00 0.01 0.00

Intersection SummaryArea Type: OtherCycle Length: 129.5Actuated Cycle Length: 61.7Natural Cycle: 125Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.29Intersection Signal Delay: 17.2 Intersection LOS: BIntersection Capacity Utilization 23.3% ICU Level of Service AAnalysis Period (min) 15

Page 68: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 49

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 69: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 50

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 22 90 112 1 13 2v/c Ratio 0.05 0.13 0.29 0.00 0.03 0.00Control Delay 11.6 12.4 22.4 0.0 19.5 0.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 11.6 12.4 22.4 0.0 19.5 0.0Queue Length 50th (m) 1.5 6.6 11.2 0.0 0.6 0.0Queue Length 95th (m) 5.3 14.5 23.6 0.0 2.6 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 521 1309 848 799 1140 1231Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.04 0.07 0.13 0.00 0.01 0.00

Intersection Summary

Page 70: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 51

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 20 83 0 0 103 1 0 0 0 12 0 2Future Volume (vph) 20 83 0 0 103 1 0 0 0 12 0 2Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1667 1716 1488 2041 1488Flt Permitted 0.48 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 835 1667 1716 1488 2041 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 22 90 0 0 112 1 0 0 0 13 0 2RTOR Reduction (vph) 0 0 0 0 0 1 0 0 0 0 2 0Lane Group Flow (vph) 22 90 0 0 112 0 0 0 0 13 0 0Heavy Vehicles (%) 0% 5% 0% 0% 2% 0% 0% 0% 0% 58% 0% 0%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 21.2 21.2 10.2 10.2 10.0 10.0Effective Green, g (s) 20.2 24.7 13.7 13.7 13.5 13.5Actuated g/C Ratio 0.33 0.40 0.22 0.22 0.22 0.22Clearance Time (s) 3.0 7.5 7.5 7.5 7.5 7.5Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 367 667 381 330 446 325v/s Ratio Prot 0.01 c0.05 c0.07 c0.01 0.00v/s Ratio Perm 0.01 0.00v/c Ratio 0.06 0.13 0.29 0.00 0.03 0.00Uniform Delay, d1 14.3 11.7 20.0 18.7 18.9 18.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.0 0.0 0.2 0.0 0.0 0.0Delay (s) 14.3 11.8 20.2 18.7 19.0 18.8Level of Service B B C B B BApproach Delay (s) 12.3 20.2 0.0 18.9Approach LOS B C A B

Intersection SummaryHCM 2000 Control Delay 16.4 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.12Actuated Cycle Length (s) 61.7 Sum of lost time (s) 16.0Intersection Capacity Utilization 23.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 71: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 52

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 13 66 1 224 61 84 2 134 379 31 48 7Future Volume (vph) 13 66 1 224 61 84 2 134 379 31 48 7Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.998 0.969 0.901 0.989Flt Protected 0.992 0.971 0.982Satd. Flow (prot) 0 1631 0 0 1510 0 0 1516 0 0 1434 0Flt Permitted 0.928 0.764 0.999 0.779Satd. Flow (perm) 0 1525 0 0 1188 0 0 1515 0 0 1138 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 1 30 199 7Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 8% 6% 0% 9% 5% 12% 0% 4% 4% 16% 23% 0%Adj. Flow (vph) 14 72 1 243 66 91 2 146 412 34 52 8Shared Lane Traffic (%)Lane Group Flow (vph) 0 87 0 0 400 0 0 560 0 0 94 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Detector Phase 4 4 8 8 2 2 6 6Switch Phase

Page 72: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3Total Split (s) 46.3 46.3 46.3 46.3 31.3 31.3 31.3 31.3Total Split (%) 59.7% 59.7% 59.7% 59.7% 40.3% 40.3% 40.3% 40.3%Maximum Green (s) 40.0 40.0 40.0 40.0 25.0 25.0 25.0 25.0Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 29.7 29.7 24.7 24.7Actuated g/C Ratio 0.47 0.47 0.39 0.39v/c Ratio 0.12 0.69 0.78 0.21Control Delay 9.6 19.2 21.8 15.8Queue Delay 0.0 0.0 0.0 0.0Total Delay 9.6 19.2 21.8 15.8LOS A B C BApproach Delay 9.6 19.2 21.8 15.8Approach LOS A B C BQueue Length 50th (m) 5.9 35.7 37.3 6.8Queue Length 95th (m) 12.6 65.0 #113.3 20.6Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m)Base Capacity (vph) 1074 845 797 521Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.08 0.47 0.70 0.18

Intersection SummaryArea Type: OtherCycle Length: 77.6Actuated Cycle Length: 62.8Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.78Intersection Signal Delay: 19.5 Intersection LOS: BIntersection Capacity Utilization 69.0% ICU Level of Service CAnalysis Period (min) 15# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 73: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 54

Lane Group EBT WBT NBT SBTLane Group Flow (vph) 87 400 560 94v/c Ratio 0.12 0.69 0.78 0.21Control Delay 9.6 19.2 21.8 15.8Queue Delay 0.0 0.0 0.0 0.0Total Delay 9.6 19.2 21.8 15.8Queue Length 50th (m) 5.9 35.7 37.3 6.8Queue Length 95th (m) 12.6 65.0 #113.3 20.6Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m)Base Capacity (vph) 1074 845 797 521Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.08 0.47 0.70 0.18

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 74: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 55

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 13 66 1 224 61 84 2 134 379 31 48 7Future Volume (vph) 13 66 1 224 61 84 2 134 379 31 48 7Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00Frt 1.00 0.97 0.90 0.99Flt Protected 0.99 0.97 1.00 0.98Satd. Flow (prot) 1631 1510 1516 1434Flt Permitted 0.93 0.76 1.00 0.78Satd. Flow (perm) 1526 1188 1515 1138Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 14 72 1 243 66 91 2 146 412 34 52 8RTOR Reduction (vph) 0 1 0 0 16 0 0 120 0 0 4 0Lane Group Flow (vph) 0 86 0 0 384 0 0 440 0 0 90 0Heavy Vehicles (%) 8% 6% 0% 9% 5% 12% 0% 4% 4% 16% 23% 0%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 27.3 27.3 22.4 22.4Effective Green, g (s) 29.6 29.6 24.7 24.7Actuated g/C Ratio 0.48 0.48 0.40 0.40Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 725 564 600 451v/s Ratio Protv/s Ratio Perm 0.06 c0.32 c0.29 0.08v/c Ratio 0.12 0.68 0.73 0.20Uniform Delay, d1 9.1 12.7 16.0 12.3Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 5.1 6.3 0.6Delay (s) 9.3 17.8 22.3 12.9Level of Service A B C BApproach Delay (s) 9.3 17.8 22.3 12.9Approach LOS A B C B

Intersection SummaryHCM 2000 Control Delay 19.0 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.70Actuated Cycle Length (s) 62.3 Sum of lost time (s) 8.0Intersection Capacity Utilization 69.0% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 75: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 56

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 25 2 2 167 154 23Future Volume (vph) 25 2 2 167 154 23Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.991 0.982Flt Protected 0.956 0.999Satd. Flow (prot) 1443 0 0 1591 1599 0Flt Permitted 0.956 0.999Satd. Flow (perm) 1443 0 0 1591 1599 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 16% 0% 0% 10% 8% 4%Adj. Flow (vph) 27 2 2 182 167 25Shared Lane Traffic (%)Lane Group Flow (vph) 29 0 0 184 192 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 21.3% ICU Level of Service AAnalysis Period (min) 15

Page 76: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 57

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 25 2 2 167 154 23Future Volume (Veh/h) 25 2 2 167 154 23Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 27 2 2 182 167 25PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 366 180 192vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 366 180 192tC, single (s) 6.6 6.2 4.1tC, 2 stage (s)tF (s) 3.6 3.3 2.2p0 queue free % 96 100 100cM capacity (veh/h) 606 869 1394

Direction, Lane # EB 1 NB 1 SB 1Volume Total 29 184 192Volume Left 27 2 0Volume Right 2 0 25cSH 619 1394 1700Volume to Capacity 0.05 0.00 0.11Queue Length 95th (m) 1.2 0.0 0.0Control Delay (s) 11.1 0.1 0.0Lane LOS B AApproach Delay (s) 11.1 0.1 0.0Approach LOS B

Intersection SummaryAverage Delay 0.8Intersection Capacity Utilization 21.3% ICU Level of Service AAnalysis Period (min) 15

Page 77: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 58

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 24 10 35 155 90 63Future Volume (vph) 24 10 35 155 90 63Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.960 0.945Flt Protected 0.966 0.991Satd. Flow (prot) 1281 0 0 1589 1557 0Flt Permitted 0.966 0.991Satd. Flow (perm) 1281 0 0 1589 1557 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 21% 40% 14% 8% 7% 5%Adj. Flow (vph) 26 11 38 168 98 68Shared Lane Traffic (%)Lane Group Flow (vph) 37 0 0 206 166 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 33.6% ICU Level of Service AAnalysis Period (min) 15

Page 78: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 59

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 24 10 35 155 90 63Future Volume (Veh/h) 24 10 35 155 90 63Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 26 11 38 168 98 68PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 376 132 166vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 376 132 166tC, single (s) 6.6 6.6 4.2tC, 2 stage (s)tF (s) 3.7 3.7 2.3p0 queue free % 95 99 97cM capacity (veh/h) 573 825 1342

Direction, Lane # EB 1 NB 1 SB 1Volume Total 37 206 166Volume Left 26 38 0Volume Right 11 0 68cSH 630 1342 1700Volume to Capacity 0.06 0.03 0.10Queue Length 95th (m) 1.5 0.7 0.0Control Delay (s) 11.1 1.6 0.0Lane LOS B AApproach Delay (s) 11.1 1.6 0.0Approach LOS B

Intersection SummaryAverage Delay 1.8Intersection Capacity Utilization 33.6% ICU Level of Service AAnalysis Period (min) 15

Page 79: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 60

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 18 23 78 173 62 39Future Volume (vph) 18 23 78 173 62 39Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.925 0.948Flt Protected 0.978 0.985Satd. Flow (prot) 1120 0 0 1636 1519 0Flt Permitted 0.978 0.985Satd. Flow (perm) 1120 0 0 1636 1519 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 298.3 331.4Travel Time (s) 14.9 21.5 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 28% 52% 4% 6% 15% 0%Adj. Flow (vph) 20 25 85 188 67 42Shared Lane Traffic (%)Lane Group Flow (vph) 45 0 0 273 109 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 31.2% ICU Level of Service AAnalysis Period (min) 15

Page 80: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 61

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 18 23 78 173 62 39Future Volume (Veh/h) 18 23 78 173 62 39Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 20 25 85 188 67 42PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 446 88 109vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 446 88 109tC, single (s) 6.7 6.7 4.1tC, 2 stage (s)tF (s) 3.8 3.8 2.2p0 queue free % 96 97 94cM capacity (veh/h) 494 849 1469

Direction, Lane # EB 1 NB 1 SB 1Volume Total 45 273 109Volume Left 20 85 0Volume Right 25 0 42cSH 643 1469 1700Volume to Capacity 0.07 0.06 0.06Queue Length 95th (m) 1.8 1.5 0.0Control Delay (s) 11.0 2.7 0.0Lane LOS B AApproach Delay (s) 11.0 2.7 0.0Approach LOS B

Intersection SummaryAverage Delay 2.9Intersection Capacity Utilization 31.2% ICU Level of Service AAnalysis Period (min) 15

Page 81: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 62

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 5 1 6 7 7 23 17 222 3 8 84 5Future Volume (vph) 5 1 6 7 7 23 17 222 3 8 84 5Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.927 0.918 0.998 0.994Flt Protected 0.981 0.990 0.997 0.996Satd. Flow (prot) 0 1182 0 0 1590 0 0 1633 0 0 1411 0Flt Permitted 0.981 0.990 0.997 0.996Satd. Flow (perm) 0 1182 0 0 1590 0 0 1633 0 0 1411 0Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 29.6Travel Time (s) 8.5 7.8 70.5 2.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 20% 0% 50% 0% 0% 0% 0% 7% 18% 13% 25% 0%Adj. Flow (vph) 5 1 7 8 8 25 18 241 3 9 91 5Shared Lane Traffic (%)Lane Group Flow (vph) 0 13 0 0 41 0 0 262 0 0 105 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 27.5% ICU Level of Service AAnalysis Period (min) 15

Page 82: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 63

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 5 1 6 7 7 23 17 222 3 8 84 5Future Volume (Veh/h) 5 1 6 7 7 23 17 222 3 8 84 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 1 7 8 8 25 18 241 3 9 91 5PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 419 392 94 398 392 242 96 244vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 419 392 94 398 392 242 96 244tC, single (s) 7.3 6.5 6.7 7.1 6.5 6.2 4.1 4.2tC, 2 stage (s)tF (s) 3.7 4.0 3.8 3.5 4.0 3.3 2.2 2.3p0 queue free % 99 100 99 99 99 97 99 99cM capacity (veh/h) 485 537 847 553 536 801 1510 1260

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 13 41 262 105Volume Left 5 8 18 9Volume Right 7 25 3 5cSH 636 677 1510 1260Volume to Capacity 0.02 0.06 0.01 0.01Queue Length 95th (m) 0.5 1.5 0.3 0.2Control Delay (s) 10.8 10.7 0.6 0.7Lane LOS B B A AApproach Delay (s) 10.8 10.7 0.6 0.7Approach LOS B B

Intersection SummaryAverage Delay 1.9Intersection Capacity Utilization 27.5% ICU Level of Service AAnalysis Period (min) 15

Page 83: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 64

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 53 27 25 102 137 57Future Volume (vph) 53 27 25 102 137 57Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.955 0.850Flt Protected 0.968 0.950Satd. Flow (prot) 1387 0 1299 1683 1683 1162Flt Permitted 0.968 0.950Satd. Flow (perm) 1387 0 1299 1683 1683 1162Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 25% 0% 28% 4% 4% 28%Adj. Flow (vph) 58 29 27 111 149 62Shared Lane Traffic (%)Lane Group Flow (vph) 87 0 27 111 149 62Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15

Page 84: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 65

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 53 27 25 102 137 57Future Volume (Veh/h) 53 27 25 102 137 57Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 58 29 27 111 149 62PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 314 149 211vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 314 149 211tC, single (s) 6.6 6.2 4.4tC, 2 stage (s)tF (s) 3.7 3.3 2.5p0 queue free % 91 97 98cM capacity (veh/h) 620 903 1219

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 87 27 111 149 62Volume Left 58 27 0 0 0Volume Right 29 0 0 0 62cSH 692 1219 1700 1700 1700Volume to Capacity 0.13 0.02 0.07 0.09 0.04Queue Length 95th (m) 3.4 0.5 0.0 0.0 0.0Control Delay (s) 10.9 8.0 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 10.9 1.6 0.0Approach LOS B

Intersection SummaryAverage Delay 2.7Intersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15

Page 85: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 66

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 48 5 122 60 10 144Future Volume (vph) 48 5 122 60 10 144Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.988 0.956Flt Protected 0.956 0.997Satd. Flow (prot) 1653 0 1598 0 0 1686Flt Permitted 0.956 0.997Satd. Flow (perm) 1653 0 1598 0 0 1686Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 7% 0% 10% 3%Adj. Flow (vph) 52 5 133 65 11 157Shared Lane Traffic (%)Lane Group Flow (vph) 57 0 198 0 0 168Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 27.1% ICU Level of Service AAnalysis Period (min) 15

Page 86: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 67

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 48 5 122 60 10 144Future Volume (Veh/h) 48 5 122 60 10 144Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 52 5 133 65 11 157PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 344 166 198vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 344 166 198tC, single (s) 6.4 6.2 4.2tC, 2 stage (s)tF (s) 3.5 3.3 2.3p0 queue free % 92 99 99cM capacity (veh/h) 651 884 1328

Direction, Lane # WB 1 NB 1 SB 1Volume Total 57 198 168Volume Left 52 0 11Volume Right 5 65 0cSH 666 1700 1328Volume to Capacity 0.09 0.12 0.01Queue Length 95th (m) 2.2 0.0 0.2Control Delay (s) 10.9 0.0 0.6Lane LOS B AApproach Delay (s) 10.9 0.0 0.6Approach LOS B

Intersection SummaryAverage Delay 1.7Intersection Capacity Utilization 27.1% ICU Level of Service AAnalysis Period (min) 15

Page 87: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 68

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 165 270 0 86 32Future Volume (vph) 0 165 270 0 86 32Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3079 3079 0 1646 1488Flt Permitted 0.950Satd. Flow (perm) 0 3079 3079 0 1646 1488Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 8% 8% 0% 1% 0%Adj. Flow (vph) 0 179 293 0 93 35Shared Lane Traffic (%)Lane Group Flow (vph) 0 179 293 0 93 35Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 19.9% ICU Level of Service AAnalysis Period (min) 15

Page 88: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 69

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 0 165 270 0 86 32Future Volume (Veh/h) 0 165 270 0 86 32Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 179 293 0 93 35PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 5Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 293 382 146vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 293 382 146tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 84 96cM capacity (veh/h) 1280 595 880

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1Volume Total 90 90 146 146 128Volume Left 0 0 0 0 93Volume Right 0 0 0 0 35cSH 1700 1700 1700 1700 819Volume to Capacity 0.05 0.05 0.09 0.09 0.16Queue Length 95th (m) 0.0 0.0 0.0 0.0 4.4Control Delay (s) 0.0 0.0 0.0 0.0 11.4Lane LOS BApproach Delay (s) 0.0 0.0 11.4Approach LOS B

Intersection SummaryAverage Delay 2.4Intersection Capacity Utilization 19.9% ICU Level of Service AAnalysis Period (min) 15

Page 89: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 70

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 260 0 0 399 121 223Future Volume (vph) 260 0 0 399 121 223Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3023 0 0 3228 1471 1352Flt Permitted 0.950Satd. Flow (perm) 3023 0 0 3228 1471 1352Link Speed (k/h) 50 50 50Link Distance (m) 104.2 91.9 169.0Travel Time (s) 7.5 6.6 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 0% 0% 3% 13% 10%Adj. Flow (vph) 283 0 0 434 132 242Shared Lane Traffic (%)Lane Group Flow (vph) 283 0 0 434 132 242Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 29.5% ICU Level of Service AAnalysis Period (min) 15

Page 90: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 71

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (veh/h) 260 0 0 399 121 223Future Volume (Veh/h) 260 0 0 399 121 223Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 283 0 0 434 132 242PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 6Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 283 500 142vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 283 500 142tC, single (s) 4.1 7.1 7.1tC, 2 stage (s)tF (s) 2.2 3.6 3.4p0 queue free % 100 72 72cM capacity (veh/h) 1291 474 856

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1Volume Total 142 142 217 217 374Volume Left 0 0 0 0 132Volume Right 0 0 0 0 242cSH 1700 1700 1700 1700 1322Volume to Capacity 0.08 0.08 0.13 0.13 0.28Queue Length 95th (m) 0.0 0.0 0.0 0.0 9.4Control Delay (s) 0.0 0.0 0.0 0.0 12.5Lane LOS BApproach Delay (s) 0.0 0.0 12.5Approach LOS B

Intersection SummaryAverage Delay 4.3Intersection Capacity Utilization 29.5% ICU Level of Service AAnalysis Period (min) 15

Page 91: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 72

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 208 93 162 45 76 18Future Volume (vph) 208 93 162 45 76 18Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.971 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1525 1667 1648 0 1498 1162Flt Permitted 0.950 0.950Satd. Flow (perm) 1525 1667 1648 0 1498 1162Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 5% 2% 7% 11% 28%Adj. Flow (vph) 226 101 176 49 83 20Shared Lane Traffic (%)Lane Group Flow (vph) 226 101 225 0 83 20Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 39.3% ICU Level of Service AAnalysis Period (min) 15

Page 92: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 73

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 208 93 162 45 76 18Future Volume (vph) 208 93 162 45 76 18Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 226 101 176 49 83 20

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total (vph) 226 101 225 83 20Volume Left (vph) 226 0 0 83 0Volume Right (vph) 0 0 49 0 20Hadj (s) 0.65 0.08 -0.08 0.69 -0.22Departure Headway (s) 5.7 5.1 5.0 6.6 5.6Degree Utilization, x 0.36 0.14 0.31 0.15 0.03Capacity (veh/h) 610 681 703 512 587Control Delay (s) 10.6 7.8 10.2 9.5 7.6Approach Delay (s) 9.8 10.2 9.2Approach LOS A B A

Intersection SummaryDelay 9.8Level of Service AIntersection Capacity Utilization 39.3% ICU Level of Service AAnalysis Period (min) 15

Page 93: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 74

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 22 216 314 53 14 37Future Volume (vph) 22 216 314 53 14 37Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 50.0 50.0 0.0Storage Lanes 0 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.995 0.950Satd. Flow (prot) 0 3181 3228 1488 1583 1305Flt Permitted 0.995 0.950Satd. Flow (perm) 0 3181 3228 1488 1583 1305Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 14% 3% 3% 0% 5% 14%Adj. Flow (vph) 24 235 341 58 15 40Shared Lane Traffic (%)Lane Group Flow (vph) 0 259 341 58 15 40Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 29.9% ICU Level of Service AAnalysis Period (min) 15

Page 94: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road Existing Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 75

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 22 216 314 53 14 37Future Volume (Veh/h) 22 216 314 53 14 37Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 24 235 341 58 15 40PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 383pX, platoon unblockedvC, conflicting volume 341 506 170vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 341 506 170tC, single (s) 4.4 6.9 7.2tC, 2 stage (s)tF (s) 2.3 3.5 3.4p0 queue free % 98 97 95cM capacity (veh/h) 1133 478 807

Direction, Lane # EB 1 EB 2 WB 1 WB 2 WB 3 SB 1 SB 2Volume Total 102 157 170 170 58 15 40Volume Left 24 0 0 0 0 15 0Volume Right 0 0 0 0 58 0 40cSH 1133 1700 1700 1700 1700 478 807Volume to Capacity 0.02 0.09 0.10 0.10 0.03 0.03 0.05Queue Length 95th (m) 0.5 0.0 0.0 0.0 0.0 0.8 1.2Control Delay (s) 2.1 0.0 0.0 0.0 0.0 12.8 9.7Lane LOS A B AApproach Delay (s) 0.8 0.0 10.5Approach LOS B

Intersection SummaryAverage Delay 1.1Intersection Capacity Utilization 29.9% ICU Level of Service AAnalysis Period (min) 15

Page 95: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 77 669 24 89 706 273 27 87 210 305 98 77Future Volume (vph) 77 669 24 89 706 273 27 87 210 305 98 77Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 0 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 0.98 1.00 0.99 0.99 1.00Frt 0.850 0.958 0.850 0.934Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1539 3228 1488 1568 3084 0 1662 1651 1430 1646 1579 0Flt Permitted 0.264 0.198 0.609 0.695Satd. Flow (perm) 427 3228 1463 326 3084 0 1066 1651 1411 1202 1579 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 77 98 228 51Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 7 6 6 7 2 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 8% 3% 0% 6% 3% 1% 0% 6% 4% 1% 0% 8%Adj. Flow (vph) 84 727 26 97 767 297 29 95 228 332 107 84Shared Lane Traffic (%)Lane Group Flow (vph) 84 727 26 97 1064 0 29 95 228 332 191 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 96: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 2 2 6Detector Phase 4 4 4 3 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.3 39.3 39.3 12.5 51.8 37.3 37.3 37.3 37.3 37.3Total Split (%) 44.1% 44.1% 44.1% 14.0% 58.1% 41.9% 41.9% 41.9% 41.9% 41.9%Maximum Green (s) 33.0 33.0 33.0 9.5 45.5 31.0 31.0 31.0 31.0 31.0Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 24.4 24.4 24.4 35.2 35.2 25.5 25.5 25.5 25.5 25.5Actuated g/C Ratio 0.35 0.35 0.35 0.51 0.51 0.37 0.37 0.37 0.37 0.37v/c Ratio 0.56 0.64 0.05 0.34 0.66 0.07 0.16 0.34 0.75 0.31Control Delay 36.3 22.2 0.2 13.4 14.1 16.9 17.1 4.4 32.8 14.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 36.3 22.2 0.2 13.4 14.1 16.9 17.1 4.4 32.8 14.1LOS D C A B B B B A C BApproach Delay 23.0 14.0 8.8 26.0Approach LOS C B A C

Intersection SummaryArea Type: OtherCycle Length: 89.1Actuated Cycle Length: 69.2Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.75Intersection Signal Delay: 18.2 Intersection LOS: BIntersection Capacity Utilization 74.2% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 97: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 84 727 26 97 1064 29 95 228 332 191v/c Ratio 0.56 0.64 0.05 0.34 0.66 0.07 0.16 0.34 0.75 0.31Control Delay 36.3 22.2 0.2 13.4 14.1 16.9 17.1 4.4 32.8 14.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 36.3 22.2 0.2 13.4 14.1 16.9 17.1 4.4 32.8 14.1Queue Length 50th (m) 9.0 42.6 0.0 6.6 48.3 2.4 8.1 0.0 37.0 12.4Queue Length 95th (m) 27.8 70.6 0.0 16.0 80.5 9.2 22.0 14.4 #93.3 33.5Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 230 1742 825 327 2271 543 840 830 612 829Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.37 0.42 0.03 0.30 0.47 0.05 0.11 0.27 0.54 0.23

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 98: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 77 669 24 89 706 273 27 87 210 305 98 77Future Volume (vph) 77 669 24 89 706 273 27 87 210 305 98 77Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.98 1.00 0.99 1.00 1.00 0.99 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 0.96 1.00 1.00 0.85 1.00 0.93Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1537 3228 1464 1568 3086 1662 1651 1411 1644 1579Flt Permitted 0.26 1.00 1.00 0.20 1.00 0.61 1.00 1.00 0.70 1.00Satd. Flow (perm) 426 3228 1464 328 3086 1066 1651 1411 1204 1579Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 84 727 26 97 767 297 29 95 228 332 107 84RTOR Reduction (vph) 0 0 17 0 48 0 0 0 143 0 32 0Lane Group Flow (vph) 84 727 9 97 1016 0 29 95 85 332 159 0Confl. Peds. (#/hr) 7 6 6 7 2 2Heavy Vehicles (%) 8% 3% 0% 6% 3% 1% 0% 6% 4% 1% 0% 8%Turn Type Perm NA Perm pm+pt NA Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 2 2 6Actuated Green, G (s) 22.2 22.2 22.2 32.8 32.8 23.1 23.1 23.1 23.1 23.1Effective Green, g (s) 24.5 24.5 24.5 31.8 35.1 25.4 25.4 25.4 25.4 25.4Actuated g/C Ratio 0.36 0.36 0.36 0.46 0.51 0.37 0.37 0.37 0.37 0.37Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 152 1154 523 271 1581 395 612 523 446 585v/s Ratio Prot 0.23 0.03 c0.33 0.06 0.10v/s Ratio Perm 0.20 0.01 0.13 0.03 0.06 c0.28v/c Ratio 0.55 0.63 0.02 0.36 0.64 0.07 0.16 0.16 0.74 0.27Uniform Delay, d1 17.6 18.2 14.2 11.7 12.1 13.9 14.4 14.4 18.7 15.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 3.5 0.9 0.0 0.6 0.8 0.1 0.1 0.1 6.3 0.2Delay (s) 21.1 19.2 14.2 12.3 12.9 14.0 14.5 14.5 25.0 15.3Level of Service C B B B B B B B C BApproach Delay (s) 19.2 12.9 14.5 21.5Approach LOS B B B C

Intersection SummaryHCM 2000 Control Delay 16.5 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.73Actuated Cycle Length (s) 68.5 Sum of lost time (s) 12.0Intersection Capacity Utilization 74.2% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 99: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1249 50 94 790 0 0 0 0 389 83 197Future Volume (vph) 0 1249 50 94 790 0 0 0 0 389 83 197Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 0.91 0.91 1.00 0.95 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 1.00 1.00 1.00 1.00Frt 0.994 0.850Flt Protected 0.950 0.950 0.968Satd. Flow (prot) 0 4656 0 1630 3260 0 0 0 0 1504 1493 1444Flt Permitted 0.137 0.950 0.968Satd. Flow (perm) 0 4656 0 235 3260 0 0 0 0 1502 1491 1444Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 8 126Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 17.0 64.2 88.8Travel Time (s) 9.7 1.2 4.6 6.4Confl. Peds. (#/hr) 6 6 2 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 2% 2% 0% 0% 0% 0% 5% 13% 3%Adj. Flow (vph) 0 1358 54 102 859 0 0 0 0 423 90 214Shared Lane Traffic (%) 40%Lane Group Flow (vph) 0 1412 0 102 859 0 0 0 0 254 259 214Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 2 1 2 1Detector Template Thru Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0Turn Type NA pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 8 6 6

Page 100: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 12.5 36.3 36.3 36.3 36.3Total Split (s) 36.3 12.5 48.5 36.5 36.5 36.5Total Split (%) 42.6% 14.7% 56.9% 42.8% 42.8% 42.8%Maximum Green (s) 30.0 9.5 42.2 30.2 30.2 30.2Yellow Time (s) 4.1 3.0 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 0.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag LeadLead-Lag Optimize? Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 28.6 40.2 40.2 20.3 20.3 20.3Actuated g/C Ratio 0.42 0.59 0.59 0.30 0.30 0.30v/c Ratio 0.73 0.35 0.45 0.57 0.59 0.42Control Delay 20.0 11.2 9.8 26.5 27.1 11.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 20.0 11.2 9.8 26.5 27.1 11.3LOS C B A C C BApproach Delay 20.0 9.9 22.3Approach LOS C A C

Intersection SummaryArea Type: OtherCycle Length: 85.3Actuated Cycle Length: 68.7Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.73Intersection Signal Delay: 17.4 Intersection LOS: BIntersection Capacity Utilization 64.8% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 101: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT WBL WBT SBL SBT SBRLane Group Flow (vph) 1412 102 859 254 259 214v/c Ratio 0.73 0.35 0.45 0.57 0.59 0.42Control Delay 20.0 11.2 9.8 26.5 27.1 11.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 20.0 11.2 9.8 26.5 27.1 11.3Queue Length 50th (m) 54.8 5.5 30.6 31.5 32.4 9.2Queue Length 95th (m) 91.8 15.5 59.4 56.3 57.8 26.1Internal Link Dist (m) 110.1 0.1 64.8Turn Bay Length (m)Base Capacity (vph) 2251 314 2182 729 724 766Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.63 0.32 0.39 0.35 0.36 0.28

Intersection Summary

Page 102: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1249 50 94 790 0 0 0 0 389 83 197Future Volume (vph) 0 1249 50 94 790 0 0 0 0 389 83 197Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 1.00 0.95 0.95 0.95 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.99 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 0.95 1.00 0.95 0.97 1.00Satd. Flow (prot) 4658 1630 3260 1502 1492 1444Flt Permitted 1.00 0.14 1.00 0.95 0.97 1.00Satd. Flow (perm) 4658 234 3260 1502 1492 1444Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 1358 54 102 859 0 0 0 0 423 90 214RTOR Reduction (vph) 0 5 0 0 0 0 0 0 0 0 0 89Lane Group Flow (vph) 0 1407 0 102 859 0 0 0 0 254 259 125Confl. Peds. (#/hr) 6 6 2 2Heavy Vehicles (%) 0% 2% 0% 2% 2% 0% 0% 0% 0% 5% 13% 3%Turn Type NA pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 8 6 6Actuated Green, G (s) 26.3 37.8 37.8 17.9 17.9 17.9Effective Green, g (s) 28.6 36.8 40.1 20.2 20.2 20.2Actuated g/C Ratio 0.42 0.54 0.59 0.30 0.30 0.30Clearance Time (s) 6.3 3.0 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1950 279 1913 444 441 427v/s Ratio Prot c0.30 0.04 c0.26v/s Ratio Perm 0.16 0.17 0.17 0.09v/c Ratio 0.72 0.37 0.45 0.57 0.59 0.29Uniform Delay, d1 16.5 10.1 7.9 20.4 20.5 18.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.3 0.8 0.2 1.8 2.0 0.4Delay (s) 17.9 10.9 8.1 22.2 22.5 18.9Level of Service B B A C C BApproach Delay (s) 17.9 8.4 0.0 21.3Approach LOS B A A C

Intersection SummaryHCM 2000 Control Delay 15.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.65Actuated Cycle Length (s) 68.3 Sum of lost time (s) 12.0Intersection Capacity Utilization 64.8% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 103: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1459 0 0 819 76 126Future Volume (vph) 1459 0 0 819 76 126Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00Ped Bike Factor 0.99Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3228 0 0 3260 3101 1430Flt Permitted 0.950Satd. Flow (perm) 3228 0 0 3260 3101 1410Right Turn on Red Yes YesSatd. Flow (RTOR) 16Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Confl. Peds. (#/hr) 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 2% 4% 4%Adj. Flow (vph) 1586 0 0 890 83 137Shared Lane Traffic (%)Lane Group Flow (vph) 1586 0 0 890 83 137Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2

Page 104: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRDetector Phase 4 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.0 35.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7%Maximum Green (s) 28.7 28.7 18.7 18.7Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 30.9 30.9 13.4 13.4Actuated g/C Ratio 0.59 0.59 0.26 0.26v/c Ratio 0.83 0.46 0.10 0.37Control Delay 14.8 7.3 15.1 17.3Queue Delay 0.0 0.0 0.0 0.0Total Delay 14.8 7.3 15.1 17.3LOS B A B BApproach Delay 14.8 7.3 16.4Approach LOS B A B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 52.3Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.83Intersection Signal Delay: 12.4 Intersection LOS: BIntersection Capacity Utilization 46.7% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 105: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 1586 890 83 137v/c Ratio 0.83 0.46 0.10 0.37Control Delay 14.8 7.3 15.1 17.3Queue Delay 0.0 0.0 0.0 0.0Total Delay 14.8 7.3 15.1 17.3Queue Length 50th (m) 52.2 20.5 3.1 9.7Queue Length 95th (m) #121.5 39.3 7.3 22.0Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 1915 1934 1246 576Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.83 0.46 0.07 0.24

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 106: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1459 0 0 819 76 126Future Volume (vph) 1459 0 0 819 76 126Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 0.95 0.97 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3228 3260 3101 1408Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 3228 3260 3101 1408Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1586 0 0 890 83 137RTOR Reduction (vph) 0 0 0 0 0 12Lane Group Flow (vph) 1586 0 0 890 83 125Confl. Peds. (#/hr) 3Heavy Vehicles (%) 3% 0% 0% 2% 4% 4%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 28.5 28.5 11.1 11.1Effective Green, g (s) 30.8 30.8 13.4 13.4Actuated g/C Ratio 0.59 0.59 0.26 0.26Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1904 1923 796 361v/s Ratio Prot c0.49 0.27 0.03v/s Ratio Perm c0.09v/c Ratio 0.83 0.46 0.10 0.35Uniform Delay, d1 8.6 6.0 14.8 15.8Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 3.3 0.2 0.1 0.6Delay (s) 11.9 6.2 14.9 16.4Level of Service B A B BApproach Delay (s) 11.9 6.2 15.8Approach LOS B A B

Intersection SummaryHCM 2000 Control Delay 10.4 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.69Actuated Cycle Length (s) 52.2 Sum of lost time (s) 8.0Intersection Capacity Utilization 46.7% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 107: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 31 833 373 249 956 13 359 22 271 18 12 82Future Volume (vph) 31 833 373 249 956 13 359 22 271 18 12 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 15.0 0.0Storage Lanes 1 1 1 0 1 1 1 0Taper Length (m) 40.0 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 0.98 1.00 1.00 0.99 0.99 1.00 0.98Frt 0.850 0.998 0.850 0.869Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1568 3197 1444 1630 3216 0 1630 1606 1458 1662 1419 0Flt Permitted 0.272 0.139 0.691 0.742Satd. Flow (perm) 448 3197 1410 238 3216 0 1178 1606 1439 1297 1419 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 261 3 295 87Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 5 14 14 5 7 1 1 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 4% 3% 2% 3% 15% 2% 9% 2% 0% 8% 5%Adj. Flow (vph) 34 905 405 271 1039 14 390 24 295 20 13 89Shared Lane Traffic (%)Lane Group Flow (vph) 34 905 405 271 1053 0 390 24 295 20 102 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 108: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 2 2 6Detector Phase 4 4 4 3 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 32.0 32.0 32.0 32.0 32.0Total Split (s) 36.0 36.0 36.0 12.5 48.5 32.0 32.0 32.0 32.0 32.0Total Split (%) 44.7% 44.7% 44.7% 15.5% 60.2% 39.8% 39.8% 39.8% 39.8% 39.8%Maximum Green (s) 28.0 28.0 28.0 9.5 40.5 24.0 24.0 24.0 24.0 24.0Yellow Time (s) 4.5 4.5 4.5 3.0 4.5 4.5 4.5 4.5 4.5 4.5All-Red Time (s) 3.5 3.5 3.5 0.0 3.5 3.5 3.5 3.5 3.5 3.5Lost Time Adjust (s) -4.0 -4.0 -4.0 1.0 -4.0 -4.0 -4.0 -4.0 -4.0 -4.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 29.7 29.7 29.7 42.3 42.3 28.0 28.0 28.0 28.0 28.0Actuated g/C Ratio 0.38 0.38 0.38 0.54 0.54 0.36 0.36 0.36 0.36 0.36v/c Ratio 0.20 0.75 0.58 0.97 0.61 0.93 0.04 0.42 0.04 0.18Control Delay 19.6 25.4 10.4 65.8 14.0 56.6 17.7 4.5 17.8 6.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.6 25.4 10.4 65.8 14.0 56.6 17.7 4.5 17.8 6.7LOS B C B E B E B A B AApproach Delay 20.7 24.6 33.6 8.5Approach LOS C C C A

Intersection SummaryArea Type: OtherCycle Length: 80.5Actuated Cycle Length: 78.3Natural Cycle: 80Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.97Intersection Signal Delay: 24.4 Intersection LOS: CIntersection Capacity Utilization 78.2% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 109: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 34 905 405 271 1053 390 24 295 20 102v/c Ratio 0.20 0.75 0.58 0.97 0.61 0.93 0.04 0.42 0.04 0.18Control Delay 19.6 25.4 10.4 65.8 14.0 56.6 17.7 4.5 17.8 6.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.6 25.4 10.4 65.8 14.0 56.6 17.7 4.5 17.8 6.7Queue Length 50th (m) 3.5 62.8 15.2 24.8 54.7 60.3 2.5 0.0 2.1 1.6Queue Length 95th (m) 10.4 84.7 41.6 #73.2 73.4 #116.1 7.6 16.2 6.7 11.7Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 15.0Base Capacity (vph) 183 1307 730 279 1831 421 574 704 464 564Starvation Cap Reductn 0 13 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.19 0.70 0.55 0.97 0.58 0.93 0.04 0.42 0.04 0.18

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 110: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 31 833 373 249 956 13 359 22 271 18 12 82Future Volume (vph) 31 833 373 249 956 13 359 22 271 18 12 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 1.00 1.00 0.99 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 1.00 1.00 0.85 1.00 0.87Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1566 3197 1410 1630 3216 1620 1606 1439 1661 1420Flt Permitted 0.27 1.00 1.00 0.14 1.00 0.69 1.00 1.00 0.74 1.00Satd. Flow (perm) 448 3197 1410 238 3216 1179 1606 1439 1297 1420Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 34 905 405 271 1039 14 390 24 295 20 13 89RTOR Reduction (vph) 0 0 162 0 1 0 0 0 190 0 56 0Lane Group Flow (vph) 34 905 243 271 1052 0 390 24 105 20 46 0Confl. Peds. (#/hr) 5 14 14 5 7 1 1 7Heavy Vehicles (%) 6% 4% 3% 2% 3% 15% 2% 9% 2% 0% 8% 5%Turn Type Perm NA Perm pm+pt NA Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 2 2 6Actuated Green, G (s) 25.8 25.8 25.8 38.3 38.3 24.0 24.0 24.0 24.0 24.0Effective Green, g (s) 29.8 29.8 29.8 37.3 42.3 28.0 28.0 28.0 28.0 28.0Actuated g/C Ratio 0.38 0.38 0.38 0.48 0.54 0.36 0.36 0.36 0.36 0.36Clearance Time (s) 8.0 8.0 8.0 3.0 8.0 8.0 8.0 8.0 8.0 8.0Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 170 1216 536 264 1737 421 574 514 463 507v/s Ratio Prot 0.28 c0.11 0.33 0.01 0.03v/s Ratio Perm 0.08 0.17 c0.38 c0.33 0.07 0.02v/c Ratio 0.20 0.74 0.45 1.03 0.61 0.93 0.04 0.21 0.04 0.09Uniform Delay, d1 16.3 21.0 18.2 18.0 12.3 24.2 16.4 17.4 16.4 16.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 2.4 0.4 62.4 0.5 26.2 0.0 0.1 0.0 0.1Delay (s) 16.7 23.3 18.6 80.4 12.8 50.4 16.4 17.6 16.4 16.8Level of Service B C B F B D B B B BApproach Delay (s) 21.7 26.6 35.6 16.7Approach LOS C C D B

Intersection SummaryHCM 2000 Control Delay 26.2 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.95Actuated Cycle Length (s) 78.3 Sum of lost time (s) 12.0Intersection Capacity Utilization 78.2% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 111: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 278 659 100 42 700 69 230 113 58 100 118 289Future Volume (vph) 278 659 100 42 700 69 230 113 58 100 118 289Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 0.99 1.00 0.99 0.99 1.00Frt 0.980 0.987 0.949 0.893Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1646 3164 0 1630 3174 0 1568 1636 0 1646 1547 0Flt Permitted 0.146 0.299 0.167 0.569Satd. Flow (perm) 251 3164 0 511 3174 0 276 1636 0 984 1547 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 15 9 26 124Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 24 11 11 24 3 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 2% 5% 2% 3% 0% 6% 0% 3% 1% 1% 1%Adj. Flow (vph) 302 716 109 46 761 75 250 123 63 109 128 314Shared Lane Traffic (%)Lane Group Flow (vph) 302 825 0 46 836 0 250 186 0 109 442 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 112: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Detector Phase 7 4 3 8 5 2 1 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0Minimum Split (s) 9.5 30.4 9.5 30.4 9.5 37.7 9.5 37.7Total Split (s) 25.0 30.4 25.0 30.4 12.0 37.7 12.0 37.7Total Split (%) 23.8% 28.9% 23.8% 28.9% 11.4% 35.9% 11.4% 35.9%Maximum Green (s) 22.0 24.0 22.0 24.0 9.0 31.0 9.0 31.0Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1All-Red Time (s) 0.0 2.3 0.0 2.3 0.0 2.6 0.0 2.6Lost Time Adjust (s) 1.0 -2.4 1.0 -2.4 1.0 -2.7 1.0 -2.7Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 47.4 37.9 32.3 26.8 35.8 27.7 33.6 26.6Actuated g/C Ratio 0.50 0.40 0.34 0.28 0.38 0.29 0.36 0.28v/c Ratio 0.82 0.65 0.19 0.92 1.16 0.37 0.27 0.84Control Delay 39.4 26.2 17.3 50.9 136.5 25.4 19.9 38.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 39.4 26.2 17.3 50.9 136.5 25.4 19.9 38.3LOS D C B D F C B DApproach Delay 29.7 49.2 89.1 34.7Approach LOS C D F C

Intersection SummaryArea Type: OtherCycle Length: 105.1Actuated Cycle Length: 94.3Natural Cycle: 100Control Type: Semi Act-UncoordMaximum v/c Ratio: 1.16Intersection Signal Delay: 45.0 Intersection LOS: DIntersection Capacity Utilization 93.5% ICU Level of Service FAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 113: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT WBL WBT NBL NBT SBL SBTLane Group Flow (vph) 302 825 46 836 250 186 109 442v/c Ratio 0.82 0.65 0.19 0.92 1.16 0.37 0.27 0.84Control Delay 39.4 26.2 17.3 50.9 136.5 25.4 19.9 38.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 39.4 26.2 17.3 50.9 136.5 25.4 19.9 38.3Queue Length 50th (m) 39.6 67.0 4.5 86.1 ~42.6 24.9 13.2 60.0Queue Length 95th (m) #82.7 98.1 11.3 #142.3 #96.7 45.2 25.4 103.4Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 441 1279 500 909 216 610 419 640Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.68 0.65 0.09 0.92 1.16 0.30 0.26 0.69

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 114: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 278 659 100 42 700 69 230 113 58 100 118 289Future Volume (vph) 278 659 100 42 700 69 230 113 58 100 118 289Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.98 1.00 0.99 1.00 0.95 1.00 0.89Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1645 3166 1627 3174 1568 1636 1644 1548Flt Permitted 0.15 1.00 0.30 1.00 0.17 1.00 0.57 1.00Satd. Flow (perm) 253 3166 512 3174 275 1636 985 1548Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 302 716 109 46 761 75 250 123 63 109 128 314RTOR Reduction (vph) 0 9 0 0 6 0 0 18 0 0 89 0Lane Group Flow (vph) 302 816 0 46 830 0 250 168 0 109 353 0Confl. Peds. (#/hr) 24 11 11 24 3 3Heavy Vehicles (%) 1% 2% 5% 2% 3% 0% 6% 0% 3% 1% 1% 1%Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Actuated Green, G (s) 44.9 35.4 30.9 24.4 34.1 25.0 31.9 23.9Effective Green, g (s) 43.9 37.8 28.9 26.8 32.1 27.7 29.9 26.6Actuated g/C Ratio 0.47 0.40 0.31 0.29 0.34 0.29 0.32 0.28Clearance Time (s) 3.0 6.4 3.0 6.4 3.0 6.7 3.0 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2Lane Grp Cap (vph) 362 1273 222 904 205 482 362 438v/s Ratio Prot c0.15 0.26 0.01 c0.26 c0.10 0.10 0.02 0.23v/s Ratio Perm 0.24 0.05 c0.31 0.07v/c Ratio 0.83 0.64 0.21 0.92 1.22 0.35 0.30 0.81Uniform Delay, d1 22.6 22.6 23.2 32.5 27.7 26.1 23.4 31.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 14.9 0.9 0.3 13.7 134.6 0.2 0.3 9.9Delay (s) 37.5 23.5 23.6 46.2 162.2 26.3 23.8 41.2Level of Service D C C D F C C DApproach Delay (s) 27.3 45.0 104.2 37.8Approach LOS C D F D

Intersection SummaryHCM 2000 Control Delay 45.6 HCM 2000 Level of Service DHCM 2000 Volume to Capacity ratio 0.99Actuated Cycle Length (s) 94.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 93.5% ICU Level of Service FAnalysis Period (min) 15c Critical Lane Group

Page 115: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 193 440 92 8 573 169 82 64 11 125 83 226Future Volume (vph) 193 440 92 8 573 169 82 64 11 125 83 226Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 0 0 0 0 0 0 1 0Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 0.95 0.95 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 0.99 1.00 0.99Frt 0.981 0.966 0.991 0.890Flt Protected 0.987 0.999 0.975 0.950Satd. Flow (prot) 0 3112 0 0 3093 0 0 1668 0 1662 1531 0Flt Permitted 0.556 0.945 0.475 0.657Satd. Flow (perm) 0 1750 0 0 2926 0 0 813 0 1136 1531 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 25 43 5 196Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 16 7 7 16 17 17Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 4% 3% 1% 0% 3% 1% 1% 0% 9% 0% 1% 2%Adj. Flow (vph) 210 478 100 9 623 184 89 70 12 136 90 246Shared Lane Traffic (%)Lane Group Flow (vph) 0 788 0 0 816 0 0 171 0 136 336 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 116: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA Perm NA Perm NA Perm NAProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6Detector Phase 7 4 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 5.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 9.5 27.1 27.1 27.1 33.1 33.1 33.1 33.1Total Split (s) 17.1 46.1 29.1 29.1 41.1 41.1 41.1 41.1Total Split (%) 19.6% 52.8% 33.3% 33.3% 47.1% 47.1% 47.1% 47.1%Maximum Green (s) 12.6 40.0 23.0 23.0 35.0 35.0 35.0 35.0Yellow Time (s) 3.5 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 1.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0Act Effct Green (s) 36.3 26.0 16.9 16.9 16.9Actuated g/C Ratio 0.59 0.42 0.27 0.27 0.27v/c Ratio 0.67 0.65 0.75 0.44 0.60Control Delay 11.3 16.6 42.7 24.1 13.4Queue Delay 0.0 0.0 0.0 0.0 0.0Total Delay 11.3 16.6 42.7 24.1 13.4LOS B B D C BApproach Delay 11.3 16.6 42.7 16.5Approach LOS B B D B

Intersection SummaryArea Type: OtherCycle Length: 87.3Actuated Cycle Length: 61.5Natural Cycle: 70Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.75Intersection Signal Delay: 16.7 Intersection LOS: BIntersection Capacity Utilization 94.5% ICU Level of Service FAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 117: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBT WBT NBT SBL SBTLane Group Flow (vph) 788 816 171 136 336v/c Ratio 0.67 0.65 0.75 0.44 0.60Control Delay 11.3 16.6 42.7 24.1 13.4Queue Delay 0.0 0.0 0.0 0.0 0.0Total Delay 11.3 16.6 42.7 24.1 13.4Queue Length 50th (m) 22.5 36.0 17.2 12.8 12.7Queue Length 95th (m) 45.2 65.5 #47.2 30.2 38.6Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 25.0Base Capacity (vph) 1380 1365 506 705 1025Starvation Cap Reductn 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.57 0.60 0.34 0.19 0.33

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 118: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 193 440 92 8 573 169 82 64 11 125 83 226Future Volume (vph) 193 440 92 8 573 169 82 64 11 125 83 226Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 0.95 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 0.99 1.00Frt 0.98 0.97 0.99 1.00 0.89Flt Protected 0.99 1.00 0.97 0.95 1.00Satd. Flow (prot) 3110 3102 1667 1648 1531Flt Permitted 0.56 0.94 0.47 0.66 1.00Satd. Flow (perm) 1754 2932 813 1140 1531Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 210 478 100 9 623 184 89 70 12 136 90 246RTOR Reduction (vph) 0 10 0 0 25 0 0 4 0 0 142 0Lane Group Flow (vph) 0 778 0 0 791 0 0 167 0 136 194 0Confl. Peds. (#/hr) 16 7 7 16 17 17Heavy Vehicles (%) 4% 3% 1% 0% 3% 1% 1% 0% 9% 0% 1% 2%Turn Type pm+pt NA Perm NA Perm NA Perm NAProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 34.2 24.0 14.8 14.8 14.8Effective Green, g (s) 36.3 26.1 16.9 16.9 16.9Actuated g/C Ratio 0.59 0.43 0.28 0.28 0.28Clearance Time (s) 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1213 1250 224 314 422v/s Ratio Prot c0.08 0.13v/s Ratio Perm 0.30 c0.27 c0.21 0.12v/c Ratio 0.64 0.63 0.75 0.43 0.46Uniform Delay, d1 8.2 13.8 20.2 18.2 18.4Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.2 1.1 12.7 1.0 0.8Delay (s) 9.3 14.8 32.9 19.2 19.2Level of Service A B C B BApproach Delay (s) 9.3 14.8 32.9 19.2Approach LOS A B C B

Intersection SummaryHCM 2000 Control Delay 15.2 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.70Actuated Cycle Length (s) 61.2 Sum of lost time (s) 12.5Intersection Capacity Utilization 94.5% ICU Level of Service FAnalysis Period (min) 15c Critical Lane Group

Page 119: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 62 355 3 5 472 244 20 3 5 197 3 69Future Volume (vph) 62 355 3 5 472 244 20 3 5 197 3 69Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 50.0 25.0 50.0 25.0 0.0 0.0 0.0Storage Lanes 1 1 1 1 1 0 1 0Taper Length (m) 75.0 50.0 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.850 0.850 0.906 0.856Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1568 3197 1488 1662 3292 1430 1662 1586 0 1583 1456 0Flt Permitted 0.250 0.523 0.950 0.950Satd. Flow (perm) 413 3197 1488 915 3292 1430 1662 1586 0 1583 1456 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 80 265 5 75Link Speed (k/h) 50 50 50 50Link Distance (m) 310.8 136.7 108.4 168.0Travel Time (s) 22.4 9.8 7.8 12.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 4% 0% 0% 1% 4% 0% 0% 0% 5% 0% 3%Adj. Flow (vph) 67 386 3 5 513 265 22 3 5 214 3 75Shared Lane Traffic (%)Lane Group Flow (vph) 67 386 3 5 513 265 22 8 0 214 78 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 2Detector Template Left Thru Right Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm Perm NA Perm Split NA Split NAProtected Phases 7 4 8 2 2 6 6

Page 120: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 4 8 8Detector Phase 7 4 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 6.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 10.5 38.1 38.1 38.1 38.1 38.1 36.1 36.1 36.1 36.1Total Split (s) 15.0 53.1 53.1 38.1 38.1 38.1 36.1 36.1 36.1 36.1Total Split (%) 12.0% 42.4% 42.4% 30.4% 30.4% 30.4% 28.8% 28.8% 28.8% 28.8%Maximum Green (s) 12.0 47.0 47.0 32.0 32.0 32.0 30.0 30.0 30.0 30.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) 1.0 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.3 2.5 2.5 2.5 2.5 2.5 4.0 4.0 4.0 4.0Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 30.4 30.4 30.4 19.2 19.2 19.2 10.7 10.7 18.7 18.7Actuated g/C Ratio 0.42 0.42 0.42 0.27 0.27 0.27 0.15 0.15 0.26 0.26v/c Ratio 0.23 0.29 0.00 0.02 0.59 0.46 0.09 0.03 0.52 0.18Control Delay 15.4 14.7 0.0 22.2 26.8 6.3 32.9 24.6 29.1 7.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 15.4 14.7 0.0 22.2 26.8 6.3 32.9 24.6 29.1 7.7LOS B B A C C A C C C AApproach Delay 14.7 19.8 30.7 23.4Approach LOS B B C C

Intersection SummaryArea Type: OtherCycle Length: 125.3Actuated Cycle Length: 72.1Natural Cycle: 125Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.59Intersection Signal Delay: 19.2 Intersection LOS: BIntersection Capacity Utilization 47.7% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)

Page 121: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBTLane Group Flow (vph) 67 386 3 5 513 265 22 8 214 78v/c Ratio 0.23 0.29 0.00 0.02 0.59 0.46 0.09 0.03 0.52 0.18Control Delay 15.4 14.7 0.0 22.2 26.8 6.3 32.9 24.6 29.1 7.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 15.4 14.7 0.0 22.2 26.8 6.3 32.9 24.6 29.1 7.7Queue Length 50th (m) 5.4 17.6 0.0 0.5 32.1 0.0 2.7 0.4 25.4 0.3Queue Length 95th (m) 14.7 33.0 0.0 3.4 58.3 18.0 10.8 4.7 54.6 10.7Internal Link Dist (m) 286.8 112.7 84.4 144.0Turn Bay Length (m) 50.0 50.0 25.0 50.0 25.0Base Capacity (vph) 355 2237 1065 444 1599 831 760 728 724 706Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.19 0.17 0.00 0.01 0.32 0.32 0.03 0.01 0.30 0.11

Intersection Summary

Page 122: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 62 355 3 5 472 244 20 3 5 197 3 69Future Volume (vph) 62 355 3 5 472 244 20 3 5 197 3 69Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.91 1.00 0.86Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1568 3197 1488 1662 3292 1430 1662 1586 1583 1456Flt Permitted 0.25 1.00 1.00 0.52 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (perm) 413 3197 1488 916 3292 1430 1662 1586 1583 1456Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 67 386 3 5 513 265 22 3 5 214 3 75RTOR Reduction (vph) 0 0 2 0 0 194 0 4 0 0 55 0Lane Group Flow (vph) 67 386 1 5 513 71 22 4 0 214 23 0Heavy Vehicles (%) 6% 4% 0% 0% 1% 4% 0% 0% 0% 5% 0% 3%Turn Type pm+pt NA Perm Perm NA Perm Split NA Split NAProtected Phases 7 4 8 2 2 6 6Permitted Phases 4 4 8 8Actuated Green, G (s) 28.2 28.2 28.2 17.1 17.1 17.1 8.5 8.5 16.5 16.5Effective Green, g (s) 27.2 30.3 30.3 19.2 19.2 19.2 10.6 10.6 18.6 18.6Actuated g/C Ratio 0.38 0.42 0.42 0.27 0.27 0.27 0.15 0.15 0.26 0.26Clearance Time (s) 3.0 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 2.3 2.5 2.5 2.5 2.5 2.5 4.0 4.0 4.0 4.0Lane Grp Cap (vph) 271 1354 630 245 884 384 246 235 411 378v/s Ratio Prot 0.02 c0.12 c0.16 c0.01 0.00 c0.14 0.02v/s Ratio Perm 0.07 0.00 0.01 0.05v/c Ratio 0.25 0.29 0.00 0.02 0.58 0.19 0.09 0.02 0.52 0.06Uniform Delay, d1 15.0 13.5 11.9 19.2 22.7 20.1 26.3 26.0 22.6 19.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 0.1 0.0 0.0 0.8 0.2 0.2 0.0 1.5 0.1Delay (s) 15.3 13.6 11.9 19.3 23.5 20.3 26.5 26.0 24.2 20.0Level of Service B B B B C C C C C BApproach Delay (s) 13.8 22.4 26.4 23.1Approach LOS B C C C

Intersection SummaryHCM 2000 Control Delay 20.1 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.44Actuated Cycle Length (s) 71.5 Sum of lost time (s) 16.0Intersection Capacity Utilization 47.7% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 123: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 408 151 28 348 296 27Future Volume (vph) 408 151 28 348 296 27Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 75.0 50.0 0.0 50.0Storage Lanes 1 1 2 1Taper Length (m) 50.0 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00Ped Bike Factor 0.99 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 3137 1316 1409 3167 3014 1488Flt Permitted 0.495 0.950Satd. Flow (perm) 3137 1300 734 3167 3014 1488Right Turn on Red Yes YesSatd. Flow (RTOR) 164 29Link Speed (k/h) 50 50 50Link Distance (m) 140.7 332.8 68.6Travel Time (s) 10.1 24.0 4.9Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 13% 18% 5% 7% 0%Adj. Flow (vph) 443 164 30 378 322 29Shared Lane Traffic (%)Lane Group Flow (vph) 443 164 30 378 322 29Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 1 1 2 1 1Detector Template Thru Right Left Thru Left RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0

Page 124: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group EBT EBR WBL WBT NBL NBRTurn Type NA Perm Perm NA Prot PermProtected Phases 4 8 2Permitted Phases 4 8 2Detector Phase 4 4 8 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 8.0 8.0Minimum Split (s) 24.5 24.5 24.5 24.5 38.1 38.1Total Split (s) 41.5 41.5 41.5 41.5 38.1 38.1Total Split (%) 52.1% 52.1% 52.1% 52.1% 47.9% 47.9%Maximum Green (s) 35.0 35.0 35.0 35.0 32.0 32.0Yellow Time (s) 4.5 4.5 4.5 4.5 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.5 -2.5 -2.5 -2.5 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.9 2.9 2.9 2.9 2.8 2.8Recall Mode Min Min Min Min Min MinWalk Time (s) 12.0 12.0Flash Dont Walk (s) 20.0 20.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 13.6 13.6 13.6 13.6 11.2 11.2Actuated g/C Ratio 0.41 0.41 0.41 0.41 0.34 0.34v/c Ratio 0.34 0.26 0.10 0.29 0.31 0.06Control Delay 7.6 2.8 7.2 7.3 9.1 4.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 7.6 2.8 7.2 7.3 9.1 4.2LOS A A A A A AApproach Delay 6.3 7.3 8.7Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 79.6Actuated Cycle Length: 32.9Natural Cycle: 65Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.34Intersection Signal Delay: 7.2 Intersection LOS: AIntersection Capacity Utilization 39.7% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49)

Page 125: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group EBT EBR WBL WBT NBL NBRLane Group Flow (vph) 443 164 30 378 322 29v/c Ratio 0.34 0.26 0.10 0.29 0.31 0.06Control Delay 7.6 2.8 7.2 7.3 9.1 4.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 7.6 2.8 7.2 7.3 9.1 4.2Queue Length 50th (m) 7.6 0.0 0.9 6.3 5.9 0.0Queue Length 95th (m) 16.2 6.5 4.2 13.8 13.8 3.1Internal Link Dist (m) 116.7 308.8 44.6Turn Bay Length (m) 75.0 50.0 50.0Base Capacity (vph) 3132 1298 733 3162 2955 1459Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.14 0.13 0.04 0.12 0.11 0.02

Intersection Summary

Page 126: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 32

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 408 151 28 348 296 27Future Volume (vph) 408 151 28 348 296 27Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 3137 1300 1408 3167 3014 1488Flt Permitted 1.00 1.00 0.50 1.00 0.95 1.00Satd. Flow (perm) 3137 1300 734 3167 3014 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 443 164 30 378 322 29RTOR Reduction (vph) 0 96 0 0 0 19Lane Group Flow (vph) 443 68 30 378 322 10Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 6% 13% 18% 5% 7% 0%Turn Type NA Perm Perm NA Prot PermProtected Phases 4 8 2Permitted Phases 4 8 2Actuated Green, G (s) 11.1 11.1 11.1 11.1 9.1 9.1Effective Green, g (s) 13.6 13.6 13.6 13.6 11.2 11.2Actuated g/C Ratio 0.41 0.41 0.41 0.41 0.34 0.34Clearance Time (s) 6.5 6.5 6.5 6.5 6.1 6.1Vehicle Extension (s) 2.9 2.9 2.9 2.9 2.8 2.8Lane Grp Cap (vph) 1300 539 304 1313 1029 508v/s Ratio Prot c0.14 0.12 c0.11v/s Ratio Perm 0.05 0.04 0.01v/c Ratio 0.34 0.13 0.10 0.29 0.31 0.02Uniform Delay, d1 6.5 5.9 5.9 6.4 8.0 7.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.1 0.1 0.1 0.2 0.0Delay (s) 6.7 6.0 6.0 6.5 8.1 7.2Level of Service A A A A A AApproach Delay (s) 6.5 6.5 8.0Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.9 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.33Actuated Cycle Length (s) 32.8 Sum of lost time (s) 8.0Intersection Capacity Utilization 39.7% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 127: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 182 6 264 0 0 121Future Volume (vph) 182 6 264 0 0 121Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.995Flt Protected 0.954Satd. Flow (prot) 3046 0 3167 0 0 3325Flt Permitted 0.954Satd. Flow (perm) 3046 0 3167 0 0 3325Right Turn on Red Yes YesSatd. Flow (RTOR) 7Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 0% 5% 0% 5% 0%Adj. Flow (vph) 198 7 287 0 0 132Shared Lane Traffic (%)Lane Group Flow (vph) 205 0 287 0 0 132Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch Phase

Page 128: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group WBL WBR NBT NBR SBL SBTMinimum Initial (s) 8.0 8.0 8.0Minimum Split (s) 25.1 22.5 22.5Total Split (s) 28.2 22.5 22.5Total Split (%) 55.6% 44.4% 44.4%Maximum Green (s) 22.1 16.4 16.4Yellow Time (s) 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 10.1 10.3 10.3Actuated g/C Ratio 0.36 0.36 0.36v/c Ratio 0.19 0.25 0.11Control Delay 6.7 7.0 6.3Queue Delay 0.0 0.0 0.0Total Delay 6.7 7.0 6.3LOS A A AApproach Delay 6.7 7.0 6.3Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50.7Actuated Cycle Length: 28.4Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.25Intersection Signal Delay: 6.7 Intersection LOS: AIntersection Capacity Utilization 21.3% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 129: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group WBL NBT SBTLane Group Flow (vph) 205 287 132v/c Ratio 0.19 0.25 0.11Control Delay 6.7 7.0 6.3Queue Delay 0.0 0.0 0.0Total Delay 6.7 7.0 6.3Queue Length 50th (m) 2.9 4.4 1.9Queue Length 95th (m) 6.3 8.3 4.3Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2945 2066 2169Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.07 0.14 0.06

Intersection Summary

Page 130: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 36

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 182 6 264 0 0 121Future Volume (vph) 182 6 264 0 0 121Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 0.99 1.00 1.00Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 3046 3167 3325Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 3046 3167 3325Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 198 7 287 0 0 132RTOR Reduction (vph) 5 0 0 0 0 0Lane Group Flow (vph) 200 0 287 0 0 132Heavy Vehicles (%) 6% 0% 5% 0% 5% 0%Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.0 8.2 8.2Effective Green, g (s) 10.1 10.3 10.3Actuated g/C Ratio 0.36 0.36 0.36Clearance Time (s) 6.1 6.1 6.1Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1083 1148 1205v/s Ratio Prot c0.07 c0.09v/s Ratio Perm 0.04v/c Ratio 0.19 0.25 0.11Uniform Delay, d1 6.3 6.3 6.0Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.0 0.1 0.0Delay (s) 6.3 6.4 6.0Level of Service A A AApproach Delay (s) 6.3 6.4 6.0Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.3 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.24Actuated Cycle Length (s) 28.4 Sum of lost time (s) 10.1Intersection Capacity Utilization 21.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 131: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 325 4 0 231 320 219Future Volume (vph) 325 4 0 231 320 219Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Ped Bike Factor 0.99Frt 0.998 0.939Flt Protected 0.953Satd. Flow (prot) 1648 0 0 3197 2994 0Flt Permitted 0.953Satd. Flow (perm) 1648 0 0 3197 2994 0Right Turn on Red Yes YesSatd. Flow (RTOR) 1 238Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 0% 0% 4% 5% 1%Adj. Flow (vph) 353 4 0 251 348 238Shared Lane Traffic (%)Lane Group Flow (vph) 357 0 0 251 586 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2

Page 132: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBR NBL NBT SBT SBRDetector Phase 4 2 2 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 31.3 42.0 42.0 42.0Total Split (%) 42.7% 57.3% 57.3% 57.3%Maximum Green (s) 25.0 35.0 35.0 35.0Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.9 2.9 2.9Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 14.8 14.4 14.4Actuated g/C Ratio 0.40 0.39 0.39v/c Ratio 0.55 0.20 0.45Control Delay 12.4 9.0 6.7Queue Delay 0.0 0.0 0.0Total Delay 12.4 9.0 6.7LOS B A AApproach Delay 12.4 9.0 6.7Approach LOS B A A

Intersection SummaryArea Type: OtherCycle Length: 73.3Actuated Cycle Length: 37.4Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.55Intersection Signal Delay: 8.9 Intersection LOS: AIntersection Capacity Utilization 43.9% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 133: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL NBT SBTLane Group Flow (vph) 357 251 586v/c Ratio 0.55 0.20 0.45Control Delay 12.4 9.0 6.7Queue Delay 0.0 0.0 0.0Total Delay 12.4 9.0 6.7Queue Length 50th (m) 15.2 5.1 7.4Queue Length 95th (m) 38.5 13.6 20.7Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1270 3041 2859Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.28 0.08 0.20

Intersection Summary

Page 134: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 325 4 0 231 320 219Future Volume (vph) 325 4 0 231 320 219Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95Frpb, ped/bikes 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 1.00 0.94Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1649 3197 2995Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 1649 3197 2995Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 353 4 0 251 348 238RTOR Reduction (vph) 1 0 0 0 146 0Lane Group Flow (vph) 356 0 0 251 440 0Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 1% 0% 0% 4% 5% 1%Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 12.5 11.4 11.4Effective Green, g (s) 14.8 14.4 14.4Actuated g/C Ratio 0.40 0.39 0.39Clearance Time (s) 6.3 7.0 7.0Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 656 1237 1159v/s Ratio Prot c0.22 0.08 c0.15v/s Ratio Permv/c Ratio 0.54 0.20 0.38Uniform Delay, d1 8.6 7.6 8.2Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.6 0.0 0.1Delay (s) 9.2 7.6 8.3Level of Service A A AApproach Delay (s) 9.2 7.6 8.3Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 8.4 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.46Actuated Cycle Length (s) 37.2 Sum of lost time (s) 8.0Intersection Capacity Utilization 43.9% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 135: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 44 136 0 0 93 24 0 0 0 115 0 61Future Volume (vph) 44 136 0 0 93 24 0 0 0 115 0 61Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1716 0 1750 1651 1430 0 1750 0 3014 1458 0Flt Permitted 0.479 0.950Satd. Flow (perm) 838 1716 0 1750 1651 1430 0 1750 0 3014 1458 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 126 920Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 0% 6% 4% 0% 0% 0% 7% 0% 2%Adj. Flow (vph) 48 148 0 0 101 26 0 0 0 125 0 66Shared Lane Traffic (%)Lane Group Flow (vph) 48 148 0 0 101 26 0 0 0 125 66 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 136: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 12.5 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 18.0 52.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (%) 13.9% 40.5% 26.6% 26.6% 26.6% 29.7% 29.7% 29.7% 29.7%Maximum Green (s) 15.0 45.0 27.0 27.0 27.0 31.0 31.0 31.0 31.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.5 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.53 0.53 0.29 0.29 0.29 0.29v/c Ratio 0.08 0.16 0.21 0.05 0.14 0.06Control Delay 5.6 6.1 13.7 0.2 12.6 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.6 6.1 13.7 0.2 12.6 0.1LOS A A B A B AApproach Delay 6.0 10.9 8.3Approach LOS A B A

Intersection SummaryArea Type: OtherCycle Length: 129.5Actuated Cycle Length: 46Natural Cycle: 125Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.21Intersection Signal Delay: 8.0 Intersection LOS: AIntersection Capacity Utilization 24.3% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 137: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 48 148 101 26 125 66v/c Ratio 0.08 0.16 0.21 0.05 0.14 0.06Control Delay 5.6 6.1 13.7 0.2 12.6 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.6 6.1 13.7 0.2 12.6 0.1Queue Length 50th (m) 1.7 5.6 6.3 0.0 3.9 0.0Queue Length 95th (m) 5.0 12.2 15.1 0.0 8.6 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 697 1716 1094 990 2260 1323Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.07 0.09 0.09 0.03 0.06 0.05

Intersection Summary

Page 138: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 44 136 0 0 93 24 0 0 0 115 0 61Future Volume (vph) 44 136 0 0 93 24 0 0 0 115 0 61Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1716 1651 1430 3014 1458Flt Permitted 0.48 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 838 1716 1651 1430 3014 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 48 148 0 0 101 26 0 0 0 125 0 66RTOR Reduction (vph) 0 0 0 0 0 18 0 0 0 0 47 0Lane Group Flow (vph) 48 148 0 0 101 8 0 0 0 125 19 0Heavy Vehicles (%) 0% 2% 0% 0% 6% 4% 0% 0% 0% 7% 0% 2%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 21.0 21.0 10.0 10.0 10.0 10.0Effective Green, g (s) 20.0 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.43 0.53 0.29 0.29 0.29 0.29Clearance Time (s) 3.0 7.5 7.5 7.5 7.5 7.5Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 489 913 484 419 884 427v/s Ratio Prot 0.01 c0.09 c0.06 c0.04 0.01v/s Ratio Perm 0.03 0.01v/c Ratio 0.10 0.16 0.21 0.02 0.14 0.05Uniform Delay, d1 7.7 5.5 12.2 11.5 12.0 11.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.1 0.0 0.0 0.0Delay (s) 7.8 5.5 12.3 11.6 12.0 11.7Level of Service A A B B B BApproach Delay (s) 6.1 12.2 0.0 11.9Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 9.8 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.20Actuated Cycle Length (s) 46.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 24.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 139: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 17 58 1 421 104 78 1 151 323 124 188 31Future Volume (vph) 17 58 1 421 104 78 1 151 323 124 188 31Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.998 0.983 0.908 0.988Flt Protected 0.989 0.966 0.982Satd. Flow (prot) 0 1596 0 0 1582 0 0 1490 0 0 1601 0Flt Permitted 0.861 0.741 0.999 0.531Satd. Flow (perm) 0 1389 0 0 1214 0 0 1488 0 0 866 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 1 13 152 7Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 9% 0% 4% 7% 8% 0% 6% 7% 13% 2% 3%Adj. Flow (vph) 18 63 1 458 113 85 1 164 351 135 204 34Shared Lane Traffic (%)Lane Group Flow (vph) 0 82 0 0 656 0 0 516 0 0 373 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Detector Phase 4 4 8 8 2 2 6 6Switch Phase

Page 140: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 46

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3Total Split (s) 46.3 46.3 46.3 46.3 36.3 36.3 36.3 36.3Total Split (%) 56.1% 56.1% 56.1% 56.1% 43.9% 43.9% 43.9% 43.9%Maximum Green (s) 40.0 40.0 40.0 40.0 30.0 30.0 30.0 30.0Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 42.3 42.3 32.3 32.3Actuated g/C Ratio 0.51 0.51 0.39 0.39v/c Ratio 0.12 1.04 0.77 1.09Control Delay 10.9 70.6 24.2 102.5Queue Delay 0.0 0.0 0.0 0.0Total Delay 10.9 70.6 24.2 102.5LOS B E C FApproach Delay 10.9 70.6 24.2 102.5Approach LOS B E C F

Intersection SummaryArea Type: OtherCycle Length: 82.6Actuated Cycle Length: 82.6Natural Cycle: 75Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 1.09Intersection Signal Delay: 60.2 Intersection LOS: EIntersection Capacity Utilization 103.5% ICU Level of Service GAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 141: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBT WBT NBT SBTLane Group Flow (vph) 82 656 516 373v/c Ratio 0.12 1.04 0.77 1.09Control Delay 10.9 70.6 24.2 102.5Queue Delay 0.0 0.0 0.0 0.0Total Delay 10.9 70.6 24.2 102.5Queue Length 50th (m) 6.6 ~118.6 51.8 ~69.9Queue Length 95th (m) 13.9 #184.9 #98.5 #124.4Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m)Base Capacity (vph) 711 628 674 342Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.12 1.04 0.77 1.09

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 142: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 17 58 1 421 104 78 1 151 323 124 188 31Future Volume (vph) 17 58 1 421 104 78 1 151 323 124 188 31Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00Frt 1.00 0.98 0.91 0.99Flt Protected 0.99 0.97 1.00 0.98Satd. Flow (prot) 1597 1582 1490 1601Flt Permitted 0.86 0.74 1.00 0.53Satd. Flow (perm) 1389 1213 1489 866Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 18 63 1 458 113 85 1 164 351 135 204 34RTOR Reduction (vph) 0 0 0 0 6 0 0 93 0 0 4 0Lane Group Flow (vph) 0 82 0 0 650 0 0 423 0 0 369 0Heavy Vehicles (%) 6% 9% 0% 4% 7% 8% 0% 6% 7% 13% 2% 3%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 40.0 40.0 30.0 30.0Effective Green, g (s) 42.3 42.3 32.3 32.3Actuated g/C Ratio 0.51 0.51 0.39 0.39Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 711 621 582 338v/s Ratio Protv/s Ratio Perm 0.06 c0.54 0.28 c0.43v/c Ratio 0.11 1.05 0.73 1.09Uniform Delay, d1 10.4 20.1 21.4 25.1Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 48.8 6.3 75.5Delay (s) 10.6 68.9 27.7 100.7Level of Service B E C FApproach Delay (s) 10.6 68.9 27.7 100.7Approach LOS B E C F

Intersection SummaryHCM 2000 Control Delay 60.2 HCM 2000 Level of Service EHCM 2000 Volume to Capacity ratio 1.06Actuated Cycle Length (s) 82.6 Sum of lost time (s) 8.0Intersection Capacity Utilization 103.5% ICU Level of Service GAnalysis Period (min) 15c Critical Lane Group

Page 143: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 34 5 2 230 190 17Future Volume (vph) 34 5 2 230 190 17Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.984 0.989Flt Protected 0.958Satd. Flow (prot) 1532 0 0 1693 1625 0Flt Permitted 0.958Satd. Flow (perm) 1532 0 0 1693 1625 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 20% 50% 3% 6% 12%Adj. Flow (vph) 37 5 2 250 207 18Shared Lane Traffic (%)Lane Group Flow (vph) 42 0 0 252 225 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 24.9% ICU Level of Service AAnalysis Period (min) 15

Page 144: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 34 5 2 230 190 17Future Volume (Veh/h) 34 5 2 230 190 17Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 37 5 2 250 207 18PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 470 216 225vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 470 216 225tC, single (s) 6.5 6.4 4.6tC, 2 stage (s)tF (s) 3.6 3.5 2.7p0 queue free % 93 99 100cM capacity (veh/h) 544 781 1106

Direction, Lane # EB 1 NB 1 SB 1Volume Total 42 252 225Volume Left 37 2 0Volume Right 5 0 18cSH 564 1106 1700Volume to Capacity 0.07 0.00 0.13Queue Length 95th (m) 1.9 0.0 0.0Control Delay (s) 11.9 0.1 0.0Lane LOS B AApproach Delay (s) 11.9 0.1 0.0Approach LOS B

Intersection SummaryAverage Delay 1.0Intersection Capacity Utilization 24.9% ICU Level of Service AAnalysis Period (min) 15

Page 145: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 34 82 24 145 187 23Future Volume (vph) 34 82 24 145 187 23Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.905 0.985Flt Protected 0.986 0.993Satd. Flow (prot) 1419 0 0 1589 1585 0Flt Permitted 0.986 0.993Satd. Flow (perm) 1419 0 0 1589 1585 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 13% 48% 3% 8% 15%Adj. Flow (vph) 37 89 26 158 203 25Shared Lane Traffic (%)Lane Group Flow (vph) 126 0 0 184 228 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 39.5% ICU Level of Service AAnalysis Period (min) 15

Page 146: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 52

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 34 82 24 145 187 23Future Volume (Veh/h) 34 82 24 145 187 23Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 37 89 26 158 203 25PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 426 216 228vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 426 216 228tC, single (s) 6.4 6.3 4.6tC, 2 stage (s)tF (s) 3.5 3.4 2.6p0 queue free % 94 89 98cM capacity (veh/h) 570 798 1111

Direction, Lane # EB 1 NB 1 SB 1Volume Total 126 184 228Volume Left 37 26 0Volume Right 89 0 25cSH 714 1111 1700Volume to Capacity 0.18 0.02 0.13Queue Length 95th (m) 5.1 0.6 0.0Control Delay (s) 11.1 1.4 0.0Lane LOS B AApproach Delay (s) 11.1 1.4 0.0Approach LOS B

Intersection SummaryAverage Delay 3.1Intersection Capacity Utilization 39.5% ICU Level of Service AAnalysis Period (min) 15

Page 147: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 24 82 24 145 187 23Future Volume (vph) 24 82 24 145 187 23Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.896 0.985Flt Protected 0.989 0.993Satd. Flow (prot) 1392 0 0 1517 1613 0Flt Permitted 0.989 0.993Satd. Flow (perm) 1392 0 0 1517 1613 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 298.3 331.4Travel Time (s) 14.9 21.5 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 13% 42% 10% 4% 30%Adj. Flow (vph) 26 89 26 158 203 25Shared Lane Traffic (%)Lane Group Flow (vph) 115 0 0 184 228 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 38.9% ICU Level of Service AAnalysis Period (min) 15

Page 148: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 24 82 24 145 187 23Future Volume (Veh/h) 24 82 24 145 187 23Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 26 89 26 158 203 25PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 426 216 228vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 426 216 228tC, single (s) 6.5 6.3 4.5tC, 2 stage (s)tF (s) 3.6 3.4 2.6p0 queue free % 95 89 98cM capacity (veh/h) 565 798 1137

Direction, Lane # EB 1 NB 1 SB 1Volume Total 115 184 228Volume Left 26 26 0Volume Right 89 0 25cSH 730 1137 1700Volume to Capacity 0.16 0.02 0.13Queue Length 95th (m) 4.5 0.6 0.0Control Delay (s) 10.9 1.3 0.0Lane LOS B AApproach Delay (s) 10.9 1.3 0.0Approach LOS B

Intersection SummaryAverage Delay 2.8Intersection Capacity Utilization 38.9% ICU Level of Service AAnalysis Period (min) 15

Page 149: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 6 9 15 12 5 4 15 164 8 14 241 14Future Volume (vph) 6 9 15 12 5 4 15 164 8 14 241 14Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.935 0.975 0.994 0.993Flt Protected 0.990 0.971 0.996 0.997Satd. Flow (prot) 0 1524 0 0 1657 0 0 1501 0 0 1647 0Flt Permitted 0.990 0.971 0.996 0.997Satd. Flow (perm) 0 1524 0 0 1657 0 0 1501 0 0 1647 0Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 29.6Travel Time (s) 8.5 7.8 70.5 2.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 13% 0% 0% 0% 7% 17% 0% 7% 5% 7%Adj. Flow (vph) 7 10 16 13 5 4 16 178 9 15 262 15Shared Lane Traffic (%)Lane Group Flow (vph) 0 33 0 0 22 0 0 203 0 0 292 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 28.5% ICU Level of Service AAnalysis Period (min) 15

Page 150: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 56

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 6 9 15 12 5 4 15 164 8 14 241 14Future Volume (Veh/h) 6 9 15 12 5 4 15 164 8 14 241 14Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 10 16 13 5 4 16 178 9 15 262 15PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 520 518 270 535 522 182 277 187vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 520 518 270 535 522 182 277 187tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.2 4.2 4.2tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.3 2.3 2.3p0 queue free % 98 98 98 97 99 100 99 99cM capacity (veh/h) 455 453 743 434 452 865 1258 1358

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 33 22 203 292Volume Left 7 13 16 15Volume Right 16 4 9 15cSH 560 482 1258 1358Volume to Capacity 0.06 0.05 0.01 0.01Queue Length 95th (m) 1.5 1.1 0.3 0.3Control Delay (s) 11.8 12.8 0.7 0.5Lane LOS B B A AApproach Delay (s) 11.8 12.8 0.7 0.5Approach LOS B B

Intersection SummaryAverage Delay 1.8Intersection Capacity Utilization 28.5% ICU Level of Service AAnalysis Period (min) 15

Page 151: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 39 34 34 187 206 40Future Volume (vph) 39 34 34 187 206 40Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.937 0.850Flt Protected 0.974 0.950Satd. Flow (prot) 1452 0 1614 1733 1716 1352Flt Permitted 0.974 0.950Satd. Flow (perm) 1452 0 1614 1733 1716 1352Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 18% 3% 1% 2% 10%Adj. Flow (vph) 42 37 37 203 224 43Shared Lane Traffic (%)Lane Group Flow (vph) 79 0 37 203 224 43Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 29.7% ICU Level of Service AAnalysis Period (min) 15

Page 152: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 58

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 39 34 34 187 206 40Future Volume (Veh/h) 39 34 34 187 206 40Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 42 37 37 203 224 43PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 501 224 267vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 501 224 267tC, single (s) 6.4 6.4 4.1tC, 2 stage (s)tF (s) 3.5 3.5 2.2p0 queue free % 92 95 97cM capacity (veh/h) 513 777 1291

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 79 37 203 224 43Volume Left 42 37 0 0 0Volume Right 37 0 0 0 43cSH 610 1291 1700 1700 1700Volume to Capacity 0.13 0.03 0.12 0.13 0.03Queue Length 95th (m) 3.5 0.7 0.0 0.0 0.0Control Delay (s) 11.8 7.9 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 11.8 1.2 0.0Approach LOS B

Intersection SummaryAverage Delay 2.1Intersection Capacity Utilization 29.7% ICU Level of Service AAnalysis Period (min) 15

Page 153: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 59

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 96 18 217 87 15 213Future Volume (vph) 96 18 217 87 15 213Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.978 0.961Flt Protected 0.960 0.997Satd. Flow (prot) 1643 0 1630 0 0 1682Flt Permitted 0.960 0.997Satd. Flow (perm) 1643 0 1630 0 0 1682Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 2% 6% 0% 4%Adj. Flow (vph) 104 20 236 95 16 232Shared Lane Traffic (%)Lane Group Flow (vph) 124 0 331 0 0 248Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 39.2% ICU Level of Service AAnalysis Period (min) 15

Page 154: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 60

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 96 18 217 87 15 213Future Volume (Veh/h) 96 18 217 87 15 213Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 104 20 236 95 16 232PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 548 284 331vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 548 284 331tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 79 97 99cM capacity (veh/h) 495 760 1240

Direction, Lane # WB 1 NB 1 SB 1Volume Total 124 331 248Volume Left 104 0 16Volume Right 20 95 0cSH 524 1700 1240Volume to Capacity 0.24 0.19 0.01Queue Length 95th (m) 7.3 0.0 0.3Control Delay (s) 14.0 0.0 0.6Lane LOS B AApproach Delay (s) 14.0 0.0 0.6Approach LOS B

Intersection SummaryAverage Delay 2.7Intersection Capacity Utilization 39.2% ICU Level of Service AAnalysis Period (min) 15

Page 155: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 61

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 317 462 0 72 29Future Volume (vph) 0 317 462 0 72 29Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3292 3228 0 1599 1390Flt Permitted 0.950Satd. Flow (perm) 0 3292 3228 0 1599 1390Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 3% 0% 4% 7%Adj. Flow (vph) 0 345 502 0 78 32Shared Lane Traffic (%)Lane Group Flow (vph) 0 345 502 0 78 32Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 24.9% ICU Level of Service AAnalysis Period (min) 15

Page 156: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 62

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 0 317 462 0 72 29Future Volume (Veh/h) 0 317 462 0 72 29Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 345 502 0 78 32PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 5Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 502 674 251vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 502 674 251tC, single (s) 4.1 6.9 7.0tC, 2 stage (s)tF (s) 2.2 3.5 3.4p0 queue free % 100 80 96cM capacity (veh/h) 1073 383 734

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1Volume Total 172 172 251 251 110Volume Left 0 0 0 0 78Volume Right 0 0 0 0 32cSH 1700 1700 1700 1700 541Volume to Capacity 0.10 0.10 0.15 0.15 0.20Queue Length 95th (m) 0.0 0.0 0.0 0.0 6.0Control Delay (s) 0.0 0.0 0.0 0.0 14.8Lane LOS BApproach Delay (s) 0.0 0.0 14.8Approach LOS B

Intersection SummaryAverage Delay 1.7Intersection Capacity Utilization 24.9% ICU Level of Service AAnalysis Period (min) 15

Page 157: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 63

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 373 0 0 773 163 366Future Volume (vph) 373 0 0 773 163 366Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3260 0 0 3228 1568 1473Flt Permitted 0.950Satd. Flow (perm) 3260 0 0 3228 1568 1473Link Speed (k/h) 50 50 50Link Distance (m) 104.2 91.9 169.0Travel Time (s) 7.5 6.6 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 3% 6% 1%Adj. Flow (vph) 405 0 0 840 177 398Shared Lane Traffic (%)Lane Group Flow (vph) 405 0 0 840 177 398Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 42.5% ICU Level of Service AAnalysis Period (min) 15

Page 158: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 64

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (veh/h) 373 0 0 773 163 366Future Volume (Veh/h) 373 0 0 773 163 366Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 405 0 0 840 177 398PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 6Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 405 825 202vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 405 825 202tC, single (s) 4.1 6.9 6.9tC, 2 stage (s)tF (s) 2.2 3.6 3.3p0 queue free % 100 42 51cM capacity (veh/h) 1165 303 808

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1Volume Total 202 202 420 420 575Volume Left 0 0 0 0 177Volume Right 0 0 0 0 398cSH 1700 1700 1700 1700 984Volume to Capacity 0.12 0.12 0.25 0.25 0.58Queue Length 95th (m) 0.0 0.0 0.0 0.0 31.3Control Delay (s) 0.0 0.0 0.0 0.0 19.4Lane LOS CApproach Delay (s) 0.0 0.0 19.4Approach LOS C

Intersection SummaryAverage Delay 6.1Intersection Capacity Utilization 42.5% ICU Level of Service AAnalysis Period (min) 15

Page 159: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 65

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 108 208 147 40 66 191Future Volume (vph) 108 208 147 40 66 191Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.971 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1549 1660 0 1614 1403Flt Permitted 0.950 0.950Satd. Flow (perm) 1662 1549 1660 0 1614 1403Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 13% 3% 0% 3% 6%Adj. Flow (vph) 117 226 160 43 72 208Shared Lane Traffic (%)Lane Group Flow (vph) 117 226 203 0 72 208Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 31.5% ICU Level of Service AAnalysis Period (min) 15

Page 160: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 66

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 108 208 147 40 66 191Future Volume (vph) 108 208 147 40 66 191Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 117 226 160 43 72 208

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total (vph) 117 226 203 72 208Volume Left (vph) 117 0 0 72 0Volume Right (vph) 0 0 43 0 208Hadj (s) 0.50 0.22 -0.09 0.55 -0.60Departure Headway (s) 6.0 5.7 5.4 6.5 5.3Degree Utilization, x 0.20 0.36 0.31 0.13 0.31Capacity (veh/h) 568 602 629 524 634Control Delay (s) 9.3 10.8 10.8 9.2 9.5Approach Delay (s) 10.3 10.8 9.4Approach LOS B B A

Intersection SummaryDelay 10.1Level of Service BIntersection Capacity Utilization 31.5% ICU Level of Service AAnalysis Period (min) 15

Page 161: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 67

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 20 443 392 91 102 27Future Volume (vph) 20 443 392 91 102 27Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 50.0 50.0 0.0Storage Lanes 0 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.998 0.950Satd. Flow (prot) 0 3287 3228 1458 1614 1430Flt Permitted 0.998 0.950Satd. Flow (perm) 0 3287 3228 1458 1614 1430Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 3% 2% 3% 4%Adj. Flow (vph) 22 482 426 99 111 29Shared Lane Traffic (%)Lane Group Flow (vph) 0 504 426 99 111 29Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 41.8% ICU Level of Service AAnalysis Period (min) 15

Page 162: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road Existing Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 68

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 20 443 392 91 102 27Future Volume (Veh/h) 20 443 392 91 102 27Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 22 482 426 99 111 29PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 383pX, platoon unblockedvC, conflicting volume 426 711 213vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 426 711 213tC, single (s) 4.1 6.9 7.0tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 98 69 96cM capacity (veh/h) 1144 358 786

Direction, Lane # EB 1 EB 2 WB 1 WB 2 WB 3 SB 1 SB 2Volume Total 183 321 213 213 99 111 29Volume Left 22 0 0 0 0 111 0Volume Right 0 0 0 0 99 0 29cSH 1144 1700 1700 1700 1700 358 786Volume to Capacity 0.02 0.19 0.13 0.13 0.06 0.31 0.04Queue Length 95th (m) 0.5 0.0 0.0 0.0 0.0 10.3 0.9Control Delay (s) 1.1 0.0 0.0 0.0 0.0 19.5 9.8Lane LOS A C AApproach Delay (s) 0.4 0.0 17.5Approach LOS C

Intersection SummaryAverage Delay 2.3Intersection Capacity Utilization 41.8% ICU Level of Service AAnalysis Period (min) 15

Page 163: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 85 667 26 93 516 238 49 70 134 231 111 58Future Volume (vph) 85 667 26 93 516 238 49 70 134 231 111 58Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 0 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 0.98 1.00 0.99 1.00 0.98 1.00 1.00Frt 0.850 0.953 0.850 0.949Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1554 3260 1488 1646 3060 0 1630 1750 1403 1646 1564 0Flt Permitted 0.343 0.204 0.622 0.708Satd. Flow (perm) 560 3260 1464 353 3060 0 1066 1750 1381 1222 1564 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 77 130 146 34Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 5 5 5 5 2 5 5 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 7% 2% 0% 1% 3% 2% 2% 0% 6% 1% 4% 9%Adj. Flow (vph) 92 725 28 101 561 259 53 76 146 251 121 63Shared Lane Traffic (%)Lane Group Flow (vph) 92 725 28 101 820 0 53 76 146 251 184 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 164: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 2 2 6Detector Phase 4 4 4 3 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.3 39.3 39.3 12.5 51.8 37.3 37.3 37.3 37.3 37.3Total Split (%) 44.1% 44.1% 44.1% 14.0% 58.1% 41.9% 41.9% 41.9% 41.9% 41.9%Maximum Green (s) 33.0 33.0 33.0 9.5 45.5 31.0 31.0 31.0 31.0 31.0Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 22.1 22.1 22.1 32.6 32.6 20.5 20.5 20.5 20.5 20.5Actuated g/C Ratio 0.36 0.36 0.36 0.53 0.53 0.33 0.33 0.33 0.33 0.33v/c Ratio 0.46 0.62 0.05 0.32 0.49 0.15 0.13 0.26 0.62 0.34Control Delay 26.0 19.7 0.2 11.3 9.3 17.3 16.4 4.9 26.0 15.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 26.0 19.7 0.2 11.3 9.3 17.3 16.4 4.9 26.0 15.6LOS C B A B A B B A C BApproach Delay 19.8 9.5 10.5 21.6Approach LOS B A B C

Intersection SummaryArea Type: OtherCycle Length: 89.1Actuated Cycle Length: 61.7Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.62Intersection Signal Delay: 15.3 Intersection LOS: BIntersection Capacity Utilization 71.1% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 165: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 92 725 28 101 820 53 76 146 251 184v/c Ratio 0.46 0.62 0.05 0.32 0.49 0.15 0.13 0.26 0.62 0.34Control Delay 26.0 19.7 0.2 11.3 9.3 17.3 16.4 4.9 26.0 15.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 26.0 19.7 0.2 11.3 9.3 17.3 16.4 4.9 26.0 15.6Queue Length 50th (m) 7.7 34.2 0.0 5.2 22.6 4.1 5.8 0.0 23.3 12.2Queue Length 95th (m) 26.8 70.2 0.0 16.4 52.7 14.3 18.0 11.8 59.3 34.3Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 340 1984 921 376 2481 612 1005 855 702 912Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.27 0.37 0.03 0.27 0.33 0.09 0.08 0.17 0.36 0.20

Intersection Summary

Page 166: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 85 667 26 93 516 238 49 70 134 231 111 58Future Volume (vph) 85 667 26 93 516 238 49 70 134 231 111 58Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.99 1.00 0.99 1.00 1.00 0.99 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 0.95 1.00 1.00 0.85 1.00 0.95Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1551 3260 1466 1646 3061 1628 1750 1382 1642 1563Flt Permitted 0.34 1.00 1.00 0.20 1.00 0.62 1.00 1.00 0.71 1.00Satd. Flow (perm) 559 3260 1466 353 3061 1067 1750 1382 1223 1563Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 92 725 28 101 561 259 53 76 146 251 121 63RTOR Reduction (vph) 0 0 18 0 61 0 0 0 97 0 23 0Lane Group Flow (vph) 92 725 10 101 759 0 53 76 49 251 161 0Confl. Peds. (#/hr) 5 5 5 5 2 5 5 2Heavy Vehicles (%) 7% 2% 0% 1% 3% 2% 2% 0% 6% 1% 4% 9%Turn Type Perm NA Perm pm+pt NA Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 2 2 6Actuated Green, G (s) 19.8 19.8 19.8 30.2 30.2 18.1 18.1 18.1 18.1 18.1Effective Green, g (s) 22.1 22.1 22.1 29.2 32.5 20.4 20.4 20.4 20.4 20.4Actuated g/C Ratio 0.36 0.36 0.36 0.48 0.53 0.33 0.33 0.33 0.33 0.33Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 202 1183 531 305 1633 357 586 462 409 523v/s Ratio Prot c0.22 0.03 c0.25 0.04 0.10v/s Ratio Perm 0.16 0.01 0.12 0.05 0.04 c0.21v/c Ratio 0.46 0.61 0.02 0.33 0.47 0.15 0.13 0.11 0.61 0.31Uniform Delay, d1 14.8 15.9 12.4 9.8 8.8 14.2 14.1 14.0 17.0 15.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.2 0.8 0.0 0.5 0.2 0.1 0.1 0.1 2.3 0.2Delay (s) 16.0 16.7 12.5 10.3 9.0 14.3 14.2 14.0 19.3 15.3Level of Service B B B B A B B B B BApproach Delay (s) 16.5 9.1 14.1 17.6Approach LOS B A B B

Intersection SummaryHCM 2000 Control Delay 13.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.61Actuated Cycle Length (s) 60.9 Sum of lost time (s) 12.0Intersection Capacity Utilization 71.1% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 167: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 749 28 128 494 0 0 0 0 337 54 217Future Volume (vph) 0 749 28 128 494 0 0 0 0 337 54 217Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 0.91 0.91 1.00 0.95 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 1.00 1.00Frt 0.995 0.850Flt Protected 0.950 0.950 0.965Satd. Flow (prot) 0 4706 0 1662 3228 0 0 0 0 1564 1563 1488Flt Permitted 0.211 0.950 0.965Satd. Flow (perm) 0 4706 0 369 3228 0 0 0 0 1564 1563 1488Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 7 236Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 17.0 64.2 88.8Travel Time (s) 9.7 1.2 4.6 6.4Confl. Peds. (#/hr) 7 4 4 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 1% 7% 0%Adj. Flow (vph) 0 814 30 139 537 0 0 0 0 366 59 236Shared Lane Traffic (%) 42%Lane Group Flow (vph) 0 844 0 139 537 0 0 0 0 212 213 236Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 2 1 2 1Detector Template Thru Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0Turn Type NA pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 8 6 6

Page 168: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 12.5 36.3 36.3 36.3 36.3Total Split (s) 36.3 12.5 48.5 36.5 36.5 36.5Total Split (%) 42.6% 14.7% 56.9% 42.8% 42.8% 42.8%Maximum Green (s) 30.0 9.5 42.2 30.2 30.2 30.2Yellow Time (s) 4.1 3.0 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 0.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag LeadLead-Lag Optimize? Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 18.3 29.9 29.9 16.3 16.3 16.3Actuated g/C Ratio 0.34 0.55 0.55 0.30 0.30 0.30v/c Ratio 0.53 0.36 0.30 0.45 0.46 0.39Control Delay 16.2 9.6 7.6 19.8 19.8 4.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 16.2 9.6 7.6 19.8 19.8 4.8LOS B A A B B AApproach Delay 16.2 8.0 14.4Approach LOS B A B

Intersection SummaryArea Type: OtherCycle Length: 85.3Actuated Cycle Length: 54.4Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.53Intersection Signal Delay: 13.1 Intersection LOS: BIntersection Capacity Utilization 46.9% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 169: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT WBL WBT SBL SBT SBRLane Group Flow (vph) 844 139 537 212 213 236v/c Ratio 0.53 0.36 0.30 0.45 0.46 0.39Control Delay 16.2 9.6 7.6 19.8 19.8 4.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 16.2 9.6 7.6 19.8 19.8 4.8Queue Length 50th (m) 23.1 5.7 12.7 17.5 17.6 0.0Queue Length 95th (m) 43.0 17.1 28.7 41.1 41.1 13.6Internal Link Dist (m) 110.1 0.1 64.8Turn Bay Length (m)Base Capacity (vph) 2868 410 2719 958 957 1003Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.29 0.34 0.20 0.22 0.22 0.24

Intersection Summary

Page 170: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 749 28 128 494 0 0 0 0 337 54 217Future Volume (vph) 0 749 28 128 494 0 0 0 0 337 54 217Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 1.00 0.95 0.95 0.95 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.99 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 0.95 1.00 0.95 0.97 1.00Satd. Flow (prot) 4704 1662 3228 1564 1563 1488Flt Permitted 1.00 0.21 1.00 0.95 0.97 1.00Satd. Flow (perm) 4704 368 3228 1564 1563 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 814 30 139 537 0 0 0 0 366 59 236RTOR Reduction (vph) 0 5 0 0 0 0 0 0 0 0 0 165Lane Group Flow (vph) 0 839 0 139 537 0 0 0 0 212 213 71Confl. Peds. (#/hr) 7 4 4 7Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 1% 7% 0%Turn Type NA pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 8 6 6Actuated Green, G (s) 16.0 27.6 27.6 13.9 13.9 13.9Effective Green, g (s) 18.3 26.6 29.9 16.2 16.2 16.2Actuated g/C Ratio 0.34 0.49 0.55 0.30 0.30 0.30Clearance Time (s) 6.3 3.0 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1591 362 1784 468 468 445v/s Ratio Prot c0.18 c0.05 0.17v/s Ratio Perm 0.13 0.14 0.14 0.05v/c Ratio 0.53 0.38 0.30 0.45 0.46 0.16Uniform Delay, d1 14.4 8.3 6.5 15.4 15.4 13.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 0.7 0.1 0.7 0.7 0.2Delay (s) 14.7 9.0 6.6 16.1 16.1 14.1Level of Service B A A B B BApproach Delay (s) 14.7 7.1 0.0 15.4Approach LOS B A A B

Intersection SummaryHCM 2000 Control Delay 12.6 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.48Actuated Cycle Length (s) 54.1 Sum of lost time (s) 12.0Intersection Capacity Utilization 46.9% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 171: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 900 0 0 567 78 94Future Volume (vph) 900 0 0 567 78 94Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3260 0 0 3260 3101 1458Flt Permitted 0.950Satd. Flow (perm) 3260 0 0 3260 3101 1458Right Turn on Red Yes YesSatd. Flow (RTOR) 88Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 2% 4% 2%Adj. Flow (vph) 978 0 0 616 85 102Shared Lane Traffic (%)Lane Group Flow (vph) 978 0 0 616 85 102Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Detector Phase 4 8 2 2Switch Phase

Page 172: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.0 35.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7%Maximum Green (s) 28.7 28.7 18.7 18.7Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 20.2 20.2 12.4 12.4Actuated g/C Ratio 0.50 0.50 0.30 0.30v/c Ratio 0.61 0.38 0.09 0.20Control Delay 9.0 6.9 12.2 6.1Queue Delay 0.0 0.0 0.0 0.0Total Delay 9.0 6.9 12.2 6.1LOS A A B AApproach Delay 9.0 6.9 8.8Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 40.7Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.61Intersection Signal Delay: 8.2 Intersection LOS: AIntersection Capacity Utilization 38.7% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 173: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 978 616 85 102v/c Ratio 0.61 0.38 0.09 0.20Control Delay 9.0 6.9 12.2 6.1Queue Delay 0.0 0.0 0.0 0.0Total Delay 9.0 6.9 12.2 6.1Queue Length 50th (m) 23.4 12.7 2.2 0.7Queue Length 95th (m) 35.3 20.0 6.9 9.6Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 2511 2511 1618 802Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.39 0.25 0.05 0.13

Intersection Summary

Page 174: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 900 0 0 567 78 94Future Volume (vph) 900 0 0 567 78 94Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 0.95 0.97 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3260 3260 3101 1458Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 3260 3260 3101 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 978 0 0 616 85 102RTOR Reduction (vph) 0 0 0 0 0 61Lane Group Flow (vph) 978 0 0 616 85 41Heavy Vehicles (%) 2% 0% 0% 2% 4% 2%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 17.9 17.9 10.1 10.1Effective Green, g (s) 20.2 20.2 12.4 12.4Actuated g/C Ratio 0.50 0.50 0.31 0.31Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1621 1621 947 445v/s Ratio Prot c0.30 0.19 0.03v/s Ratio Perm c0.03v/c Ratio 0.60 0.38 0.09 0.09Uniform Delay, d1 7.3 6.3 10.1 10.1Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.6 0.1 0.0 0.1Delay (s) 8.0 6.5 10.1 10.2Level of Service A A B BApproach Delay (s) 8.0 6.5 10.1Approach LOS A A B

Intersection SummaryHCM 2000 Control Delay 7.7 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.41Actuated Cycle Length (s) 40.6 Sum of lost time (s) 8.0Intersection Capacity Utilization 38.7% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 175: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 741 502 293 717 35 519 15 342 16 3 24Future Volume (vph) 27 741 502 293 717 35 519 15 342 16 3 24Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 15.0 0.0Storage Lanes 1 1 1 0 1 1 1 0Taper Length (m) 40.0 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.98 1.00 1.00 0.99 1.00 0.99Frt 0.850 0.993 0.850 0.866Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1662 3292 1473 1630 3240 0 1630 1750 1473 1662 1443 0Flt Permitted 0.344 0.156 0.738 0.747Satd. Flow (perm) 602 3292 1450 267 3240 0 1263 1750 1451 1303 1443 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 394 10 329 26Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 4 4 3 3 3 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 1% 2% 2% 0% 2% 0% 1% 0% 0% 4%Adj. Flow (vph) 29 805 546 318 779 38 564 16 372 17 3 26Shared Lane Traffic (%)Lane Group Flow (vph) 29 805 546 318 817 0 564 16 372 17 29 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 176: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 2 2 6Detector Phase 4 4 4 3 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 32.0 32.0 32.0 32.0 32.0Total Split (s) 36.0 36.0 36.0 12.5 48.5 32.0 32.0 32.0 32.0 32.0Total Split (%) 44.7% 44.7% 44.7% 15.5% 60.2% 39.8% 39.8% 39.8% 39.8% 39.8%Maximum Green (s) 28.0 28.0 28.0 9.5 40.5 24.0 24.0 24.0 24.0 24.0Yellow Time (s) 4.5 4.5 4.5 3.0 4.5 4.5 4.5 4.5 4.5 4.5All-Red Time (s) 3.5 3.5 3.5 0.0 3.5 3.5 3.5 3.5 3.5 3.5Lost Time Adjust (s) -4.0 -4.0 -4.0 1.0 -4.0 -4.0 -4.0 -4.0 -4.0 -4.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 28.1 28.1 28.1 40.6 40.6 28.1 28.1 28.1 28.1 28.1Actuated g/C Ratio 0.37 0.37 0.37 0.53 0.53 0.37 0.37 0.37 0.37 0.37v/c Ratio 0.13 0.67 0.70 1.09 0.48 1.22 0.03 0.50 0.04 0.05Control Delay 17.5 23.4 11.1 97.0 12.1 144.0 17.3 6.3 17.6 8.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 17.5 23.4 11.1 97.0 12.1 144.0 17.3 6.3 17.6 8.3LOS B C B F B F B A B AApproach Delay 18.4 35.9 88.1 11.7Approach LOS B D F B

Intersection SummaryArea Type: OtherCycle Length: 80.5Actuated Cycle Length: 76.7Natural Cycle: 100Control Type: Semi Act-UncoordMaximum v/c Ratio: 1.22Intersection Signal Delay: 42.8 Intersection LOS: DIntersection Capacity Utilization 87.9% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 177: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 29 805 546 318 817 564 16 372 17 29v/c Ratio 0.13 0.67 0.70 1.09 0.48 1.22 0.03 0.50 0.04 0.05Control Delay 17.5 23.4 11.1 97.0 12.1 144.0 17.3 6.3 17.6 8.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 17.5 23.4 11.1 97.0 12.1 144.0 17.3 6.3 17.6 8.3Queue Length 50th (m) 2.9 52.9 16.1 ~37.0 37.7 ~111.8 1.6 4.4 1.7 0.3Queue Length 95th (m) 8.6 72.0 51.6 #88.1 51.5 #178.1 5.8 25.0 6.1 5.7Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 15.0Base Capacity (vph) 251 1377 835 292 1889 462 640 740 477 544Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.12 0.58 0.65 1.09 0.43 1.22 0.03 0.50 0.04 0.05

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 178: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 741 502 293 717 35 519 15 342 16 3 24Future Volume (vph) 27 741 502 293 717 35 519 15 342 16 3 24Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 1.00 1.00 0.99 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 0.99 1.00 1.00 0.85 1.00 0.87Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 3292 1450 1630 3240 1625 1750 1451 1658 1443Flt Permitted 0.34 1.00 1.00 0.16 1.00 0.74 1.00 1.00 0.75 1.00Satd. Flow (perm) 601 3292 1450 267 3240 1263 1750 1451 1304 1443Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 29 805 546 318 779 38 564 16 372 17 3 26RTOR Reduction (vph) 0 0 250 0 5 0 0 0 208 0 16 0Lane Group Flow (vph) 29 805 296 318 812 0 564 16 164 17 13 0Confl. Peds. (#/hr) 4 4 3 3 3 3Heavy Vehicles (%) 0% 1% 1% 2% 2% 0% 2% 0% 1% 0% 0% 4%Turn Type Perm NA Perm pm+pt NA Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 2 2 6Actuated Green, G (s) 24.1 24.1 24.1 36.6 36.6 24.1 24.1 24.1 24.1 24.1Effective Green, g (s) 28.1 28.1 28.1 35.6 40.6 28.1 28.1 28.1 28.1 28.1Actuated g/C Ratio 0.37 0.37 0.37 0.46 0.53 0.37 0.37 0.37 0.37 0.37Clearance Time (s) 8.0 8.0 8.0 3.0 8.0 8.0 8.0 8.0 8.0 8.0Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 220 1206 531 274 1715 462 641 531 477 528v/s Ratio Prot 0.24 c0.13 0.25 0.01 0.01v/s Ratio Perm 0.05 0.20 c0.41 c0.45 0.11 0.01v/c Ratio 0.13 0.67 0.56 1.16 0.47 1.22 0.02 0.31 0.04 0.02Uniform Delay, d1 16.2 20.4 19.4 16.4 11.3 24.3 15.5 17.4 15.6 15.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 1.3 1.0 105.0 0.2 117.6 0.0 0.2 0.0 0.0Delay (s) 16.4 21.7 20.4 121.3 11.5 141.9 15.6 17.6 15.6 15.5Level of Service B C C F B F B B B BApproach Delay (s) 21.0 42.3 91.2 15.6Approach LOS C D F B

Intersection SummaryHCM 2000 Control Delay 46.8 HCM 2000 Level of Service DHCM 2000 Volume to Capacity ratio 1.14Actuated Cycle Length (s) 76.7 Sum of lost time (s) 12.0Intersection Capacity Utilization 87.9% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group

Page 179: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 340 791 138 81 659 121 245 164 62 143 119 336Future Volume (vph) 340 791 138 81 659 121 245 164 62 143 119 336Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 1.00 1.00 0.99 0.99 0.98Frt 0.978 0.977 0.959 0.889Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1599 3174 0 1630 3195 0 1630 1641 0 1630 1511 0Flt Permitted 0.148 0.185 0.150 0.452Satd. Flow (perm) 249 3174 0 317 3195 0 257 1641 0 764 1511 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 18 19 19 143Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 9 9 10 23 23 10Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 4% 2% 1% 2% 2% 0% 2% 1% 2% 2% 2% 1%Adj. Flow (vph) 370 860 150 88 716 132 266 178 67 155 129 365Shared Lane Traffic (%)Lane Group Flow (vph) 370 1010 0 88 848 0 266 245 0 155 494 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 180: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Detector Phase 7 4 3 8 5 2 1 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0Minimum Split (s) 9.5 30.4 9.5 30.4 9.5 37.7 9.5 37.7Total Split (s) 25.0 30.4 25.0 30.4 12.0 37.7 12.0 37.7Total Split (%) 23.8% 28.9% 23.8% 28.9% 11.4% 35.9% 11.4% 35.9%Maximum Green (s) 22.0 24.0 22.0 24.0 9.0 31.0 9.0 31.0Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1All-Red Time (s) 0.0 2.3 0.0 2.3 0.0 2.6 0.0 2.6Lost Time Adjust (s) 1.0 -2.4 1.0 -2.4 1.0 -2.7 1.0 -2.7Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 50.9 40.0 33.4 26.5 38.4 30.4 37.6 30.0Actuated g/C Ratio 0.50 0.40 0.33 0.26 0.38 0.30 0.37 0.30v/c Ratio 0.93 0.80 0.45 1.00 1.29 0.48 0.44 0.90Control Delay 57.3 33.4 24.0 67.7 185.2 30.1 23.6 45.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 57.3 33.4 24.0 67.7 185.2 30.1 23.6 45.1LOS E C C E F C C DApproach Delay 39.8 63.6 110.9 40.0Approach LOS D E F D

Intersection SummaryArea Type: OtherCycle Length: 105.1Actuated Cycle Length: 101Natural Cycle: 120Control Type: Semi Act-UncoordMaximum v/c Ratio: 1.29Intersection Signal Delay: 56.7 Intersection LOS: EIntersection Capacity Utilization 102.5% ICU Level of Service GAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 181: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT WBL WBT NBL NBT SBL SBTLane Group Flow (vph) 370 1010 88 848 266 245 155 494v/c Ratio 0.93 0.80 0.45 1.00 1.29 0.48 0.44 0.90Control Delay 57.3 33.4 24.0 67.7 185.2 30.1 23.6 45.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 57.3 33.4 24.0 67.7 185.2 30.1 23.6 45.1Queue Length 50th (m) 61.7 99.6 9.9 ~102.4 ~54.4 38.3 20.4 73.0Queue Length 95th (m) #120.9 #142.8 18.8 #142.6 #107.2 62.3 34.8 #133.4Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 407 1268 423 852 207 562 356 601Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.91 0.80 0.21 1.00 1.29 0.44 0.44 0.82

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 182: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 340 791 138 81 659 121 245 164 62 143 119 336Future Volume (vph) 340 791 138 81 659 121 245 164 62 143 119 336Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 0.99 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 0.99 1.00Frt 1.00 0.98 1.00 0.98 1.00 0.96 1.00 0.89Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1599 3174 1629 3193 1629 1642 1620 1512Flt Permitted 0.15 1.00 0.19 1.00 0.15 1.00 0.45 1.00Satd. Flow (perm) 248 3174 318 3193 257 1642 771 1512Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 370 860 150 88 716 132 266 178 67 155 129 365RTOR Reduction (vph) 0 11 0 0 14 0 0 13 0 0 100 0Lane Group Flow (vph) 370 999 0 88 834 0 266 232 0 155 394 0Confl. Peds. (#/hr) 9 9 10 23 23 10Heavy Vehicles (%) 4% 2% 1% 2% 2% 0% 2% 1% 2% 2% 2% 1%Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Actuated Green, G (s) 48.5 37.6 32.0 24.1 36.7 27.7 35.9 27.3Effective Green, g (s) 47.5 40.0 30.0 26.5 34.7 30.4 33.9 30.0Actuated g/C Ratio 0.47 0.40 0.30 0.26 0.34 0.30 0.34 0.30Clearance Time (s) 3.0 6.4 3.0 6.4 3.0 6.7 3.0 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2Lane Grp Cap (vph) 389 1258 184 838 197 494 322 449v/s Ratio Prot c0.19 0.31 0.03 c0.26 c0.11 0.14 0.04 0.26v/s Ratio Perm 0.25 0.11 c0.36 0.13v/c Ratio 0.95 0.79 0.48 1.00 1.35 0.47 0.48 0.88Uniform Delay, d1 27.9 26.8 26.7 37.1 29.6 28.7 24.9 33.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 33.1 3.4 1.4 29.7 187.3 0.4 0.8 16.9Delay (s) 61.0 30.2 28.1 66.8 216.9 29.0 25.7 50.6Level of Service E C C E F C C DApproach Delay (s) 38.4 63.2 126.8 44.6Approach LOS D E F D

Intersection SummaryHCM 2000 Control Delay 59.3 HCM 2000 Level of Service EHCM 2000 Volume to Capacity ratio 1.09Actuated Cycle Length (s) 100.9 Sum of lost time (s) 16.0Intersection Capacity Utilization 102.5% ICU Level of Service GAnalysis Period (min) 15c Critical Lane Group

Page 183: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 231 498 62 5 451 128 58 44 13 148 60 234Future Volume (vph) 231 498 62 5 451 128 58 44 13 148 60 234Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 0 0 0 0 0 0 1 0Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 0.95 0.95 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 0.99 1.00 1.00 0.99Frt 0.988 0.967 0.985 0.881Flt Protected 0.986 0.975 0.950Satd. Flow (prot) 0 3146 0 0 3108 0 0 1648 0 1646 1495 0Flt Permitted 0.576 0.949 0.493 0.696Satd. Flow (perm) 0 1838 0 0 2950 0 0 832 0 1201 1495 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 14 41 9 254Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 5 6 6 5 7 5 5 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 3% 3% 0% 3% 2% 2% 2% 0% 1% 0% 2%Adj. Flow (vph) 251 541 67 5 490 139 63 48 14 161 65 254Shared Lane Traffic (%)Lane Group Flow (vph) 0 859 0 0 634 0 0 125 0 161 319 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 184: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type custom NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 7 8 2 6Detector Phase 7 4 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 6.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 17.0 27.1 27.1 27.1 33.1 33.1 33.1 33.1Total Split (s) 17.0 46.1 29.1 29.1 41.1 41.1 41.1 41.1Total Split (%) 19.5% 52.9% 33.4% 33.4% 47.1% 47.1% 47.1% 47.1%Maximum Green (s) 14.0 40.0 23.0 23.0 35.0 35.0 35.0 35.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0Act Effct Green (s) 42.3 33.3 16.4 16.4 16.4Actuated g/C Ratio 0.63 0.50 0.25 0.25 0.25v/c Ratio 0.73 0.43 0.60 0.55 0.57Control Delay 14.7 11.8 32.5 29.0 9.7Queue Delay 0.0 0.0 0.0 0.0 0.0Total Delay 14.7 11.8 32.5 29.0 9.7LOS B B C C AApproach Delay 14.7 11.8 32.5 16.2Approach LOS B B C B

Intersection SummaryArea Type: OtherCycle Length: 87.2Actuated Cycle Length: 66.7Natural Cycle: 80Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.73Intersection Signal Delay: 15.2 Intersection LOS: BIntersection Capacity Utilization 85.6% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 185: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBT WBT NBT SBL SBTLane Group Flow (vph) 859 634 125 161 319v/c Ratio 0.73 0.43 0.60 0.55 0.57Control Delay 14.7 11.8 32.5 29.0 9.7Queue Delay 0.0 0.0 0.0 0.0 0.0Total Delay 14.7 11.8 32.5 29.0 9.7Queue Length 50th (m) 33.5 23.5 13.3 18.2 6.7Queue Length 95th (m) #84.5 44.9 29.4 35.0 26.2Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 25.0Base Capacity (vph) 1170 1491 469 671 947Starvation Cap Reductn 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.73 0.43 0.27 0.24 0.34

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 186: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 231 498 62 5 451 128 58 44 13 148 60 234Future Volume (vph) 231 498 62 5 451 128 58 44 13 148 60 234Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 0.95 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00Frt 0.99 0.97 0.98 1.00 0.88Flt Protected 0.99 1.00 0.98 0.95 1.00Satd. Flow (prot) 3144 3109 1647 1641 1496Flt Permitted 0.58 0.95 0.49 0.70 1.00Satd. Flow (perm) 1839 2951 832 1202 1496Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 251 541 67 5 490 139 63 48 14 161 65 254RTOR Reduction (vph) 0 5 0 0 21 0 0 7 0 0 192 0Lane Group Flow (vph) 0 854 0 0 613 0 0 118 0 161 127 0Confl. Peds. (#/hr) 5 6 6 5 7 5 5 7Heavy Vehicles (%) 2% 3% 3% 0% 3% 2% 2% 2% 0% 1% 0% 2%Turn Type custom NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 7 8 2 6Actuated Green, G (s) 40.2 31.2 14.3 14.3 14.3Effective Green, g (s) 42.3 33.3 16.4 16.4 16.4Actuated g/C Ratio 0.63 0.50 0.25 0.25 0.25Clearance Time (s) 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1166 1473 204 295 367v/s Ratio Prot 0.09v/s Ratio Perm c0.46 0.21 c0.14 0.13v/c Ratio 0.73 0.42 0.58 0.55 0.35Uniform Delay, d1 8.3 10.6 22.1 21.9 20.7Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 2.4 0.2 4.0 2.1 0.6Delay (s) 10.7 10.7 26.1 24.0 21.3Level of Service B B C C CApproach Delay (s) 10.7 10.7 26.1 22.2Approach LOS B B C C

Intersection SummaryHCM 2000 Control Delay 14.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.73Actuated Cycle Length (s) 66.7 Sum of lost time (s) 11.0Intersection Capacity Utilization 85.6% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group

Page 187: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 54 479 12 7 425 189 11 7 9 226 10 67Future Volume (vph) 54 479 12 7 425 189 11 7 9 226 10 67Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 50.0 25.0 50.0 25.0 0.0 0.0 0.0Storage Lanes 1 1 1 1 1 0 1 0Taper Length (m) 75.0 50.0 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 0.99 1.00 0.99Frt 0.850 0.850 0.917 0.870Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1568 3292 1488 1662 3325 1417 1662 1605 0 1583 1454 0Flt Permitted 0.272 0.459 0.950 0.950Satd. Flow (perm) 449 3292 1488 803 3325 1398 1661 1605 0 1583 1454 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 80 205 10 73Link Speed (k/h) 50 50 50 50Link Distance (m) 310.8 136.7 108.4 168.0Travel Time (s) 22.4 9.8 7.8 12.1Confl. Peds. (#/hr) 1 1 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 1% 0% 0% 0% 5% 0% 0% 0% 5% 0% 4%Adj. Flow (vph) 59 521 13 8 462 205 12 8 10 246 11 73Shared Lane Traffic (%)Lane Group Flow (vph) 59 521 13 8 462 205 12 18 0 246 84 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 2Detector Template Left Thru Right Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 188: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA Perm Perm NA Perm Split NA Split NAProtected Phases 7 4 8 2 2 6 6Permitted Phases 4 4 8 8Detector Phase 7 4 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 6.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 10.5 38.1 38.1 38.1 38.1 38.1 36.1 36.1 36.1 36.1Total Split (s) 15.0 53.1 53.1 38.1 38.1 38.1 36.1 36.1 36.1 36.1Total Split (%) 12.0% 42.4% 42.4% 30.4% 30.4% 30.4% 28.8% 28.8% 28.8% 28.8%Maximum Green (s) 12.0 47.0 47.0 32.0 32.0 32.0 30.0 30.0 30.0 30.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) 1.0 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.3 2.5 2.5 2.5 2.5 2.5 4.0 4.0 4.0 4.0Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 28.4 28.4 28.4 17.7 17.7 17.7 10.4 10.4 19.9 19.9Actuated g/C Ratio 0.40 0.40 0.40 0.25 0.25 0.25 0.15 0.15 0.28 0.28v/c Ratio 0.21 0.40 0.02 0.04 0.56 0.41 0.05 0.07 0.56 0.18Control Delay 16.0 16.6 0.1 23.1 26.8 6.6 32.2 23.4 28.0 8.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 16.0 16.6 0.1 23.1 26.8 6.6 32.2 23.4 28.0 8.1LOS B B A C C A C C C AApproach Delay 16.2 20.6 26.9 22.9Approach LOS B C C C

Intersection SummaryArea Type: OtherCycle Length: 125.3Actuated Cycle Length: 71Natural Cycle: 125Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.56Intersection Signal Delay: 19.6 Intersection LOS: BIntersection Capacity Utilization 51.5% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)

Page 189: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBTLane Group Flow (vph) 59 521 13 8 462 205 12 18 246 84v/c Ratio 0.21 0.40 0.02 0.04 0.56 0.41 0.05 0.07 0.56 0.18Control Delay 16.0 16.6 0.1 23.1 26.8 6.6 32.2 23.4 28.0 8.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 16.0 16.6 0.1 23.1 26.8 6.6 32.2 23.4 28.0 8.1Queue Length 50th (m) 4.8 25.7 0.0 0.8 28.6 0.0 1.4 1.0 28.2 1.1Queue Length 95th (m) 13.7 45.7 0.0 4.6 52.1 16.4 7.1 7.6 58.1 11.4Internal Link Dist (m) 286.8 112.7 84.4 144.0Turn Bay Length (m) 50.0 50.0 25.0 50.0 25.0Base Capacity (vph) 357 2329 1076 394 1633 791 768 747 732 711Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.17 0.22 0.01 0.02 0.28 0.26 0.02 0.02 0.34 0.12

Intersection Summary

Page 190: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 54 479 12 7 425 189 11 7 9 226 10 67Future Volume (vph) 54 479 12 7 425 189 11 7 9 226 10 67Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.92 1.00 0.87Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1568 3292 1488 1662 3325 1399 1662 1604 1583 1455Flt Permitted 0.27 1.00 1.00 0.46 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (perm) 449 3292 1488 804 3325 1399 1662 1604 1583 1455Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 59 521 13 8 462 205 12 8 10 246 11 73RTOR Reduction (vph) 0 0 8 0 0 153 0 9 0 0 53 0Lane Group Flow (vph) 59 521 5 8 462 52 12 9 0 246 31 0Confl. Peds. (#/hr) 1 1 1 1Heavy Vehicles (%) 6% 1% 0% 0% 0% 5% 0% 0% 0% 5% 0% 4%Turn Type pm+pt NA Perm Perm NA Perm Split NA Split NAProtected Phases 7 4 8 2 2 6 6Permitted Phases 4 4 8 8Actuated Green, G (s) 26.3 26.3 26.3 15.7 15.7 15.7 8.3 8.3 17.7 17.7Effective Green, g (s) 25.3 28.4 28.4 17.8 17.8 17.8 10.4 10.4 19.8 19.8Actuated g/C Ratio 0.36 0.40 0.40 0.25 0.25 0.25 0.15 0.15 0.28 0.28Clearance Time (s) 3.0 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 2.3 2.5 2.5 2.5 2.5 2.5 4.0 4.0 4.0 4.0Lane Grp Cap (vph) 265 1324 598 202 838 352 244 236 443 408v/s Ratio Prot 0.02 c0.16 c0.14 c0.01 0.01 c0.16 0.02v/s Ratio Perm 0.06 0.00 0.01 0.04v/c Ratio 0.22 0.39 0.01 0.04 0.55 0.15 0.05 0.04 0.56 0.08Uniform Delay, d1 15.6 15.0 12.7 19.9 22.9 20.5 25.9 25.8 21.6 18.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.1 0.0 0.1 0.6 0.1 0.1 0.1 1.9 0.1Delay (s) 15.9 15.1 12.7 20.0 23.6 20.6 26.0 25.9 23.5 18.8Level of Service B B B C C C C C C BApproach Delay (s) 15.1 22.6 25.9 22.3Approach LOS B C C C

Intersection SummaryHCM 2000 Control Delay 19.9 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.45Actuated Cycle Length (s) 70.6 Sum of lost time (s) 16.0Intersection Capacity Utilization 51.5% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 191: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 613 116 31 464 117 47Future Volume (vph) 613 116 31 464 117 47Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 75.0 50.0 0.0 50.0Storage Lanes 1 1 2 1Taper Length (m) 50.0 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00Ped Bike Factor 0.99 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 3228 1403 1662 3228 3101 1488Flt Permitted 0.388 0.950Satd. Flow (perm) 3228 1386 679 3228 3097 1488Right Turn on Red Yes YesSatd. Flow (RTOR) 126 51Link Speed (k/h) 50 50 50Link Distance (m) 140.7 332.8 68.6Travel Time (s) 10.1 24.0 4.9Confl. Peds. (#/hr) 1 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 6% 0% 3% 4% 0%Adj. Flow (vph) 666 126 34 504 127 51Shared Lane Traffic (%)Lane Group Flow (vph) 666 126 34 504 127 51Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 1 1 2 1 1Detector Template Thru Right Left Thru Left RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0

Page 192: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group EBT EBR WBL WBT NBL NBRTurn Type NA Perm Perm NA Prot PermProtected Phases 4 8 2Permitted Phases 4 8 2Detector Phase 4 4 8 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 8.0 8.0Minimum Split (s) 24.5 24.5 24.5 24.5 38.1 38.1Total Split (s) 41.5 41.5 41.5 41.5 38.1 38.1Total Split (%) 52.1% 52.1% 52.1% 52.1% 47.9% 47.9%Maximum Green (s) 35.0 35.0 35.0 35.0 32.0 32.0Yellow Time (s) 4.5 4.5 4.5 4.5 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.5 -2.5 -2.5 -2.5 -2.5 -2.5Total Lost Time (s) 4.0 4.0 4.0 4.0 3.6 3.6Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.9 2.9 2.9 2.9 2.8 2.8Recall Mode Min Min Min Min Min MinWalk Time (s) 12.0 12.0Flash Dont Walk (s) 20.0 20.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 15.0 15.0 15.0 15.0 10.6 10.6Actuated g/C Ratio 0.45 0.45 0.45 0.45 0.32 0.32v/c Ratio 0.46 0.18 0.11 0.35 0.13 0.10Control Delay 7.4 2.1 6.1 6.6 9.3 4.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 7.4 2.1 6.1 6.6 9.3 4.4LOS A A A A A AApproach Delay 6.5 6.5 7.9Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 79.6Actuated Cycle Length: 33.3Natural Cycle: 65Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.46Intersection Signal Delay: 6.7 Intersection LOS: AIntersection Capacity Utilization 41.3% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49)

Page 193: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group EBT EBR WBL WBT NBL NBRLane Group Flow (vph) 666 126 34 504 127 51v/c Ratio 0.46 0.18 0.11 0.35 0.13 0.10Control Delay 7.4 2.1 6.1 6.6 9.3 4.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 7.4 2.1 6.1 6.6 9.3 4.4Queue Length 50th (m) 11.9 0.0 1.0 8.4 2.5 0.0Queue Length 95th (m) 20.1 4.5 3.8 14.7 7.1 4.7Internal Link Dist (m) 116.7 308.8 44.6Turn Bay Length (m) 75.0 50.0 50.0Base Capacity (vph) 3226 1385 679 3226 3050 1464Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.21 0.09 0.05 0.16 0.04 0.03

Intersection Summary

Page 194: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 32

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 613 116 31 464 117 47Future Volume (vph) 613 116 31 464 117 47Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 3.6 3.6Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 3228 1386 1662 3228 3101 1488Flt Permitted 1.00 1.00 0.39 1.00 0.95 1.00Satd. Flow (perm) 3228 1386 679 3228 3101 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 666 126 34 504 127 51RTOR Reduction (vph) 0 69 0 0 0 35Lane Group Flow (vph) 666 57 34 504 127 16Confl. Peds. (#/hr) 1 1 1Heavy Vehicles (%) 3% 6% 0% 3% 4% 0%Turn Type NA Perm Perm NA Prot PermProtected Phases 4 8 2Permitted Phases 4 8 2Actuated Green, G (s) 12.5 12.5 12.5 12.5 8.1 8.1Effective Green, g (s) 15.0 15.0 15.0 15.0 10.6 10.6Actuated g/C Ratio 0.45 0.45 0.45 0.45 0.32 0.32Clearance Time (s) 6.5 6.5 6.5 6.5 6.1 6.1Vehicle Extension (s) 2.9 2.9 2.9 2.9 2.8 2.8Lane Grp Cap (vph) 1458 626 306 1458 990 475v/s Ratio Prot c0.21 0.16 c0.04v/s Ratio Perm 0.04 0.05 0.01v/c Ratio 0.46 0.09 0.11 0.35 0.13 0.03Uniform Delay, d1 6.3 5.2 5.3 5.9 8.0 7.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.1 0.2 0.1 0.1 0.0Delay (s) 6.5 5.3 5.4 6.0 8.1 7.8Level of Service A A A A A AApproach Delay (s) 6.3 6.0 8.0Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.4 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.32Actuated Cycle Length (s) 33.2 Sum of lost time (s) 7.6Intersection Capacity Utilization 41.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 195: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 131 79 174 0 0 230Future Volume (vph) 131 79 174 0 0 230Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.943Flt Protected 0.970Satd. Flow (prot) 3045 0 3260 0 0 3260Flt Permitted 0.970Satd. Flow (perm) 3045 0 3260 0 0 3260Right Turn on Red Yes YesSatd. Flow (RTOR) 86Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 2% 2% 0% 0% 2%Adj. Flow (vph) 142 86 189 0 0 250Shared Lane Traffic (%)Lane Group Flow (vph) 228 0 189 0 0 250Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch Phase

Page 196: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group WBL WBR NBT NBR SBL SBTMinimum Initial (s) 8.0 8.0 8.0Minimum Split (s) 25.1 22.5 22.5Total Split (s) 28.2 22.5 22.5Total Split (%) 55.6% 44.4% 44.4%Maximum Green (s) 22.1 16.4 16.4Yellow Time (s) 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 10.1 10.1 10.1Actuated g/C Ratio 0.36 0.36 0.36v/c Ratio 0.20 0.16 0.21Control Delay 4.6 6.6 6.9Queue Delay 0.0 0.0 0.0Total Delay 4.6 6.6 6.9LOS A A AApproach Delay 4.6 6.6 6.9Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50.7Actuated Cycle Length: 28.2Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.21Intersection Signal Delay: 6.0 Intersection LOS: AIntersection Capacity Utilization 20.3% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 197: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group WBL NBT SBTLane Group Flow (vph) 228 189 250v/c Ratio 0.20 0.16 0.21Control Delay 4.6 6.6 6.9Queue Delay 0.0 0.0 0.0Total Delay 4.6 6.6 6.9Queue Length 50th (m) 2.0 2.8 3.8Queue Length 95th (m) 5.2 5.7 7.3Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2959 2137 2137Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.08 0.09 0.12

Intersection Summary

Page 198: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 36

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 131 79 174 0 0 230Future Volume (vph) 131 79 174 0 0 230Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 0.94 1.00 1.00Flt Protected 0.97 1.00 1.00Satd. Flow (prot) 3045 3260 3260Flt Permitted 0.97 1.00 1.00Satd. Flow (perm) 3045 3260 3260Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 142 86 189 0 0 250RTOR Reduction (vph) 55 0 0 0 0 0Lane Group Flow (vph) 173 0 189 0 0 250Heavy Vehicles (%) 2% 2% 2% 0% 0% 2%Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.0 8.0 8.0Effective Green, g (s) 10.1 10.1 10.1Actuated g/C Ratio 0.36 0.36 0.36Clearance Time (s) 6.1 6.1 6.1Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1090 1167 1167v/s Ratio Prot c0.06 0.06v/s Ratio Perm c0.08v/c Ratio 0.16 0.16 0.21Uniform Delay, d1 6.2 6.2 6.3Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.0 0.0 0.1Delay (s) 6.2 6.2 6.3Level of Service A A AApproach Delay (s) 6.2 6.2 6.3Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.3 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.21Actuated Cycle Length (s) 28.2 Sum of lost time (s) 10.1Intersection Capacity Utilization 20.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 199: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 378 12 2 259 263 388Future Volume (vph) 378 12 2 259 263 388Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Frt 0.996 0.911Flt Protected 0.954Satd. Flow (prot) 1663 0 0 3198 2981 0Flt Permitted 0.954 0.948Satd. Flow (perm) 1663 0 0 3032 2981 0Right Turn on Red Yes YesSatd. Flow (RTOR) 2 422Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 0% 4% 4% 0%Adj. Flow (vph) 411 13 2 282 286 422Shared Lane Traffic (%)Lane Group Flow (vph) 424 0 0 284 708 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot Perm NA NAProtected Phases 4 2 6Permitted Phases 2Detector Phase 4 2 2 6Switch Phase

Page 200: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBR NBL NBT SBT SBRMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 31.3 42.0 42.0 42.0Total Split (%) 42.7% 57.3% 57.3% 57.3%Maximum Green (s) 25.0 35.0 35.0 35.0Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.9 2.9 2.9Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 16.7 14.7 14.7Actuated g/C Ratio 0.42 0.37 0.37v/c Ratio 0.61 0.25 0.52Control Delay 13.1 10.4 5.8Queue Delay 0.0 0.0 0.0Total Delay 13.1 10.4 5.8LOS B B AApproach Delay 13.1 10.4 5.8Approach LOS B B A

Intersection SummaryArea Type: OtherCycle Length: 73.3Actuated Cycle Length: 39.6Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.61Intersection Signal Delay: 8.9 Intersection LOS: AIntersection Capacity Utilization 51.7% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 201: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL NBT SBTLane Group Flow (vph) 424 284 708v/c Ratio 0.61 0.25 0.52Control Delay 13.1 10.4 5.8Queue Delay 0.0 0.0 0.0Total Delay 13.1 10.4 5.8Queue Length 50th (m) 18.9 6.5 6.5Queue Length 95th (m) 48.1 17.4 21.3Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1182 2810 2793Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.36 0.10 0.25

Intersection Summary

Page 202: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 378 12 2 259 263 388Future Volume (vph) 378 12 2 259 263 388Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95Frt 1.00 1.00 0.91Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1662 3197 2980Flt Permitted 0.95 0.95 1.00Satd. Flow (perm) 1662 3031 2980Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 411 13 2 282 286 422RTOR Reduction (vph) 1 0 0 0 265 0Lane Group Flow (vph) 423 0 0 284 443 0Heavy Vehicles (%) 0% 0% 0% 4% 4% 0%Turn Type Prot Perm NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 14.3 11.6 11.6Effective Green, g (s) 16.6 14.6 14.6Actuated g/C Ratio 0.42 0.37 0.37Clearance Time (s) 6.3 7.0 7.0Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 703 1128 1109v/s Ratio Prot c0.25 c0.15v/s Ratio Perm 0.09v/c Ratio 0.60 0.25 0.40Uniform Delay, d1 8.7 8.5 9.1Progression Factor 1.00 1.00 1.00Incremental Delay, d2 1.1 0.1 0.1Delay (s) 9.8 8.6 9.2Level of Service A A AApproach Delay (s) 9.8 8.6 9.2Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 9.3 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.51Actuated Cycle Length (s) 39.2 Sum of lost time (s) 8.0Intersection Capacity Utilization 51.7% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 203: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 59 63 0 0 95 36 0 0 0 190 0 75Future Volume (vph) 59 63 0 0 95 36 0 0 0 190 0 75Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1716 0 1750 1667 1403 0 1750 0 3101 1488 0Flt Permitted 0.478 0.950Satd. Flow (perm) 836 1716 0 1750 1667 1403 0 1750 0 3101 1488 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 126 918Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 0% 5% 6% 0% 0% 0% 4% 0% 0%Adj. Flow (vph) 64 68 0 0 103 39 0 0 0 207 0 82Shared Lane Traffic (%)Lane Group Flow (vph) 64 68 0 0 103 39 0 0 0 207 82 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 204: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 12.5 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 18.0 52.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (%) 13.9% 40.5% 26.6% 26.6% 26.6% 29.7% 29.7% 29.7% 29.7%Maximum Green (s) 15.0 45.0 27.0 27.0 27.0 31.0 31.0 31.0 31.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.6 24.6 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.53 0.53 0.29 0.29 0.29 0.29v/c Ratio 0.11 0.07 0.21 0.08 0.23 0.08Control Delay 5.8 5.5 13.7 0.3 13.2 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.8 5.5 13.7 0.3 13.2 0.1LOS A A B A B AApproach Delay 5.6 10.1 9.5Approach LOS A B A

Intersection SummaryArea Type: OtherCycle Length: 129.5Actuated Cycle Length: 46.1Natural Cycle: 125Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.23Intersection Signal Delay: 8.7 Intersection LOS: AIntersection Capacity Utilization 25.2% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 205: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 64 68 103 39 207 82v/c Ratio 0.11 0.07 0.21 0.08 0.23 0.08Control Delay 5.8 5.5 13.7 0.3 13.2 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.8 5.5 13.7 0.3 13.2 0.1Queue Length 50th (m) 2.3 2.5 6.5 0.0 6.7 0.0Queue Length 95th (m) 6.2 6.5 15.5 0.0 13.0 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 696 1716 1104 971 2322 1344Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.09 0.04 0.09 0.04 0.09 0.06

Intersection Summary

Page 206: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 59 63 0 0 95 36 0 0 0 190 0 75Future Volume (vph) 59 63 0 0 95 36 0 0 0 190 0 75Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1716 1667 1403 3101 1488Flt Permitted 0.48 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 837 1716 1667 1403 3101 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 64 68 0 0 103 39 0 0 0 207 0 82RTOR Reduction (vph) 0 0 0 0 0 28 0 0 0 0 58 0Lane Group Flow (vph) 64 68 0 0 103 11 0 0 0 207 24 0Heavy Vehicles (%) 0% 2% 0% 0% 5% 6% 0% 0% 0% 4% 0% 0%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 21.1 21.1 10.0 10.0 10.0 10.0Effective Green, g (s) 20.1 24.6 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.44 0.53 0.29 0.29 0.29 0.29Clearance Time (s) 3.0 7.5 7.5 7.5 7.5 7.5Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 492 915 488 410 908 435v/s Ratio Prot c0.02 0.04 c0.06 c0.07 0.02v/s Ratio Perm 0.04 0.01v/c Ratio 0.13 0.07 0.21 0.03 0.23 0.06Uniform Delay, d1 7.8 5.2 12.3 11.6 12.4 11.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.1 0.0 0.1 0.0Delay (s) 7.9 5.2 12.4 11.6 12.4 11.7Level of Service A A B B B BApproach Delay (s) 6.5 12.2 0.0 12.2Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 10.9 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.23Actuated Cycle Length (s) 46.1 Sum of lost time (s) 16.0Intersection Capacity Utilization 25.2% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 207: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 14 36 2 25 51 79 3 137 201 93 153 15Future Volume (vph) 14 36 2 25 51 79 3 137 201 93 153 15Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.995 0.931 0.920 0.992Flt Protected 0.987 0.992 0.982Satd. Flow (prot) 0 1719 0 0 1603 0 0 1594 0 0 1699 0Flt Permitted 0.904 0.950 0.997 0.794Satd. Flow (perm) 0 1574 0 0 1535 0 0 1589 0 0 1373 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 2 86 103 4Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 0% 2% 0% 1% 0% 1% 1% 1% 0% 0%Adj. Flow (vph) 15 39 2 27 55 86 3 149 218 101 166 16Shared Lane Traffic (%)Lane Group Flow (vph) 0 56 0 0 168 0 0 370 0 0 283 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 0.0 0.0Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Detector Phase 4 4 8 8 2 2 6 6Switch Phase

Page 208: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 46

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3Total Split (s) 46.3 46.3 46.3 46.3 36.3 36.3 36.3 36.3Total Split (%) 56.1% 56.1% 56.1% 56.1% 43.9% 43.9% 43.9% 43.9%Maximum Green (s) 40.0 40.0 40.0 40.0 30.0 30.0 30.0 30.0Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 14.1 14.1 19.5 19.5Actuated g/C Ratio 0.34 0.34 0.47 0.47v/c Ratio 0.11 0.29 0.46 0.44Control Delay 11.4 8.1 7.5 10.0Queue Delay 0.0 0.0 0.0 0.0Total Delay 11.4 8.1 7.5 10.0LOS B A A AApproach Delay 11.4 8.1 7.5 10.0Approach LOS B A A A

Intersection SummaryArea Type: OtherCycle Length: 82.6Actuated Cycle Length: 41.8Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.46Intersection Signal Delay: 8.7 Intersection LOS: AIntersection Capacity Utilization 58.0% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 209: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBT WBT NBT SBTLane Group Flow (vph) 56 168 370 283v/c Ratio 0.11 0.29 0.46 0.44Control Delay 11.4 8.1 7.5 10.0Queue Delay 0.0 0.0 0.0 0.0Total Delay 11.4 8.1 7.5 10.0Queue Length 50th (m) 2.6 4.0 10.8 11.8Queue Length 95th (m) 10.2 17.5 29.2 29.7Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m)Base Capacity (vph) 1491 1458 1279 1088Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.04 0.12 0.29 0.26

Intersection Summary

Page 210: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 14 36 2 25 51 79 3 137 201 93 153 15Future Volume (vph) 14 36 2 25 51 79 3 137 201 93 153 15Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00Frt 1.00 0.93 0.92 0.99Flt Protected 0.99 0.99 1.00 0.98Satd. Flow (prot) 1719 1603 1594 1700Flt Permitted 0.90 0.95 1.00 0.79Satd. Flow (perm) 1574 1534 1591 1374Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 15 39 2 27 55 86 3 149 218 101 166 16RTOR Reduction (vph) 0 1 0 0 57 0 0 55 0 0 2 0Lane Group Flow (vph) 0 55 0 0 111 0 0 315 0 0 281 0Heavy Vehicles (%) 0% 0% 0% 2% 0% 1% 0% 1% 1% 1% 0% 0%Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 11.8 11.8 17.2 17.2Effective Green, g (s) 14.1 14.1 19.5 19.5Actuated g/C Ratio 0.34 0.34 0.47 0.47Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 533 519 745 644v/s Ratio Protv/s Ratio Perm 0.03 c0.07 0.20 c0.20v/c Ratio 0.10 0.21 0.42 0.44Uniform Delay, d1 9.4 9.8 7.3 7.4Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.6 1.1 1.3Delay (s) 9.7 10.4 8.4 8.7Level of Service A B A AApproach Delay (s) 9.7 10.4 8.4 8.7Approach LOS A B A A

Intersection SummaryHCM 2000 Control Delay 9.0 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.34Actuated Cycle Length (s) 41.6 Sum of lost time (s) 8.0Intersection Capacity Utilization 58.0% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 211: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 14 2 3 157 122 17Future Volume (vph) 14 2 3 157 122 17Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.984 0.984Flt Protected 0.958 0.999Satd. Flow (prot) 1395 0 0 1722 1680 0Flt Permitted 0.958 0.999Satd. Flow (perm) 1395 0 0 1722 1680 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 14% 50% 33% 1% 2% 6%Adj. Flow (vph) 15 2 3 171 133 18Shared Lane Traffic (%)Lane Group Flow (vph) 17 0 0 174 151 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 21.6% ICU Level of Service AAnalysis Period (min) 15

Page 212: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 14 2 3 157 122 17Future Volume (Veh/h) 14 2 3 157 122 17Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 15 2 3 171 133 18PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 319 142 151vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 319 142 151tC, single (s) 6.5 6.7 4.4tC, 2 stage (s)tF (s) 3.6 3.8 2.5p0 queue free % 98 100 100cM capacity (veh/h) 649 793 1261

Direction, Lane # EB 1 NB 1 SB 1Volume Total 17 174 151Volume Left 15 3 0Volume Right 2 0 18cSH 663 1261 1700Volume to Capacity 0.03 0.00 0.09Queue Length 95th (m) 0.6 0.1 0.0Control Delay (s) 10.6 0.2 0.0Lane LOS B AApproach Delay (s) 10.6 0.2 0.0Approach LOS B

Intersection SummaryAverage Delay 0.6Intersection Capacity Utilization 21.6% ICU Level of Service AAnalysis Period (min) 15

Page 213: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 19 7 5 145 108 11Future Volume (vph) 19 7 5 145 108 11Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.963 0.987Flt Protected 0.965 0.998Satd. Flow (prot) 1569 0 0 1730 1667 0Flt Permitted 0.965 0.998Satd. Flow (perm) 1569 0 0 1730 1667 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 5% 0% 0% 1% 4% 0%Adj. Flow (vph) 21 8 5 158 117 12Shared Lane Traffic (%)Lane Group Flow (vph) 29 0 0 163 129 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 22.7% ICU Level of Service AAnalysis Period (min) 15

Page 214: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 52

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 19 7 5 145 108 11Future Volume (Veh/h) 19 7 5 145 108 11Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 21 8 5 158 117 12PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 291 123 129vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 291 123 129tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 97 99 100cM capacity (veh/h) 691 933 1469

Direction, Lane # EB 1 NB 1 SB 1Volume Total 29 163 129Volume Left 21 5 0Volume Right 8 0 12cSH 744 1469 1700Volume to Capacity 0.04 0.00 0.08Queue Length 95th (m) 1.0 0.1 0.0Control Delay (s) 10.0 0.3 0.0Lane LOS B AApproach Delay (s) 10.0 0.3 0.0Approach LOS B

Intersection SummaryAverage Delay 1.0Intersection Capacity Utilization 22.7% ICU Level of Service AAnalysis Period (min) 15

Page 215: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 5 15 6 145 110 5Future Volume (vph) 5 15 6 145 110 5Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.897 0.995Flt Protected 0.988 0.998Satd. Flow (prot) 1472 0 0 1694 1677 0Flt Permitted 0.988 0.998Satd. Flow (perm) 1472 0 0 1694 1677 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 298.3 331.4Travel Time (s) 14.9 21.5 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 7% 50% 1% 4% 0%Adj. Flow (vph) 5 16 7 158 120 5Shared Lane Traffic (%)Lane Group Flow (vph) 21 0 0 165 125 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 23.6% ICU Level of Service AAnalysis Period (min) 15

Page 216: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 5 15 6 145 110 5Future Volume (Veh/h) 5 15 6 145 110 5Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 16 7 158 120 5PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 294 122 125vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 294 122 125tC, single (s) 6.4 6.3 4.6tC, 2 stage (s)tF (s) 3.5 3.4 2.7p0 queue free % 99 98 99cM capacity (veh/h) 697 915 1212

Direction, Lane # EB 1 NB 1 SB 1Volume Total 21 165 125Volume Left 5 7 0Volume Right 16 0 5cSH 852 1212 1700Volume to Capacity 0.02 0.01 0.07Queue Length 95th (m) 0.6 0.1 0.0Control Delay (s) 9.3 0.4 0.0Lane LOS A AApproach Delay (s) 9.3 0.4 0.0Approach LOS A

Intersection SummaryAverage Delay 0.8Intersection Capacity Utilization 23.6% ICU Level of Service AAnalysis Period (min) 15

Page 217: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 4 8 30 10 13 8 20 137 5 2 119 4Future Volume (vph) 4 8 30 10 13 8 20 137 5 2 119 4Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.903 0.964 0.996 0.996Flt Protected 0.996 0.984 0.994 0.999Satd. Flow (prot) 0 1469 0 0 1660 0 0 1669 0 0 1677 0Flt Permitted 0.996 0.984 0.994 0.999Satd. Flow (perm) 0 1469 0 0 1660 0 0 1669 0 0 1677 0Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 29.6Travel Time (s) 8.5 7.8 70.5 2.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 10% 0% 0% 0% 10% 3% 0% 0% 4% 0%Adj. Flow (vph) 4 9 33 11 14 9 22 149 5 2 129 4Shared Lane Traffic (%)Lane Group Flow (vph) 0 46 0 0 34 0 0 176 0 0 135 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 31.0% ICU Level of Service AAnalysis Period (min) 15

Page 218: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 56

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 4 8 30 10 13 8 20 137 5 2 119 4Future Volume (Veh/h) 4 8 30 10 13 8 20 137 5 2 119 4Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 4 9 33 11 14 9 22 149 5 2 129 4PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 346 333 131 368 332 152 133 154vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 346 333 131 368 332 152 133 154tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.2 4.2 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.3 2.3 2.2p0 queue free % 99 98 96 98 98 99 98 100cM capacity (veh/h) 587 580 898 556 581 900 1404 1439

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 46 34 176 135Volume Left 4 11 22 2Volume Right 33 9 5 4cSH 778 631 1404 1439Volume to Capacity 0.06 0.05 0.02 0.00Queue Length 95th (m) 1.5 1.4 0.4 0.0Control Delay (s) 9.9 11.0 1.1 0.1Lane LOS A B A AApproach Delay (s) 9.9 11.0 1.1 0.1Approach LOS A B

Intersection SummaryAverage Delay 2.6Intersection Capacity Utilization 31.0% ICU Level of Service AAnalysis Period (min) 15

Page 219: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 36 42 12 138 189 31Future Volume (vph) 36 42 12 138 189 31Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.927 0.850Flt Protected 0.978 0.950Satd. Flow (prot) 1510 0 1662 1733 1733 1282Flt Permitted 0.978 0.950Satd. Flow (perm) 1510 0 1662 1733 1733 1282Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 11% 0% 0% 1% 1% 16%Adj. Flow (vph) 39 46 13 150 205 34Shared Lane Traffic (%)Lane Group Flow (vph) 85 0 13 150 205 34Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 22.5% ICU Level of Service AAnalysis Period (min) 15

Page 220: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 58

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 36 42 12 138 189 31Future Volume (Veh/h) 36 42 12 138 189 31Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 39 46 13 150 205 34PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 381 205 239vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 381 205 239tC, single (s) 6.5 6.2 4.1tC, 2 stage (s)tF (s) 3.6 3.3 2.2p0 queue free % 93 95 99cM capacity (veh/h) 598 841 1340

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 85 13 150 205 34Volume Left 39 13 0 0 0Volume Right 46 0 0 0 34cSH 709 1340 1700 1700 1700Volume to Capacity 0.12 0.01 0.09 0.12 0.02Queue Length 95th (m) 3.3 0.2 0.0 0.0 0.0Control Delay (s) 10.8 7.7 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 10.8 0.6 0.0Approach LOS B

Intersection SummaryAverage Delay 2.1Intersection Capacity Utilization 22.5% ICU Level of Service AAnalysis Period (min) 15

Page 221: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 59

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 101 18 148 77 22 190Future Volume (vph) 101 18 148 77 22 190Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.979 0.954Flt Protected 0.959 0.995Satd. Flow (prot) 1616 0 1642 0 0 1702Flt Permitted 0.959 0.995Satd. Flow (perm) 1616 0 1642 0 0 1702Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 2% 1% 5% 2%Adj. Flow (vph) 110 20 161 84 24 207Shared Lane Traffic (%)Lane Group Flow (vph) 130 0 245 0 0 231Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 43.0% ICU Level of Service AAnalysis Period (min) 15

Page 222: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 60

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 101 18 148 77 22 190Future Volume (Veh/h) 101 18 148 77 22 190Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 110 20 161 84 24 207PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 458 203 245vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 458 203 245tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 80 98 98cM capacity (veh/h) 551 843 1304

Direction, Lane # WB 1 NB 1 SB 1Volume Total 130 245 231Volume Left 110 0 24Volume Right 20 84 0cSH 582 1700 1304Volume to Capacity 0.22 0.14 0.02Queue Length 95th (m) 6.8 0.0 0.4Control Delay (s) 13.0 0.0 1.0Lane LOS B AApproach Delay (s) 13.0 0.0 1.0Approach LOS B

Intersection SummaryAverage Delay 3.1Intersection Capacity Utilization 43.0% ICU Level of Service AAnalysis Period (min) 15

Page 223: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 61

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 301 126 0 189 225Future Volume (vph) 0 301 126 0 189 225Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3228 3197 0 1614 1458Flt Permitted 0.950Satd. Flow (perm) 0 3228 3197 0 1614 1458Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 3% 4% 0% 3% 2%Adj. Flow (vph) 0 327 137 0 205 245Shared Lane Traffic (%)Lane Group Flow (vph) 0 327 137 0 205 245Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 27.1% ICU Level of Service AAnalysis Period (min) 15

Page 224: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 62

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 0 301 126 0 189 225Future Volume (Veh/h) 0 301 126 0 189 225Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 327 137 0 205 245PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 5Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 137 300 68vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 137 300 68tC, single (s) 4.1 6.9 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 69 75cM capacity (veh/h) 1459 664 981

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1Volume Total 164 164 68 68 450Volume Left 0 0 0 0 205Volume Right 0 0 0 0 245cSH 1700 1700 1700 1700 1458Volume to Capacity 0.10 0.10 0.04 0.04 0.31Queue Length 95th (m) 0.0 0.0 0.0 0.0 10.6Control Delay (s) 0.0 0.0 0.0 0.0 11.2Lane LOS BApproach Delay (s) 0.0 0.0 11.2Approach LOS B

Intersection SummaryAverage Delay 5.5Intersection Capacity Utilization 27.1% ICU Level of Service AAnalysis Period (min) 15

Page 225: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 63

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 286 0 0 122 28 30Future Volume (vph) 286 0 0 122 28 30Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3228 0 0 3260 1554 1444Flt Permitted 0.950Satd. Flow (perm) 3228 0 0 3260 1554 1444Link Speed (k/h) 50 50 50Link Distance (m) 104.2 91.9 169.0Travel Time (s) 7.5 6.6 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 2% 7% 3%Adj. Flow (vph) 311 0 0 133 30 33Shared Lane Traffic (%)Lane Group Flow (vph) 311 0 0 133 30 33Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 18.6% ICU Level of Service AAnalysis Period (min) 15

Page 226: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 64

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (veh/h) 286 0 0 122 28 30Future Volume (Veh/h) 286 0 0 122 28 30Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 311 0 0 133 30 33PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 6Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 311 378 156vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 311 378 156tC, single (s) 4.1 6.9 7.0tC, 2 stage (s)tF (s) 2.2 3.6 3.3p0 queue free % 100 95 96cM capacity (veh/h) 1261 584 859

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1Volume Total 156 156 66 66 63Volume Left 0 0 0 0 30Volume Right 0 0 0 0 33cSH 1700 1700 1700 1700 1226Volume to Capacity 0.09 0.09 0.04 0.04 0.05Queue Length 95th (m) 0.0 0.0 0.0 0.0 1.3Control Delay (s) 0.0 0.0 0.0 0.0 10.4Lane LOS BApproach Delay (s) 0.0 0.0 10.4Approach LOS B

Intersection SummaryAverage Delay 1.3Intersection Capacity Utilization 18.6% ICU Level of Service AAnalysis Period (min) 15

Page 227: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 65

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 118 230 170 44 41 118Future Volume (vph) 118 230 170 44 41 118Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.972 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1630 1716 1668 0 1630 1458Flt Permitted 0.950 0.950Satd. Flow (perm) 1630 1716 1668 0 1630 1458Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 128 250 185 48 45 128Shared Lane Traffic (%)Lane Group Flow (vph) 128 250 233 0 45 128Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 33.0% ICU Level of Service AAnalysis Period (min) 15

Page 228: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 66

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 118 230 170 44 41 118Future Volume (vph) 118 230 170 44 41 118Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 128 250 185 48 45 128

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total (vph) 128 250 233 45 128Volume Left (vph) 128 0 0 45 0Volume Right (vph) 0 0 48 0 128Hadj (s) 0.53 0.03 -0.09 0.53 -0.67Departure Headway (s) 5.8 5.3 5.1 6.5 5.3Degree Utilization, x 0.21 0.37 0.33 0.08 0.19Capacity (veh/h) 598 662 672 514 623Control Delay (s) 9.1 10.1 10.7 8.9 8.4Approach Delay (s) 9.7 10.7 8.5Approach LOS A B A

Intersection SummaryDelay 9.7Level of Service AIntersection Capacity Utilization 33.0% ICU Level of Service AAnalysis Period (min) 15

Page 229: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway/Marinelane Parkway & Portage Road Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 67

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 15 641 443 80 149 34Future Volume (vph) 15 641 443 80 149 34Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 50.0 50.0 0.0Storage Lanes 0 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.999 0.950Satd. Flow (prot) 0 3258 3260 1473 1646 1488Flt Permitted 0.999 0.950Satd. Flow (perm) 0 3258 3260 1473 1646 1488Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 2% 1% 1% 0%Adj. Flow (vph) 16 697 482 87 162 37Shared Lane Traffic (%)Lane Group Flow (vph) 0 713 482 87 162 37Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 46.5% ICU Level of Service AAnalysis Period (min) 15

Page 230: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan212: Marineland Parkway/Marinelane Parkway & Portage Road Existing Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 68

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 15 641 443 80 149 34Future Volume (Veh/h) 15 641 443 80 149 34Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 697 482 87 162 37PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 383pX, platoon unblockedvC, conflicting volume 482 862 241vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 482 862 241tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 99 44 95cM capacity (veh/h) 1091 292 766

Direction, Lane # EB 1 EB 2 WB 1 WB 2 WB 3 SB 1 SB 2Volume Total 248 465 241 241 87 162 37Volume Left 16 0 0 0 0 162 0Volume Right 0 0 0 0 87 0 37cSH 1091 1700 1700 1700 1700 292 766Volume to Capacity 0.01 0.27 0.14 0.14 0.05 0.56 0.05Queue Length 95th (m) 0.4 0.0 0.0 0.0 0.0 25.1 1.2Control Delay (s) 0.7 0.0 0.0 0.0 0.0 31.7 9.9Lane LOS A D AApproach Delay (s) 0.2 0.0 27.7Approach LOS D

Intersection SummaryAverage Delay 3.8Intersection Capacity Utilization 46.5% ICU Level of Service AAnalysis Period (min) 15

Page 231: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Thundering Waters Transportation Master Plan | 151385 | July 2016

Paradigm Transportation Solutions Limited | Appendices

Appendix D

Existing Traffic Operations with Improvements Reports

Page 232: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 57 556 218 115 556 21 87 3 79 13 2 19Future Volume (vph) 57 556 218 115 556 21 87 3 79 13 2 19Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 75.0 0.0 15.0 0.0Storage Lanes 1 1 1 0 2 1 1 0Taper Length (m) 40.0 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.98 1.00 0.97 0.99Frt 0.850 0.994 0.850 0.863Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3260 1458 1630 3240 0 3162 1716 1458 1630 1481 0Flt Permitted 0.414 0.236 0.950 0.756Satd. Flow (perm) 710 3260 1434 404 3240 0 3162 1716 1422 1280 1481 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 198 6 86 21Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 5 5 12 12Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 62 604 237 125 604 23 95 3 86 14 2 21Shared Lane Traffic (%)Lane Group Flow (vph) 62 604 237 125 627 0 95 3 86 14 23 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm pm+pt NA Prot NA Perm Perm NA

Page 233: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 8 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 9.5 32.0 32.0 32.0 32.0Total Split (s) 38.0 38.0 38.0 10.5 48.5 9.5 41.5 41.5 32.0 32.0Total Split (%) 42.2% 42.2% 42.2% 11.7% 53.9% 10.6% 46.1% 46.1% 35.6% 35.6%Maximum Green (s) 31.7 31.7 31.7 7.5 42.2 5.0 35.2 35.2 25.7 25.7Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 3.5 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 1.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 2.2 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 17.8 17.8 17.8 27.7 27.7 7.3 19.9 19.9 10.4 10.4Actuated g/C Ratio 0.32 0.32 0.32 0.50 0.50 0.13 0.36 0.36 0.19 0.19v/c Ratio 0.27 0.58 0.40 0.38 0.39 0.23 0.00 0.15 0.06 0.08Control Delay 17.5 18.2 6.0 10.7 9.2 24.7 13.7 4.9 21.5 11.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 17.5 18.2 6.0 10.7 9.2 24.7 13.7 4.9 21.5 11.8LOS B B A B A C B A C BApproach Delay 15.0 9.5 15.3 15.5Approach LOS B A B B

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 55.7Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.58Intersection Signal Delay: 12.8 Intersection LOS: BIntersection Capacity Utilization 48.6% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 234: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 62 604 237 125 627 95 3 86 14 23v/c Ratio 0.27 0.58 0.40 0.38 0.39 0.23 0.00 0.15 0.06 0.08Control Delay 17.5 18.2 6.0 10.7 9.2 24.7 13.7 4.9 21.5 11.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 17.5 18.2 6.0 10.7 9.2 24.7 13.7 4.9 21.5 11.8Queue Length 50th (m) 4.9 27.8 2.9 6.6 19.6 4.7 0.2 0.0 1.3 0.2Queue Length 95th (m) 13.1 41.5 15.7 13.6 29.0 11.5 1.9 8.3 5.8 5.6Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 25.0 50.0 75.0 15.0Base Capacity (vph) 435 2002 957 344 2605 416 1162 991 647 759Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.14 0.30 0.25 0.36 0.24 0.23 0.00 0.09 0.02 0.03

Intersection Summary

Page 235: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 57 556 218 115 556 21 87 3 79 13 2 19Future Volume (vph) 57 556 218 115 556 21 87 3 79 13 2 19Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 2.2 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.98 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 1.00Frt 1.00 1.00 0.85 1.00 0.99 1.00 1.00 0.85 1.00 0.86Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1630 3260 1437 1630 3242 3162 1716 1429 1616 1481Flt Permitted 0.41 1.00 1.00 0.24 1.00 0.95 1.00 1.00 0.76 1.00Satd. Flow (perm) 710 3260 1437 405 3242 3162 1716 1429 1286 1481Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 62 604 237 125 604 23 95 3 86 14 2 21RTOR Reduction (vph) 0 0 135 0 3 0 0 0 55 0 17 0Lane Group Flow (vph) 62 604 102 125 624 0 95 3 31 14 6 0Confl. Peds. (#/hr) 5 5 12 12Turn Type Perm NA Perm pm+pt NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 8 2 6Actuated Green, G (s) 15.4 15.4 15.4 25.4 25.4 5.0 17.6 17.6 8.1 8.1Effective Green, g (s) 17.7 17.7 17.7 24.4 27.7 7.3 19.9 19.9 10.4 10.4Actuated g/C Ratio 0.32 0.32 0.32 0.44 0.50 0.13 0.36 0.36 0.19 0.19Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 4.5 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 226 1037 457 309 1615 415 614 511 240 277v/s Ratio Prot c0.19 0.04 c0.19 c0.03 0.00 0.00v/s Ratio Perm 0.09 0.07 0.13 c0.02 0.01v/c Ratio 0.27 0.58 0.22 0.40 0.39 0.23 0.00 0.06 0.06 0.02Uniform Delay, d1 14.2 15.9 13.9 10.2 8.7 21.6 11.5 11.7 18.6 18.4Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.5 0.7 0.2 0.6 0.1 0.3 0.0 0.0 0.1 0.0Delay (s) 14.6 16.6 14.1 10.8 8.8 21.9 11.5 11.7 18.6 18.5Level of Service B B B B A C B B B BApproach Delay (s) 15.8 9.1 17.0 18.5Approach LOS B A B B

Intersection SummaryHCM 2000 Control Delay 13.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.38Actuated Cycle Length (s) 55.6 Sum of lost time (s) 14.2Intersection Capacity Utilization 48.6% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 236: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 121 405 44 57 438 55 124 74 67 48 64 130Future Volume (vph) 121 405 44 57 438 55 124 74 67 48 64 130Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 50.0Storage Lanes 1 0 1 0 1 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 1.00 1.00 0.99 0.99 1.00Frt 0.985 0.983 0.928 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1525 3032 0 1599 3008 0 1630 1536 0 1630 1699 1417Flt Permitted 0.269 0.474 0.593 0.660Satd. Flow (perm) 428 3032 0 794 3008 0 1017 1536 0 1129 1699 1417Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 11 12 46 141Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 12 5 5 12 4 4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 7% 14% 4% 8% 9% 2% 4% 6% 2% 3% 5%Adj. Flow (vph) 132 440 48 62 476 60 135 80 73 52 70 141Shared Lane Traffic (%)Lane Group Flow (vph) 132 488 0 62 536 0 135 153 0 52 70 141Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 237: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6 6Detector Phase 7 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 9.5 30.4 9.5 30.4 9.5 37.7 9.5 37.7 37.7Total Split (s) 25.0 30.4 25.0 30.4 12.0 37.7 12.0 37.7 37.7Total Split (%) 23.8% 28.9% 23.8% 28.9% 11.4% 35.9% 11.4% 35.9% 35.9%Maximum Green (s) 22.0 24.0 22.0 24.0 9.0 31.0 9.0 31.0 31.0Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1 4.1All-Red Time (s) 0.0 2.3 0.0 2.3 0.0 2.6 0.0 2.6 2.6Lost Time Adjust (s) 1.0 -2.4 0.0 -2.4 1.0 -2.7 1.0 -2.7 0.0Total Lost Time (s) 4.0 4.0 3.0 4.0 4.0 4.0 4.0 4.0 6.7Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 28.3 20.5 24.9 17.6 21.1 13.9 17.7 12.3 9.5Actuated g/C Ratio 0.46 0.33 0.40 0.29 0.34 0.23 0.29 0.20 0.15v/c Ratio 0.39 0.48 0.15 0.62 0.32 0.40 0.14 0.21 0.42Control Delay 12.6 17.8 9.5 22.5 16.9 19.9 15.2 24.7 9.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 12.6 17.8 9.5 22.5 16.9 19.9 15.2 24.7 9.8LOS B B A C B B B C AApproach Delay 16.7 21.2 18.5 14.8Approach LOS B C B B

Intersection SummaryArea Type: OtherCycle Length: 105.1Actuated Cycle Length: 61.5Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.62Intersection Signal Delay: 18.2 Intersection LOS: BIntersection Capacity Utilization 52.5% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 238: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 132 488 62 536 135 153 52 70 141v/c Ratio 0.39 0.48 0.15 0.62 0.32 0.40 0.14 0.21 0.42Control Delay 12.6 17.8 9.5 22.5 16.9 19.9 15.2 24.7 9.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 12.6 17.8 9.5 22.5 16.9 19.9 15.2 24.7 9.8Queue Length 50th (m) 7.9 22.4 3.4 27.2 10.2 10.3 3.7 7.0 0.0Queue Length 95th (m) 19.2 40.7 9.9 50.4 26.5 30.7 12.3 19.7 14.6Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0 50.0Base Capacity (vph) 590 1364 692 1328 447 882 442 953 799Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.22 0.36 0.09 0.40 0.30 0.17 0.12 0.07 0.18

Intersection Summary

Page 239: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 121 405 44 57 438 55 124 74 67 48 64 130Future Volume (vph) 121 405 44 57 438 55 124 74 67 48 64 130Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 3.0 4.0 4.0 4.0 4.0 4.0 6.7Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.99 1.00 0.98 1.00 0.93 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1523 3034 1596 3012 1630 1537 1628 1699 1417Flt Permitted 0.27 1.00 0.47 1.00 0.59 1.00 0.66 1.00 1.00Satd. Flow (perm) 432 3034 797 3012 1017 1537 1131 1699 1417Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 132 440 48 62 476 60 135 80 73 52 70 141RTOR Reduction (vph) 0 7 0 0 9 0 0 36 0 0 0 119Lane Group Flow (vph) 132 481 0 62 527 0 135 117 0 52 70 22Confl. Peds. (#/hr) 12 5 5 12 4 4Heavy Vehicles (%) 9% 7% 14% 4% 8% 9% 2% 4% 6% 2% 3% 5%Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 27.1 18.0 21.5 15.2 19.4 11.2 16.0 9.5 9.5Effective Green, g (s) 25.1 20.4 21.5 17.6 17.4 13.9 14.0 12.2 9.5Actuated g/C Ratio 0.41 0.33 0.35 0.29 0.28 0.23 0.23 0.20 0.16Clearance Time (s) 3.0 6.4 3.0 6.4 3.0 6.7 3.0 6.7 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 322 1012 362 867 361 349 303 339 220v/s Ratio Prot c0.05 0.16 0.02 c0.18 c0.04 c0.08 0.02 0.04v/s Ratio Perm 0.11 0.04 0.06 0.02 0.02v/c Ratio 0.41 0.47 0.17 0.61 0.37 0.34 0.17 0.21 0.10Uniform Delay, d1 12.1 16.1 13.4 18.8 17.1 19.7 18.8 20.4 22.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.6 0.2 0.2 0.9 0.5 0.3 0.2 0.2 0.1Delay (s) 12.7 16.3 13.5 19.7 17.5 20.0 18.9 20.6 22.2Level of Service B B B B B C B C CApproach Delay (s) 15.5 19.0 18.9 21.1Approach LOS B B B C

Intersection SummaryHCM 2000 Control Delay 18.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.47Actuated Cycle Length (s) 61.1 Sum of lost time (s) 16.0Intersection Capacity Utilization 52.5% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 240: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 13 66 1 224 61 84 2 134 379 31 48 7Future Volume (vph) 13 66 1 224 61 84 2 134 379 31 48 7Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 0.0 0.0 50.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.998 0.913 0.850 0.980Flt Protected 0.992 0.950 0.999 0.950Satd. Flow (prot) 0 1631 0 1525 1465 0 0 1682 1430 1433 1430 0Flt Permitted 0.951 0.701 0.997 0.663Satd. Flow (perm) 0 1563 0 1125 1465 0 0 1679 1430 1000 1430 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 1 91 412 8Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 8% 6% 0% 9% 5% 12% 0% 4% 4% 16% 23% 0%Adj. Flow (vph) 14 72 1 243 66 91 2 146 412 34 52 8Shared Lane Traffic (%)Lane Group Flow (vph) 0 87 0 243 157 0 0 148 412 34 60 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 241: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 39.0 39.0 39.0 39.0 41.0 41.0 41.0 41.0 41.0Total Split (%) 48.8% 48.8% 48.8% 48.8% 51.3% 51.3% 51.3% 51.3% 51.3%Maximum Green (s) 32.7 32.7 32.7 32.7 34.7 34.7 34.7 34.7 34.7Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 -2.3 -2.3 0.0 0.0 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 6.3 6.3 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 20.4 18.0 20.4 17.4 14.9 14.9 17.4Actuated g/C Ratio 0.44 0.39 0.44 0.38 0.32 0.32 0.38v/c Ratio 0.13 0.56 0.23 0.23 0.56 0.11 0.11Control Delay 8.7 17.1 5.2 12.4 5.2 13.6 10.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 8.7 17.1 5.2 12.4 5.2 13.6 10.5LOS A B A B A B BApproach Delay 8.7 12.4 7.1 11.6Approach LOS A B A B

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 46.2Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.56Intersection Signal Delay: 9.5 Intersection LOS: AIntersection Capacity Utilization 54.1% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 242: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 87 243 157 148 412 34 60v/c Ratio 0.13 0.56 0.23 0.23 0.56 0.11 0.11Control Delay 8.7 17.1 5.2 12.4 5.2 13.6 10.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 8.7 17.1 5.2 12.4 5.2 13.6 10.5Queue Length 50th (m) 3.7 14.2 2.8 7.7 0.0 1.9 2.6Queue Length 95th (m) 12.5 40.0 13.3 23.6 16.6 8.3 10.8Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 50.0 50.0 50.0Base Capacity (vph) 1237 840 1178 1385 1212 786 1181Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.07 0.29 0.13 0.11 0.34 0.04 0.05

Intersection Summary

Page 243: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 13 66 1 224 61 84 2 134 379 31 48 7Future Volume (vph) 13 66 1 224 61 84 2 134 379 31 48 7Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 6.3 6.3 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.91 1.00 0.85 1.00 0.98Flt Protected 0.99 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1631 1525 1465 1682 1430 1433 1430Flt Permitted 0.95 0.70 1.00 1.00 1.00 0.66 1.00Satd. Flow (perm) 1564 1125 1465 1679 1430 1000 1430Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 14 72 1 243 66 91 2 146 412 34 52 8RTOR Reduction (vph) 0 1 0 0 50 0 0 0 277 0 5 0Lane Group Flow (vph) 0 86 0 243 107 0 0 148 135 34 55 0Heavy Vehicles (%) 8% 6% 0% 9% 5% 12% 0% 4% 4% 16% 23% 0%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 18.0 18.0 18.0 14.9 14.9 14.9 14.9Effective Green, g (s) 20.3 18.0 20.3 17.2 14.9 14.9 17.2Actuated g/C Ratio 0.45 0.40 0.45 0.38 0.33 0.33 0.38Clearance Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 697 445 653 634 468 327 540v/s Ratio Prot 0.07 0.04v/s Ratio Perm 0.06 c0.22 0.09 c0.09 0.03v/c Ratio 0.12 0.55 0.16 0.23 0.29 0.10 0.10Uniform Delay, d1 7.4 10.6 7.5 9.7 11.4 10.7 9.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 3.1 0.3 0.5 1.0 0.4 0.2Delay (s) 7.6 13.7 7.9 10.2 12.3 11.0 9.4Level of Service A B A B B B AApproach Delay (s) 7.6 11.4 11.8 10.0Approach LOS A B B A

Intersection SummaryHCM 2000 Control Delay 11.2 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.38Actuated Cycle Length (s) 45.5 Sum of lost time (s) 8.0Intersection Capacity Utilization 54.1% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 244: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 31 833 373 249 956 13 359 22 271 18 12 82Future Volume (vph) 31 833 373 249 956 13 359 22 271 18 12 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 15.0 25.0Storage Lanes 1 1 1 0 2 1 1 0Taper Length (m) 40.0 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 0.97 1.00 1.00 0.99 0.99 1.00 0.98Frt 0.850 0.998 0.850 0.869Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1568 3197 1444 1630 3215 0 3162 1606 1458 1662 1416 0Flt Permitted 0.272 0.127 0.950 0.742Satd. Flow (perm) 448 3197 1403 217 3215 0 3118 1606 1439 1297 1416 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 164 2 295 49Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 5 14 14 5 7 1 1 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 4% 3% 2% 3% 15% 2% 9% 2% 0% 8% 5%Adj. Flow (vph) 34 905 405 271 1039 14 390 24 295 20 13 89Shared Lane Traffic (%)Lane Group Flow (vph) 34 905 405 271 1053 0 390 24 295 20 102 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 245: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 8 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 9.5 32.0 32.0 32.0 32.0Total Split (s) 37.0 37.0 37.0 19.0 56.0 20.0 54.0 54.0 34.0 34.0Total Split (%) 33.6% 33.6% 33.6% 17.3% 50.9% 18.2% 49.1% 49.1% 30.9% 30.9%Maximum Green (s) 29.0 29.0 29.0 16.0 48.0 15.5 46.0 46.0 26.0 26.0Yellow Time (s) 4.5 4.5 4.5 3.0 4.5 3.5 4.5 4.5 4.5 4.5All-Red Time (s) 3.5 3.5 3.5 0.0 3.5 1.0 3.5 3.5 3.5 3.5Lost Time Adjust (s) -4.0 -4.0 -4.0 1.0 -4.0 -0.5 -4.0 -4.0 -4.0 -4.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 32.4 32.4 32.4 50.6 50.6 15.4 33.1 33.1 13.7 13.7Actuated g/C Ratio 0.35 0.35 0.35 0.55 0.55 0.17 0.36 0.36 0.15 0.15v/c Ratio 0.22 0.80 0.67 0.80 0.59 0.73 0.04 0.42 0.10 0.40Control Delay 26.6 33.9 21.6 37.9 15.7 46.1 19.5 4.5 35.6 25.6Queue Delay 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 26.6 34.3 21.6 37.9 15.7 46.1 19.5 4.5 35.6 25.6LOS C C C D B D B A D CApproach Delay 30.2 20.3 27.9 27.2Approach LOS C C C C

Intersection SummaryArea Type: OtherCycle Length: 110Actuated Cycle Length: 91.7Natural Cycle: 100Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.80Intersection Signal Delay: 25.9 Intersection LOS: CIntersection Capacity Utilization 67.8% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 246: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 34 905 405 271 1053 390 24 295 20 102v/c Ratio 0.22 0.80 0.67 0.80 0.59 0.73 0.04 0.42 0.10 0.40Control Delay 26.6 33.9 21.6 37.9 15.7 46.1 19.5 4.5 35.6 25.6Queue Delay 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 26.6 34.3 21.6 37.9 15.7 46.1 19.5 4.5 35.6 25.6Queue Length 50th (m) 4.4 78.8 37.2 30.2 62.8 35.8 2.9 0.0 3.3 9.1Queue Length 95th (m) 13.3 #114.0 77.8 #76.9 93.7 #56.4 8.3 16.3 10.2 24.5Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 15.0Base Capacity (vph) 161 1154 611 351 1830 553 878 920 425 497Starvation Cap Reductn 0 35 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.21 0.81 0.66 0.77 0.58 0.71 0.03 0.32 0.05 0.21

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 247: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 31 833 373 249 956 13 359 22 271 18 12 82Future Volume (vph) 31 833 373 249 956 13 359 22 271 18 12 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.97 1.00 1.00 1.00 1.00 0.99 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 1.00 1.00 0.85 1.00 0.87Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1565 3197 1407 1630 3216 3162 1606 1439 1661 1418Flt Permitted 0.27 1.00 1.00 0.13 1.00 0.95 1.00 1.00 0.74 1.00Satd. Flow (perm) 448 3197 1407 219 3216 3162 1606 1439 1296 1418Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 34 905 405 271 1039 14 390 24 295 20 13 89RTOR Reduction (vph) 0 0 106 0 1 0 0 0 189 0 42 0Lane Group Flow (vph) 34 905 299 271 1052 0 390 24 106 20 60 0Confl. Peds. (#/hr) 5 14 14 5 7 1 1 7Heavy Vehicles (%) 6% 4% 3% 2% 3% 15% 2% 9% 2% 0% 8% 5%Turn Type Perm NA Perm pm+pt NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 8 2 6Actuated Green, G (s) 28.4 28.4 28.4 46.6 46.6 14.9 29.1 29.1 9.7 9.7Effective Green, g (s) 32.4 32.4 32.4 45.6 50.6 15.4 33.1 33.1 13.7 13.7Actuated g/C Ratio 0.35 0.35 0.35 0.50 0.55 0.17 0.36 0.36 0.15 0.15Clearance Time (s) 8.0 8.0 8.0 3.0 8.0 4.5 8.0 8.0 8.0 8.0Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 158 1129 497 327 1774 531 579 519 193 211v/s Ratio Prot c0.28 c0.13 0.33 c0.12 0.01 c0.04v/s Ratio Perm 0.08 0.21 0.28 0.07 0.02v/c Ratio 0.22 0.80 0.60 0.83 0.59 0.73 0.04 0.21 0.10 0.29Uniform Delay, d1 20.8 26.8 24.3 21.6 13.7 36.2 19.0 20.2 33.7 34.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.5 4.1 1.7 15.4 0.4 5.2 0.0 0.1 0.2 0.5Delay (s) 21.3 30.8 26.1 37.0 14.1 41.4 19.0 20.4 33.9 35.2Level of Service C C C D B D B C C DApproach Delay (s) 29.1 18.8 31.9 35.0Approach LOS C B C C

Intersection SummaryHCM 2000 Control Delay 26.0 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.70Actuated Cycle Length (s) 91.7 Sum of lost time (s) 16.0Intersection Capacity Utilization 67.8% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 248: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 278 659 100 42 700 69 230 113 58 100 118 289Future Volume (vph) 278 659 100 42 700 69 230 113 58 100 118 289Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 50.0Storage Lanes 1 0 1 0 1 0 1 1Taper Length (m) 50.0 50.0 50.0 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 0.99 1.00 0.99 0.99 1.00Frt 0.980 0.987 0.949 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1646 3164 0 1630 3174 0 1568 1636 0 1646 1733 1473Flt Permitted 0.142 0.341 0.563 0.500Satd. Flow (perm) 244 3164 0 583 3174 0 929 1636 0 864 1733 1473Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 15 10 26 314Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 24 11 11 24 3 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 2% 5% 2% 3% 0% 6% 0% 3% 1% 1% 1%Adj. Flow (vph) 302 716 109 46 761 75 250 123 63 109 128 314Shared Lane Traffic (%)Lane Group Flow (vph) 302 825 0 46 836 0 250 186 0 109 128 314Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 249: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6 6Detector Phase 7 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 9.5 30.4 9.5 30.4 9.5 37.7 9.5 37.7 37.7Total Split (s) 23.0 30.4 25.0 32.4 12.0 37.7 12.0 37.7 37.7Total Split (%) 21.9% 28.9% 23.8% 30.8% 11.4% 35.9% 11.4% 35.9% 35.9%Maximum Green (s) 20.0 24.0 22.0 26.0 9.0 31.0 9.0 31.0 31.0Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1 4.1All-Red Time (s) 0.0 2.3 0.0 2.3 0.0 2.6 0.0 2.6 2.6Lost Time Adjust (s) 1.0 -2.4 1.0 -2.4 1.0 -2.7 1.0 -2.7 -2.7Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 46.9 37.7 32.6 27.6 24.6 16.5 22.5 15.5 15.5Actuated g/C Ratio 0.57 0.46 0.39 0.33 0.30 0.20 0.27 0.19 0.19v/c Ratio 0.76 0.57 0.16 0.78 0.74 0.54 0.36 0.40 0.59Control Delay 29.6 18.5 11.7 32.3 39.0 32.6 24.3 34.1 8.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 29.6 18.5 11.7 32.3 39.0 32.6 24.3 34.1 8.8LOS C B B C D C C C AApproach Delay 21.5 31.2 36.3 17.7Approach LOS C C D B

Intersection SummaryArea Type: OtherCycle Length: 105.1Actuated Cycle Length: 82.6Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.78Intersection Signal Delay: 25.8 Intersection LOS: CIntersection Capacity Utilization 74.2% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 250: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 302 825 46 836 250 186 109 128 314v/c Ratio 0.76 0.57 0.16 0.78 0.74 0.54 0.36 0.40 0.59Control Delay 29.6 18.5 11.7 32.3 39.0 32.6 24.3 34.1 8.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 29.6 18.5 11.7 32.3 39.0 32.6 24.3 34.1 8.8Queue Length 50th (m) 29.7 49.6 3.1 66.2 33.9 25.0 13.3 19.4 0.0Queue Length 95th (m) #70.9 79.3 8.9 #111.2 #61.3 46.8 26.1 36.4 21.5Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0 50.0Base Capacity (vph) 465 1452 595 1112 339 691 323 716 793Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.65 0.57 0.08 0.75 0.74 0.27 0.34 0.18 0.40

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 251: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 278 659 100 42 700 69 230 113 58 100 118 289Future Volume (vph) 278 659 100 42 700 69 230 113 58 100 118 289Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.98 1.00 0.99 1.00 0.95 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1645 3167 1627 3176 1568 1636 1645 1733 1473Flt Permitted 0.14 1.00 0.34 1.00 0.56 1.00 0.50 1.00 1.00Satd. Flow (perm) 246 3167 583 3176 930 1636 865 1733 1473Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 302 716 109 46 761 75 250 123 63 109 128 314RTOR Reduction (vph) 0 8 0 0 7 0 0 21 0 0 0 255Lane Group Flow (vph) 302 817 0 46 829 0 250 165 0 109 128 59Confl. Peds. (#/hr) 24 11 11 24 3 3Heavy Vehicles (%) 1% 2% 5% 2% 3% 0% 6% 0% 3% 1% 1% 1%Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 44.4 35.3 31.2 25.1 22.9 13.8 20.9 12.8 12.8Effective Green, g (s) 43.4 37.7 29.2 27.5 20.9 16.5 18.9 15.5 15.5Actuated g/C Ratio 0.53 0.46 0.35 0.33 0.25 0.20 0.23 0.19 0.19Clearance Time (s) 3.0 6.4 3.0 6.4 3.0 6.7 3.0 6.7 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 389 1448 271 1059 298 327 265 325 277v/s Ratio Prot c0.14 0.26 0.01 c0.26 c0.08 0.10 0.04 0.07v/s Ratio Perm 0.26 0.05 c0.13 0.06 0.04v/c Ratio 0.78 0.56 0.17 0.78 0.84 0.51 0.41 0.39 0.21Uniform Delay, d1 17.7 16.3 17.7 24.8 28.2 29.3 26.2 29.3 28.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 9.0 0.3 0.2 3.6 18.0 0.6 0.8 0.4 0.2Delay (s) 26.7 16.7 17.9 28.4 46.2 29.9 27.0 29.7 28.5Level of Service C B B C D C C C CApproach Delay (s) 19.4 27.8 39.2 28.5Approach LOS B C D C

Intersection SummaryHCM 2000 Control Delay 26.4 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.77Actuated Cycle Length (s) 82.4 Sum of lost time (s) 16.0Intersection Capacity Utilization 74.2% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 252: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer (with Improvements)

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 17 58 1 421 104 78 1 151 323 124 188 31Future Volume (vph) 17 58 1 421 104 78 1 151 323 124 188 31Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 115.0 0.0 0.0 50.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 100.0 7.5 100.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.998 0.936 0.850 0.979Flt Protected 0.989 0.950 0.950Satd. Flow (prot) 0 1596 0 1599 1525 0 0 1652 1390 1471 1677 0Flt Permitted 0.933 0.704 0.998 0.649Satd. Flow (perm) 0 1506 0 1185 1525 0 0 1648 1390 1005 1677 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 1 73 351 12Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 9% 0% 4% 7% 8% 0% 6% 7% 13% 2% 3%Adj. Flow (vph) 18 63 1 458 113 85 1 164 351 135 204 34Shared Lane Traffic (%)Lane Group Flow (vph) 0 82 0 458 198 0 0 165 351 135 238 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 253: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer (with Improvements)

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 47.0 47.0 47.0 47.0 33.0 33.0 33.0 33.0 33.0Total Split (%) 58.8% 58.8% 58.8% 58.8% 41.3% 41.3% 41.3% 41.3% 41.3%Maximum Green (s) 40.7 40.7 40.7 40.7 26.7 26.7 26.7 26.7 26.7Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 0.0 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 6.3 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 33.1 33.1 33.1 20.3 17.8 20.3 20.3Actuated g/C Ratio 0.53 0.53 0.53 0.33 0.29 0.33 0.33v/c Ratio 0.10 0.72 0.23 0.31 0.54 0.41 0.43Control Delay 8.1 19.7 6.2 19.3 6.0 22.9 19.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 8.1 19.7 6.2 19.3 6.0 22.9 19.8LOS A B A B A C BApproach Delay 8.1 15.6 10.3 20.9Approach LOS A B B C

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 61.9Natural Cycle: 65Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.72Intersection Signal Delay: 14.8 Intersection LOS: BIntersection Capacity Utilization 63.5% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 254: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer (with Improvements)

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 82 458 198 165 351 135 238v/c Ratio 0.10 0.72 0.23 0.31 0.54 0.41 0.43Control Delay 8.1 19.7 6.2 19.3 6.0 22.9 19.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 8.1 19.7 6.2 19.3 6.0 22.9 19.8Queue Length 50th (m) 4.3 37.0 6.8 15.1 0.0 12.9 21.5Queue Length 95th (m) 12.6 91.2 20.1 33.2 17.8 31.1 45.3Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 115.0 50.0 50.0Base Capacity (vph) 1092 859 1126 823 829 502 844Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.08 0.53 0.18 0.20 0.42 0.27 0.28

Intersection Summary

Page 255: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer (with Improvements)

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 17 58 1 421 104 78 1 151 323 124 188 31Future Volume (vph) 17 58 1 421 104 78 1 151 323 124 188 31Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 6.3 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.94 1.00 0.85 1.00 0.98Flt Protected 0.99 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1597 1599 1524 1651 1390 1471 1677Flt Permitted 0.93 0.70 1.00 1.00 1.00 0.65 1.00Satd. Flow (perm) 1507 1184 1524 1649 1390 1004 1677Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 18 63 1 458 113 85 1 164 351 135 204 34RTOR Reduction (vph) 0 0 0 0 34 0 0 0 249 0 8 0Lane Group Flow (vph) 0 82 0 458 164 0 0 165 102 135 230 0Heavy Vehicles (%) 6% 9% 0% 4% 7% 8% 0% 6% 7% 13% 2% 3%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 30.6 30.6 30.6 17.8 17.8 17.8 17.8Effective Green, g (s) 32.9 32.9 32.9 20.1 17.8 20.1 20.1Actuated g/C Ratio 0.54 0.54 0.54 0.33 0.29 0.33 0.33Clearance Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 812 638 821 543 405 330 552v/s Ratio Prot 0.11 c0.14v/s Ratio Perm 0.05 c0.39 0.10 0.07 0.13v/c Ratio 0.10 0.72 0.20 0.30 0.25 0.41 0.42Uniform Delay, d1 6.8 10.6 7.3 15.2 16.5 15.8 15.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 5.5 0.3 0.9 0.9 2.3 1.4Delay (s) 7.0 16.1 7.6 16.1 17.4 18.2 17.3Level of Service A B A B B B BApproach Delay (s) 7.0 13.5 17.0 17.6Approach LOS A B B B

Intersection SummaryHCM 2000 Control Delay 15.2 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.60Actuated Cycle Length (s) 61.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 63.5% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 256: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 741 502 293 717 35 519 15 342 16 3 24Future Volume (vph) 27 741 502 293 717 35 519 15 342 16 3 24Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 100.0 0.0 15.0 0.0Storage Lanes 1 1 1 0 2 1 1 0Taper Length (m) 40.0 7.5 100.0 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.98 1.00 0.99 0.98 1.00 0.99Frt 0.850 0.993 0.850 0.866Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1662 3292 1473 1630 3240 0 3162 1750 1473 1662 1442 0Flt Permitted 0.344 0.131 0.950 0.747Satd. Flow (perm) 602 3292 1448 225 3240 0 3140 1750 1449 1302 1442 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 230 6 372 26Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 4 4 3 3 3 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 1% 2% 2% 0% 2% 0% 1% 0% 0% 4%Adj. Flow (vph) 29 805 546 318 779 38 564 16 372 17 3 26Shared Lane Traffic (%)Lane Group Flow (vph) 29 805 546 318 817 0 564 16 372 17 29 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 257: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 8 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 9.5 32.0 32.0 32.0 32.0Total Split (s) 36.0 36.0 36.0 21.3 57.3 25.7 57.7 57.7 32.0 32.0Total Split (%) 31.3% 31.3% 31.3% 18.5% 49.8% 22.3% 50.2% 50.2% 27.8% 27.8%Maximum Green (s) 28.0 28.0 28.0 18.3 49.3 21.2 49.7 49.7 24.0 24.0Yellow Time (s) 4.5 4.5 4.5 3.0 4.5 3.5 4.5 4.5 4.5 4.5All-Red Time (s) 3.5 3.5 3.5 0.0 3.5 1.0 3.5 3.5 3.5 3.5Lost Time Adjust (s) -4.0 -4.0 -4.0 1.0 -4.0 -0.5 -4.0 -4.0 -4.0 -4.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 31.5 31.5 31.5 52.8 52.8 21.4 37.5 37.5 12.1 12.1Actuated g/C Ratio 0.32 0.32 0.32 0.54 0.54 0.22 0.38 0.38 0.12 0.12v/c Ratio 0.15 0.76 0.88 0.86 0.47 0.82 0.02 0.48 0.11 0.14Control Delay 26.6 35.8 35.7 46.2 15.1 47.8 19.3 4.5 40.6 18.3Queue Delay 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 26.6 36.1 35.7 46.2 15.1 47.8 19.3 4.5 40.6 18.3LOS C D D D B D B A D BApproach Delay 35.7 23.8 30.4 26.5Approach LOS D C C C

Intersection SummaryArea Type: OtherCycle Length: 115Actuated Cycle Length: 98.3Natural Cycle: 110Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.88Intersection Signal Delay: 30.3 Intersection LOS: CIntersection Capacity Utilization 72.7% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 258: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 29 805 546 318 817 564 16 372 17 29v/c Ratio 0.15 0.76 0.88 0.86 0.47 0.82 0.02 0.48 0.11 0.14Control Delay 26.6 35.8 35.7 46.2 15.1 47.8 19.3 4.5 40.6 18.3Queue Delay 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 26.6 36.1 35.7 46.2 15.1 47.8 19.3 4.5 40.6 18.3Queue Length 50th (m) 4.1 76.0 63.9 44.2 50.2 56.0 2.0 0.0 3.1 0.6Queue Length 95th (m) 11.6 99.9 #131.0 #94.2 66.6 #81.9 6.3 18.3 9.8 9.0Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 25.0 50.0 100.0 15.0Base Capacity (vph) 195 1072 626 368 1760 698 956 960 371 429Starvation Cap Reductn 0 34 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.15 0.78 0.87 0.86 0.46 0.81 0.02 0.39 0.05 0.07

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 259: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 741 502 293 717 35 519 15 342 16 3 24Future Volume (vph) 27 741 502 293 717 35 519 15 342 16 3 24Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 1.00 1.00 0.98 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 0.99 1.00 1.00 0.85 1.00 0.87Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 3292 1449 1630 3240 3162 1750 1450 1657 1442Flt Permitted 0.34 1.00 1.00 0.13 1.00 0.95 1.00 1.00 0.75 1.00Satd. Flow (perm) 601 3292 1449 225 3240 3162 1750 1450 1303 1442Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 29 805 546 318 779 38 564 16 372 17 3 26RTOR Reduction (vph) 0 0 156 0 3 0 0 0 230 0 23 0Lane Group Flow (vph) 29 805 390 318 814 0 564 16 142 17 6 0Confl. Peds. (#/hr) 4 4 3 3 3 3Heavy Vehicles (%) 0% 1% 1% 2% 2% 0% 2% 0% 1% 0% 0% 4%Turn Type Perm NA Perm pm+pt NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 8 2 6Actuated Green, G (s) 27.5 27.5 27.5 48.8 48.8 20.9 33.5 33.5 8.1 8.1Effective Green, g (s) 31.5 31.5 31.5 47.8 52.8 21.4 37.5 37.5 12.1 12.1Actuated g/C Ratio 0.32 0.32 0.32 0.49 0.54 0.22 0.38 0.38 0.12 0.12Clearance Time (s) 8.0 8.0 8.0 3.0 8.0 4.5 8.0 8.0 8.0 8.0Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 192 1054 464 356 1740 688 667 553 160 177v/s Ratio Prot 0.24 c0.16 0.25 c0.18 0.01 0.00v/s Ratio Perm 0.05 c0.27 0.28 c0.10 0.01v/c Ratio 0.15 0.76 0.84 0.89 0.47 0.82 0.02 0.26 0.11 0.04Uniform Delay, d1 23.9 30.1 31.1 25.5 14.1 36.6 19.0 20.8 38.3 38.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 3.2 12.4 23.4 0.1 7.6 0.0 0.2 0.2 0.1Delay (s) 24.1 33.2 43.5 48.9 14.2 44.2 19.0 21.0 38.5 38.0Level of Service C C D D B D B C D DApproach Delay (s) 37.1 23.9 34.7 38.2Approach LOS D C C D

Intersection SummaryHCM 2000 Control Delay 32.2 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.77Actuated Cycle Length (s) 98.3 Sum of lost time (s) 16.0Intersection Capacity Utilization 72.7% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 260: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 340 791 138 81 659 121 245 164 62 143 119 336Future Volume (vph) 340 791 138 81 659 121 245 164 62 143 119 336Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 50.0Storage Lanes 1 0 1 0 1 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 1.00 0.99 0.99 0.98 0.98Frt 0.978 0.977 0.959 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1599 3174 0 1630 3195 0 1630 1641 0 1630 1716 1473Flt Permitted 0.135 0.278 0.475 0.413Satd. Flow (perm) 227 3174 0 475 3195 0 808 1641 0 697 1716 1440Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 22 19 18 365Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 9 9 10 23 23 10Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 4% 2% 1% 2% 2% 0% 2% 1% 2% 2% 2% 1%Adj. Flow (vph) 370 860 150 88 716 132 266 178 67 155 129 365Shared Lane Traffic (%)Lane Group Flow (vph) 370 1010 0 88 848 0 266 245 0 155 129 365Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 261: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6 6Detector Phase 7 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 9.5 30.4 9.5 30.4 9.5 37.7 9.5 37.7 37.7Total Split (s) 26.0 49.2 10.8 34.0 13.0 40.0 10.0 37.0 37.0Total Split (%) 23.6% 44.7% 9.8% 30.9% 11.8% 36.4% 9.1% 33.6% 33.6%Maximum Green (s) 23.0 42.8 7.8 27.6 10.0 33.3 7.0 30.3 30.3Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1 4.1All-Red Time (s) 0.0 2.3 0.0 2.3 0.0 2.6 0.0 2.6 2.6Lost Time Adjust (s) 1.0 -2.4 1.0 -2.4 1.0 -2.7 1.0 -2.7 -2.7Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 54.5 44.7 34.9 29.1 29.4 20.3 23.4 17.3 17.3Actuated g/C Ratio 0.59 0.48 0.38 0.31 0.32 0.22 0.25 0.19 0.19v/c Ratio 0.82 0.66 0.35 0.84 0.79 0.66 0.66 0.40 0.65Control Delay 38.0 21.3 16.1 38.9 45.2 39.7 40.0 37.2 9.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 38.0 21.3 16.1 38.9 45.2 39.7 40.0 37.2 9.4LOS D C B D D D D D AApproach Delay 25.8 36.7 42.6 22.2Approach LOS C D D C

Intersection SummaryArea Type: OtherCycle Length: 110Actuated Cycle Length: 93Natural Cycle: 100Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.84Intersection Signal Delay: 30.5 Intersection LOS: CIntersection Capacity Utilization 86.7% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 262: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 370 1010 88 848 266 245 155 129 365v/c Ratio 0.82 0.66 0.35 0.84 0.79 0.66 0.66 0.40 0.65Control Delay 38.0 21.3 16.1 38.9 45.2 39.7 40.0 37.2 9.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 38.0 21.3 16.1 38.9 45.2 39.7 40.0 37.2 9.4Queue Length 50th (m) 48.5 71.4 6.7 76.6 41.0 40.1 22.1 22.0 0.0Queue Length 95th (m) #111.8 111.6 16.1 #124.3 #68.7 65.4 37.7 39.0 24.1Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0 50.0Base Capacity (vph) 460 1579 268 1050 335 650 235 613 749Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.80 0.64 0.33 0.81 0.79 0.38 0.66 0.21 0.49

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 263: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Existing Summer (with Improvements)

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 340 791 138 81 659 121 245 164 62 143 119 336Future Volume (vph) 340 791 138 81 659 121 245 164 62 143 119 336Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 0.99 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00Frt 1.00 0.98 1.00 0.98 1.00 0.96 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1599 3174 1628 3193 1625 1642 1621 1716 1442Flt Permitted 0.13 1.00 0.28 1.00 0.47 1.00 0.41 1.00 1.00Satd. Flow (perm) 227 3174 477 3193 812 1642 705 1716 1442Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 370 860 150 88 716 132 266 178 67 155 129 365RTOR Reduction (vph) 0 11 0 0 13 0 0 14 0 0 0 297Lane Group Flow (vph) 370 999 0 88 835 0 266 231 0 155 129 68Confl. Peds. (#/hr) 9 9 10 23 23 10Heavy Vehicles (%) 4% 2% 1% 2% 2% 0% 2% 1% 2% 2% 2% 1%Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 52.2 42.4 33.5 26.7 27.7 17.7 21.6 14.6 14.6Effective Green, g (s) 51.2 44.8 31.5 29.1 25.8 20.4 19.6 17.3 17.3Actuated g/C Ratio 0.55 0.48 0.34 0.31 0.28 0.22 0.21 0.19 0.19Clearance Time (s) 3.0 6.4 3.0 6.4 3.0 6.7 3.0 6.7 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 442 1528 233 999 304 360 207 319 268v/s Ratio Prot c0.19 0.31 0.02 c0.26 c0.09 0.14 0.05 0.08v/s Ratio Perm 0.27 0.10 c0.16 0.11 0.05v/c Ratio 0.84 0.65 0.38 0.84 0.88 0.64 0.75 0.40 0.25Uniform Delay, d1 23.1 18.2 21.5 29.7 30.9 33.0 33.2 33.3 32.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 12.7 0.8 0.7 6.0 23.1 3.1 13.1 0.4 0.3Delay (s) 35.8 19.1 22.2 35.7 54.0 36.1 46.3 33.7 32.6Level of Service D B C D D D D C CApproach Delay (s) 23.5 34.4 45.4 36.1Approach LOS C C D D

Intersection SummaryHCM 2000 Control Delay 32.0 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.84Actuated Cycle Length (s) 93.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 86.7% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group

Page 264: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer (with Improvements)

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 14 36 2 25 51 79 3 137 201 93 153 15Future Volume (vph) 14 36 2 25 51 79 3 137 201 93 153 15Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 0.0 0.0 50.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.995 0.909 0.850 0.987Flt Protected 0.987 0.950 0.999 0.950Satd. Flow (prot) 0 1719 0 1630 1581 0 0 1731 1473 1646 1727 0Flt Permitted 0.907 0.720 0.993 0.660Satd. Flow (perm) 0 1579 0 1235 1581 0 0 1721 1473 1144 1727 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 2 86 218 9Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 0% 2% 0% 1% 0% 1% 1% 1% 0% 0%Adj. Flow (vph) 15 39 2 27 55 86 3 149 218 101 166 16Shared Lane Traffic (%)Lane Group Flow (vph) 0 56 0 27 141 0 0 152 218 101 182 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 265: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer (with Improvements)

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 34.0 34.0 34.0 34.0 46.0 46.0 46.0 46.0 46.0Total Split (%) 42.5% 42.5% 42.5% 42.5% 57.5% 57.5% 57.5% 57.5% 57.5%Maximum Green (s) 27.7 27.7 27.7 27.7 39.7 39.7 39.7 39.7 39.7Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 -2.3 -2.3 0.0 0.0 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 6.3 6.3 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 12.9 10.6 12.9 14.3 12.0 12.0 14.3Actuated g/C Ratio 0.37 0.30 0.37 0.41 0.34 0.34 0.41v/c Ratio 0.10 0.07 0.22 0.22 0.34 0.26 0.26Control Delay 8.4 10.3 5.4 7.8 3.4 10.4 7.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 8.4 10.3 5.4 7.8 3.4 10.4 7.7LOS A B A A A B AApproach Delay 8.4 6.2 5.2 8.7Approach LOS A A A A

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 35.2Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.34Intersection Signal Delay: 6.7 Intersection LOS: AIntersection Capacity Utilization 43.6% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 266: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer (with Improvements)

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 56 27 141 152 218 101 182v/c Ratio 0.10 0.07 0.22 0.22 0.34 0.26 0.26Control Delay 8.4 10.3 5.4 7.8 3.4 10.4 7.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 8.4 10.3 5.4 7.8 3.4 10.4 7.7Queue Length 50th (m) 1.9 1.1 2.0 5.3 0.0 4.1 6.1Queue Length 95th (m) 7.5 5.2 10.6 13.9 8.9 12.1 15.8Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 50.0 50.0 50.0Base Capacity (vph) 1354 977 1367 1721 1467 1139 1727Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.04 0.03 0.10 0.09 0.15 0.09 0.11

Intersection Summary

Page 267: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Existing Summer (with Improvements)

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 14 36 2 25 51 79 3 137 201 93 153 15Future Volume (vph) 14 36 2 25 51 79 3 137 201 93 153 15Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 6.3 6.3 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.91 1.00 0.85 1.00 0.99Flt Protected 0.99 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1719 1630 1580 1731 1473 1646 1727Flt Permitted 0.91 0.72 1.00 0.99 1.00 0.66 1.00Satd. Flow (perm) 1580 1236 1580 1721 1473 1144 1727Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 15 39 2 27 55 86 3 149 218 101 166 16RTOR Reduction (vph) 0 1 0 0 54 0 0 0 144 0 5 0Lane Group Flow (vph) 0 55 0 27 87 0 0 152 74 101 177 0Heavy Vehicles (%) 0% 0% 0% 2% 0% 1% 0% 1% 1% 1% 0% 0%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 10.6 10.6 10.6 12.0 12.0 12.0 12.0Effective Green, g (s) 12.9 10.6 12.9 14.3 12.0 12.0 14.3Actuated g/C Ratio 0.37 0.30 0.37 0.41 0.34 0.34 0.41Clearance Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 579 372 579 699 502 390 701v/s Ratio Prot c0.05 c0.10v/s Ratio Perm 0.03 0.02 0.09 0.05 0.09v/c Ratio 0.09 0.07 0.15 0.22 0.15 0.26 0.25Uniform Delay, d1 7.3 8.8 7.5 6.8 8.1 8.4 6.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.2 0.3 0.4 0.4 1.0 0.5Delay (s) 7.5 9.0 7.8 7.2 8.4 9.4 7.4Level of Service A A A A A A AApproach Delay (s) 7.5 8.0 7.9 8.1Approach LOS A A A A

Intersection SummaryHCM 2000 Control Delay 8.0 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.20Actuated Cycle Length (s) 35.2 Sum of lost time (s) 8.0Intersection Capacity Utilization 43.6% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 268: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Thundering Waters Transportation Master Plan | 151385 | July 2016

Paradigm Transportation Solutions Limited | Appendices

Appendix E

Internal Capture Calculation

Page 269: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Land Use A Shopping CentreITE Code 820Size 313230Total Internal External

90 Enter 194 62 132Exit 119 29 90

132 Total 313 91 222% 100% 29% 71%

3% 4 43 22% 33% 39 330 38%4 8 25 54

15% 152 8 4% 11% 25 54 28%

Land Use B Office Demand Balanced Demand Land Use C ResidentialITE Code 710 0 0 0 ITE Code 230Size 1315888 0% 0% Size 2900Total Internal External Total Internal External

196 Enter 1014 4 1010 Enter 223 29 194 194Exit 208 12 196 Exit 869 54 815

1010 Total 1222 16 1206 2% 3% Total 1092 83 1009 815% 100% 1% 99% 4 4 7 % 100% 8% 92%

Demand Balanced Demand

A B C TotalEnter 132 1010 194 1336Exit 90 196 815 1101Total 222 1206 1009 2437

Single-Use Trip Gen Est 313 1222 1092 2627 7% <- Internal Capture

Net External Trips

MULTl-USE DEVELOPMENT TRIP GENERATION AND INTERNAL CAPTURE SUMMARYAM Peak Hour

Page 270: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Land Use A Shopping CentreITE Code 820Size 313230Total Internal External

569 Enter 618 61 557Exit 669 100 569

557 Total 1287 161 1126% 100% 13% 87%

3% 20 142 23% 12% 80 42 9%20 19 80 42

31% 52 19 2% 31% 272 328 53%

Land Use B Office Demand Balanced Demand Land Use C ResidentialITE Code 710 0 0 0 ITE Code 230Size 1315888 0% 0% Size 2900Total Internal External Total Internal External

915 Enter 168 20 148 Enter 876 98 778 778Exit 952 37 915 Exit 466 42 424

148 Total 1120 57 1063 2% 2% Total 1342 140 1202 424% 100% 5% 95% 19 18 18 % 100% 10% 90%

Demand Balanced Demand

A B C TotalEnter 557 148 778 1483Exit 569 915 424 1908Total 1126 1063 1202 3391

Single-Use Trip Gen Est 1287 1120 1342 3749 10% <- Internal Capture

Net External Trips

MULTl-USE DEVELOPMENT TRIP GENERATION AND INTERNAL CAPTURE SUMMARYPM Peak Hour

Page 271: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Land Use A Shopping CentreITE Code 820Size 313230Total Internal External

793 Enter 955 48 907Exit 881 88 793

907 Total 1836 136 1700% 100% 7% 93%

3% 26 38 4% 7% 62 30 5%26 18 62 30

38% 46 18 20% 37% 257 325 34%

Land Use B Office Demand Balanced Demand Land Use C ResidentialITE Code 710 0 0 0 ITE Code 230Size 1315888 0% 0% Size 2900Total Internal External Total Internal External

72 Enter 120 26 94 Enter 695 62 633 633Exit 90 18 72 Exit 592 30 562

94 Total 210 44 166 0% 0% Total 1287 92 1195 562% 100% 21% 79% 0 0 0 % 100% 7% 93%

Demand Balanced Demand

A B C TotalEnter 907 94 633 1634Exit 793 72 562 1427Total 1700 166 1195 3061

Single-Use Trip Gen Est 1836 210 1287 3333 8% <- Internal Capture

Net External Trips

MULTl-USE DEVELOPMENT TRIP GENERATION AND INTERNAL CAPTURE SUMMARYSaturday Peak Hour

Page 272: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Thundering Waters Transportation Master Plan | 151385 | July 2016

Paradigm Transportation Solutions Limited | Appendices

Appendix F

Future Background Traffic Operations Reports

Page 273: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 95 610 18 29 490 215 30 75 80 176 47 82Future Volume (vph) 95 610 18 29 490 215 30 75 80 176 47 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 1 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95Ped Bike Factor 1.00 0.98Frt 0.850 0.850 0.850 0.905Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1525 3197 1390 1484 3167 1430 1471 1606 1250 1614 2733 0Flt Permitted 0.454 0.235 0.663 0.704Satd. Flow (perm) 728 3197 1390 367 3167 1409 1027 1606 1250 1196 2733 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 77 234 87 89Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 4 4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 4% 7% 12% 5% 4% 13% 9% 19% 3% 5% 13%Adj. Flow (vph) 103 663 20 32 533 234 33 82 87 191 51 89Shared Lane Traffic (%)Lane Group Flow (vph) 103 663 20 32 533 234 33 82 87 191 140 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 1 2Detector Template Left Thru Right Left Thru Right Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 274: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Detector Phase 4 4 4 3 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.3 39.3 39.3 12.5 51.8 51.8 37.3 37.3 37.3 37.3 37.3Total Split (%) 44.1% 44.1% 44.1% 14.0% 58.1% 58.1% 41.9% 41.9% 41.9% 41.9% 41.9%Maximum Green (s) 33.0 33.0 33.0 9.5 45.5 45.5 31.0 31.0 31.0 31.0 31.0Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 0.0 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 19.2 19.2 19.2 28.6 28.6 26.2 16.9 16.9 16.9 16.9 16.9Actuated g/C Ratio 0.36 0.36 0.36 0.53 0.53 0.49 0.31 0.31 0.31 0.31 0.31v/c Ratio 0.40 0.58 0.04 0.11 0.32 0.29 0.10 0.16 0.19 0.51 0.15Control Delay 19.3 16.8 0.1 7.9 8.2 2.6 15.2 15.3 5.3 21.5 7.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.3 16.8 0.1 7.9 8.2 2.6 15.2 15.3 5.3 21.5 7.1LOS B B A A A A B B A C AApproach Delay 16.7 6.5 11.0 15.4Approach LOS B A B B

Intersection SummaryArea Type: OtherCycle Length: 89.1Actuated Cycle Length: 53.8Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.58Intersection Signal Delay: 12.1 Intersection LOS: BIntersection Capacity Utilization 56.9% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 275: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBTLane Group Flow (vph) 103 663 20 32 533 234 33 82 87 191 140v/c Ratio 0.40 0.58 0.04 0.11 0.32 0.29 0.10 0.16 0.19 0.51 0.15Control Delay 19.3 16.8 0.1 7.9 8.2 2.6 15.2 15.3 5.3 21.5 7.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.3 16.8 0.1 7.9 8.2 2.6 15.2 15.3 5.3 21.5 7.1Queue Length 50th (m) 7.2 26.3 0.0 1.3 13.4 0.0 2.3 5.8 0.0 15.1 1.8Queue Length 95th (m) 22.8 52.1 0.0 5.8 30.3 10.1 8.8 16.7 8.6 38.5 8.0Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 494 2171 968 377 2846 1273 658 1029 832 766 1783Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.21 0.31 0.02 0.08 0.19 0.18 0.05 0.08 0.10 0.25 0.08

Intersection Summary

Page 276: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 95 610 18 29 490 215 30 75 80 176 47 82Future Volume (vph) 95 610 18 29 490 215 30 75 80 176 47 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.90Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1524 3197 1390 1484 3167 1410 1471 1606 1250 1614 2732Flt Permitted 0.45 1.00 1.00 0.23 1.00 1.00 0.66 1.00 1.00 0.70 1.00Satd. Flow (perm) 728 3197 1390 367 3167 1410 1027 1606 1250 1196 2732Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 103 663 20 32 533 234 33 82 87 191 51 89RTOR Reduction (vph) 0 0 13 0 0 119 0 0 60 0 61 0Lane Group Flow (vph) 103 663 7 32 533 115 33 82 27 191 79 0Confl. Peds. (#/hr) 4 4Heavy Vehicles (%) 9% 4% 7% 12% 5% 4% 13% 9% 19% 3% 5% 13%Turn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Actuated Green, G (s) 16.9 16.9 16.9 26.2 26.2 26.2 14.5 14.5 14.5 14.5 14.5Effective Green, g (s) 19.2 19.2 19.2 25.2 28.5 26.2 16.8 16.8 16.8 16.8 16.8Actuated g/C Ratio 0.36 0.36 0.36 0.47 0.53 0.49 0.32 0.32 0.32 0.32 0.32Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 262 1151 500 284 1693 693 323 506 393 376 861v/s Ratio Prot c0.21 0.01 c0.17 0.05 0.03v/s Ratio Perm 0.14 0.01 0.04 0.08 0.03 0.02 c0.16v/c Ratio 0.39 0.58 0.01 0.11 0.31 0.17 0.10 0.16 0.07 0.51 0.09Uniform Delay, d1 12.7 13.8 11.0 8.2 6.9 7.5 12.9 13.2 12.8 14.9 12.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.7 0.6 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.8 0.0Delay (s) 13.4 14.3 11.0 8.4 7.0 7.6 13.0 13.3 12.8 15.7 12.9Level of Service B B B A A A B B B B BApproach Delay (s) 14.1 7.2 13.0 14.5Approach LOS B A B B

Intersection SummaryHCM 2000 Control Delay 11.5 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.53Actuated Cycle Length (s) 53.3 Sum of lost time (s) 12.0Intersection Capacity Utilization 56.9% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 277: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 814 1 50 552 0 0 0 0 287 86 164Future Volume (vph) 0 814 1 50 552 0 0 0 0 287 86 164Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 50.0 50.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 0 1 1 0 0 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 0.99 1.00 1.00 1.00 0.99Frt 0.850 0.850Flt Protected 0.950 0.950 0.973Satd. Flow (prot) 0 4638 1488 1662 4594 0 0 0 0 1519 1522 1430Flt Permitted 0.202 0.950 0.973Satd. Flow (perm) 0 4638 1467 353 4594 0 0 0 0 1515 1520 1412Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 81 178Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 32.2 64.2 88.8Travel Time (s) 9.7 2.3 4.6 6.4Confl. Peds. (#/hr) 2 2 3 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 3% 0% 0% 4% 0% 0% 0% 0% 4% 9% 4%Adj. Flow (vph) 0 885 1 54 600 0 0 0 0 312 93 178Shared Lane Traffic (%) 36%Lane Group Flow (vph) 0 885 1 54 600 0 0 0 0 200 205 178Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 1 2 1 2 1Detector Template Thru Right Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0

Page 278: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Detector Phase 4 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 36.3 12.5 36.3 36.3 36.3 36.3Total Split (s) 36.3 36.3 12.5 48.5 36.5 36.5 36.5Total Split (%) 42.6% 42.6% 14.7% 56.9% 42.8% 42.8% 42.8%Maximum Green (s) 30.0 30.0 9.5 42.2 30.2 30.2 30.2Yellow Time (s) 4.1 4.1 3.0 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 0.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 19.1 16.8 30.4 30.4 16.3 16.3 16.3Actuated g/C Ratio 0.35 0.31 0.55 0.55 0.30 0.30 0.30v/c Ratio 0.55 0.00 0.15 0.24 0.44 0.45 0.33Control Delay 16.1 0.0 7.5 7.0 19.9 20.1 4.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 16.1 0.0 7.5 7.0 19.9 20.1 4.9LOS B A A A B C AApproach Delay 16.1 7.0 15.4Approach LOS B A B

Intersection SummaryArea Type: OtherCycle Length: 85.3Actuated Cycle Length: 54.9Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.55Intersection Signal Delay: 13.1 Intersection LOS: BIntersection Capacity Utilization 45.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 279: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT EBR WBL WBT SBL SBT SBRLane Group Flow (vph) 885 1 54 600 200 205 178v/c Ratio 0.55 0.00 0.15 0.24 0.44 0.45 0.33Control Delay 16.1 0.0 7.5 7.0 19.9 20.1 4.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 16.1 0.0 7.5 7.0 19.9 20.1 4.9Queue Length 50th (m) 24.9 0.0 2.1 9.5 16.8 17.3 0.0Queue Length 95th (m) 44.3 0.0 8.0 20.6 39.2 40.2 12.0Internal Link Dist (m) 110.1 8.2 64.8Turn Bay Length (m) 50.0 50.0Base Capacity (vph) 2795 857 403 3841 919 921 926Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.32 0.00 0.13 0.16 0.22 0.22 0.19

Intersection Summary

Page 280: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 814 1 50 552 0 0 0 0 287 86 164Future Volume (vph) 0 814 1 50 552 0 0 0 0 287 86 164Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 1.00 1.00 0.91 0.95 0.95 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 0.97 1.00Satd. Flow (prot) 4638 1468 1662 4594 1516 1521 1412Flt Permitted 1.00 1.00 0.20 1.00 0.95 0.97 1.00Satd. Flow (perm) 4638 1468 354 4594 1516 1521 1412Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 885 1 54 600 0 0 0 0 312 93 178RTOR Reduction (vph) 0 0 1 0 0 0 0 0 0 0 0 125Lane Group Flow (vph) 0 885 0 54 600 0 0 0 0 200 205 53Confl. Peds. (#/hr) 2 2 3 1Heavy Vehicles (%) 0% 3% 0% 0% 4% 0% 0% 0% 0% 4% 9% 4%Turn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Actuated Green, G (s) 16.8 16.8 28.0 28.0 14.0 14.0 14.0Effective Green, g (s) 19.1 16.8 27.0 30.3 16.3 16.3 16.3Actuated g/C Ratio 0.35 0.31 0.49 0.55 0.30 0.30 0.30Clearance Time (s) 6.3 6.3 3.0 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1622 451 347 2549 452 454 421v/s Ratio Prot c0.19 0.02 c0.13v/s Ratio Perm 0.00 0.06 0.13 0.13 0.04v/c Ratio 0.55 0.00 0.16 0.24 0.44 0.45 0.13Uniform Delay, d1 14.3 13.1 7.8 6.2 15.5 15.5 14.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.0 0.2 0.0 0.7 0.7 0.1Delay (s) 14.6 13.1 8.0 6.3 16.2 16.2 14.1Level of Service B B A A B B BApproach Delay (s) 14.6 6.4 0.0 15.6Approach LOS B A A B

Intersection SummaryHCM 2000 Control Delay 12.4 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.47Actuated Cycle Length (s) 54.6 Sum of lost time (s) 12.0Intersection Capacity Utilization 45.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 281: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 863 0 0 566 54 111Future Volume (vph) 863 0 0 566 54 111Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.91 1.00 1.00 0.91 0.97 1.00Ped Bike Factor 1.00 0.98Frt 0.850Flt Protected 0.950Satd. Flow (prot) 4684 0 0 4550 3162 1430Flt Permitted 0.950Satd. Flow (perm) 4684 0 0 4550 3151 1398Right Turn on Red Yes YesSatd. Flow (RTOR) 98Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Confl. Peds. (#/hr) 4 13Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 5% 2% 4%Adj. Flow (vph) 938 0 0 615 59 121Shared Lane Traffic (%)Lane Group Flow (vph) 938 0 0 615 59 121Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2

Page 282: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRDetector Phase 4 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.0 35.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7%Maximum Green (s) 28.7 28.7 18.7 18.7Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 15.8 15.8 12.4 12.4Actuated g/C Ratio 0.44 0.44 0.34 0.34v/c Ratio 0.46 0.31 0.05 0.22Control Delay 7.9 7.0 9.3 5.2Queue Delay 0.0 0.0 0.0 0.0Total Delay 7.9 7.0 9.3 5.2LOS A A A AApproach Delay 7.9 7.0 6.5Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 36.2Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.46Intersection Signal Delay: 7.4 Intersection LOS: AIntersection Capacity Utilization 33.5% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 283: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 938 615 59 121v/c Ratio 0.46 0.31 0.05 0.22Control Delay 7.9 7.0 9.3 5.2Queue Delay 0.0 0.0 0.0 0.0Total Delay 7.9 7.0 9.3 5.2Queue Length 50th (m) 13.6 8.2 1.2 1.0Queue Length 95th (m) 20.3 13.0 4.2 9.2Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 4034 3919 1844 856Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.23 0.16 0.03 0.14

Intersection Summary

Page 284: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 863 0 0 566 54 111Future Volume (vph) 863 0 0 566 54 111Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 0.91 0.97 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 4684 4550 3162 1397Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 4684 4550 3162 1397Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 938 0 0 615 59 121RTOR Reduction (vph) 0 0 0 0 0 64Lane Group Flow (vph) 938 0 0 615 59 57Confl. Peds. (#/hr) 4 13Heavy Vehicles (%) 2% 0% 0% 5% 2% 4%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 13.5 13.5 10.1 10.1Effective Green, g (s) 15.8 15.8 12.4 12.4Actuated g/C Ratio 0.44 0.44 0.34 0.34Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 2044 1985 1083 478v/s Ratio Prot c0.20 0.14 0.02v/s Ratio Perm c0.04v/c Ratio 0.46 0.31 0.05 0.12Uniform Delay, d1 7.2 6.6 8.0 8.2Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.1 0.0 0.1Delay (s) 7.4 6.7 8.0 8.3Level of Service A A A AApproach Delay (s) 7.4 6.7 8.2Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 7.2 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.31Actuated Cycle Length (s) 36.2 Sum of lost time (s) 8.0Intersection Capacity Utilization 33.5% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 285: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 67 652 256 135 652 25 102 4 93 15 2 22Future Volume (vph) 67 652 256 135 652 25 102 4 93 15 2 22Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 15.0 0.0Storage Lanes 1 1 2 0 2 1 1 0Taper Length (m) 40.0 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.98 1.00 0.97 0.99Frt 0.850 0.994 0.850 0.862Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3260 1458 3162 3240 0 3162 1716 1458 1630 1479 0Flt Permitted 0.372 0.950 0.950 0.755Satd. Flow (perm) 638 3260 1434 3153 3240 0 3162 1716 1422 1278 1479 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 278 6 101 24Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 5 5 12 12Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 73 709 278 147 709 27 111 4 101 16 2 24Shared Lane Traffic (%)Lane Group Flow (vph) 73 709 278 147 736 0 111 4 101 16 26 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NA

Page 286: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 9.5 32.0 32.0 32.0 32.0Total Split (s) 36.0 36.0 36.0 12.0 48.0 9.5 42.0 42.0 32.5 32.5Total Split (%) 40.0% 40.0% 40.0% 13.3% 53.3% 10.6% 46.7% 46.7% 36.1% 36.1%Maximum Green (s) 29.7 29.7 29.7 7.5 41.7 5.0 35.7 35.7 26.2 26.2Yellow Time (s) 4.1 4.1 4.1 3.5 4.1 3.5 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 1.0 2.2 1.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -0.5 -2.3 -0.5 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 21.0 21.0 21.0 7.6 32.6 5.5 19.9 19.9 10.4 10.4Actuated g/C Ratio 0.35 0.35 0.35 0.13 0.54 0.09 0.33 0.33 0.17 0.17v/c Ratio 0.33 0.63 0.41 0.37 0.42 0.39 0.01 0.19 0.07 0.10Control Delay 19.0 19.1 4.0 28.5 8.9 31.9 16.2 5.5 24.5 12.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.0 19.1 4.0 28.5 8.9 31.9 16.2 5.5 24.5 12.6LOS B B A C A C B A C BApproach Delay 15.2 12.2 19.3 17.2Approach LOS B B B B

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 60.6Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.63Intersection Signal Delay: 14.4 Intersection LOS: BIntersection Capacity Utilization 51.9% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 287: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 73 709 278 147 736 111 4 101 16 26v/c Ratio 0.33 0.63 0.41 0.37 0.42 0.39 0.01 0.19 0.07 0.10Control Delay 19.0 19.1 4.0 28.5 8.9 31.9 16.2 5.5 24.5 12.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.0 19.1 4.0 28.5 8.9 31.9 16.2 5.5 24.5 12.6Queue Length 50th (m) 6.2 35.8 0.0 8.1 24.1 6.4 0.4 0.0 1.6 0.2Queue Length 95th (m) 15.8 51.1 12.8 17.6 34.2 14.6 2.4 9.9 6.9 6.4Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 50.0 50.0 15.0Base Capacity (vph) 339 1733 892 420 2370 288 1083 935 605 713Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.22 0.41 0.31 0.35 0.31 0.39 0.00 0.11 0.03 0.04

Intersection Summary

Page 288: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 67 652 256 135 652 25 102 4 93 15 2 22Future Volume (vph) 67 652 256 135 652 25 102 4 93 15 2 22Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 1.00 1.00 0.98 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 1.00Frt 1.00 1.00 0.85 1.00 0.99 1.00 1.00 0.85 1.00 0.86Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1630 3260 1436 3162 3242 3162 1716 1428 1615 1478Flt Permitted 0.37 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.76 1.00Satd. Flow (perm) 638 3260 1436 3162 3242 3162 1716 1428 1284 1478Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 73 709 278 147 709 27 111 4 101 16 2 24RTOR Reduction (vph) 0 0 182 0 3 0 0 0 68 0 20 0Lane Group Flow (vph) 73 709 96 147 733 0 111 4 33 16 6 0Confl. Peds. (#/hr) 5 5 12 12Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Actuated Green, G (s) 18.7 18.7 18.7 7.1 30.3 5.0 17.6 17.6 8.1 8.1Effective Green, g (s) 21.0 21.0 21.0 7.6 32.6 5.5 19.9 19.9 10.4 10.4Actuated g/C Ratio 0.35 0.35 0.35 0.13 0.54 0.09 0.33 0.33 0.17 0.17Clearance Time (s) 6.3 6.3 6.3 4.5 6.3 4.5 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 221 1131 498 397 1746 287 564 469 220 254v/s Ratio Prot c0.22 0.05 c0.23 c0.04 0.00 0.00v/s Ratio Perm 0.11 0.07 c0.02 0.01v/c Ratio 0.33 0.63 0.19 0.37 0.42 0.39 0.01 0.07 0.07 0.02Uniform Delay, d1 14.6 16.5 13.8 24.3 8.3 25.9 13.7 13.9 21.0 20.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.6 0.9 0.1 0.4 0.1 0.9 0.0 0.0 0.1 0.0Delay (s) 15.2 17.4 14.0 24.7 8.4 26.8 13.7 14.0 21.1 20.9Level of Service B B B C A C B B C CApproach Delay (s) 16.4 11.1 20.6 21.0Approach LOS B B C C

Intersection SummaryHCM 2000 Control Delay 14.8 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.45Actuated Cycle Length (s) 60.5 Sum of lost time (s) 16.0Intersection Capacity Utilization 51.9% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 289: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 142 475 52 67 514 64 145 87 79 56 75 152Future Volume (vph) 142 475 52 67 514 64 145 87 79 56 75 152Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 2 0 1 0 1 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 0.97 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 1.00 1.00 1.00 0.99 1.00Frt 0.985 0.983 0.929 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 2959 3032 0 1599 3014 0 1630 1537 0 1630 1699 1417Flt Permitted 0.950 0.402 0.594 0.643Satd. Flow (perm) 2926 3032 0 674 3014 0 1019 1537 0 1100 1699 1417Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 11 12 46 165Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 12 5 5 12 4 4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 7% 14% 4% 8% 9% 2% 4% 6% 2% 3% 5%Adj. Flow (vph) 154 516 57 73 559 70 158 95 86 61 82 165Shared Lane Traffic (%)Lane Group Flow (vph) 154 573 0 73 629 0 158 181 0 61 82 165Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 290: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Detector Phase 7 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 9.5 30.4 9.5 30.4 9.5 37.7 9.5 37.7 37.7Total Split (s) 25.0 30.4 25.0 30.4 12.0 37.7 12.0 37.7 37.7Total Split (%) 23.8% 28.9% 23.8% 28.9% 11.4% 35.9% 11.4% 35.9% 35.9%Maximum Green (s) 21.0 24.0 22.0 24.0 9.0 31.0 9.0 31.0 31.0Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1 4.1All-Red Time (s) 1.0 2.3 0.0 2.3 0.0 2.6 0.0 2.6 2.6Lost Time Adjust (s) -4.0 -2.4 0.0 -2.4 1.0 -2.7 1.0 -2.7 0.0Total Lost Time (s) 0.0 4.0 3.0 4.0 4.0 4.0 4.0 4.0 6.7Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 12.8 24.0 28.5 20.9 22.7 15.1 19.2 13.4 10.7Actuated g/C Ratio 0.19 0.36 0.43 0.31 0.34 0.23 0.29 0.20 0.16v/c Ratio 0.27 0.52 0.19 0.66 0.38 0.47 0.17 0.24 0.45Control Delay 26.5 19.0 10.3 24.1 19.0 22.7 16.5 26.2 9.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 26.5 19.0 10.3 24.1 19.0 22.7 16.5 26.2 9.4LOS C B B C B C B C AApproach Delay 20.6 22.7 21.0 15.3Approach LOS C C C B

Intersection SummaryArea Type: OtherCycle Length: 105.1Actuated Cycle Length: 66.9Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.66Intersection Signal Delay: 20.6 Intersection LOS: CIntersection Capacity Utilization 52.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 291: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 154 573 73 629 158 181 61 82 165v/c Ratio 0.27 0.52 0.19 0.66 0.38 0.47 0.17 0.24 0.45Control Delay 26.5 19.0 10.3 24.1 19.0 22.7 16.5 26.2 9.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 26.5 19.0 10.3 24.1 19.0 22.7 16.5 26.2 9.4Queue Length 50th (m) 8.6 28.2 4.2 34.6 13.9 15.0 5.0 9.1 0.0Queue Length 95th (m) 19.7 52.5 12.1 63.9 31.3 37.6 14.0 22.4 15.6Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 1130 1276 660 1223 430 813 419 875 758Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.14 0.45 0.11 0.51 0.37 0.22 0.15 0.09 0.22

Intersection Summary

Page 292: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 142 475 52 67 514 64 145 87 79 56 75 152Future Volume (vph) 142 475 52 67 514 64 145 87 79 56 75 152Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 0.0 4.0 3.0 4.0 4.0 4.0 4.0 4.0 6.7Lane Util. Factor 0.97 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.99 1.00 0.98 1.00 0.93 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 2959 3033 1597 3017 1630 1538 1628 1699 1417Flt Permitted 0.95 1.00 0.40 1.00 0.59 1.00 0.64 1.00 1.00Satd. Flow (perm) 2959 3033 675 3017 1018 1538 1102 1699 1417Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 154 516 57 73 559 70 158 95 86 61 82 165RTOR Reduction (vph) 0 7 0 0 8 0 0 36 0 0 0 138Lane Group Flow (vph) 154 566 0 73 621 0 158 145 0 61 82 27Confl. Peds. (#/hr) 12 5 5 12 4 4Heavy Vehicles (%) 9% 7% 14% 4% 8% 9% 2% 4% 6% 2% 3% 5%Turn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Actuated Green, G (s) 8.7 21.6 25.1 18.5 21.1 12.5 17.5 10.7 10.7Effective Green, g (s) 12.7 24.0 25.1 20.9 19.1 15.2 15.5 13.4 10.7Actuated g/C Ratio 0.19 0.36 0.38 0.31 0.29 0.23 0.23 0.20 0.16Clearance Time (s) 4.0 6.4 3.0 6.4 3.0 6.7 3.0 6.7 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 564 1092 345 946 361 351 302 341 227v/s Ratio Prot c0.05 0.19 0.02 c0.21 c0.05 c0.09 0.02 0.05v/s Ratio Perm 0.06 0.08 0.03 0.02v/c Ratio 0.27 0.52 0.21 0.66 0.44 0.41 0.20 0.24 0.12Uniform Delay, d1 23.0 16.8 13.6 19.7 18.8 21.9 20.4 22.3 23.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.2 0.2 1.3 0.6 0.4 0.2 0.2 0.1Delay (s) 23.2 17.0 13.8 21.1 19.4 22.3 20.6 22.5 24.0Level of Service C B B C B C C C CApproach Delay (s) 18.3 20.3 21.0 22.9Approach LOS B C C C

Intersection SummaryHCM 2000 Control Delay 20.1 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.51Actuated Cycle Length (s) 66.6 Sum of lost time (s) 15.0Intersection Capacity Utilization 52.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 293: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 141 429 40 0 354 108 107 60 11 97 21 184Future Volume (vph) 141 429 40 0 354 108 107 60 11 97 21 184Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 1 0 1 0 0 0 1 1Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 1.00 1.00 1.00 1.00Frt 0.987 0.965 0.992 0.850Flt Protected 0.950 0.971 0.950Satd. Flow (prot) 1554 3055 0 1750 2957 0 0 1652 0 1630 1667 1417Flt Permitted 0.468 0.808 0.699Satd. Flow (perm) 763 3055 0 1750 2957 0 0 1375 0 1198 1667 1417Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 16 65 5 200Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 5 3 3 5 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 7% 7% 9% 0% 9% 5% 1% 2% 11% 2% 5% 5%Adj. Flow (vph) 153 466 43 0 385 117 116 65 12 105 23 200Shared Lane Traffic (%)Lane Group Flow (vph) 153 509 0 0 502 0 0 193 0 105 23 200Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 294: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm NA Perm NA Perm NA PermProtected Phases 4 8 2 6Permitted Phases 4 8 2 6 6Detector Phase 4 4 8 8 2 2 6 6 6Switch PhaseMinimum Initial (s) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 27.1 27.1 27.1 27.1 33.1 33.1 33.1 33.1 33.1Total Split (s) 47.0 47.0 47.0 47.0 40.2 40.2 40.2 40.2 40.2Total Split (%) 53.9% 53.9% 53.9% 53.9% 46.1% 46.1% 46.1% 46.1% 46.1%Maximum Green (s) 40.9 40.9 40.9 40.9 34.1 34.1 34.1 34.1 34.1Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 13.0 17.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 17.3 17.3 17.3 14.2 14.2 14.2 11.9Actuated g/C Ratio 0.43 0.43 0.43 0.36 0.36 0.36 0.30v/c Ratio 0.47 0.38 0.38 0.39 0.25 0.04 0.36Control Delay 13.9 8.5 7.6 13.9 12.8 11.0 4.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 13.9 8.5 7.6 13.9 12.8 11.0 4.8LOS B A A B B B AApproach Delay 9.7 7.6 13.9 7.8Approach LOS A A B A

Intersection SummaryArea Type: OtherCycle Length: 87.2Actuated Cycle Length: 40Natural Cycle: 65Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.47Intersection Signal Delay: 9.2 Intersection LOS: AIntersection Capacity Utilization 50.9% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 295: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBL EBT WBT NBT SBL SBT SBRLane Group Flow (vph) 153 509 502 193 105 23 200v/c Ratio 0.47 0.38 0.38 0.39 0.25 0.04 0.36Control Delay 13.9 8.5 7.6 13.9 12.8 11.0 4.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 13.9 8.5 7.6 13.9 12.8 11.0 4.8Queue Length 50th (m) 6.4 10.2 8.9 8.6 4.5 0.9 0.0Queue Length 95th (m) 23.2 25.1 22.7 30.9 18.3 5.7 12.1Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 50.0 25.0Base Capacity (vph) 716 2867 2778 1214 1058 1472 1240Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.21 0.18 0.18 0.16 0.10 0.02 0.16

Intersection Summary

Page 296: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 141 429 40 0 354 108 107 60 11 97 21 184Future Volume (vph) 141 429 40 0 354 108 107 60 11 97 21 184Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.99 0.97 0.99 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.97 0.95 1.00 1.00Satd. Flow (prot) 1552 3057 2959 1651 1629 1667 1417Flt Permitted 0.47 1.00 1.00 0.81 0.70 1.00 1.00Satd. Flow (perm) 764 3057 2959 1374 1198 1667 1417Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 153 466 43 0 385 117 116 65 12 105 23 200RTOR Reduction (vph) 0 9 0 0 37 0 0 3 0 0 0 139Lane Group Flow (vph) 153 500 0 0 465 0 0 190 0 105 23 61Confl. Peds. (#/hr) 5 3 3 5 1 1Heavy Vehicles (%) 7% 7% 9% 0% 9% 5% 1% 2% 11% 2% 5% 5%Turn Type Perm NA Perm NA Perm NA Perm NA PermProtected Phases 4 8 2 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 15.0 15.0 15.0 11.9 11.9 11.9 11.9Effective Green, g (s) 17.1 17.1 17.1 14.0 14.0 14.0 11.9Actuated g/C Ratio 0.44 0.44 0.44 0.36 0.36 0.36 0.30Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 334 1336 1294 491 428 596 431v/s Ratio Prot 0.16 0.16 0.01v/s Ratio Perm c0.20 c0.14 0.09 0.04v/c Ratio 0.46 0.37 0.36 0.39 0.25 0.04 0.14Uniform Delay, d1 7.7 7.4 7.3 9.4 8.8 8.2 9.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.0 0.2 0.2 0.5 0.3 0.0 0.2Delay (s) 8.7 7.6 7.5 9.9 9.1 8.2 10.0Level of Service A A A A A A BApproach Delay (s) 7.8 7.5 9.9 9.6Approach LOS A A A A

Intersection SummaryHCM 2000 Control Delay 8.3 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.43Actuated Cycle Length (s) 39.1 Sum of lost time (s) 8.0Intersection Capacity Utilization 50.9% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 297: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 54 471 12 5 410 178 1 1 2 147 4 50Future Volume (vph) 54 471 12 5 410 178 1 1 2 147 4 50Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 50.0 25.0 50.0 25.0 0.0 0.0 0.0Storage Lanes 1 1 1 1 1 0 1 0Taper Length (m) 75.0 50.0 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.850 0.850 0.900 0.860Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1511 3228 1488 1662 3137 1365 1662 1575 0 1525 1321 0Flt Permitted 0.292 0.463 0.950 0.950Satd. Flow (perm) 465 3228 1488 810 3137 1365 1662 1575 0 1525 1321 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 80 193 2 54Link Speed (k/h) 50 50 50 50Link Distance (m) 310.8 136.7 108.4 168.0Travel Time (s) 22.4 9.8 7.8 12.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 3% 0% 0% 6% 9% 0% 0% 0% 9% 0% 15%Adj. Flow (vph) 59 512 13 5 446 193 1 1 2 160 4 54Shared Lane Traffic (%)Lane Group Flow (vph) 59 512 13 5 446 193 1 3 0 160 58 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 2Detector Template Left Thru Right Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm Perm NA Perm Split NA Split NAProtected Phases 7 4 8 2 2 6 6

Page 298: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 4 8 8Detector Phase 7 4 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 6.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 10.5 38.1 38.1 38.1 38.1 38.1 36.1 36.1 36.1 36.1Total Split (s) 15.0 53.1 53.1 38.1 38.1 38.1 36.1 36.1 36.1 36.1Total Split (%) 12.0% 42.4% 42.4% 30.4% 30.4% 30.4% 28.8% 28.8% 28.8% 28.8%Maximum Green (s) 12.0 47.0 47.0 32.0 32.0 32.0 30.0 30.0 30.0 30.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) 1.0 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.3 2.5 2.5 2.5 2.5 2.5 4.0 4.0 4.0 4.0Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 27.4 27.4 27.4 16.8 16.8 16.8 10.3 10.3 15.8 15.8Actuated g/C Ratio 0.42 0.42 0.42 0.26 0.26 0.26 0.16 0.16 0.24 0.24v/c Ratio 0.20 0.38 0.02 0.02 0.56 0.39 0.00 0.01 0.44 0.16Control Delay 13.7 14.4 0.1 20.2 24.7 6.3 29.0 23.7 26.4 8.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 13.7 14.4 0.1 20.2 24.7 6.3 29.0 23.7 26.4 8.7LOS B B A C C A C C C AApproach Delay 14.0 19.1 25.0 21.7Approach LOS B B C C

Intersection SummaryArea Type: OtherCycle Length: 125.3Actuated Cycle Length: 65.7Natural Cycle: 125Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.56Intersection Signal Delay: 17.5 Intersection LOS: BIntersection Capacity Utilization 46.3% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)

Page 299: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBTLane Group Flow (vph) 59 512 13 5 446 193 1 3 160 58v/c Ratio 0.20 0.38 0.02 0.02 0.56 0.39 0.00 0.01 0.44 0.16Control Delay 13.7 14.4 0.1 20.2 24.7 6.3 29.0 23.7 26.4 8.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 13.7 14.4 0.1 20.2 24.7 6.3 29.0 23.7 26.4 8.7Queue Length 50th (m) 4.3 22.4 0.0 0.5 25.3 0.0 0.1 0.1 16.9 0.4Queue Length 95th (m) 11.9 38.5 0.0 3.2 45.4 14.7 1.6 2.6 38.3 9.2Internal Link Dist (m) 286.8 112.7 84.4 144.0Turn Bay Length (m) 50.0 50.0 25.0 50.0 25.0Base Capacity (vph) 372 2457 1152 428 1658 812 827 784 759 684Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.16 0.21 0.01 0.01 0.27 0.24 0.00 0.00 0.21 0.08

Intersection Summary

Page 300: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 54 471 12 5 410 178 1 1 2 147 4 50Future Volume (vph) 54 471 12 5 410 178 1 1 2 147 4 50Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.90 1.00 0.86Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1511 3228 1488 1662 3137 1365 1662 1575 1525 1321Flt Permitted 0.29 1.00 1.00 0.46 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (perm) 465 3228 1488 811 3137 1365 1662 1575 1525 1321Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 59 512 13 5 446 193 1 1 2 160 4 54RTOR Reduction (vph) 0 0 8 0 0 143 0 2 0 0 41 0Lane Group Flow (vph) 59 512 5 5 446 50 1 1 0 160 17 0Heavy Vehicles (%) 10% 3% 0% 0% 6% 9% 0% 0% 0% 9% 0% 15%Turn Type pm+pt NA Perm Perm NA Perm Split NA Split NAProtected Phases 7 4 8 2 2 6 6Permitted Phases 4 4 8 8Actuated Green, G (s) 25.3 25.3 25.3 14.8 14.8 14.8 8.1 8.1 13.6 13.6Effective Green, g (s) 24.3 27.4 27.4 16.9 16.9 16.9 10.2 10.2 15.7 15.7Actuated g/C Ratio 0.37 0.42 0.42 0.26 0.26 0.26 0.16 0.16 0.24 0.24Clearance Time (s) 3.0 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 2.3 2.5 2.5 2.5 2.5 2.5 4.0 4.0 4.0 4.0Lane Grp Cap (vph) 277 1354 624 209 811 353 259 246 366 317v/s Ratio Prot 0.02 c0.16 c0.14 0.00 c0.00 c0.10 0.01v/s Ratio Perm 0.06 0.00 0.01 0.04v/c Ratio 0.21 0.38 0.01 0.02 0.55 0.14 0.00 0.01 0.44 0.05Uniform Delay, d1 13.8 13.1 11.0 18.0 20.9 18.6 23.3 23.3 21.0 19.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.1 0.0 0.0 0.6 0.1 0.0 0.0 1.1 0.1Delay (s) 14.1 13.2 11.0 18.1 21.5 18.8 23.3 23.3 22.2 19.2Level of Service B B B B C B C C C BApproach Delay (s) 13.2 20.7 23.3 21.4Approach LOS B C C C

Intersection SummaryHCM 2000 Control Delay 17.8 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.39Actuated Cycle Length (s) 65.3 Sum of lost time (s) 16.0Intersection Capacity Utilization 46.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 301: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 449 171 16 394 199 29Future Volume (vph) 449 171 16 394 199 29Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 75.0 50.0 0.0 50.0Storage Lanes 1 1 2 1Taper Length (m) 50.0 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 3107 1365 1458 3107 2780 1430Flt Permitted 0.474 0.950Satd. Flow (perm) 3107 1365 728 3107 2780 1430Right Turn on Red Yes YesSatd. Flow (RTOR) 186 32Link Speed (k/h) 50 50 50Link Distance (m) 140.7 332.8 68.6Travel Time (s) 10.1 24.0 4.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 7% 9% 14% 7% 16% 4%Adj. Flow (vph) 488 186 17 428 216 32Shared Lane Traffic (%)Lane Group Flow (vph) 488 186 17 428 216 32Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 1 1 2 1 1Detector Template Thru Right Left Thru Left RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA Perm Perm NA Prot PermProtected Phases 4 8 2

Page 302: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group EBT EBR WBL WBT NBL NBRPermitted Phases 4 8 2Detector Phase 4 4 8 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 8.0 8.0Minimum Split (s) 24.5 24.5 24.5 24.5 38.1 38.1Total Split (s) 41.5 41.5 41.5 41.5 38.1 38.1Total Split (%) 52.1% 52.1% 52.1% 52.1% 47.9% 47.9%Maximum Green (s) 35.4 35.4 35.4 35.4 32.0 32.0Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.9 2.9 2.9 2.9 2.8 2.8Recall Mode Min Min Min Min Min MinWalk Time (s) 12.0 12.0Flash Dont Walk (s) 20.0 20.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 13.4 13.4 13.4 13.4 10.7 10.7Actuated g/C Ratio 0.42 0.42 0.42 0.42 0.33 0.33v/c Ratio 0.38 0.27 0.06 0.33 0.23 0.06Control Delay 7.5 2.6 6.2 7.2 9.0 4.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 7.5 2.6 6.2 7.2 9.0 4.4LOS A A A A A AApproach Delay 6.1 7.1 8.4Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 79.6Actuated Cycle Length: 32.1Natural Cycle: 65Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.38Intersection Signal Delay: 6.9 Intersection LOS: AIntersection Capacity Utilization 27.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49)

Page 303: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group EBT EBR WBL WBT NBL NBRLane Group Flow (vph) 488 186 17 428 216 32v/c Ratio 0.38 0.27 0.06 0.33 0.23 0.06Control Delay 7.5 2.6 6.2 7.2 9.0 4.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 7.5 2.6 6.2 7.2 9.0 4.4Queue Length 50th (m) 8.2 0.0 0.5 7.0 3.7 0.0Queue Length 95th (m) 16.5 6.3 2.6 14.5 10.2 3.4Internal Link Dist (m) 116.7 308.8 44.6Turn Bay Length (m) 75.0 50.0 50.0Base Capacity (vph) 3107 1365 728 3107 2732 1406Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.16 0.14 0.02 0.14 0.08 0.02

Intersection Summary

Page 304: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 32

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 449 171 16 394 199 29Future Volume (vph) 449 171 16 394 199 29Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00Frt 1.00 0.85 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 3107 1365 1458 3107 2780 1430Flt Permitted 1.00 1.00 0.47 1.00 0.95 1.00Satd. Flow (perm) 3107 1365 728 3107 2780 1430Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 488 186 17 428 216 32RTOR Reduction (vph) 0 108 0 0 0 21Lane Group Flow (vph) 488 78 17 428 216 11Heavy Vehicles (%) 7% 9% 14% 7% 16% 4%Turn Type NA Perm Perm NA Prot PermProtected Phases 4 8 2Permitted Phases 4 8 2Actuated Green, G (s) 11.3 11.3 11.3 11.3 8.6 8.6Effective Green, g (s) 13.4 13.4 13.4 13.4 10.7 10.7Actuated g/C Ratio 0.42 0.42 0.42 0.42 0.33 0.33Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 2.9 2.9 2.9 2.9 2.8 2.8Lane Grp Cap (vph) 1297 569 303 1297 926 476v/s Ratio Prot c0.16 0.14 c0.08v/s Ratio Perm 0.06 0.02 0.01v/c Ratio 0.38 0.14 0.06 0.33 0.23 0.02Uniform Delay, d1 6.5 5.8 5.6 6.3 7.7 7.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.1 0.1 0.1 0.1 0.0Delay (s) 6.6 5.9 5.7 6.5 7.9 7.2Level of Service A A A A A AApproach Delay (s) 6.4 6.4 7.8Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.7 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.31Actuated Cycle Length (s) 32.1 Sum of lost time (s) 8.0Intersection Capacity Utilization 27.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 305: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 134 4 182 0 0 94Future Volume (vph) 134 4 182 0 0 94Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.996Flt Protected 0.954Satd. Flow (prot) 3163 0 3260 0 0 3260Flt Permitted 0.954Satd. Flow (perm) 3163 0 3260 0 0 3260Right Turn on Red Yes YesSatd. Flow (RTOR) 4Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 146 4 198 0 0 102Shared Lane Traffic (%)Lane Group Flow (vph) 150 0 198 0 0 102Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch PhaseMinimum Initial (s) 8.0 8.0 8.0

Page 306: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group WBL WBR NBT NBR SBL SBTMinimum Split (s) 24.2 22.5 22.5Total Split (s) 28.2 22.5 22.5Total Split (%) 55.6% 44.4% 44.4%Maximum Green (s) 23.0 17.0 17.0Yellow Time (s) 3.2 3.5 3.5All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -1.2 -1.5 -1.5Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 9.2 9.5 9.5Actuated g/C Ratio 0.34 0.36 0.36v/c Ratio 0.14 0.17 0.09Control Delay 6.3 6.3 6.0Queue Delay 0.0 0.0 0.0Total Delay 6.3 6.3 6.0LOS A A AApproach Delay 6.3 6.3 6.0Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50.7Actuated Cycle Length: 26.7Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.17Intersection Signal Delay: 6.2 Intersection LOS: AIntersection Capacity Utilization 20.0% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 307: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group WBL NBT SBTLane Group Flow (vph) 150 198 102v/c Ratio 0.14 0.17 0.09Control Delay 6.3 6.3 6.0Queue Delay 0.0 0.0 0.0Total Delay 6.3 6.3 6.0Queue Length 50th (m) 2.0 2.7 1.3Queue Length 95th (m) 4.4 5.5 3.3Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2867 2258 2258Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.05 0.09 0.05

Intersection Summary

Page 308: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 36

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 134 4 182 0 0 94Future Volume (vph) 134 4 182 0 0 94Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 1.00 1.00 1.00Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 3161 3260 3260Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 3161 3260 3260Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 146 4 198 0 0 102RTOR Reduction (vph) 3 0 0 0 0 0Lane Group Flow (vph) 147 0 198 0 0 102Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.0 8.0 8.0Effective Green, g (s) 9.2 9.5 9.5Actuated g/C Ratio 0.34 0.36 0.36Clearance Time (s) 5.2 5.5 5.5Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1089 1159 1159v/s Ratio Prot c0.05 c0.06v/s Ratio Perm 0.03v/c Ratio 0.14 0.17 0.09Uniform Delay, d1 6.0 5.9 5.7Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.0 0.0 0.0Delay (s) 6.0 5.9 5.7Level of Service A A AApproach Delay (s) 6.0 5.9 5.7Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 5.9 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.17Actuated Cycle Length (s) 26.7 Sum of lost time (s) 9.5Intersection Capacity Utilization 20.0% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 309: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 90 0 0 109 266 127Future Volume (vph) 90 0 0 109 266 127Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Ped Bike Factor 0.99Frt 0.952Flt Protected 0.950Satd. Flow (prot) 1614 0 0 2969 2992 0Flt Permitted 0.950Satd. Flow (perm) 1614 0 0 2969 2992 0Right Turn on Red Yes YesSatd. Flow (RTOR) 138Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 12% 7% 1%Adj. Flow (vph) 98 0 0 118 289 138Shared Lane Traffic (%)Lane Group Flow (vph) 98 0 0 118 427 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2

Page 310: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBR NBL NBT SBT SBRDetector Phase 4 2 2 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 31.3 42.0 42.0 42.0Total Split (%) 42.7% 57.3% 57.3% 57.3%Maximum Green (s) 25.0 35.0 35.0 35.0Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.9 2.9 2.9Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 10.4 13.0 13.0Actuated g/C Ratio 0.33 0.41 0.41v/c Ratio 0.18 0.10 0.32Control Delay 8.5 5.9 4.9Queue Delay 0.0 0.0 0.0Total Delay 8.5 5.9 4.9LOS A A AApproach Delay 8.5 5.9 4.9Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 73.3Actuated Cycle Length: 31.4Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.32Intersection Signal Delay: 5.6 Intersection LOS: AIntersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 311: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL NBT SBTLane Group Flow (vph) 98 118 427v/c Ratio 0.18 0.10 0.32Control Delay 8.5 5.9 4.9Queue Delay 0.0 0.0 0.0Total Delay 8.5 5.9 4.9Queue Length 50th (m) 3.5 1.7 4.6Queue Length 95th (m) 8.9 4.2 9.7Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1568 2969 2992Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.06 0.04 0.14

Intersection Summary

Page 312: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 90 0 0 109 266 127Future Volume (vph) 90 0 0 109 266 127Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95Frpb, ped/bikes 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 1.00 0.95Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1614 2969 2991Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 1614 2969 2991Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 98 0 0 118 289 138RTOR Reduction (vph) 0 0 0 0 81 0Lane Group Flow (vph) 98 0 0 118 346 0Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 3% 0% 0% 12% 7% 1%Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 8.1 10.0 10.0Effective Green, g (s) 10.4 13.0 13.0Actuated g/C Ratio 0.33 0.41 0.41Clearance Time (s) 6.3 7.0 7.0Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 534 1229 1238v/s Ratio Prot c0.06 0.04 c0.12v/s Ratio Permv/c Ratio 0.18 0.10 0.28Uniform Delay, d1 7.5 5.6 6.1Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.1Delay (s) 7.6 5.6 6.2Level of Service A A AApproach Delay (s) 7.6 5.6 6.2Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.3 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.24Actuated Cycle Length (s) 31.4 Sum of lost time (s) 8.0Intersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 313: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Future Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1667 0 1750 1716 1488 0 1750 0 2041 1488 0Flt Permitted 0.466 0.950Satd. Flow (perm) 816 1667 0 1750 1716 1488 0 1750 0 2041 1488 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 126 884Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 5% 0% 0% 2% 0% 0% 0% 0% 58% 0% 0%Adj. Flow (vph) 25 105 0 0 132 23 0 0 0 13 0 2Shared Lane Traffic (%)Lane Group Flow (vph) 25 105 0 0 132 23 0 0 0 13 2 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 314: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 12.5 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 18.0 52.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (%) 13.9% 40.5% 26.6% 26.6% 26.6% 29.7% 29.7% 29.7% 29.7%Maximum Green (s) 15.0 45.0 27.0 27.0 27.0 31.0 31.0 31.0 31.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.5 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.53 0.53 0.29 0.29 0.29 0.29v/c Ratio 0.04 0.12 0.26 0.04 0.02 0.00Control Delay 5.3 5.8 14.2 0.1 11.8 0.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.3 5.8 14.2 0.1 11.8 0.0LOS A A B A B AApproach Delay 5.7 12.1 10.2Approach LOS A B B

Intersection SummaryArea Type: OtherCycle Length: 129.5Actuated Cycle Length: 46Natural Cycle: 125Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.26Intersection Signal Delay: 9.3 Intersection LOS: AIntersection Capacity Utilization 35.0% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 315: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 25 105 132 23 13 2v/c Ratio 0.04 0.12 0.26 0.04 0.02 0.00Control Delay 5.3 5.8 14.2 0.1 11.8 0.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.3 5.8 14.2 0.1 11.8 0.0Queue Length 50th (m) 0.9 3.9 8.4 0.0 0.4 0.0Queue Length 95th (m) 3.2 9.2 18.8 0.0 1.8 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 692 1667 1137 1029 1530 1337Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.04 0.06 0.12 0.02 0.01 0.00

Intersection Summary

Page 316: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Future Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1667 1716 1488 2041 1488Flt Permitted 0.47 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 815 1667 1716 1488 2041 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 25 105 0 0 132 23 0 0 0 13 0 2RTOR Reduction (vph) 0 0 0 0 0 16 0 0 0 0 1 0Lane Group Flow (vph) 25 105 0 0 132 7 0 0 0 13 1 0Heavy Vehicles (%) 0% 5% 0% 0% 2% 0% 0% 0% 0% 58% 0% 0%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 21.0 21.0 10.0 10.0 10.0 10.0Effective Green, g (s) 20.0 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.43 0.53 0.29 0.29 0.29 0.29Clearance Time (s) 3.0 7.5 7.5 7.5 7.5 7.5Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 483 887 503 436 598 436v/s Ratio Prot 0.01 c0.06 c0.08 c0.01 0.00v/s Ratio Perm 0.01 0.00v/c Ratio 0.05 0.12 0.26 0.02 0.02 0.00Uniform Delay, d1 7.6 5.4 12.4 11.5 11.6 11.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.0 0.0 0.1 0.0 0.0 0.0Delay (s) 7.7 5.4 12.6 11.5 11.6 11.5Level of Service A A B B B BApproach Delay (s) 5.8 12.4 0.0 11.6Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 9.5 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.16Actuated Cycle Length (s) 46.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 35.0% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 317: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 15 77 1 263 72 98 2 157 444 103 159 23Future Volume (vph) 15 77 1 263 72 98 2 157 444 103 159 23Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 0.0 0.0 100.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.999 0.913 0.850 0.981Flt Protected 0.992 0.950 0.999 0.950Satd. Flow (prot) 0 1632 0 1525 1465 0 0 1682 1430 1433 1429 0Flt Permitted 0.949 0.692 0.997 0.648Satd. Flow (perm) 0 1561 0 1111 1465 0 0 1678 1430 978 1429 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 1 107 483 12Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 8% 6% 0% 9% 5% 12% 0% 4% 4% 16% 23% 0%Adj. Flow (vph) 16 84 1 286 78 107 2 171 483 112 173 25Shared Lane Traffic (%)Lane Group Flow (vph) 0 101 0 286 185 0 0 173 483 112 198 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 318: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 46

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0Total Split (%) 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0%Maximum Green (s) 33.7 33.7 33.7 33.7 33.7 33.7 33.7 33.7 33.7Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 0.0 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 6.3 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 23.3 23.3 23.3 19.6 17.1 19.6 19.6Actuated g/C Ratio 0.45 0.45 0.45 0.38 0.33 0.38 0.38v/c Ratio 0.14 0.57 0.26 0.27 0.61 0.30 0.36Control Delay 9.6 16.5 5.6 13.7 5.5 15.5 14.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.6 16.5 5.6 13.7 5.5 15.5 14.2LOS A B A B A B BApproach Delay 9.6 12.2 7.7 14.7Approach LOS A B A B

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 51.4Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.61Intersection Signal Delay: 10.6 Intersection LOS: BIntersection Capacity Utilization 60.7% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 319: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 101 286 185 173 483 112 198v/c Ratio 0.14 0.57 0.26 0.27 0.61 0.30 0.36Control Delay 9.6 16.5 5.6 13.7 5.5 15.5 14.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.6 16.5 5.6 13.7 5.5 15.5 14.2Queue Length 50th (m) 4.9 17.4 3.7 10.4 0.0 6.8 11.5Queue Length 95th (m) 15.6 50.2 16.4 29.9 18.4 22.8 33.9Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 50.0 100.0 50.0Base Capacity (vph) 1159 825 1115 1246 1148 726 1064Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.09 0.35 0.17 0.14 0.42 0.15 0.19

Intersection Summary

Page 320: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 15 77 1 263 72 98 2 157 444 103 159 23Future Volume (vph) 15 77 1 263 72 98 2 157 444 103 159 23Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 6.3 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.91 1.00 0.85 1.00 0.98Flt Protected 0.99 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1632 1525 1466 1682 1430 1433 1430Flt Permitted 0.95 0.69 1.00 1.00 1.00 0.65 1.00Satd. Flow (perm) 1561 1111 1466 1678 1430 977 1430Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 16 84 1 286 78 107 2 171 483 112 173 25RTOR Reduction (vph) 0 1 0 0 58 0 0 0 319 0 7 0Lane Group Flow (vph) 0 100 0 286 127 0 0 173 164 112 191 0Heavy Vehicles (%) 8% 6% 0% 9% 5% 12% 0% 4% 4% 16% 23% 0%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 20.8 20.8 20.8 17.1 17.1 17.1 17.1Effective Green, g (s) 23.1 23.1 23.1 19.4 17.1 19.4 19.4Actuated g/C Ratio 0.46 0.46 0.46 0.38 0.34 0.38 0.38Clearance Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 714 508 670 644 484 375 549v/s Ratio Prot 0.09 c0.13v/s Ratio Perm 0.06 c0.26 0.10 0.11 0.11v/c Ratio 0.14 0.56 0.19 0.27 0.34 0.30 0.35Uniform Delay, d1 7.9 10.0 8.1 10.7 12.5 10.8 11.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 3.0 0.4 0.6 1.2 1.3 1.1Delay (s) 8.2 13.0 8.5 11.3 13.6 12.1 12.1Level of Service A B A B B B BApproach Delay (s) 8.2 11.2 13.0 12.1Approach LOS A B B B

Intersection SummaryHCM 2000 Control Delay 12.0 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.46Actuated Cycle Length (s) 50.5 Sum of lost time (s) 8.0Intersection Capacity Utilization 60.7% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 321: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 33 2 2 196 181 7Future Volume (vph) 33 2 2 196 181 7Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.993 0.995Flt Protected 0.955Satd. Flow (prot) 1441 0 0 1592 1615 0Flt Permitted 0.955Satd. Flow (perm) 1441 0 0 1592 1615 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 16% 0% 0% 10% 8% 4%Adj. Flow (vph) 36 2 2 213 197 8Shared Lane Traffic (%)Lane Group Flow (vph) 38 0 0 215 205 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 22.9% ICU Level of Service AAnalysis Period (min) 15

Page 322: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 33 2 2 196 181 7Future Volume (Veh/h) 33 2 2 196 181 7Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 36 2 2 213 197 8PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 418 201 205vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 418 201 205tC, single (s) 6.6 6.2 4.1tC, 2 stage (s)tF (s) 3.6 3.3 2.2p0 queue free % 94 100 100cM capacity (veh/h) 565 845 1378

Direction, Lane # EB 1 NB 1 SB 1Volume Total 38 215 205Volume Left 36 2 0Volume Right 2 0 8cSH 575 1378 1700Volume to Capacity 0.07 0.00 0.12Queue Length 95th (m) 1.7 0.0 0.0Control Delay (s) 11.7 0.1 0.0Lane LOS B AApproach Delay (s) 11.7 0.1 0.0Approach LOS B

Intersection SummaryAverage Delay 1.0Intersection Capacity Utilization 22.9% ICU Level of Service AAnalysis Period (min) 15

Page 323: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 16 12 41 182 106 77Future Volume (vph) 16 12 41 182 106 77Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.941 0.943Flt Protected 0.972 0.991Satd. Flow (prot) 1239 0 0 1589 1555 0Flt Permitted 0.972 0.991Satd. Flow (perm) 1239 0 0 1589 1555 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 21% 40% 14% 8% 7% 5%Adj. Flow (vph) 17 13 45 198 115 84Shared Lane Traffic (%)Lane Group Flow (vph) 30 0 0 243 199 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 37.4% ICU Level of Service AAnalysis Period (min) 15

Page 324: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 52

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 12 41 182 106 77Future Volume (Veh/h) 16 12 41 182 106 77Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 13 45 198 115 84PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 445 157 199vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 445 157 199tC, single (s) 6.6 6.6 4.2tC, 2 stage (s)tF (s) 3.7 3.7 2.3p0 queue free % 97 98 97cM capacity (veh/h) 518 798 1305

Direction, Lane # EB 1 NB 1 SB 1Volume Total 30 243 199Volume Left 17 45 0Volume Right 13 0 84cSH 611 1305 1700Volume to Capacity 0.05 0.03 0.12Queue Length 95th (m) 1.2 0.9 0.0Control Delay (s) 11.2 1.7 0.0Lane LOS B AApproach Delay (s) 11.2 1.7 0.0Approach LOS B

Intersection SummaryAverage Delay 1.6Intersection Capacity Utilization 37.4% ICU Level of Service AAnalysis Period (min) 15

Page 325: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 20 41 91 203 73 45Future Volume (vph) 20 41 91 203 73 45Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.909 0.948Flt Protected 0.984 0.985Satd. Flow (prot) 1086 0 0 1636 1518 0Flt Permitted 0.984 0.985Satd. Flow (perm) 1086 0 0 1636 1518 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 298.3 331.4Travel Time (s) 14.9 21.5 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 28% 52% 4% 6% 15% 0%Adj. Flow (vph) 22 45 99 221 79 49Shared Lane Traffic (%)Lane Group Flow (vph) 67 0 0 320 128 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 34.3% ICU Level of Service AAnalysis Period (min) 15

Page 326: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 20 41 91 203 73 45Future Volume (Veh/h) 20 41 91 203 73 45Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 22 45 99 221 79 49PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 522 104 128vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 522 104 128tC, single (s) 6.7 6.7 4.1tC, 2 stage (s)tF (s) 3.8 3.8 2.2p0 queue free % 95 95 93cM capacity (veh/h) 440 831 1446

Direction, Lane # EB 1 NB 1 SB 1Volume Total 67 320 128Volume Left 22 99 0Volume Right 45 0 49cSH 643 1446 1700Volume to Capacity 0.10 0.07 0.08Queue Length 95th (m) 2.8 1.8 0.0Control Delay (s) 11.2 2.8 0.0Lane LOS B AApproach Delay (s) 11.2 2.8 0.0Approach LOS B

Intersection SummaryAverage Delay 3.2Intersection Capacity Utilization 34.3% ICU Level of Service AAnalysis Period (min) 15

Page 327: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 6 1 7 8 8 27 20 261 15 9 98 6Future Volume (vph) 6 1 7 8 8 27 20 261 15 9 98 6Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.932 0.917 0.993 0.992Flt Protected 0.979 0.991 0.997 0.996Satd. Flow (prot) 0 1194 0 0 1590 0 0 1618 0 0 1410 0Flt Permitted 0.979 0.991 0.997 0.996Satd. Flow (perm) 0 1194 0 0 1590 0 0 1618 0 0 1410 0Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 29.6Travel Time (s) 8.5 7.8 70.5 2.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 20% 0% 50% 0% 0% 0% 0% 7% 18% 13% 25% 0%Adj. Flow (vph) 7 1 8 9 9 29 22 284 16 10 107 7Shared Lane Traffic (%)Lane Group Flow (vph) 0 16 0 0 47 0 0 322 0 0 124 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 31.5% ICU Level of Service AAnalysis Period (min) 15

Page 328: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 56

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 6 1 7 8 8 27 20 261 15 9 98 6Future Volume (Veh/h) 6 1 7 8 8 27 20 261 15 9 98 6Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 1 8 9 9 29 22 284 16 10 107 7PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 500 474 110 475 470 292 114 300vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 500 474 110 475 470 292 114 300tC, single (s) 7.3 6.5 6.7 7.1 6.5 6.2 4.1 4.2tC, 2 stage (s)tF (s) 3.7 4.0 3.8 3.5 4.0 3.3 2.2 2.3p0 queue free % 98 100 99 98 98 96 99 99cM capacity (veh/h) 422 480 827 489 483 752 1488 1201

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 16 47 322 124Volume Left 7 9 22 10Volume Right 8 29 16 7cSH 565 622 1488 1201Volume to Capacity 0.03 0.08 0.01 0.01Queue Length 95th (m) 0.7 2.0 0.4 0.2Control Delay (s) 11.6 11.3 0.6 0.7Lane LOS B B A AApproach Delay (s) 11.6 11.3 0.6 0.7Approach LOS B B

Intersection SummaryAverage Delay 2.0Intersection Capacity Utilization 31.5% ICU Level of Service AAnalysis Period (min) 15

Page 329: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 62 32 60 120 161 67Future Volume (vph) 62 32 60 120 161 67Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.954 0.850Flt Protected 0.968 0.950Satd. Flow (prot) 1388 0 1299 1683 1683 1162Flt Permitted 0.968 0.950Satd. Flow (perm) 1388 0 1299 1683 1683 1162Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 25% 0% 28% 4% 4% 28%Adj. Flow (vph) 67 35 65 130 175 73Shared Lane Traffic (%)Lane Group Flow (vph) 102 0 65 130 175 73Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 28.7% ICU Level of Service AAnalysis Period (min) 15

Page 330: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 58

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 62 32 60 120 161 67Future Volume (Veh/h) 62 32 60 120 161 67Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 67 35 65 130 175 73PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 435 175 248vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 435 175 248tC, single (s) 6.6 6.2 4.4tC, 2 stage (s)tF (s) 3.7 3.3 2.5p0 queue free % 87 96 94cM capacity (veh/h) 508 874 1180

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 102 65 130 175 73Volume Left 67 65 0 0 0Volume Right 35 0 0 0 73cSH 593 1180 1700 1700 1700Volume to Capacity 0.17 0.06 0.08 0.10 0.04Queue Length 95th (m) 4.9 1.4 0.0 0.0 0.0Control Delay (s) 12.3 8.2 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 12.3 2.7 0.0Approach LOS B

Intersection SummaryAverage Delay 3.3Intersection Capacity Utilization 28.7% ICU Level of Service AAnalysis Period (min) 15

Page 331: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 59

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 117 6 174 97 23 169Future Volume (vph) 117 6 174 97 23 169Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.993 0.952Flt Protected 0.955 0.994Satd. Flow (prot) 1660 0 1594 0 0 1675Flt Permitted 0.955 0.994Satd. Flow (perm) 1660 0 1594 0 0 1675Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 7% 0% 10% 3%Adj. Flow (vph) 127 7 189 105 25 184Shared Lane Traffic (%)Lane Group Flow (vph) 134 0 294 0 0 209Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 44.8% ICU Level of Service AAnalysis Period (min) 15

Page 332: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 60

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 117 6 174 97 23 169Future Volume (Veh/h) 117 6 174 97 23 169Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 127 7 189 105 25 184PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 476 242 294vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 476 242 294tC, single (s) 6.4 6.2 4.2tC, 2 stage (s)tF (s) 3.5 3.3 2.3p0 queue free % 76 99 98cM capacity (veh/h) 540 802 1223

Direction, Lane # WB 1 NB 1 SB 1Volume Total 134 294 209Volume Left 127 0 25Volume Right 7 105 0cSH 550 1700 1223Volume to Capacity 0.24 0.17 0.02Queue Length 95th (m) 7.6 0.0 0.5Control Delay (s) 13.6 0.0 1.1Lane LOS B AApproach Delay (s) 13.6 0.0 1.1Approach LOS B

Intersection SummaryAverage Delay 3.2Intersection Capacity Utilization 44.8% ICU Level of Service AAnalysis Period (min) 15

Page 333: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 61

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 451 320 0 101 113Future Volume (vph) 0 451 320 0 101 113Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3079 3079 0 1646 1488Flt Permitted 0.950Satd. Flow (perm) 0 3079 3079 0 1646 1488Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 8% 8% 0% 1% 0%Adj. Flow (vph) 0 490 348 0 110 123Shared Lane Traffic (%)Lane Group Flow (vph) 0 490 348 0 110 123Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 26.3% ICU Level of Service AAnalysis Period (min) 15

Page 334: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 62

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 0 451 320 0 101 113Future Volume (Veh/h) 0 451 320 0 101 113Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 490 348 0 110 123PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 5Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 348 593 174vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 348 593 174tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 75 85cM capacity (veh/h) 1222 439 846

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1Volume Total 245 245 174 174 233Volume Left 0 0 0 0 110Volume Right 0 0 0 0 123cSH 1700 1700 1700 1700 930Volume to Capacity 0.14 0.14 0.10 0.10 0.25Queue Length 95th (m) 0.0 0.0 0.0 0.0 7.9Control Delay (s) 0.0 0.0 0.0 0.0 12.8Lane LOS BApproach Delay (s) 0.0 0.0 12.8Approach LOS B

Intersection SummaryAverage Delay 2.8Intersection Capacity Utilization 26.3% ICU Level of Service AAnalysis Period (min) 15

Page 335: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 63

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 541 0 0 468 142 261Future Volume (vph) 541 0 0 468 142 261Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3023 0 0 3228 1471 1352Flt Permitted 0.950Satd. Flow (perm) 3023 0 0 3228 1471 1352Link Speed (k/h) 50 50 50Link Distance (m) 104.2 91.9 169.0Travel Time (s) 7.5 6.6 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 0% 0% 3% 13% 10%Adj. Flow (vph) 588 0 0 509 154 284Shared Lane Traffic (%)Lane Group Flow (vph) 588 0 0 509 154 284Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 40.4% ICU Level of Service AAnalysis Period (min) 15

Page 336: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 64

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (veh/h) 541 0 0 468 142 261Future Volume (Veh/h) 541 0 0 468 142 261Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 588 0 0 509 154 284PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 6Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 588 842 294vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 588 842 294tC, single (s) 4.1 7.1 7.1tC, 2 stage (s)tF (s) 2.2 3.6 3.4p0 queue free % 100 45 58cM capacity (veh/h) 997 282 679

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1Volume Total 294 294 254 254 438Volume Left 0 0 0 0 154Volume Right 0 0 0 0 284cSH 1700 1700 1700 1700 802Volume to Capacity 0.17 0.17 0.15 0.15 0.55Queue Length 95th (m) 0.0 0.0 0.0 0.0 26.9Control Delay (s) 0.0 0.0 0.0 0.0 20.4Lane LOS CApproach Delay (s) 0.0 0.0 20.4Approach LOS C

Intersection SummaryAverage Delay 5.8Intersection Capacity Utilization 40.4% ICU Level of Service AAnalysis Period (min) 15

Page 337: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 65

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 244 109 190 53 93 21Future Volume (vph) 244 109 190 53 93 21Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.970 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1525 1667 1647 0 1498 1162Flt Permitted 0.950 0.950Satd. Flow (perm) 1525 1667 1647 0 1498 1162Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 5% 2% 7% 11% 28%Adj. Flow (vph) 265 118 207 58 101 23Shared Lane Traffic (%)Lane Group Flow (vph) 265 118 265 0 101 23Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 44.6% ICU Level of Service AAnalysis Period (min) 15

Page 338: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 66

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 244 109 190 53 93 21Future Volume (vph) 244 109 190 53 93 21Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 265 118 207 58 101 23

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total (vph) 265 118 265 101 23Volume Left (vph) 265 0 0 101 0Volume Right (vph) 0 0 58 0 23Hadj (s) 0.65 0.09 -0.08 0.69 -0.22Departure Headway (s) 5.8 5.3 5.1 6.8 5.9Degree Utilization, x 0.43 0.17 0.38 0.19 0.04Capacity (veh/h) 596 662 681 481 561Control Delay (s) 12.0 8.2 11.2 10.2 7.9Approach Delay (s) 10.8 11.2 9.8Approach LOS B B A

Intersection SummaryDelay 10.8Level of Service BIntersection Capacity Utilization 44.6% ICU Level of Service AAnalysis Period (min) 15

Page 339: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 67

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 49 429 367 62 16 43Future Volume (vph) 49 429 367 62 16 43Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 50.0 50.0 0.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1458 3228 3228 1488 1583 1305Flt Permitted 0.950 0.950Satd. Flow (perm) 1458 3228 3228 1488 1583 1305Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 14% 3% 3% 0% 5% 14%Adj. Flow (vph) 53 466 399 67 17 47Shared Lane Traffic (%)Lane Group Flow (vph) 53 466 399 67 17 47Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 27.7% ICU Level of Service AAnalysis Period (min) 15

Page 340: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road Background 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 68

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 49 429 367 62 16 43Future Volume (Veh/h) 49 429 367 62 16 43Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 53 466 399 67 17 47PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 383pX, platoon unblockedvC, conflicting volume 399 738 200vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 399 738 200tC, single (s) 4.4 6.9 7.2tC, 2 stage (s)tF (s) 2.3 3.5 3.4p0 queue free % 95 95 94cM capacity (veh/h) 1075 330 772

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 SB 1 SB 2Volume Total 53 233 233 200 200 67 17 47Volume Left 53 0 0 0 0 0 17 0Volume Right 0 0 0 0 0 67 0 47cSH 1075 1700 1700 1700 1700 1700 330 772Volume to Capacity 0.05 0.14 0.14 0.12 0.12 0.04 0.05 0.06Queue Length 95th (m) 1.2 0.0 0.0 0.0 0.0 0.0 1.3 1.6Control Delay (s) 8.5 0.0 0.0 0.0 0.0 0.0 16.5 10.0Lane LOS A C AApproach Delay (s) 0.9 0.0 11.7Approach LOS B

Intersection SummaryAverage Delay 1.1Intersection Capacity Utilization 27.7% ICU Level of Service AAnalysis Period (min) 15

Page 341: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 90 732 28 104 828 320 32 102 246 299 115 90Future Volume (vph) 90 732 28 104 828 320 32 102 246 299 115 90Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 1 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95Ped Bike Factor 1.00 0.98 1.00 0.98 0.99 1.00Frt 0.850 0.850 0.850 0.934Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1539 3228 1488 1568 3228 1473 1662 1651 1430 1646 3000 0Flt Permitted 0.316 0.170 0.612 0.685Satd. Flow (perm) 511 3228 1462 280 3228 1447 1071 1651 1411 1185 3000 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 76 348 267 98Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 7 6 6 7 2 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 8% 3% 0% 6% 3% 1% 0% 6% 4% 1% 0% 8%Adj. Flow (vph) 98 796 30 113 900 348 35 111 267 325 125 98Shared Lane Traffic (%)Lane Group Flow (vph) 98 796 30 113 900 348 35 111 267 325 223 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 1 2Detector Template Left Thru Right Left Thru Right Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 342: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Detector Phase 4 4 4 3 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.4 39.4 39.4 12.5 51.9 51.9 38.1 38.1 38.1 38.1 38.1Total Split (%) 43.8% 43.8% 43.8% 13.9% 57.7% 57.7% 42.3% 42.3% 42.3% 42.3% 42.3%Maximum Green (s) 33.1 33.1 33.1 9.5 45.6 45.6 31.8 31.8 31.8 31.8 31.8Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 0.0 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 25.7 25.7 25.7 36.7 36.7 34.3 26.0 26.0 26.0 26.0 26.0Actuated g/C Ratio 0.36 0.36 0.36 0.52 0.52 0.48 0.37 0.37 0.37 0.37 0.37v/c Ratio 0.54 0.68 0.05 0.42 0.54 0.40 0.09 0.18 0.39 0.75 0.19Control Delay 32.6 23.6 0.2 15.2 13.7 3.0 17.2 17.7 4.4 33.5 10.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 32.6 23.6 0.2 15.2 13.7 3.0 17.2 17.7 4.4 33.5 10.0LOS C C A B B A B B A C AApproach Delay 23.8 11.1 9.1 23.9Approach LOS C B A C

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 71.2Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.75Intersection Signal Delay: 16.6 Intersection LOS: BIntersection Capacity Utilization 72.6% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 343: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBTLane Group Flow (vph) 98 796 30 113 900 348 35 111 267 325 223v/c Ratio 0.54 0.68 0.05 0.42 0.54 0.40 0.09 0.18 0.39 0.75 0.19Control Delay 32.6 23.6 0.2 15.2 13.7 3.0 17.2 17.7 4.4 33.5 10.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 32.6 23.6 0.2 15.2 13.7 3.0 17.2 17.7 4.4 33.5 10.0Queue Length 50th (m) 10.8 49.4 0.0 7.9 42.7 0.0 3.1 10.3 0.0 38.7 5.9Queue Length 95th (m) 30.3 80.1 0.2 18.6 69.6 13.2 10.5 25.1 15.4 #90.8 15.3Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 267 1692 802 306 2290 1090 540 833 844 598 1563Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.37 0.47 0.04 0.37 0.39 0.32 0.06 0.13 0.32 0.54 0.14

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 344: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 90 732 28 104 828 320 32 102 246 299 115 90Future Volume (vph) 90 732 28 104 828 320 32 102 246 299 115 90Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 0.98 1.00 1.00 0.99 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.93Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1537 3228 1464 1568 3228 1449 1662 1651 1411 1644 3000Flt Permitted 0.32 1.00 1.00 0.17 1.00 1.00 0.61 1.00 1.00 0.69 1.00Satd. Flow (perm) 512 3228 1464 281 3228 1449 1072 1651 1411 1186 3000Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 98 796 30 113 900 348 35 111 267 325 125 98RTOR Reduction (vph) 0 0 19 0 0 179 0 0 169 0 62 0Lane Group Flow (vph) 98 796 11 113 900 169 35 111 98 325 161 0Confl. Peds. (#/hr) 7 6 6 7 2 2Heavy Vehicles (%) 8% 3% 0% 6% 3% 1% 0% 6% 4% 1% 0% 8%Turn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Actuated Green, G (s) 23.4 23.4 23.4 34.3 34.3 34.3 23.6 23.6 23.6 23.6 23.6Effective Green, g (s) 25.7 25.7 25.7 33.3 36.6 34.3 25.9 25.9 25.9 25.9 25.9Actuated g/C Ratio 0.36 0.36 0.36 0.47 0.52 0.49 0.37 0.37 0.37 0.37 0.37Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 186 1176 533 258 1675 704 393 606 518 435 1102v/s Ratio Prot c0.25 0.04 c0.28 0.07 0.05v/s Ratio Perm 0.19 0.01 0.16 0.12 0.03 0.07 c0.27v/c Ratio 0.53 0.68 0.02 0.44 0.54 0.24 0.09 0.18 0.19 0.75 0.15Uniform Delay, d1 17.6 18.9 14.3 12.2 11.3 10.5 14.6 15.1 15.2 19.4 14.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 2.0 1.4 0.0 0.9 0.3 0.1 0.1 0.1 0.1 6.5 0.0Delay (s) 19.7 20.3 14.4 13.1 11.6 10.7 14.7 15.2 15.3 26.0 15.0Level of Service B C B B B B B B B C BApproach Delay (s) 20.1 11.5 15.2 21.5Approach LOS C B B C

Intersection SummaryHCM 2000 Control Delay 16.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.70Actuated Cycle Length (s) 70.5 Sum of lost time (s) 12.0Intersection Capacity Utilization 72.6% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 345: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1232 45 94 943 0 0 0 0 462 82 297Future Volume (vph) 0 1232 45 94 943 0 0 0 0 462 82 297Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 0.91 0.91 1.00 0.91 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 1.00 1.00 1.00 1.00Frt 0.995 0.850Flt Protected 0.950 0.950 0.966Satd. Flow (prot) 0 4661 0 1630 4684 0 0 0 0 1504 1496 1444Flt Permitted 0.129 0.950 0.966Satd. Flow (perm) 0 4661 0 221 4684 0 0 0 0 1501 1494 1444Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 7 88Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 17.0 64.2 88.8Travel Time (s) 9.7 1.2 4.6 6.4Confl. Peds. (#/hr) 6 6 2 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 2% 2% 0% 0% 0% 0% 5% 13% 3%Adj. Flow (vph) 0 1339 49 102 1025 0 0 0 0 502 89 323Shared Lane Traffic (%) 42%Lane Group Flow (vph) 0 1388 0 102 1025 0 0 0 0 291 300 323Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 2 1 2 1Detector Template Thru Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0Turn Type NA pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 8 6 6

Page 346: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 12.5 36.3 36.3 36.3 36.3Total Split (s) 39.0 13.6 52.6 37.4 37.4 37.4Total Split (%) 43.3% 15.1% 58.4% 41.6% 41.6% 41.6%Maximum Green (s) 32.7 10.6 46.3 31.1 31.1 31.1Yellow Time (s) 4.1 3.0 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 0.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag LeadLead-Lag Optimize? Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 30.1 42.0 42.0 23.3 23.3 23.3Actuated g/C Ratio 0.41 0.57 0.57 0.32 0.32 0.32v/c Ratio 0.73 0.37 0.38 0.61 0.63 0.62Control Delay 21.6 12.6 9.9 28.1 28.8 21.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 21.6 12.6 9.9 28.1 28.8 21.6LOS C B A C C CApproach Delay 21.6 10.1 26.0Approach LOS C B C

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 73.6Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.73Intersection Signal Delay: 19.0 Intersection LOS: BIntersection Capacity Utilization 66.5% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 347: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT WBL WBT SBL SBT SBRLane Group Flow (vph) 1388 102 1025 291 300 323v/c Ratio 0.73 0.37 0.38 0.61 0.63 0.62Control Delay 21.6 12.6 9.9 28.1 28.8 21.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 21.6 12.6 9.9 28.1 28.8 21.6Queue Length 50th (m) 58.4 6.2 27.2 38.0 39.5 28.8Queue Length 95th (m) 96.5 16.5 47.6 69.2 72.0 59.5Internal Link Dist (m) 110.1 0.1 64.8Turn Bay Length (m)Base Capacity (vph) 2290 315 3191 702 699 722Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.61 0.32 0.32 0.41 0.43 0.45

Intersection Summary

Page 348: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1232 45 94 943 0 0 0 0 462 82 297Future Volume (vph) 0 1232 45 94 943 0 0 0 0 462 82 297Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 1.00 0.91 0.95 0.95 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.99 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 0.95 1.00 0.95 0.97 1.00Satd. Flow (prot) 4660 1630 4684 1502 1494 1444Flt Permitted 1.00 0.13 1.00 0.95 0.97 1.00Satd. Flow (perm) 4660 222 4684 1502 1494 1444Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 1339 49 102 1025 0 0 0 0 502 89 323RTOR Reduction (vph) 0 4 0 0 0 0 0 0 0 0 0 60Lane Group Flow (vph) 0 1384 0 102 1025 0 0 0 0 291 300 263Confl. Peds. (#/hr) 6 6 2 2Heavy Vehicles (%) 0% 2% 0% 2% 2% 0% 0% 0% 0% 5% 13% 3%Turn Type NA pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 8 6 6Actuated Green, G (s) 27.9 39.7 39.7 20.9 20.9 20.9Effective Green, g (s) 30.2 38.7 42.0 23.2 23.2 23.2Actuated g/C Ratio 0.41 0.53 0.57 0.32 0.32 0.32Clearance Time (s) 6.3 3.0 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1922 267 2687 476 473 457v/s Ratio Prot c0.30 0.04 c0.22v/s Ratio Perm 0.16 0.19 0.20 0.18v/c Ratio 0.72 0.38 0.38 0.61 0.63 0.58Uniform Delay, d1 18.0 11.1 8.5 21.2 21.4 20.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.4 0.9 0.1 2.3 2.8 1.8Delay (s) 19.3 12.1 8.6 23.5 24.2 22.6Level of Service B B A C C CApproach Delay (s) 19.3 8.9 0.0 23.4Approach LOS B A A C

Intersection SummaryHCM 2000 Control Delay 17.0 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.65Actuated Cycle Length (s) 73.2 Sum of lost time (s) 12.0Intersection Capacity Utilization 66.5% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 349: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1303 0 0 960 89 148Future Volume (vph) 1303 0 0 960 89 148Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.91 1.00 1.00 0.91 0.97 1.00Ped Bike Factor 0.99Frt 0.850Flt Protected 0.950Satd. Flow (prot) 4638 0 0 4684 3101 1430Flt Permitted 0.950Satd. Flow (perm) 4638 0 0 4684 3101 1410Right Turn on Red Yes YesSatd. Flow (RTOR) 27Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Confl. Peds. (#/hr) 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 2% 4% 4%Adj. Flow (vph) 1416 0 0 1043 97 161Shared Lane Traffic (%)Lane Group Flow (vph) 1416 0 0 1043 97 161Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2

Page 350: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRDetector Phase 4 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.0 35.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7%Maximum Green (s) 28.7 28.7 18.7 18.7Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 23.4 23.4 13.9 13.9Actuated g/C Ratio 0.52 0.52 0.31 0.31v/c Ratio 0.59 0.43 0.10 0.36Control Delay 8.9 7.5 13.1 14.4Queue Delay 0.0 0.0 0.0 0.0Total Delay 8.9 7.5 13.1 14.4LOS A A B BApproach Delay 8.9 7.5 13.9Approach LOS A A B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 45.4Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.59Intersection Signal Delay: 8.8 Intersection LOS: AIntersection Capacity Utilization 43.7% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 351: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 1416 1043 97 161v/c Ratio 0.59 0.43 0.10 0.36Control Delay 8.9 7.5 13.1 14.4Queue Delay 0.0 0.0 0.0 0.0Total Delay 8.9 7.5 13.1 14.4Queue Length 50th (m) 23.8 15.6 2.8 8.2Queue Length 95th (m) 44.2 29.7 8.2 24.3Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 3239 3271 1467 681Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.44 0.32 0.07 0.24

Intersection Summary

Page 352: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1303 0 0 960 89 148Future Volume (vph) 1303 0 0 960 89 148Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 0.91 0.97 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 4638 4684 3101 1409Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 4638 4684 3101 1409Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1416 0 0 1043 97 161RTOR Reduction (vph) 0 0 0 0 0 19Lane Group Flow (vph) 1416 0 0 1043 97 142Confl. Peds. (#/hr) 3Heavy Vehicles (%) 3% 0% 0% 2% 4% 4%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 21.0 21.0 11.5 11.5Effective Green, g (s) 23.3 23.3 13.8 13.8Actuated g/C Ratio 0.52 0.52 0.31 0.31Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 2396 2419 948 431v/s Ratio Prot c0.31 0.22 0.03v/s Ratio Perm c0.10v/c Ratio 0.59 0.43 0.10 0.33Uniform Delay, d1 7.6 6.8 11.2 12.1Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.1 0.0 0.5Delay (s) 8.0 6.9 11.3 12.5Level of Service A A B BApproach Delay (s) 8.0 6.9 12.1Approach LOS A A B

Intersection SummaryHCM 2000 Control Delay 8.0 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.49Actuated Cycle Length (s) 45.1 Sum of lost time (s) 8.0Intersection Capacity Utilization 43.7% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 353: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 36 977 437 292 1121 15 421 26 218 21 14 96Future Volume (vph) 36 977 437 292 1121 15 421 26 218 21 14 96Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 15.0 25.0Storage Lanes 1 1 2 0 2 1 1 0Taper Length (m) 40.0 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 0.97 0.99 1.00 0.99 0.99 1.00 0.98Frt 0.850 0.998 0.850 0.869Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1568 3197 1444 3162 3216 0 3162 1606 1458 1662 1417 0Flt Permitted 0.199 0.950 0.950 0.739Satd. Flow (perm) 328 3197 1405 3143 3216 0 3137 1606 1439 1292 1417 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 461 2 237 27Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 5 14 14 5 7 1 1 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 4% 3% 2% 3% 15% 2% 9% 2% 0% 8% 5%Adj. Flow (vph) 39 1062 475 317 1218 16 458 28 237 23 15 104Shared Lane Traffic (%)Lane Group Flow (vph) 39 1062 475 317 1234 0 458 28 237 23 119 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 354: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 9.5 32.0 32.0 32.0 32.0Total Split (s) 36.0 36.0 36.0 17.0 53.0 20.0 52.0 52.0 32.0 32.0Total Split (%) 34.3% 34.3% 34.3% 16.2% 50.5% 19.0% 49.5% 49.5% 30.5% 30.5%Maximum Green (s) 28.0 28.0 28.0 12.5 45.0 15.5 44.0 44.0 24.0 24.0Yellow Time (s) 4.5 4.5 4.5 3.5 4.5 3.5 4.5 4.5 4.5 4.5All-Red Time (s) 3.5 3.5 3.5 1.0 3.5 1.0 3.5 3.5 3.5 3.5Lost Time Adjust (s) -4.0 -4.0 -4.0 -0.5 -4.0 -0.5 -4.0 -4.0 -4.0 -4.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 32.1 32.1 32.1 12.6 48.6 16.0 35.5 35.5 15.4 15.4Actuated g/C Ratio 0.35 0.35 0.35 0.14 0.53 0.17 0.39 0.39 0.17 0.17v/c Ratio 0.34 0.96 0.60 0.74 0.73 0.83 0.05 0.34 0.11 0.46Control Delay 34.3 49.1 6.4 50.0 20.3 52.1 17.8 4.0 33.2 32.4Queue Delay 0.0 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 34.3 50.2 6.4 50.0 20.3 52.1 17.8 4.0 33.2 32.4LOS C D A D C D B A C CApproach Delay 36.6 26.3 35.0 32.5Approach LOS D C C C

Intersection SummaryArea Type: OtherCycle Length: 105Actuated Cycle Length: 92.1Natural Cycle: 100Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.96Intersection Signal Delay: 32.2 Intersection LOS: CIntersection Capacity Utilization 72.2% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 355: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 39 1062 475 317 1234 458 28 237 23 119v/c Ratio 0.34 0.96 0.60 0.74 0.73 0.83 0.05 0.34 0.11 0.46Control Delay 34.3 49.1 6.4 50.0 20.3 52.1 17.8 4.0 33.2 32.4Queue Delay 0.0 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 34.3 50.2 6.4 50.0 20.3 52.1 17.8 4.0 33.2 32.4Queue Length 50th (m) 5.3 100.3 1.7 29.3 86.2 42.8 3.3 0.0 3.7 15.5Queue Length 95th (m) 16.8 #159.4 27.8 #50.8 128.5 #74.3 8.7 14.2 10.6 32.4Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 50.0 50.0 15.0Base Capacity (vph) 114 1112 789 446 1714 550 838 864 393 450Starvation Cap Reductn 0 11 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.34 0.96 0.60 0.71 0.72 0.83 0.03 0.27 0.06 0.26

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 356: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 36 977 437 292 1121 15 421 26 218 21 14 96Future Volume (vph) 36 977 437 292 1121 15 421 26 218 21 14 96Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.97 1.00 1.00 1.00 1.00 0.99 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 1.00 1.00 0.85 1.00 0.87Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1566 3197 1407 3162 3216 3162 1606 1439 1661 1418Flt Permitted 0.20 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.74 1.00Satd. Flow (perm) 328 3197 1407 3162 3216 3162 1606 1439 1292 1418Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 39 1062 475 317 1218 16 458 28 237 23 15 104RTOR Reduction (vph) 0 0 301 0 1 0 0 0 146 0 22 0Lane Group Flow (vph) 39 1062 174 317 1233 0 458 28 91 23 97 0Confl. Peds. (#/hr) 5 14 14 5 7 1 1 7Heavy Vehicles (%) 6% 4% 3% 2% 3% 15% 2% 9% 2% 0% 8% 5%Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Actuated Green, G (s) 28.0 28.0 28.0 12.1 44.6 15.5 31.5 31.5 11.5 11.5Effective Green, g (s) 32.0 32.0 32.0 12.6 48.6 16.0 35.5 35.5 15.5 15.5Actuated g/C Ratio 0.35 0.35 0.35 0.14 0.53 0.17 0.39 0.39 0.17 0.17Clearance Time (s) 8.0 8.0 8.0 4.5 8.0 4.5 8.0 8.0 8.0 8.0Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 113 1110 488 432 1697 549 619 554 217 238v/s Ratio Prot c0.33 0.10 c0.38 c0.14 0.02 c0.07v/s Ratio Perm 0.12 0.12 0.06 0.02v/c Ratio 0.35 0.96 0.36 0.73 0.73 0.83 0.05 0.16 0.11 0.41Uniform Delay, d1 22.3 29.4 22.4 38.1 16.7 36.8 17.7 18.6 32.4 34.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.3 17.4 0.3 6.0 1.5 10.5 0.0 0.1 0.2 0.8Delay (s) 23.6 46.8 22.7 44.1 18.1 47.3 17.7 18.7 32.6 35.0Level of Service C D C D B D B B C DApproach Delay (s) 39.0 23.5 36.8 34.6Approach LOS D C D C

Intersection SummaryHCM 2000 Control Delay 32.4 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.79Actuated Cycle Length (s) 92.1 Sum of lost time (s) 16.0Intersection Capacity Utilization 72.2% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 357: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 326 773 117 49 821 81 269 133 68 117 138 339Future Volume (vph) 326 773 117 49 821 81 269 133 68 117 138 339Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 50.0Storage Lanes 2 0 1 0 1 0 1 0Taper Length (m) 50.0 50.0 50.0 50.0Lane Util. Factor 0.97 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 0.99 1.00 1.00 0.99 1.00Frt 0.980 0.987 0.949 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 3193 3164 0 1630 3182 0 1568 1636 0 1646 1733 1473Flt Permitted 0.950 0.234 0.406 0.558Satd. Flow (perm) 3148 3164 0 400 3182 0 670 1636 0 965 1733 1473Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 18 10 26 241Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 24 11 11 24 3 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 2% 5% 2% 3% 0% 6% 0% 3% 1% 1% 1%Adj. Flow (vph) 354 840 127 53 892 88 292 145 74 127 150 368Shared Lane Traffic (%)Lane Group Flow (vph) 354 967 0 53 980 0 292 219 0 127 150 368Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 358: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Detector Phase 7 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 11.4 30.4 9.5 30.4 9.5 37.7 9.5 37.7 37.7Total Split (s) 18.0 47.4 9.6 39.0 15.0 42.1 10.9 38.0 38.0Total Split (%) 16.4% 43.1% 8.7% 35.5% 13.6% 38.3% 9.9% 34.5% 34.5%Maximum Green (s) 11.6 41.0 6.6 32.6 12.0 35.4 7.9 31.3 31.3Yellow Time (s) 4.1 4.1 3.0 4.1 3.0 4.1 3.0 4.1 4.1All-Red Time (s) 2.3 2.3 0.0 2.3 0.0 2.6 0.0 2.6 2.6Lost Time Adjust (s) -2.4 -2.4 1.0 -2.4 1.0 -2.7 1.0 -2.7 -2.7Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 14.1 43.0 38.9 33.9 32.5 21.9 24.1 17.4 17.4Actuated g/C Ratio 0.15 0.46 0.42 0.37 0.35 0.24 0.26 0.19 0.19v/c Ratio 0.73 0.65 0.23 0.84 0.85 0.54 0.42 0.46 0.78Control Delay 48.9 22.4 14.3 35.3 49.2 32.3 26.4 37.8 24.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 48.9 22.4 14.3 35.3 49.2 32.3 26.4 37.8 24.5LOS D C B D D C C D CApproach Delay 29.5 34.2 41.9 28.0Approach LOS C C D C

Intersection SummaryArea Type: OtherCycle Length: 110Actuated Cycle Length: 92.6Natural Cycle: 90Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.85Intersection Signal Delay: 32.4 Intersection LOS: CIntersection Capacity Utilization 76.6% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 359: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 354 967 53 980 292 219 127 150 368v/c Ratio 0.73 0.65 0.23 0.84 0.85 0.54 0.42 0.46 0.78Control Delay 48.9 22.4 14.3 35.3 49.2 32.3 26.4 37.8 24.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 48.9 22.4 14.3 35.3 49.2 32.3 26.4 37.8 24.5Queue Length 50th (m) 32.7 67.1 4.0 83.3 43.9 32.2 16.9 25.6 22.1Queue Length 95th (m) #62.2 113.7 12.2 #145.9 #78.5 54.4 29.8 43.5 55.5Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0 50.0Base Capacity (vph) 486 1512 245 1217 342 693 305 640 696Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.73 0.64 0.22 0.81 0.85 0.32 0.42 0.23 0.53

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 360: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 326 773 117 49 821 81 269 133 68 117 138 339Future Volume (vph) 326 773 117 49 821 81 269 133 68 117 138 339Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.98 1.00 0.99 1.00 0.95 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 3193 3166 1628 3182 1568 1636 1644 1733 1473Flt Permitted 0.95 1.00 0.23 1.00 0.41 1.00 0.56 1.00 1.00Satd. Flow (perm) 3193 3166 401 3182 671 1636 966 1733 1473Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 354 840 127 53 892 88 292 145 74 127 150 368RTOR Reduction (vph) 0 10 0 0 6 0 0 20 0 0 0 196Lane Group Flow (vph) 354 957 0 53 974 0 292 199 0 127 150 172Confl. Peds. (#/hr) 24 11 11 24 3 3Heavy Vehicles (%) 1% 2% 5% 2% 3% 0% 6% 0% 3% 1% 1% 1%Turn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Actuated Green, G (s) 11.7 40.6 37.5 31.5 29.8 19.1 22.4 14.7 14.7Effective Green, g (s) 14.1 43.0 35.5 33.9 28.8 21.8 20.4 17.4 17.4Actuated g/C Ratio 0.15 0.46 0.38 0.37 0.31 0.24 0.22 0.19 0.19Clearance Time (s) 6.4 6.4 3.0 6.4 3.0 6.7 3.0 6.7 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 486 1471 220 1166 316 385 262 325 277v/s Ratio Prot c0.11 0.30 0.01 c0.31 c0.11 0.12 0.04 0.09v/s Ratio Perm 0.08 c0.18 0.07 0.12v/c Ratio 0.73 0.65 0.24 0.84 0.92 0.52 0.48 0.46 0.62Uniform Delay, d1 37.4 19.0 18.4 26.7 29.0 30.8 30.5 33.4 34.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 5.1 0.8 0.4 5.1 31.5 0.6 1.0 0.5 3.4Delay (s) 42.4 19.8 18.8 31.9 60.5 31.4 31.5 33.9 37.9Level of Service D B B C E C C C DApproach Delay (s) 25.9 31.2 48.0 35.7Approach LOS C C D D

Intersection SummaryHCM 2000 Control Delay 32.5 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.84Actuated Cycle Length (s) 92.5 Sum of lost time (s) 16.0Intersection Capacity Utilization 76.6% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 361: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 226 624 108 9 590 198 96 75 13 147 97 265Future Volume (vph) 226 624 108 9 590 198 96 75 13 147 97 265Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 1 0 1 0 0 0 1 1Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 1.00 1.00 0.99 1.00 0.99Frt 0.978 0.962 0.991 0.850Flt Protected 0.950 0.950 0.975 0.950Satd. Flow (prot) 1599 3151 0 1662 3083 0 0 1669 0 1662 1733 1458Flt Permitted 0.169 0.351 0.785 0.631Satd. Flow (perm) 283 3151 0 612 3083 0 0 1343 0 1093 1733 1458Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 37 63 6 288Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 16 7 7 16 17 17Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 4% 3% 1% 0% 3% 1% 1% 0% 9% 0% 1% 2%Adj. Flow (vph) 246 678 117 10 641 215 104 82 14 160 105 288Shared Lane Traffic (%)Lane Group Flow (vph) 246 795 0 10 856 0 0 200 0 160 105 288Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 362: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Detector Phase 7 4 8 8 2 2 6 6 6Switch PhaseMinimum Initial (s) 5.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 9.5 27.1 27.1 27.1 33.1 33.1 33.1 33.1 33.1Total Split (s) 14.0 41.1 27.1 27.1 33.9 33.9 33.9 33.9 33.9Total Split (%) 18.7% 54.8% 36.1% 36.1% 45.2% 45.2% 45.2% 45.2% 45.2%Maximum Green (s) 9.5 35.0 21.0 21.0 27.8 27.8 27.8 27.8 27.8Yellow Time (s) 3.5 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 1.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -0.5 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 17.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 35.6 35.6 21.3 21.3 16.5 16.5 16.5 14.4Actuated g/C Ratio 0.59 0.59 0.35 0.35 0.27 0.27 0.27 0.24v/c Ratio 0.63 0.42 0.05 0.76 0.54 0.54 0.22 0.51Control Delay 18.4 8.0 15.7 22.0 23.9 25.8 18.0 6.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 18.4 8.0 15.7 22.0 23.9 25.8 18.0 6.1LOS B A B C C C B AApproach Delay 10.5 22.0 23.9 14.1Approach LOS B C C B

Intersection SummaryArea Type: OtherCycle Length: 75Actuated Cycle Length: 60.2Natural Cycle: 75Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.76Intersection Signal Delay: 16.0 Intersection LOS: BIntersection Capacity Utilization 70.5% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 363: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBL EBT WBL WBT NBT SBL SBT SBRLane Group Flow (vph) 246 795 10 856 200 160 105 288v/c Ratio 0.63 0.42 0.05 0.76 0.54 0.54 0.22 0.51Control Delay 18.4 8.0 15.7 22.0 23.9 25.8 18.0 6.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 18.4 8.0 15.7 22.0 23.9 25.8 18.0 6.1Queue Length 50th (m) 11.6 21.0 0.7 40.5 19.7 16.3 9.7 0.0Queue Length 95th (m) #47.7 45.0 4.1 #77.1 37.3 32.4 20.0 15.4Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 50.0 50.0 25.0Base Capacity (vph) 389 1987 238 1241 681 551 875 837Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.63 0.40 0.04 0.69 0.29 0.29 0.12 0.34

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 364: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 226 624 108 9 590 198 96 75 13 147 97 265Future Volume (vph) 226 624 108 9 590 198 96 75 13 147 97 265Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00Frt 1.00 0.98 1.00 0.96 0.99 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.97 0.95 1.00 1.00Satd. Flow (prot) 1598 3152 1657 3089 1668 1649 1733 1458Flt Permitted 0.17 1.00 0.35 1.00 0.79 0.63 1.00 1.00Satd. Flow (perm) 284 3152 612 3089 1343 1096 1733 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 246 678 117 10 641 215 104 82 14 160 105 288RTOR Reduction (vph) 0 15 0 0 41 0 0 4 0 0 0 219Lane Group Flow (vph) 246 780 0 10 815 0 0 196 0 160 105 69Confl. Peds. (#/hr) 16 7 7 16 17 17Heavy Vehicles (%) 4% 3% 1% 0% 3% 1% 1% 0% 9% 0% 1% 2%Turn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 33.4 33.4 19.2 19.2 14.4 14.4 14.4 14.4Effective Green, g (s) 33.9 35.5 21.3 21.3 16.5 16.5 16.5 14.4Actuated g/C Ratio 0.56 0.59 0.36 0.36 0.28 0.28 0.28 0.24Clearance Time (s) 4.5 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 383 1864 217 1096 369 301 476 349v/s Ratio Prot c0.11 0.25 c0.26 0.06v/s Ratio Perm 0.25 0.02 0.15 c0.15 0.05v/c Ratio 0.64 0.42 0.05 0.74 0.53 0.53 0.22 0.20Uniform Delay, d1 9.0 6.6 12.7 17.0 18.5 18.5 16.8 18.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 3.7 0.2 0.1 2.8 1.5 1.8 0.2 0.3Delay (s) 12.7 6.8 12.8 19.7 19.9 20.3 17.0 18.5Level of Service B A B B B C B BApproach Delay (s) 8.2 19.7 19.9 18.7Approach LOS A B B B

Intersection SummaryHCM 2000 Control Delay 15.0 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.65Actuated Cycle Length (s) 60.0 Sum of lost time (s) 12.0Intersection Capacity Utilization 70.5% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 365: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 120 660 4 6 553 286 23 4 6 231 4 220Future Volume (vph) 120 660 4 6 553 286 23 4 6 231 4 220Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 50.0 25.0 50.0 25.0 0.0 0.0 0.0Storage Lanes 1 1 1 1 1 0 1 0Taper Length (m) 75.0 50.0 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.850 0.850 0.905 0.852Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1568 3197 1488 1662 3292 1430 1662 1584 0 1583 1448 0Flt Permitted 0.206 0.379 0.950 0.950Satd. Flow (perm) 340 3197 1488 663 3292 1430 1662 1584 0 1583 1448 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 80 282 7 239Link Speed (k/h) 50 50 50 50Link Distance (m) 310.8 136.7 108.4 168.0Travel Time (s) 22.4 9.8 7.8 12.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 4% 0% 0% 1% 4% 0% 0% 0% 5% 0% 3%Adj. Flow (vph) 130 717 4 7 601 311 25 4 7 251 4 239Shared Lane Traffic (%)Lane Group Flow (vph) 130 717 4 7 601 311 25 11 0 251 243 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 2Detector Template Left Thru Right Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm Perm NA Perm Split NA Split NAProtected Phases 7 4 8 2 2 6 6

Page 366: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 4 8 8Detector Phase 7 4 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 6.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 10.5 38.1 38.1 38.1 38.1 38.1 36.1 36.1 36.1 36.1Total Split (s) 15.0 53.1 53.1 38.1 38.1 38.1 36.1 36.1 36.1 36.1Total Split (%) 12.0% 42.4% 42.4% 30.4% 30.4% 30.4% 28.8% 28.8% 28.8% 28.8%Maximum Green (s) 12.0 47.0 47.0 32.0 32.0 32.0 30.0 30.0 30.0 30.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) 1.0 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.3 2.5 2.5 2.5 2.5 2.5 4.0 4.0 4.0 4.0Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 36.2 36.2 36.2 23.1 23.1 23.1 10.9 10.9 22.1 22.1Actuated g/C Ratio 0.44 0.44 0.44 0.28 0.28 0.28 0.13 0.13 0.27 0.27v/c Ratio 0.45 0.51 0.01 0.04 0.65 0.51 0.11 0.05 0.59 0.43Control Delay 20.0 18.2 0.0 24.5 30.1 8.0 38.6 27.3 33.1 6.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 20.0 18.2 0.0 24.5 30.1 8.0 38.6 27.3 33.1 6.4LOS C B A C C A D C C AApproach Delay 18.4 22.6 35.1 20.0Approach LOS B C D B

Intersection SummaryArea Type: OtherCycle Length: 125.3Actuated Cycle Length: 81.6Natural Cycle: 125Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.65Intersection Signal Delay: 20.7 Intersection LOS: CIntersection Capacity Utilization 57.2% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)

Page 367: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBTLane Group Flow (vph) 130 717 4 7 601 311 25 11 251 243v/c Ratio 0.45 0.51 0.01 0.04 0.65 0.51 0.11 0.05 0.59 0.43Control Delay 20.0 18.2 0.0 24.5 30.1 8.0 38.6 27.3 33.1 6.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 20.0 18.2 0.0 24.5 30.1 8.0 38.6 27.3 33.1 6.4Queue Length 50th (m) 11.8 40.5 0.0 0.8 44.2 3.4 3.6 0.6 35.0 0.5Queue Length 95th (m) 28.1 71.2 0.0 4.6 74.6 26.2 13.2 6.2 68.8 18.3Internal Link Dist (m) 286.8 112.7 84.4 144.0Turn Bay Length (m) 50.0 50.0 25.0 50.0 25.0Base Capacity (vph) 322 1989 956 286 1422 777 675 648 643 730Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.40 0.36 0.00 0.02 0.42 0.40 0.04 0.02 0.39 0.33

Intersection Summary

Page 368: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 120 660 4 6 553 286 23 4 6 231 4 220Future Volume (vph) 120 660 4 6 553 286 23 4 6 231 4 220Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.90 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1568 3197 1488 1662 3292 1430 1662 1583 1583 1449Flt Permitted 0.21 1.00 1.00 0.38 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (perm) 341 3197 1488 663 3292 1430 1662 1583 1583 1449Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 130 717 4 7 601 311 25 4 7 251 4 239RTOR Reduction (vph) 0 0 2 0 0 202 0 6 0 0 174 0Lane Group Flow (vph) 130 717 2 7 601 109 25 5 0 251 69 0Heavy Vehicles (%) 6% 4% 0% 0% 1% 4% 0% 0% 0% 5% 0% 3%Turn Type pm+pt NA Perm Perm NA Perm Split NA Split NAProtected Phases 7 4 8 2 2 6 6Permitted Phases 4 4 8 8Actuated Green, G (s) 34.1 34.1 34.1 21.0 21.0 21.0 8.7 8.7 19.9 19.9Effective Green, g (s) 33.1 36.2 36.2 23.1 23.1 23.1 10.8 10.8 22.0 22.0Actuated g/C Ratio 0.41 0.45 0.45 0.29 0.29 0.29 0.13 0.13 0.27 0.27Clearance Time (s) 3.0 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 2.3 2.5 2.5 2.5 2.5 2.5 4.0 4.0 4.0 4.0Lane Grp Cap (vph) 277 1428 665 189 938 407 221 211 429 393v/s Ratio Prot 0.05 c0.22 c0.18 c0.02 0.00 c0.16 0.05v/s Ratio Perm 0.14 0.00 0.01 0.08v/c Ratio 0.47 0.50 0.00 0.04 0.64 0.27 0.11 0.02 0.59 0.18Uniform Delay, d1 16.6 16.0 12.4 20.9 25.3 22.4 30.9 30.5 25.5 22.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.7 0.2 0.0 0.1 1.3 0.3 0.3 0.1 2.4 0.3Delay (s) 17.3 16.2 12.4 21.0 26.7 22.7 31.2 30.6 28.0 22.9Level of Service B B B C C C C C C CApproach Delay (s) 16.3 25.3 31.0 25.4Approach LOS B C C C

Intersection SummaryHCM 2000 Control Delay 22.1 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.53Actuated Cycle Length (s) 81.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 57.2% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 369: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 720 177 66 568 278 32Future Volume (vph) 720 177 66 568 278 32Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 75.0 50.0 0.0 50.0Storage Lanes 1 1 2 1Taper Length (m) 50.0 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00Ped Bike Factor 0.99 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 3137 1316 1409 3167 3014 1488Flt Permitted 0.317 0.950Satd. Flow (perm) 3137 1300 470 3167 3014 1488Right Turn on Red Yes YesSatd. Flow (RTOR) 192 35Link Speed (k/h) 50 50 50Link Distance (m) 140.7 332.8 68.6Travel Time (s) 10.1 24.0 4.9Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 13% 18% 5% 7% 0%Adj. Flow (vph) 783 192 72 617 302 35Shared Lane Traffic (%)Lane Group Flow (vph) 783 192 72 617 302 35Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 1 1 2 1 1Detector Template Thru Right Left Thru Left RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0

Page 370: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group EBT EBR WBL WBT NBL NBRTurn Type NA Perm Perm NA Prot PermProtected Phases 4 8 2Permitted Phases 4 8 2Detector Phase 4 4 8 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 8.0 8.0Minimum Split (s) 24.5 24.5 24.5 24.5 38.1 38.1Total Split (s) 41.5 41.5 41.5 41.5 38.1 38.1Total Split (%) 52.1% 52.1% 52.1% 52.1% 47.9% 47.9%Maximum Green (s) 35.0 35.0 35.0 35.0 32.0 32.0Yellow Time (s) 4.5 4.5 4.5 4.5 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.5 -2.5 -2.5 -2.5 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.9 2.9 2.9 2.9 2.8 2.8Recall Mode Min Min Min Min Min MinWalk Time (s) 12.0 12.0Flash Dont Walk (s) 20.0 20.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 18.5 18.5 18.5 18.5 12.2 12.2Actuated g/C Ratio 0.48 0.48 0.48 0.48 0.31 0.31v/c Ratio 0.53 0.27 0.32 0.41 0.32 0.07Control Delay 8.7 2.4 11.3 7.6 12.1 5.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 8.7 2.4 11.3 7.6 12.1 5.5LOS A A B A B AApproach Delay 7.4 8.0 11.5Approach LOS A A B

Intersection SummaryArea Type: OtherCycle Length: 79.6Actuated Cycle Length: 38.9Natural Cycle: 65Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.53Intersection Signal Delay: 8.3 Intersection LOS: AIntersection Capacity Utilization 48.6% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49)

Page 371: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group EBT EBR WBL WBT NBL NBRLane Group Flow (vph) 783 192 72 617 302 35v/c Ratio 0.53 0.27 0.32 0.41 0.32 0.07Control Delay 8.7 2.4 11.3 7.6 12.1 5.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 8.7 2.4 11.3 7.6 12.1 5.5Queue Length 50th (m) 16.6 0.0 2.6 12.2 7.8 0.0Queue Length 95th (m) 33.4 7.0 10.8 25.1 18.7 4.6Internal Link Dist (m) 116.7 308.8 44.6Turn Bay Length (m) 75.0 50.0 50.0Base Capacity (vph) 2972 1242 445 3000 2716 1344Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.26 0.15 0.16 0.21 0.11 0.03

Intersection Summary

Page 372: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 32

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 720 177 66 568 278 32Future Volume (vph) 720 177 66 568 278 32Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 3137 1300 1409 3167 3014 1488Flt Permitted 1.00 1.00 0.32 1.00 0.95 1.00Satd. Flow (perm) 3137 1300 470 3167 3014 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 783 192 72 617 302 35RTOR Reduction (vph) 0 100 0 0 0 24Lane Group Flow (vph) 783 92 72 617 302 11Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 6% 13% 18% 5% 7% 0%Turn Type NA Perm Perm NA Prot PermProtected Phases 4 8 2Permitted Phases 4 8 2Actuated Green, G (s) 15.9 15.9 15.9 15.9 10.0 10.0Effective Green, g (s) 18.4 18.4 18.4 18.4 12.1 12.1Actuated g/C Ratio 0.48 0.48 0.48 0.48 0.31 0.31Clearance Time (s) 6.5 6.5 6.5 6.5 6.1 6.1Vehicle Extension (s) 2.9 2.9 2.9 2.9 2.8 2.8Lane Grp Cap (vph) 1499 621 224 1513 947 467v/s Ratio Prot c0.25 0.19 c0.10v/s Ratio Perm 0.07 0.15 0.01v/c Ratio 0.52 0.15 0.32 0.41 0.32 0.02Uniform Delay, d1 7.0 5.6 6.2 6.5 10.1 9.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 0.1 0.8 0.2 0.2 0.0Delay (s) 7.3 5.8 7.0 6.7 10.2 9.1Level of Service A A A A B AApproach Delay (s) 7.0 6.7 10.1Approach LOS A A B

Intersection SummaryHCM 2000 Control Delay 7.4 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.44Actuated Cycle Length (s) 38.5 Sum of lost time (s) 8.0Intersection Capacity Utilization 48.6% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 373: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 150 70 310 0 0 247Future Volume (vph) 150 70 310 0 0 247Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.952Flt Protected 0.967Satd. Flow (prot) 3003 0 3167 0 0 3325Flt Permitted 0.967Satd. Flow (perm) 3003 0 3167 0 0 3325Right Turn on Red Yes YesSatd. Flow (RTOR) 76Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 0% 5% 0% 5% 0%Adj. Flow (vph) 163 76 337 0 0 268Shared Lane Traffic (%)Lane Group Flow (vph) 239 0 337 0 0 268Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch Phase

Page 374: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group WBL WBR NBT NBR SBL SBTMinimum Initial (s) 8.0 8.0 8.0Minimum Split (s) 25.1 22.5 22.5Total Split (s) 28.2 22.5 22.5Total Split (%) 55.6% 44.4% 44.4%Maximum Green (s) 22.1 16.4 16.4Yellow Time (s) 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 10.1 10.4 10.4Actuated g/C Ratio 0.35 0.36 0.36v/c Ratio 0.21 0.29 0.22Control Delay 5.1 7.2 6.7Queue Delay 0.0 0.0 0.0Total Delay 5.1 7.2 6.7LOS A A AApproach Delay 5.1 7.2 6.7Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50.7Actuated Cycle Length: 28.5Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.29Intersection Signal Delay: 6.5 Intersection LOS: AIntersection Capacity Utilization 23.0% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 375: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group WBL NBT SBTLane Group Flow (vph) 239 337 268v/c Ratio 0.21 0.29 0.22Control Delay 5.1 7.2 6.7Queue Delay 0.0 0.0 0.0Total Delay 5.1 7.2 6.7Queue Length 50th (m) 2.4 5.3 4.1Queue Length 95th (m) 6.2 9.6 7.7Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2808 2053 2156Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.09 0.16 0.12

Intersection Summary

Page 376: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 36

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 150 70 310 0 0 247Future Volume (vph) 150 70 310 0 0 247Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 0.95 1.00 1.00Flt Protected 0.97 1.00 1.00Satd. Flow (prot) 3004 3167 3325Flt Permitted 0.97 1.00 1.00Satd. Flow (perm) 3004 3167 3325Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 163 76 337 0 0 268RTOR Reduction (vph) 49 0 0 0 0 0Lane Group Flow (vph) 190 0 337 0 0 268Heavy Vehicles (%) 6% 0% 5% 0% 5% 0%Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.0 8.3 8.3Effective Green, g (s) 10.1 10.4 10.4Actuated g/C Ratio 0.35 0.36 0.36Clearance Time (s) 6.1 6.1 6.1Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1064 1155 1213v/s Ratio Prot c0.06 c0.11v/s Ratio Perm 0.08v/c Ratio 0.18 0.29 0.22Uniform Delay, d1 6.3 6.4 6.3Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.0 0.1 0.1Delay (s) 6.4 6.5 6.3Level of Service A A AApproach Delay (s) 6.4 6.5 6.3Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.4 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.26Actuated Cycle Length (s) 28.5 Sum of lost time (s) 10.1Intersection Capacity Utilization 23.0% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 377: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 394 5 0 271 487 257Future Volume (vph) 394 5 0 271 487 257Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Ped Bike Factor 0.99Frt 0.998 0.948Flt Protected 0.953Satd. Flow (prot) 1648 0 0 3197 3020 0Flt Permitted 0.953Satd. Flow (perm) 1648 0 0 3197 3020 0Right Turn on Red Yes YesSatd. Flow (RTOR) 1 195Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 0% 0% 4% 5% 1%Adj. Flow (vph) 428 5 0 295 529 279Shared Lane Traffic (%)Lane Group Flow (vph) 433 0 0 295 808 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2

Page 378: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBR NBL NBT SBT SBRDetector Phase 4 2 2 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 31.3 42.0 42.0 42.0Total Split (%) 42.7% 57.3% 57.3% 57.3%Maximum Green (s) 25.0 35.0 35.0 35.0Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.9 2.9 2.9Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 18.7 19.0 19.0Actuated g/C Ratio 0.40 0.41 0.41v/c Ratio 0.65 0.22 0.59Control Delay 16.9 10.1 10.4Queue Delay 0.0 0.0 0.0Total Delay 16.9 10.1 10.4LOS B B BApproach Delay 16.9 10.1 10.4Approach LOS B B B

Intersection SummaryArea Type: OtherCycle Length: 73.3Actuated Cycle Length: 46.2Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.65Intersection Signal Delay: 12.2 Intersection LOS: BIntersection Capacity Utilization 54.3% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 379: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL NBT SBTLane Group Flow (vph) 433 295 808v/c Ratio 0.65 0.22 0.59Control Delay 16.9 10.1 10.4Queue Delay 0.0 0.0 0.0Total Delay 16.9 10.1 10.4Queue Length 50th (m) 26.5 7.7 18.2Queue Length 95th (m) 64.2 18.4 42.7Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1026 2664 2549Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.42 0.11 0.32

Intersection Summary

Page 380: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 394 5 0 271 487 257Future Volume (vph) 394 5 0 271 487 257Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95Frpb, ped/bikes 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 1.00 0.95Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1649 3197 3021Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 1649 3197 3021Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 428 5 0 295 529 279RTOR Reduction (vph) 1 0 0 0 114 0Lane Group Flow (vph) 432 0 0 295 694 0Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 1% 0% 0% 4% 5% 1%Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 16.3 15.9 15.9Effective Green, g (s) 18.6 18.9 18.9Actuated g/C Ratio 0.41 0.42 0.42Clearance Time (s) 6.3 7.0 7.0Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 674 1327 1254v/s Ratio Prot c0.26 0.09 c0.23v/s Ratio Permv/c Ratio 0.64 0.22 0.55Uniform Delay, d1 10.8 8.6 10.1Progression Factor 1.00 1.00 1.00Incremental Delay, d2 1.7 0.0 0.4Delay (s) 12.5 8.6 10.4Level of Service B A BApproach Delay (s) 12.5 8.6 10.4Approach LOS B A B

Intersection SummaryHCM 2000 Control Delay 10.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.60Actuated Cycle Length (s) 45.5 Sum of lost time (s) 8.0Intersection Capacity Utilization 54.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 381: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Future Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1716 0 1750 1651 1430 0 1750 0 3014 1458 0Flt Permitted 0.472 0.950Satd. Flow (perm) 826 1716 0 1750 1651 1430 0 1750 0 3014 1458 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 126 899Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 0% 6% 4% 0% 0% 0% 7% 0% 2%Adj. Flow (vph) 57 173 0 0 118 30 0 0 0 121 0 78Shared Lane Traffic (%)Lane Group Flow (vph) 57 173 0 0 118 30 0 0 0 121 78 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 382: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 12.5 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 18.0 52.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (%) 13.9% 40.5% 26.6% 26.6% 26.6% 29.7% 29.7% 29.7% 29.7%Maximum Green (s) 15.0 45.0 27.0 27.0 27.0 31.0 31.0 31.0 31.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.5 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.53 0.53 0.29 0.29 0.29 0.29v/c Ratio 0.10 0.19 0.24 0.06 0.14 0.07Control Delay 5.7 6.3 14.0 0.2 12.5 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.7 6.3 14.0 0.2 12.5 0.1LOS A A B A B AApproach Delay 6.1 11.2 7.7Approach LOS A B A

Intersection SummaryArea Type: OtherCycle Length: 129.5Actuated Cycle Length: 46Natural Cycle: 125Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.24Intersection Signal Delay: 8.0 Intersection LOS: AIntersection Capacity Utilization 24.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 383: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 57 173 118 30 121 78v/c Ratio 0.10 0.19 0.24 0.06 0.14 0.07Control Delay 5.7 6.3 14.0 0.2 12.5 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.7 6.3 14.0 0.2 12.5 0.1Queue Length 50th (m) 2.0 6.6 7.5 0.0 3.8 0.0Queue Length 95th (m) 5.7 14.0 17.2 0.0 8.4 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 694 1716 1094 990 2260 1318Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.08 0.10 0.11 0.03 0.05 0.06

Intersection Summary

Page 384: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Future Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1716 1651 1430 3014 1458Flt Permitted 0.47 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 825 1716 1651 1430 3014 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 57 173 0 0 118 30 0 0 0 121 0 78RTOR Reduction (vph) 0 0 0 0 0 21 0 0 0 0 55 0Lane Group Flow (vph) 57 173 0 0 118 9 0 0 0 121 23 0Heavy Vehicles (%) 0% 2% 0% 0% 6% 4% 0% 0% 0% 7% 0% 2%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 21.0 21.0 10.0 10.0 10.0 10.0Effective Green, g (s) 20.0 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.43 0.53 0.29 0.29 0.29 0.29Clearance Time (s) 3.0 7.5 7.5 7.5 7.5 7.5Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 486 913 484 419 884 427v/s Ratio Prot 0.02 c0.10 c0.07 c0.04 0.02v/s Ratio Perm 0.03 0.01v/c Ratio 0.12 0.19 0.24 0.02 0.14 0.05Uniform Delay, d1 7.8 5.6 12.4 11.6 12.0 11.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.1 0.1 0.0 0.0 0.0Delay (s) 7.9 5.6 12.5 11.6 12.0 11.7Level of Service A A B B B BApproach Delay (s) 6.2 12.3 0.0 11.9Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 9.7 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.22Actuated Cycle Length (s) 46.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 24.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 385: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 20 68 1 494 122 91 1 272 379 145 267 36Future Volume (vph) 20 68 1 494 122 91 1 272 379 145 267 36Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 115.0 0.0 0.0 100.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 100.0 7.5 100.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.999 0.936 0.850 0.982Flt Protected 0.989 0.950 0.950Satd. Flow (prot) 0 1598 0 1599 1525 0 0 1651 1390 1471 1683 0Flt Permitted 0.921 0.694 0.999 0.460Satd. Flow (perm) 0 1488 0 1168 1525 0 0 1650 1390 712 1683 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 1 74 412 10Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 9% 0% 4% 7% 8% 0% 6% 7% 13% 2% 3%Adj. Flow (vph) 22 74 1 537 133 99 1 296 412 158 290 39Shared Lane Traffic (%)Lane Group Flow (vph) 0 97 0 537 232 0 0 297 412 158 329 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 386: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 46

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 43.0 43.0 43.0 43.0 32.0 32.0 32.0 32.0 32.0Total Split (%) 57.3% 57.3% 57.3% 57.3% 42.7% 42.7% 42.7% 42.7% 42.7%Maximum Green (s) 36.7 36.7 36.7 36.7 25.7 25.7 25.7 25.7 25.7Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 36.8 36.8 36.8 23.7 23.7 23.7 23.7Actuated g/C Ratio 0.54 0.54 0.54 0.34 0.34 0.34 0.34v/c Ratio 0.12 0.86 0.27 0.52 0.55 0.64 0.56Control Delay 9.3 31.5 7.3 22.1 5.1 33.5 22.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.3 31.5 7.3 22.1 5.1 33.5 22.3LOS A C A C A C CApproach Delay 9.3 24.2 12.2 25.9Approach LOS A C B C

Intersection SummaryArea Type: OtherCycle Length: 75Actuated Cycle Length: 68.7Natural Cycle: 75Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.86Intersection Signal Delay: 19.8 Intersection LOS: BIntersection Capacity Utilization 79.6% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 387: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 97 537 232 297 412 158 329v/c Ratio 0.12 0.86 0.27 0.52 0.55 0.64 0.56Control Delay 9.3 31.5 7.3 22.1 5.1 33.5 22.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.3 31.5 7.3 22.1 5.1 33.5 22.3Queue Length 50th (m) 6.4 62.4 11.1 33.0 0.0 18.5 36.0Queue Length 95th (m) 14.3 #131.8 24.2 55.4 17.3 #41.2 60.1Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 115.0 100.0 50.0Base Capacity (vph) 861 676 913 685 818 295 704Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.11 0.79 0.25 0.43 0.50 0.54 0.47

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 388: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 20 68 1 494 122 91 1 272 379 145 267 36Future Volume (vph) 20 68 1 494 122 91 1 272 379 145 267 36Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.94 1.00 0.85 1.00 0.98Flt Protected 0.99 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1597 1599 1525 1651 1390 1471 1683Flt Permitted 0.92 0.69 1.00 1.00 1.00 0.46 1.00Satd. Flow (perm) 1488 1168 1525 1650 1390 713 1683Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 22 74 1 537 133 99 1 296 412 158 290 39RTOR Reduction (vph) 0 0 0 0 34 0 0 0 269 0 7 0Lane Group Flow (vph) 0 97 0 537 198 0 0 297 143 158 322 0Heavy Vehicles (%) 6% 9% 0% 4% 7% 8% 0% 6% 7% 13% 2% 3%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 34.5 34.5 34.5 21.4 21.4 21.4 21.4Effective Green, g (s) 36.8 36.8 36.8 23.7 23.7 23.7 23.7Actuated g/C Ratio 0.54 0.54 0.54 0.35 0.35 0.35 0.35Clearance Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 799 627 819 570 480 246 582v/s Ratio Prot 0.13 0.19v/s Ratio Perm 0.06 c0.46 0.18 0.10 c0.22v/c Ratio 0.12 0.86 0.24 0.52 0.30 0.64 0.55Uniform Delay, d1 7.8 13.6 8.4 17.9 16.3 18.8 18.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 12.6 0.4 2.1 1.0 9.1 2.5Delay (s) 8.0 26.2 8.9 20.0 17.3 27.9 20.6Level of Service A C A C B C CApproach Delay (s) 8.0 21.0 18.4 23.0Approach LOS A C B C

Intersection SummaryHCM 2000 Control Delay 20.0 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.77Actuated Cycle Length (s) 68.5 Sum of lost time (s) 8.0Intersection Capacity Utilization 79.6% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 389: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 40 20 2 270 223 20Future Volume (vph) 40 20 2 270 223 20Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.954 0.989Flt Protected 0.968Satd. Flow (prot) 1459 0 0 1694 1625 0Flt Permitted 0.968Satd. Flow (perm) 1459 0 0 1694 1625 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 20% 50% 3% 6% 12%Adj. Flow (vph) 43 22 2 293 242 22Shared Lane Traffic (%)Lane Group Flow (vph) 65 0 0 295 264 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 27.6% ICU Level of Service AAnalysis Period (min) 15

Page 390: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 40 20 2 270 223 20Future Volume (Veh/h) 40 20 2 270 223 20Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 43 22 2 293 242 22PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 550 253 264vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 550 253 264tC, single (s) 6.5 6.4 4.6tC, 2 stage (s)tF (s) 3.6 3.5 2.7p0 queue free % 91 97 100cM capacity (veh/h) 488 744 1067

Direction, Lane # EB 1 NB 1 SB 1Volume Total 65 295 264Volume Left 43 2 0Volume Right 22 0 22cSH 553 1067 1700Volume to Capacity 0.12 0.00 0.16Queue Length 95th (m) 3.2 0.0 0.0Control Delay (s) 12.4 0.1 0.0Lane LOS B AApproach Delay (s) 12.4 0.1 0.0Approach LOS B

Intersection SummaryAverage Delay 1.3Intersection Capacity Utilization 27.6% ICU Level of Service AAnalysis Period (min) 15

Page 391: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 81 42 25 191 204 39Future Volume (vph) 81 42 25 191 204 39Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.954 0.979Flt Protected 0.968 0.994Satd. Flow (prot) 1518 0 0 1608 1570 0Flt Permitted 0.968 0.994Satd. Flow (perm) 1518 0 0 1608 1570 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 13% 48% 3% 8% 15%Adj. Flow (vph) 88 46 27 208 222 42Shared Lane Traffic (%)Lane Group Flow (vph) 134 0 0 235 264 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 44.3% ICU Level of Service AAnalysis Period (min) 15

Page 392: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 52

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 81 42 25 191 204 39Future Volume (Veh/h) 81 42 25 191 204 39Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 88 46 27 208 222 42PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 505 243 264vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 505 243 264tC, single (s) 6.4 6.3 4.6tC, 2 stage (s)tF (s) 3.5 3.4 2.6p0 queue free % 83 94 97cM capacity (veh/h) 512 770 1075

Direction, Lane # EB 1 NB 1 SB 1Volume Total 134 235 264Volume Left 88 27 0Volume Right 46 0 42cSH 578 1075 1700Volume to Capacity 0.23 0.03 0.16Queue Length 95th (m) 7.1 0.6 0.0Control Delay (s) 13.1 1.2 0.0Lane LOS B AApproach Delay (s) 13.1 1.2 0.0Approach LOS B

Intersection SummaryAverage Delay 3.2Intersection Capacity Utilization 44.3% ICU Level of Service AAnalysis Period (min) 15

Page 393: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 40 96 28 176 219 27Future Volume (vph) 40 96 28 176 219 27Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.904 0.985Flt Protected 0.986 0.993Satd. Flow (prot) 1406 0 0 1520 1614 0Flt Permitted 0.986 0.993Satd. Flow (perm) 1406 0 0 1520 1614 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 298.3 331.4Travel Time (s) 14.9 21.5 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 13% 42% 10% 4% 30%Adj. Flow (vph) 43 104 30 191 238 29Shared Lane Traffic (%)Lane Group Flow (vph) 147 0 0 221 267 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 44.9% ICU Level of Service AAnalysis Period (min) 15

Page 394: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 40 96 28 176 219 27Future Volume (Veh/h) 40 96 28 176 219 27Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 43 104 30 191 238 29PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 504 252 267vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 504 252 267tC, single (s) 6.5 6.3 4.5tC, 2 stage (s)tF (s) 3.6 3.4 2.6p0 queue free % 92 86 97cM capacity (veh/h) 507 760 1097

Direction, Lane # EB 1 NB 1 SB 1Volume Total 147 221 267Volume Left 43 30 0Volume Right 104 0 29cSH 663 1097 1700Volume to Capacity 0.22 0.03 0.16Queue Length 95th (m) 6.7 0.7 0.0Control Delay (s) 12.0 1.4 0.0Lane LOS B AApproach Delay (s) 12.0 1.4 0.0Approach LOS B

Intersection SummaryAverage Delay 3.2Intersection Capacity Utilization 44.9% ICU Level of Service AAnalysis Period (min) 15

Page 395: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 7 11 18 14 6 5 18 192 9 16 283 16Future Volume (vph) 7 11 18 14 6 5 18 192 9 16 283 16Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.932 0.975 0.994 0.993Flt Protected 0.990 0.973 0.996 0.998Satd. Flow (prot) 0 1516 0 0 1660 0 0 1501 0 0 1649 0Flt Permitted 0.990 0.973 0.996 0.998Satd. Flow (perm) 0 1516 0 0 1660 0 0 1501 0 0 1649 0Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 29.6Travel Time (s) 8.5 7.8 70.5 2.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 13% 0% 0% 0% 7% 17% 0% 7% 5% 7%Adj. Flow (vph) 8 12 20 15 7 5 20 209 10 17 308 17Shared Lane Traffic (%)Lane Group Flow (vph) 0 40 0 0 27 0 0 239 0 0 342 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 31.8% ICU Level of Service AAnalysis Period (min) 15

Page 396: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 56

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 7 11 18 14 6 5 18 192 9 16 283 16Future Volume (Veh/h) 7 11 18 14 6 5 18 192 9 16 283 16Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 8 12 20 15 7 5 20 209 10 17 308 17PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 613 610 316 630 613 214 325 219vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 613 610 316 630 613 214 325 219tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.2 4.2 4.2tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.3 2.3 2.3p0 queue free % 98 97 97 96 98 99 98 99cM capacity (veh/h) 391 400 699 368 398 831 1207 1321

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 40 27 239 342Volume Left 8 15 20 17Volume Right 20 5 10 17cSH 506 420 1207 1321Volume to Capacity 0.08 0.06 0.02 0.01Queue Length 95th (m) 2.1 1.6 0.4 0.3Control Delay (s) 12.7 14.2 0.8 0.5Lane LOS B B A AApproach Delay (s) 12.7 14.2 0.8 0.5Approach LOS B B

Intersection SummaryAverage Delay 1.9Intersection Capacity Utilization 31.8% ICU Level of Service AAnalysis Period (min) 15

Page 397: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 46 40 40 219 315 82Future Volume (vph) 46 40 40 219 315 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.938 0.850Flt Protected 0.974 0.950Satd. Flow (prot) 1454 0 1614 1733 1716 1352Flt Permitted 0.974 0.950Satd. Flow (perm) 1454 0 1614 1733 1716 1352Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 18% 3% 1% 2% 10%Adj. Flow (vph) 50 43 43 238 342 89Shared Lane Traffic (%)Lane Group Flow (vph) 93 0 43 238 342 89Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 36.8% ICU Level of Service AAnalysis Period (min) 15

Page 398: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 58

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 46 40 40 219 315 82Future Volume (Veh/h) 46 40 40 219 315 82Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 50 43 43 238 342 89PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 666 342 431vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 666 342 431tC, single (s) 6.4 6.4 4.1tC, 2 stage (s)tF (s) 3.5 3.5 2.2p0 queue free % 88 94 96cM capacity (veh/h) 407 666 1123

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 93 43 238 342 89Volume Left 50 43 0 0 0Volume Right 43 0 0 0 89cSH 496 1123 1700 1700 1700Volume to Capacity 0.19 0.04 0.14 0.20 0.05Queue Length 95th (m) 5.5 1.0 0.0 0.0 0.0Control Delay (s) 13.9 8.3 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 13.9 1.3 0.0Approach LOS B

Intersection SummaryAverage Delay 2.1Intersection Capacity Utilization 36.8% ICU Level of Service AAnalysis Period (min) 15

Page 399: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 59

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 159 21 238 145 66 290Future Volume (vph) 159 21 238 145 66 290Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.984 0.949Flt Protected 0.958 0.991Satd. Flow (prot) 1650 0 1604 0 0 1680Flt Permitted 0.958 0.991Satd. Flow (perm) 1650 0 1604 0 0 1680Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 2% 6% 0% 4%Adj. Flow (vph) 173 23 259 158 72 315Shared Lane Traffic (%)Lane Group Flow (vph) 196 0 417 0 0 387Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 64.7% ICU Level of Service CAnalysis Period (min) 15

Page 400: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 60

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 159 21 238 145 66 290Future Volume (Veh/h) 159 21 238 145 66 290Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 173 23 259 158 72 315PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 797 338 417vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 797 338 417tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 49 97 94cM capacity (veh/h) 336 709 1153

Direction, Lane # WB 1 NB 1 SB 1Volume Total 196 417 387Volume Left 173 0 72Volume Right 23 158 0cSH 358 1700 1153Volume to Capacity 0.55 0.25 0.06Queue Length 95th (m) 25.1 0.0 1.6Control Delay (s) 26.6 0.0 2.1Lane LOS D AApproach Delay (s) 26.6 0.0 2.1Approach LOS D

Intersection SummaryAverage Delay 6.0Intersection Capacity Utilization 64.7% ICU Level of Service CAnalysis Period (min) 15

Page 401: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 61

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 372 542 0 103 165Future Volume (vph) 0 372 542 0 103 165Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3292 3228 0 1599 1390Flt Permitted 0.950Satd. Flow (perm) 0 3292 3228 0 1599 1390Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 3% 0% 4% 7%Adj. Flow (vph) 0 404 589 0 112 179Shared Lane Traffic (%)Lane Group Flow (vph) 0 404 589 0 112 179Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 34.0% ICU Level of Service AAnalysis Period (min) 15

Page 402: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 62

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 0 372 542 0 103 165Future Volume (Veh/h) 0 372 542 0 103 165Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 404 589 0 112 179PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 5Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 589 791 294vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 589 791 294tC, single (s) 4.1 6.9 7.0tC, 2 stage (s)tF (s) 2.2 3.5 3.4p0 queue free % 100 65 74cM capacity (veh/h) 996 323 687

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1Volume Total 202 202 294 294 291Volume Left 0 0 0 0 112Volume Right 0 0 0 0 179cSH 1700 1700 1700 1700 838Volume to Capacity 0.12 0.12 0.17 0.17 0.35Queue Length 95th (m) 0.0 0.0 0.0 0.0 12.5Control Delay (s) 0.0 0.0 0.0 0.0 15.9Lane LOS CApproach Delay (s) 0.0 0.0 15.9Approach LOS C

Intersection SummaryAverage Delay 3.6Intersection Capacity Utilization 34.0% ICU Level of Service AAnalysis Period (min) 15

Page 403: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 63

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 437 0 0 906 191 417Future Volume (vph) 437 0 0 906 191 417Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3260 0 0 3228 1568 1473Flt Permitted 0.950Satd. Flow (perm) 3260 0 0 3228 1568 1473Link Speed (k/h) 50 50 50Link Distance (m) 104.2 91.9 169.0Travel Time (s) 7.5 6.6 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 3% 6% 1%Adj. Flow (vph) 475 0 0 985 208 453Shared Lane Traffic (%)Lane Group Flow (vph) 475 0 0 985 208 453Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 47.8% ICU Level of Service AAnalysis Period (min) 15

Page 404: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 64

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (veh/h) 437 0 0 906 191 417Future Volume (Veh/h) 437 0 0 906 191 417Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 475 0 0 985 208 453PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 6Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 475 968 238vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 475 968 238tC, single (s) 4.1 6.9 6.9tC, 2 stage (s)tF (s) 2.2 3.6 3.3p0 queue free % 100 15 41cM capacity (veh/h) 1098 245 767

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1Volume Total 238 238 492 492 661Volume Left 0 0 0 0 208Volume Right 0 0 0 0 453cSH 1700 1700 1700 1700 777Volume to Capacity 0.14 0.14 0.29 0.29 0.85Queue Length 95th (m) 0.0 0.0 0.0 0.0 80.6Control Delay (s) 0.0 0.0 0.0 0.0 32.6Lane LOS DApproach Delay (s) 0.0 0.0 32.6Approach LOS D

Intersection SummaryAverage Delay 10.2Intersection Capacity Utilization 47.8% ICU Level of Service AAnalysis Period (min) 15

Page 405: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 65

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 149 244 172 70 224 90Future Volume (vph) 149 244 172 70 224 90Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.961 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1549 1647 0 1614 1403Flt Permitted 0.950 0.950Satd. Flow (perm) 1662 1549 1647 0 1614 1403Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 13% 3% 0% 3% 6%Adj. Flow (vph) 162 265 187 76 243 98Shared Lane Traffic (%)Lane Group Flow (vph) 162 265 263 0 243 98Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 46.9% ICU Level of Service AAnalysis Period (min) 15

Page 406: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 66

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 149 244 172 70 224 90Future Volume (vph) 149 244 172 70 224 90Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 162 265 187 76 243 98

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total (vph) 162 265 263 243 98Volume Left (vph) 162 0 0 243 0Volume Right (vph) 0 0 76 0 98Hadj (s) 0.50 0.22 -0.14 0.55 -0.60Departure Headway (s) 6.5 6.2 5.9 6.9 5.8Degree Utilization, x 0.29 0.46 0.43 0.47 0.16Capacity (veh/h) 531 560 589 490 588Control Delay (s) 11.0 13.2 13.2 14.7 8.6Approach Delay (s) 12.3 13.2 12.9Approach LOS B B B

Intersection SummaryDelay 12.8Level of Service BIntersection Capacity Utilization 46.9% ICU Level of Service AAnalysis Period (min) 15

Page 407: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 67

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 23 728 602 107 120 32Future Volume (vph) 23 728 602 107 120 32Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 50.0 50.0 0.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 3292 3228 1458 1614 1430Flt Permitted 0.950 0.950Satd. Flow (perm) 1662 3292 3228 1458 1614 1430Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 3% 2% 3% 4%Adj. Flow (vph) 25 791 654 116 130 35Shared Lane Traffic (%)Lane Group Flow (vph) 25 791 654 116 130 35Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 35.7% ICU Level of Service AAnalysis Period (min) 15

Page 408: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road Background 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 68

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 23 728 602 107 120 32Future Volume (Veh/h) 23 728 602 107 120 32Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 25 791 654 116 130 35PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 383pX, platoon unblockedvC, conflicting volume 654 1100 327vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 654 1100 327tC, single (s) 4.1 6.9 7.0tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 97 35 95cM capacity (veh/h) 943 200 663

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 SB 1 SB 2Volume Total 25 396 396 327 327 116 130 35Volume Left 25 0 0 0 0 0 130 0Volume Right 0 0 0 0 0 116 0 35cSH 943 1700 1700 1700 1700 1700 200 663Volume to Capacity 0.03 0.23 0.23 0.19 0.19 0.07 0.65 0.05Queue Length 95th (m) 0.7 0.0 0.0 0.0 0.0 0.0 31.0 1.3Control Delay (s) 8.9 0.0 0.0 0.0 0.0 0.0 51.5 10.7Lane LOS A F BApproach Delay (s) 0.3 0.0 42.9Approach LOS E

Intersection SummaryAverage Delay 4.2Intersection Capacity Utilization 35.7% ICU Level of Service AAnalysis Period (min) 15

Page 409: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 100 782 30 109 605 279 57 82 157 271 130 68Future Volume (vph) 100 782 30 109 605 279 57 82 157 271 130 68Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 1 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95Ped Bike Factor 1.00 0.98 1.00 0.97 1.00 0.98 1.00 1.00Frt 0.850 0.850 0.850 0.948Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1554 3260 1488 1646 3228 1458 1630 1750 1403 1646 2967 0Flt Permitted 0.402 0.158 0.617 0.699Satd. Flow (perm) 656 3260 1464 274 3228 1420 1057 1750 1381 1207 2967 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 77 303 171 74Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 5 5 5 5 2 5 5 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 7% 2% 0% 1% 3% 2% 2% 0% 6% 1% 4% 9%Adj. Flow (vph) 109 850 33 118 658 303 62 89 171 295 141 74Shared Lane Traffic (%)Lane Group Flow (vph) 109 850 33 118 658 303 62 89 171 295 215 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 1 2Detector Template Left Thru Right Left Thru Right Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 410: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Detector Phase 4 4 4 3 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.3 39.3 39.3 12.5 51.8 51.8 37.3 37.3 37.3 37.3 37.3Total Split (%) 44.1% 44.1% 44.1% 14.0% 58.1% 58.1% 41.9% 41.9% 41.9% 41.9% 41.9%Maximum Green (s) 33.0 33.0 33.0 9.5 45.5 45.5 31.0 31.0 31.0 31.0 31.0Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 0.0 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 26.0 26.0 26.0 37.0 37.0 34.5 23.8 23.8 23.8 23.8 23.8Actuated g/C Ratio 0.38 0.38 0.38 0.53 0.53 0.50 0.34 0.34 0.34 0.34 0.34v/c Ratio 0.44 0.69 0.06 0.42 0.38 0.35 0.17 0.15 0.29 0.71 0.20Control Delay 25.0 22.5 0.5 14.2 10.9 2.8 18.8 17.8 4.8 31.7 11.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 25.0 22.5 0.5 14.2 10.9 2.8 18.8 17.8 4.8 31.7 11.8LOS C C A B B A B B A C BApproach Delay 22.0 9.0 11.1 23.3Approach LOS C A B C

Intersection SummaryArea Type: OtherCycle Length: 89.1Actuated Cycle Length: 69.2Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.71Intersection Signal Delay: 16.2 Intersection LOS: BIntersection Capacity Utilization 71.3% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 411: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBTLane Group Flow (vph) 109 850 33 118 658 303 62 89 171 295 215v/c Ratio 0.44 0.69 0.06 0.42 0.38 0.35 0.17 0.15 0.29 0.71 0.20Control Delay 25.0 22.5 0.5 14.2 10.9 2.8 18.8 17.8 4.8 31.7 11.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 25.0 22.5 0.5 14.2 10.9 2.8 18.8 17.8 4.8 31.7 11.8Queue Length 50th (m) 10.6 49.2 0.0 7.4 25.3 0.0 5.6 8.0 0.0 33.3 6.6Queue Length 95th (m) 29.7 85.4 0.8 18.8 46.3 12.4 16.4 20.7 12.7 73.4 16.4Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 353 1759 825 324 2341 1079 538 891 787 614 1547Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.31 0.48 0.04 0.36 0.28 0.28 0.12 0.10 0.22 0.48 0.14

Intersection Summary

Page 412: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 100 782 30 109 605 279 57 82 157 271 130 68Future Volume (vph) 100 782 30 109 605 279 57 82 157 271 130 68Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 0.97 1.00 1.00 0.98 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.95Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1551 3260 1465 1646 3228 1422 1628 1750 1382 1641 2969Flt Permitted 0.40 1.00 1.00 0.16 1.00 1.00 0.62 1.00 1.00 0.70 1.00Satd. Flow (perm) 656 3260 1465 274 3228 1422 1058 1750 1382 1208 2969Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 109 850 33 118 658 303 62 89 171 295 141 74RTOR Reduction (vph) 0 0 20 0 0 150 0 0 112 0 48 0Lane Group Flow (vph) 109 850 13 118 658 153 62 89 59 295 167 0Confl. Peds. (#/hr) 5 5 5 5 2 5 5 2Heavy Vehicles (%) 7% 2% 0% 1% 3% 2% 2% 0% 6% 1% 4% 9%Turn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Actuated Green, G (s) 23.7 23.7 23.7 34.5 34.5 34.5 21.3 21.3 21.3 21.3 21.3Effective Green, g (s) 26.0 26.0 26.0 33.5 36.8 34.5 23.6 23.6 23.6 23.6 23.6Actuated g/C Ratio 0.38 0.38 0.38 0.49 0.54 0.50 0.35 0.35 0.35 0.35 0.35Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 249 1239 556 270 1736 717 365 603 476 416 1024v/s Ratio Prot c0.26 0.04 c0.20 0.05 0.06v/s Ratio Perm 0.17 0.01 0.17 0.11 0.06 0.04 c0.24v/c Ratio 0.44 0.69 0.02 0.44 0.38 0.21 0.17 0.15 0.12 0.71 0.16Uniform Delay, d1 15.8 17.8 13.3 11.4 9.2 9.4 15.6 15.5 15.3 19.4 15.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.9 1.5 0.0 0.8 0.1 0.1 0.2 0.1 0.1 5.1 0.1Delay (s) 16.7 19.2 13.3 12.2 9.3 9.5 15.7 15.5 15.4 24.5 15.6Level of Service B B B B A A B B B C BApproach Delay (s) 18.8 9.7 15.5 20.7Approach LOS B A B C

Intersection SummaryHCM 2000 Control Delay 15.4 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.67Actuated Cycle Length (s) 68.4 Sum of lost time (s) 12.0Intersection Capacity Utilization 71.3% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 413: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1177 33 150 739 0 0 0 0 395 63 254Future Volume (vph) 0 1177 33 150 739 0 0 0 0 395 63 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 0.91 0.91 1.00 0.91 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 1.00 1.00Frt 0.996 0.850Flt Protected 0.950 0.950 0.965Satd. Flow (prot) 0 4711 0 1662 4638 0 0 0 0 1564 1563 1488Flt Permitted 0.143 0.950 0.965Satd. Flow (perm) 0 4711 0 250 4638 0 0 0 0 1564 1563 1488Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 5 140Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 17.0 64.2 88.8Travel Time (s) 9.7 1.2 4.6 6.4Confl. Peds. (#/hr) 7 4 4 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 1% 7% 0%Adj. Flow (vph) 0 1279 36 163 803 0 0 0 0 429 68 276Shared Lane Traffic (%) 42%Lane Group Flow (vph) 0 1315 0 163 803 0 0 0 0 249 248 276Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 2 1 2 1Detector Template Thru Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0Turn Type NA pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 8 6 6

Page 414: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 12.5 36.3 36.3 36.3 36.3Total Split (s) 36.3 12.5 48.5 36.5 36.5 36.5Total Split (%) 42.6% 14.7% 56.9% 42.8% 42.8% 42.8%Maximum Green (s) 30.0 9.5 42.2 30.2 30.2 30.2Yellow Time (s) 4.1 3.0 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 0.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag LeadLead-Lag Optimize? Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 27.2 39.2 39.2 19.6 19.6 19.6Actuated g/C Ratio 0.41 0.59 0.59 0.29 0.29 0.29v/c Ratio 0.69 0.52 0.30 0.55 0.54 0.52Control Delay 19.1 14.6 7.9 25.5 25.5 13.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.1 14.6 7.9 25.5 25.5 13.9LOS B B A C C BApproach Delay 19.1 9.1 21.3Approach LOS B A C

Intersection SummaryArea Type: OtherCycle Length: 85.3Actuated Cycle Length: 67Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.69Intersection Signal Delay: 16.5 Intersection LOS: BIntersection Capacity Utilization 58.2% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 415: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT WBL WBT SBL SBT SBRLane Group Flow (vph) 1315 163 803 249 248 276v/c Ratio 0.69 0.52 0.30 0.55 0.54 0.52Control Delay 19.1 14.6 7.9 25.5 25.5 13.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.1 14.6 7.9 25.5 25.5 13.9Queue Length 50th (m) 48.9 8.7 17.0 28.7 28.6 13.8Queue Length 95th (m) 81.0 24.7 32.4 54.7 54.6 36.4Internal Link Dist (m) 110.1 0.1 64.8Turn Bay Length (m)Base Capacity (vph) 2344 330 3197 782 781 814Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.56 0.49 0.25 0.32 0.32 0.34

Intersection Summary

Page 416: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1177 33 150 739 0 0 0 0 395 63 254Future Volume (vph) 0 1177 33 150 739 0 0 0 0 395 63 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 1.00 0.91 0.95 0.95 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 0.95 1.00 0.95 0.96 1.00Satd. Flow (prot) 4710 1662 4638 1564 1563 1488Flt Permitted 1.00 0.14 1.00 0.95 0.96 1.00Satd. Flow (perm) 4710 251 4638 1564 1563 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 1279 36 163 803 0 0 0 0 429 68 276RTOR Reduction (vph) 0 3 0 0 0 0 0 0 0 0 0 99Lane Group Flow (vph) 0 1312 0 163 803 0 0 0 0 249 248 177Confl. Peds. (#/hr) 7 4 4 7Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 1% 7% 0%Turn Type NA pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 8 6 6Actuated Green, G (s) 24.9 36.8 36.8 17.2 17.2 17.2Effective Green, g (s) 27.2 35.8 39.1 19.5 19.5 19.5Actuated g/C Ratio 0.41 0.54 0.59 0.29 0.29 0.29Clearance Time (s) 6.3 3.0 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1923 302 2722 457 457 435v/s Ratio Prot c0.28 c0.06 0.17v/s Ratio Perm 0.23 c0.16 0.16 0.12v/c Ratio 0.68 0.54 0.30 0.54 0.54 0.41Uniform Delay, d1 16.2 10.2 6.9 19.8 19.8 18.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.0 1.9 0.1 1.3 1.3 0.6Delay (s) 17.2 12.0 6.9 21.1 21.1 19.5Level of Service B B A C C BApproach Delay (s) 17.2 7.8 0.0 20.6Approach LOS B A A C

Intersection SummaryHCM 2000 Control Delay 15.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.61Actuated Cycle Length (s) 66.6 Sum of lost time (s) 12.0Intersection Capacity Utilization 58.2% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 417: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1074 0 0 885 78 254Future Volume (vph) 1074 0 0 885 78 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.91 1.00 1.00 0.91 0.97 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 4684 0 0 4684 3101 1458Flt Permitted 0.950Satd. Flow (perm) 4684 0 0 4684 3101 1458Right Turn on Red Yes YesSatd. Flow (RTOR) 53Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 2% 4% 2%Adj. Flow (vph) 1167 0 0 962 85 276Shared Lane Traffic (%)Lane Group Flow (vph) 1167 0 0 962 85 276Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Detector Phase 4 8 2 2Switch Phase

Page 418: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.0 35.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7%Maximum Green (s) 28.7 28.7 18.7 18.7Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 20.5 20.5 15.4 15.4Actuated g/C Ratio 0.46 0.46 0.35 0.35v/c Ratio 0.54 0.44 0.08 0.51Control Delay 9.6 8.8 11.1 13.9Queue Delay 0.0 0.0 0.0 0.0Total Delay 9.6 8.8 11.1 13.9LOS A A B BApproach Delay 9.6 8.8 13.2Approach LOS A A B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 44.1Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.54Intersection Signal Delay: 9.8 Intersection LOS: AIntersection Capacity Utilization 46.3% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 419: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 1167 962 85 276v/c Ratio 0.54 0.44 0.08 0.51Control Delay 9.6 8.8 11.1 13.9Queue Delay 0.0 0.0 0.0 0.0Total Delay 9.6 8.8 11.1 13.9Queue Length 50th (m) 20.6 16.0 2.2 13.1Queue Length 95th (m) 39.3 31.2 6.9 37.4Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 3405 3405 1527 744Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.34 0.28 0.06 0.37

Intersection Summary

Page 420: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1074 0 0 885 78 254Future Volume (vph) 1074 0 0 885 78 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 0.91 0.97 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 4684 4684 3101 1458Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 4684 4684 3101 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1167 0 0 962 85 276RTOR Reduction (vph) 0 0 0 0 0 34Lane Group Flow (vph) 1167 0 0 962 85 242Heavy Vehicles (%) 2% 0% 0% 2% 4% 2%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 18.1 18.1 13.0 13.0Effective Green, g (s) 20.4 20.4 15.3 15.3Actuated g/C Ratio 0.47 0.47 0.35 0.35Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 2186 2186 1085 510v/s Ratio Prot c0.25 0.21 0.03v/s Ratio Perm c0.17v/c Ratio 0.53 0.44 0.08 0.47Uniform Delay, d1 8.3 7.8 9.5 11.1Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 0.1 0.0 0.7Delay (s) 8.5 8.0 9.5 11.8Level of Service A A A BApproach Delay (s) 8.5 8.0 11.2Approach LOS A A B

Intersection SummaryHCM 2000 Control Delay 8.7 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.51Actuated Cycle Length (s) 43.7 Sum of lost time (s) 8.0Intersection Capacity Utilization 46.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 421: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 32 869 471 344 841 41 386 18 344 19 4 28Future Volume (vph) 32 869 471 344 841 41 386 18 344 19 4 28Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 100.0 0.0 15.0 0.0Storage Lanes 1 1 2 0 2 1 1 0Taper Length (m) 40.0 7.5 100.0 7.5Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.98 1.00 1.00 0.98 1.00 0.99Frt 0.850 0.993 0.850 0.868Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1662 3292 1473 3162 3240 0 3162 1750 1473 1662 1447 0Flt Permitted 0.299 0.950 0.950 0.744Satd. Flow (perm) 523 3292 1449 3156 3240 0 3150 1750 1449 1297 1447 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 512 6 354 30Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 4 4 3 3 3 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 1% 2% 2% 0% 2% 0% 1% 0% 0% 4%Adj. Flow (vph) 35 945 512 374 914 45 420 20 374 21 4 30Shared Lane Traffic (%)Lane Group Flow (vph) 35 945 512 374 959 0 420 20 374 21 34 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 422: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 9.5 32.0 32.0 32.0 32.0Total Split (s) 36.0 36.0 36.0 17.4 53.4 19.0 51.6 51.6 32.6 32.6Total Split (%) 34.3% 34.3% 34.3% 16.6% 50.9% 18.1% 49.1% 49.1% 31.0% 31.0%Maximum Green (s) 28.0 28.0 28.0 12.9 45.4 14.5 43.6 43.6 24.6 24.6Yellow Time (s) 4.5 4.5 4.5 3.5 4.5 3.5 4.5 4.5 4.5 4.5All-Red Time (s) 3.5 3.5 3.5 1.0 3.5 1.0 3.5 3.5 3.5 3.5Lost Time Adjust (s) -4.0 -4.0 -4.0 -0.5 -4.0 -0.5 -4.0 -4.0 -4.0 -4.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min None Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 31.7 31.7 31.7 13.4 49.1 15.0 31.1 31.1 12.1 12.1Actuated g/C Ratio 0.36 0.36 0.36 0.15 0.56 0.17 0.35 0.35 0.14 0.14v/c Ratio 0.19 0.80 0.60 0.78 0.53 0.78 0.03 0.51 0.12 0.15Control Delay 22.7 31.6 5.4 48.8 13.6 46.8 19.1 5.7 35.3 16.2Queue Delay 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 22.7 32.0 5.4 48.8 13.6 46.8 19.1 5.7 35.3 16.2LOS C C A D B D B A D BApproach Delay 22.6 23.5 27.2 23.5Approach LOS C C C C

Intersection SummaryArea Type: OtherCycle Length: 105Actuated Cycle Length: 88.2Natural Cycle: 100Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.80Intersection Signal Delay: 23.9 Intersection LOS: CIntersection Capacity Utilization 66.2% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 423: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 35 945 512 374 959 420 20 374 21 34v/c Ratio 0.19 0.80 0.60 0.78 0.53 0.78 0.03 0.51 0.12 0.15Control Delay 22.7 31.6 5.4 48.8 13.6 46.8 19.1 5.7 35.3 16.2Queue Delay 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 22.7 32.0 5.4 48.8 13.6 46.8 19.1 5.7 35.3 16.2Queue Length 50th (m) 4.2 78.2 0.0 33.5 52.1 37.4 2.3 2.3 3.4 0.6Queue Length 95th (m) 11.8 103.9 21.8 #54.5 70.1 #59.3 7.1 21.9 10.2 9.1Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 50.0 100.0 15.0Base Capacity (vph) 189 1194 852 480 1817 537 944 944 420 489Starvation Cap Reductn 0 36 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.19 0.82 0.60 0.78 0.53 0.78 0.02 0.40 0.05 0.07

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 424: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 32 869 471 344 841 41 386 18 344 19 4 28Future Volume (vph) 32 869 471 344 841 41 386 18 344 19 4 28Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 1.00 1.00 0.98 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 0.99 1.00 1.00 0.85 1.00 0.87Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 3292 1450 3162 3240 3162 1750 1450 1657 1447Flt Permitted 0.30 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.74 1.00Satd. Flow (perm) 522 3292 1450 3162 3240 3162 1750 1450 1298 1447Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 35 945 512 374 914 45 420 20 374 21 4 30RTOR Reduction (vph) 0 0 328 0 3 0 0 0 229 0 26 0Lane Group Flow (vph) 35 945 184 374 956 0 420 20 145 21 8 0Confl. Peds. (#/hr) 4 4 3 3 3 3Heavy Vehicles (%) 0% 1% 1% 2% 2% 0% 2% 0% 1% 0% 0% 4%Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Actuated Green, G (s) 27.7 27.7 27.7 12.9 45.1 14.5 27.1 27.1 8.1 8.1Effective Green, g (s) 31.7 31.7 31.7 13.4 49.1 15.0 31.1 31.1 12.1 12.1Actuated g/C Ratio 0.36 0.36 0.36 0.15 0.56 0.17 0.35 0.35 0.14 0.14Clearance Time (s) 8.0 8.0 8.0 4.5 8.0 4.5 8.0 8.0 8.0 8.0Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 187 1183 521 480 1803 537 617 511 178 198v/s Ratio Prot c0.29 c0.12 0.30 c0.13 0.01 0.01v/s Ratio Perm 0.07 0.13 c0.10 0.02v/c Ratio 0.19 0.80 0.35 0.78 0.53 0.78 0.03 0.28 0.12 0.04Uniform Delay, d1 19.4 25.4 20.7 36.0 12.3 35.0 18.7 20.5 33.4 33.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 3.7 0.3 7.5 0.2 7.3 0.0 0.2 0.2 0.1Delay (s) 19.8 29.1 21.0 43.5 12.5 42.3 18.7 20.8 33.6 33.1Level of Service B C C D B D B C C CApproach Delay (s) 26.1 21.2 31.8 33.3Approach LOS C C C C

Intersection SummaryHCM 2000 Control Delay 25.7 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.71Actuated Cycle Length (s) 88.2 Sum of lost time (s) 16.0Intersection Capacity Utilization 66.2% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 425: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 399 671 162 95 634 142 235 192 73 168 140 356Future Volume (vph) 399 671 162 95 634 142 235 192 73 168 140 356Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 2 0 1 0 1 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 0.97 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 1.00 0.99 0.99 0.99 0.98Frt 0.971 0.973 0.959 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 3101 3147 0 1630 3183 0 1630 1641 0 1630 1716 1473Flt Permitted 0.950 0.254 0.544 0.319Satd. Flow (perm) 3101 3147 0 434 3183 0 926 1641 0 540 1716 1440Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 31 25 18 387Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 9 9 10 23 23 10Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 4% 2% 1% 2% 2% 0% 2% 1% 2% 2% 2% 1%Adj. Flow (vph) 434 729 176 103 689 154 255 209 79 183 152 387Shared Lane Traffic (%)Lane Group Flow (vph) 434 905 0 103 843 0 255 288 0 183 152 387Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 426: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Detector Phase 7 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 9.5 30.4 9.5 30.4 9.5 37.7 9.5 37.7 37.7Total Split (s) 22.6 45.5 13.3 36.2 11.8 40.2 11.0 39.4 39.4Total Split (%) 20.5% 41.4% 12.1% 32.9% 10.7% 36.5% 10.0% 35.8% 35.8%Maximum Green (s) 18.6 39.1 10.3 29.8 8.8 33.5 8.0 32.7 32.7Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1 4.1All-Red Time (s) 1.0 2.3 0.0 2.3 0.0 2.6 0.0 2.6 2.6Lost Time Adjust (s) 0.0 -2.4 1.0 -2.4 1.0 -2.7 1.0 -2.7 -2.7Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 16.8 39.4 36.2 29.4 30.9 22.9 29.2 22.1 22.1Actuated g/C Ratio 0.18 0.43 0.39 0.32 0.33 0.25 0.32 0.24 0.24v/c Ratio 0.77 0.67 0.40 0.82 0.69 0.69 0.72 0.37 0.61Control Delay 47.7 24.4 17.7 37.1 35.3 39.1 41.2 32.8 7.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 47.7 24.4 17.7 37.1 35.3 39.1 41.2 32.8 7.6LOS D C B D D D D C AApproach Delay 32.0 35.0 37.3 21.4Approach LOS C C D C

Intersection SummaryArea Type: OtherCycle Length: 110Actuated Cycle Length: 92.5Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.82Intersection Signal Delay: 31.4 Intersection LOS: CIntersection Capacity Utilization 81.2% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 427: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 434 905 103 843 255 288 183 152 387v/c Ratio 0.77 0.67 0.40 0.82 0.69 0.69 0.72 0.37 0.61Control Delay 47.7 24.4 17.7 37.1 35.3 39.1 41.2 32.8 7.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 47.7 24.4 17.7 37.1 35.3 39.1 41.2 32.8 7.6Queue Length 50th (m) 41.8 67.0 8.8 76.2 38.2 49.1 26.1 25.4 0.0Queue Length 95th (m) #70.3 109.0 20.6 #122.4 59.8 77.2 #46.0 43.2 23.2Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 635 1479 304 1145 369 665 254 669 797Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.68 0.61 0.34 0.74 0.69 0.43 0.72 0.23 0.49

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 428: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 399 671 162 95 634 142 235 192 73 168 140 356Future Volume (vph) 399 671 162 95 634 142 235 192 73 168 140 356Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 0.99 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.97 1.00 0.97 1.00 0.96 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 3101 3148 1628 3182 1624 1642 1624 1716 1442Flt Permitted 0.95 1.00 0.25 1.00 0.54 1.00 0.32 1.00 1.00Satd. Flow (perm) 3101 3148 436 3182 931 1642 545 1716 1442Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 434 729 176 103 689 154 255 209 79 183 152 387RTOR Reduction (vph) 0 18 0 0 17 0 0 14 0 0 0 295Lane Group Flow (vph) 434 887 0 103 826 0 255 274 0 183 152 92Confl. Peds. (#/hr) 9 9 10 23 23 10Heavy Vehicles (%) 4% 2% 1% 2% 2% 0% 2% 1% 2% 2% 2% 1%Turn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Actuated Green, G (s) 16.8 37.0 34.8 27.0 29.2 20.2 27.4 19.3 19.3Effective Green, g (s) 16.8 39.4 32.8 29.4 27.2 22.9 25.4 22.0 22.0Actuated g/C Ratio 0.18 0.43 0.36 0.32 0.30 0.25 0.28 0.24 0.24Clearance Time (s) 4.0 6.4 3.0 6.4 3.0 6.7 3.0 6.7 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 565 1345 243 1014 334 407 233 409 344v/s Ratio Prot c0.14 0.28 0.03 c0.26 c0.07 c0.17 0.06 0.09v/s Ratio Perm 0.12 0.16 0.16 0.06v/c Ratio 0.77 0.66 0.42 0.81 0.76 0.67 0.79 0.37 0.27Uniform Delay, d1 35.8 21.1 20.6 28.9 28.6 31.3 29.0 29.3 28.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 6.0 1.0 0.9 4.9 9.5 3.7 15.3 0.3 0.2Delay (s) 41.8 22.0 21.5 33.8 38.1 34.9 44.3 29.6 28.8Level of Service D C C C D C D C CApproach Delay (s) 28.4 32.5 36.4 32.9Approach LOS C C D C

Intersection SummaryHCM 2000 Control Delay 31.6 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.77Actuated Cycle Length (s) 92.2 Sum of lost time (s) 16.0Intersection Capacity Utilization 81.2% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 429: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 271 568 73 6 526 150 68 52 15 174 70 274Future Volume (vph) 271 568 73 6 526 150 68 52 15 174 70 274Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 1 0 1 0 0 0 1 1Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.98Frt 0.983 0.967 0.985 0.850Flt Protected 0.950 0.950 0.975 0.950Satd. Flow (prot) 1630 3162 0 1662 3116 0 0 1648 0 1646 1750 1458Flt Permitted 0.190 0.387 0.821 0.681Satd. Flow (perm) 326 3162 0 674 3116 0 0 1384 0 1176 1750 1432Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 25 47 9 298Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 5 6 6 5 7 5 5 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 3% 3% 0% 3% 2% 2% 2% 0% 1% 0% 2%Adj. Flow (vph) 295 617 79 7 572 163 74 57 16 189 76 298Shared Lane Traffic (%)Lane Group Flow (vph) 295 696 0 7 735 0 0 147 0 189 76 298Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 430: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Detector Phase 7 4 8 8 2 2 6 6 6Switch PhaseMinimum Initial (s) 6.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 17.0 27.1 27.1 27.1 33.1 33.1 33.1 33.1 33.1Total Split (s) 17.0 45.0 28.0 28.0 35.0 35.0 35.0 35.0 35.0Total Split (%) 21.3% 56.3% 35.0% 35.0% 43.8% 43.8% 43.8% 43.8% 43.8%Maximum Green (s) 14.0 38.9 21.9 21.9 28.9 28.9 28.9 28.9 28.9Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) 0.0 -2.1 0.0 -2.1 -2.1 -2.1 -2.1 0.0Total Lost Time (s) 3.0 4.0 6.1 4.0 4.0 4.0 4.0 6.1Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 17.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 37.5 36.4 17.9 20.1 18.0 18.0 18.0 15.8Actuated g/C Ratio 0.60 0.58 0.29 0.32 0.29 0.29 0.29 0.25v/c Ratio 0.63 0.38 0.04 0.71 0.37 0.56 0.15 0.51Control Delay 16.6 8.2 19.3 23.0 20.2 26.9 18.0 6.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 16.6 8.2 19.3 23.0 20.2 26.9 18.0 6.1LOS B A B C C C B AApproach Delay 10.7 22.9 20.2 14.7Approach LOS B C C B

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 62.7Natural Cycle: 80Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.71Intersection Signal Delay: 15.9 Intersection LOS: BIntersection Capacity Utilization 65.7% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 431: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBL EBT WBL WBT NBT SBL SBT SBRLane Group Flow (vph) 295 696 7 735 147 189 76 298v/c Ratio 0.63 0.38 0.04 0.71 0.37 0.56 0.15 0.51Control Delay 16.6 8.2 19.3 23.0 20.2 26.9 18.0 6.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 16.6 8.2 19.3 23.0 20.2 26.9 18.0 6.1Queue Length 50th (m) 15.0 19.6 0.6 38.2 14.0 20.6 7.2 0.0Queue Length 95th (m) #54.7 42.1 3.8 69.1 28.9 40.3 16.5 16.2Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 50.0 50.0 25.0Base Capacity (vph) 496 2152 244 1265 713 602 897 840Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.59 0.32 0.03 0.58 0.21 0.31 0.08 0.35

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 432: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 271 568 73 6 526 150 68 52 15 174 70 274Future Volume (vph) 271 568 73 6 526 150 68 52 15 174 70 274Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.0 4.0 6.1 4.0 4.0 4.0 4.0 6.1Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.98 1.00 0.97 0.99 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.98 0.95 1.00 1.00Satd. Flow (prot) 1630 3163 1657 3116 1646 1642 1750 1434Flt Permitted 0.19 1.00 0.39 1.00 0.82 0.68 1.00 1.00Satd. Flow (perm) 327 3163 675 3116 1386 1178 1750 1434Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 295 617 79 7 572 163 74 57 16 189 76 298RTOR Reduction (vph) 0 10 0 0 32 0 0 6 0 0 0 222Lane Group Flow (vph) 295 686 0 7 703 0 0 141 0 189 76 76Confl. Peds. (#/hr) 5 6 6 5 7 5 5 7Heavy Vehicles (%) 2% 3% 3% 0% 3% 2% 2% 2% 0% 1% 0% 2%Turn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 34.3 34.3 18.0 18.0 15.8 15.8 15.8 15.8Effective Green, g (s) 34.3 36.4 18.0 20.1 17.9 17.9 17.9 15.8Actuated g/C Ratio 0.55 0.58 0.29 0.32 0.29 0.29 0.29 0.25Clearance Time (s) 3.0 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 458 1848 195 1005 398 338 502 363v/s Ratio Prot c0.14 0.22 c0.23 0.04v/s Ratio Perm 0.22 0.01 0.10 c0.16 0.05v/c Ratio 0.64 0.37 0.04 0.70 0.35 0.56 0.15 0.21Uniform Delay, d1 9.3 6.9 15.9 18.5 17.6 18.8 16.5 18.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 3.1 0.1 0.1 2.2 0.5 2.0 0.1 0.3Delay (s) 12.4 7.0 16.0 20.6 18.2 20.9 16.7 18.6Level of Service B A B C B C B BApproach Delay (s) 8.6 20.6 18.2 19.1Approach LOS A C B B

Intersection SummaryHCM 2000 Control Delay 15.2 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.64Actuated Cycle Length (s) 62.3 Sum of lost time (s) 11.0Intersection Capacity Utilization 65.7% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 433: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 63 679 14 8 498 222 13 8 11 265 12 174Future Volume (vph) 63 679 14 8 498 222 13 8 11 265 12 174Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 50.0 25.0 50.0 25.0 0.0 0.0 0.0Storage Lanes 1 1 1 1 1 0 1 0Taper Length (m) 75.0 50.0 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 0.99 1.00 0.99Frt 0.850 0.850 0.914 0.860Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1568 3292 1488 1662 3325 1417 1662 1600 0 1583 1433 0Flt Permitted 0.229 0.371 0.950 0.950Satd. Flow (perm) 378 3292 1488 649 3325 1398 1661 1600 0 1583 1433 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 80 241 12 189Link Speed (k/h) 50 50 50 50Link Distance (m) 310.8 136.7 108.4 168.0Travel Time (s) 22.4 9.8 7.8 12.1Confl. Peds. (#/hr) 1 1 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 1% 0% 0% 0% 5% 0% 0% 0% 5% 0% 4%Adj. Flow (vph) 68 738 15 9 541 241 14 9 12 288 13 189Shared Lane Traffic (%)Lane Group Flow (vph) 68 738 15 9 541 241 14 21 0 288 202 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 2Detector Template Left Thru Right Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 434: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA Perm Perm NA Perm Split NA Split NAProtected Phases 7 4 8 2 2 6 6Permitted Phases 4 4 8 8Detector Phase 7 4 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 6.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 10.5 38.1 38.1 38.1 38.1 38.1 36.1 36.1 36.1 36.1Total Split (s) 15.0 53.1 53.1 38.1 38.1 38.1 36.1 36.1 36.1 36.1Total Split (%) 12.0% 42.4% 42.4% 30.4% 30.4% 30.4% 28.8% 28.8% 28.8% 28.8%Maximum Green (s) 12.0 47.0 47.0 32.0 32.0 32.0 30.0 30.0 30.0 30.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) 1.0 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.3 2.5 2.5 2.5 2.5 2.5 4.0 4.0 4.0 4.0Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 31.6 31.6 31.6 20.6 20.6 20.6 10.5 10.5 23.0 23.0Actuated g/C Ratio 0.41 0.41 0.41 0.27 0.27 0.27 0.14 0.14 0.30 0.30v/c Ratio 0.26 0.55 0.02 0.05 0.61 0.44 0.06 0.09 0.61 0.36Control Delay 18.0 19.8 0.1 24.8 29.1 6.5 36.0 24.7 30.4 6.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 18.0 19.8 0.1 24.8 29.1 6.5 36.0 24.7 30.4 6.4LOS B B A C C A D C C AApproach Delay 19.3 22.2 29.2 20.5Approach LOS B C C C

Intersection SummaryArea Type: OtherCycle Length: 125.3Actuated Cycle Length: 77.4Natural Cycle: 125Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.61Intersection Signal Delay: 20.8 Intersection LOS: CIntersection Capacity Utilization 59.7% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)

Page 435: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBTLane Group Flow (vph) 68 738 15 9 541 241 14 21 288 202v/c Ratio 0.26 0.55 0.02 0.05 0.61 0.44 0.06 0.09 0.61 0.36Control Delay 18.0 19.8 0.1 24.8 29.1 6.5 36.0 24.7 30.4 6.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 18.0 19.8 0.1 24.8 29.1 6.5 36.0 24.7 30.4 6.4Queue Length 50th (m) 6.1 43.2 0.0 1.0 37.3 0.0 1.9 1.2 37.5 1.4Queue Length 95th (m) 16.2 72.2 0.0 5.2 65.0 17.7 8.5 8.7 72.3 17.3Internal Link Dist (m) 286.8 112.7 84.4 144.0Turn Bay Length (m) 50.0 50.0 25.0 50.0 25.0Base Capacity (vph) 327 2144 997 293 1504 764 708 688 674 718Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.21 0.34 0.02 0.03 0.36 0.32 0.02 0.03 0.43 0.28

Intersection Summary

Page 436: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan107: Thundering Waters Blvd/Stanley Ave (RR 102) & McLeod Rd (RR 49)/Marine Land Pkway (RR 49)Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 63 679 14 8 498 222 13 8 11 265 12 174Future Volume (vph) 63 679 14 8 498 222 13 8 11 265 12 174Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.91 1.00 0.86Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1568 3292 1488 1662 3325 1399 1662 1600 1583 1433Flt Permitted 0.23 1.00 1.00 0.37 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (perm) 378 3292 1488 650 3325 1399 1662 1600 1583 1433Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 68 738 15 9 541 241 14 9 12 288 13 189RTOR Reduction (vph) 0 0 9 0 0 176 0 10 0 0 133 0Lane Group Flow (vph) 68 738 6 9 541 65 14 11 0 288 69 0Confl. Peds. (#/hr) 1 1 1 1Heavy Vehicles (%) 6% 1% 0% 0% 0% 5% 0% 0% 0% 5% 0% 4%Turn Type pm+pt NA Perm Perm NA Perm Split NA Split NAProtected Phases 7 4 8 2 2 6 6Permitted Phases 4 4 8 8Actuated Green, G (s) 29.4 29.4 29.4 18.5 18.5 18.5 8.4 8.4 20.8 20.8Effective Green, g (s) 28.4 31.5 31.5 20.6 20.6 20.6 10.5 10.5 22.9 22.9Actuated g/C Ratio 0.37 0.41 0.41 0.27 0.27 0.27 0.14 0.14 0.30 0.30Clearance Time (s) 3.0 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 2.3 2.5 2.5 2.5 2.5 2.5 4.0 4.0 4.0 4.0Lane Grp Cap (vph) 246 1348 609 174 890 374 226 218 471 426v/s Ratio Prot 0.02 c0.22 0.16 c0.01 0.01 c0.18 0.05v/s Ratio Perm 0.08 0.00 0.01 0.05v/c Ratio 0.28 0.55 0.01 0.05 0.61 0.17 0.06 0.05 0.61 0.16Uniform Delay, d1 16.8 17.3 13.5 20.9 24.6 21.6 28.9 28.9 23.2 19.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.4 0.0 0.1 1.0 0.2 0.2 0.1 2.7 0.2Delay (s) 17.1 17.6 13.5 21.0 25.6 21.8 29.1 29.0 25.9 20.2Level of Service B B B C C C C C C CApproach Delay (s) 17.5 24.4 29.0 23.5Approach LOS B C C C

Intersection SummaryHCM 2000 Control Delay 21.6 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.52Actuated Cycle Length (s) 76.9 Sum of lost time (s) 16.0Intersection Capacity Utilization 59.7% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 437: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 818 136 36 583 145 55Future Volume (vph) 818 136 36 583 145 55Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 75.0 50.0 0.0 50.0Storage Lanes 1 1 2 1Taper Length (m) 50.0 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00Ped Bike Factor 0.99 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 3228 1403 1662 3228 3101 1488Flt Permitted 0.277 0.950Satd. Flow (perm) 3228 1386 485 3228 3097 1488Right Turn on Red Yes YesSatd. Flow (RTOR) 148 60Link Speed (k/h) 50 50 50Link Distance (m) 140.7 332.8 68.6Travel Time (s) 10.1 24.0 4.9Confl. Peds. (#/hr) 1 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 6% 0% 3% 4% 0%Adj. Flow (vph) 889 148 39 634 158 60Shared Lane Traffic (%)Lane Group Flow (vph) 889 148 39 634 158 60Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 1 1 2 1 1Detector Template Thru Right Left Thru Left RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0

Page 438: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group EBT EBR WBL WBT NBL NBRTurn Type NA Perm Perm NA Prot PermProtected Phases 4 8 2Permitted Phases 4 8 2Detector Phase 4 4 8 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 8.0 8.0Minimum Split (s) 24.5 24.5 24.5 24.5 38.1 38.1Total Split (s) 41.5 41.5 41.5 41.5 38.1 38.1Total Split (%) 52.1% 52.1% 52.1% 52.1% 47.9% 47.9%Maximum Green (s) 35.0 35.0 35.0 35.0 32.0 32.0Yellow Time (s) 4.5 4.5 4.5 4.5 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.5 -2.5 -2.5 -2.5 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.9 2.9 2.9 2.9 2.8 2.8Recall Mode Min Min Min Min Min MinWalk Time (s) 12.0 12.0Flash Dont Walk (s) 20.0 20.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 18.9 18.9 18.9 18.9 10.7 10.7Actuated g/C Ratio 0.50 0.50 0.50 0.50 0.28 0.28v/c Ratio 0.55 0.19 0.16 0.39 0.18 0.13Control Delay 7.8 1.9 6.7 6.5 12.2 5.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 7.8 1.9 6.7 6.5 12.2 5.5LOS A A A A B AApproach Delay 6.9 6.5 10.4Approach LOS A A B

Intersection SummaryArea Type: OtherCycle Length: 79.6Actuated Cycle Length: 37.7Natural Cycle: 65Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.55Intersection Signal Delay: 7.2 Intersection LOS: AIntersection Capacity Utilization 45.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49)

Page 439: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group EBT EBR WBL WBT NBL NBRLane Group Flow (vph) 889 148 39 634 158 60v/c Ratio 0.55 0.19 0.16 0.39 0.18 0.13Control Delay 7.8 1.9 6.7 6.5 12.2 5.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 7.8 1.9 6.7 6.5 12.2 5.5Queue Length 50th (m) 17.4 0.0 1.1 11.2 3.9 0.0Queue Length 95th (m) 31.1 5.1 4.8 20.5 10.8 6.3Internal Link Dist (m) 116.7 308.8 44.6Turn Bay Length (m) 75.0 50.0 50.0Base Capacity (vph) 3074 1327 462 3074 2804 1351Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.29 0.11 0.08 0.21 0.06 0.04

Intersection Summary

Page 440: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Ave (RR 102) & Marine Land Pkway (RR 49) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 32

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 818 136 36 583 145 55Future Volume (vph) 818 136 36 583 145 55Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 3228 1386 1662 3228 3101 1488Flt Permitted 1.00 1.00 0.28 1.00 0.95 1.00Satd. Flow (perm) 3228 1386 484 3228 3101 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 889 148 39 634 158 60RTOR Reduction (vph) 0 74 0 0 0 43Lane Group Flow (vph) 889 74 39 634 158 17Confl. Peds. (#/hr) 1 1 1Heavy Vehicles (%) 3% 6% 0% 3% 4% 0%Turn Type NA Perm Perm NA Prot PermProtected Phases 4 8 2Permitted Phases 4 8 2Actuated Green, G (s) 16.3 16.3 16.3 16.3 8.5 8.5Effective Green, g (s) 18.8 18.8 18.8 18.8 10.6 10.6Actuated g/C Ratio 0.50 0.50 0.50 0.50 0.28 0.28Clearance Time (s) 6.5 6.5 6.5 6.5 6.1 6.1Vehicle Extension (s) 2.9 2.9 2.9 2.9 2.8 2.8Lane Grp Cap (vph) 1622 696 243 1622 878 421v/s Ratio Prot c0.28 0.20 c0.05v/s Ratio Perm 0.05 0.08 0.01v/c Ratio 0.55 0.11 0.16 0.39 0.18 0.04Uniform Delay, d1 6.4 4.9 5.0 5.8 10.1 9.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.1 0.3 0.1 0.1 0.0Delay (s) 6.7 5.0 5.3 5.9 10.2 9.7Level of Service A A A A B AApproach Delay (s) 6.5 5.9 10.1Approach LOS A A B

Intersection SummaryHCM 2000 Control Delay 6.7 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.42Actuated Cycle Length (s) 37.4 Sum of lost time (s) 8.0Intersection Capacity Utilization 45.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 441: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 154 93 204 0 0 270Future Volume (vph) 154 93 204 0 0 270Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.943Flt Protected 0.970Satd. Flow (prot) 3045 0 3260 0 0 3260Flt Permitted 0.970Satd. Flow (perm) 3045 0 3260 0 0 3260Right Turn on Red Yes YesSatd. Flow (RTOR) 101Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 2% 2% 0% 0% 2%Adj. Flow (vph) 167 101 222 0 0 293Shared Lane Traffic (%)Lane Group Flow (vph) 268 0 222 0 0 293Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch Phase

Page 442: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group WBL WBR NBT NBR SBL SBTMinimum Initial (s) 8.0 8.0 8.0Minimum Split (s) 25.1 22.5 22.5Total Split (s) 28.2 22.5 22.5Total Split (%) 55.6% 44.4% 44.4%Maximum Green (s) 22.1 16.4 16.4Yellow Time (s) 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 10.1 10.3 10.3Actuated g/C Ratio 0.36 0.36 0.36v/c Ratio 0.23 0.19 0.25Control Delay 4.7 6.7 7.0Queue Delay 0.0 0.0 0.0Total Delay 4.7 6.7 7.0LOS A A AApproach Delay 4.7 6.7 7.0Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50.7Actuated Cycle Length: 28.4Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.25Intersection Signal Delay: 6.1 Intersection LOS: AIntersection Capacity Utilization 22.7% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 443: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group WBL NBT SBTLane Group Flow (vph) 268 222 293v/c Ratio 0.23 0.19 0.25Control Delay 4.7 6.7 7.0Queue Delay 0.0 0.0 0.0Total Delay 4.7 6.7 7.0Queue Length 50th (m) 2.4 3.4 4.5Queue Length 95th (m) 6.2 6.6 8.4Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2947 2126 2126Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.09 0.10 0.14

Intersection Summary

Page 444: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 36

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 154 93 204 0 0 270Future Volume (vph) 154 93 204 0 0 270Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 0.94 1.00 1.00Flt Protected 0.97 1.00 1.00Satd. Flow (prot) 3045 3260 3260Flt Permitted 0.97 1.00 1.00Satd. Flow (perm) 3045 3260 3260Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 167 101 222 0 0 293RTOR Reduction (vph) 65 0 0 0 0 0Lane Group Flow (vph) 203 0 222 0 0 293Heavy Vehicles (%) 2% 2% 2% 0% 0% 2%Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.0 8.2 8.2Effective Green, g (s) 10.1 10.3 10.3Actuated g/C Ratio 0.36 0.36 0.36Clearance Time (s) 6.1 6.1 6.1Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1082 1182 1182v/s Ratio Prot c0.07 0.07v/s Ratio Perm c0.09v/c Ratio 0.19 0.19 0.25Uniform Delay, d1 6.3 6.2 6.3Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.0 0.0 0.1Delay (s) 6.4 6.2 6.4Level of Service A A AApproach Delay (s) 6.4 6.2 6.4Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.3 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.24Actuated Cycle Length (s) 28.4 Sum of lost time (s) 10.1Intersection Capacity Utilization 22.7% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 445: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 443 14 2 304 308 455Future Volume (vph) 443 14 2 304 308 455Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Frt 0.996 0.911Flt Protected 0.954Satd. Flow (prot) 1663 0 0 3198 2981 0Flt Permitted 0.954 0.948Satd. Flow (perm) 1663 0 0 3032 2981 0Right Turn on Red Yes YesSatd. Flow (RTOR) 2 495Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 0% 4% 4% 0%Adj. Flow (vph) 482 15 2 330 335 495Shared Lane Traffic (%)Lane Group Flow (vph) 497 0 0 332 830 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot Perm NA NAProtected Phases 4 2 6Permitted Phases 2Detector Phase 4 2 2 6Switch Phase

Page 446: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBR NBL NBT SBT SBRMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 31.3 42.0 42.0 42.0Total Split (%) 42.7% 57.3% 57.3% 57.3%Maximum Green (s) 25.0 35.0 35.0 35.0Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.9 2.9 2.9Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 20.0 15.7 15.7Actuated g/C Ratio 0.45 0.36 0.36v/c Ratio 0.66 0.31 0.60Control Delay 14.5 12.0 6.9Queue Delay 0.0 0.0 0.0Total Delay 14.5 12.0 6.9LOS B B AApproach Delay 14.5 12.0 6.9Approach LOS B B A

Intersection SummaryArea Type: OtherCycle Length: 73.3Actuated Cycle Length: 44Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.66Intersection Signal Delay: 10.2 Intersection LOS: BIntersection Capacity Utilization 59.4% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 447: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL NBT SBTLane Group Flow (vph) 497 332 830v/c Ratio 0.66 0.31 0.60Control Delay 14.5 12.0 6.9Queue Delay 0.0 0.0 0.0Total Delay 14.5 12.0 6.9Queue Length 50th (m) 25.2 9.3 9.5Queue Length 95th (m) 64.7 21.2 26.5Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1065 2637 2657Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.47 0.13 0.31

Intersection Summary

Page 448: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 443 14 2 304 308 455Future Volume (vph) 443 14 2 304 308 455Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95Frt 1.00 1.00 0.91Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1662 3197 2979Flt Permitted 0.95 0.95 1.00Satd. Flow (perm) 1662 3032 2979Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 482 15 2 330 335 495RTOR Reduction (vph) 1 0 0 0 318 0Lane Group Flow (vph) 496 0 0 332 512 0Heavy Vehicles (%) 0% 0% 0% 4% 4% 0%Turn Type Prot Perm NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 17.7 12.6 12.6Effective Green, g (s) 20.0 15.6 15.6Actuated g/C Ratio 0.46 0.36 0.36Clearance Time (s) 6.3 7.0 7.0Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 762 1084 1065v/s Ratio Prot c0.30 c0.17v/s Ratio Perm 0.11v/c Ratio 0.65 0.31 0.48Uniform Delay, d1 9.1 10.1 10.9Progression Factor 1.00 1.00 1.00Incremental Delay, d2 1.6 0.1 0.2Delay (s) 10.7 10.2 11.0Level of Service B B BApproach Delay (s) 10.7 10.2 11.0Approach LOS B B B

Intersection SummaryHCM 2000 Control Delay 10.8 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.58Actuated Cycle Length (s) 43.6 Sum of lost time (s) 8.0Intersection Capacity Utilization 59.4% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 449: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Future Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1716 0 1750 1667 1403 0 1750 0 3101 1488 0Flt Permitted 0.473 0.950Satd. Flow (perm) 828 1716 0 1750 1667 1403 0 1750 0 3101 1488 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 126 896Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 0% 5% 6% 0% 0% 0% 4% 0% 0%Adj. Flow (vph) 75 80 0 0 121 46 0 0 0 252 0 96Shared Lane Traffic (%)Lane Group Flow (vph) 75 80 0 0 121 46 0 0 0 252 96 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 450: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 12.5 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 18.0 52.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (%) 13.9% 40.5% 26.6% 26.6% 26.6% 29.7% 29.7% 29.7% 29.7%Maximum Green (s) 15.0 45.0 27.0 27.0 27.0 31.0 31.0 31.0 31.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.9 24.9 13.6 13.6 13.6 13.6Actuated g/C Ratio 0.54 0.54 0.29 0.29 0.29 0.29v/c Ratio 0.13 0.09 0.25 0.09 0.28 0.09Control Delay 5.9 5.6 14.4 0.4 13.8 0.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.9 5.6 14.4 0.4 13.8 0.2LOS A A B A B AApproach Delay 5.8 10.5 10.0Approach LOS A B B

Intersection SummaryArea Type: OtherCycle Length: 129.5Actuated Cycle Length: 46.5Natural Cycle: 125Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.28Intersection Signal Delay: 9.2 Intersection LOS: AIntersection Capacity Utilization 25.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 451: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 75 80 121 46 252 96v/c Ratio 0.13 0.09 0.25 0.09 0.28 0.09Control Delay 5.9 5.6 14.4 0.4 13.8 0.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.9 5.6 14.4 0.4 13.8 0.2Queue Length 50th (m) 2.7 2.9 7.7 0.0 8.3 0.0Queue Length 95th (m) 7.2 7.6 18.5 0.2 16.2 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 693 1714 1093 963 2299 1335Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.11 0.05 0.11 0.05 0.11 0.07

Intersection Summary

Page 452: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Future Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1716 1667 1403 3101 1488Flt Permitted 0.47 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 828 1716 1667 1403 3101 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 75 80 0 0 121 46 0 0 0 252 0 96RTOR Reduction (vph) 0 0 0 0 0 32 0 0 0 0 68 0Lane Group Flow (vph) 75 80 0 0 121 14 0 0 0 252 28 0Heavy Vehicles (%) 0% 2% 0% 0% 5% 6% 0% 0% 0% 4% 0% 0%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 21.4 21.4 10.2 10.2 10.2 10.2Effective Green, g (s) 20.4 24.9 13.7 13.7 13.7 13.7Actuated g/C Ratio 0.44 0.53 0.29 0.29 0.29 0.29Clearance Time (s) 3.0 7.5 7.5 7.5 7.5 7.5Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 491 916 490 412 911 437v/s Ratio Prot c0.02 0.05 c0.07 c0.08 0.02v/s Ratio Perm 0.04 0.01v/c Ratio 0.15 0.09 0.25 0.03 0.28 0.06Uniform Delay, d1 7.9 5.3 12.5 11.7 12.6 11.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.1 0.0 0.1 0.0Delay (s) 8.0 5.3 12.7 11.7 12.7 11.9Level of Service A A B B B BApproach Delay (s) 6.6 12.4 0.0 12.5Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 11.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.27Actuated Cycle Length (s) 46.6 Sum of lost time (s) 16.0Intersection Capacity Utilization 25.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 453: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 42 2 293 60 93 4 161 236 123 260 18Future Volume (vph) 16 42 2 293 60 93 4 161 236 123 260 18Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 0.0 0.0 30.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.996 0.909 0.850 0.990Flt Protected 0.987 0.950 0.999 0.950Satd. Flow (prot) 0 1720 0 1630 1581 0 0 1731 1473 1646 1732 0Flt Permitted 0.925 0.715 0.992 0.644Satd. Flow (perm) 0 1612 0 1227 1581 0 0 1719 1473 1116 1732 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 2 101 257 5Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 0% 2% 0% 1% 0% 1% 1% 1% 0% 0%Adj. Flow (vph) 17 46 2 318 65 101 4 175 257 134 283 20Shared Lane Traffic (%)Lane Group Flow (vph) 0 65 0 318 166 0 0 179 257 134 303 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 454: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 46

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 46.3 46.3 46.3 46.3 36.3 36.3 36.3 36.3 36.3Total Split (%) 56.1% 56.1% 56.1% 56.1% 43.9% 43.9% 43.9% 43.9% 43.9%Maximum Green (s) 40.0 40.0 40.0 40.0 30.0 30.0 30.0 30.0 30.0Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 -2.3 -2.3 0.0 0.0 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 6.3 6.3 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 26.1 23.6 26.1 21.4 18.9 18.9 21.4Actuated g/C Ratio 0.47 0.42 0.47 0.38 0.34 0.34 0.38v/c Ratio 0.09 0.62 0.21 0.27 0.39 0.36 0.46Control Delay 9.3 19.2 5.2 15.1 4.5 19.2 17.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.3 19.2 5.2 15.1 4.5 19.2 17.0LOS A B A B A B BApproach Delay 9.3 14.4 8.9 17.6Approach LOS A B A B

Intersection SummaryArea Type: OtherCycle Length: 82.6Actuated Cycle Length: 56.1Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.62Intersection Signal Delay: 13.5 Intersection LOS: BIntersection Capacity Utilization 59.8% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 455: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 65 318 166 179 257 134 303v/c Ratio 0.09 0.62 0.21 0.27 0.39 0.36 0.46Control Delay 9.3 19.2 5.2 15.1 4.5 19.2 17.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.3 19.2 5.2 15.1 4.5 19.2 17.0Queue Length 50th (m) 3.3 23.4 3.4 11.7 0.0 9.7 21.1Queue Length 95th (m) 11.4 60.1 14.9 34.6 14.9 30.7 57.9Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 50.0 30.0 50.0Base Capacity (vph) 1266 924 1263 1068 958 644 1078Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.05 0.34 0.13 0.17 0.27 0.21 0.28

Intersection Summary

Page 456: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 42 2 293 60 93 4 161 236 123 260 18Future Volume (vph) 16 42 2 293 60 93 4 161 236 123 260 18Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 6.3 6.3 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.91 1.00 0.85 1.00 0.99Flt Protected 0.99 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1720 1630 1581 1731 1473 1646 1733Flt Permitted 0.92 0.71 1.00 0.99 1.00 0.64 1.00Satd. Flow (perm) 1612 1226 1581 1719 1473 1117 1733Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 17 46 2 318 65 101 4 175 257 134 283 20RTOR Reduction (vph) 0 1 0 0 54 0 0 0 169 0 3 0Lane Group Flow (vph) 0 64 0 318 112 0 0 179 88 134 300 0Heavy Vehicles (%) 0% 0% 0% 2% 0% 1% 0% 1% 1% 1% 0% 0%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 23.6 23.6 23.6 18.9 18.9 18.9 18.9Effective Green, g (s) 25.9 23.6 25.9 21.2 18.9 18.9 21.2Actuated g/C Ratio 0.47 0.43 0.47 0.38 0.34 0.34 0.38Clearance Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 757 525 743 661 505 383 666v/s Ratio Prot 0.07 c0.17v/s Ratio Perm 0.04 c0.26 0.10 0.06 0.12v/c Ratio 0.08 0.61 0.15 0.27 0.17 0.35 0.45Uniform Delay, d1 8.1 12.2 8.3 11.6 12.6 13.5 12.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 3.5 0.3 0.6 0.5 1.6 1.4Delay (s) 8.2 15.7 8.6 12.3 13.1 15.1 14.0Level of Service A B A B B B BApproach Delay (s) 8.2 13.2 12.8 14.3Approach LOS A B B B

Intersection SummaryHCM 2000 Control Delay 13.2 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.51Actuated Cycle Length (s) 55.1 Sum of lost time (s) 8.0Intersection Capacity Utilization 59.8% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 457: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 16 2 8 184 143 29Future Volume (vph) 16 2 8 184 143 29Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.986 0.977Flt Protected 0.957 0.998Satd. Flow (prot) 1402 0 0 1706 1665 0Flt Permitted 0.957 0.998Satd. Flow (perm) 1402 0 0 1706 1665 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 14% 50% 33% 1% 2% 6%Adj. Flow (vph) 17 2 9 200 155 32Shared Lane Traffic (%)Lane Group Flow (vph) 19 0 0 209 187 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 27.6% ICU Level of Service AAnalysis Period (min) 15

Page 458: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 2 8 184 143 29Future Volume (Veh/h) 16 2 8 184 143 29Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 2 9 200 155 32PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 389 171 187vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 389 171 187tC, single (s) 6.5 6.7 4.4tC, 2 stage (s)tF (s) 3.6 3.8 2.5p0 queue free % 97 100 99cM capacity (veh/h) 588 762 1221

Direction, Lane # EB 1 NB 1 SB 1Volume Total 19 209 187Volume Left 17 9 0Volume Right 2 0 32cSH 602 1221 1700Volume to Capacity 0.03 0.01 0.11Queue Length 95th (m) 0.8 0.2 0.0Control Delay (s) 11.2 0.4 0.0Lane LOS B AApproach Delay (s) 11.2 0.4 0.0Approach LOS B

Intersection SummaryAverage Delay 0.7Intersection Capacity Utilization 27.6% ICU Level of Service AAnalysis Period (min) 15

Page 459: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 22 8 6 170 127 19Future Volume (vph) 22 8 6 170 127 19Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.963 0.982Flt Protected 0.965 0.998Satd. Flow (prot) 1569 0 0 1730 1661 0Flt Permitted 0.965 0.998Satd. Flow (perm) 1569 0 0 1730 1661 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 5% 0% 0% 1% 4% 0%Adj. Flow (vph) 24 9 7 185 138 21Shared Lane Traffic (%)Lane Group Flow (vph) 33 0 0 192 159 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 25.0% ICU Level of Service AAnalysis Period (min) 15

Page 460: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 52

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 22 8 6 170 127 19Future Volume (Veh/h) 22 8 6 170 127 19Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 24 9 7 185 138 21PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 348 148 159vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 348 148 159tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 96 99 100cM capacity (veh/h) 640 904 1433

Direction, Lane # EB 1 NB 1 SB 1Volume Total 33 192 159Volume Left 24 7 0Volume Right 9 0 21cSH 696 1433 1700Volume to Capacity 0.05 0.00 0.09Queue Length 95th (m) 1.2 0.1 0.0Control Delay (s) 10.4 0.3 0.0Lane LOS B AApproach Delay (s) 10.4 0.3 0.0Approach LOS B

Intersection SummaryAverage Delay 1.1Intersection Capacity Utilization 25.0% ICU Level of Service AAnalysis Period (min) 15

Page 461: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 6 18 7 170 129 6Future Volume (vph) 6 18 7 170 129 6Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.900 0.994Flt Protected 0.987 0.998Satd. Flow (prot) 1478 0 0 1695 1676 0Flt Permitted 0.987 0.998Satd. Flow (perm) 1478 0 0 1695 1676 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 298.3 331.4Travel Time (s) 14.9 21.5 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 7% 50% 1% 4% 0%Adj. Flow (vph) 7 20 8 185 140 7Shared Lane Traffic (%)Lane Group Flow (vph) 27 0 0 193 147 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 25.9% ICU Level of Service AAnalysis Period (min) 15

Page 462: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 6 18 7 170 129 6Future Volume (Veh/h) 6 18 7 170 129 6Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 20 8 185 140 7PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 344 144 147vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 344 144 147tC, single (s) 6.4 6.3 4.6tC, 2 stage (s)tF (s) 3.5 3.4 2.7p0 queue free % 99 98 99cM capacity (veh/h) 652 891 1188

Direction, Lane # EB 1 NB 1 SB 1Volume Total 27 193 147Volume Left 7 8 0Volume Right 20 0 7cSH 813 1188 1700Volume to Capacity 0.03 0.01 0.09Queue Length 95th (m) 0.8 0.2 0.0Control Delay (s) 9.6 0.4 0.0Lane LOS A AApproach Delay (s) 9.6 0.4 0.0Approach LOS A

Intersection SummaryAverage Delay 0.9Intersection Capacity Utilization 25.9% ICU Level of Service AAnalysis Period (min) 15

Page 463: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 5 9 35 12 15 12 23 161 6 2 140 5Future Volume (vph) 5 9 35 12 15 12 23 161 6 2 140 5Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.903 0.958 0.995 0.996Flt Protected 0.995 0.985 0.994 0.999Satd. Flow (prot) 0 1467 0 0 1651 0 0 1668 0 0 1677 0Flt Permitted 0.995 0.985 0.994 0.999Satd. Flow (perm) 0 1467 0 0 1651 0 0 1668 0 0 1677 0Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 29.6Travel Time (s) 8.5 7.8 70.5 2.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 10% 0% 0% 0% 10% 3% 0% 0% 4% 0%Adj. Flow (vph) 5 10 38 13 16 13 25 175 7 2 152 5Shared Lane Traffic (%)Lane Group Flow (vph) 0 53 0 0 42 0 0 207 0 0 159 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 34.7% ICU Level of Service AAnalysis Period (min) 15

Page 464: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 56

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 5 9 35 12 15 12 23 161 6 2 140 5Future Volume (Veh/h) 5 9 35 12 15 12 23 161 6 2 140 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 10 38 13 16 13 25 175 7 2 152 5PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 408 390 154 430 390 178 157 182vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 408 390 154 430 390 178 157 182tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.2 4.2 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.3 2.3 2.2p0 queue free % 99 98 96 97 97 99 98 100cM capacity (veh/h) 529 537 871 501 538 870 1375 1405

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 53 42 207 159Volume Left 5 13 25 2Volume Right 38 13 7 5cSH 739 594 1375 1405Volume to Capacity 0.07 0.07 0.02 0.00Queue Length 95th (m) 1.8 1.8 0.4 0.0Control Delay (s) 10.2 11.5 1.1 0.1Lane LOS B B A AApproach Delay (s) 10.2 11.5 1.1 0.1Approach LOS B B

Intersection SummaryAverage Delay 2.7Intersection Capacity Utilization 34.7% ICU Level of Service AAnalysis Period (min) 15

Page 465: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 42 50 33 162 198 36Future Volume (vph) 42 50 33 162 198 36Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.927 0.850Flt Protected 0.978 0.950Satd. Flow (prot) 1510 0 1662 1733 1733 1282Flt Permitted 0.978 0.950Satd. Flow (perm) 1510 0 1662 1733 1733 1282Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 11% 0% 0% 1% 1% 16%Adj. Flow (vph) 46 54 36 176 215 39Shared Lane Traffic (%)Lane Group Flow (vph) 100 0 36 176 215 39Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 30.5% ICU Level of Service AAnalysis Period (min) 15

Page 466: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 58

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 42 50 33 162 198 36Future Volume (Veh/h) 42 50 33 162 198 36Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 46 54 36 176 215 39PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 463 215 254vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 463 215 254tC, single (s) 6.5 6.2 4.1tC, 2 stage (s)tF (s) 3.6 3.3 2.2p0 queue free % 91 93 97cM capacity (veh/h) 526 830 1323

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 100 36 176 215 39Volume Left 46 36 0 0 0Volume Right 54 0 0 0 39cSH 656 1323 1700 1700 1700Volume to Capacity 0.15 0.03 0.10 0.13 0.02Queue Length 95th (m) 4.3 0.7 0.0 0.0 0.0Control Delay (s) 11.5 7.8 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 11.5 1.3 0.0Approach LOS B

Intersection SummaryAverage Delay 2.5Intersection Capacity Utilization 30.5% ICU Level of Service AAnalysis Period (min) 15

Page 467: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 59

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 178 21 174 96 26 223Future Volume (vph) 178 21 174 96 26 223Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.986 0.952Flt Protected 0.957 0.995Satd. Flow (prot) 1622 0 1639 0 0 1702Flt Permitted 0.957 0.995Satd. Flow (perm) 1622 0 1639 0 0 1702Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 2% 1% 5% 2%Adj. Flow (vph) 193 23 189 104 28 242Shared Lane Traffic (%)Lane Group Flow (vph) 216 0 293 0 0 270Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 52.7% ICU Level of Service AAnalysis Period (min) 15

Page 468: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 60

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 178 21 174 96 26 223Future Volume (Veh/h) 178 21 174 96 26 223Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 193 23 189 104 28 242PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 539 241 293vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 539 241 293tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 61 97 98cM capacity (veh/h) 492 803 1252

Direction, Lane # WB 1 NB 1 SB 1Volume Total 216 293 270Volume Left 193 0 28Volume Right 23 104 0cSH 513 1700 1252Volume to Capacity 0.42 0.17 0.02Queue Length 95th (m) 16.5 0.0 0.5Control Delay (s) 17.0 0.0 1.0Lane LOS C AApproach Delay (s) 17.0 0.0 1.0Approach LOS C

Intersection SummaryAverage Delay 5.1Intersection Capacity Utilization 52.7% ICU Level of Service AAnalysis Period (min) 15

Page 469: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 61

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 353 182 0 208 264Future Volume (vph) 0 353 182 0 208 264Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3228 3197 0 1614 1458Flt Permitted 0.950Satd. Flow (perm) 0 3228 3197 0 1614 1458Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 3% 4% 0% 3% 2%Adj. Flow (vph) 0 384 198 0 226 287Shared Lane Traffic (%)Lane Group Flow (vph) 0 384 198 0 226 287Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 29.9% ICU Level of Service AAnalysis Period (min) 15

Page 470: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 62

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 0 353 182 0 208 264Future Volume (Veh/h) 0 353 182 0 208 264Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 384 198 0 226 287PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 5Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 198 390 99vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 198 390 99tC, single (s) 4.1 6.9 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 61 69cM capacity (veh/h) 1387 584 937

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1Volume Total 192 192 99 99 513Volume Left 0 0 0 0 226Volume Right 0 0 0 0 287cSH 1700 1700 1700 1700 1325Volume to Capacity 0.11 0.11 0.06 0.06 0.39Queue Length 95th (m) 0.0 0.0 0.0 0.0 14.9Control Delay (s) 0.0 0.0 0.0 0.0 12.5Lane LOS BApproach Delay (s) 0.0 0.0 12.5Approach LOS B

Intersection SummaryAverage Delay 5.9Intersection Capacity Utilization 29.9% ICU Level of Service AAnalysis Period (min) 15

Page 471: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 63

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 335 0 0 169 34 88Future Volume (vph) 335 0 0 169 34 88Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3228 0 0 3260 1554 1444Flt Permitted 0.950Satd. Flow (perm) 3228 0 0 3260 1554 1444Link Speed (k/h) 50 50 50Link Distance (m) 104.2 91.9 169.0Travel Time (s) 7.5 6.6 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 2% 7% 3%Adj. Flow (vph) 364 0 0 184 37 96Shared Lane Traffic (%)Lane Group Flow (vph) 364 0 0 184 37 96Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 22.6% ICU Level of Service AAnalysis Period (min) 15

Page 472: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 64

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (veh/h) 335 0 0 169 34 88Future Volume (Veh/h) 335 0 0 169 34 88Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 364 0 0 184 37 96PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 6Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 364 456 182vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 364 456 182tC, single (s) 4.1 6.9 7.0tC, 2 stage (s)tF (s) 2.2 3.6 3.3p0 queue free % 100 93 88cM capacity (veh/h) 1206 520 826

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1Volume Total 182 182 92 92 133Volume Left 0 0 0 0 37Volume Right 0 0 0 0 96cSH 1700 1700 1700 1700 1145Volume to Capacity 0.11 0.11 0.05 0.05 0.12Queue Length 95th (m) 0.0 0.0 0.0 0.0 3.1Control Delay (s) 0.0 0.0 0.0 0.0 10.6Lane LOS BApproach Delay (s) 0.0 0.0 10.6Approach LOS B

Intersection SummaryAverage Delay 2.1Intersection Capacity Utilization 22.6% ICU Level of Service AAnalysis Period (min) 15

Page 473: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 65

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 120 304 213 70 97 89Future Volume (vph) 120 304 213 70 97 89Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.967 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1630 1716 1659 0 1630 1458Flt Permitted 0.950 0.950Satd. Flow (perm) 1630 1716 1659 0 1630 1458Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 130 330 232 76 105 97Shared Lane Traffic (%)Lane Group Flow (vph) 130 330 308 0 105 97Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 39.8% ICU Level of Service AAnalysis Period (min) 15

Page 474: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 66

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 120 304 213 70 97 89Future Volume (vph) 120 304 213 70 97 89Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 130 330 232 76 105 97

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total (vph) 130 330 308 105 97Volume Left (vph) 130 0 0 105 0Volume Right (vph) 0 0 76 0 97Hadj (s) 0.53 0.03 -0.11 0.53 -0.67Departure Headway (s) 6.0 5.5 5.4 7.0 5.7Degree Utilization, x 0.22 0.51 0.46 0.20 0.15Capacity (veh/h) 573 634 647 473 575Control Delay (s) 9.5 12.9 12.9 10.5 8.6Approach Delay (s) 11.9 12.9 9.6Approach LOS B B A

Intersection SummaryDelay 11.8Level of Service BIntersection Capacity Utilization 39.8% ICU Level of Service AAnalysis Period (min) 15

Page 475: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway/Marinelane Parkway & Portage Road Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 67

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 18 856 579 94 175 40Future Volume (vph) 18 856 579 94 175 40Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 50.0 50.0 0.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 3260 3260 1473 1646 1488Flt Permitted 0.950 0.950Satd. Flow (perm) 1662 3260 3260 1473 1646 1488Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 2% 1% 1% 0%Adj. Flow (vph) 20 930 629 102 190 43Shared Lane Traffic (%)Lane Group Flow (vph) 20 930 629 102 190 43Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 42.9% ICU Level of Service AAnalysis Period (min) 15

Page 476: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan212: Marineland Parkway/Marinelane Parkway & Portage Road Background 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 68

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 18 856 579 94 175 40Future Volume (Veh/h) 18 856 579 94 175 40Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 20 930 629 102 190 43PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 383pX, platoon unblockedvC, conflicting volume 629 1134 314vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 629 1134 314tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 98 2 94cM capacity (veh/h) 963 194 687

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 SB 1 SB 2Volume Total 20 465 465 314 314 102 190 43Volume Left 20 0 0 0 0 0 190 0Volume Right 0 0 0 0 0 102 0 43cSH 963 1700 1700 1700 1700 1700 194 687Volume to Capacity 0.02 0.27 0.27 0.18 0.18 0.06 0.98 0.06Queue Length 95th (m) 0.5 0.0 0.0 0.0 0.0 0.0 65.7 1.6Control Delay (s) 8.8 0.0 0.0 0.0 0.0 0.0 110.0 10.6Lane LOS A F BApproach Delay (s) 0.2 0.0 91.7Approach LOS F

Intersection SummaryAverage Delay 11.3Intersection Capacity Utilization 42.9% ICU Level of Service AAnalysis Period (min) 15

Page 477: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Thundering Waters Transportation Master Plan | 151385 | July 2016

Paradigm Transportation Solutions Limited | Appendices

Appendix G

Future Total Traffic Operations Reports

Page 478: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 95 725 18 29 584 285 30 75 107 261 47 82Future Volume (vph) 95 725 18 29 584 285 30 75 107 261 47 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 1 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95Ped Bike Factor 1.00 0.98Frt 0.850 0.850 0.850 0.905Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1525 3197 1390 1484 3167 1430 1471 1606 1250 1614 2733 0Flt Permitted 0.411 0.184 0.663 0.704Satd. Flow (perm) 659 3197 1390 288 3167 1409 1027 1606 1250 1196 2733 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 77 310 116 89Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 4 4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 4% 7% 12% 5% 4% 13% 9% 19% 3% 5% 13%Adj. Flow (vph) 103 788 20 32 635 310 33 82 116 284 51 89Shared Lane Traffic (%)Lane Group Flow (vph) 103 788 20 32 635 310 33 82 116 284 140 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 1 2Detector Template Left Thru Right Left Thru Right Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 479: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Detector Phase 4 4 4 3 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.3 39.3 39.3 12.5 51.8 51.8 37.3 37.3 37.3 37.3 37.3Total Split (%) 44.1% 44.1% 44.1% 14.0% 58.1% 58.1% 41.9% 41.9% 41.9% 41.9% 41.9%Maximum Green (s) 33.0 33.0 33.0 9.5 45.5 45.5 31.0 31.0 31.0 31.0 31.0Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 0.0 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 24.1 24.1 24.1 33.8 33.8 31.4 22.6 22.6 22.6 22.6 22.6Actuated g/C Ratio 0.37 0.37 0.37 0.52 0.52 0.48 0.35 0.35 0.35 0.35 0.35v/c Ratio 0.42 0.66 0.04 0.13 0.38 0.37 0.09 0.15 0.23 0.68 0.14Control Delay 23.0 20.6 0.1 10.3 10.8 2.9 16.4 16.4 5.0 28.6 7.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 23.0 20.6 0.1 10.3 10.8 2.9 16.4 16.4 5.0 28.6 7.4LOS C C A B B A B B A C AApproach Delay 20.4 8.3 10.7 21.6Approach LOS C A B C

Intersection SummaryArea Type: OtherCycle Length: 89.1Actuated Cycle Length: 64.8Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.68Intersection Signal Delay: 15.1 Intersection LOS: BIntersection Capacity Utilization 64.2% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 480: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBTLane Group Flow (vph) 103 788 20 32 635 310 33 82 116 284 140v/c Ratio 0.42 0.66 0.04 0.13 0.38 0.37 0.09 0.15 0.23 0.68 0.14Control Delay 23.0 20.6 0.1 10.3 10.8 2.9 16.4 16.4 5.0 28.6 7.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 23.0 20.6 0.1 10.3 10.8 2.9 16.4 16.4 5.0 28.6 7.4Queue Length 50th (m) 9.1 41.1 0.0 1.8 22.8 0.0 2.6 6.7 0.0 28.9 2.1Queue Length 95th (m) 27.0 74.8 0.0 6.9 45.1 12.7 9.8 18.8 10.4 67.6 8.8Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 378 1835 830 315 2426 1122 555 869 730 647 1520Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.27 0.43 0.02 0.10 0.26 0.28 0.06 0.09 0.16 0.44 0.09

Intersection Summary

Page 481: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 95 725 18 29 584 285 30 75 107 261 47 82Future Volume (vph) 95 725 18 29 584 285 30 75 107 261 47 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.90Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1524 3197 1390 1484 3167 1410 1471 1606 1250 1614 2732Flt Permitted 0.41 1.00 1.00 0.18 1.00 1.00 0.66 1.00 1.00 0.70 1.00Satd. Flow (perm) 659 3197 1390 287 3167 1410 1027 1606 1250 1196 2732Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 103 788 20 32 635 310 33 82 116 284 51 89RTOR Reduction (vph) 0 0 12 0 0 158 0 0 75 0 58 0Lane Group Flow (vph) 103 788 8 32 635 152 33 82 41 284 82 0Confl. Peds. (#/hr) 4 4Heavy Vehicles (%) 9% 4% 7% 12% 5% 4% 13% 9% 19% 3% 5% 13%Turn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Actuated Green, G (s) 21.9 21.9 21.9 31.4 31.4 31.4 20.1 20.1 20.1 20.1 20.1Effective Green, g (s) 24.2 24.2 24.2 30.4 33.7 31.4 22.4 22.4 22.4 22.4 22.4Actuated g/C Ratio 0.38 0.38 0.38 0.47 0.53 0.49 0.35 0.35 0.35 0.35 0.35Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 248 1206 524 238 1665 690 358 561 436 417 954v/s Ratio Prot c0.25 0.01 c0.20 0.05 0.03v/s Ratio Perm 0.16 0.01 0.05 0.11 0.03 0.03 c0.24v/c Ratio 0.42 0.65 0.01 0.13 0.38 0.22 0.09 0.15 0.09 0.68 0.09Uniform Delay, d1 14.7 16.5 12.5 10.2 9.0 9.3 14.0 14.3 14.0 17.8 14.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.8 1.1 0.0 0.2 0.1 0.1 0.1 0.1 0.1 4.2 0.0Delay (s) 15.5 17.6 12.5 10.4 9.1 9.5 14.1 14.4 14.1 22.0 14.0Level of Service B B B B A A B B B C BApproach Delay (s) 17.3 9.3 14.2 19.3Approach LOS B A B B

Intersection SummaryHCM 2000 Control Delay 14.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.65Actuated Cycle Length (s) 64.1 Sum of lost time (s) 12.0Intersection Capacity Utilization 64.2% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 482: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1041 1 73 716 0 0 0 0 534 86 164Future Volume (vph) 0 1041 1 73 716 0 0 0 0 534 86 164Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 50.0 50.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 0 1 1 0 0 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 0.99 1.00 1.00 1.00 0.99Frt 0.850 0.850Flt Protected 0.950 0.950 0.965Satd. Flow (prot) 0 4638 1488 1662 4594 0 0 0 0 1519 1522 1430Flt Permitted 0.152 0.950 0.965Satd. Flow (perm) 0 4638 1467 266 4594 0 0 0 0 1515 1520 1412Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 81 155Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 32.2 64.2 88.8Travel Time (s) 9.7 2.3 4.6 6.4Confl. Peds. (#/hr) 2 2 3 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 3% 0% 0% 4% 0% 0% 0% 0% 4% 9% 4%Adj. Flow (vph) 0 1132 1 79 778 0 0 0 0 580 93 178Shared Lane Traffic (%) 42%Lane Group Flow (vph) 0 1132 1 79 778 0 0 0 0 336 337 178Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 1 2 1 2 1Detector Template Thru Right Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0

Page 483: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Detector Phase 4 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 36.3 12.5 36.3 36.3 36.3 36.3Total Split (s) 36.3 36.3 12.5 48.5 36.5 36.5 36.5Total Split (%) 42.6% 42.6% 14.7% 56.9% 42.8% 42.8% 42.8%Maximum Green (s) 30.0 30.0 9.5 42.2 30.2 30.2 30.2Yellow Time (s) 4.1 4.1 3.0 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 0.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 25.6 23.2 37.2 37.2 23.4 23.4 23.4Actuated g/C Ratio 0.37 0.34 0.54 0.54 0.34 0.34 0.34v/c Ratio 0.66 0.00 0.27 0.31 0.65 0.65 0.31Control Delay 20.8 0.0 11.4 9.9 26.6 26.6 6.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 20.8 0.0 11.4 9.9 26.6 26.6 6.0LOS C A B A C C AApproach Delay 20.7 10.0 22.3Approach LOS C B C

Intersection SummaryArea Type: OtherCycle Length: 85.3Actuated Cycle Length: 68.9Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.66Intersection Signal Delay: 18.0 Intersection LOS: BIntersection Capacity Utilization 57.4% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 484: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT EBR WBL WBT SBL SBT SBRLane Group Flow (vph) 1132 1 79 778 336 337 178v/c Ratio 0.66 0.00 0.27 0.31 0.65 0.65 0.31Control Delay 20.8 0.0 11.4 9.9 26.6 26.6 6.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 20.8 0.0 11.4 9.9 26.6 26.6 6.0Queue Length 50th (m) 44.6 0.0 4.7 19.5 39.0 39.1 2.0Queue Length 95th (m) 72.4 0.0 13.3 34.4 76.8 76.7 15.4Internal Link Dist (m) 110.1 8.2 64.8Turn Bay Length (m) 50.0 50.0Base Capacity (vph) 2249 705 321 3090 739 742 768Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.50 0.00 0.25 0.25 0.45 0.45 0.23

Intersection Summary

Page 485: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1041 1 73 716 0 0 0 0 534 86 164Future Volume (vph) 0 1041 1 73 716 0 0 0 0 534 86 164Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 1.00 1.00 0.91 0.95 0.95 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 0.97 1.00Satd. Flow (prot) 4638 1468 1662 4594 1516 1520 1412Flt Permitted 1.00 1.00 0.15 1.00 0.95 0.97 1.00Satd. Flow (perm) 4638 1468 266 4594 1516 1520 1412Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 1132 1 79 778 0 0 0 0 580 93 178RTOR Reduction (vph) 0 0 1 0 0 0 0 0 0 0 0 102Lane Group Flow (vph) 0 1132 0 79 778 0 0 0 0 336 337 76Confl. Peds. (#/hr) 2 2 3 1Heavy Vehicles (%) 0% 3% 0% 0% 4% 0% 0% 0% 0% 4% 9% 4%Turn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Actuated Green, G (s) 23.3 23.3 34.8 34.8 21.1 21.1 21.1Effective Green, g (s) 25.6 23.3 33.8 37.1 23.4 23.4 23.4Actuated g/C Ratio 0.37 0.34 0.49 0.54 0.34 0.34 0.34Clearance Time (s) 6.3 6.3 3.0 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1733 499 284 2488 517 519 482v/s Ratio Prot c0.24 0.03 c0.17v/s Ratio Perm 0.00 0.11 0.22 0.22 0.05v/c Ratio 0.65 0.00 0.28 0.31 0.65 0.65 0.16Uniform Delay, d1 17.8 14.9 10.6 8.7 19.1 19.1 15.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.9 0.0 0.5 0.1 2.8 2.8 0.2Delay (s) 18.7 14.9 11.2 8.7 21.9 21.9 15.8Level of Service B B B A C C BApproach Delay (s) 18.7 9.0 0.0 20.6Approach LOS B A A C

Intersection SummaryHCM 2000 Control Delay 16.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.61Actuated Cycle Length (s) 68.5 Sum of lost time (s) 12.0Intersection Capacity Utilization 57.4% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 486: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1337 0 0 753 54 111Future Volume (vph) 1337 0 0 753 54 111Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.91 1.00 1.00 0.91 0.97 1.00Ped Bike Factor 1.00 0.98Frt 0.850Flt Protected 0.950Satd. Flow (prot) 4684 0 0 4550 3162 1430Flt Permitted 0.950Satd. Flow (perm) 4684 0 0 4550 3151 1398Right Turn on Red Yes YesSatd. Flow (RTOR) 24Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Confl. Peds. (#/hr) 4 13Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 5% 2% 4%Adj. Flow (vph) 1453 0 0 818 59 121Shared Lane Traffic (%)Lane Group Flow (vph) 1453 0 0 818 59 121Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2

Page 487: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRDetector Phase 4 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.0 35.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7%Maximum Green (s) 28.7 28.7 18.7 18.7Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 23.3 23.3 13.1 13.1Actuated g/C Ratio 0.52 0.52 0.29 0.29v/c Ratio 0.59 0.34 0.06 0.28Control Delay 8.4 6.5 13.2 13.7Queue Delay 0.0 0.0 0.0 0.0Total Delay 8.4 6.5 13.2 13.7LOS A A B BApproach Delay 8.4 6.5 13.5Approach LOS A A B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 44.6Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.59Intersection Signal Delay: 8.1 Intersection LOS: AIntersection Capacity Utilization 43.5% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 488: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 1453 818 59 121v/c Ratio 0.59 0.34 0.06 0.28Control Delay 8.4 6.5 13.2 13.7Queue Delay 0.0 0.0 0.0 0.0Total Delay 8.4 6.5 13.2 13.7Queue Length 50th (m) 24.5 11.6 1.7 5.8Queue Length 95th (m) 40.4 20.2 5.7 18.9Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 3312 3217 1514 682Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.44 0.25 0.04 0.18

Intersection Summary

Page 489: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1337 0 0 753 54 111Future Volume (vph) 1337 0 0 753 54 111Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 0.91 0.97 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 4684 4550 3162 1395Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 4684 4550 3162 1395Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1453 0 0 818 59 121RTOR Reduction (vph) 0 0 0 0 0 17Lane Group Flow (vph) 1453 0 0 818 59 104Confl. Peds. (#/hr) 4 13Heavy Vehicles (%) 2% 0% 0% 5% 2% 4%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 21.0 21.0 10.8 10.8Effective Green, g (s) 23.3 23.3 13.1 13.1Actuated g/C Ratio 0.52 0.52 0.30 0.30Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 2458 2387 932 411v/s Ratio Prot c0.31 0.18 0.02v/s Ratio Perm c0.07v/c Ratio 0.59 0.34 0.06 0.25Uniform Delay, d1 7.3 6.1 11.2 11.9Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.1 0.0 0.3Delay (s) 7.7 6.2 11.3 12.2Level of Service A A B BApproach Delay (s) 7.7 6.2 11.9Approach LOS A A B

Intersection SummaryHCM 2000 Control Delay 7.5 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.47Actuated Cycle Length (s) 44.4 Sum of lost time (s) 8.0Intersection Capacity Utilization 43.5% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 490: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 67 1126 256 135 1040 25 102 4 93 15 2 22Future Volume (vph) 67 1126 256 135 1040 25 102 4 93 15 2 22Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 15.0 0.0Storage Lanes 1 1 2 0 2 1 1 0Taper Length (m) 40.0 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.98 1.00 0.97 0.99Frt 0.850 0.996 0.850 0.862Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3260 1458 3162 3247 0 3162 1716 1458 1630 1479 0Flt Permitted 0.245 0.950 0.950 0.755Satd. Flow (perm) 420 3260 1434 3157 3247 0 3162 1716 1422 1278 1479 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 278 4 101 24Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 5 5 12 12Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 73 1224 278 147 1130 27 111 4 101 16 2 24Shared Lane Traffic (%)Lane Group Flow (vph) 73 1224 278 147 1157 0 111 4 101 16 26 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NA

Page 491: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 9.5 32.0 32.0 32.0 32.0Total Split (s) 36.0 36.0 36.0 12.0 48.0 9.5 42.0 42.0 32.5 32.5Total Split (%) 40.0% 40.0% 40.0% 13.3% 53.3% 10.6% 46.7% 46.7% 36.1% 36.1%Maximum Green (s) 29.7 29.7 29.7 7.5 41.7 5.0 35.7 35.7 26.2 26.2Yellow Time (s) 4.1 4.1 4.1 3.5 4.1 3.5 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 1.0 2.2 1.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -0.5 -2.3 -0.5 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 32.0 32.0 32.0 7.7 43.7 5.5 19.8 19.8 10.3 10.3Actuated g/C Ratio 0.45 0.45 0.45 0.11 0.61 0.08 0.28 0.28 0.14 0.14v/c Ratio 0.39 0.84 0.35 0.43 0.58 0.46 0.01 0.22 0.09 0.11Control Delay 21.1 24.3 3.1 34.2 9.8 38.2 19.0 6.1 28.1 13.8Queue Delay 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 21.1 24.6 3.1 34.2 9.8 38.2 19.0 6.1 28.1 13.8LOS C C A C A D B A C BApproach Delay 20.7 12.6 22.8 19.2Approach LOS C B C B

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 71.5Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.84Intersection Signal Delay: 17.4 Intersection LOS: BIntersection Capacity Utilization 63.6% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 492: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 73 1224 278 147 1157 111 4 101 16 26v/c Ratio 0.39 0.84 0.35 0.43 0.58 0.46 0.01 0.22 0.09 0.11Control Delay 21.1 24.3 3.1 34.2 9.8 38.2 19.0 6.1 28.1 13.8Queue Delay 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 21.1 24.6 3.1 34.2 9.8 38.2 19.0 6.1 28.1 13.8Queue Length 50th (m) 6.6 77.5 0.0 10.2 45.6 7.9 0.4 0.0 2.0 0.3Queue Length 95th (m) 18.7 #108.1 12.3 18.6 62.4 15.6 2.5 10.4 7.4 6.8Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 50.0 50.0 15.0Base Capacity (vph) 188 1459 795 354 2000 243 912 803 509 604Starvation Cap Reductn 0 29 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.39 0.86 0.35 0.42 0.58 0.46 0.00 0.13 0.03 0.04

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 493: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 67 1126 256 135 1040 25 102 4 93 15 2 22Future Volume (vph) 67 1126 256 135 1040 25 102 4 93 15 2 22Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 1.00 1.00 0.98 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 1.00Frt 1.00 1.00 0.85 1.00 1.00 1.00 1.00 0.85 1.00 0.86Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1630 3260 1435 3162 3248 3162 1716 1426 1613 1478Flt Permitted 0.25 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.76 1.00Satd. Flow (perm) 420 3260 1435 3162 3248 3162 1716 1426 1282 1478Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 73 1224 278 147 1130 27 111 4 101 16 2 24RTOR Reduction (vph) 0 0 154 0 2 0 0 0 73 0 21 0Lane Group Flow (vph) 73 1224 124 147 1155 0 111 4 28 16 5 0Confl. Peds. (#/hr) 5 5 12 12Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Actuated Green, G (s) 29.7 29.7 29.7 7.2 41.4 5.0 17.5 17.5 8.0 8.0Effective Green, g (s) 32.0 32.0 32.0 7.7 43.7 5.5 19.8 19.8 10.3 10.3Actuated g/C Ratio 0.45 0.45 0.45 0.11 0.61 0.08 0.28 0.28 0.14 0.14Clearance Time (s) 6.3 6.3 6.3 4.5 6.3 4.5 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 187 1459 642 340 1985 243 475 394 184 212v/s Ratio Prot c0.38 0.05 c0.36 c0.04 0.00 0.00v/s Ratio Perm 0.17 0.09 c0.02 0.01v/c Ratio 0.39 0.84 0.19 0.43 0.58 0.46 0.01 0.07 0.09 0.03Uniform Delay, d1 13.2 17.5 11.9 29.9 8.4 31.6 18.7 19.1 26.5 26.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.0 4.3 0.1 0.6 0.4 1.4 0.0 0.1 0.1 0.0Delay (s) 14.2 21.8 12.1 30.5 8.8 32.9 18.7 19.1 26.7 26.3Level of Service B C B C A C B B C CApproach Delay (s) 19.7 11.2 26.2 26.5Approach LOS B B C C

Intersection SummaryHCM 2000 Control Delay 16.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.64Actuated Cycle Length (s) 71.5 Sum of lost time (s) 16.0Intersection Capacity Utilization 63.6% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 494: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 142 584 417 67 735 64 312 165 79 56 169 152Future Volume (vph) 142 584 417 67 735 64 312 165 79 56 169 152Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 2 0 1 0 1 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 0.97 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 0.99 1.00 1.00 0.99 1.00Frt 0.938 0.988 0.951 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 2959 2801 0 1599 3033 0 1630 1582 0 1630 1699 1417Flt Permitted 0.950 0.164 0.437 0.438Satd. Flow (perm) 2936 2801 0 276 3033 0 750 1582 0 750 1699 1417Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 163 8 24 165Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 12 5 5 12 4 4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 7% 14% 4% 8% 9% 2% 4% 6% 2% 3% 5%Adj. Flow (vph) 154 635 453 73 799 70 339 179 86 61 184 165Shared Lane Traffic (%)Lane Group Flow (vph) 154 1088 0 73 869 0 339 265 0 61 184 165Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 495: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Detector Phase 7 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 9.5 30.4 9.5 30.4 9.5 37.7 9.5 37.7 37.7Total Split (s) 25.0 30.4 25.0 30.4 12.0 37.7 12.0 37.7 37.7Total Split (%) 23.8% 28.9% 23.8% 28.9% 11.4% 35.9% 11.4% 35.9% 35.9%Maximum Green (s) 21.0 24.0 22.0 24.0 9.0 31.0 9.0 31.0 31.0Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1 4.1All-Red Time (s) 1.0 2.3 0.0 2.3 0.0 2.6 0.0 2.6 2.6Lost Time Adjust (s) -4.0 -2.4 0.0 -2.4 1.0 -2.7 1.0 -2.7 0.0Total Lost Time (s) 0.0 4.0 3.0 4.0 4.0 4.0 4.0 4.0 6.7Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 13.1 29.9 34.6 26.7 27.9 19.8 23.4 17.6 14.8Actuated g/C Ratio 0.17 0.39 0.45 0.34 0.36 0.26 0.30 0.23 0.19v/c Ratio 0.31 0.92 0.30 0.83 0.94 0.63 0.21 0.48 0.41Control Delay 31.3 35.1 14.7 33.4 58.1 30.7 17.1 30.2 7.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 31.3 35.1 14.7 33.4 58.1 30.7 17.1 30.2 7.8LOS C D B C E C B C AApproach Delay 34.6 31.9 46.1 19.2Approach LOS C C D B

Intersection SummaryArea Type: OtherCycle Length: 105.1Actuated Cycle Length: 77.6Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.94Intersection Signal Delay: 34.0 Intersection LOS: CIntersection Capacity Utilization 78.2% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 496: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 154 1088 73 869 339 265 61 184 165v/c Ratio 0.31 0.92 0.30 0.83 0.94 0.63 0.21 0.48 0.41Control Delay 31.3 35.1 14.7 33.4 58.1 30.7 17.1 30.2 7.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 31.3 35.1 14.7 33.4 58.1 30.7 17.1 30.2 7.8Queue Length 50th (m) 10.6 69.8 5.1 61.5 39.3 32.5 5.8 24.5 0.0Queue Length 95th (m) 21.8 #144.7 14.6 #125.5 #92.9 61.1 13.9 44.7 14.7Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 964 1179 524 1049 361 708 339 746 671Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.16 0.92 0.14 0.83 0.94 0.37 0.18 0.25 0.25

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 497: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 142 584 417 67 735 64 312 165 79 56 169 152Future Volume (vph) 142 584 417 67 735 64 312 165 79 56 169 152Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 0.0 4.0 3.0 4.0 4.0 4.0 4.0 4.0 6.7Lane Util. Factor 0.97 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.94 1.00 0.99 1.00 0.95 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 2959 2803 1598 3034 1630 1583 1629 1699 1417Flt Permitted 0.95 1.00 0.16 1.00 0.44 1.00 0.44 1.00 1.00Satd. Flow (perm) 2959 2803 276 3034 751 1583 752 1699 1417Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 154 635 453 73 799 70 339 179 86 61 184 165RTOR Reduction (vph) 0 100 0 0 5 0 0 18 0 0 0 133Lane Group Flow (vph) 154 988 0 73 864 0 339 247 0 61 184 32Confl. Peds. (#/hr) 12 5 5 12 4 4Heavy Vehicles (%) 9% 7% 14% 4% 8% 9% 2% 4% 6% 2% 3% 5%Turn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Actuated Green, G (s) 9.0 27.5 31.3 24.4 26.2 17.1 21.6 14.8 14.8Effective Green, g (s) 13.0 29.9 31.3 26.8 24.2 19.8 19.6 17.5 14.8Actuated g/C Ratio 0.17 0.39 0.40 0.35 0.31 0.26 0.25 0.23 0.19Clearance Time (s) 4.0 6.4 3.0 6.4 3.0 6.7 3.0 6.7 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 496 1082 229 1050 326 404 256 384 270v/s Ratio Prot c0.05 c0.35 0.03 0.28 c0.11 0.16 0.02 0.11v/s Ratio Perm 0.10 c0.22 0.04 0.02v/c Ratio 0.31 0.91 0.32 0.82 1.04 0.61 0.24 0.48 0.12Uniform Delay, d1 28.3 22.5 16.0 23.1 25.5 25.4 22.5 26.0 25.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 11.4 0.6 5.1 60.6 2.1 0.4 0.5 0.1Delay (s) 28.5 33.9 16.6 28.2 86.1 27.5 22.9 26.5 26.0Level of Service C C B C F C C C CApproach Delay (s) 33.3 27.3 60.4 25.7Approach LOS C C E C

Intersection SummaryHCM 2000 Control Delay 35.7 HCM 2000 Level of Service DHCM 2000 Volume to Capacity ratio 0.88Actuated Cycle Length (s) 77.4 Sum of lost time (s) 15.0Intersection Capacity Utilization 78.2% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 498: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 141 538 40 0 442 108 240 171 11 97 156 184Future Volume (vph) 141 538 40 0 442 108 240 171 11 97 156 184Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 1 0 1 0 0 0 1 1Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 1.00 1.00 1.00 1.00Frt 0.990 0.971 0.996 0.850Flt Protected 0.950 0.972 0.950Satd. Flow (prot) 1554 3067 0 1750 2973 0 0 1666 0 1630 1667 1417Flt Permitted 0.352 0.731 0.521Satd. Flow (perm) 574 3067 0 1750 2973 0 0 1253 0 894 1667 1417Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 12 48 2 200Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 5 3 3 5 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 7% 7% 9% 0% 9% 5% 1% 2% 11% 2% 5% 5%Adj. Flow (vph) 153 585 43 0 480 117 261 186 12 105 170 200Shared Lane Traffic (%)Lane Group Flow (vph) 153 628 0 0 597 0 0 459 0 105 170 200Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 499: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm NA Perm NA Perm NA PermProtected Phases 4 8 2 6Permitted Phases 4 8 2 6 6Detector Phase 4 4 8 8 2 2 6 6 6Switch PhaseMinimum Initial (s) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 27.1 27.1 27.1 27.1 33.1 33.1 33.1 33.1 33.1Total Split (s) 47.0 47.0 47.0 47.0 40.2 40.2 40.2 40.2 40.2Total Split (%) 53.9% 53.9% 53.9% 53.9% 46.1% 46.1% 46.1% 46.1% 46.1%Maximum Green (s) 40.9 40.9 40.9 40.9 34.1 34.1 34.1 34.1 34.1Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 13.0 17.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 25.5 25.5 25.5 32.1 32.1 32.1 29.9Actuated g/C Ratio 0.39 0.39 0.39 0.49 0.49 0.49 0.45v/c Ratio 0.69 0.53 0.51 0.75 0.24 0.21 0.27Control Delay 35.3 16.9 15.6 26.5 14.7 13.0 3.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 35.3 16.9 15.6 26.5 14.7 13.0 3.7LOS D B B C B B AApproach Delay 20.5 15.6 26.5 9.5Approach LOS C B C A

Intersection SummaryArea Type: OtherCycle Length: 87.2Actuated Cycle Length: 66.1Natural Cycle: 65Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.75Intersection Signal Delay: 18.2 Intersection LOS: BIntersection Capacity Utilization 72.8% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 500: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBL EBT WBT NBT SBL SBT SBRLane Group Flow (vph) 153 628 597 459 105 170 200v/c Ratio 0.69 0.53 0.51 0.75 0.24 0.21 0.27Control Delay 35.3 16.9 15.6 26.5 14.7 13.0 3.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 35.3 16.9 15.6 26.5 14.7 13.0 3.7Queue Length 50th (m) 17.7 34.5 30.3 43.2 7.1 11.3 0.0Queue Length 95th (m) 39.2 47.8 43.0 #132.5 24.5 33.2 13.0Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 50.0 25.0Base Capacity (vph) 396 2120 2066 728 519 968 865Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.39 0.30 0.29 0.63 0.20 0.18 0.23

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 501: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 141 538 40 0 442 108 240 171 11 97 156 184Future Volume (vph) 141 538 40 0 442 108 240 171 11 97 156 184Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.99 0.97 1.00 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.97 0.95 1.00 1.00Satd. Flow (prot) 1551 3066 2973 1667 1629 1667 1417Flt Permitted 0.35 1.00 1.00 0.73 0.52 1.00 1.00Satd. Flow (perm) 574 3066 2973 1254 894 1667 1417Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 153 585 43 0 480 117 261 186 12 105 170 200RTOR Reduction (vph) 0 7 0 0 29 0 0 1 0 0 0 109Lane Group Flow (vph) 153 621 0 0 568 0 0 458 0 105 170 91Confl. Peds. (#/hr) 5 3 3 5 1 1Heavy Vehicles (%) 7% 7% 9% 0% 9% 5% 1% 2% 11% 2% 5% 5%Turn Type Perm NA Perm NA Perm NA Perm NA PermProtected Phases 4 8 2 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 23.3 23.3 23.3 29.9 29.9 29.9 29.9Effective Green, g (s) 25.4 25.4 25.4 32.0 32.0 32.0 29.9Actuated g/C Ratio 0.39 0.39 0.39 0.49 0.49 0.49 0.46Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 222 1190 1154 613 437 815 647v/s Ratio Prot 0.20 0.19 0.10v/s Ratio Perm c0.27 c0.37 0.12 0.06v/c Ratio 0.69 0.52 0.49 0.75 0.24 0.21 0.14Uniform Delay, d1 16.7 15.3 15.1 13.4 9.7 9.5 10.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 8.6 0.4 0.3 5.0 0.3 0.1 0.1Delay (s) 25.3 15.8 15.5 18.4 10.0 9.6 10.4Level of Service C B B B A A BApproach Delay (s) 17.6 15.5 18.4 10.0Approach LOS B B B B

Intersection SummaryHCM 2000 Control Delay 15.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.72Actuated Cycle Length (s) 65.4 Sum of lost time (s) 8.0Intersection Capacity Utilization 72.8% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 502: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 54 399 193 93 316 75 183 148 92 64 141 50Future Volume (vph) 54 399 193 93 316 75 183 148 92 64 141 50Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95Frt 0.951 0.971 0.943 0.961Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3100 0 1630 3165 0 1630 3074 0 1630 3133 0Flt Permitted 0.462 0.294 0.598 0.591Satd. Flow (perm) 793 3100 0 504 3165 0 1026 3074 0 1014 3133 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 118 42 100 54Link Speed (k/h) 50 50 50 50Link Distance (m) 136.7 152.3 137.9 105.9Travel Time (s) 9.8 11.0 9.9 7.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 59 434 210 101 343 82 199 161 100 70 153 54Shared Lane Traffic (%)Lane Group Flow (vph) 59 644 0 101 425 0 199 261 0 70 207 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6

Page 503: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 7 4 3 8 5 2 1 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 9.5 24.3 9.5 24.3 9.5 24.3 9.5 24.3Total Split (s) 9.5 24.3 9.5 24.3 9.5 26.7 9.5 26.7Total Split (%) 13.6% 34.7% 13.6% 34.7% 13.6% 38.1% 13.6% 38.1%Maximum Green (s) 6.5 18.0 6.5 18.0 6.5 20.4 6.5 20.4Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1All-Red Time (s) 0.0 2.2 0.0 2.2 0.0 2.2 0.0 2.2Lost Time Adjust (s) 1.0 -2.3 1.0 -2.3 1.0 -2.3 1.0 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 21.9 16.7 22.2 16.8 16.6 11.0 16.0 10.7Actuated g/C Ratio 0.40 0.31 0.41 0.31 0.30 0.20 0.29 0.20v/c Ratio 0.15 0.62 0.32 0.42 0.53 0.37 0.20 0.31Control Delay 9.0 16.2 11.2 15.0 19.9 13.9 13.7 15.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.0 16.2 11.2 15.0 19.9 13.9 13.7 15.8LOS A B B B B B B BApproach Delay 15.6 14.3 16.5 15.2Approach LOS B B B B

Intersection SummaryArea Type: OtherCycle Length: 70Actuated Cycle Length: 54.5Natural Cycle: 70Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.62Intersection Signal Delay: 15.4 Intersection LOS: BIntersection Capacity Utilization 54.6% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 108: Stanley Avenue & Marine Land Pkway (RR 49)

Page 504: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT WBL WBT NBL NBT SBL SBTLane Group Flow (vph) 59 644 101 425 199 261 70 207v/c Ratio 0.15 0.62 0.32 0.42 0.53 0.37 0.20 0.31Control Delay 9.0 16.2 11.2 15.0 19.9 13.9 13.7 15.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.0 16.2 11.2 15.0 19.9 13.9 13.7 15.8Queue Length 50th (m) 3.0 23.6 5.3 16.1 14.3 7.5 4.6 7.1Queue Length 95th (m) 8.6 41.3 13.2 28.7 30.3 17.2 12.4 15.7Internal Link Dist (m) 112.7 128.3 113.9 81.9Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 409 1240 322 1218 373 1352 365 1350Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.14 0.52 0.31 0.35 0.53 0.19 0.19 0.15

Intersection Summary

Page 505: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 54 399 193 93 316 75 183 148 92 64 141 50Future Volume (vph) 54 399 193 93 316 75 183 148 92 64 141 50Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.95 1.00 0.95Frt 1.00 0.95 1.00 0.97 1.00 0.94 1.00 0.96Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1630 3100 1630 3165 1630 3072 1630 3132Flt Permitted 0.46 1.00 0.29 1.00 0.60 1.00 0.59 1.00Satd. Flow (perm) 792 3100 505 3165 1026 3072 1013 3132Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 59 434 210 101 343 82 199 161 100 70 153 54RTOR Reduction (vph) 0 82 0 0 29 0 0 80 0 0 43 0Lane Group Flow (vph) 59 562 0 101 396 0 199 181 0 70 164 0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Actuated Green, G (s) 20.6 14.4 21.0 14.6 15.3 8.7 14.7 8.4Effective Green, g (s) 18.6 16.7 19.0 16.9 13.3 11.0 12.7 10.7Actuated g/C Ratio 0.34 0.31 0.35 0.31 0.24 0.20 0.23 0.20Clearance Time (s) 3.0 6.3 3.0 6.3 3.0 6.3 3.0 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 350 951 288 983 313 621 296 616v/s Ratio Prot 0.02 c0.18 c0.03 0.13 c0.07 0.06 0.02 0.05v/s Ratio Perm 0.04 0.09 c0.09 0.03v/c Ratio 0.17 0.59 0.35 0.40 0.64 0.29 0.24 0.27Uniform Delay, d1 12.2 16.0 12.5 14.8 17.7 18.4 16.7 18.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 1.0 0.7 0.3 4.2 0.3 0.4 0.2Delay (s) 12.5 17.0 13.3 15.0 21.9 18.7 17.1 18.8Level of Service B B B B C B B BApproach Delay (s) 16.6 14.7 20.1 18.3Approach LOS B B C B

Intersection SummaryHCM 2000 Control Delay 17.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.53Actuated Cycle Length (s) 54.4 Sum of lost time (s) 16.0Intersection Capacity Utilization 54.6% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 506: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 157 4 209 0 0 94Future Volume (vph) 157 4 209 0 0 94Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.997Flt Protected 0.953Satd. Flow (prot) 3162 0 3260 0 0 3260Flt Permitted 0.953Satd. Flow (perm) 3162 0 3260 0 0 3260Right Turn on Red Yes YesSatd. Flow (RTOR) 4Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 171 4 227 0 0 102Shared Lane Traffic (%)Lane Group Flow (vph) 175 0 227 0 0 102Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch PhaseMinimum Initial (s) 8.0 8.0 8.0

Page 507: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group WBL WBR NBT NBR SBL SBTMinimum Split (s) 24.2 22.5 22.5Total Split (s) 28.2 22.5 22.5Total Split (%) 55.6% 44.4% 44.4%Maximum Green (s) 23.0 17.0 17.0Yellow Time (s) 3.2 3.5 3.5All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -1.2 -1.5 -1.5Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 9.2 9.5 9.5Actuated g/C Ratio 0.34 0.36 0.36v/c Ratio 0.16 0.20 0.09Control Delay 6.4 6.5 6.0Queue Delay 0.0 0.0 0.0Total Delay 6.4 6.5 6.0LOS A A AApproach Delay 6.4 6.5 6.0Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50.7Actuated Cycle Length: 26.7Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.20Intersection Signal Delay: 6.3 Intersection LOS: AIntersection Capacity Utilization 20.0% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 508: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group WBL NBT SBTLane Group Flow (vph) 175 227 102v/c Ratio 0.16 0.20 0.09Control Delay 6.4 6.5 6.0Queue Delay 0.0 0.0 0.0Total Delay 6.4 6.5 6.0Queue Length 50th (m) 2.4 3.2 1.3Queue Length 95th (m) 5.0 6.2 3.3Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2866 2258 2258Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.06 0.10 0.05

Intersection Summary

Page 509: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 32

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 157 4 209 0 0 94Future Volume (vph) 157 4 209 0 0 94Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 1.00 1.00 1.00Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 3163 3260 3260Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 3163 3260 3260Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 171 4 227 0 0 102RTOR Reduction (vph) 3 0 0 0 0 0Lane Group Flow (vph) 172 0 227 0 0 102Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.0 8.0 8.0Effective Green, g (s) 9.2 9.5 9.5Actuated g/C Ratio 0.34 0.36 0.36Clearance Time (s) 5.2 5.5 5.5Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1089 1159 1159v/s Ratio Prot c0.05 c0.07v/s Ratio Perm 0.03v/c Ratio 0.16 0.20 0.09Uniform Delay, d1 6.1 6.0 5.7Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.0 0.0 0.0Delay (s) 6.1 6.0 5.7Level of Service A A AApproach Delay (s) 6.1 6.0 5.7Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.0 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.19Actuated Cycle Length (s) 26.7 Sum of lost time (s) 9.5Intersection Capacity Utilization 20.0% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 510: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 90 0 0 109 266 127Future Volume (vph) 90 0 0 109 266 127Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Ped Bike Factor 0.99Frt 0.952Flt Protected 0.950Satd. Flow (prot) 1614 0 0 2969 2992 0Flt Permitted 0.950Satd. Flow (perm) 1614 0 0 2969 2992 0Right Turn on Red Yes YesSatd. Flow (RTOR) 138Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 12% 7% 1%Adj. Flow (vph) 98 0 0 118 289 138Shared Lane Traffic (%)Lane Group Flow (vph) 98 0 0 118 427 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2

Page 511: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group EBL EBR NBL NBT SBT SBRDetector Phase 4 2 2 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 31.3 42.0 42.0 42.0Total Split (%) 42.7% 57.3% 57.3% 57.3%Maximum Green (s) 25.0 35.0 35.0 35.0Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.9 2.9 2.9Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 10.4 13.0 13.0Actuated g/C Ratio 0.33 0.41 0.41v/c Ratio 0.18 0.10 0.32Control Delay 8.5 5.9 4.9Queue Delay 0.0 0.0 0.0Total Delay 8.5 5.9 4.9LOS A A AApproach Delay 8.5 5.9 4.9Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 73.3Actuated Cycle Length: 31.4Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.32Intersection Signal Delay: 5.6 Intersection LOS: AIntersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 512: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group EBL NBT SBTLane Group Flow (vph) 98 118 427v/c Ratio 0.18 0.10 0.32Control Delay 8.5 5.9 4.9Queue Delay 0.0 0.0 0.0Total Delay 8.5 5.9 4.9Queue Length 50th (m) 3.5 1.7 4.6Queue Length 95th (m) 8.9 4.2 9.7Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1568 2969 2992Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.06 0.04 0.14

Intersection Summary

Page 513: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 36

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 90 0 0 109 266 127Future Volume (vph) 90 0 0 109 266 127Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95Frpb, ped/bikes 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 1.00 0.95Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1614 2969 2991Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 1614 2969 2991Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 98 0 0 118 289 138RTOR Reduction (vph) 0 0 0 0 81 0Lane Group Flow (vph) 98 0 0 118 346 0Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 3% 0% 0% 12% 7% 1%Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 8.1 10.0 10.0Effective Green, g (s) 10.4 13.0 13.0Actuated g/C Ratio 0.33 0.41 0.41Clearance Time (s) 6.3 7.0 7.0Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 534 1229 1238v/s Ratio Prot c0.06 0.04 c0.12v/s Ratio Permv/c Ratio 0.18 0.10 0.28Uniform Delay, d1 7.5 5.6 6.1Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.1Delay (s) 7.6 5.6 6.2Level of Service A A AApproach Delay (s) 7.6 5.6 6.2Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.3 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.24Actuated Cycle Length (s) 31.4 Sum of lost time (s) 8.0Intersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 514: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Future Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1667 0 1750 1716 1488 0 1750 0 2041 1488 0Flt Permitted 0.466 0.950Satd. Flow (perm) 816 1667 0 1750 1716 1488 0 1750 0 2041 1488 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 126 884Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 5% 0% 0% 2% 0% 0% 0% 0% 58% 0% 0%Adj. Flow (vph) 25 105 0 0 132 23 0 0 0 13 0 2Shared Lane Traffic (%)Lane Group Flow (vph) 25 105 0 0 132 23 0 0 0 13 2 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 515: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 12.5 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 18.0 52.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (%) 13.9% 40.5% 26.6% 26.6% 26.6% 29.7% 29.7% 29.7% 29.7%Maximum Green (s) 15.0 45.0 27.0 27.0 27.0 31.0 31.0 31.0 31.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.5 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.53 0.53 0.29 0.29 0.29 0.29v/c Ratio 0.04 0.12 0.26 0.04 0.02 0.00Control Delay 5.3 5.8 14.2 0.1 11.8 0.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.3 5.8 14.2 0.1 11.8 0.0LOS A A B A B AApproach Delay 5.7 12.1 10.2Approach LOS A B B

Intersection SummaryArea Type: OtherCycle Length: 129.5Actuated Cycle Length: 46Natural Cycle: 125Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.26Intersection Signal Delay: 9.3 Intersection LOS: AIntersection Capacity Utilization 35.0% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 516: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 25 105 132 23 13 2v/c Ratio 0.04 0.12 0.26 0.04 0.02 0.00Control Delay 5.3 5.8 14.2 0.1 11.8 0.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.3 5.8 14.2 0.1 11.8 0.0Queue Length 50th (m) 0.9 3.9 8.4 0.0 0.4 0.0Queue Length 95th (m) 3.2 9.2 18.8 0.0 1.8 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 692 1667 1137 1029 1530 1337Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.04 0.06 0.12 0.02 0.01 0.00

Intersection Summary

Page 517: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Future Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1667 1716 1488 2041 1488Flt Permitted 0.47 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 815 1667 1716 1488 2041 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 25 105 0 0 132 23 0 0 0 13 0 2RTOR Reduction (vph) 0 0 0 0 0 16 0 0 0 0 1 0Lane Group Flow (vph) 25 105 0 0 132 7 0 0 0 13 1 0Heavy Vehicles (%) 0% 5% 0% 0% 2% 0% 0% 0% 0% 58% 0% 0%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 21.0 21.0 10.0 10.0 10.0 10.0Effective Green, g (s) 20.0 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.43 0.53 0.29 0.29 0.29 0.29Clearance Time (s) 3.0 7.5 7.5 7.5 7.5 7.5Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 483 887 503 436 598 436v/s Ratio Prot 0.01 c0.06 c0.08 c0.01 0.00v/s Ratio Perm 0.01 0.00v/c Ratio 0.05 0.12 0.26 0.02 0.02 0.00Uniform Delay, d1 7.6 5.4 12.4 11.5 11.6 11.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.0 0.0 0.1 0.0 0.0 0.0Delay (s) 7.7 5.4 12.6 11.5 11.6 11.5Level of Service A A B B B BApproach Delay (s) 5.8 12.4 0.0 11.6Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 9.5 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.16Actuated Cycle Length (s) 46.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 35.0% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 518: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 15 89 1 276 82 98 2 157 459 103 159 23Future Volume (vph) 15 89 1 276 82 98 2 157 459 103 159 23Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 0.0 0.0 100.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.999 0.918 0.850 0.981Flt Protected 0.993 0.950 0.999 0.950Satd. Flow (prot) 0 1634 0 1525 1476 0 0 1682 1430 1433 1429 0Flt Permitted 0.954 0.684 0.997 0.648Satd. Flow (perm) 0 1570 0 1098 1476 0 0 1678 1430 978 1429 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 1 98 499 12Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 8% 6% 0% 9% 5% 12% 0% 4% 4% 16% 23% 0%Adj. Flow (vph) 16 97 1 300 89 107 2 171 499 112 173 25Shared Lane Traffic (%)Lane Group Flow (vph) 0 114 0 300 196 0 0 173 499 112 198 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 519: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0Total Split (%) 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0%Maximum Green (s) 33.7 33.7 33.7 33.7 33.7 33.7 33.7 33.7 33.7Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 0.0 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 6.3 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 24.6 24.6 24.6 20.0 17.5 20.0 20.0Actuated g/C Ratio 0.46 0.46 0.46 0.38 0.33 0.38 0.38v/c Ratio 0.16 0.59 0.27 0.28 0.62 0.31 0.36Control Delay 9.9 17.2 6.3 14.3 5.6 16.0 14.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.9 17.2 6.3 14.3 5.6 16.0 14.8LOS A B A B A B BApproach Delay 9.9 12.9 7.8 15.2Approach LOS A B A B

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 53.2Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.62Intersection Signal Delay: 11.0 Intersection LOS: BIntersection Capacity Utilization 61.7% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 520: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 114 300 196 173 499 112 198v/c Ratio 0.16 0.59 0.27 0.28 0.62 0.31 0.36Control Delay 9.9 17.2 6.3 14.3 5.6 16.0 14.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.9 17.2 6.3 14.3 5.6 16.0 14.8Queue Length 50th (m) 5.6 19.0 4.8 11.2 0.0 7.4 12.5Queue Length 95th (m) 18.1 56.1 19.4 29.8 18.4 22.5 33.6Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 50.0 100.0 50.0Base Capacity (vph) 1131 791 1090 1209 1131 704 1033Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.10 0.38 0.18 0.14 0.44 0.16 0.19

Intersection Summary

Page 521: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 15 89 1 276 82 98 2 157 459 103 159 23Future Volume (vph) 15 89 1 276 82 98 2 157 459 103 159 23Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 6.3 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.92 1.00 0.85 1.00 0.98Flt Protected 0.99 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1634 1525 1476 1682 1430 1433 1430Flt Permitted 0.95 0.68 1.00 1.00 1.00 0.65 1.00Satd. Flow (perm) 1570 1098 1476 1678 1430 977 1430Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 16 97 1 300 89 107 2 171 499 112 173 25RTOR Reduction (vph) 0 1 0 0 52 0 0 0 332 0 7 0Lane Group Flow (vph) 0 113 0 300 144 0 0 173 167 112 191 0Heavy Vehicles (%) 8% 6% 0% 9% 5% 12% 0% 4% 4% 16% 23% 0%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 22.2 22.2 22.2 17.5 17.5 17.5 17.5Effective Green, g (s) 24.5 24.5 24.5 19.8 17.5 19.8 19.8Actuated g/C Ratio 0.47 0.47 0.47 0.38 0.33 0.38 0.38Clearance Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 735 514 691 635 478 369 541v/s Ratio Prot 0.10 c0.13v/s Ratio Perm 0.07 c0.27 0.10 0.12 0.11v/c Ratio 0.15 0.58 0.21 0.27 0.35 0.30 0.35Uniform Delay, d1 8.0 10.2 8.2 11.3 13.1 11.4 11.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 3.2 0.4 0.7 1.2 1.3 1.1Delay (s) 8.2 13.4 8.6 11.9 14.4 12.7 12.8Level of Service A B A B B B BApproach Delay (s) 8.2 11.5 13.7 12.8Approach LOS A B B B

Intersection SummaryHCM 2000 Control Delay 12.5 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.48Actuated Cycle Length (s) 52.3 Sum of lost time (s) 8.0Intersection Capacity Utilization 61.7% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 522: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 65 19 25 359 380 48Future Volume (vph) 65 19 25 359 380 48Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.969 0.985Flt Protected 0.963 0.997Satd. Flow (prot) 1454 0 0 1596 1603 0Flt Permitted 0.963 0.997Satd. Flow (perm) 1454 0 0 1596 1603 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 16% 0% 0% 10% 8% 4%Adj. Flow (vph) 71 21 27 390 413 52Shared Lane Traffic (%)Lane Group Flow (vph) 92 0 0 417 465 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 54.7% ICU Level of Service AAnalysis Period (min) 15

Page 523: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 46

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 65 19 25 359 380 48Future Volume (Veh/h) 65 19 25 359 380 48Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 71 21 27 390 413 52PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 883 439 465vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 883 439 465tC, single (s) 6.6 6.2 4.1tC, 2 stage (s)tF (s) 3.6 3.3 2.2p0 queue free % 76 97 98cM capacity (veh/h) 292 622 1107

Direction, Lane # EB 1 NB 1 SB 1Volume Total 92 417 465Volume Left 71 27 0Volume Right 21 0 52cSH 332 1107 1700Volume to Capacity 0.28 0.02 0.27Queue Length 95th (m) 8.9 0.6 0.0Control Delay (s) 20.0 0.8 0.0Lane LOS C AApproach Delay (s) 20.0 0.8 0.0Approach LOS C

Intersection SummaryAverage Delay 2.2Intersection Capacity Utilization 54.7% ICU Level of Service AAnalysis Period (min) 15

Page 524: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 16 12 41 368 322 77Future Volume (vph) 16 12 41 368 322 77Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.941 0.974Flt Protected 0.972 0.995Satd. Flow (prot) 1239 0 0 1603 1599 0Flt Permitted 0.972 0.995Satd. Flow (perm) 1239 0 0 1603 1599 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 21% 40% 14% 8% 7% 5%Adj. Flow (vph) 17 13 45 400 350 84Shared Lane Traffic (%)Lane Group Flow (vph) 30 0 0 445 434 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 60.3% ICU Level of Service BAnalysis Period (min) 15

Page 525: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 12 41 368 322 77Future Volume (Veh/h) 16 12 41 368 322 77Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 13 45 400 350 84PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 882 392 434vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 882 392 434tC, single (s) 6.6 6.6 4.2tC, 2 stage (s)tF (s) 3.7 3.7 2.3p0 queue free % 94 98 96cM capacity (veh/h) 281 581 1065

Direction, Lane # EB 1 NB 1 SB 1Volume Total 30 445 434Volume Left 17 45 0Volume Right 13 0 84cSH 362 1065 1700Volume to Capacity 0.08 0.04 0.26Queue Length 95th (m) 2.2 1.1 0.0Control Delay (s) 15.8 1.3 0.0Lane LOS C AApproach Delay (s) 15.8 1.3 0.0Approach LOS C

Intersection SummaryAverage Delay 1.2Intersection Capacity Utilization 60.3% ICU Level of Service BAnalysis Period (min) 15

Page 526: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 20 41 91 389 289 45Future Volume (vph) 20 41 91 389 289 45Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.909 0.982Flt Protected 0.984 0.991Satd. Flow (prot) 1086 0 0 1642 1521 0Flt Permitted 0.984 0.991Satd. Flow (perm) 1086 0 0 1642 1521 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 298.3 331.4Travel Time (s) 14.9 21.5 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 28% 52% 4% 6% 15% 0%Adj. Flow (vph) 22 45 99 423 314 49Shared Lane Traffic (%)Lane Group Flow (vph) 67 0 0 522 363 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 61.1% ICU Level of Service BAnalysis Period (min) 15

Page 527: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 20 41 91 389 289 45Future Volume (Veh/h) 20 41 91 389 289 45Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 22 45 99 423 314 49PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 960 338 363vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 960 338 363tC, single (s) 6.7 6.7 4.1tC, 2 stage (s)tF (s) 3.8 3.8 2.2p0 queue free % 91 93 92cM capacity (veh/h) 234 603 1185

Direction, Lane # EB 1 NB 1 SB 1Volume Total 67 522 363Volume Left 22 99 0Volume Right 45 0 49cSH 398 1185 1700Volume to Capacity 0.17 0.08 0.21Queue Length 95th (m) 4.8 2.2 0.0Control Delay (s) 15.9 2.3 0.0Lane LOS C AApproach Delay (s) 15.9 2.3 0.0Approach LOS C

Intersection SummaryAverage Delay 2.4Intersection Capacity Utilization 61.1% ICU Level of Service BAnalysis Period (min) 15

Page 528: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 169 11 300 8 20 28 373 283 15 10 114 205Future Volume (vph) 169 11 300 8 20 28 373 283 15 10 114 205Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.916 0.934 0.997 0.916Flt Protected 0.983 0.993 0.973 0.998Satd. Flow (prot) 0 1140 0 0 1623 0 0 1643 0 0 1467 0Flt Permitted 0.983 0.993 0.973 0.998Satd. Flow (perm) 0 1140 0 0 1623 0 0 1643 0 0 1467 0Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 29.6Travel Time (s) 8.5 7.8 70.5 2.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 20% 0% 50% 0% 0% 0% 0% 7% 18% 13% 25% 0%Adj. Flow (vph) 184 12 326 9 22 30 405 308 16 11 124 223Shared Lane Traffic (%)Lane Group Flow (vph) 0 522 0 0 61 0 0 729 0 0 358 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 107.8% ICU Level of Service GAnalysis Period (min) 15

Page 529: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 52

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 169 11 300 8 20 28 373 283 15 10 114 205Future Volume (Veh/h) 169 11 300 8 20 28 373 283 15 10 114 205Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 184 12 326 9 22 30 405 308 16 11 124 223PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1424 1392 236 1716 1495 316 347 324vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1424 1392 236 1716 1495 316 347 324tC, single (s) 7.3 6.5 6.7 7.1 6.5 6.2 4.1 4.2tC, 2 stage (s)tF (s) 3.7 4.0 3.8 3.5 4.0 3.3 2.2 2.3p0 queue free % 0 87 53 65 73 96 67 99cM capacity (veh/h) 59 95 698 26 82 729 1223 1176

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 522 61 729 358Volume Left 184 9 405 11Volume Right 326 30 16 223cSH 140 93 1223 1176Volume to Capacity 3.72 0.66 0.33 0.01Queue Length 95th (m) Err 25.6 11.7 0.2Control Delay (s) Err 99.2 6.9 0.3Lane LOS F F A AApproach Delay (s) Err 99.2 6.9 0.3Approach LOS F F

Intersection SummaryAverage Delay 3132.2Intersection Capacity Utilization 107.8% ICU Level of Service GAnalysis Period (min) 15

Page 530: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 89 32 60 120 161 90Future Volume (vph) 89 32 60 120 161 90Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.964 0.850Flt Protected 0.965 0.950Satd. Flow (prot) 1375 0 1299 1683 1683 1162Flt Permitted 0.965 0.950Satd. Flow (perm) 1375 0 1299 1683 1683 1162Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 25% 0% 28% 4% 4% 28%Adj. Flow (vph) 97 35 65 130 175 98Shared Lane Traffic (%)Lane Group Flow (vph) 132 0 65 130 175 98Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 30.3% ICU Level of Service AAnalysis Period (min) 15

Page 531: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 89 32 60 120 161 90Future Volume (Veh/h) 89 32 60 120 161 90Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 97 35 65 130 175 98PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 435 175 273vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 435 175 273tC, single (s) 6.6 6.2 4.4tC, 2 stage (s)tF (s) 3.7 3.3 2.5p0 queue free % 81 96 94cM capacity (veh/h) 507 874 1154

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 132 65 130 175 98Volume Left 97 65 0 0 0Volume Right 35 0 0 0 98cSH 571 1154 1700 1700 1700Volume to Capacity 0.23 0.06 0.08 0.10 0.06Queue Length 95th (m) 7.1 1.4 0.0 0.0 0.0Control Delay (s) 13.2 8.3 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 13.2 2.8 0.0Approach LOS B

Intersection SummaryAverage Delay 3.8Intersection Capacity Utilization 30.3% ICU Level of Service AAnalysis Period (min) 15

Page 532: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 117 6 174 97 23 169Future Volume (vph) 117 6 174 97 23 169Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.993 0.952Flt Protected 0.955 0.994Satd. Flow (prot) 1660 0 1594 0 0 1675Flt Permitted 0.955 0.994Satd. Flow (perm) 1660 0 1594 0 0 1675Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 7% 0% 10% 3%Adj. Flow (vph) 127 7 189 105 25 184Shared Lane Traffic (%)Lane Group Flow (vph) 134 0 294 0 0 209Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 44.8% ICU Level of Service AAnalysis Period (min) 15

Page 533: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 56

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 117 6 174 97 23 169Future Volume (Veh/h) 117 6 174 97 23 169Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 127 7 189 105 25 184PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 476 242 294vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 476 242 294tC, single (s) 6.4 6.2 4.2tC, 2 stage (s)tF (s) 3.5 3.3 2.3p0 queue free % 76 99 98cM capacity (veh/h) 540 802 1223

Direction, Lane # WB 1 NB 1 SB 1Volume Total 134 294 209Volume Left 127 0 25Volume Right 7 105 0cSH 550 1700 1223Volume to Capacity 0.24 0.17 0.02Queue Length 95th (m) 7.6 0.0 0.5Control Delay (s) 13.6 0.0 1.1Lane LOS B AApproach Delay (s) 13.6 0.0 1.1Approach LOS B

Intersection SummaryAverage Delay 3.2Intersection Capacity Utilization 44.8% ICU Level of Service AAnalysis Period (min) 15

Page 534: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 478 343 0 268 113Future Volume (vph) 0 478 343 0 268 113Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3079 3079 0 1646 1488Flt Permitted 0.950Satd. Flow (perm) 0 3079 3079 0 1646 1488Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 8% 8% 0% 1% 0%Adj. Flow (vph) 0 520 373 0 291 123Shared Lane Traffic (%)Lane Group Flow (vph) 0 520 373 0 291 123Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 37.1% ICU Level of Service AAnalysis Period (min) 15

Page 535: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 58

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 0 478 343 0 268 113Future Volume (Veh/h) 0 478 343 0 268 113Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 520 373 0 291 123PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 5Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 373 633 186vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 373 633 186tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 30 85cM capacity (veh/h) 1197 414 830

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1Volume Total 260 260 186 186 414Volume Left 0 0 0 0 291Volume Right 0 0 0 0 123cSH 1700 1700 1700 1700 589Volume to Capacity 0.15 0.15 0.11 0.11 0.70Queue Length 95th (m) 0.0 0.0 0.0 0.0 45.1Control Delay (s) 0.0 0.0 0.0 0.0 25.3Lane LOS DApproach Delay (s) 0.0 0.0 25.3Approach LOS D

Intersection SummaryAverage Delay 8.0Intersection Capacity Utilization 37.1% ICU Level of Service AAnalysis Period (min) 15

Page 536: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 59

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 735 0 0 522 142 298Future Volume (vph) 735 0 0 522 142 298Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3023 0 0 3228 1471 1352Flt Permitted 0.950Satd. Flow (perm) 3023 0 0 3228 1471 1352Link Speed (k/h) 50 50 50Link Distance (m) 104.2 91.9 169.0Travel Time (s) 7.5 6.6 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 0% 0% 3% 13% 10%Adj. Flow (vph) 799 0 0 567 154 324Shared Lane Traffic (%)Lane Group Flow (vph) 799 0 0 567 154 324Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 48.8% ICU Level of Service AAnalysis Period (min) 15

Page 537: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 60

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (veh/h) 735 0 0 522 142 298Future Volume (Veh/h) 735 0 0 522 142 298Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 799 0 0 567 154 324PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 6Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 799 1082 400vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 799 1082 400tC, single (s) 4.1 7.1 7.1tC, 2 stage (s)tF (s) 2.2 3.6 3.4p0 queue free % 100 21 44cM capacity (veh/h) 833 195 578

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1Volume Total 400 400 284 284 478Volume Left 0 0 0 0 154Volume Right 0 0 0 0 324cSH 1700 1700 1700 1700 605Volume to Capacity 0.23 0.23 0.17 0.17 0.79Queue Length 95th (m) 0.0 0.0 0.0 0.0 60.9Control Delay (s) 0.0 0.0 0.0 0.0 35.3Lane LOS EApproach Delay (s) 0.0 0.0 35.3Approach LOS E

Intersection SummaryAverage Delay 9.2Intersection Capacity Utilization 48.8% ICU Level of Service AAnalysis Period (min) 15

Page 538: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 61

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 475 109 190 182 199 224Future Volume (vph) 475 109 190 182 199 224Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.934 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1525 1667 1565 0 1498 1162Flt Permitted 0.950 0.950Satd. Flow (perm) 1525 1667 1565 0 1498 1162Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 5% 2% 7% 11% 28%Adj. Flow (vph) 516 118 207 198 216 243Shared Lane Traffic (%)Lane Group Flow (vph) 516 118 405 0 216 243Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 73.5% ICU Level of Service DAnalysis Period (min) 15

Page 539: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 62

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 475 109 190 182 199 224Future Volume (vph) 475 109 190 182 199 224Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 516 118 207 198 216 243

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total (vph) 516 118 405 216 243Volume Left (vph) 516 0 0 216 0Volume Right (vph) 0 0 198 0 243Hadj (s) 0.65 0.09 -0.22 0.69 -0.22Departure Headway (s) 7.5 6.9 6.5 8.0 7.1Degree Utilization, x 1.07 0.23 0.73 0.48 0.48Capacity (veh/h) 476 513 540 432 497Control Delay (s) 86.7 10.7 25.4 17.0 15.3Approach Delay (s) 72.5 25.4 16.1Approach LOS F D C

Intersection SummaryDelay 42.5Level of Service EIntersection Capacity Utilization 73.5% ICU Level of Service DAnalysis Period (min) 15

Page 540: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 63

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 49 506 444 62 16 43Future Volume (vph) 49 506 444 62 16 43Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 50.0 50.0 0.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1458 3228 3228 1488 1583 1305Flt Permitted 0.950 0.950Satd. Flow (perm) 1458 3228 3228 1488 1583 1305Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 14% 3% 3% 0% 5% 14%Adj. Flow (vph) 53 550 483 67 17 47Shared Lane Traffic (%)Lane Group Flow (vph) 53 550 483 67 17 47Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 30.0% ICU Level of Service AAnalysis Period (min) 15

Page 541: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road No Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 64

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 49 506 444 62 16 43Future Volume (Veh/h) 49 506 444 62 16 43Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 53 550 483 67 17 47PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 483 864 242vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 483 864 242tC, single (s) 4.4 6.9 7.2tC, 2 stage (s)tF (s) 2.3 3.5 3.4p0 queue free % 95 94 94cM capacity (veh/h) 996 272 724

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 SB 1 SB 2Volume Total 53 275 275 242 242 67 17 47Volume Left 53 0 0 0 0 0 17 0Volume Right 0 0 0 0 0 67 0 47cSH 996 1700 1700 1700 1700 1700 272 724Volume to Capacity 0.05 0.16 0.16 0.14 0.14 0.04 0.06 0.06Queue Length 95th (m) 1.3 0.0 0.0 0.0 0.0 0.0 1.6 1.7Control Delay (s) 8.8 0.0 0.0 0.0 0.0 0.0 19.1 10.3Lane LOS A C BApproach Delay (s) 0.8 0.0 12.6Approach LOS B

Intersection SummaryAverage Delay 1.0Intersection Capacity Utilization 30.0% ICU Level of Service AAnalysis Period (min) 15

Page 542: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 90 862 28 104 984 436 32 102 277 396 115 90Future Volume (vph) 90 862 28 104 984 436 32 102 277 396 115 90Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 1 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95Ped Bike Factor 1.00 0.98 1.00 0.98 0.99 1.00Frt 0.850 0.850 0.850 0.934Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1539 3228 1488 1568 3228 1473 1662 1651 1430 1646 3000 0Flt Permitted 0.247 0.115 0.612 0.685Satd. Flow (perm) 400 3228 1462 190 3228 1447 1071 1651 1411 1185 3000 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 112 474 212 73Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 7 6 6 7 2 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 8% 3% 0% 6% 3% 1% 0% 6% 4% 1% 0% 8%Adj. Flow (vph) 98 937 30 113 1070 474 35 111 301 430 125 98Shared Lane Traffic (%)Lane Group Flow (vph) 98 937 30 113 1070 474 35 111 301 430 223 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 1 2Detector Template Left Thru Right Left Thru Right Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 543: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Detector Phase 4 4 4 3 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.4 39.4 39.4 12.5 51.9 51.9 38.1 38.1 38.1 38.1 38.1Total Split (%) 43.8% 43.8% 43.8% 13.9% 57.7% 57.7% 42.3% 42.3% 42.3% 42.3% 42.3%Maximum Green (s) 33.3 33.3 33.3 6.4 45.8 45.8 32.0 32.0 32.0 32.0 32.0Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 0.0 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 3.8 3.8 3.8 7.1 3.8 6.1 3.8 3.8 3.8 3.8 3.8Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 30.9 30.9 30.9 40.1 43.4 41.1 33.4 33.4 33.4 33.4 33.4Actuated g/C Ratio 0.37 0.37 0.37 0.48 0.51 0.49 0.40 0.40 0.40 0.40 0.40v/c Ratio 0.67 0.79 0.05 0.64 0.64 0.50 0.08 0.17 0.44 0.92 0.18Control Delay 47.8 29.6 0.1 31.0 17.1 3.2 18.2 18.6 8.6 53.3 12.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 47.8 29.6 0.1 31.0 17.1 3.2 18.2 18.6 8.6 53.3 12.2LOS D C A C B A B B A D BApproach Delay 30.5 14.1 11.8 39.2Approach LOS C B B D

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 84.4Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.92Intersection Signal Delay: 22.7 Intersection LOS: CIntersection Capacity Utilization 79.3% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 544: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBTLane Group Flow (vph) 98 937 30 113 1070 474 35 111 301 430 223v/c Ratio 0.67 0.79 0.05 0.64 0.64 0.50 0.08 0.17 0.44 0.92 0.18Control Delay 47.8 29.6 0.1 31.0 17.1 3.2 18.2 18.6 8.6 53.3 12.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 47.8 29.6 0.1 31.0 17.1 3.2 18.2 18.6 8.6 53.3 12.2Queue Length 50th (m) 14.0 74.7 0.0 10.6 67.2 0.0 3.8 12.3 9.9 69.9 8.6Queue Length 95th (m) #39.0 98.5 0.0 #25.2 87.9 15.0 10.5 25.0 31.4 #135.9 17.0Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 169 1371 685 179 1852 1005 438 675 702 484 1271Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.58 0.68 0.04 0.63 0.58 0.47 0.08 0.16 0.43 0.89 0.18

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 545: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 90 862 28 104 984 436 32 102 277 396 115 90Future Volume (vph) 90 862 28 104 984 436 32 102 277 396 115 90Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.8 3.8 3.8 7.1 3.8 6.1 3.8 3.8 3.8 3.8 3.8Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 0.98 1.00 1.00 0.99 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.93Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1538 3228 1463 1568 3228 1447 1662 1651 1411 1644 3000Flt Permitted 0.25 1.00 1.00 0.12 1.00 1.00 0.61 1.00 1.00 0.69 1.00Satd. Flow (perm) 399 3228 1463 190 3228 1447 1072 1651 1411 1186 3000Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 98 937 30 113 1070 474 35 111 301 430 125 98RTOR Reduction (vph) 0 0 19 0 0 243 0 0 128 0 44 0Lane Group Flow (vph) 98 937 11 113 1070 231 35 111 173 430 179 0Confl. Peds. (#/hr) 7 6 6 7 2 2Heavy Vehicles (%) 8% 3% 0% 6% 3% 1% 0% 6% 4% 1% 0% 8%Turn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Actuated Green, G (s) 28.6 28.6 28.6 41.1 41.1 41.1 31.1 31.1 31.1 31.1 31.1Effective Green, g (s) 30.9 30.9 30.9 40.1 43.4 41.1 33.4 33.4 33.4 33.4 33.4Actuated g/C Ratio 0.37 0.37 0.37 0.48 0.51 0.49 0.40 0.40 0.40 0.40 0.40Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 146 1181 535 178 1659 704 424 653 558 469 1187v/s Ratio Prot c0.29 0.04 c0.33 0.07 0.06v/s Ratio Perm 0.25 0.01 0.26 0.16 0.03 0.12 c0.36v/c Ratio 0.67 0.79 0.02 0.63 0.64 0.33 0.08 0.17 0.31 0.92 0.15Uniform Delay, d1 22.5 23.9 17.1 16.6 14.9 13.2 15.9 16.5 17.6 24.2 16.4Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 10.5 3.6 0.0 6.3 0.8 0.2 0.1 0.1 0.2 22.6 0.0Delay (s) 33.0 27.5 17.1 22.9 15.7 13.4 16.0 16.6 17.8 46.8 16.4Level of Service C C B C B B B B B D BApproach Delay (s) 27.7 15.5 17.4 36.4Approach LOS C B B D

Intersection SummaryHCM 2000 Control Delay 22.7 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.88Actuated Cycle Length (s) 84.4 Sum of lost time (s) 14.7Intersection Capacity Utilization 79.3% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 546: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1314 45 131 1215 0 0 0 0 718 82 297Future Volume (vph) 0 1314 45 131 1215 0 0 0 0 718 82 297Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 50.0 0.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 0 1 1 0 0 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 0.98 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950 0.962Satd. Flow (prot) 0 4684 1488 1630 4684 0 0 0 0 1504 1500 1444Flt Permitted 0.109 0.950 0.962Satd. Flow (perm) 0 4684 1462 187 4684 0 0 0 0 1501 1498 1444Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 111 111Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 17.0 64.2 88.8Travel Time (s) 9.7 1.2 4.6 6.4Confl. Peds. (#/hr) 6 6 2 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 2% 2% 0% 0% 0% 0% 5% 13% 3%Adj. Flow (vph) 0 1428 49 142 1321 0 0 0 0 780 89 323Shared Lane Traffic (%) 45%Lane Group Flow (vph) 0 1428 49 142 1321 0 0 0 0 429 440 323Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 1 2 1 2 1Detector Template Thru Right Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0

Page 547: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Detector Phase 4 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 36.3 14.1 36.3 36.3 36.3 36.3Total Split (s) 39.0 39.0 14.1 52.6 37.4 37.4 37.4Total Split (%) 43.1% 43.1% 15.6% 58.1% 41.3% 41.3% 41.3%Maximum Green (s) 32.9 32.9 8.0 46.5 31.3 31.3 31.3Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.3 0.0 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 3.8 6.1 7.1 3.8 3.8 3.8 3.8Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 32.9 30.6 43.8 47.2 30.6 30.6 30.6Actuated g/C Ratio 0.39 0.36 0.51 0.55 0.36 0.36 0.36v/c Ratio 0.79 0.08 0.66 0.51 0.80 0.82 0.55Control Delay 27.4 0.3 29.7 13.2 37.8 39.7 18.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 27.4 0.3 29.7 13.2 37.8 39.7 18.2LOS C A C B D D BApproach Delay 26.5 14.8 33.2Approach LOS C B C

Intersection SummaryArea Type: OtherCycle Length: 90.5Actuated Cycle Length: 85.4Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.82Intersection Signal Delay: 24.3 Intersection LOS: CIntersection Capacity Utilization 78.6% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 548: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT EBR WBL WBT SBL SBT SBRLane Group Flow (vph) 1428 49 142 1321 429 440 323v/c Ratio 0.79 0.08 0.66 0.51 0.80 0.82 0.55Control Delay 27.4 0.3 29.7 13.2 37.8 39.7 18.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 27.4 0.3 29.7 13.2 37.8 39.7 18.2Queue Length 50th (m) 82.4 0.0 13.3 52.7 71.4 74.2 29.0Queue Length 95th (m) 101.1 0.0 #36.3 64.9 #122.0 #127.1 55.3Internal Link Dist (m) 110.1 0.1 64.8Turn Bay Length (m) 50.0Base Capacity (vph) 1951 637 215 2733 597 596 641Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.73 0.08 0.66 0.48 0.72 0.74 0.50

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 549: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1314 45 131 1215 0 0 0 0 718 82 297Future Volume (vph) 0 1314 45 131 1215 0 0 0 0 718 82 297Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.8 6.1 7.1 3.8 3.8 3.8 3.8Lane Util. Factor 0.91 1.00 1.00 0.91 0.95 0.95 1.00Frpb, ped/bikes 1.00 0.98 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 0.96 1.00Satd. Flow (prot) 4684 1462 1630 4684 1502 1497 1444Flt Permitted 1.00 1.00 0.11 1.00 0.95 0.96 1.00Satd. Flow (perm) 4684 1462 187 4684 1502 1497 1444Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 1428 49 142 1321 0 0 0 0 780 89 323RTOR Reduction (vph) 0 0 31 0 0 0 0 0 0 0 0 71Lane Group Flow (vph) 0 1428 18 142 1321 0 0 0 0 429 440 252Confl. Peds. (#/hr) 6 6 2 2Heavy Vehicles (%) 0% 2% 0% 2% 2% 0% 0% 0% 0% 5% 13% 3%Turn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Actuated Green, G (s) 30.6 30.6 44.8 44.8 28.2 28.2 28.2Effective Green, g (s) 32.9 30.6 43.8 47.1 30.5 30.5 30.5Actuated g/C Ratio 0.39 0.36 0.51 0.55 0.36 0.36 0.36Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1808 525 216 2589 537 535 516v/s Ratio Prot c0.30 0.05 c0.28v/s Ratio Perm 0.01 0.28 0.29 0.29 0.17v/c Ratio 0.79 0.03 0.66 0.51 0.80 0.82 0.49Uniform Delay, d1 23.1 17.7 15.8 11.9 24.6 24.9 21.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 2.4 0.0 7.0 0.2 8.1 9.9 0.7Delay (s) 25.5 17.7 22.8 12.0 32.7 34.8 22.0Level of Service C B C B C C CApproach Delay (s) 25.2 13.1 0.0 30.6Approach LOS C B A C

Intersection SummaryHCM 2000 Control Delay 22.5 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.81Actuated Cycle Length (s) 85.2 Sum of lost time (s) 14.7Intersection Capacity Utilization 78.6% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 550: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1817 216 0 1269 89 148Future Volume (vph) 1817 216 0 1269 89 148Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.91 0.91 1.00 0.91 0.97 1.00Ped Bike Factor 0.99Frt 0.984 0.850Flt Protected 0.950Satd. Flow (prot) 4578 0 0 4684 3101 1430Flt Permitted 0.950Satd. Flow (perm) 4578 0 0 4684 3101 1410Right Turn on Red Yes YesSatd. Flow (RTOR) 51 6Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Confl. Peds. (#/hr) 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 2% 4% 4%Adj. Flow (vph) 1975 235 0 1379 97 161Shared Lane Traffic (%)Lane Group Flow (vph) 2210 0 0 1379 97 161Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2

Page 551: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRDetector Phase 4 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.0 35.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7%Maximum Green (s) 28.9 28.9 18.9 18.9Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 3.8 3.8 3.8 3.8Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 31.3 31.3 14.3 14.3Actuated g/C Ratio 0.59 0.59 0.27 0.27v/c Ratio 0.81 0.50 0.12 0.42Control Delay 12.6 7.5 14.7 19.0Queue Delay 0.0 0.0 0.0 0.0Total Delay 12.6 7.5 14.7 19.0LOS B A B BApproach Delay 12.6 7.5 17.4Approach LOS B A B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 53.2Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.81Intersection Signal Delay: 11.1 Intersection LOS: BIntersection Capacity Utilization 60.3% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 552: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 2210 1379 97 161v/c Ratio 0.81 0.50 0.12 0.42Control Delay 12.6 7.5 14.7 19.0Queue Delay 0.0 0.0 0.0 0.0Total Delay 12.6 7.5 14.7 19.0Queue Length 50th (m) 49.9 23.5 3.7 12.7Queue Length 95th (m) #95.4 43.1 8.1 26.3Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 2713 2754 1239 567Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.81 0.50 0.08 0.28

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 553: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1817 216 0 1269 89 148Future Volume (vph) 1817 216 0 1269 89 148Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.8 3.8 3.8 3.8Lane Util. Factor 0.91 0.91 0.97 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 0.98 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 4579 4684 3101 1408Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 4579 4684 3101 1408Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1975 235 0 1379 97 161RTOR Reduction (vph) 21 0 0 0 0 4Lane Group Flow (vph) 2189 0 0 1379 97 157Confl. Peds. (#/hr) 3Heavy Vehicles (%) 3% 0% 0% 2% 4% 4%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 29.0 29.0 12.0 12.0Effective Green, g (s) 31.3 31.3 14.3 14.3Actuated g/C Ratio 0.59 0.59 0.27 0.27Clearance Time (s) 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 2694 2755 833 378v/s Ratio Prot c0.48 0.29 0.03v/s Ratio Perm c0.11v/c Ratio 0.81 0.50 0.12 0.41Uniform Delay, d1 8.6 6.4 14.7 16.0Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 2.0 0.1 0.1 0.7Delay (s) 10.6 6.5 14.7 16.7Level of Service B A B BApproach Delay (s) 10.6 6.5 16.0Approach LOS B A B

Intersection SummaryHCM 2000 Control Delay 9.5 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.69Actuated Cycle Length (s) 53.2 Sum of lost time (s) 7.6Intersection Capacity Utilization 60.3% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 554: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 36 1491 437 292 1889 15 421 26 218 21 14 96Future Volume (vph) 36 1491 437 292 1889 15 421 26 218 21 14 96Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 15.0 25.0Storage Lanes 1 1 2 0 2 1 1 0Taper Length (m) 40.0 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.97 1.00 1.00 0.99 0.99 1.00 0.98Frt 0.850 0.999 0.850 0.869Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1568 3197 1444 3162 3221 0 3162 1606 1458 1662 1417 0Flt Permitted 0.118 0.950 0.950 0.739Satd. Flow (perm) 195 3197 1405 3153 3221 0 3137 1606 1439 1292 1417 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 310 1 237 5Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 5 14 14 5 7 1 1 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 4% 3% 2% 3% 15% 2% 9% 2% 0% 8% 5%Adj. Flow (vph) 39 1621 475 317 2053 16 458 28 237 23 15 104Shared Lane Traffic (%)Lane Group Flow (vph) 39 1621 475 317 2069 0 458 28 237 23 119 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 555: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 12.1 36.0 11.1 32.0 32.0 32.0 32.0Total Split (s) 36.0 36.0 36.0 17.0 53.0 20.0 52.0 52.0 32.0 32.0Total Split (%) 34.3% 34.3% 34.3% 16.2% 50.5% 19.0% 49.5% 49.5% 30.5% 30.5%Maximum Green (s) 29.9 29.9 29.9 10.9 46.9 13.9 45.9 45.9 25.9 25.9Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -4.0 -4.0 -4.0 -0.5 -4.0 -0.5 -4.0 -4.0 -4.0 -4.0Total Lost Time (s) 2.1 2.1 2.1 5.6 2.1 5.6 2.1 2.1 2.1 2.1Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 33.9 33.9 33.9 11.4 51.0 14.4 36.4 36.4 16.4 16.4Actuated g/C Ratio 0.37 0.37 0.37 0.12 0.56 0.16 0.40 0.40 0.18 0.18v/c Ratio 0.54 1.37 0.66 0.80 1.15 0.92 0.04 0.33 0.10 0.46Control Delay 56.7 198.6 13.7 56.6 98.8 64.8 16.7 3.7 31.7 38.1Queue Delay 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 56.7 198.7 13.7 56.6 98.8 64.8 16.7 3.7 31.7 38.1LOS E F B E F E B A C DApproach Delay 154.9 93.2 42.9 37.0Approach LOS F F D D

Intersection SummaryArea Type: OtherCycle Length: 105Actuated Cycle Length: 91.6Natural Cycle: 145Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 1.37Intersection Signal Delay: 109.4 Intersection LOS: FIntersection Capacity Utilization 95.3% ICU Level of Service FAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 556: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 39 1621 475 317 2069 458 28 237 23 119v/c Ratio 0.54 1.37 0.66 0.80 1.15 0.92 0.04 0.33 0.10 0.46Control Delay 56.7 198.6 13.7 56.6 98.8 64.8 16.7 3.7 31.7 38.1Queue Delay 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 56.7 198.7 13.7 56.6 98.8 64.8 16.7 3.7 31.7 38.1Queue Length 50th (m) 5.6 ~209.5 22.2 29.7 ~240.0 43.4 3.1 0.0 3.6 19.1Queue Length 95th (m) #24.1 #275.8 64.6 #55.6 #314.2 #79.2 8.4 13.6 10.4 35.8Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 50.0 50.0 15.0Base Capacity (vph) 72 1184 715 394 1792 497 876 892 422 466Starvation Cap Reductn 0 38 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.54 1.41 0.66 0.80 1.15 0.92 0.03 0.27 0.05 0.26

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 557: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 36 1491 437 292 1889 15 421 26 218 21 14 96Future Volume (vph) 36 1491 437 292 1889 15 421 26 218 21 14 96Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 2.1 2.1 2.1 5.6 2.1 5.6 2.1 2.1 2.1 2.1Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.97 1.00 1.00 1.00 1.00 0.99 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 1.00 1.00 0.85 1.00 0.87Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1568 3197 1407 3162 3221 3162 1606 1439 1661 1418Flt Permitted 0.12 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.74 1.00Satd. Flow (perm) 194 3197 1407 3162 3221 3162 1606 1439 1292 1418Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 39 1621 475 317 2053 16 458 28 237 23 15 104RTOR Reduction (vph) 0 0 195 0 0 0 0 0 143 0 4 0Lane Group Flow (vph) 39 1621 280 317 2069 0 458 28 94 23 115 0Confl. Peds. (#/hr) 5 14 14 5 7 1 1 7Heavy Vehicles (%) 6% 4% 3% 2% 3% 15% 2% 9% 2% 0% 8% 5%Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Actuated Green, G (s) 30.0 30.0 30.0 10.9 47.0 13.9 32.4 32.4 12.4 12.4Effective Green, g (s) 34.0 34.0 34.0 11.4 51.0 14.4 36.4 36.4 16.4 16.4Actuated g/C Ratio 0.37 0.37 0.37 0.12 0.56 0.16 0.40 0.40 0.18 0.18Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 72 1186 522 393 1793 497 638 571 231 253v/s Ratio Prot c0.51 0.10 c0.64 c0.14 0.02 c0.08v/s Ratio Perm 0.20 0.20 0.07 0.02v/c Ratio 0.54 1.37 0.54 0.81 1.15 0.92 0.04 0.16 0.10 0.45Uniform Delay, d1 22.7 28.8 22.6 39.0 20.3 38.0 16.9 17.8 31.4 33.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 6.4 170.5 0.8 11.2 76.0 22.6 0.0 0.1 0.1 0.9Delay (s) 29.1 199.3 23.4 50.2 96.3 60.7 16.9 17.9 31.6 34.5Level of Service C F C D F E B B C CApproach Delay (s) 157.1 90.2 44.9 34.1Approach LOS F F D C

Intersection SummaryHCM 2000 Control Delay 109.2 HCM 2000 Level of Service FHCM 2000 Volume to Capacity ratio 1.09Actuated Cycle Length (s) 91.6 Sum of lost time (s) 15.4Intersection Capacity Utilization 95.3% ICU Level of Service FAnalysis Period (min) 15c Critical Lane Group

Page 558: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 326 909 495 49 1262 81 596 211 68 117 246 339Future Volume (vph) 326 909 495 49 1262 81 596 211 68 117 246 339Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 50.0Storage Lanes 2 0 1 0 1 0 1 0Taper Length (m) 50.0 50.0 50.0 50.0Lane Util. Factor 0.97 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 0.98 1.00 1.00 1.00Frt 0.947 0.991 0.963 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 3193 3007 0 1630 3196 0 1568 1667 0 1646 1733 1473Flt Permitted 0.950 0.119 0.236 0.350Satd. Flow (perm) 3170 3007 0 204 3196 0 390 1667 0 605 1733 1473Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 107 6 16 209Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 24 11 11 24 3 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 2% 5% 2% 3% 0% 6% 0% 3% 1% 1% 1%Adj. Flow (vph) 354 988 538 53 1372 88 648 229 74 127 267 368Shared Lane Traffic (%)Lane Group Flow (vph) 354 1526 0 53 1460 0 648 303 0 127 267 368Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 559: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Detector Phase 7 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 11.4 30.4 11.1 30.4 11.1 37.7 11.1 37.7 37.7Total Split (s) 18.0 47.4 11.1 39.0 15.0 42.1 11.1 38.0 38.0Total Split (%) 16.1% 42.4% 9.9% 34.9% 13.4% 37.7% 9.9% 34.0% 34.0%Maximum Green (s) 11.9 41.3 5.0 32.9 8.9 36.0 5.0 31.9 31.9Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.4 -2.4 1.0 -2.4 1.0 -2.7 1.0 -2.7 -2.7Total Lost Time (s) 3.7 3.7 7.1 3.7 7.1 3.4 7.1 3.4 3.4Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 14.4 43.9 37.5 36.9 31.0 26.8 23.2 22.9 22.9Actuated g/C Ratio 0.14 0.44 0.37 0.37 0.31 0.27 0.23 0.23 0.23v/c Ratio 0.77 1.11 0.40 1.23 3.03 0.66 0.70 0.67 0.74Control Delay 55.0 86.4 24.6 142.8 942.5 37.9 48.7 43.8 24.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 55.0 86.4 24.6 142.8 942.5 37.9 48.7 43.8 24.2LOS D F C F F D D D CApproach Delay 80.5 138.6 654.3 35.2Approach LOS F F F D

Intersection SummaryArea Type: OtherCycle Length: 111.7Actuated Cycle Length: 100.1Natural Cycle: 145Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 3.03Intersection Signal Delay: 197.8 Intersection LOS: FIntersection Capacity Utilization 114.9% ICU Level of Service HAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 560: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 354 1526 53 1460 648 303 127 267 368v/c Ratio 0.77 1.11 0.40 1.23 3.03 0.66 0.70 0.67 0.74Control Delay 55.0 86.4 24.6 142.8 942.5 37.9 48.7 43.8 24.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 55.0 86.4 24.6 142.8 942.5 37.9 48.7 43.8 24.2Queue Length 50th (m) 35.9 ~179.4 5.1 ~193.6 ~213.5 52.0 18.2 49.8 29.7Queue Length 95th (m) #66.4 #262.6 13.8 #277.4 #323.7 79.9 31.9 76.2 63.1Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0 50.0Base Capacity (vph) 458 1377 133 1183 214 656 181 604 650Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.77 1.11 0.40 1.23 3.03 0.46 0.70 0.44 0.57

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 561: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 326 909 495 49 1262 81 596 211 68 117 246 339Future Volume (vph) 326 909 495 49 1262 81 596 211 68 117 246 339Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.7 3.7 7.1 3.7 7.1 3.4 7.1 3.4 3.4Lane Util. Factor 0.97 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.95 1.00 0.99 1.00 0.96 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 3193 3010 1630 3197 1568 1668 1645 1733 1473Flt Permitted 0.95 1.00 0.12 1.00 0.24 1.00 0.35 1.00 1.00Satd. Flow (perm) 3193 3010 204 3197 390 1668 606 1733 1473Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 354 988 538 53 1372 88 648 229 74 127 267 368RTOR Reduction (vph) 0 60 0 0 4 0 0 12 0 0 0 161Lane Group Flow (vph) 354 1466 0 53 1456 0 648 291 0 127 267 207Confl. Peds. (#/hr) 24 11 11 24 3 3Heavy Vehicles (%) 1% 2% 5% 2% 3% 0% 6% 0% 3% 1% 1% 1%Turn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Actuated Green, G (s) 11.9 41.5 39.6 34.6 33.0 24.1 25.2 20.2 20.2Effective Green, g (s) 14.3 43.9 37.6 37.0 31.0 26.8 23.2 22.9 22.9Actuated g/C Ratio 0.14 0.44 0.38 0.37 0.31 0.27 0.23 0.23 0.23Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 456 1321 133 1182 213 447 182 396 337v/s Ratio Prot c0.11 c0.49 0.02 c0.46 c0.24 0.17 0.03 0.15v/s Ratio Perm 0.13 c0.70 0.13 0.14v/c Ratio 0.78 1.11 0.40 1.23 3.04 0.65 0.70 0.67 0.61Uniform Delay, d1 41.3 28.1 24.6 31.5 32.3 32.5 35.0 35.1 34.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 7.8 60.6 1.4 111.9 931.4 2.8 10.2 3.8 2.5Delay (s) 49.1 88.7 26.1 143.4 963.8 35.2 45.3 38.9 37.1Level of Service D F C F F D D D DApproach Delay (s) 81.2 139.3 667.9 39.1Approach LOS F F F D

Intersection SummaryHCM 2000 Control Delay 201.4 HCM 2000 Level of Service FHCM 2000 Volume to Capacity ratio 1.92Actuated Cycle Length (s) 100.0 Sum of lost time (s) 21.3Intersection Capacity Utilization 114.9% ICU Level of Service HAnalysis Period (min) 15c Critical Lane Group

Page 562: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 226 760 108 9 689 198 438 258 13 147 250 265Future Volume (vph) 226 760 108 9 689 198 438 258 13 147 250 265Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 1 0 1 0 0 0 1 1Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 1.00 0.99 1.00 1.00Frt 0.981 0.967 0.998 0.850Flt Protected 0.950 0.950 0.970 0.950Satd. Flow (prot) 1599 3162 0 1662 3102 0 0 1680 0 1662 1733 1458Flt Permitted 0.148 0.303 0.572 0.536Satd. Flow (perm) 249 3162 0 528 3102 0 0 991 0 935 1733 1458Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 29 51 1 288Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 16 7 7 16 17 17Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 4% 3% 1% 0% 3% 1% 1% 0% 9% 0% 1% 2%Adj. Flow (vph) 246 826 117 10 749 215 476 280 14 160 272 288Shared Lane Traffic (%)Lane Group Flow (vph) 246 943 0 10 964 0 0 770 0 160 272 288Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 563: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Detector Phase 7 4 8 8 2 2 6 6 6Switch PhaseMinimum Initial (s) 5.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 11.1 27.1 27.1 27.1 33.1 33.1 33.1 33.1 33.1Total Split (s) 14.0 41.1 27.1 27.1 33.9 33.9 33.9 33.9 33.9Total Split (%) 18.7% 54.8% 36.1% 36.1% 45.2% 45.2% 45.2% 45.2% 45.2%Maximum Green (s) 7.9 35.0 21.0 21.0 27.8 27.8 27.8 27.8 27.8Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -0.5 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 0.0Total Lost Time (s) 5.6 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 17.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 35.5 37.1 23.1 23.1 29.9 29.9 29.9 27.8Actuated g/C Ratio 0.47 0.49 0.31 0.31 0.40 0.40 0.40 0.37v/c Ratio 0.91 0.60 0.06 0.97 1.95 0.43 0.39 0.40Control Delay 55.4 15.1 19.8 49.1 457.3 20.9 18.2 4.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 55.4 15.1 19.8 49.1 457.3 20.9 18.2 4.1LOS E B B D F C B AApproach Delay 23.4 48.8 457.3 13.2Approach LOS C D F B

Intersection SummaryArea Type: OtherCycle Length: 75Actuated Cycle Length: 75Natural Cycle: 80Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 1.95Intersection Signal Delay: 119.6 Intersection LOS: FIntersection Capacity Utilization 112.4% ICU Level of Service HAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 564: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBL EBT WBL WBT NBT SBL SBT SBRLane Group Flow (vph) 246 943 10 964 770 160 272 288v/c Ratio 0.91 0.60 0.06 0.97 1.95 0.43 0.39 0.40Control Delay 55.4 15.1 19.8 49.1 457.3 20.9 18.2 4.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 55.4 15.1 19.8 49.1 457.3 20.9 18.2 4.1Queue Length 50th (m) 21.6 48.4 1.0 70.5 ~183.9 16.8 28.0 0.0Queue Length 95th (m) #64.5 66.8 4.5 #112.5 #251.1 33.7 47.4 14.8Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 50.0 50.0 25.0Base Capacity (vph) 269 1578 162 990 395 372 690 721Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.91 0.60 0.06 0.97 1.95 0.43 0.39 0.40

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 565: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 226 760 108 9 689 198 438 258 13 147 250 265Future Volume (vph) 226 760 108 9 689 198 438 258 13 147 250 265Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 5.6 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.98 1.00 0.97 1.00 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.97 0.95 1.00 1.00Satd. Flow (prot) 1599 3163 1657 3100 1679 1657 1733 1458Flt Permitted 0.15 1.00 0.30 1.00 0.57 0.54 1.00 1.00Satd. Flow (perm) 248 3163 529 3100 991 936 1733 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 246 826 117 10 749 215 476 280 14 160 272 288RTOR Reduction (vph) 0 15 0 0 35 0 0 1 0 0 0 181Lane Group Flow (vph) 246 928 0 10 929 0 0 769 0 160 272 107Confl. Peds. (#/hr) 16 7 7 16 17 17Heavy Vehicles (%) 4% 3% 1% 0% 3% 1% 1% 0% 9% 0% 1% 2%Turn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 35.0 35.0 21.0 21.0 27.8 27.8 27.8 27.8Effective Green, g (s) 35.5 37.1 23.1 23.1 29.9 29.9 29.9 27.8Actuated g/C Ratio 0.47 0.49 0.31 0.31 0.40 0.40 0.40 0.37Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 268 1564 162 954 395 373 690 540v/s Ratio Prot c0.10 0.29 c0.30 0.16v/s Ratio Perm 0.33 0.02 c0.78 0.17 0.07v/c Ratio 0.92 0.59 0.06 0.97 1.95 0.43 0.39 0.20Uniform Delay, d1 16.3 13.6 18.3 25.6 22.6 16.4 16.1 16.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 33.6 0.6 0.2 22.7 435.7 0.8 0.4 0.2Delay (s) 49.9 14.2 18.5 48.4 458.2 17.2 16.5 16.2Level of Service D B B D F B B BApproach Delay (s) 21.6 48.1 458.2 16.5Approach LOS C D F B

Intersection SummaryHCM 2000 Control Delay 119.7 HCM 2000 Level of Service FHCM 2000 Volume to Capacity ratio 1.45Actuated Cycle Length (s) 75.0 Sum of lost time (s) 13.6Intersection Capacity Utilization 112.4% ICU Level of Service HAnalysis Period (min) 15c Critical Lane Group

Page 566: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 120 603 197 153 433 151 238 212 136 115 177 224Future Volume (vph) 120 603 197 153 433 151 238 212 136 115 177 224Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95Frt 0.963 0.961 0.941 0.916Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3139 0 1630 3133 0 1630 3067 0 1630 2986 0Flt Permitted 0.271 0.176 0.320 0.457Satd. Flow (perm) 465 3139 0 302 3133 0 549 3067 0 784 2986 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 50 55 148 243Link Speed (k/h) 50 50 50 50Link Distance (m) 136.7 140.7 96.7 133.0Travel Time (s) 9.8 10.1 7.0 9.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 130 655 214 166 471 164 259 230 148 125 192 243Shared Lane Traffic (%)Lane Group Flow (vph) 130 869 0 166 635 0 259 378 0 125 435 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6

Page 567: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 7 4 3 8 5 2 1 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 11.1 24.3 11.1 24.3 11.1 24.3 11.1 24.3Total Split (s) 14.7 30.0 15.0 30.3 18.0 28.6 16.4 27.0Total Split (%) 16.3% 33.3% 16.7% 33.7% 20.0% 31.8% 18.2% 30.0%Maximum Green (s) 8.6 23.9 8.9 24.2 11.9 22.5 10.3 20.9Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) 1.0 -2.3 1.0 -2.3 1.0 -2.3 1.0 -2.3Total Lost Time (s) 7.1 3.8 7.1 3.8 7.1 3.8 7.1 3.8Lead/Lag Lead Lag Lead Lag Lead Lag Lead LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 29.0 25.3 30.4 26.0 23.3 15.8 17.8 13.1Actuated g/C Ratio 0.37 0.32 0.39 0.33 0.30 0.20 0.23 0.17v/c Ratio 0.47 0.83 0.68 0.59 0.84 0.51 0.48 0.62Control Delay 19.6 32.5 30.4 23.3 46.3 19.6 25.0 17.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.6 32.5 30.4 23.3 46.3 19.6 25.0 17.3LOS B C C C D B C BApproach Delay 30.8 24.8 30.5 19.0Approach LOS C C C B

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 78.8Natural Cycle: 90Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.84Intersection Signal Delay: 26.9 Intersection LOS: CIntersection Capacity Utilization 77.5% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 108: Stanley Avenue & Marine Land Pkway (RR 49)

Page 568: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT WBL WBT NBL NBT SBL SBTLane Group Flow (vph) 130 869 166 635 259 378 125 435v/c Ratio 0.47 0.83 0.68 0.59 0.84 0.51 0.48 0.62Control Delay 19.6 32.5 30.4 23.3 46.3 19.6 25.0 17.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.6 32.5 30.4 23.3 46.3 19.6 25.0 17.3Queue Length 50th (m) 11.3 62.6 14.8 39.8 31.6 17.0 13.9 14.6Queue Length 95th (m) 24.3 #104.8 #41.1 62.8 #62.4 30.4 26.1 28.8Internal Link Dist (m) 112.7 116.7 72.7 109.0Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 288 1083 251 1102 314 1072 290 1055Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.45 0.80 0.66 0.58 0.82 0.35 0.43 0.41

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 569: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 120 603 197 153 433 151 238 212 136 115 177 224Future Volume (vph) 120 603 197 153 433 151 238 212 136 115 177 224Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 7.1 3.8 7.1 3.8 7.1 3.8 7.1 3.8Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.95 1.00 0.95Frt 1.00 0.96 1.00 0.96 1.00 0.94 1.00 0.92Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1630 3139 1630 3134 1630 3068 1630 2987Flt Permitted 0.27 1.00 0.18 1.00 0.32 1.00 0.46 1.00Satd. Flow (perm) 465 3139 302 3134 549 3068 785 2987Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 130 655 214 166 471 164 259 230 148 125 192 243RTOR Reduction (vph) 0 34 0 0 37 0 0 118 0 0 203 0Lane Group Flow (vph) 130 835 0 166 598 0 259 260 0 125 233 0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Actuated Green, G (s) 31.0 23.0 32.4 23.7 25.2 13.5 19.8 10.8Effective Green, g (s) 29.0 25.3 30.4 26.0 23.2 15.8 17.8 13.1Actuated g/C Ratio 0.37 0.32 0.39 0.33 0.30 0.20 0.23 0.17Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 275 1010 246 1036 309 616 263 497v/s Ratio Prot 0.04 c0.27 c0.07 0.19 c0.11 0.08 0.05 0.08v/s Ratio Perm 0.13 0.19 c0.13 0.06v/c Ratio 0.47 0.83 0.67 0.58 0.84 0.42 0.48 0.47Uniform Delay, d1 17.4 24.6 18.2 21.8 23.7 27.4 25.5 29.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.3 5.6 7.1 0.8 17.7 0.5 1.4 0.7Delay (s) 18.7 30.3 25.3 22.5 41.4 27.9 26.8 30.3Level of Service B C C C D C C CApproach Delay (s) 28.8 23.1 33.4 29.5Approach LOS C C C C

Intersection SummaryHCM 2000 Control Delay 28.4 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.80Actuated Cycle Length (s) 78.6 Sum of lost time (s) 21.8Intersection Capacity Utilization 77.5% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 570: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 187 70 341 0 0 247Future Volume (vph) 187 70 341 0 0 247Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.959Flt Protected 0.965Satd. Flow (prot) 3010 0 3167 0 0 3325Flt Permitted 0.965Satd. Flow (perm) 3010 0 3167 0 0 3325Right Turn on Red Yes YesSatd. Flow (RTOR) 76Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 0% 5% 0% 5% 0%Adj. Flow (vph) 203 76 371 0 0 268Shared Lane Traffic (%)Lane Group Flow (vph) 279 0 371 0 0 268Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch Phase

Page 571: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group WBL WBR NBT NBR SBL SBTMinimum Initial (s) 8.0 8.0 8.0Minimum Split (s) 25.1 22.5 22.5Total Split (s) 28.2 22.5 22.5Total Split (%) 55.6% 44.4% 44.4%Maximum Green (s) 22.1 16.4 16.4Yellow Time (s) 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 10.3 10.6 10.6Actuated g/C Ratio 0.36 0.37 0.37v/c Ratio 0.25 0.32 0.22Control Delay 5.6 7.4 6.8Queue Delay 0.0 0.0 0.0Total Delay 5.6 7.4 6.8LOS A A AApproach Delay 5.6 7.4 6.8Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50.7Actuated Cycle Length: 28.9Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.32Intersection Signal Delay: 6.7 Intersection LOS: AIntersection Capacity Utilization 25.1% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 572: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group WBL NBT SBTLane Group Flow (vph) 279 371 268v/c Ratio 0.25 0.32 0.22Control Delay 5.6 7.4 6.8Queue Delay 0.0 0.0 0.0Total Delay 5.6 7.4 6.8Queue Length 50th (m) 3.0 5.9 4.1Queue Length 95th (m) 7.7 11.2 8.2Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2787 2031 2132Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.10 0.18 0.13

Intersection Summary

Page 573: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 32

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 187 70 341 0 0 247Future Volume (vph) 187 70 341 0 0 247Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 0.96 1.00 1.00Flt Protected 0.96 1.00 1.00Satd. Flow (prot) 3011 3167 3325Flt Permitted 0.96 1.00 1.00Satd. Flow (perm) 3011 3167 3325Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 203 76 371 0 0 268RTOR Reduction (vph) 49 0 0 0 0 0Lane Group Flow (vph) 230 0 371 0 0 268Heavy Vehicles (%) 6% 0% 5% 0% 5% 0%Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.1 8.5 8.5Effective Green, g (s) 10.2 10.6 10.6Actuated g/C Ratio 0.35 0.37 0.37Clearance Time (s) 6.1 6.1 6.1Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1066 1165 1223v/s Ratio Prot c0.08 c0.12v/s Ratio Perm 0.08v/c Ratio 0.22 0.32 0.22Uniform Delay, d1 6.5 6.5 6.3Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.0 0.1 0.1Delay (s) 6.5 6.6 6.3Level of Service A A AApproach Delay (s) 6.5 6.6 6.3Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.5 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.30Actuated Cycle Length (s) 28.8 Sum of lost time (s) 10.1Intersection Capacity Utilization 25.1% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 574: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 394 5 0 271 487 257Future Volume (vph) 394 5 0 271 487 257Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Ped Bike Factor 0.99Frt 0.998 0.948Flt Protected 0.953Satd. Flow (prot) 1648 0 0 3197 3020 0Flt Permitted 0.953Satd. Flow (perm) 1648 0 0 3197 3020 0Right Turn on Red Yes YesSatd. Flow (RTOR) 1 200Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 0% 0% 4% 5% 1%Adj. Flow (vph) 428 5 0 295 529 279Shared Lane Traffic (%)Lane Group Flow (vph) 433 0 0 295 808 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2

Page 575: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group EBL EBR NBL NBT SBT SBRDetector Phase 4 2 2 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 31.3 42.0 42.0 42.0Total Split (%) 42.7% 57.3% 57.3% 57.3%Maximum Green (s) 25.2 35.9 35.9 35.9Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 3.8 3.1 3.1Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 18.4 18.7 18.7Actuated g/C Ratio 0.41 0.42 0.42v/c Ratio 0.63 0.22 0.58Control Delay 15.8 9.5 9.7Queue Delay 0.0 0.0 0.0Total Delay 15.8 9.5 9.7LOS B A AApproach Delay 15.8 9.5 9.7Approach LOS B A A

Intersection SummaryArea Type: OtherCycle Length: 73.3Actuated Cycle Length: 44.4Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.63Intersection Signal Delay: 11.4 Intersection LOS: BIntersection Capacity Utilization 54.3% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 576: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group EBL NBT SBTLane Group Flow (vph) 433 295 808v/c Ratio 0.63 0.22 0.58Control Delay 15.8 9.5 9.7Queue Delay 0.0 0.0 0.0Total Delay 15.8 9.5 9.7Queue Length 50th (m) 24.5 7.1 16.6Queue Length 95th (m) 60.9 17.9 41.2Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1117 2759 2633Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.39 0.11 0.31

Intersection Summary

Page 577: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 36

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 394 5 0 271 487 257Future Volume (vph) 394 5 0 271 487 257Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.8 3.1 3.1Lane Util. Factor 1.00 0.95 0.95Frpb, ped/bikes 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 1.00 0.95Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1649 3197 3021Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 1649 3197 3021Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 428 5 0 295 529 279RTOR Reduction (vph) 1 0 0 0 115 0Lane Group Flow (vph) 432 0 0 295 693 0Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 1% 0% 0% 4% 5% 1%Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 16.0 15.6 15.6Effective Green, g (s) 18.3 18.6 18.6Actuated g/C Ratio 0.42 0.42 0.42Clearance Time (s) 6.1 6.1 6.1Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 688 1357 1282v/s Ratio Prot c0.26 0.09 c0.23v/s Ratio Permv/c Ratio 0.63 0.22 0.54Uniform Delay, d1 10.1 8.0 9.4Progression Factor 1.00 1.00 1.00Incremental Delay, d2 1.4 0.0 0.3Delay (s) 11.5 8.0 9.7Level of Service B A AApproach Delay (s) 11.5 8.0 9.7Approach LOS B A A

Intersection SummaryHCM 2000 Control Delay 9.9 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.58Actuated Cycle Length (s) 43.8 Sum of lost time (s) 6.9Intersection Capacity Utilization 54.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 578: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Future Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1716 0 1750 1651 1430 0 1750 0 3014 1458 0Flt Permitted 0.381 0.950Satd. Flow (perm) 667 1716 0 1750 1651 1430 0 1750 0 3014 1458 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 129 895Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 0% 6% 4% 0% 0% 0% 7% 0% 2%Adj. Flow (vph) 57 173 0 0 118 30 0 0 0 121 0 78Shared Lane Traffic (%)Lane Group Flow (vph) 57 173 0 0 118 30 0 0 0 121 78 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 579: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 14.1 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 18.0 52.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (%) 13.9% 40.5% 26.6% 26.6% 26.6% 29.7% 29.7% 29.7% 29.7%Maximum Green (s) 11.9 46.4 28.4 28.4 28.4 32.4 32.4 32.4 32.4Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 7.1 2.6 2.6 2.6 2.6 2.6 2.6 2.6Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 23.1 27.6 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.50 0.60 0.29 0.29 0.29 0.29v/c Ratio 0.12 0.17 0.25 0.06 0.14 0.07Control Delay 6.7 4.7 14.3 0.2 12.7 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 6.7 4.7 14.3 0.2 12.7 0.1LOS A A B A B AApproach Delay 5.2 11.4 7.8Approach LOS A B A

Intersection SummaryArea Type: OtherCycle Length: 129.5Actuated Cycle Length: 46.3Natural Cycle: 130Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.25Intersection Signal Delay: 7.7 Intersection LOS: AIntersection Capacity Utilization 24.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 580: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 57 173 118 30 121 78v/c Ratio 0.12 0.17 0.25 0.06 0.14 0.07Control Delay 6.7 4.7 14.3 0.2 12.7 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 6.7 4.7 14.3 0.2 12.7 0.1Queue Length 50th (m) 2.3 5.4 7.6 0.0 3.8 0.0Queue Length 95th (m) 6.3 11.5 17.5 0.0 8.5 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 567 1716 1137 1025 2335 1331Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.10 0.10 0.10 0.03 0.05 0.06

Intersection Summary

Page 581: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Future Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 7.1 2.6 2.6 2.6 2.6 2.6Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1716 1651 1430 3014 1458Flt Permitted 0.38 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 666 1716 1651 1430 3014 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 57 173 0 0 118 30 0 0 0 121 0 78RTOR Reduction (vph) 0 0 0 0 0 21 0 0 0 0 55 0Lane Group Flow (vph) 57 173 0 0 118 9 0 0 0 121 23 0Heavy Vehicles (%) 0% 2% 0% 0% 6% 4% 0% 0% 0% 7% 0% 2%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 24.1 24.1 10.0 10.0 10.0 10.0Effective Green, g (s) 23.1 27.6 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.50 0.60 0.29 0.29 0.29 0.29Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 482 1022 481 416 878 425v/s Ratio Prot 0.02 c0.10 c0.07 c0.04 0.02v/s Ratio Perm 0.04 0.01v/c Ratio 0.12 0.17 0.25 0.02 0.14 0.05Uniform Delay, d1 6.6 4.2 12.5 11.7 12.1 11.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.1 0.0 0.0 0.0Delay (s) 6.7 4.2 12.6 11.7 12.1 11.8Level of Service A A B B B BApproach Delay (s) 4.8 12.5 0.0 12.0Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 9.3 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.23Actuated Cycle Length (s) 46.3 Sum of lost time (s) 14.9Intersection Capacity Utilization 24.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 582: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 20 82 1 515 139 91 1 272 396 145 267 36Future Volume (vph) 20 82 1 515 139 91 1 272 396 145 267 36Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 115.0 0.0 0.0 100.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 100.0 7.5 100.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.999 0.941 0.850 0.982Flt Protected 0.990 0.950 0.950Satd. Flow (prot) 0 1598 0 1599 1533 0 0 1651 1390 1471 1683 0Flt Permitted 0.929 0.733 0.999 0.457Satd. Flow (perm) 0 1499 0 1233 1533 0 0 1650 1390 708 1683 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 1 66 430 10Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 9% 0% 4% 7% 8% 0% 6% 7% 13% 2% 3%Adj. Flow (vph) 22 89 1 560 151 99 1 296 430 158 290 39Shared Lane Traffic (%)Lane Group Flow (vph) 0 112 0 560 250 0 0 297 430 158 329 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 583: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 43.0 43.0 43.0 43.0 32.0 32.0 32.0 32.0 32.0Total Split (%) 57.3% 57.3% 57.3% 57.3% 42.7% 42.7% 42.7% 42.7% 42.7%Maximum Green (s) 36.9 36.9 36.9 36.9 25.9 25.9 25.9 25.9 25.9Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 3.8 3.8 3.8 3.8 3.8 3.8 3.8Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 36.9 36.9 36.9 23.8 23.8 23.8 23.8Actuated g/C Ratio 0.54 0.54 0.54 0.35 0.35 0.35 0.35v/c Ratio 0.14 0.84 0.29 0.52 0.56 0.64 0.56Control Delay 9.3 28.9 7.9 21.9 5.1 33.3 22.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.3 28.9 7.9 21.9 5.1 33.3 22.0LOS A C A C A C CApproach Delay 9.3 22.4 12.0 25.7Approach LOS A C B C

Intersection SummaryArea Type: OtherCycle Length: 75Actuated Cycle Length: 68.5Natural Cycle: 75Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.84Intersection Signal Delay: 18.9 Intersection LOS: BIntersection Capacity Utilization 80.9% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 584: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 112 560 250 297 430 158 329v/c Ratio 0.14 0.84 0.29 0.52 0.56 0.64 0.56Control Delay 9.3 28.9 7.9 21.9 5.1 33.3 22.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.3 28.9 7.9 21.9 5.1 33.3 22.0Queue Length 50th (m) 7.4 63.5 13.0 32.8 0.0 18.5 35.8Queue Length 95th (m) 16.1 #134.1 27.3 55.1 17.5 #41.0 59.8Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 115.0 100.0 50.0Base Capacity (vph) 876 721 923 694 833 297 713Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.13 0.78 0.27 0.43 0.52 0.53 0.46

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 585: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 20 82 1 515 139 91 1 272 396 145 267 36Future Volume (vph) 20 82 1 515 139 91 1 272 396 145 267 36Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.8 3.8 3.8 3.8 3.8 3.8 3.8Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.94 1.00 0.85 1.00 0.98Flt Protected 0.99 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1598 1599 1533 1651 1390 1471 1683Flt Permitted 0.93 0.73 1.00 1.00 1.00 0.46 1.00Satd. Flow (perm) 1498 1233 1533 1650 1390 707 1683Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 22 89 1 560 151 99 1 296 430 158 290 39RTOR Reduction (vph) 0 0 0 0 30 0 0 0 281 0 7 0Lane Group Flow (vph) 0 112 0 560 220 0 0 297 149 158 322 0Heavy Vehicles (%) 6% 9% 0% 4% 7% 8% 0% 6% 7% 13% 2% 3%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 34.6 34.6 34.6 21.4 21.4 21.4 21.4Effective Green, g (s) 36.9 36.9 36.9 23.7 23.7 23.7 23.7Actuated g/C Ratio 0.54 0.54 0.54 0.35 0.35 0.35 0.35Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 810 667 829 573 483 245 584v/s Ratio Prot 0.14 0.19v/s Ratio Perm 0.07 c0.45 0.18 0.11 c0.22v/c Ratio 0.14 0.84 0.27 0.52 0.31 0.64 0.55Uniform Delay, d1 7.8 13.2 8.4 17.7 16.3 18.7 18.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 10.5 0.5 2.1 1.0 9.2 2.4Delay (s) 8.0 23.7 8.9 19.8 17.3 27.9 20.4Level of Service A C A B B C CApproach Delay (s) 8.0 19.1 18.3 22.8Approach LOS A B B C

Intersection SummaryHCM 2000 Control Delay 19.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.76Actuated Cycle Length (s) 68.2 Sum of lost time (s) 7.6Intersection Capacity Utilization 80.9% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 586: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 83 51 28 503 457 70Future Volume (vph) 83 51 28 503 457 70Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.949 0.982Flt Protected 0.970 0.997Satd. Flow (prot) 1447 0 0 1655 1609 0Flt Permitted 0.970 0.997Satd. Flow (perm) 1447 0 0 1655 1609 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 20% 50% 3% 6% 12%Adj. Flow (vph) 90 55 30 547 497 76Shared Lane Traffic (%)Lane Group Flow (vph) 145 0 0 577 573 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 68.6% ICU Level of Service CAnalysis Period (min) 15

Page 587: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 46

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 83 51 28 503 457 70Future Volume (Veh/h) 83 51 28 503 457 70Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 90 55 30 547 497 76PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1142 535 573vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1142 535 573tC, single (s) 6.5 6.4 4.6tC, 2 stage (s)tF (s) 3.6 3.5 2.7p0 queue free % 57 89 96cM capacity (veh/h) 209 512 801

Direction, Lane # EB 1 NB 1 SB 1Volume Total 145 577 573Volume Left 90 30 0Volume Right 55 0 76cSH 270 801 1700Volume to Capacity 0.54 0.04 0.34Queue Length 95th (m) 23.5 0.9 0.0Control Delay (s) 32.8 1.0 0.0Lane LOS D AApproach Delay (s) 32.8 1.0 0.0Approach LOS D

Intersection SummaryAverage Delay 4.1Intersection Capacity Utilization 68.6% ICU Level of Service CAnalysis Period (min) 15

Page 588: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 81 42 25 450 469 39Future Volume (vph) 81 42 25 450 469 39Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.954 0.990Flt Protected 0.968 0.997Satd. Flow (prot) 1518 0 0 1656 1596 0Flt Permitted 0.968 0.997Satd. Flow (perm) 1518 0 0 1656 1596 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 13% 48% 3% 8% 15%Adj. Flow (vph) 88 46 27 489 510 42Shared Lane Traffic (%)Lane Group Flow (vph) 134 0 0 516 552 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 62.2% ICU Level of Service BAnalysis Period (min) 15

Page 589: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 81 42 25 450 469 39Future Volume (Veh/h) 81 42 25 450 469 39Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 88 46 27 489 510 42PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1074 531 552vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1074 531 552tC, single (s) 6.4 6.3 4.6tC, 2 stage (s)tF (s) 3.5 3.4 2.6p0 queue free % 62 91 97cM capacity (veh/h) 234 527 824

Direction, Lane # EB 1 NB 1 SB 1Volume Total 134 516 552Volume Left 88 27 0Volume Right 46 0 42cSH 290 824 1700Volume to Capacity 0.46 0.03 0.32Queue Length 95th (m) 18.5 0.8 0.0Control Delay (s) 27.7 0.9 0.0Lane LOS D AApproach Delay (s) 27.7 0.9 0.0Approach LOS D

Intersection SummaryAverage Delay 3.5Intersection Capacity Utilization 62.2% ICU Level of Service BAnalysis Period (min) 15

Page 590: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 40 96 28 435 484 27Future Volume (vph) 40 96 28 435 484 27Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.904 0.993Flt Protected 0.986 0.997Satd. Flow (prot) 1406 0 0 1559 1649 0Flt Permitted 0.986 0.997Satd. Flow (perm) 1406 0 0 1559 1649 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 298.3 331.4Travel Time (s) 14.9 21.5 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 13% 42% 10% 4% 30%Adj. Flow (vph) 43 104 30 473 526 29Shared Lane Traffic (%)Lane Group Flow (vph) 147 0 0 503 555 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 65.3% ICU Level of Service CAnalysis Period (min) 15

Page 591: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 40 96 28 435 484 27Future Volume (Veh/h) 40 96 28 435 484 27Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 43 104 30 473 526 29PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1074 540 555vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1074 540 555tC, single (s) 6.5 6.3 4.5tC, 2 stage (s)tF (s) 3.6 3.4 2.6p0 queue free % 81 80 96cM capacity (veh/h) 231 521 843

Direction, Lane # EB 1 NB 1 SB 1Volume Total 147 503 555Volume Left 43 30 0Volume Right 104 0 29cSH 381 843 1700Volume to Capacity 0.39 0.04 0.33Queue Length 95th (m) 14.2 0.9 0.0Control Delay (s) 20.3 1.0 0.0Lane LOS C AApproach Delay (s) 20.3 1.0 0.0Approach LOS C

Intersection SummaryAverage Delay 2.9Intersection Capacity Utilization 65.3% ICU Level of Service CAnalysis Period (min) 15

Page 592: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 240 27 423 14 19 7 440 216 9 18 312 250Future Volume (vph) 240 27 423 14 19 7 440 216 9 18 312 250Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.917 0.975 0.998 0.942Flt Protected 0.983 0.983 0.968 0.998Satd. Flow (prot) 0 1461 0 0 1677 0 0 1535 0 0 1553 0Flt Permitted 0.983 0.983 0.968 0.998Satd. Flow (perm) 0 1461 0 0 1677 0 0 1535 0 0 1553 0Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 29.6Travel Time (s) 8.5 7.8 70.5 2.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 13% 0% 0% 0% 7% 17% 0% 7% 5% 7%Adj. Flow (vph) 261 29 460 15 21 8 478 235 10 20 339 272Shared Lane Traffic (%)Lane Group Flow (vph) 0 750 0 0 44 0 0 723 0 0 631 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 135.7% ICU Level of Service HAnalysis Period (min) 15

Page 593: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 52

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 240 27 423 14 19 7 440 216 9 18 312 250Future Volume (Veh/h) 240 27 423 14 19 7 440 216 9 18 312 250Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 261 29 460 15 21 8 478 235 10 20 339 272PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1730 1716 475 2186 1847 240 611 245vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1730 1716 475 2186 1847 240 611 245tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.2 4.2 4.2tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.3 2.3 2.3p0 queue free % 0 34 19 0 43 99 49 98cM capacity (veh/h) 24 44 568 2 37 804 944 1292

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 750 44 723 631Volume Left 261 15 478 20Volume Right 460 8 10 272cSH 60 5 944 1292Volume to Capacity 12.40 8.46 0.51 0.02Queue Length 95th (m) Err Err 23.4 0.4Control Delay (s) Err Err 10.9 0.4Lane LOS F F B AApproach Delay (s) Err Err 10.9 0.4Approach LOS F F

Intersection SummaryAverage Delay 3699.9Intersection Capacity Utilization 135.7% ICU Level of Service HAnalysis Period (min) 15

Page 594: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 77 40 40 219 315 119Future Volume (vph) 77 40 40 219 315 119Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.954 0.850Flt Protected 0.968 0.950Satd. Flow (prot) 1495 0 1614 1733 1716 1352Flt Permitted 0.968 0.950Satd. Flow (perm) 1495 0 1614 1733 1716 1352Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 18% 3% 1% 2% 10%Adj. Flow (vph) 84 43 43 238 342 129Shared Lane Traffic (%)Lane Group Flow (vph) 127 0 43 238 342 129Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 38.6% ICU Level of Service AAnalysis Period (min) 15

Page 595: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 77 40 40 219 315 119Future Volume (Veh/h) 77 40 40 219 315 119Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 84 43 43 238 342 129PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 666 342 471vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 666 342 471tC, single (s) 6.4 6.4 4.1tC, 2 stage (s)tF (s) 3.5 3.5 2.2p0 queue free % 79 94 96cM capacity (veh/h) 406 666 1086

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 127 43 238 342 129Volume Left 84 43 0 0 0Volume Right 43 0 0 0 129cSH 468 1086 1700 1700 1700Volume to Capacity 0.27 0.04 0.14 0.20 0.08Queue Length 95th (m) 8.7 1.0 0.0 0.0 0.0Control Delay (s) 15.5 8.5 0.0 0.0 0.0Lane LOS C AApproach Delay (s) 15.5 1.3 0.0Approach LOS C

Intersection SummaryAverage Delay 2.7Intersection Capacity Utilization 38.6% ICU Level of Service AAnalysis Period (min) 15

Page 596: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 159 21 238 145 66 290Future Volume (vph) 159 21 238 145 66 290Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.984 0.949Flt Protected 0.958 0.991Satd. Flow (prot) 1650 0 1604 0 0 1680Flt Permitted 0.958 0.991Satd. Flow (perm) 1650 0 1604 0 0 1680Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 2% 6% 0% 4%Adj. Flow (vph) 173 23 259 158 72 315Shared Lane Traffic (%)Lane Group Flow (vph) 196 0 417 0 0 387Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 64.7% ICU Level of Service CAnalysis Period (min) 15

Page 597: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 56

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 159 21 238 145 66 290Future Volume (Veh/h) 159 21 238 145 66 290Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 173 23 259 158 72 315PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 797 338 417vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 797 338 417tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 49 97 94cM capacity (veh/h) 336 709 1153

Direction, Lane # WB 1 NB 1 SB 1Volume Total 196 417 387Volume Left 173 0 72Volume Right 23 158 0cSH 358 1700 1153Volume to Capacity 0.55 0.25 0.06Queue Length 95th (m) 25.1 0.0 1.6Control Delay (s) 26.6 0.0 2.1Lane LOS D AApproach Delay (s) 26.6 0.0 2.1Approach LOS D

Intersection SummaryAverage Delay 6.0Intersection Capacity Utilization 64.7% ICU Level of Service CAnalysis Period (min) 15

Page 598: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 403 580 0 313 165Future Volume (vph) 0 403 580 0 313 165Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3292 3228 0 1599 1390Flt Permitted 0.950Satd. Flow (perm) 0 3292 3228 0 1599 1390Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 3% 0% 4% 7%Adj. Flow (vph) 0 438 630 0 340 179Shared Lane Traffic (%)Lane Group Flow (vph) 0 438 630 0 340 179Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 42.9% ICU Level of Service AAnalysis Period (min) 15

Page 599: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 58

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 0 403 580 0 313 165Future Volume (Veh/h) 0 403 580 0 313 165Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 438 630 0 340 179PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 5Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 630 849 315vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 630 849 315tC, single (s) 4.1 6.9 7.0tC, 2 stage (s)tF (s) 2.2 3.5 3.4p0 queue free % 100 0 73cM capacity (veh/h) 962 296 666

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1Volume Total 219 219 315 315 519Volume Left 0 0 0 0 340Volume Right 0 0 0 0 179cSH 1700 1700 1700 1700 397Volume to Capacity 0.13 0.13 0.19 0.19 1.31Queue Length 95th (m) 0.0 0.0 0.0 0.0 188.3Control Delay (s) 0.0 0.0 0.0 0.0 184.0Lane LOS FApproach Delay (s) 0.0 0.0 184.0Approach LOS F

Intersection SummaryAverage Delay 60.2Intersection Capacity Utilization 42.9% ICU Level of Service AAnalysis Period (min) 15

Page 600: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 59

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 678 0 0 994 191 459Future Volume (vph) 678 0 0 994 191 459Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3260 0 0 3228 1568 1473Flt Permitted 0.950Satd. Flow (perm) 3260 0 0 3228 1568 1473Link Speed (k/h) 50 50 50Link Distance (m) 104.2 91.9 169.0Travel Time (s) 7.5 6.6 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 3% 6% 1%Adj. Flow (vph) 737 0 0 1080 208 499Shared Lane Traffic (%)Lane Group Flow (vph) 737 0 0 1080 208 499Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 57.9% ICU Level of Service BAnalysis Period (min) 15

Page 601: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 60

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (veh/h) 678 0 0 994 191 459Future Volume (Veh/h) 678 0 0 994 191 459Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 737 0 0 1080 208 499PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 6Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 737 1277 368vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 737 1277 368tC, single (s) 4.1 6.9 6.9tC, 2 stage (s)tF (s) 2.2 3.6 3.3p0 queue free % 100 0 21cM capacity (veh/h) 878 153 631

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1Volume Total 368 368 540 540 707Volume Left 0 0 0 0 208Volume Right 0 0 0 0 499cSH 1700 1700 1700 1700 400Volume to Capacity 0.22 0.22 0.32 0.32 1.77Queue Length 95th (m) 0.0 0.0 0.0 0.0 354.4Control Delay (s) 0.0 0.0 0.0 0.0 378.1Lane LOS FApproach Delay (s) 0.0 0.0 378.1Approach LOS F

Intersection SummaryAverage Delay 105.9Intersection Capacity Utilization 57.9% ICU Level of Service BAnalysis Period (min) 15

Page 602: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 61

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 432 244 172 216 265 483Future Volume (vph) 432 244 172 216 265 483Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.925 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1549 1598 0 1614 1403Flt Permitted 0.950 0.950Satd. Flow (perm) 1662 1549 1598 0 1614 1403Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 13% 3% 0% 3% 6%Adj. Flow (vph) 470 265 187 235 288 525Shared Lane Traffic (%)Lane Group Flow (vph) 470 265 422 0 288 525Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 76.1% ICU Level of Service DAnalysis Period (min) 15

Page 603: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 62

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 432 244 172 216 265 483Future Volume (vph) 432 244 172 216 265 483Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 470 265 187 235 288 525

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total (vph) 470 265 422 288 525Volume Left (vph) 470 0 0 288 0Volume Right (vph) 0 0 235 0 525Hadj (s) 0.50 0.22 -0.31 0.55 -0.60Departure Headway (s) 8.1 7.8 7.0 8.1 6.9Degree Utilization, x 1.05 0.57 0.82 0.65 1.01Capacity (veh/h) 448 450 507 435 525Control Delay (s) 84.7 19.5 35.0 23.6 68.0Approach Delay (s) 61.2 35.0 52.3Approach LOS F D F

Intersection SummaryDelay 51.9Level of Service FIntersection Capacity Utilization 76.1% ICU Level of Service DAnalysis Period (min) 15

Page 604: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 63

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 23 831 689 107 120 32Future Volume (vph) 23 831 689 107 120 32Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 50.0 50.0 0.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 3292 3228 1458 1614 1430Flt Permitted 0.950 0.950Satd. Flow (perm) 1662 3292 3228 1458 1614 1430Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 3% 2% 3% 4%Adj. Flow (vph) 25 903 749 116 130 35Shared Lane Traffic (%)Lane Group Flow (vph) 25 903 749 116 130 35Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 38.8% ICU Level of Service AAnalysis Period (min) 15

Page 605: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road No Crossing Scenario 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 64

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 23 831 689 107 120 32Future Volume (Veh/h) 23 831 689 107 120 32Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 25 903 749 116 130 35PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 749 1250 374vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 749 1250 374tC, single (s) 4.1 6.9 7.0tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 97 18 94cM capacity (veh/h) 869 159 617

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 SB 1 SB 2Volume Total 25 452 452 374 374 116 130 35Volume Left 25 0 0 0 0 0 130 0Volume Right 0 0 0 0 0 116 0 35cSH 869 1700 1700 1700 1700 1700 159 617Volume to Capacity 0.03 0.27 0.27 0.22 0.22 0.07 0.82 0.06Queue Length 95th (m) 0.7 0.0 0.0 0.0 0.0 0.0 43.4 1.4Control Delay (s) 9.3 0.0 0.0 0.0 0.0 0.0 87.2 11.2Lane LOS A F BApproach Delay (s) 0.2 0.0 71.1Approach LOS F

Intersection SummaryAverage Delay 6.1Intersection Capacity Utilization 38.8% ICU Level of Service AAnalysis Period (min) 15

Page 606: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 100 928 30 109 729 371 57 82 192 380 130 68Future Volume (vph) 100 928 30 109 729 371 57 82 192 380 130 68Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 1 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95Ped Bike Factor 1.00 0.98 1.00 0.97 1.00 0.98 1.00 1.00Frt 0.850 0.850 0.850 0.948Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1554 3260 1488 1646 3228 1458 1630 1750 1403 1646 2967 0Flt Permitted 0.352 0.124 0.617 0.699Satd. Flow (perm) 574 3260 1464 215 3228 1419 1057 1750 1380 1206 2967 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 76 403 209 74Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 5 5 5 5 2 5 5 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 7% 2% 0% 1% 3% 2% 2% 0% 6% 1% 4% 9%Adj. Flow (vph) 109 1009 33 118 792 403 62 89 209 413 141 74Shared Lane Traffic (%)Lane Group Flow (vph) 109 1009 33 118 792 403 62 89 209 413 215 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 1 2Detector Template Left Thru Right Left Thru Right Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 607: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Detector Phase 4 4 4 3 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.4 39.4 39.4 12.5 51.9 51.9 38.1 38.1 38.1 38.1 38.1Total Split (%) 43.8% 43.8% 43.8% 13.9% 57.7% 57.7% 42.3% 42.3% 42.3% 42.3% 42.3%Maximum Green (s) 33.1 33.1 33.1 9.5 45.6 45.6 31.8 31.8 31.8 31.8 31.8Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 0.0 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 31.5 31.5 31.5 42.5 42.5 40.2 32.1 32.1 32.1 32.1 32.1Actuated g/C Ratio 0.38 0.38 0.38 0.51 0.51 0.49 0.39 0.39 0.39 0.39 0.39v/c Ratio 0.50 0.81 0.05 0.51 0.48 0.45 0.15 0.13 0.32 0.88 0.18Control Delay 30.1 29.6 0.5 18.9 14.2 3.1 19.3 18.5 4.3 47.9 12.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 30.1 29.6 0.5 18.9 14.2 3.1 19.3 18.5 4.3 47.9 12.0LOS C C A B B A B B A D BApproach Delay 28.8 11.2 10.4 35.6Approach LOS C B B D

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 82.8Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.88Intersection Signal Delay: 21.4 Intersection LOS: CIntersection Capacity Utilization 81.6% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 608: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBTLane Group Flow (vph) 109 1009 33 118 792 403 62 89 209 413 215v/c Ratio 0.50 0.81 0.05 0.51 0.48 0.45 0.15 0.13 0.32 0.88 0.18Control Delay 30.1 29.6 0.5 18.9 14.2 3.1 19.3 18.5 4.3 47.9 12.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 30.1 29.6 0.5 18.9 14.2 3.1 19.3 18.5 4.3 47.9 12.0Queue Length 50th (m) 14.1 80.8 0.0 10.2 44.3 0.0 7.1 10.1 0.0 67.7 8.3Queue Length 95th (m) 32.2 108.7 0.9 19.1 59.1 14.1 16.5 20.6 13.8 #127.6 16.4Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 249 1418 679 259 1900 972 442 733 699 505 1286Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.44 0.71 0.05 0.46 0.42 0.41 0.14 0.12 0.30 0.82 0.17

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 609: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 100 928 30 109 729 371 57 82 192 380 130 68Future Volume (vph) 100 928 30 109 729 371 57 82 192 380 130 68Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 0.97 1.00 1.00 0.98 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.95Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1551 3260 1464 1646 3228 1420 1628 1750 1381 1640 2969Flt Permitted 0.35 1.00 1.00 0.12 1.00 1.00 0.62 1.00 1.00 0.70 1.00Satd. Flow (perm) 575 3260 1464 215 3228 1420 1058 1750 1381 1207 2969Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 109 1009 33 118 792 403 62 89 209 413 141 74RTOR Reduction (vph) 0 0 20 0 0 207 0 0 128 0 45 0Lane Group Flow (vph) 109 1009 13 118 792 196 62 89 81 413 170 0Confl. Peds. (#/hr) 5 5 5 5 2 5 5 2Heavy Vehicles (%) 7% 2% 0% 1% 3% 2% 2% 0% 6% 1% 4% 9%Turn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Actuated Green, G (s) 29.2 29.2 29.2 40.2 40.2 40.2 29.8 29.8 29.8 29.8 29.8Effective Green, g (s) 31.5 31.5 31.5 39.2 42.5 40.2 32.1 32.1 32.1 32.1 32.1Actuated g/C Ratio 0.38 0.38 0.38 0.47 0.51 0.49 0.39 0.39 0.39 0.39 0.39Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 219 1243 558 223 1660 691 411 680 536 469 1153v/s Ratio Prot c0.31 0.04 c0.25 0.05 0.06v/s Ratio Perm 0.19 0.01 0.21 0.14 0.06 0.06 c0.34v/c Ratio 0.50 0.81 0.02 0.53 0.48 0.28 0.15 0.13 0.15 0.88 0.15Uniform Delay, d1 19.5 22.9 15.9 15.7 12.9 12.6 16.4 16.3 16.4 23.5 16.4Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.3 4.0 0.0 1.7 0.2 0.2 0.1 0.1 0.1 17.2 0.0Delay (s) 20.8 26.9 16.0 17.4 13.1 12.8 16.5 16.3 16.5 40.7 16.4Level of Service C C B B B B B B B D BApproach Delay (s) 26.0 13.4 16.5 32.4Approach LOS C B B C

Intersection SummaryHCM 2000 Control Delay 21.4 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.82Actuated Cycle Length (s) 82.6 Sum of lost time (s) 12.0Intersection Capacity Utilization 81.6% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 610: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1168 33 180 955 0 0 0 0 731 63 254Future Volume (vph) 0 1168 33 180 955 0 0 0 0 731 63 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 0.98 1.00Frt 0.850 0.850Flt Protected 0.950 0.950 0.960Satd. Flow (prot) 0 4730 1488 1662 4638 0 0 0 0 1564 1566 1488Flt Permitted 0.135 0.950 0.960Satd. Flow (perm) 0 4730 1465 236 4638 0 0 0 0 1564 1566 1488Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 81 81Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 17.0 64.2 88.8Travel Time (s) 9.7 1.2 4.6 6.4Confl. Peds. (#/hr) 7 4 4 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 1% 7% 0%Adj. Flow (vph) 0 1270 36 196 1038 0 0 0 0 795 68 276Shared Lane Traffic (%) 46%Lane Group Flow (vph) 0 1270 36 196 1038 0 0 0 0 429 434 276Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 1 2 1 2 1Detector Template Thru Right Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0Turn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6

Page 611: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 4 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 36.3 12.5 36.3 36.3 36.3 36.3Total Split (s) 36.3 36.3 12.5 48.5 36.5 36.5 36.5Total Split (%) 42.6% 42.6% 14.7% 56.9% 42.8% 42.8% 42.8%Maximum Green (s) 30.0 30.0 9.5 42.2 30.2 30.2 30.2Yellow Time (s) 4.1 4.1 3.0 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 0.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 28.9 26.6 41.3 41.3 27.9 27.9 27.9Actuated g/C Ratio 0.37 0.34 0.53 0.53 0.36 0.36 0.36v/c Ratio 0.72 0.06 0.70 0.42 0.76 0.77 0.47Control Delay 24.0 0.7 27.9 12.0 32.4 32.9 16.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 24.0 0.7 27.9 12.0 32.4 32.9 16.4LOS C A C B C C BApproach Delay 23.3 14.5 28.7Approach LOS C B C

Intersection SummaryArea Type: OtherCycle Length: 85.3Actuated Cycle Length: 77.4Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.77Intersection Signal Delay: 22.0 Intersection LOS: CIntersection Capacity Utilization 69.2% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 612: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT EBR WBL WBT SBL SBT SBRLane Group Flow (vph) 1270 36 196 1038 429 434 276v/c Ratio 0.72 0.06 0.70 0.42 0.76 0.77 0.47Control Delay 24.0 0.7 27.9 12.0 32.4 32.9 16.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 24.0 0.7 27.9 12.0 32.4 32.9 16.4Queue Length 50th (m) 65.6 0.0 16.8 36.9 64.1 65.0 23.4Queue Length 95th (m) 82.9 1.0 #45.7 47.7 102.4 104.0 45.6Internal Link Dist (m) 110.1 0.1 64.8Turn Bay Length (m)Base Capacity (vph) 2021 630 286 2748 672 673 686Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.63 0.06 0.69 0.38 0.64 0.64 0.40

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 613: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1168 33 180 955 0 0 0 0 731 63 254Future Volume (vph) 0 1168 33 180 955 0 0 0 0 731 63 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 1.00 1.00 0.91 0.95 0.95 1.00Frpb, ped/bikes 1.00 0.98 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 0.96 1.00Satd. Flow (prot) 4730 1465 1662 4638 1564 1565 1488Flt Permitted 1.00 1.00 0.13 1.00 0.95 0.96 1.00Satd. Flow (perm) 4730 1465 236 4638 1564 1565 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 1270 36 196 1038 0 0 0 0 795 68 276RTOR Reduction (vph) 0 0 24 0 0 0 0 0 0 0 0 52Lane Group Flow (vph) 0 1270 12 196 1038 0 0 0 0 429 434 224Confl. Peds. (#/hr) 7 4 4 7Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 1% 7% 0%Turn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Actuated Green, G (s) 26.7 26.7 39.0 39.0 25.5 25.5 25.5Effective Green, g (s) 29.0 26.7 38.0 41.3 27.8 27.8 27.8Actuated g/C Ratio 0.38 0.35 0.49 0.54 0.36 0.36 0.36Clearance Time (s) 6.3 6.3 3.0 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1779 507 269 2484 563 564 536v/s Ratio Prot c0.27 c0.08 0.22v/s Ratio Perm 0.01 0.28 0.27 0.28 0.15v/c Ratio 0.71 0.02 0.73 0.42 0.76 0.77 0.42Uniform Delay, d1 20.5 16.6 14.1 10.7 21.7 21.8 18.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.4 0.0 9.5 0.1 6.0 6.3 0.5Delay (s) 21.9 16.6 23.6 10.8 27.8 28.1 19.1Level of Service C B C B C C BApproach Delay (s) 21.8 12.8 0.0 25.8Approach LOS C B A C

Intersection SummaryHCM 2000 Control Delay 20.0 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.74Actuated Cycle Length (s) 77.1 Sum of lost time (s) 12.0Intersection Capacity Utilization 69.2% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 614: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1700 0 0 1131 78 254Future Volume (vph) 1700 0 0 1131 78 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.91 1.00 1.00 0.91 0.97 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 4684 0 0 4684 3101 1458Flt Permitted 0.950Satd. Flow (perm) 4684 0 0 4684 3101 1458Right Turn on Red Yes YesSatd. Flow (RTOR) 8Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 2% 4% 2%Adj. Flow (vph) 1848 0 0 1229 85 276Shared Lane Traffic (%)Lane Group Flow (vph) 1848 0 0 1229 85 276Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Detector Phase 4 8 2 2Switch Phase

Page 615: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.0 35.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7%Maximum Green (s) 28.7 28.7 18.7 18.7Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 29.0 29.0 17.2 17.2Actuated g/C Ratio 0.53 0.53 0.32 0.32v/c Ratio 0.74 0.49 0.09 0.59Control Delay 12.4 9.2 13.6 21.5Queue Delay 0.0 0.0 0.0 0.0Total Delay 12.4 9.2 13.6 21.5LOS B A B CApproach Delay 12.4 9.2 19.6Approach LOS B A B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 54.3Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.74Intersection Signal Delay: 12.0 Intersection LOS: BIntersection Capacity Utilization 59.4% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 616: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 1848 1229 85 276v/c Ratio 0.74 0.49 0.09 0.59Control Delay 12.4 9.2 13.6 21.5Queue Delay 0.0 0.0 0.0 0.0Total Delay 12.4 9.2 13.6 21.5Queue Length 50th (m) 48.9 26.7 3.2 24.1Queue Length 95th (m) 74.8 41.6 7.3 45.0Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 2715 2715 1217 577Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.68 0.45 0.07 0.48

Intersection Summary

Page 617: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1700 0 0 1131 78 254Future Volume (vph) 1700 0 0 1131 78 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 0.91 0.97 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 4684 4684 3101 1458Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 4684 4684 3101 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1848 0 0 1229 85 276RTOR Reduction (vph) 0 0 0 0 0 5Lane Group Flow (vph) 1848 0 0 1229 85 271Heavy Vehicles (%) 2% 0% 0% 2% 4% 2%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 26.7 26.7 14.9 14.9Effective Green, g (s) 29.0 29.0 17.2 17.2Actuated g/C Ratio 0.54 0.54 0.32 0.32Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 2506 2506 984 462v/s Ratio Prot c0.39 0.26 0.03v/s Ratio Perm c0.19v/c Ratio 0.74 0.49 0.09 0.59Uniform Delay, d1 9.7 7.9 13.0 15.5Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 1.2 0.2 0.0 1.9Delay (s) 10.8 8.1 13.0 17.4Level of Service B A B BApproach Delay (s) 10.8 8.1 16.4Approach LOS B A B

Intersection SummaryHCM 2000 Control Delay 10.4 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.68Actuated Cycle Length (s) 54.2 Sum of lost time (s) 8.0Intersection Capacity Utilization 59.4% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 618: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 32 1495 471 344 1397 41 386 18 344 19 4 28Future Volume (vph) 32 1495 471 344 1397 41 386 18 344 19 4 28Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 100.0 0.0 15.0 0.0Storage Lanes 1 1 2 0 2 1 1 0Taper Length (m) 40.0 7.5 100.0 7.5Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.98 1.00 1.00 0.98 1.00 0.99Frt 0.850 0.996 0.850 0.868Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1662 3292 1473 3162 3249 0 3162 1750 1473 1662 1447 0Flt Permitted 0.125 0.950 0.950 0.744Satd. Flow (perm) 219 3292 1449 3160 3249 0 3150 1750 1449 1297 1447 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 325 4 344 15Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 4 4 3 3 3 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 1% 2% 2% 0% 2% 0% 1% 0% 0% 4%Adj. Flow (vph) 35 1625 512 374 1518 45 420 20 374 21 4 30Shared Lane Traffic (%)Lane Group Flow (vph) 35 1625 512 374 1563 0 420 20 374 21 34 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 619: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 9.5 32.0 32.0 32.0 32.0Total Split (s) 36.0 36.0 36.0 17.4 53.4 19.0 51.6 51.6 32.6 32.6Total Split (%) 34.3% 34.3% 34.3% 16.6% 50.9% 18.1% 49.1% 49.1% 31.0% 31.0%Maximum Green (s) 28.0 28.0 28.0 12.9 45.4 14.5 43.6 43.6 24.6 24.6Yellow Time (s) 4.5 4.5 4.5 3.5 4.5 3.5 4.5 4.5 4.5 4.5All-Red Time (s) 3.5 3.5 3.5 1.0 3.5 1.0 3.5 3.5 3.5 3.5Lost Time Adjust (s) -4.0 -4.0 -4.0 -0.5 -4.0 -0.5 -4.0 -4.0 -4.0 -4.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min None Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 32.0 32.0 32.0 13.4 49.4 15.0 31.2 31.2 12.2 12.2Actuated g/C Ratio 0.36 0.36 0.36 0.15 0.56 0.17 0.35 0.35 0.14 0.14v/c Ratio 0.44 1.37 0.70 0.78 0.86 0.79 0.03 0.51 0.12 0.16Control Delay 43.0 197.5 14.4 49.1 23.1 47.1 19.1 6.1 35.3 24.7Queue Delay 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 43.0 197.6 14.4 49.1 23.1 47.1 19.1 6.1 35.3 24.7LOS D F B D C D B A D CApproach Delay 151.9 28.1 27.6 28.7Approach LOS F C C C

Intersection SummaryArea Type: OtherCycle Length: 105Actuated Cycle Length: 88.6Natural Cycle: 150Control Type: Semi Act-UncoordMaximum v/c Ratio: 1.37Intersection Signal Delay: 82.0 Intersection LOS: FIntersection Capacity Utilization 85.0% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 620: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 35 1625 512 374 1563 420 20 374 21 34v/c Ratio 0.44 1.37 0.70 0.78 0.86 0.79 0.03 0.51 0.12 0.16Control Delay 43.0 197.5 14.4 49.1 23.1 47.1 19.1 6.1 35.3 24.7Queue Delay 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 43.0 197.6 14.4 49.1 23.1 47.1 19.1 6.1 35.3 24.7Queue Length 50th (m) 4.7 ~203.3 25.8 33.5 116.0 37.4 2.3 3.5 3.4 3.0Queue Length 95th (m) #18.1 #249.3 66.0 #54.7 155.0 #59.5 7.1 23.9 10.2 11.7Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 50.0 100.0 15.0Base Capacity (vph) 79 1189 730 478 1814 535 940 938 418 477Starvation Cap Reductn 0 25 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.44 1.40 0.70 0.78 0.86 0.79 0.02 0.40 0.05 0.07

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 621: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 32 1495 471 344 1397 41 386 18 344 19 4 28Future Volume (vph) 32 1495 471 344 1397 41 386 18 344 19 4 28Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 1.00 1.00 0.98 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 1.00 1.00 0.85 1.00 0.87Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 3292 1450 3162 3248 3162 1750 1450 1657 1447Flt Permitted 0.12 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.74 1.00Satd. Flow (perm) 219 3292 1450 3162 3248 3162 1750 1450 1298 1447Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 35 1625 512 374 1518 45 420 20 374 21 4 30RTOR Reduction (vph) 0 0 208 0 2 0 0 0 223 0 13 0Lane Group Flow (vph) 35 1625 304 374 1561 0 420 20 151 21 21 0Confl. Peds. (#/hr) 4 4 3 3 3 3Heavy Vehicles (%) 0% 1% 1% 2% 2% 0% 2% 0% 1% 0% 0% 4%Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Actuated Green, G (s) 28.0 28.0 28.0 12.9 45.4 14.5 27.2 27.2 8.2 8.2Effective Green, g (s) 32.0 32.0 32.0 13.4 49.4 15.0 31.2 31.2 12.2 12.2Actuated g/C Ratio 0.36 0.36 0.36 0.15 0.56 0.17 0.35 0.35 0.14 0.14Clearance Time (s) 8.0 8.0 8.0 4.5 8.0 4.5 8.0 8.0 8.0 8.0Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 79 1188 523 478 1810 535 616 510 178 199v/s Ratio Prot c0.49 0.12 c0.48 c0.13 0.01 0.01v/s Ratio Perm 0.16 0.21 c0.10 0.02v/c Ratio 0.44 1.37 0.58 0.78 0.86 0.79 0.03 0.30 0.12 0.11Uniform Delay, d1 21.5 28.3 22.9 36.2 16.7 35.3 18.8 20.8 33.5 33.4Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 2.9 171.0 1.4 7.9 4.5 7.4 0.0 0.2 0.2 0.2Delay (s) 24.4 199.3 24.3 44.1 21.2 42.7 18.8 21.0 33.7 33.6Level of Service C F C D C D B C C CApproach Delay (s) 155.2 25.6 32.1 33.6Approach LOS F C C C

Intersection SummaryHCM 2000 Control Delay 83.3 HCM 2000 Level of Service FHCM 2000 Volume to Capacity ratio 1.00Actuated Cycle Length (s) 88.6 Sum of lost time (s) 16.0Intersection Capacity Utilization 85.0% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group

Page 622: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 399 794 665 95 634 142 491 270 73 168 261 356Future Volume (vph) 399 794 665 95 634 142 491 270 73 168 261 356Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 2 0 1 0 1 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 0.97 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.98 0.99 0.99 0.99 0.98Frt 0.932 0.973 0.968 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 3101 2996 0 1630 3183 0 1630 1661 0 1630 1716 1473Flt Permitted 0.950 0.138 0.335 0.220Satd. Flow (perm) 3101 2996 0 237 3183 0 571 1661 0 373 1716 1440Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 221 25 13 348Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 9 9 10 23 23 10Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 4% 2% 1% 2% 2% 0% 2% 1% 2% 2% 2% 1%Adj. Flow (vph) 434 863 723 103 689 154 534 293 79 183 284 387Shared Lane Traffic (%)Lane Group Flow (vph) 434 1586 0 103 843 0 534 372 0 183 284 387Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 623: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Detector Phase 7 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 9.5 30.4 9.5 30.4 9.5 37.7 9.5 37.7 37.7Total Split (s) 22.6 45.5 13.3 36.2 11.8 40.2 11.0 39.4 39.4Total Split (%) 20.5% 41.4% 12.1% 32.9% 10.7% 36.5% 10.0% 35.8% 35.8%Maximum Green (s) 18.6 39.1 10.3 29.8 8.8 33.5 8.0 32.7 32.7Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1 4.1All-Red Time (s) 1.0 2.3 0.0 2.3 0.0 2.6 0.0 2.6 2.6Lost Time Adjust (s) 0.0 -2.4 1.0 -2.4 1.0 -2.7 1.0 -2.7 -2.7Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 17.1 42.3 39.4 32.3 36.2 28.3 34.6 27.5 27.5Actuated g/C Ratio 0.17 0.42 0.39 0.32 0.36 0.28 0.34 0.27 0.27v/c Ratio 0.83 1.15 0.54 0.81 1.86 0.78 0.85 0.61 0.60Control Delay 55.6 100.3 27.0 39.5 423.5 44.5 58.4 37.8 9.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 55.6 100.3 27.0 39.5 423.5 44.5 58.4 37.8 9.0LOS E F C D F D E D AApproach Delay 90.7 38.1 267.9 29.2Approach LOS F D F C

Intersection SummaryArea Type: OtherCycle Length: 110Actuated Cycle Length: 100.9Natural Cycle: 140Control Type: Semi Act-UncoordMaximum v/c Ratio: 1.86Intersection Signal Delay: 103.0 Intersection LOS: FIntersection Capacity Utilization 114.0% ICU Level of Service HAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 624: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 434 1586 103 843 534 372 183 284 387v/c Ratio 0.83 1.15 0.54 0.81 1.86 0.78 0.85 0.61 0.60Control Delay 55.6 100.3 27.0 39.5 423.5 44.5 58.4 37.8 9.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 55.6 100.3 27.0 39.5 423.5 44.5 58.4 37.8 9.0Queue Length 50th (m) 45.4 ~191.9 10.4 84.4 ~172.5 69.5 26.1 51.8 6.1Queue Length 95th (m) #74.0 #265.1 23.1 #129.2 #247.1 104.4 #57.3 79.3 32.4Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 575 1385 227 1045 287 608 215 606 734Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.75 1.15 0.45 0.81 1.86 0.61 0.85 0.47 0.53

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 625: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 399 794 665 95 634 142 491 270 73 168 261 356Future Volume (vph) 399 794 665 95 634 142 491 270 73 168 261 356Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.93 1.00 0.97 1.00 0.97 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 3101 2997 1630 3182 1627 1662 1627 1716 1441Flt Permitted 0.95 1.00 0.14 1.00 0.33 1.00 0.22 1.00 1.00Satd. Flow (perm) 3101 2997 237 3182 574 1662 378 1716 1441Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 434 863 723 103 689 154 534 293 79 183 284 387RTOR Reduction (vph) 0 128 0 0 17 0 0 9 0 0 0 253Lane Group Flow (vph) 434 1458 0 103 826 0 534 363 0 183 284 134Confl. Peds. (#/hr) 9 9 10 23 23 10Heavy Vehicles (%) 4% 2% 1% 2% 2% 0% 2% 1% 2% 2% 2% 1%Turn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Actuated Green, G (s) 17.1 39.9 38.0 29.9 34.5 25.6 32.9 24.8 24.8Effective Green, g (s) 17.1 42.3 36.0 32.3 32.5 28.3 30.9 27.5 27.5Actuated g/C Ratio 0.17 0.42 0.36 0.32 0.32 0.28 0.31 0.27 0.27Clearance Time (s) 4.0 6.4 3.0 6.4 3.0 6.7 3.0 6.7 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 526 1257 182 1019 267 466 203 468 393v/s Ratio Prot c0.14 c0.49 0.04 0.26 c0.16 0.22 0.06 0.17v/s Ratio Perm 0.16 c0.49 0.21 0.09v/c Ratio 0.83 1.16 0.57 0.81 2.00 0.78 0.90 0.61 0.34Uniform Delay, d1 40.4 29.2 25.5 31.4 33.1 33.4 31.1 31.9 29.4Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 10.0 81.1 3.2 4.8 463.1 7.5 37.1 1.7 0.3Delay (s) 50.4 110.3 28.8 36.2 496.2 40.8 68.2 33.6 29.6Level of Service D F C D F D E C CApproach Delay (s) 97.5 35.4 309.2 39.2Approach LOS F D F D

Intersection SummaryHCM 2000 Control Delay 115.1 HCM 2000 Level of Service FHCM 2000 Volume to Capacity ratio 1.43Actuated Cycle Length (s) 100.8 Sum of lost time (s) 16.0Intersection Capacity Utilization 114.0% ICU Level of Service HAnalysis Period (min) 15c Critical Lane Group

Page 626: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 271 691 73 6 634 150 263 197 15 174 242 274Future Volume (vph) 271 691 73 6 634 150 263 197 15 174 242 274Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 1 0 1 0 0 0 1 1Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.98Frt 0.986 0.971 0.996 0.850Flt Protected 0.950 0.950 0.973 0.950Satd. Flow (prot) 1630 3174 0 1662 3130 0 0 1663 0 1646 1750 1458Flt Permitted 0.164 0.339 0.596 0.512Satd. Flow (perm) 281 3174 0 591 3130 0 0 1016 0 886 1750 1432Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 20 37 2 298Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 5 6 6 5 7 5 5 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 3% 3% 0% 3% 2% 2% 2% 0% 1% 0% 2%Adj. Flow (vph) 295 751 79 7 689 163 286 214 16 189 263 298Shared Lane Traffic (%)Lane Group Flow (vph) 295 830 0 7 852 0 0 516 0 189 263 298Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 627: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Detector Phase 7 4 8 8 2 2 6 6 6Switch PhaseMinimum Initial (s) 6.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 17.0 27.1 27.1 27.1 33.1 33.1 33.1 33.1 33.1Total Split (s) 17.0 45.0 28.0 28.0 35.0 35.0 35.0 35.0 35.0Total Split (%) 21.3% 56.3% 35.0% 35.0% 43.8% 43.8% 43.8% 43.8% 43.8%Maximum Green (s) 14.0 38.9 21.9 21.9 28.9 28.9 28.9 28.9 28.9Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) 0.0 -2.1 0.0 -2.1 -2.1 -2.1 -2.1 0.0Total Lost Time (s) 3.0 4.0 6.1 4.0 4.0 4.0 4.0 6.1Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 17.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 41.1 40.1 21.4 23.5 31.0 31.0 31.0 28.9Actuated g/C Ratio 0.52 0.51 0.27 0.30 0.39 0.39 0.39 0.37v/c Ratio 0.78 0.51 0.04 0.89 1.29 0.54 0.38 0.42Control Delay 31.0 14.0 22.5 38.9 175.4 26.2 19.6 4.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 31.0 14.0 22.5 38.9 175.4 26.2 19.6 4.4LOS C B C D F C B AApproach Delay 18.5 38.7 175.4 15.2Approach LOS B D F B

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 79.1Natural Cycle: 90Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 1.29Intersection Signal Delay: 48.0 Intersection LOS: DIntersection Capacity Utilization 97.7% ICU Level of Service FAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 628: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBL EBT WBL WBT NBT SBL SBT SBRLane Group Flow (vph) 295 830 7 852 516 189 263 298v/c Ratio 0.78 0.51 0.04 0.89 1.29 0.54 0.38 0.42Control Delay 31.0 14.0 22.5 38.9 175.4 26.2 19.6 4.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 31.0 14.0 22.5 38.9 175.4 26.2 19.6 4.4Queue Length 50th (m) 26.7 42.1 0.8 65.2 ~108.5 23.0 29.6 0.0Queue Length 95th (m) #65.9 57.8 3.9 #100.2 #168.9 44.9 49.3 15.7Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 50.0 50.0 25.0Base Capacity (vph) 384 1655 163 975 399 347 686 712Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.77 0.50 0.04 0.87 1.29 0.54 0.38 0.42

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 629: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 271 691 73 6 634 150 263 197 15 174 242 274Future Volume (vph) 271 691 73 6 634 150 263 197 15 174 242 274Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.0 4.0 6.1 4.0 4.0 4.0 4.0 6.1Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.99 1.00 0.97 1.00 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.97 0.95 1.00 1.00Satd. Flow (prot) 1630 3173 1657 3131 1659 1643 1750 1432Flt Permitted 0.16 1.00 0.34 1.00 0.60 0.51 1.00 1.00Satd. Flow (perm) 281 3173 591 3131 1015 886 1750 1432Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 295 751 79 7 689 163 286 214 16 189 263 298RTOR Reduction (vph) 0 10 0 0 26 0 0 1 0 0 0 189Lane Group Flow (vph) 295 820 0 7 826 0 0 515 0 189 263 109Confl. Peds. (#/hr) 5 6 6 5 7 5 5 7Heavy Vehicles (%) 2% 3% 3% 0% 3% 2% 2% 2% 0% 1% 0% 2%Turn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 38.0 38.0 21.4 21.4 28.9 28.9 28.9 28.9Effective Green, g (s) 38.0 40.1 21.4 23.5 31.0 31.0 31.0 28.9Actuated g/C Ratio 0.48 0.51 0.27 0.30 0.39 0.39 0.39 0.37Clearance Time (s) 3.0 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 366 1608 159 930 397 347 685 523v/s Ratio Prot c0.14 0.26 c0.26 0.15v/s Ratio Perm 0.25 0.01 c0.51 0.21 0.08v/c Ratio 0.81 0.51 0.04 0.89 1.30 0.54 0.38 0.21Uniform Delay, d1 16.5 13.0 21.3 26.5 24.0 18.6 17.2 17.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 12.2 0.3 0.1 10.3 151.0 1.7 0.4 0.2Delay (s) 28.7 13.2 21.4 36.9 175.1 20.3 17.6 17.4Level of Service C B C D F C B BApproach Delay (s) 17.3 36.7 175.1 18.2Approach LOS B D F B

Intersection SummaryHCM 2000 Control Delay 47.7 HCM 2000 Level of Service DHCM 2000 Volume to Capacity ratio 1.06Actuated Cycle Length (s) 79.1 Sum of lost time (s) 11.0Intersection Capacity Utilization 97.7% ICU Level of Service FAnalysis Period (min) 15c Critical Lane Group

Page 630: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 63 690 126 134 426 158 178 130 138 132 202 186Future Volume (vph) 63 690 126 134 426 158 178 130 138 132 202 186Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95Frt 0.977 0.959 0.923 0.928Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3185 0 1630 3126 0 1630 3009 0 1630 3025 0Flt Permitted 0.300 0.233 0.449 0.549Satd. Flow (perm) 515 3185 0 400 3126 0 770 3009 0 942 3025 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 30 77 150 202Link Speed (k/h) 50 50 50 50Link Distance (m) 136.7 140.7 105.6 128.9Travel Time (s) 9.8 10.1 7.6 9.3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 68 750 137 146 463 172 193 141 150 143 220 202Shared Lane Traffic (%)Lane Group Flow (vph) 68 887 0 146 635 0 193 291 0 143 422 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6

Page 631: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 7 4 3 8 5 2 1 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 9.5 24.3 9.5 24.3 9.5 24.3 9.5 24.3Total Split (s) 9.5 24.3 9.5 24.3 9.5 26.7 9.5 26.7Total Split (%) 13.6% 34.7% 13.6% 34.7% 13.6% 38.1% 13.6% 38.1%Maximum Green (s) 6.5 18.0 6.5 18.0 6.5 20.4 6.5 20.4Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1All-Red Time (s) 0.0 2.2 0.0 2.2 0.0 2.2 0.0 2.2Lost Time Adjust (s) 1.0 -2.3 1.0 -2.3 1.0 -2.3 1.0 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 25.4 20.2 25.9 20.5 17.8 12.2 17.6 12.2Actuated g/C Ratio 0.43 0.34 0.44 0.35 0.30 0.21 0.30 0.21v/c Ratio 0.21 0.80 0.51 0.56 0.62 0.39 0.42 0.54Control Delay 10.5 25.3 16.3 16.7 24.2 11.5 17.4 13.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 10.5 25.3 16.3 16.7 24.2 11.5 17.4 13.3LOS B C B B C B B BApproach Delay 24.2 16.6 16.6 14.3Approach LOS C B B B

Intersection SummaryArea Type: OtherCycle Length: 70Actuated Cycle Length: 59.4Natural Cycle: 70Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.80Intersection Signal Delay: 18.7 Intersection LOS: BIntersection Capacity Utilization 69.7% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 108: Stanley Ave & Marine Land Pkway (RR 49)

Page 632: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT WBL WBT NBL NBT SBL SBTLane Group Flow (vph) 68 887 146 635 193 291 143 422v/c Ratio 0.21 0.80 0.51 0.56 0.62 0.39 0.42 0.54Control Delay 10.5 25.3 16.3 16.7 24.2 11.5 17.4 13.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 10.5 25.3 16.3 16.7 24.2 11.5 17.4 13.3Queue Length 50th (m) 3.8 45.8 8.5 26.5 15.5 7.1 11.1 11.4Queue Length 95th (m) 10.6 #85.0 19.9 46.1 29.1 16.2 22.1 22.7Internal Link Dist (m) 112.7 116.7 81.6 104.9Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 326 1110 289 1126 309 1245 344 1283Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.21 0.80 0.51 0.56 0.62 0.23 0.42 0.33

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 633: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 63 690 126 134 426 158 178 130 138 132 202 186Future Volume (vph) 63 690 126 134 426 158 178 130 138 132 202 186Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.95 1.00 0.95Frt 1.00 0.98 1.00 0.96 1.00 0.92 1.00 0.93Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1630 3184 1630 3127 1630 3008 1630 3026Flt Permitted 0.30 1.00 0.23 1.00 0.45 1.00 0.55 1.00Satd. Flow (perm) 514 3184 399 3127 771 3008 941 3026Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 68 750 137 146 463 172 193 141 150 143 220 202RTOR Reduction (vph) 0 20 0 0 50 0 0 119 0 0 161 0Lane Group Flow (vph) 68 867 0 146 585 0 193 172 0 143 261 0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Actuated Green, G (s) 24.1 17.9 24.7 18.2 16.4 9.9 16.4 9.9Effective Green, g (s) 22.1 20.2 22.7 20.5 14.4 12.2 14.4 12.2Actuated g/C Ratio 0.37 0.34 0.38 0.35 0.24 0.21 0.24 0.21Clearance Time (s) 3.0 6.3 3.0 6.3 3.0 6.3 3.0 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 288 1082 266 1079 266 617 291 621v/s Ratio Prot 0.02 c0.27 c0.05 0.19 c0.07 0.06 0.05 0.09v/s Ratio Perm 0.07 0.16 c0.11 0.07v/c Ratio 0.24 0.80 0.55 0.54 0.73 0.28 0.49 0.42Uniform Delay, d1 12.4 17.8 13.5 15.7 19.6 19.9 18.7 20.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 4.4 2.3 0.6 9.4 0.2 1.3 0.5Delay (s) 12.8 22.1 15.8 16.2 29.1 20.1 20.0 21.0Level of Service B C B B C C B CApproach Delay (s) 21.5 16.1 23.7 20.7Approach LOS C B C C

Intersection SummaryHCM 2000 Control Delay 20.2 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.68Actuated Cycle Length (s) 59.4 Sum of lost time (s) 16.0Intersection Capacity Utilization 69.7% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 634: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 184 93 239 0 0 270Future Volume (vph) 184 93 239 0 0 270Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.950Flt Protected 0.968Satd. Flow (prot) 3061 0 3260 0 0 3260Flt Permitted 0.968Satd. Flow (perm) 3061 0 3260 0 0 3260Right Turn on Red Yes YesSatd. Flow (RTOR) 101Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 2% 2% 0% 0% 2%Adj. Flow (vph) 200 101 260 0 0 293Shared Lane Traffic (%)Lane Group Flow (vph) 301 0 260 0 0 293Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch Phase

Page 635: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group WBL WBR NBT NBR SBL SBTMinimum Initial (s) 8.0 8.0 8.0Minimum Split (s) 25.1 22.5 22.5Total Split (s) 28.2 22.5 22.5Total Split (%) 55.6% 44.4% 44.4%Maximum Green (s) 22.1 16.4 16.4Yellow Time (s) 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 10.2 10.3 10.3Actuated g/C Ratio 0.36 0.36 0.36v/c Ratio 0.26 0.22 0.25Control Delay 5.0 6.9 7.0Queue Delay 0.0 0.0 0.0Total Delay 5.0 6.9 7.0LOS A A AApproach Delay 5.0 6.9 7.0Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50.7Actuated Cycle Length: 28.5Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.26Intersection Signal Delay: 6.3 Intersection LOS: AIntersection Capacity Utilization 23.6% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 636: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group WBL NBT SBTLane Group Flow (vph) 301 260 293v/c Ratio 0.26 0.22 0.25Control Delay 5.0 6.9 7.0Queue Delay 0.0 0.0 0.0Total Delay 5.0 6.9 7.0Queue Length 50th (m) 2.9 4.0 4.5Queue Length 95th (m) 7.1 7.8 8.6Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2955 2119 2119Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.10 0.12 0.14

Intersection Summary

Page 637: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 32

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 184 93 239 0 0 270Future Volume (vph) 184 93 239 0 0 270Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 0.95 1.00 1.00Flt Protected 0.97 1.00 1.00Satd. Flow (prot) 3059 3260 3260Flt Permitted 0.97 1.00 1.00Satd. Flow (perm) 3059 3260 3260Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 200 101 260 0 0 293RTOR Reduction (vph) 65 0 0 0 0 0Lane Group Flow (vph) 236 0 260 0 0 293Heavy Vehicles (%) 2% 2% 2% 0% 0% 2%Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.1 8.2 8.2Effective Green, g (s) 10.2 10.3 10.3Actuated g/C Ratio 0.36 0.36 0.36Clearance Time (s) 6.1 6.1 6.1Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1094 1178 1178v/s Ratio Prot c0.08 0.08v/s Ratio Perm c0.09v/c Ratio 0.22 0.22 0.25Uniform Delay, d1 6.4 6.3 6.4Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.0 0.1 0.1Delay (s) 6.4 6.4 6.4Level of Service A A AApproach Delay (s) 6.4 6.4 6.4Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.4 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.26Actuated Cycle Length (s) 28.5 Sum of lost time (s) 10.1Intersection Capacity Utilization 23.6% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 638: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 443 14 2 304 308 455Future Volume (vph) 443 14 2 304 308 455Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Frt 0.996 0.911Flt Protected 0.954Satd. Flow (prot) 1663 0 0 3198 2981 0Flt Permitted 0.954 0.948Satd. Flow (perm) 1663 0 0 3032 2981 0Right Turn on Red Yes YesSatd. Flow (RTOR) 2 495Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 0% 4% 4% 0%Adj. Flow (vph) 482 15 2 330 335 495Shared Lane Traffic (%)Lane Group Flow (vph) 497 0 0 332 830 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot Perm NA NAProtected Phases 4 2 6Permitted Phases 2Detector Phase 4 2 2 6Switch Phase

Page 639: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group EBL EBR NBL NBT SBT SBRMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 31.3 42.0 42.0 42.0Total Split (%) 42.7% 57.3% 57.3% 57.3%Maximum Green (s) 25.0 35.0 35.0 35.0Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.9 2.9 2.9Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 20.0 15.7 15.7Actuated g/C Ratio 0.45 0.36 0.36v/c Ratio 0.66 0.31 0.60Control Delay 14.5 12.0 6.9Queue Delay 0.0 0.0 0.0Total Delay 14.5 12.0 6.9LOS B B AApproach Delay 14.5 12.0 6.9Approach LOS B B A

Intersection SummaryArea Type: OtherCycle Length: 73.3Actuated Cycle Length: 44Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.66Intersection Signal Delay: 10.2 Intersection LOS: BIntersection Capacity Utilization 59.4% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 640: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group EBL NBT SBTLane Group Flow (vph) 497 332 830v/c Ratio 0.66 0.31 0.60Control Delay 14.5 12.0 6.9Queue Delay 0.0 0.0 0.0Total Delay 14.5 12.0 6.9Queue Length 50th (m) 25.2 9.3 9.5Queue Length 95th (m) 64.7 21.2 26.5Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1065 2637 2657Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.47 0.13 0.31

Intersection Summary

Page 641: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 36

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 443 14 2 304 308 455Future Volume (vph) 443 14 2 304 308 455Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95Frt 1.00 1.00 0.91Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1662 3197 2979Flt Permitted 0.95 0.95 1.00Satd. Flow (perm) 1662 3032 2979Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 482 15 2 330 335 495RTOR Reduction (vph) 1 0 0 0 318 0Lane Group Flow (vph) 496 0 0 332 512 0Heavy Vehicles (%) 0% 0% 0% 4% 4% 0%Turn Type Prot Perm NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 17.7 12.6 12.6Effective Green, g (s) 20.0 15.6 15.6Actuated g/C Ratio 0.46 0.36 0.36Clearance Time (s) 6.3 7.0 7.0Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 762 1084 1065v/s Ratio Prot c0.30 c0.17v/s Ratio Perm 0.11v/c Ratio 0.65 0.31 0.48Uniform Delay, d1 9.1 10.1 10.9Progression Factor 1.00 1.00 1.00Incremental Delay, d2 1.6 0.1 0.2Delay (s) 10.7 10.2 11.0Level of Service B B BApproach Delay (s) 10.7 10.2 11.0Approach LOS B B B

Intersection SummaryHCM 2000 Control Delay 10.8 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.58Actuated Cycle Length (s) 43.6 Sum of lost time (s) 8.0Intersection Capacity Utilization 59.4% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 642: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Future Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1716 0 1750 1667 1403 0 1750 0 3101 1488 0Flt Permitted 0.473 0.950Satd. Flow (perm) 828 1716 0 1750 1667 1403 0 1750 0 3101 1488 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 126 896Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 0% 5% 6% 0% 0% 0% 4% 0% 0%Adj. Flow (vph) 75 80 0 0 121 46 0 0 0 252 0 96Shared Lane Traffic (%)Lane Group Flow (vph) 75 80 0 0 121 46 0 0 0 252 96 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 643: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 12.5 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 18.0 52.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (%) 13.9% 40.5% 26.6% 26.6% 26.6% 29.7% 29.7% 29.7% 29.7%Maximum Green (s) 15.0 45.0 27.0 27.0 27.0 31.0 31.0 31.0 31.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.9 24.9 13.6 13.6 13.6 13.6Actuated g/C Ratio 0.54 0.54 0.29 0.29 0.29 0.29v/c Ratio 0.13 0.09 0.25 0.09 0.28 0.09Control Delay 5.9 5.6 14.4 0.4 13.8 0.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.9 5.6 14.4 0.4 13.8 0.2LOS A A B A B AApproach Delay 5.8 10.5 10.0Approach LOS A B B

Intersection SummaryArea Type: OtherCycle Length: 129.5Actuated Cycle Length: 46.5Natural Cycle: 125Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.28Intersection Signal Delay: 9.2 Intersection LOS: AIntersection Capacity Utilization 25.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 644: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 75 80 121 46 252 96v/c Ratio 0.13 0.09 0.25 0.09 0.28 0.09Control Delay 5.9 5.6 14.4 0.4 13.8 0.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.9 5.6 14.4 0.4 13.8 0.2Queue Length 50th (m) 2.7 2.9 7.7 0.0 8.3 0.0Queue Length 95th (m) 7.2 7.6 18.5 0.2 16.2 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 693 1714 1093 963 2299 1335Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.11 0.05 0.11 0.05 0.11 0.07

Intersection Summary

Page 645: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Future Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1716 1667 1403 3101 1488Flt Permitted 0.47 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 828 1716 1667 1403 3101 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 75 80 0 0 121 46 0 0 0 252 0 96RTOR Reduction (vph) 0 0 0 0 0 32 0 0 0 0 68 0Lane Group Flow (vph) 75 80 0 0 121 14 0 0 0 252 28 0Heavy Vehicles (%) 0% 2% 0% 0% 5% 6% 0% 0% 0% 4% 0% 0%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 21.4 21.4 10.2 10.2 10.2 10.2Effective Green, g (s) 20.4 24.9 13.7 13.7 13.7 13.7Actuated g/C Ratio 0.44 0.53 0.29 0.29 0.29 0.29Clearance Time (s) 3.0 7.5 7.5 7.5 7.5 7.5Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 491 916 490 412 911 437v/s Ratio Prot c0.02 0.05 c0.07 c0.08 0.02v/s Ratio Perm 0.04 0.01v/c Ratio 0.15 0.09 0.25 0.03 0.28 0.06Uniform Delay, d1 7.9 5.3 12.5 11.7 12.6 11.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.1 0.0 0.1 0.0Delay (s) 8.0 5.3 12.7 11.7 12.7 11.9Level of Service A A B B B BApproach Delay (s) 6.6 12.4 0.0 12.5Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 11.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.27Actuated Cycle Length (s) 46.6 Sum of lost time (s) 16.0Intersection Capacity Utilization 25.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 646: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 58 2 309 73 93 4 161 255 123 260 18Future Volume (vph) 16 58 2 309 73 93 4 161 255 123 260 18Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 0.0 0.0 30.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.997 0.916 0.850 0.990Flt Protected 0.990 0.950 0.999 0.950Satd. Flow (prot) 0 1727 0 1630 1594 0 0 1731 1473 1646 1732 0Flt Permitted 0.937 0.704 0.992 0.644Satd. Flow (perm) 0 1635 0 1208 1594 0 0 1719 1473 1116 1732 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 2 101 277 5Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 0% 2% 0% 1% 0% 1% 1% 1% 0% 0%Adj. Flow (vph) 17 63 2 336 79 101 4 175 277 134 283 20Shared Lane Traffic (%)Lane Group Flow (vph) 0 82 0 336 180 0 0 179 277 134 303 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 647: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 44.0 44.0 44.0 44.0 36.0 36.0 36.0 36.0 36.0Total Split (%) 55.0% 55.0% 55.0% 55.0% 45.0% 45.0% 45.0% 45.0% 45.0%Maximum Green (s) 37.7 37.7 37.7 37.7 29.7 29.7 29.7 29.7 29.7Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 -2.3 -2.3 0.0 0.0 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 6.3 6.3 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 26.9 24.4 26.9 21.5 19.1 19.1 21.5Actuated g/C Ratio 0.47 0.43 0.47 0.38 0.34 0.34 0.38v/c Ratio 0.11 0.65 0.22 0.28 0.41 0.36 0.46Control Delay 9.5 20.5 5.6 15.3 4.5 19.4 17.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.5 20.5 5.6 15.3 4.5 19.4 17.2LOS A C A B A B BApproach Delay 9.5 15.3 8.8 17.9Approach LOS A B A B

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 57Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.65Intersection Signal Delay: 13.7 Intersection LOS: BIntersection Capacity Utilization 60.7% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 648: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 82 336 180 179 277 134 303v/c Ratio 0.11 0.65 0.22 0.28 0.41 0.36 0.46Control Delay 9.5 20.5 5.6 15.3 4.5 19.4 17.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.5 20.5 5.6 15.3 4.5 19.4 17.2Queue Length 50th (m) 4.2 25.9 4.2 12.7 0.0 10.4 22.8Queue Length 95th (m) 13.6 65.1 16.7 33.2 15.0 29.4 55.4Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 50.0 30.0 50.0Base Capacity (vph) 1209 856 1205 1036 946 624 1046Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.07 0.39 0.15 0.17 0.29 0.21 0.29

Intersection Summary

Page 649: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 58 2 309 73 93 4 161 255 123 260 18Future Volume (vph) 16 58 2 309 73 93 4 161 255 123 260 18Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 6.3 6.3 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.92 1.00 0.85 1.00 0.99Flt Protected 0.99 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1726 1630 1594 1731 1473 1646 1733Flt Permitted 0.94 0.70 1.00 0.99 1.00 0.64 1.00Satd. Flow (perm) 1634 1207 1594 1719 1473 1117 1733Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 17 63 2 336 79 101 4 175 277 134 283 20RTOR Reduction (vph) 0 1 0 0 53 0 0 0 183 0 3 0Lane Group Flow (vph) 0 81 0 336 127 0 0 179 94 134 300 0Heavy Vehicles (%) 0% 0% 0% 2% 0% 1% 0% 1% 1% 1% 0% 0%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 24.4 24.4 24.4 19.1 19.1 19.1 19.1Effective Green, g (s) 26.7 24.4 26.7 21.4 19.1 19.1 21.4Actuated g/C Ratio 0.48 0.43 0.48 0.38 0.34 0.34 0.38Clearance Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 777 524 758 655 501 380 661v/s Ratio Prot 0.08 c0.17v/s Ratio Perm 0.05 c0.28 0.10 0.06 0.12v/c Ratio 0.10 0.64 0.17 0.27 0.19 0.35 0.45Uniform Delay, d1 8.1 12.4 8.4 12.0 13.0 13.9 13.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 4.4 0.3 0.6 0.5 1.6 1.4Delay (s) 8.3 16.8 8.7 12.6 13.6 15.5 14.4Level of Service A B A B B B BApproach Delay (s) 8.3 13.9 13.2 14.7Approach LOS A B B B

Intersection SummaryHCM 2000 Control Delay 13.6 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.53Actuated Cycle Length (s) 56.1 Sum of lost time (s) 8.0Intersection Capacity Utilization 60.7% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 650: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 57 26 38 389 385 77Future Volume (vph) 57 26 38 389 385 77Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.958 0.977Flt Protected 0.967 0.996Satd. Flow (prot) 1295 0 0 1679 1665 0Flt Permitted 0.967 0.996Satd. Flow (perm) 1295 0 0 1679 1665 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 14% 50% 33% 1% 2% 6%Adj. Flow (vph) 62 28 41 423 418 84Shared Lane Traffic (%)Lane Group Flow (vph) 90 0 0 464 502 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 66.7% ICU Level of Service CAnalysis Period (min) 15

Page 651: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 46

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 57 26 38 389 385 77Future Volume (Veh/h) 57 26 38 389 385 77Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 62 28 41 423 418 84PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 965 460 502vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 965 460 502tC, single (s) 6.5 6.7 4.4tC, 2 stage (s)tF (s) 3.6 3.8 2.5p0 queue free % 76 95 96cM capacity (veh/h) 257 513 920

Direction, Lane # EB 1 NB 1 SB 1Volume Total 90 464 502Volume Left 62 41 0Volume Right 28 0 84cSH 304 920 1700Volume to Capacity 0.30 0.04 0.30Queue Length 95th (m) 9.6 1.1 0.0Control Delay (s) 21.7 1.3 0.0Lane LOS C AApproach Delay (s) 21.7 1.3 0.0Approach LOS C

Intersection SummaryAverage Delay 2.4Intersection Capacity Utilization 66.7% ICU Level of Service CAnalysis Period (min) 15

Page 652: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 22 8 6 405 393 19Future Volume (vph) 22 8 6 405 393 19Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.963 0.994Flt Protected 0.965 0.999Satd. Flow (prot) 1569 0 0 1731 1676 0Flt Permitted 0.965 0.999Satd. Flow (perm) 1569 0 0 1731 1676 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 5% 0% 0% 1% 4% 0%Adj. Flow (vph) 24 9 7 440 427 21Shared Lane Traffic (%)Lane Group Flow (vph) 33 0 0 447 448 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 38.4% ICU Level of Service AAnalysis Period (min) 15

Page 653: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 22 8 6 405 393 19Future Volume (Veh/h) 22 8 6 405 393 19Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 24 9 7 440 427 21PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 892 438 448vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 892 438 448tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 92 99 99cM capacity (veh/h) 307 623 1123

Direction, Lane # EB 1 NB 1 SB 1Volume Total 33 447 448Volume Left 24 7 0Volume Right 9 0 21cSH 356 1123 1700Volume to Capacity 0.09 0.01 0.26Queue Length 95th (m) 2.4 0.2 0.0Control Delay (s) 16.1 0.2 0.0Lane LOS C AApproach Delay (s) 16.1 0.2 0.0Approach LOS C

Intersection SummaryAverage Delay 0.7Intersection Capacity Utilization 38.4% ICU Level of Service AAnalysis Period (min) 15

Page 654: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 6 18 7 405 395 6Future Volume (vph) 6 18 7 405 395 6Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.900 0.998Flt Protected 0.987 0.999Satd. Flow (prot) 1478 0 0 1716 1680 0Flt Permitted 0.987 0.999Satd. Flow (perm) 1478 0 0 1716 1680 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 298.3 331.4Travel Time (s) 14.9 21.5 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 7% 50% 1% 4% 0%Adj. Flow (vph) 7 20 8 440 429 7Shared Lane Traffic (%)Lane Group Flow (vph) 27 0 0 448 436 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 39.2% ICU Level of Service AAnalysis Period (min) 15

Page 655: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 6 18 7 405 395 6Future Volume (Veh/h) 6 18 7 405 395 6Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 20 8 440 429 7PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 888 432 436vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 888 432 436tC, single (s) 6.4 6.3 4.6tC, 2 stage (s)tF (s) 3.5 3.4 2.7p0 queue free % 98 97 99cM capacity (veh/h) 314 613 910

Direction, Lane # EB 1 NB 1 SB 1Volume Total 27 448 436Volume Left 7 8 0Volume Right 20 0 7cSH 491 910 1700Volume to Capacity 0.05 0.01 0.26Queue Length 95th (m) 1.4 0.2 0.0Control Delay (s) 12.8 0.3 0.0Lane LOS B AApproach Delay (s) 12.8 0.3 0.0Approach LOS B

Intersection SummaryAverage Delay 0.5Intersection Capacity Utilization 39.2% ICU Level of Service AAnalysis Period (min) 15

Page 656: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 210 22 396 12 30 14 450 189 6 3 163 247Future Volume (vph) 210 22 396 12 30 14 450 189 6 3 163 247Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.915 0.967 0.999 0.919Flt Protected 0.984 0.989 0.966Satd. Flow (prot) 0 1482 0 0 1674 0 0 1566 0 0 1583 0Flt Permitted 0.984 0.989 0.966Satd. Flow (perm) 0 1482 0 0 1674 0 0 1566 0 0 1583 0Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 29.6Travel Time (s) 8.5 7.8 70.5 2.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 10% 0% 0% 0% 10% 3% 0% 0% 4% 0%Adj. Flow (vph) 228 24 430 13 33 15 489 205 7 3 177 268Shared Lane Traffic (%)Lane Group Flow (vph) 0 682 0 0 61 0 0 701 0 0 448 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 121.2% ICU Level of Service HAnalysis Period (min) 15

Page 657: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 52

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 210 22 396 12 30 14 450 189 6 3 163 247Future Volume (Veh/h) 210 22 396 12 30 14 450 189 6 3 163 247Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 228 24 430 13 33 15 489 205 7 3 177 268PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1535 1507 311 1946 1638 208 445 212vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1535 1507 311 1946 1638 208 445 212tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.2 4.2 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.3 2.3 2.2p0 queue free % 0 64 40 0 40 98 54 100cM capacity (veh/h) 33 66 711 9 55 837 1074 1370

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 682 61 701 448Volume Left 228 13 489 3Volume Right 430 15 7 268cSH 88 30 1074 1370Volume to Capacity 7.79 2.02 0.46 0.00Queue Length 95th (m) Err 56.6 19.4 0.1Control Delay (s) Err 753.5 9.5 0.1Lane LOS F F A AApproach Delay (s) Err 753.5 9.5 0.1Approach LOS F F

Intersection SummaryAverage Delay 3632.1Intersection Capacity Utilization 121.2% ICU Level of Service HAnalysis Period (min) 15

Page 658: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 77 50 33 162 198 66Future Volume (vph) 77 50 33 162 198 66Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.947 0.850Flt Protected 0.970 0.950Satd. Flow (prot) 1507 0 1662 1733 1733 1282Flt Permitted 0.970 0.950Satd. Flow (perm) 1507 0 1662 1733 1733 1282Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 11% 0% 0% 1% 1% 16%Adj. Flow (vph) 84 54 36 176 215 72Shared Lane Traffic (%)Lane Group Flow (vph) 138 0 36 176 215 72Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 32.6% ICU Level of Service AAnalysis Period (min) 15

Page 659: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 77 50 33 162 198 66Future Volume (Veh/h) 77 50 33 162 198 66Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 84 54 36 176 215 72PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 463 215 287vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 463 215 287tC, single (s) 6.5 6.2 4.1tC, 2 stage (s)tF (s) 3.6 3.3 2.2p0 queue free % 84 93 97cM capacity (veh/h) 526 830 1287

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 138 36 176 215 72Volume Left 84 36 0 0 0Volume Right 54 0 0 0 72cSH 614 1287 1700 1700 1700Volume to Capacity 0.22 0.03 0.10 0.13 0.04Queue Length 95th (m) 6.9 0.7 0.0 0.0 0.0Control Delay (s) 12.6 7.9 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 12.6 1.3 0.0Approach LOS B

Intersection SummaryAverage Delay 3.2Intersection Capacity Utilization 32.6% ICU Level of Service AAnalysis Period (min) 15

Page 660: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 178 21 174 96 26 223Future Volume (vph) 178 21 174 96 26 223Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.986 0.952Flt Protected 0.957 0.995Satd. Flow (prot) 1622 0 1639 0 0 1702Flt Permitted 0.957 0.995Satd. Flow (perm) 1622 0 1639 0 0 1702Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 2% 1% 5% 2%Adj. Flow (vph) 193 23 189 104 28 242Shared Lane Traffic (%)Lane Group Flow (vph) 216 0 293 0 0 270Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 52.7% ICU Level of Service AAnalysis Period (min) 15

Page 661: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 56

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 178 21 174 96 26 223Future Volume (Veh/h) 178 21 174 96 26 223Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 193 23 189 104 28 242PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 539 241 293vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 539 241 293tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 61 97 98cM capacity (veh/h) 492 803 1252

Direction, Lane # WB 1 NB 1 SB 1Volume Total 216 293 270Volume Left 193 0 28Volume Right 23 104 0cSH 513 1700 1252Volume to Capacity 0.42 0.17 0.02Queue Length 95th (m) 16.5 0.0 0.5Control Delay (s) 17.0 0.0 1.0Lane LOS C AApproach Delay (s) 17.0 0.0 1.0Approach LOS C

Intersection SummaryAverage Delay 5.1Intersection Capacity Utilization 52.7% ICU Level of Service AAnalysis Period (min) 15

Page 662: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 388 211 0 397 264Future Volume (vph) 0 388 211 0 397 264Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3228 3197 0 1614 1458Flt Permitted 0.950Satd. Flow (perm) 0 3228 3197 0 1614 1458Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 3% 4% 0% 3% 2%Adj. Flow (vph) 0 422 229 0 432 287Shared Lane Traffic (%)Lane Group Flow (vph) 0 422 229 0 432 287Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 42.2% ICU Level of Service AAnalysis Period (min) 15

Page 663: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 58

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 0 388 211 0 397 264Future Volume (Veh/h) 0 388 211 0 397 264Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 422 229 0 432 287PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 5Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 229 440 114vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 229 440 114tC, single (s) 4.1 6.9 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 20 69cM capacity (veh/h) 1351 543 916

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1Volume Total 211 211 114 114 719Volume Left 0 0 0 0 432Volume Right 0 0 0 0 287cSH 1700 1700 1700 1700 904Volume to Capacity 0.12 0.12 0.07 0.07 0.80Queue Length 95th (m) 0.0 0.0 0.0 0.0 68.3Control Delay (s) 0.0 0.0 0.0 0.0 23.9Lane LOS CApproach Delay (s) 0.0 0.0 23.9Approach LOS C

Intersection SummaryAverage Delay 12.5Intersection Capacity Utilization 42.2% ICU Level of Service AAnalysis Period (min) 15

Page 664: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 59

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 559 0 0 238 34 135Future Volume (vph) 559 0 0 238 34 135Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3228 0 0 3260 1554 1444Flt Permitted 0.950Satd. Flow (perm) 3228 0 0 3260 1554 1444Link Speed (k/h) 50 50 50Link Distance (m) 104.2 91.9 169.0Travel Time (s) 7.5 6.6 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 2% 7% 3%Adj. Flow (vph) 608 0 0 259 37 147Shared Lane Traffic (%)Lane Group Flow (vph) 608 0 0 259 37 147Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 32.5% ICU Level of Service AAnalysis Period (min) 15

Page 665: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 60

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (veh/h) 559 0 0 238 34 135Future Volume (Veh/h) 559 0 0 238 34 135Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 608 0 0 259 37 147PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 6Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 608 738 304vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 608 738 304tC, single (s) 4.1 6.9 7.0tC, 2 stage (s)tF (s) 2.2 3.6 3.3p0 queue free % 100 89 79cM capacity (veh/h) 980 343 689

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1Volume Total 304 304 130 130 184Volume Left 0 0 0 0 37Volume Right 0 0 0 0 147cSH 1700 1700 1700 1700 862Volume to Capacity 0.18 0.18 0.08 0.08 0.21Queue Length 95th (m) 0.0 0.0 0.0 0.0 6.4Control Delay (s) 0.0 0.0 0.0 0.0 12.7Lane LOS BApproach Delay (s) 0.0 0.0 12.7Approach LOS B

Intersection SummaryAverage Delay 2.2Intersection Capacity Utilization 32.5% ICU Level of Service AAnalysis Period (min) 15

Page 666: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 61

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 391 304 213 235 236 334Future Volume (vph) 391 304 213 235 236 334Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.929 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1630 1716 1594 0 1630 1458Flt Permitted 0.950 0.950Satd. Flow (perm) 1630 1716 1594 0 1630 1458Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 425 330 232 255 257 363Shared Lane Traffic (%)Lane Group Flow (vph) 425 330 487 0 257 363Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 75.5% ICU Level of Service DAnalysis Period (min) 15

Page 667: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 62

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 391 304 213 235 236 334Future Volume (vph) 391 304 213 235 236 334Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 425 330 232 255 257 363

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total (vph) 425 330 487 257 363Volume Left (vph) 425 0 0 257 0Volume Right (vph) 0 0 255 0 363Hadj (s) 0.53 0.03 -0.28 0.53 -0.67Departure Headway (s) 8.0 7.5 6.9 8.3 7.1Degree Utilization, x 0.94 0.68 0.93 0.59 0.71Capacity (veh/h) 425 467 511 420 495Control Delay (s) 56.2 23.9 50.8 21.4 24.4Approach Delay (s) 42.1 50.8 23.2Approach LOS E F C

Intersection SummaryDelay 38.1Level of Service EIntersection Capacity Utilization 75.5% ICU Level of Service DAnalysis Period (min) 15

Page 668: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway/Marinelane Parkway & Portage Road No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 63

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 18 942 677 94 175 40Future Volume (vph) 18 942 677 94 175 40Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 50.0 50.0 0.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 3260 3260 1473 1646 1488Flt Permitted 0.950 0.950Satd. Flow (perm) 1662 3260 3260 1473 1646 1488Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 2% 1% 1% 0%Adj. Flow (vph) 20 1024 736 102 190 43Shared Lane Traffic (%)Lane Group Flow (vph) 20 1024 736 102 190 43Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 45.5% ICU Level of Service AAnalysis Period (min) 15

Page 669: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan212: Marineland Parkway/Marinelane Parkway & Portage Road No Crossing Scenario 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 64

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 18 942 677 94 175 40Future Volume (Veh/h) 18 942 677 94 175 40Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 20 1024 736 102 190 43PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 736 1288 368vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 736 1288 368tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 98 0 93cM capacity (veh/h) 879 153 635

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 SB 1 SB 2Volume Total 20 512 512 368 368 102 190 43Volume Left 20 0 0 0 0 0 190 0Volume Right 0 0 0 0 0 102 0 43cSH 879 1700 1700 1700 1700 1700 153 635Volume to Capacity 0.02 0.30 0.30 0.22 0.22 0.06 1.24 0.07Queue Length 95th (m) 0.6 0.0 0.0 0.0 0.0 0.0 88.3 1.7Control Delay (s) 9.2 0.0 0.0 0.0 0.0 0.0 208.5 11.1Lane LOS A F BApproach Delay (s) 0.2 0.0 172.1Approach LOS F

Intersection SummaryAverage Delay 19.0Intersection Capacity Utilization 45.5% ICU Level of Service AAnalysis Period (min) 15

Page 670: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Thundering Waters Transportation Master Plan | 151385 | July 2016

Paradigm Transportation Solutions Limited | Appendices

Appendix H

Future Total Traffic Operations with Improvements Reports

Page 671: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 95 725 18 29 584 285 30 75 107 261 47 82Future Volume (vph) 95 725 18 29 584 285 30 75 107 261 47 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 1 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95Ped Bike Factor 1.00 0.98Frt 0.850 0.850 0.850 0.905Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1525 3197 1390 1484 3167 1430 1471 1606 1250 1614 2733 0Flt Permitted 0.411 0.182 0.663 0.704Satd. Flow (perm) 659 3197 1390 284 3167 1409 1027 1606 1250 1196 2733 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 76 310 116 89Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 4 4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 4% 7% 12% 5% 4% 13% 9% 19% 3% 5% 13%Adj. Flow (vph) 103 788 20 32 635 310 33 82 116 284 51 89Shared Lane Traffic (%)Lane Group Flow (vph) 103 788 20 32 635 310 33 82 116 284 140 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 1 2Detector Template Left Thru Right Left Thru Right Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 672: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Detector Phase 4 4 4 3 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.4 39.4 39.4 12.5 51.9 51.9 38.1 38.1 38.1 38.1 38.1Total Split (%) 43.8% 43.8% 43.8% 13.9% 57.7% 57.7% 42.3% 42.3% 42.3% 42.3% 42.3%Maximum Green (s) 33.1 33.1 33.1 9.5 45.6 45.6 31.8 31.8 31.8 31.8 31.8Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 0.0 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 24.1 24.1 24.1 33.9 33.9 31.4 22.7 22.7 22.7 22.7 22.7Actuated g/C Ratio 0.37 0.37 0.37 0.52 0.52 0.48 0.35 0.35 0.35 0.35 0.35v/c Ratio 0.42 0.66 0.04 0.13 0.39 0.37 0.09 0.15 0.23 0.68 0.14Control Delay 23.2 20.8 0.1 10.5 11.0 3.0 16.4 16.4 5.0 28.4 7.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 23.2 20.8 0.1 10.5 11.0 3.0 16.4 16.4 5.0 28.4 7.4LOS C C A B B A B B A C AApproach Delay 20.6 8.4 10.6 21.5Approach LOS C A B C

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 65Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.68Intersection Signal Delay: 15.2 Intersection LOS: BIntersection Capacity Utilization 64.2% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 673: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBTLane Group Flow (vph) 103 788 20 32 635 310 33 82 116 284 140v/c Ratio 0.42 0.66 0.04 0.13 0.39 0.37 0.09 0.15 0.23 0.68 0.14Control Delay 23.2 20.8 0.1 10.5 11.0 3.0 16.4 16.4 5.0 28.4 7.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 23.2 20.8 0.1 10.5 11.0 3.0 16.4 16.4 5.0 28.4 7.4Queue Length 50th (m) 9.2 41.2 0.0 1.8 22.8 0.0 2.7 6.7 0.0 29.0 2.1Queue Length 95th (m) 27.3 76.3 0.0 7.1 46.0 12.9 9.8 18.7 10.3 67.6 8.8Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 378 1835 830 313 2423 1121 567 887 743 661 1550Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.27 0.43 0.02 0.10 0.26 0.28 0.06 0.09 0.16 0.43 0.09

Intersection Summary

Page 674: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 95 725 18 29 584 285 30 75 107 261 47 82Future Volume (vph) 95 725 18 29 584 285 30 75 107 261 47 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.90Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1524 3197 1390 1484 3167 1410 1471 1606 1250 1614 2732Flt Permitted 0.41 1.00 1.00 0.18 1.00 1.00 0.66 1.00 1.00 0.70 1.00Satd. Flow (perm) 659 3197 1390 284 3167 1410 1027 1606 1250 1196 2732Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 103 788 20 32 635 310 33 82 116 284 51 89RTOR Reduction (vph) 0 0 13 0 0 159 0 0 75 0 58 0Lane Group Flow (vph) 103 788 7 32 635 151 33 82 41 284 82 0Confl. Peds. (#/hr) 4 4Heavy Vehicles (%) 9% 4% 7% 12% 5% 4% 13% 9% 19% 3% 5% 13%Turn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Actuated Green, G (s) 21.8 21.8 21.8 31.4 31.4 31.4 20.3 20.3 20.3 20.3 20.3Effective Green, g (s) 24.1 24.1 24.1 30.4 33.7 31.4 22.6 22.6 22.6 22.6 22.6Actuated g/C Ratio 0.37 0.37 0.37 0.47 0.52 0.49 0.35 0.35 0.35 0.35 0.35Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 246 1198 520 238 1659 688 360 564 439 420 960v/s Ratio Prot c0.25 0.01 c0.20 0.05 0.03v/s Ratio Perm 0.16 0.01 0.05 0.11 0.03 0.03 c0.24v/c Ratio 0.42 0.66 0.01 0.13 0.38 0.22 0.09 0.15 0.09 0.68 0.09Uniform Delay, d1 14.9 16.7 12.6 10.3 9.1 9.4 14.0 14.2 14.0 17.7 13.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.8 1.2 0.0 0.2 0.1 0.1 0.1 0.1 0.1 3.9 0.0Delay (s) 15.7 17.9 12.6 10.5 9.2 9.5 14.1 14.3 14.0 21.6 14.0Level of Service B B B B A A B B B C BApproach Delay (s) 17.5 9.4 14.1 19.1Approach LOS B A B B

Intersection SummaryHCM 2000 Control Delay 14.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.65Actuated Cycle Length (s) 64.3 Sum of lost time (s) 12.0Intersection Capacity Utilization 64.2% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 675: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1041 1 73 716 0 0 0 0 534 86 164Future Volume (vph) 0 1041 1 73 716 0 0 0 0 534 86 164Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 50.0 50.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 0 1 1 0 0 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 0.99 1.00 1.00 1.00 0.99Frt 0.850 0.850Flt Protected 0.950 0.950 0.965Satd. Flow (prot) 0 4638 1488 1662 4594 0 0 0 0 1519 1522 1430Flt Permitted 0.149 0.950 0.965Satd. Flow (perm) 0 4638 1467 261 4594 0 0 0 0 1515 1519 1412Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 76 154Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 32.2 64.2 88.8Travel Time (s) 9.7 2.3 4.6 6.4Confl. Peds. (#/hr) 2 2 3 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 3% 0% 0% 4% 0% 0% 0% 0% 4% 9% 4%Adj. Flow (vph) 0 1132 1 79 778 0 0 0 0 580 93 178Shared Lane Traffic (%) 42%Lane Group Flow (vph) 0 1132 1 79 778 0 0 0 0 336 337 178Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 1 2 1 2 1Detector Template Thru Right Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0

Page 676: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Detector Phase 4 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 36.3 12.5 36.3 36.3 36.3 36.3Total Split (s) 38.0 38.0 13.0 51.0 39.0 39.0 39.0Total Split (%) 42.2% 42.2% 14.4% 56.7% 43.3% 43.3% 43.3%Maximum Green (s) 31.7 31.7 10.0 44.7 32.7 32.7 32.7Yellow Time (s) 4.1 4.1 3.0 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 0.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 26.1 23.7 37.8 37.8 24.1 24.1 24.1Actuated g/C Ratio 0.37 0.34 0.54 0.54 0.34 0.34 0.34v/c Ratio 0.66 0.00 0.27 0.31 0.65 0.65 0.30Control Delay 21.1 0.0 11.8 10.2 26.5 26.5 6.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 21.1 0.0 11.8 10.2 26.5 26.5 6.0LOS C A B B C C AApproach Delay 21.1 10.3 22.2Approach LOS C B C

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 70.2Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.66Intersection Signal Delay: 18.2 Intersection LOS: BIntersection Capacity Utilization 57.4% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 677: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT EBR WBL WBT SBL SBT SBRLane Group Flow (vph) 1132 1 79 778 336 337 178v/c Ratio 0.66 0.00 0.27 0.31 0.65 0.65 0.30Control Delay 21.1 0.0 11.8 10.2 26.5 26.5 6.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 21.1 0.0 11.8 10.2 26.5 26.5 6.0Queue Length 50th (m) 45.0 0.0 4.8 19.7 39.1 39.2 2.1Queue Length 95th (m) 75.8 0.0 14.1 36.5 78.7 78.7 15.7Internal Link Dist (m) 110.1 8.2 64.8Turn Bay Length (m) 50.0 50.0Base Capacity (vph) 2333 728 326 3194 784 786 805Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.49 0.00 0.24 0.24 0.43 0.43 0.22

Intersection Summary

Page 678: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1041 1 73 716 0 0 0 0 534 86 164Future Volume (vph) 0 1041 1 73 716 0 0 0 0 534 86 164Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 1.00 1.00 0.91 0.95 0.95 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 0.97 1.00Satd. Flow (prot) 4638 1468 1662 4594 1515 1520 1412Flt Permitted 1.00 1.00 0.15 1.00 0.95 0.97 1.00Satd. Flow (perm) 4638 1468 261 4594 1515 1520 1412Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 1132 1 79 778 0 0 0 0 580 93 178RTOR Reduction (vph) 0 0 1 0 0 0 0 0 0 0 0 101Lane Group Flow (vph) 0 1132 0 79 778 0 0 0 0 336 337 77Confl. Peds. (#/hr) 2 2 3 1Heavy Vehicles (%) 0% 3% 0% 0% 4% 0% 0% 0% 0% 4% 9% 4%Turn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Actuated Green, G (s) 23.8 23.8 35.4 35.4 21.7 21.7 21.7Effective Green, g (s) 26.1 23.8 34.4 37.7 24.0 24.0 24.0Actuated g/C Ratio 0.37 0.34 0.49 0.54 0.34 0.34 0.34Clearance Time (s) 6.3 6.3 3.0 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1736 501 281 2484 521 523 486v/s Ratio Prot c0.24 0.03 c0.17v/s Ratio Perm 0.00 0.11 c0.22 0.22 0.05v/c Ratio 0.65 0.00 0.28 0.31 0.64 0.64 0.16Uniform Delay, d1 18.0 15.1 10.8 8.8 19.3 19.3 15.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.9 0.0 0.6 0.1 2.7 2.7 0.2Delay (s) 18.9 15.1 11.4 8.9 22.0 22.0 16.0Level of Service B B B A C C BApproach Delay (s) 18.9 9.1 0.0 20.7Approach LOS B A A C

Intersection SummaryHCM 2000 Control Delay 16.5 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.61Actuated Cycle Length (s) 69.7 Sum of lost time (s) 12.0Intersection Capacity Utilization 57.4% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 679: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1337 0 0 753 54 111Future Volume (vph) 1337 0 0 753 54 111Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.91 1.00 1.00 0.91 0.97 1.00Ped Bike Factor 1.00 0.98Frt 0.850Flt Protected 0.950Satd. Flow (prot) 4684 0 0 4550 3162 1430Flt Permitted 0.950Satd. Flow (perm) 4684 0 0 4550 3151 1398Right Turn on Red Yes YesSatd. Flow (RTOR) 24Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Confl. Peds. (#/hr) 4 13Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 5% 2% 4%Adj. Flow (vph) 1453 0 0 818 59 121Shared Lane Traffic (%)Lane Group Flow (vph) 1453 0 0 818 59 121Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2

Page 680: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRDetector Phase 4 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.0 35.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7%Maximum Green (s) 28.7 28.7 18.7 18.7Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 23.3 23.3 13.1 13.1Actuated g/C Ratio 0.52 0.52 0.29 0.29v/c Ratio 0.59 0.34 0.06 0.28Control Delay 8.4 6.5 13.2 13.7Queue Delay 0.0 0.0 0.0 0.0Total Delay 8.4 6.5 13.2 13.7LOS A A B BApproach Delay 8.4 6.5 13.5Approach LOS A A B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 44.6Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.59Intersection Signal Delay: 8.1 Intersection LOS: AIntersection Capacity Utilization 43.5% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 681: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 1453 818 59 121v/c Ratio 0.59 0.34 0.06 0.28Control Delay 8.4 6.5 13.2 13.7Queue Delay 0.0 0.0 0.0 0.0Total Delay 8.4 6.5 13.2 13.7Queue Length 50th (m) 24.5 11.6 1.7 5.8Queue Length 95th (m) 40.4 20.2 5.7 18.9Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 3312 3217 1514 682Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.44 0.25 0.04 0.18

Intersection Summary

Page 682: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1337 0 0 753 54 111Future Volume (vph) 1337 0 0 753 54 111Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 0.91 0.97 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 4684 4550 3162 1395Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 4684 4550 3162 1395Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1453 0 0 818 59 121RTOR Reduction (vph) 0 0 0 0 0 17Lane Group Flow (vph) 1453 0 0 818 59 104Confl. Peds. (#/hr) 4 13Heavy Vehicles (%) 2% 0% 0% 5% 2% 4%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 21.0 21.0 10.8 10.8Effective Green, g (s) 23.3 23.3 13.1 13.1Actuated g/C Ratio 0.52 0.52 0.30 0.30Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 2458 2387 932 411v/s Ratio Prot c0.31 0.18 0.02v/s Ratio Perm c0.07v/c Ratio 0.59 0.34 0.06 0.25Uniform Delay, d1 7.3 6.1 11.2 11.9Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.1 0.0 0.3Delay (s) 7.7 6.2 11.3 12.2Level of Service A A B BApproach Delay (s) 7.7 6.2 11.9Approach LOS A A B

Intersection SummaryHCM 2000 Control Delay 7.5 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.47Actuated Cycle Length (s) 44.4 Sum of lost time (s) 8.0Intersection Capacity Utilization 43.5% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 683: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 67 1126 256 135 1040 25 102 4 93 15 2 22Future Volume (vph) 67 1126 256 135 1040 25 102 4 93 15 2 22Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 15.0 0.0Storage Lanes 1 1 2 0 2 1 1 0Taper Length (m) 40.0 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.98 1.00 0.97 0.99Frt 0.850 0.996 0.850 0.862Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3260 1458 3162 3247 0 3162 1716 1458 1630 1479 0Flt Permitted 0.245 0.950 0.950 0.755Satd. Flow (perm) 420 3260 1434 3157 3247 0 3162 1716 1422 1278 1479 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 278 4 101 24Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 5 5 12 12Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 73 1224 278 147 1130 27 111 4 101 16 2 24Shared Lane Traffic (%)Lane Group Flow (vph) 73 1224 278 147 1157 0 111 4 101 16 26 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NA

Page 684: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 9.5 32.0 32.0 32.0 32.0Total Split (s) 38.0 38.0 38.0 10.5 48.5 9.5 41.5 41.5 32.0 32.0Total Split (%) 42.2% 42.2% 42.2% 11.7% 53.9% 10.6% 46.1% 46.1% 35.6% 35.6%Maximum Green (s) 31.7 31.7 31.7 6.0 42.2 5.0 35.2 35.2 25.7 25.7Yellow Time (s) 4.1 4.1 4.1 3.5 4.1 3.5 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 1.0 2.2 1.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -0.5 -2.3 -0.5 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 34.0 34.0 34.0 6.5 44.5 5.5 19.8 19.8 10.3 10.3Actuated g/C Ratio 0.47 0.47 0.47 0.09 0.62 0.08 0.27 0.27 0.14 0.14v/c Ratio 0.37 0.80 0.34 0.52 0.58 0.46 0.01 0.22 0.09 0.11Control Delay 19.2 21.2 2.9 38.4 9.7 38.7 19.2 6.2 28.3 13.9Queue Delay 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.2 21.8 2.9 38.4 9.7 38.7 19.2 6.2 28.3 13.9LOS B C A D A D B A C BApproach Delay 18.3 13.0 23.1 19.4Approach LOS B B C B

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 72.3Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.80Intersection Signal Delay: 16.4 Intersection LOS: BIntersection Capacity Utilization 63.6% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 685: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 73 1224 278 147 1157 111 4 101 16 26v/c Ratio 0.37 0.80 0.34 0.52 0.58 0.46 0.01 0.22 0.09 0.11Control Delay 19.2 21.2 2.9 38.4 9.7 38.7 19.2 6.2 28.3 13.9Queue Delay 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.2 21.8 2.9 38.4 9.7 38.7 19.2 6.2 28.3 13.9Queue Length 50th (m) 6.4 74.1 0.0 10.5 45.6 8.0 0.4 0.0 2.0 0.3Queue Length 95th (m) 17.7 101.0 11.8 19.3 62.3 15.6 2.5 10.5 7.3 6.9Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 50.0 50.0 15.0Base Capacity (vph) 197 1533 821 284 2000 240 890 786 494 587Starvation Cap Reductn 0 82 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.37 0.84 0.34 0.52 0.58 0.46 0.00 0.13 0.03 0.04

Intersection Summary

Page 686: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 67 1126 256 135 1040 25 102 4 93 15 2 22Future Volume (vph) 67 1126 256 135 1040 25 102 4 93 15 2 22Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 1.00 1.00 0.98 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 1.00Frt 1.00 1.00 0.85 1.00 1.00 1.00 1.00 0.85 1.00 0.86Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1630 3260 1435 3162 3248 3162 1716 1425 1612 1478Flt Permitted 0.25 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.76 1.00Satd. Flow (perm) 420 3260 1435 3162 3248 3162 1716 1425 1282 1478Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 73 1224 278 147 1130 27 111 4 101 16 2 24RTOR Reduction (vph) 0 0 147 0 2 0 0 0 73 0 21 0Lane Group Flow (vph) 73 1224 131 147 1155 0 111 4 28 16 5 0Confl. Peds. (#/hr) 5 5 12 12Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Actuated Green, G (s) 31.7 31.7 31.7 6.0 42.2 5.0 17.5 17.5 8.0 8.0Effective Green, g (s) 34.0 34.0 34.0 6.5 44.5 5.5 19.8 19.8 10.3 10.3Actuated g/C Ratio 0.47 0.47 0.47 0.09 0.62 0.08 0.27 0.27 0.14 0.14Clearance Time (s) 6.3 6.3 6.3 4.5 6.3 4.5 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 197 1533 674 284 1999 240 469 390 182 210v/s Ratio Prot c0.38 0.05 c0.36 c0.04 0.00 0.00v/s Ratio Perm 0.17 0.09 c0.02 0.01v/c Ratio 0.37 0.80 0.19 0.52 0.58 0.46 0.01 0.07 0.09 0.03Uniform Delay, d1 12.3 16.2 11.2 31.4 8.3 32.0 19.1 19.4 26.9 26.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.9 2.9 0.1 1.2 0.3 1.4 0.0 0.1 0.2 0.0Delay (s) 13.1 19.1 11.3 32.6 8.6 33.4 19.1 19.5 27.1 26.7Level of Service B B B C A C B B C CApproach Delay (s) 17.5 11.3 26.6 26.9Approach LOS B B C C

Intersection SummaryHCM 2000 Control Delay 15.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.63Actuated Cycle Length (s) 72.3 Sum of lost time (s) 16.0Intersection Capacity Utilization 63.6% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 687: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 142 584 417 67 735 64 312 165 79 56 169 152Future Volume (vph) 142 584 417 67 735 64 312 165 79 56 169 152Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 50.0 50.0 50.0 50.0 0.0 50.0 0.0Storage Lanes 2 1 1 0 2 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 0.97 0.95 1.00 1.00 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 0.97 1.00 1.00 0.99 1.00Frt 0.850 0.988 0.951 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 2959 3107 1305 1599 3033 0 3162 1582 0 1630 1699 1417Flt Permitted 0.950 0.309 0.950 0.488Satd. Flow (perm) 2939 3107 1267 518 3033 0 3162 1582 0 835 1699 1417Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 453 10 32 165Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 12 5 5 12 4 4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 7% 14% 4% 8% 9% 2% 4% 6% 2% 3% 5%Adj. Flow (vph) 154 635 453 73 799 70 339 179 86 61 184 165Shared Lane Traffic (%)Lane Group Flow (vph) 154 635 453 73 869 0 339 265 0 61 184 165Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 2 1Detector Template Left Thru Right Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 688: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Prot NA Perm pm+pt NA Prot NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 6 6Detector Phase 7 4 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 9.5 30.4 30.4 9.5 30.4 9.5 37.7 9.5 37.7 37.7Total Split (s) 9.5 30.4 30.4 9.5 30.4 12.0 40.5 9.6 38.1 38.1Total Split (%) 10.6% 33.8% 33.8% 10.6% 33.8% 13.3% 45.0% 10.7% 42.3% 42.3%Maximum Green (s) 5.5 24.0 24.0 6.5 24.0 9.0 33.8 6.6 31.4 31.4Yellow Time (s) 3.0 4.1 4.1 3.0 4.1 3.0 4.1 3.0 4.1 4.1All-Red Time (s) 1.0 2.3 2.3 0.0 2.3 0.0 2.6 0.0 2.6 2.6Lost Time Adjust (s) -4.0 -2.4 0.0 0.0 -2.4 1.0 -2.7 1.0 -2.7 0.0Total Lost Time (s) 0.0 4.0 6.4 3.0 4.0 4.0 4.0 4.0 4.0 6.7Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 9.6 26.4 24.0 33.0 25.9 8.0 18.7 20.9 15.8 13.1Actuated g/C Ratio 0.13 0.37 0.34 0.46 0.36 0.11 0.26 0.29 0.22 0.18v/c Ratio 0.39 0.55 0.62 0.22 0.79 0.95 0.61 0.20 0.49 0.42Control Delay 33.0 21.0 6.7 12.0 27.3 72.9 26.6 15.5 28.8 7.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 33.0 21.0 6.7 12.0 27.3 72.9 26.6 15.5 28.8 7.9LOS C C A B C E C B C AApproach Delay 17.2 26.1 52.6 18.4Approach LOS B C D B

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 71.4Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.95Intersection Signal Delay: 26.7 Intersection LOS: CIntersection Capacity Utilization 62.4% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 689: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 154 635 453 73 869 339 265 61 184 165v/c Ratio 0.39 0.55 0.62 0.22 0.79 0.95 0.61 0.20 0.49 0.42Control Delay 33.0 21.0 6.7 12.0 27.3 72.9 26.6 15.5 28.8 7.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 33.0 21.0 6.7 12.0 27.3 72.9 26.6 15.5 28.8 7.9Queue Length 50th (m) 10.3 36.2 0.0 4.8 54.5 24.8 29.0 5.4 22.9 0.0Queue Length 95th (m) 20.9 61.0 23.8 13.4 #98.9 #56.5 51.7 12.2 40.7 14.2Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0 50.0Base Capacity (vph) 395 1160 729 341 1133 356 828 313 816 718Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.39 0.55 0.62 0.21 0.77 0.95 0.32 0.19 0.23 0.23

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 690: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 142 584 417 67 735 64 312 165 79 56 169 152Future Volume (vph) 142 584 417 67 735 64 312 165 79 56 169 152Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 0.0 4.0 6.4 3.0 4.0 4.0 4.0 4.0 4.0 6.7Lane Util. Factor 0.97 0.95 1.00 1.00 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.97 1.00 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 0.99 1.00 0.95 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 2959 3107 1269 1597 3034 3162 1583 1629 1699 1417Flt Permitted 0.95 1.00 1.00 0.31 1.00 0.95 1.00 0.49 1.00 1.00Satd. Flow (perm) 2959 3107 1269 520 3034 3162 1583 837 1699 1417Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 154 635 453 73 799 70 339 179 86 61 184 165RTOR Reduction (vph) 0 0 301 0 6 0 0 24 0 0 0 135Lane Group Flow (vph) 154 635 152 73 863 0 339 241 0 61 184 30Confl. Peds. (#/hr) 12 5 5 12 4 4Heavy Vehicles (%) 9% 7% 14% 4% 8% 9% 2% 4% 6% 2% 3% 5%Turn Type Prot NA Perm pm+pt NA Prot NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 6 6Actuated Green, G (s) 5.5 24.0 24.0 29.7 23.6 9.0 16.0 19.2 13.1 13.1Effective Green, g (s) 9.5 26.4 24.0 29.7 26.0 8.0 18.7 17.2 15.8 13.1Actuated g/C Ratio 0.13 0.37 0.34 0.42 0.36 0.11 0.26 0.24 0.22 0.18Clearance Time (s) 4.0 6.4 6.4 3.0 6.4 3.0 6.7 3.0 6.7 6.7Vehicle Extension (s) 2.5 2.2 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 394 1150 427 308 1106 354 415 258 376 260v/s Ratio Prot c0.05 0.20 0.02 c0.28 c0.11 c0.15 0.02 0.11v/s Ratio Perm 0.12 0.08 0.04 0.02v/c Ratio 0.39 0.55 0.36 0.24 0.78 0.96 0.58 0.24 0.49 0.12Uniform Delay, d1 28.3 17.8 17.8 13.0 20.1 31.5 22.9 21.4 24.2 24.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.5 0.4 0.3 0.3 3.3 36.4 1.5 0.3 0.5 0.1Delay (s) 28.7 18.2 18.1 13.3 23.4 67.8 24.4 21.7 24.7 24.4Level of Service C B B B C E C C C CApproach Delay (s) 19.4 22.6 48.8 24.1Approach LOS B C D C

Intersection SummaryHCM 2000 Control Delay 26.5 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.71Actuated Cycle Length (s) 71.3 Sum of lost time (s) 15.0Intersection Capacity Utilization 62.4% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 691: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 141 538 40 0 442 108 240 171 11 97 156 184Future Volume (vph) 141 538 40 0 442 108 240 171 11 97 156 184Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 2 0 1 0 2 0 1 1Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 0.97 0.95 0.95 1.00 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 1.00 1.00 1.00 1.00Frt 0.990 0.971 0.991 0.850Flt Protected 0.950 0.950 0.950Satd. Flow (prot) 3014 3067 0 1750 2973 0 3193 1690 0 1630 1667 1417Flt Permitted 0.950 0.950 0.633Satd. Flow (perm) 3002 3067 0 1750 2973 0 3193 1690 0 1085 1667 1417Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 11 38 6 200Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 5 3 3 5 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 7% 7% 9% 0% 9% 5% 1% 2% 11% 2% 5% 5%Adj. Flow (vph) 153 585 43 0 480 117 261 186 12 105 170 200Shared Lane Traffic (%)Lane Group Flow (vph) 153 628 0 0 597 0 261 198 0 105 170 200Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 692: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Prot NA Perm NA Prot NA Perm NA PermProtected Phases 7 4 8 5 2 6Permitted Phases 8 6 6Detector Phase 7 4 8 8 5 2 6 6 6Switch PhaseMinimum Initial (s) 5.0 8.0 8.0 8.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 9.5 27.1 27.1 27.1 9.5 33.1 33.1 33.1 33.1Total Split (s) 9.5 36.6 27.1 27.1 10.0 43.4 33.4 33.4 33.4Total Split (%) 11.9% 45.8% 33.9% 33.9% 12.5% 54.3% 41.8% 41.8% 41.8%Maximum Green (s) 5.0 30.5 21.0 21.0 5.5 37.3 27.3 27.3 27.3Yellow Time (s) 3.5 4.1 4.1 4.1 3.5 4.1 4.1 4.1 4.1All-Red Time (s) 1.0 2.0 2.0 2.0 1.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 0.0Total Lost Time (s) 2.4 4.0 4.0 4.0 2.4 4.0 4.0 4.0 6.1Lead/Lag Lead Lag Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode None Min Min Min None Min Min Min MinWalk Time (s) 8.0 8.0 8.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0Act Effct Green (s) 7.4 25.6 18.5 7.9 24.6 14.2 14.2 12.1Actuated g/C Ratio 0.13 0.44 0.32 0.14 0.42 0.24 0.24 0.21v/c Ratio 0.40 0.47 0.62 0.61 0.28 0.40 0.42 0.44Control Delay 30.7 12.6 20.0 34.7 13.6 25.4 23.8 7.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 30.7 12.6 20.0 34.7 13.6 25.4 23.8 7.3LOS C B B C B C C AApproach Delay 16.2 20.0 25.6 17.2Approach LOS B B C B

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 58.5Natural Cycle: 80Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.62Intersection Signal Delay: 19.2 Intersection LOS: BIntersection Capacity Utilization 55.1% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 693: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBL EBT WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 153 628 597 261 198 105 170 200v/c Ratio 0.40 0.47 0.62 0.61 0.28 0.40 0.42 0.44Control Delay 30.7 12.6 20.0 34.7 13.6 25.4 23.8 7.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 30.7 12.6 20.0 34.7 13.6 25.4 23.8 7.3Queue Length 50th (m) 8.6 23.2 28.4 14.9 14.4 10.3 16.8 0.0Queue Length 95th (m) 19.5 42.5 50.4 #36.0 30.5 24.7 35.0 14.7Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 50.0 25.0 25.0Base Capacity (vph) 378 1774 1238 429 1180 564 867 788Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.40 0.35 0.48 0.61 0.17 0.19 0.20 0.25

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 694: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 141 538 40 0 442 108 240 171 11 97 156 184Future Volume (vph) 141 538 40 0 442 108 240 171 11 97 156 184Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 2.4 4.0 4.0 2.4 4.0 4.0 4.0 6.1Lane Util. Factor 0.97 0.95 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.99 0.97 1.00 0.99 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 3014 3067 2973 3193 1690 1629 1667 1417Flt Permitted 0.95 1.00 1.00 0.95 1.00 0.63 1.00 1.00Satd. Flow (perm) 3014 3067 2973 3193 1690 1086 1667 1417Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 153 585 43 0 480 117 261 186 12 105 170 200RTOR Reduction (vph) 0 6 0 0 26 0 0 4 0 0 0 159Lane Group Flow (vph) 153 622 0 0 571 0 261 194 0 105 170 41Confl. Peds. (#/hr) 5 3 3 5 1 1Heavy Vehicles (%) 7% 7% 9% 0% 9% 5% 1% 2% 11% 2% 5% 5%Turn Type Prot NA Perm NA Prot NA Perm NA PermProtected Phases 7 4 8 5 2 6Permitted Phases 8 6 6Actuated Green, G (s) 3.8 24.6 16.3 5.7 22.4 12.2 12.2 12.2Effective Green, g (s) 5.9 26.7 18.4 7.8 24.5 14.3 14.3 12.2Actuated g/C Ratio 0.10 0.45 0.31 0.13 0.41 0.24 0.24 0.21Clearance Time (s) 4.5 6.1 6.1 4.5 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 300 1383 924 420 699 262 402 292v/s Ratio Prot c0.05 0.20 c0.19 c0.08 0.12 c0.10v/s Ratio Perm 0.10 0.03v/c Ratio 0.51 0.45 0.62 0.62 0.28 0.40 0.42 0.14Uniform Delay, d1 25.3 11.2 17.4 24.3 11.5 18.9 19.0 19.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.5 0.2 1.2 2.9 0.2 1.0 0.7 0.2Delay (s) 26.7 11.4 18.6 27.2 11.7 19.9 19.7 19.4Level of Service C B B C B B B BApproach Delay (s) 14.4 18.6 20.5 19.6Approach LOS B B C B

Intersection SummaryHCM 2000 Control Delay 17.8 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.54Actuated Cycle Length (s) 59.2 Sum of lost time (s) 12.8Intersection Capacity Utilization 55.1% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 695: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 54 399 193 93 316 75 183 148 92 64 141 50Future Volume (vph) 54 399 193 93 316 75 183 148 92 64 141 50Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95Frt 0.951 0.971 0.943 0.961Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3100 0 1630 3165 0 1630 3074 0 1630 3133 0Flt Permitted 0.462 0.294 0.598 0.591Satd. Flow (perm) 793 3100 0 504 3165 0 1026 3074 0 1014 3133 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 118 42 100 54Link Speed (k/h) 50 50 50 50Link Distance (m) 136.7 152.3 137.9 105.9Travel Time (s) 9.8 11.0 9.9 7.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 59 434 210 101 343 82 199 161 100 70 153 54Shared Lane Traffic (%)Lane Group Flow (vph) 59 644 0 101 425 0 199 261 0 70 207 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6

Page 696: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 7 4 3 8 5 2 1 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 9.5 24.3 9.5 24.3 9.5 24.3 9.5 24.3Total Split (s) 9.5 24.3 9.5 24.3 9.5 26.7 9.5 26.7Total Split (%) 13.6% 34.7% 13.6% 34.7% 13.6% 38.1% 13.6% 38.1%Maximum Green (s) 6.5 18.0 6.5 18.0 6.5 20.4 6.5 20.4Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1All-Red Time (s) 0.0 2.2 0.0 2.2 0.0 2.2 0.0 2.2Lost Time Adjust (s) 1.0 -2.3 1.0 -2.3 1.0 -2.3 1.0 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 21.9 16.7 22.2 16.8 16.6 11.0 16.0 10.7Actuated g/C Ratio 0.40 0.31 0.41 0.31 0.30 0.20 0.29 0.20v/c Ratio 0.15 0.62 0.32 0.42 0.53 0.37 0.20 0.31Control Delay 9.0 16.2 11.2 15.0 19.9 13.9 13.7 15.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.0 16.2 11.2 15.0 19.9 13.9 13.7 15.8LOS A B B B B B B BApproach Delay 15.6 14.3 16.5 15.2Approach LOS B B B B

Intersection SummaryArea Type: OtherCycle Length: 70Actuated Cycle Length: 54.5Natural Cycle: 70Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.62Intersection Signal Delay: 15.4 Intersection LOS: BIntersection Capacity Utilization 54.6% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 108: Stanley Avenue & Marine Land Pkway (RR 49)

Page 697: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT WBL WBT NBL NBT SBL SBTLane Group Flow (vph) 59 644 101 425 199 261 70 207v/c Ratio 0.15 0.62 0.32 0.42 0.53 0.37 0.20 0.31Control Delay 9.0 16.2 11.2 15.0 19.9 13.9 13.7 15.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.0 16.2 11.2 15.0 19.9 13.9 13.7 15.8Queue Length 50th (m) 3.0 23.6 5.3 16.1 14.3 7.5 4.6 7.1Queue Length 95th (m) 8.6 41.3 13.2 28.7 30.3 17.2 12.4 15.7Internal Link Dist (m) 112.7 128.3 113.9 81.9Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 409 1240 322 1218 373 1352 365 1350Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.14 0.52 0.31 0.35 0.53 0.19 0.19 0.15

Intersection Summary

Page 698: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 54 399 193 93 316 75 183 148 92 64 141 50Future Volume (vph) 54 399 193 93 316 75 183 148 92 64 141 50Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.95 1.00 0.95Frt 1.00 0.95 1.00 0.97 1.00 0.94 1.00 0.96Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1630 3100 1630 3165 1630 3072 1630 3132Flt Permitted 0.46 1.00 0.29 1.00 0.60 1.00 0.59 1.00Satd. Flow (perm) 792 3100 505 3165 1026 3072 1013 3132Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 59 434 210 101 343 82 199 161 100 70 153 54RTOR Reduction (vph) 0 82 0 0 29 0 0 80 0 0 43 0Lane Group Flow (vph) 59 562 0 101 396 0 199 181 0 70 164 0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Actuated Green, G (s) 20.6 14.4 21.0 14.6 15.3 8.7 14.7 8.4Effective Green, g (s) 18.6 16.7 19.0 16.9 13.3 11.0 12.7 10.7Actuated g/C Ratio 0.34 0.31 0.35 0.31 0.24 0.20 0.23 0.20Clearance Time (s) 3.0 6.3 3.0 6.3 3.0 6.3 3.0 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 350 951 288 983 313 621 296 616v/s Ratio Prot 0.02 c0.18 c0.03 0.13 c0.07 0.06 0.02 0.05v/s Ratio Perm 0.04 0.09 c0.09 0.03v/c Ratio 0.17 0.59 0.35 0.40 0.64 0.29 0.24 0.27Uniform Delay, d1 12.2 16.0 12.5 14.8 17.7 18.4 16.7 18.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 1.0 0.7 0.3 4.2 0.3 0.4 0.2Delay (s) 12.5 17.0 13.3 15.0 21.9 18.7 17.1 18.8Level of Service B B B B C B B BApproach Delay (s) 16.6 14.7 20.1 18.3Approach LOS B B C B

Intersection SummaryHCM 2000 Control Delay 17.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.53Actuated Cycle Length (s) 54.4 Sum of lost time (s) 16.0Intersection Capacity Utilization 54.6% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 699: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 157 4 209 0 0 94Future Volume (vph) 157 4 209 0 0 94Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.997Flt Protected 0.953Satd. Flow (prot) 3162 0 3260 0 0 3260Flt Permitted 0.953Satd. Flow (perm) 3162 0 3260 0 0 3260Right Turn on Red Yes YesSatd. Flow (RTOR) 4Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 171 4 227 0 0 102Shared Lane Traffic (%)Lane Group Flow (vph) 175 0 227 0 0 102Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch PhaseMinimum Initial (s) 8.0 8.0 8.0

Page 700: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group WBL WBR NBT NBR SBL SBTMinimum Split (s) 24.2 22.5 22.5Total Split (s) 26.0 24.0 24.0Total Split (%) 52.0% 48.0% 48.0%Maximum Green (s) 20.8 18.5 18.5Yellow Time (s) 3.2 3.5 3.5All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -1.2 -1.5 -1.5Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 9.2 9.5 9.5Actuated g/C Ratio 0.34 0.36 0.36v/c Ratio 0.16 0.20 0.09Control Delay 6.4 6.5 6.0Queue Delay 0.0 0.0 0.0Total Delay 6.4 6.5 6.0LOS A A AApproach Delay 6.4 6.5 6.0Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50Actuated Cycle Length: 26.7Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.20Intersection Signal Delay: 6.3 Intersection LOS: AIntersection Capacity Utilization 20.0% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 701: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group WBL NBT SBTLane Group Flow (vph) 175 227 102v/c Ratio 0.16 0.20 0.09Control Delay 6.4 6.5 6.0Queue Delay 0.0 0.0 0.0Total Delay 6.4 6.5 6.0Queue Length 50th (m) 2.4 3.2 1.3Queue Length 95th (m) 5.0 6.2 3.3Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2606 2441 2441Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.07 0.09 0.04

Intersection Summary

Page 702: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 32

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 157 4 209 0 0 94Future Volume (vph) 157 4 209 0 0 94Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 1.00 1.00 1.00Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 3163 3260 3260Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 3163 3260 3260Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 171 4 227 0 0 102RTOR Reduction (vph) 3 0 0 0 0 0Lane Group Flow (vph) 172 0 227 0 0 102Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.0 8.0 8.0Effective Green, g (s) 9.2 9.5 9.5Actuated g/C Ratio 0.34 0.36 0.36Clearance Time (s) 5.2 5.5 5.5Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1089 1159 1159v/s Ratio Prot c0.05 c0.07v/s Ratio Perm 0.03v/c Ratio 0.16 0.20 0.09Uniform Delay, d1 6.1 6.0 5.7Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.0 0.0 0.0Delay (s) 6.1 6.0 5.7Level of Service A A AApproach Delay (s) 6.1 6.0 5.7Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.0 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.19Actuated Cycle Length (s) 26.7 Sum of lost time (s) 9.5Intersection Capacity Utilization 20.0% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 703: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 90 0 0 109 266 127Future Volume (vph) 90 0 0 109 266 127Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Ped Bike Factor 0.99Frt 0.952Flt Protected 0.950Satd. Flow (prot) 1614 0 0 2969 2992 0Flt Permitted 0.950Satd. Flow (perm) 1614 0 0 2969 2992 0Right Turn on Red Yes YesSatd. Flow (RTOR) 138Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 12% 7% 1%Adj. Flow (vph) 98 0 0 118 289 138Shared Lane Traffic (%)Lane Group Flow (vph) 98 0 0 118 427 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2

Page 704: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group EBL EBR NBL NBT SBT SBRDetector Phase 4 2 2 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 25.0 35.0 35.0 35.0Total Split (%) 41.7% 58.3% 58.3% 58.3%Maximum Green (s) 18.7 28.0 28.0 28.0Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.9 2.9 2.9Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 10.4 13.0 13.0Actuated g/C Ratio 0.33 0.41 0.41v/c Ratio 0.18 0.10 0.32Control Delay 8.6 5.9 4.9Queue Delay 0.0 0.0 0.0Total Delay 8.6 5.9 4.9LOS A A AApproach Delay 8.6 5.9 4.9Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 31.4Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.32Intersection Signal Delay: 5.6 Intersection LOS: AIntersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 705: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group EBL NBT SBTLane Group Flow (vph) 98 118 427v/c Ratio 0.18 0.10 0.32Control Delay 8.6 5.9 4.9Queue Delay 0.0 0.0 0.0Total Delay 8.6 5.9 4.9Queue Length 50th (m) 3.5 1.7 4.6Queue Length 95th (m) 8.9 4.2 9.8Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1077 2927 2952Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.09 0.04 0.14

Intersection Summary

Page 706: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 36

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 90 0 0 109 266 127Future Volume (vph) 90 0 0 109 266 127Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95Frpb, ped/bikes 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 1.00 0.95Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1614 2969 2991Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 1614 2969 2991Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 98 0 0 118 289 138RTOR Reduction (vph) 0 0 0 0 81 0Lane Group Flow (vph) 98 0 0 118 346 0Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 3% 0% 0% 12% 7% 1%Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 8.1 10.0 10.0Effective Green, g (s) 10.4 13.0 13.0Actuated g/C Ratio 0.33 0.41 0.41Clearance Time (s) 6.3 7.0 7.0Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 534 1229 1238v/s Ratio Prot c0.06 0.04 c0.12v/s Ratio Permv/c Ratio 0.18 0.10 0.28Uniform Delay, d1 7.5 5.6 6.1Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.1Delay (s) 7.6 5.6 6.2Level of Service A A AApproach Delay (s) 7.6 5.6 6.2Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.3 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.24Actuated Cycle Length (s) 31.4 Sum of lost time (s) 8.0Intersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 707: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Future Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1667 0 1750 1716 1488 0 1750 0 2041 1488 0Flt Permitted 0.466 0.950Satd. Flow (perm) 816 1667 0 1750 1716 1488 0 1750 0 2041 1488 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 131 874Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 5% 0% 0% 2% 0% 0% 0% 0% 58% 0% 0%Adj. Flow (vph) 25 105 0 0 132 23 0 0 0 13 0 2Shared Lane Traffic (%)Lane Group Flow (vph) 25 105 0 0 132 23 0 0 0 13 2 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 708: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 12.5 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 12.5 47.5 35.0 35.0 35.0 39.0 39.0 38.5 38.5Total Split (%) 10.0% 38.0% 28.0% 28.0% 28.0% 31.2% 31.2% 30.8% 30.8%Maximum Green (s) 9.5 40.0 27.5 27.5 27.5 31.5 31.5 31.0 31.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.5 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.53 0.53 0.29 0.29 0.29 0.29v/c Ratio 0.04 0.12 0.26 0.04 0.02 0.00Control Delay 5.3 5.8 14.2 0.1 11.8 0.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.3 5.8 14.2 0.1 11.8 0.0LOS A A B A B AApproach Delay 5.7 12.1 10.2Approach LOS A B B

Intersection SummaryArea Type: OtherCycle Length: 125Actuated Cycle Length: 46Natural Cycle: 125Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.26Intersection Signal Delay: 9.3 Intersection LOS: AIntersection Capacity Utilization 35.0% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 709: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 25 105 132 23 13 2v/c Ratio 0.04 0.12 0.26 0.04 0.02 0.00Control Delay 5.3 5.8 14.2 0.1 11.8 0.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.3 5.8 14.2 0.1 11.8 0.0Queue Length 50th (m) 0.9 3.9 8.4 0.0 0.4 0.0Queue Length 95th (m) 3.2 9.2 18.8 0.0 1.8 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 590 1576 1156 1045 1530 1334Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.04 0.07 0.11 0.02 0.01 0.00

Intersection Summary

Page 710: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Future Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1667 1716 1488 2041 1488Flt Permitted 0.47 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 815 1667 1716 1488 2041 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 25 105 0 0 132 23 0 0 0 13 0 2RTOR Reduction (vph) 0 0 0 0 0 16 0 0 0 0 1 0Lane Group Flow (vph) 25 105 0 0 132 7 0 0 0 13 1 0Heavy Vehicles (%) 0% 5% 0% 0% 2% 0% 0% 0% 0% 58% 0% 0%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 21.0 21.0 10.0 10.0 10.0 10.0Effective Green, g (s) 20.0 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.43 0.53 0.29 0.29 0.29 0.29Clearance Time (s) 3.0 7.5 7.5 7.5 7.5 7.5Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 483 887 503 436 598 436v/s Ratio Prot 0.01 c0.06 c0.08 c0.01 0.00v/s Ratio Perm 0.01 0.00v/c Ratio 0.05 0.12 0.26 0.02 0.02 0.00Uniform Delay, d1 7.6 5.4 12.4 11.5 11.6 11.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.0 0.0 0.1 0.0 0.0 0.0Delay (s) 7.7 5.4 12.6 11.5 11.6 11.5Level of Service A A B B B BApproach Delay (s) 5.8 12.4 0.0 11.6Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 9.5 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.16Actuated Cycle Length (s) 46.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 35.0% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 711: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 15 89 1 276 82 98 2 157 459 103 159 23Future Volume (vph) 15 89 1 276 82 98 2 157 459 103 159 23Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 0.0 0.0 100.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.999 0.918 0.850 0.981Flt Protected 0.993 0.950 0.999 0.950Satd. Flow (prot) 0 1634 0 1525 1476 0 0 1682 1430 1433 1429 0Flt Permitted 0.951 0.684 0.997 0.648Satd. Flow (perm) 0 1565 0 1098 1476 0 0 1678 1430 978 1429 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 1 107 499 16Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 8% 6% 0% 9% 5% 12% 0% 4% 4% 16% 23% 0%Adj. Flow (vph) 16 97 1 300 89 107 2 171 499 112 173 25Shared Lane Traffic (%)Lane Group Flow (vph) 0 114 0 300 196 0 0 173 499 112 198 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 712: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 28.0 28.0 28.0 28.0 32.0 32.0 32.0 32.0 32.0Total Split (%) 46.7% 46.7% 46.7% 46.7% 53.3% 53.3% 53.3% 53.3% 53.3%Maximum Green (s) 21.7 21.7 21.7 21.7 25.7 25.7 25.7 25.7 25.7Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 0.0 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 6.3 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 20.5 20.5 20.5 18.7 16.3 18.7 18.7Actuated g/C Ratio 0.43 0.43 0.43 0.39 0.34 0.39 0.39v/c Ratio 0.17 0.64 0.28 0.26 0.61 0.29 0.35Control Delay 10.3 20.0 6.4 11.4 5.0 12.7 11.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 10.3 20.0 6.4 11.4 5.0 12.7 11.6LOS B B A B A B BApproach Delay 10.3 14.6 6.7 12.0Approach LOS B B A B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 47.5Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.64Intersection Signal Delay: 10.4 Intersection LOS: BIntersection Capacity Utilization 61.7% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 713: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 114 300 196 173 499 112 198v/c Ratio 0.17 0.64 0.28 0.26 0.61 0.29 0.35Control Delay 10.3 20.0 6.4 11.4 5.0 12.7 11.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 10.3 20.0 6.4 11.4 5.0 12.7 11.6Queue Length 50th (m) 5.4 18.4 4.2 10.7 0.0 7.1 11.6Queue Length 95th (m) 17.5 #62.1 18.2 21.7 15.3 16.6 24.2Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 50.0 100.0 50.0Base Capacity (vph) 823 577 827 1029 1023 600 882Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.14 0.52 0.24 0.17 0.49 0.19 0.22

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 714: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 15 89 1 276 82 98 2 157 459 103 159 23Future Volume (vph) 15 89 1 276 82 98 2 157 459 103 159 23Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 6.3 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.92 1.00 0.85 1.00 0.98Flt Protected 0.99 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1634 1525 1476 1682 1430 1433 1430Flt Permitted 0.95 0.68 1.00 1.00 1.00 0.65 1.00Satd. Flow (perm) 1565 1098 1476 1678 1430 977 1430Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 16 97 1 300 89 107 2 171 499 112 173 25RTOR Reduction (vph) 0 1 0 0 61 0 0 0 326 0 10 0Lane Group Flow (vph) 0 113 0 300 135 0 0 173 173 112 188 0Heavy Vehicles (%) 8% 6% 0% 9% 5% 12% 0% 4% 4% 16% 23% 0%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 18.1 18.1 18.1 16.3 16.3 16.3 16.3Effective Green, g (s) 20.4 20.4 20.4 18.6 16.3 18.6 18.6Actuated g/C Ratio 0.43 0.43 0.43 0.40 0.35 0.40 0.40Clearance Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 679 476 640 664 495 386 565v/s Ratio Prot 0.09 c0.13v/s Ratio Perm 0.07 c0.27 0.10 0.12 0.11v/c Ratio 0.17 0.63 0.21 0.26 0.35 0.29 0.33Uniform Delay, d1 8.1 10.4 8.3 9.6 11.4 9.7 9.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 4.5 0.5 0.6 1.2 1.2 1.0Delay (s) 8.4 14.9 8.8 10.2 12.6 10.9 10.9Level of Service A B A B B B BApproach Delay (s) 8.4 12.4 12.0 10.9Approach LOS A B B B

Intersection SummaryHCM 2000 Control Delay 11.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.49Actuated Cycle Length (s) 47.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 61.7% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 715: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 65 19 25 359 380 48Future Volume (vph) 65 19 25 359 380 48Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.969 0.985Flt Protected 0.963 0.997Satd. Flow (prot) 1454 0 0 1596 1603 0Flt Permitted 0.963 0.997Satd. Flow (perm) 1454 0 0 1596 1603 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 16% 0% 0% 10% 8% 4%Adj. Flow (vph) 71 21 27 390 413 52Shared Lane Traffic (%)Lane Group Flow (vph) 92 0 0 417 465 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 54.7% ICU Level of Service AAnalysis Period (min) 15

Page 716: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 46

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 65 19 25 359 380 48Future Volume (Veh/h) 65 19 25 359 380 48Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 71 21 27 390 413 52PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 883 439 465vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 883 439 465tC, single (s) 6.6 6.2 4.1tC, 2 stage (s)tF (s) 3.6 3.3 2.2p0 queue free % 76 97 98cM capacity (veh/h) 292 622 1107

Direction, Lane # EB 1 NB 1 SB 1Volume Total 92 417 465Volume Left 71 27 0Volume Right 21 0 52cSH 332 1107 1700Volume to Capacity 0.28 0.02 0.27Queue Length 95th (m) 8.9 0.6 0.0Control Delay (s) 20.0 0.8 0.0Lane LOS C AApproach Delay (s) 20.0 0.8 0.0Approach LOS C

Intersection SummaryAverage Delay 2.2Intersection Capacity Utilization 54.7% ICU Level of Service AAnalysis Period (min) 15

Page 717: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 16 12 41 368 322 77Future Volume (vph) 16 12 41 368 322 77Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.941 0.974Flt Protected 0.972 0.995Satd. Flow (prot) 1239 0 0 1603 1599 0Flt Permitted 0.972 0.995Satd. Flow (perm) 1239 0 0 1603 1599 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 21% 40% 14% 8% 7% 5%Adj. Flow (vph) 17 13 45 400 350 84Shared Lane Traffic (%)Lane Group Flow (vph) 30 0 0 445 434 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 60.3% ICU Level of Service BAnalysis Period (min) 15

Page 718: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 12 41 368 322 77Future Volume (Veh/h) 16 12 41 368 322 77Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 13 45 400 350 84PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 882 392 434vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 882 392 434tC, single (s) 6.6 6.6 4.2tC, 2 stage (s)tF (s) 3.7 3.7 2.3p0 queue free % 94 98 96cM capacity (veh/h) 281 581 1065

Direction, Lane # EB 1 NB 1 SB 1Volume Total 30 445 434Volume Left 17 45 0Volume Right 13 0 84cSH 362 1065 1700Volume to Capacity 0.08 0.04 0.26Queue Length 95th (m) 2.2 1.1 0.0Control Delay (s) 15.8 1.3 0.0Lane LOS C AApproach Delay (s) 15.8 1.3 0.0Approach LOS C

Intersection SummaryAverage Delay 1.2Intersection Capacity Utilization 60.3% ICU Level of Service BAnalysis Period (min) 15

Page 719: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 20 41 91 389 289 45Future Volume (vph) 20 41 91 389 289 45Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.909 0.982Flt Protected 0.984 0.991Satd. Flow (prot) 1086 0 0 1642 1521 0Flt Permitted 0.984 0.991Satd. Flow (perm) 1086 0 0 1642 1521 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 327.8 331.4Travel Time (s) 14.9 23.6 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 28% 52% 4% 6% 15% 0%Adj. Flow (vph) 22 45 99 423 314 49Shared Lane Traffic (%)Lane Group Flow (vph) 67 0 0 522 363 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 61.1% ICU Level of Service BAnalysis Period (min) 15

Page 720: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 20 41 91 389 289 45Future Volume (Veh/h) 20 41 91 389 289 45Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 22 45 99 423 314 49PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 328pX, platoon unblockedvC, conflicting volume 960 338 363vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 960 338 363tC, single (s) 6.7 6.7 4.1tC, 2 stage (s)tF (s) 3.8 3.8 2.2p0 queue free % 91 93 92cM capacity (veh/h) 234 603 1185

Direction, Lane # EB 1 NB 1 SB 1Volume Total 67 522 363Volume Left 22 99 0Volume Right 45 0 49cSH 398 1185 1700Volume to Capacity 0.17 0.08 0.21Queue Length 95th (m) 4.8 2.2 0.0Control Delay (s) 15.9 2.3 0.0Lane LOS C AApproach Delay (s) 15.9 2.3 0.0Approach LOS C

Intersection SummaryAverage Delay 2.4Intersection Capacity Utilization 61.1% ICU Level of Service BAnalysis Period (min) 15

Page 721: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 169 11 300 8 20 28 373 283 15 10 114 205Future Volume (vph) 169 11 300 8 20 28 373 283 15 10 114 205Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 40.0 0.0 0.0 0.0 40.0 0.0 0.0 30.0Storage Lanes 1 0 0 0 2 0 0 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00 1.00 1.00 1.00Frt 0.855 0.934 0.993 0.850Flt Protected 0.950 0.993 0.950 0.996Satd. Flow (prot) 1385 1009 0 0 1623 0 3225 1616 0 0 1405 1488Flt Permitted 0.717 0.929 0.950 0.953Satd. Flow (perm) 1046 1009 0 0 1518 0 3225 1616 0 0 1345 1488Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 326 30 7 223Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 327.8Travel Time (s) 8.5 7.8 70.5 23.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 20% 0% 50% 0% 0% 0% 0% 7% 18% 13% 25% 0%Adj. Flow (vph) 184 12 326 9 22 30 405 308 16 11 124 223Shared Lane Traffic (%)Lane Group Flow (vph) 184 338 0 0 61 0 405 324 0 0 135 223Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Prot NA Perm NA PermProtected Phases 4 8 5 2 6

Page 722: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 52

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 6 6Detector Phase 4 4 8 8 5 2 6 6 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 24.0 24.0 24.0 24.0 9.5 24.0 24.0 24.0 24.0Total Split (s) 24.0 24.0 24.0 24.0 12.0 36.0 24.0 24.0 24.0Total Split (%) 40.0% 40.0% 40.0% 40.0% 20.0% 60.0% 40.0% 40.0% 40.0%Maximum Green (s) 18.0 18.0 18.0 18.0 7.5 30.0 18.0 18.0 18.0Yellow Time (s) 4.0 4.0 4.0 4.0 3.5 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 1.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 3.9 3.9 3.9 2.4 3.9 3.9 3.9Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode None None None None None Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 15.0 15.0 15.0 9.8 24.6 12.3 12.3Actuated g/C Ratio 0.32 0.32 0.32 0.21 0.52 0.26 0.26v/c Ratio 0.56 0.63 0.12 0.61 0.39 0.39 0.41Control Delay 21.6 8.2 8.4 24.6 9.2 19.1 5.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 21.6 8.2 8.4 24.6 9.2 19.1 5.3LOS C A A C A B AApproach Delay 12.9 8.4 17.7 10.5Approach LOS B A B B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 47.5Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.63Intersection Signal Delay: 14.4 Intersection LOS: BIntersection Capacity Utilization 45.7% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy

Page 723: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBT WBT NBL NBT SBT SBRLane Group Flow (vph) 184 338 61 405 324 135 223v/c Ratio 0.56 0.63 0.12 0.61 0.39 0.39 0.41Control Delay 21.6 8.2 8.4 24.6 9.2 19.1 5.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 21.6 8.2 8.4 24.6 9.2 19.1 5.3Queue Length 50th (m) 12.9 0.7 1.8 16.8 15.0 9.8 0.0Queue Length 95th (m) 32.9 18.9 8.9 #40.5 34.9 24.0 12.8Internal Link Dist (m) 93.4 84.9 954.6 303.8Turn Bay Length (m) 40.0 40.0 30.0Base Capacity (vph) 453 622 675 667 1120 583 771Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.41 0.54 0.09 0.61 0.29 0.23 0.29

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 724: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 169 11 300 8 20 28 373 283 15 10 114 205Future Volume (vph) 169 11 300 8 20 28 373 283 15 10 114 205Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.9 3.9 3.9 2.4 3.9 3.9 3.9Lane Util. Factor 1.00 1.00 1.00 0.97 1.00 1.00 1.00Frt 1.00 0.86 0.93 1.00 0.99 1.00 0.85Flt Protected 0.95 1.00 0.99 0.95 1.00 1.00 1.00Satd. Flow (prot) 1385 1010 1622 3225 1615 1405 1488Flt Permitted 0.72 1.00 0.93 0.95 1.00 0.95 1.00Satd. Flow (perm) 1046 1010 1518 3225 1615 1344 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 184 12 326 9 22 30 405 308 16 11 124 223RTOR Reduction (vph) 0 223 0 0 21 0 0 3 0 0 0 165Lane Group Flow (vph) 184 115 0 0 40 0 405 321 0 0 135 58Heavy Vehicles (%) 20% 0% 50% 0% 0% 0% 0% 7% 18% 13% 25% 0%Turn Type Perm NA Perm NA Prot NA Perm NA PermProtected Phases 4 8 5 2 6Permitted Phases 4 8 6 6Actuated Green, G (s) 12.8 12.8 12.8 7.7 22.4 10.2 10.2Effective Green, g (s) 14.9 14.9 14.9 9.8 24.5 12.3 12.3Actuated g/C Ratio 0.32 0.32 0.32 0.21 0.52 0.26 0.26Clearance Time (s) 6.0 6.0 6.0 4.5 6.0 6.0 6.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 330 318 479 669 838 350 387v/s Ratio Prot 0.11 c0.13 c0.20v/s Ratio Perm c0.18 0.03 0.10 0.04v/c Ratio 0.56 0.36 0.08 0.61 0.38 0.39 0.15Uniform Delay, d1 13.4 12.5 11.4 16.9 6.8 14.3 13.4Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 2.0 0.7 0.1 1.6 0.3 0.7 0.2Delay (s) 15.5 13.2 11.4 18.5 7.1 15.1 13.6Level of Service B B B B A B BApproach Delay (s) 14.0 11.4 13.4 14.2Approach LOS B B B B

Intersection SummaryHCM 2000 Control Delay 13.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.54Actuated Cycle Length (s) 47.2 Sum of lost time (s) 10.2Intersection Capacity Utilization 45.7% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 725: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 89 32 60 120 161 90Future Volume (vph) 89 32 60 120 161 90Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.964 0.850Flt Protected 0.965 0.950Satd. Flow (prot) 1375 0 1299 1683 1683 1162Flt Permitted 0.965 0.950Satd. Flow (perm) 1375 0 1299 1683 1683 1162Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 25% 0% 28% 4% 4% 28%Adj. Flow (vph) 97 35 65 130 175 98Shared Lane Traffic (%)Lane Group Flow (vph) 132 0 65 130 175 98Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 30.3% ICU Level of Service AAnalysis Period (min) 15

Page 726: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 56

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 89 32 60 120 161 90Future Volume (Veh/h) 89 32 60 120 161 90Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 97 35 65 130 175 98PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 435 175 273vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 435 175 273tC, single (s) 6.6 6.2 4.4tC, 2 stage (s)tF (s) 3.7 3.3 2.5p0 queue free % 81 96 94cM capacity (veh/h) 507 874 1154

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 132 65 130 175 98Volume Left 97 65 0 0 0Volume Right 35 0 0 0 98cSH 571 1154 1700 1700 1700Volume to Capacity 0.23 0.06 0.08 0.10 0.06Queue Length 95th (m) 7.1 1.4 0.0 0.0 0.0Control Delay (s) 13.2 8.3 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 13.2 2.8 0.0Approach LOS B

Intersection SummaryAverage Delay 3.8Intersection Capacity Utilization 30.3% ICU Level of Service AAnalysis Period (min) 15

Page 727: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 117 6 174 97 23 169Future Volume (vph) 117 6 174 97 23 169Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.993 0.952Flt Protected 0.955 0.994Satd. Flow (prot) 1660 0 1594 0 0 1675Flt Permitted 0.955 0.994Satd. Flow (perm) 1660 0 1594 0 0 1675Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 7% 0% 10% 3%Adj. Flow (vph) 127 7 189 105 25 184Shared Lane Traffic (%)Lane Group Flow (vph) 134 0 294 0 0 209Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 44.8% ICU Level of Service AAnalysis Period (min) 15

Page 728: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 58

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 117 6 174 97 23 169Future Volume (Veh/h) 117 6 174 97 23 169Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 127 7 189 105 25 184PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 476 242 294vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 476 242 294tC, single (s) 6.4 6.2 4.2tC, 2 stage (s)tF (s) 3.5 3.3 2.3p0 queue free % 76 99 98cM capacity (veh/h) 540 802 1223

Direction, Lane # WB 1 NB 1 SB 1Volume Total 134 294 209Volume Left 127 0 25Volume Right 7 105 0cSH 550 1700 1223Volume to Capacity 0.24 0.17 0.02Queue Length 95th (m) 7.6 0.0 0.5Control Delay (s) 13.6 0.0 1.1Lane LOS B AApproach Delay (s) 13.6 0.0 1.1Approach LOS B

Intersection SummaryAverage Delay 3.2Intersection Capacity Utilization 44.8% ICU Level of Service AAnalysis Period (min) 15

Page 729: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 59

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 478 343 0 268 113Future Volume (vph) 0 478 343 0 268 113Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3079 3079 0 1646 1488Flt Permitted 0.950Satd. Flow (perm) 0 3079 3079 0 1646 1488Right Turn on Red Yes YesSatd. Flow (RTOR) 123Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 8% 8% 0% 1% 0%Adj. Flow (vph) 0 520 373 0 291 123Shared Lane Traffic (%)Lane Group Flow (vph) 0 520 373 0 291 123Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Perm PermProtected Phases 4 8

Page 730: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 60

Lane Group EBL EBT WBT WBR SBL SBRPermitted Phases 6 6Detector Phase 4 8 6 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0Minimum Split (s) 24.2 24.2 24.2 24.2Total Split (s) 24.2 24.2 25.8 25.8Total Split (%) 48.4% 48.4% 51.6% 51.6%Maximum Green (s) 18.1 18.1 19.7 19.7Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode None None Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 13.7 13.7 13.9 13.9Actuated g/C Ratio 0.38 0.38 0.39 0.39v/c Ratio 0.44 0.32 0.46 0.19Control Delay 10.2 9.2 11.3 3.0Queue Delay 0.0 0.0 0.0 0.0Total Delay 10.2 9.2 11.3 3.0LOS B A B AApproach Delay 10.2 9.2 8.9Approach LOS B A A

Intersection SummaryArea Type: OtherCycle Length: 50Actuated Cycle Length: 35.9Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.46Intersection Signal Delay: 9.5 Intersection LOS: AIntersection Capacity Utilization 37.1% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp

Page 731: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 61

Lane Group EBT WBT SBL SBRLane Group Flow (vph) 520 373 291 123v/c Ratio 0.44 0.32 0.46 0.19Control Delay 10.2 9.2 11.3 3.0Queue Delay 0.0 0.0 0.0 0.0Total Delay 10.2 9.2 11.3 3.0Queue Length 50th (m) 11.3 7.6 11.9 0.0Queue Length 95th (m) 27.0 19.2 32.7 6.8Internal Link Dist (m) 61.5 104.4 150.5Turn Bay Length (m) 40.0Base Capacity (vph) 1801 1801 1039 985Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.29 0.21 0.28 0.12

Intersection Summary

Page 732: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 62

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 478 343 0 268 113Future Volume (vph) 0 478 343 0 268 113Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 0.95 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3079 3079 1646 1488Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 3079 3079 1646 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 520 373 0 291 123RTOR Reduction (vph) 0 0 0 0 0 75Lane Group Flow (vph) 0 520 373 0 291 48Heavy Vehicles (%) 0% 8% 8% 0% 1% 0%Turn Type NA NA Perm PermProtected Phases 4 8Permitted Phases 6 6Actuated Green, G (s) 11.5 11.5 11.7 11.7Effective Green, g (s) 13.6 13.6 13.8 13.8Actuated g/C Ratio 0.38 0.38 0.39 0.39Clearance Time (s) 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1182 1182 641 580v/s Ratio Prot c0.17 0.12v/s Ratio Perm c0.18 0.03v/c Ratio 0.44 0.32 0.45 0.08Uniform Delay, d1 8.1 7.6 8.0 6.8Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 0.2 0.5 0.1Delay (s) 8.3 7.8 8.5 6.9Level of Service A A A AApproach Delay (s) 8.3 7.8 8.0Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 8.1 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.48Actuated Cycle Length (s) 35.4 Sum of lost time (s) 10.1Intersection Capacity Utilization 37.1% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 733: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 63

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 735 0 0 522 142 298Future Volume (vph) 735 0 0 522 142 298Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3023 0 0 3228 1471 1352Flt Permitted 0.950Satd. Flow (perm) 3023 0 0 3228 1471 1352Right Turn on Red Yes YesSatd. Flow (RTOR) 87Link Speed (k/h) 50 50 50Link Distance (m) 104.2 91.9 169.0Travel Time (s) 7.5 6.6 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 0% 0% 3% 13% 10%Adj. Flow (vph) 799 0 0 567 154 324Shared Lane Traffic (%)Lane Group Flow (vph) 799 0 0 567 154 324Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Perm PermProtected Phases 4 8

Page 734: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 64

Lane Group EBT EBR WBL WBT NBL NBRPermitted Phases 2 2Detector Phase 4 8 2 2Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0Minimum Split (s) 24.1 24.1 24.1 24.1Total Split (s) 25.0 25.0 25.0 25.0Total Split (%) 50.0% 50.0% 50.0% 50.0%Maximum Green (s) 18.9 18.9 18.9 18.9Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode None None Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 17.6 17.6 14.7 14.7Actuated g/C Ratio 0.43 0.43 0.36 0.36v/c Ratio 0.61 0.41 0.29 0.59Control Delay 12.0 9.6 11.3 13.0Queue Delay 0.0 0.0 0.0 0.0Total Delay 12.0 9.6 11.3 13.0LOS B A B BApproach Delay 12.0 9.6 12.5Approach LOS B A B

Intersection SummaryArea Type: OtherCycle Length: 50Actuated Cycle Length: 40.7Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.61Intersection Signal Delay: 11.4 Intersection LOS: BIntersection Capacity Utilization 48.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47)

Page 735: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 65

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 799 567 154 324v/c Ratio 0.61 0.41 0.29 0.59Control Delay 12.0 9.6 11.3 13.0Queue Delay 0.0 0.0 0.0 0.0Total Delay 12.0 9.6 11.3 13.0Queue Length 50th (m) 21.8 13.8 7.9 13.2Queue Length 95th (m) 44.9 29.0 18.8 33.9Internal Link Dist (m) 80.2 67.9 145.0Turn Bay Length (m) 50.0Base Capacity (vph) 1631 1742 794 769Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.49 0.33 0.19 0.42

Intersection Summary

Page 736: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 66

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 735 0 0 522 142 298Future Volume (vph) 735 0 0 522 142 298Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 0.95 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3023 3228 1471 1352Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 3023 3228 1471 1352Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 799 0 0 567 154 324RTOR Reduction (vph) 0 0 0 0 0 55Lane Group Flow (vph) 799 0 0 567 154 269Heavy Vehicles (%) 10% 0% 0% 3% 13% 10%Turn Type NA NA Perm PermProtected Phases 4 8Permitted Phases 2 2Actuated Green, G (s) 15.4 15.4 12.5 12.5Effective Green, g (s) 17.5 17.5 14.6 14.6Actuated g/C Ratio 0.44 0.44 0.36 0.36Clearance Time (s) 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1319 1408 535 492v/s Ratio Prot c0.26 0.18v/s Ratio Perm 0.10 c0.20v/c Ratio 0.61 0.40 0.29 0.55Uniform Delay, d1 8.7 7.7 9.1 10.1Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.8 0.2 0.3 1.2Delay (s) 9.5 7.9 9.4 11.4Level of Service A A A BApproach Delay (s) 9.5 7.9 10.7Approach LOS A A B

Intersection SummaryHCM 2000 Control Delay 9.3 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.62Actuated Cycle Length (s) 40.1 Sum of lost time (s) 10.1Intersection Capacity Utilization 48.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 737: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 67

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 475 109 190 182 199 224Future Volume (vph) 475 109 190 182 199 224Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.934 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1525 1667 1565 0 1498 1162Flt Permitted 0.182 0.950Satd. Flow (perm) 292 1667 1565 0 1498 1162Right Turn on Red Yes YesSatd. Flow (RTOR) 58 243Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 5% 2% 7% 11% 28%Adj. Flow (vph) 516 118 207 198 216 243Shared Lane Traffic (%)Lane Group Flow (vph) 516 118 405 0 216 243Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 2 2 1 1Detector Template Left Thru Thru Left RightLeading Detector (m) 2.0 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type pm+pt NA NA Perm PermProtected Phases 7 4 8

Page 738: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 68

Lane Group EBL EBT WBT WBR SBL SBRPermitted Phases 4 6 6Detector Phase 7 4 8 6 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 11.1 24.1 24.1 24.1 24.1Total Split (s) 29.0 54.0 25.0 26.0 26.0Total Split (%) 36.3% 67.5% 31.3% 32.5% 32.5%Maximum Green (s) 22.9 47.9 18.9 19.9 19.9Yellow Time (s) 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead LagLead-Lag Optimize? Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0Recall Mode None None None Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 49.3 49.3 20.2 17.3 17.3Actuated g/C Ratio 0.66 0.66 0.27 0.23 0.23v/c Ratio 0.85 0.11 0.87 0.62 0.53Control Delay 31.2 5.7 44.8 34.3 8.2Queue Delay 0.0 0.0 0.0 0.0 0.0Total Delay 31.2 5.7 44.8 34.3 8.2LOS C A D C AApproach Delay 26.4 44.8 20.5Approach LOS C D C

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 74.7Natural Cycle: 80Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.87Intersection Signal Delay: 29.6 Intersection LOS: CIntersection Capacity Utilization 73.5% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102)

Page 739: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 69

Lane Group EBL EBT WBT SBL SBRLane Group Flow (vph) 516 118 405 216 243v/c Ratio 0.85 0.11 0.87 0.62 0.53Control Delay 31.2 5.7 44.8 34.3 8.2Queue Delay 0.0 0.0 0.0 0.0 0.0Total Delay 31.2 5.7 44.8 34.3 8.2Queue Length 50th (m) 53.7 5.7 50.0 29.2 0.0Queue Length 95th (m) #122.1 13.1 #107.4 50.9 17.6Internal Link Dist (m) 152.2 155.7 954.6Turn Bay Length (m) 50.0 50.0Base Capacity (vph) 607 1122 484 443 515Starvation Cap Reductn 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.85 0.11 0.84 0.49 0.47

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 740: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 70

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 475 109 190 182 199 224Future Volume (vph) 475 109 190 182 199 224Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.93 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1525 1667 1565 1498 1162Flt Permitted 0.18 1.00 1.00 0.95 1.00Satd. Flow (perm) 292 1667 1565 1498 1162Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 516 118 207 198 216 243RTOR Reduction (vph) 0 0 42 0 0 187Lane Group Flow (vph) 516 118 363 0 216 56Heavy Vehicles (%) 9% 5% 2% 7% 11% 28%Turn Type pm+pt NA NA Perm PermProtected Phases 7 4 8Permitted Phases 4 6 6Actuated Green, G (s) 47.2 47.2 18.1 15.2 15.2Effective Green, g (s) 49.3 49.3 20.2 17.3 17.3Actuated g/C Ratio 0.66 0.66 0.27 0.23 0.23Clearance Time (s) 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 607 1101 423 347 269v/s Ratio Prot c0.29 0.07 0.23v/s Ratio Perm c0.28 c0.14 0.05v/c Ratio 0.85 0.11 0.86 0.62 0.21Uniform Delay, d1 15.4 4.6 25.8 25.7 23.1Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 11.0 0.0 15.6 3.5 0.4Delay (s) 26.4 4.7 41.5 29.2 23.5Level of Service C A D C CApproach Delay (s) 22.3 41.5 26.2Approach LOS C D C

Intersection SummaryHCM 2000 Control Delay 28.7 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.85Actuated Cycle Length (s) 74.6 Sum of lost time (s) 14.1Intersection Capacity Utilization 73.5% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 741: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 71

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 49 506 444 62 16 43Future Volume (vph) 49 506 444 62 16 43Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 50.0 50.0 0.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1458 3228 3228 1488 1583 1305Flt Permitted 0.476 0.950Satd. Flow (perm) 731 3228 3228 1488 1583 1305Right Turn on Red Yes YesSatd. Flow (RTOR) 67 47Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 14% 3% 3% 0% 5% 14%Adj. Flow (vph) 53 550 483 67 17 47Shared Lane Traffic (%)Lane Group Flow (vph) 53 550 483 67 17 47Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 2 2 1 1 1Detector Template Left Thru Thru Right Left RightLeading Detector (m) 2.0 10.0 10.0 2.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6 2.0 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Perm NA NA Perm Perm PermProtected Phases 4 8

Page 742: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 72

Lane Group EBL EBT WBT WBR SBL SBRPermitted Phases 4 8 6 6Detector Phase 4 4 8 8 6 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 24.0 24.0 24.0 24.0 24.0 24.0Total Split (s) 25.0 25.0 25.0 25.0 25.0 25.0Total Split (%) 50.0% 50.0% 50.0% 50.0% 50.0% 50.0%Maximum Green (s) 19.0 19.0 19.0 19.0 19.0 19.0Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 3.9 3.9 3.9 3.9 3.9 3.9Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode None None None None Min MinWalk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 12.4 12.4 12.4 12.4 8.2 8.2Actuated g/C Ratio 0.44 0.44 0.44 0.44 0.29 0.29v/c Ratio 0.17 0.39 0.34 0.10 0.04 0.12Control Delay 6.3 6.3 6.0 2.1 8.7 4.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 6.3 6.3 6.0 2.1 8.7 4.5LOS A A A A A AApproach Delay 6.3 5.6 5.6Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50Actuated Cycle Length: 28.5Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.39Intersection Signal Delay: 5.9 Intersection LOS: AIntersection Capacity Utilization 31.7% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 212: Marineland Parkway & Portage Road

Page 743: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 73

Lane Group EBL EBT WBT WBR SBL SBRLane Group Flow (vph) 53 550 483 67 17 47v/c Ratio 0.17 0.39 0.34 0.10 0.04 0.12Control Delay 6.3 6.3 6.0 2.1 8.7 4.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 6.3 6.3 6.0 2.1 8.7 4.5Queue Length 50th (m) 1.2 7.4 6.4 0.0 0.5 0.0Queue Length 95th (m) 4.8 14.7 12.8 3.0 3.2 4.1Internal Link Dist (m) 26.4 78.7 82.3Turn Bay Length (m) 50.0 50.0 50.0Base Capacity (vph) 569 2517 2517 1175 1234 1028Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.09 0.22 0.19 0.06 0.01 0.05

Intersection Summary

Page 744: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road No Crossing 2031 Summer with Improvements

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 74

Lane Group EBL EBT WBT WBR SBL SBRLane Group Flow (vph) 53 550 483 67 17 47v/c Ratio 0.17 0.39 0.34 0.10 0.04 0.12Control Delay 6.3 6.3 6.0 2.1 8.7 4.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 6.3 6.3 6.0 2.1 8.7 4.5Queue Length 50th (m) 1.2 7.4 6.4 0.0 0.5 0.0Queue Length 95th (m) 4.8 14.7 12.8 3.0 3.2 4.1Internal Link Dist (m) 26.4 78.7 82.3Turn Bay Length (m) 50.0 50.0 50.0Base Capacity (vph) 569 2517 2517 1175 1234 1028Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.09 0.22 0.19 0.06 0.01 0.05

Intersection Summary

Page 745: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 90 862 28 104 984 436 32 102 277 396 115 90Future Volume (vph) 90 862 28 104 984 436 32 102 277 396 115 90Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 1 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95Ped Bike Factor 1.00 0.98 1.00 0.98 0.99 1.00Frt 0.850 0.850 0.850 0.934Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1539 3228 1488 1568 3228 1473 1662 1651 1430 1646 3000 0Flt Permitted 0.247 0.115 0.612 0.685Satd. Flow (perm) 400 3228 1462 190 3228 1447 1071 1651 1411 1185 3000 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 112 474 212 73Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 7 6 6 7 2 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 8% 3% 0% 6% 3% 1% 0% 6% 4% 1% 0% 8%Adj. Flow (vph) 98 937 30 113 1070 474 35 111 301 430 125 98Shared Lane Traffic (%)Lane Group Flow (vph) 98 937 30 113 1070 474 35 111 301 430 223 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 1 2Detector Template Left Thru Right Left Thru Right Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 746: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Detector Phase 4 4 4 3 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.4 39.4 39.4 12.5 51.9 51.9 38.1 38.1 38.1 38.1 38.1Total Split (%) 43.8% 43.8% 43.8% 13.9% 57.7% 57.7% 42.3% 42.3% 42.3% 42.3% 42.3%Maximum Green (s) 33.3 33.3 33.3 6.4 45.8 45.8 32.0 32.0 32.0 32.0 32.0Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 0.0 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 3.8 3.8 3.8 7.1 3.8 6.1 3.8 3.8 3.8 3.8 3.8Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 30.9 30.9 30.9 40.1 43.4 41.1 33.4 33.4 33.4 33.4 33.4Actuated g/C Ratio 0.37 0.37 0.37 0.48 0.51 0.49 0.40 0.40 0.40 0.40 0.40v/c Ratio 0.67 0.79 0.05 0.64 0.64 0.50 0.08 0.17 0.44 0.92 0.18Control Delay 47.8 29.6 0.1 31.0 17.1 3.2 18.2 18.6 8.6 53.3 12.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 47.8 29.6 0.1 31.0 17.1 3.2 18.2 18.6 8.6 53.3 12.2LOS D C A C B A B B A D BApproach Delay 30.5 14.1 11.8 39.2Approach LOS C B B D

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 84.4Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.92Intersection Signal Delay: 22.7 Intersection LOS: CIntersection Capacity Utilization 79.3% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 747: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBTLane Group Flow (vph) 98 937 30 113 1070 474 35 111 301 430 223v/c Ratio 0.67 0.79 0.05 0.64 0.64 0.50 0.08 0.17 0.44 0.92 0.18Control Delay 47.8 29.6 0.1 31.0 17.1 3.2 18.2 18.6 8.6 53.3 12.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 47.8 29.6 0.1 31.0 17.1 3.2 18.2 18.6 8.6 53.3 12.2Queue Length 50th (m) 14.0 74.7 0.0 10.6 67.2 0.0 3.8 12.3 9.9 69.9 8.6Queue Length 95th (m) #39.0 98.5 0.0 #25.2 87.9 15.0 10.5 25.0 31.4 #135.9 17.0Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 169 1371 685 179 1852 1005 438 675 702 484 1271Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.58 0.68 0.04 0.63 0.58 0.47 0.08 0.16 0.43 0.89 0.18

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 748: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 90 862 28 104 984 436 32 102 277 396 115 90Future Volume (vph) 90 862 28 104 984 436 32 102 277 396 115 90Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.8 3.8 3.8 7.1 3.8 6.1 3.8 3.8 3.8 3.8 3.8Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 0.98 1.00 1.00 0.99 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.93Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1538 3228 1463 1568 3228 1447 1662 1651 1411 1644 3000Flt Permitted 0.25 1.00 1.00 0.12 1.00 1.00 0.61 1.00 1.00 0.69 1.00Satd. Flow (perm) 399 3228 1463 190 3228 1447 1072 1651 1411 1186 3000Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 98 937 30 113 1070 474 35 111 301 430 125 98RTOR Reduction (vph) 0 0 19 0 0 243 0 0 128 0 44 0Lane Group Flow (vph) 98 937 11 113 1070 231 35 111 173 430 179 0Confl. Peds. (#/hr) 7 6 6 7 2 2Heavy Vehicles (%) 8% 3% 0% 6% 3% 1% 0% 6% 4% 1% 0% 8%Turn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Actuated Green, G (s) 28.6 28.6 28.6 41.1 41.1 41.1 31.1 31.1 31.1 31.1 31.1Effective Green, g (s) 30.9 30.9 30.9 40.1 43.4 41.1 33.4 33.4 33.4 33.4 33.4Actuated g/C Ratio 0.37 0.37 0.37 0.48 0.51 0.49 0.40 0.40 0.40 0.40 0.40Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 146 1181 535 178 1659 704 424 653 558 469 1187v/s Ratio Prot c0.29 0.04 c0.33 0.07 0.06v/s Ratio Perm 0.25 0.01 0.26 0.16 0.03 0.12 c0.36v/c Ratio 0.67 0.79 0.02 0.63 0.64 0.33 0.08 0.17 0.31 0.92 0.15Uniform Delay, d1 22.5 23.9 17.1 16.6 14.9 13.2 15.9 16.5 17.6 24.2 16.4Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 10.5 3.6 0.0 6.3 0.8 0.2 0.1 0.1 0.2 22.6 0.0Delay (s) 33.0 27.5 17.1 22.9 15.7 13.4 16.0 16.6 17.8 46.8 16.4Level of Service C C B C B B B B B D BApproach Delay (s) 27.7 15.5 17.4 36.4Approach LOS C B B D

Intersection SummaryHCM 2000 Control Delay 22.7 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.88Actuated Cycle Length (s) 84.4 Sum of lost time (s) 14.7Intersection Capacity Utilization 79.3% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 749: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1314 45 131 1215 0 0 0 0 718 82 297Future Volume (vph) 0 1314 45 131 1215 0 0 0 0 718 82 297Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 50.0 0.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 0 1 1 0 0 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 0.98 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950 0.962Satd. Flow (prot) 0 4684 1488 1630 4684 0 0 0 0 1504 1500 1444Flt Permitted 0.114 0.950 0.962Satd. Flow (perm) 0 4684 1462 196 4684 0 0 0 0 1501 1498 1444Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 112 112Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 17.0 64.2 88.8Travel Time (s) 9.7 1.2 4.6 6.4Confl. Peds. (#/hr) 6 6 2 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 2% 2% 0% 0% 0% 0% 5% 13% 3%Adj. Flow (vph) 0 1428 49 142 1321 0 0 0 0 780 89 323Shared Lane Traffic (%) 45%Lane Group Flow (vph) 0 1428 49 142 1321 0 0 0 0 429 440 323Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 1 2 1 2 1Detector Template Thru Right Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0

Page 750: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Detector Phase 4 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 36.3 14.1 36.3 36.3 36.3 36.3Total Split (s) 36.4 36.4 15.0 51.4 38.6 38.6 38.6Total Split (%) 40.4% 40.4% 16.7% 57.1% 42.9% 42.9% 42.9%Maximum Green (s) 30.3 30.3 8.9 45.3 32.5 32.5 32.5Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.3 0.0 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 3.8 6.1 7.1 3.8 3.8 3.8 3.8Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 31.2 28.9 42.7 46.0 31.0 31.0 31.0Actuated g/C Ratio 0.37 0.34 0.50 0.54 0.37 0.37 0.37v/c Ratio 0.83 0.09 0.62 0.52 0.78 0.80 0.54Control Delay 30.0 0.3 26.8 13.7 35.5 37.1 17.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 30.0 0.3 26.8 13.7 35.5 37.1 17.2LOS C A C B D D BApproach Delay 29.0 15.0 31.1Approach LOS C B C

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 84.7Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.83Intersection Signal Delay: 24.6 Intersection LOS: CIntersection Capacity Utilization 78.6% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 751: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT EBR WBL WBT SBL SBT SBRLane Group Flow (vph) 1428 49 142 1321 429 440 323v/c Ratio 0.83 0.09 0.62 0.52 0.78 0.80 0.54Control Delay 30.0 0.3 26.8 13.7 35.5 37.1 17.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 30.0 0.3 26.8 13.7 35.5 37.1 17.2Queue Length 50th (m) 85.9 0.0 13.7 54.5 69.0 71.6 27.8Queue Length 95th (m) 105.4 0.0 #33.2 67.2 108.8 #116.9 53.4Internal Link Dist (m) 110.1 0.1 64.8Turn Bay Length (m) 50.0Base Capacity (vph) 1822 600 234 2661 623 622 665Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.78 0.08 0.61 0.50 0.69 0.71 0.49

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 752: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1314 45 131 1215 0 0 0 0 718 82 297Future Volume (vph) 0 1314 45 131 1215 0 0 0 0 718 82 297Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.8 6.1 7.1 3.8 3.8 3.8 3.8Lane Util. Factor 0.91 1.00 1.00 0.91 0.95 0.95 1.00Frpb, ped/bikes 1.00 0.98 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 0.96 1.00Satd. Flow (prot) 4684 1462 1630 4684 1502 1497 1444Flt Permitted 1.00 1.00 0.11 1.00 0.95 0.96 1.00Satd. Flow (perm) 4684 1462 196 4684 1502 1497 1444Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 1428 49 142 1321 0 0 0 0 780 89 323RTOR Reduction (vph) 0 0 32 0 0 0 0 0 0 0 0 71Lane Group Flow (vph) 0 1428 17 142 1321 0 0 0 0 429 440 252Confl. Peds. (#/hr) 6 6 2 2Heavy Vehicles (%) 0% 2% 0% 2% 2% 0% 0% 0% 0% 5% 13% 3%Turn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Actuated Green, G (s) 28.9 28.9 43.7 43.7 28.6 28.6 28.6Effective Green, g (s) 31.2 28.9 42.7 46.0 30.9 30.9 30.9Actuated g/C Ratio 0.37 0.34 0.51 0.54 0.37 0.37 0.37Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1729 500 229 2549 549 547 528v/s Ratio Prot c0.30 0.06 c0.28v/s Ratio Perm 0.01 0.26 0.29 0.29 0.17v/c Ratio 0.83 0.03 0.62 0.52 0.78 0.80 0.48Uniform Delay, d1 24.2 18.5 16.0 12.2 23.8 24.1 20.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 3.4 0.0 5.1 0.2 7.1 8.4 0.7Delay (s) 27.6 18.5 21.2 12.4 30.9 32.5 21.3Level of Service C B C B C C CApproach Delay (s) 27.3 13.2 0.0 28.9Approach LOS C B A C

Intersection SummaryHCM 2000 Control Delay 22.8 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.82Actuated Cycle Length (s) 84.5 Sum of lost time (s) 14.7Intersection Capacity Utilization 78.6% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 753: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1817 216 0 1269 89 148Future Volume (vph) 1817 216 0 1269 89 148Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.91 0.91 1.00 0.91 0.97 1.00Ped Bike Factor 0.99Frt 0.984 0.850Flt Protected 0.950Satd. Flow (prot) 4578 0 0 4684 3101 1430Flt Permitted 0.950Satd. Flow (perm) 4578 0 0 4684 3101 1409Right Turn on Red Yes YesSatd. Flow (RTOR) 53 7Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Confl. Peds. (#/hr) 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 2% 4% 4%Adj. Flow (vph) 1975 235 0 1379 97 161Shared Lane Traffic (%)Lane Group Flow (vph) 2210 0 0 1379 97 161Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2

Page 754: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRDetector Phase 4 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 36.0 36.0 24.0 24.0Total Split (%) 60.0% 60.0% 40.0% 40.0%Maximum Green (s) 29.9 29.9 17.9 17.9Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 3.8 3.8 3.8 3.8Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 31.9 31.9 14.4 14.4Actuated g/C Ratio 0.59 0.59 0.27 0.27v/c Ratio 0.81 0.50 0.12 0.42Control Delay 12.3 7.5 15.2 19.4Queue Delay 0.0 0.0 0.0 0.0Total Delay 12.3 7.5 15.2 19.4LOS B A B BApproach Delay 12.3 7.5 17.8Approach LOS B A B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 53.9Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.81Intersection Signal Delay: 10.9 Intersection LOS: BIntersection Capacity Utilization 60.3% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 755: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 2210 1379 97 161v/c Ratio 0.81 0.50 0.12 0.42Control Delay 12.3 7.5 15.2 19.4Queue Delay 0.0 0.0 0.0 0.0Total Delay 12.3 7.5 15.2 19.4Queue Length 50th (m) 50.2 23.7 3.8 13.0Queue Length 95th (m) 92.4 43.3 8.3 26.9Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 2763 2805 1165 533Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.80 0.49 0.08 0.30

Intersection Summary

Page 756: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1817 216 0 1269 89 148Future Volume (vph) 1817 216 0 1269 89 148Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.8 3.8 3.8 3.8Lane Util. Factor 0.91 0.91 0.97 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 0.98 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 4579 4684 3101 1408Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 4579 4684 3101 1408Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1975 235 0 1379 97 161RTOR Reduction (vph) 22 0 0 0 0 5Lane Group Flow (vph) 2188 0 0 1379 97 156Confl. Peds. (#/hr) 3Heavy Vehicles (%) 3% 0% 0% 2% 4% 4%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 29.6 29.6 12.0 12.0Effective Green, g (s) 31.9 31.9 14.3 14.3Actuated g/C Ratio 0.59 0.59 0.27 0.27Clearance Time (s) 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 2715 2777 824 374v/s Ratio Prot c0.48 0.29 0.03v/s Ratio Perm c0.11v/c Ratio 0.81 0.50 0.12 0.42Uniform Delay, d1 8.5 6.3 15.0 16.3Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 1.8 0.1 0.1 0.8Delay (s) 10.4 6.5 15.0 17.1Level of Service B A B BApproach Delay (s) 10.4 6.5 16.3Approach LOS B A B

Intersection SummaryHCM 2000 Control Delay 9.4 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.69Actuated Cycle Length (s) 53.8 Sum of lost time (s) 7.6Intersection Capacity Utilization 60.3% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 757: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 36 1491 437 292 1889 15 421 26 218 21 14 96Future Volume (vph) 36 1491 437 292 1889 15 421 26 218 21 14 96Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 15.0 50.0Storage Lanes 1 1 2 0 2 1 1 0Taper Length (m) 40.0 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.97 1.00 1.00 0.99 0.99 1.00 0.98Frt 0.850 0.999 0.850 0.869Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1568 3197 1444 3162 3221 0 3162 1606 1458 1662 1412 0Flt Permitted 0.058 0.950 0.950 0.739Satd. Flow (perm) 96 3197 1396 3150 3221 0 3128 1606 1438 1291 1412 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 284 1 177 71Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 5 14 14 5 7 1 1 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 4% 3% 2% 3% 15% 2% 9% 2% 0% 8% 5%Adj. Flow (vph) 39 1621 475 317 2053 16 458 28 237 23 15 104Shared Lane Traffic (%)Lane Group Flow (vph) 39 1621 475 317 2069 0 458 28 237 23 119 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 758: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA Perm Prot NA Prot NA Perm pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 4 2 6Detector Phase 7 4 4 3 8 5 2 2 1 6Switch PhaseMinimum Initial (s) 5.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 5.0 8.0Minimum Split (s) 11.1 36.0 36.0 12.1 36.0 11.1 32.0 32.0 11.1 32.0Total Split (s) 11.1 69.5 69.5 19.6 78.0 23.0 44.8 44.8 11.1 32.9Total Split (%) 7.7% 47.9% 47.9% 13.5% 53.8% 15.9% 30.9% 30.9% 7.7% 22.7%Maximum Green (s) 5.0 63.4 63.4 13.5 71.9 16.9 38.7 38.7 5.0 26.8Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -4.0 -4.0 -4.0 -0.5 -4.0 -0.5 -4.0 -4.0 -4.0 -4.0Total Lost Time (s) 2.1 2.1 2.1 5.6 2.1 5.6 2.1 2.1 2.1 2.1Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lag Lead LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 2.5 2.5 2.5 2.5 3.0 2.5 2.5 3.0 2.5Recall Mode None Min Min Min Min Min Min Min None MinWalk Time (s) 11.0 11.0 11.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 76.5 67.5 67.5 14.0 78.2 17.4 31.2 31.2 23.8 14.8Actuated g/C Ratio 0.59 0.52 0.52 0.11 0.61 0.13 0.24 0.24 0.18 0.11v/c Ratio 0.25 0.97 0.55 0.92 1.06 1.08 0.07 0.49 0.09 0.53Control Delay 12.9 46.4 10.5 90.0 64.7 117.2 40.6 16.1 33.8 32.3Queue Delay 0.0 42.3 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 12.9 88.7 11.9 90.0 64.7 117.2 40.6 16.1 33.8 32.3LOS B F B F E F D B C CApproach Delay 70.2 68.1 81.1 32.6Approach LOS E E F C

Intersection SummaryArea Type: OtherCycle Length: 145Actuated Cycle Length: 129.1Natural Cycle: 145Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 1.08Intersection Signal Delay: 69.8 Intersection LOS: EIntersection Capacity Utilization 91.1% ICU Level of Service FAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 759: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 39 1621 475 317 2069 458 28 237 23 119v/c Ratio 0.25 0.97 0.55 0.92 1.06 1.08 0.07 0.49 0.09 0.53Control Delay 12.9 46.4 10.5 90.0 64.7 117.2 40.6 16.1 33.8 32.3Queue Delay 0.0 42.3 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 12.9 88.7 11.9 90.0 64.7 117.2 40.6 16.1 33.8 32.3Queue Length 50th (m) 3.1 208.6 29.2 43.4 ~321.9 ~68.6 6.1 13.4 4.4 12.0Queue Length 95th (m) 8.2 #296.2 67.1 #77.0 #400.5 #111.4 14.7 39.8 11.4 32.3Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 50.0 50.0 15.0Base Capacity (vph) 159 1670 865 343 1952 426 531 594 263 391Starvation Cap Reductn 0 411 211 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.25 1.29 0.73 0.92 1.06 1.08 0.05 0.40 0.09 0.30

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 760: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 36 1491 437 292 1889 15 421 26 218 21 14 96Future Volume (vph) 36 1491 437 292 1889 15 421 26 218 21 14 96Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 2.1 2.1 2.1 5.6 2.1 5.6 2.1 2.1 2.1 2.1Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.97 1.00 1.00 1.00 1.00 0.99 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 1.00 1.00 0.85 1.00 0.87Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1568 3197 1399 3162 3221 3162 1606 1438 1661 1413Flt Permitted 0.06 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.74 1.00Satd. Flow (perm) 96 3197 1399 3162 3221 3162 1606 1438 1292 1413Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 39 1621 475 317 2053 16 458 28 237 23 15 104RTOR Reduction (vph) 0 0 137 0 0 0 0 0 135 0 62 0Lane Group Flow (vph) 39 1621 338 317 2069 0 458 28 102 23 57 0Confl. Peds. (#/hr) 5 14 14 5 7 1 1 7Heavy Vehicles (%) 6% 4% 3% 2% 3% 15% 2% 9% 2% 0% 8% 5%Turn Type pm+pt NA Perm Prot NA Prot NA Perm pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 4 2 6Actuated Green, G (s) 68.7 64.7 64.7 13.5 74.2 16.9 27.2 27.2 16.3 13.3Effective Green, g (s) 76.7 68.7 68.7 14.0 78.2 17.4 31.2 31.2 24.3 17.3Actuated g/C Ratio 0.58 0.52 0.52 0.11 0.59 0.13 0.23 0.23 0.18 0.13Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 2.5 2.5 2.5 2.5 3.0 2.5 2.5 3.0 2.5Lane Grp Cap (vph) 144 1653 723 333 1896 414 377 337 255 184v/s Ratio Prot 0.02 0.51 c0.10 c0.64 c0.14 0.02 0.00 0.04v/s Ratio Perm 0.14 0.24 c0.07 0.01v/c Ratio 0.27 0.98 0.47 0.95 1.09 1.11 0.07 0.30 0.09 0.31Uniform Delay, d1 28.3 31.4 20.4 59.1 27.3 57.7 39.6 41.8 44.9 52.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.0 17.6 0.3 36.6 50.2 76.2 0.1 0.4 0.2 0.7Delay (s) 29.3 49.0 20.8 95.7 77.5 133.9 39.6 42.2 45.1 53.1Level of Service C D C F E F D D D DApproach Delay (s) 42.4 79.9 100.2 51.8Approach LOS D E F D

Intersection SummaryHCM 2000 Control Delay 67.0 HCM 2000 Level of Service EHCM 2000 Volume to Capacity ratio 1.00Actuated Cycle Length (s) 132.8 Sum of lost time (s) 15.4Intersection Capacity Utilization 91.1% ICU Level of Service FAnalysis Period (min) 15c Critical Lane Group

Page 761: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 326 909 495 49 1262 81 596 211 68 117 246 339Future Volume (vph) 326 909 495 49 1262 81 596 211 68 117 246 339Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 50.0 50.0 50.0 50.0 0.0 50.0 50.0Storage Lanes 2 1 1 0 2 0 1 1Taper Length (m) 50.0 50.0 50.0 50.0Lane Util. Factor 0.97 0.95 1.00 1.00 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.95 1.00 1.00 1.00Frt 0.850 0.991 0.963 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 3193 3260 1417 1630 3194 0 3043 1666 0 1646 1733 1473Flt Permitted 0.066 0.158 0.950 0.575Satd. Flow (perm) 222 3260 1342 271 3194 0 3043 1666 0 994 1733 1473Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 302 5 12 161Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 24 11 11 24 3 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 2% 5% 2% 3% 0% 6% 0% 3% 1% 1% 1%Adj. Flow (vph) 354 988 538 53 1372 88 648 229 74 127 267 368Shared Lane Traffic (%)Lane Group Flow (vph) 354 988 538 53 1460 0 648 303 0 127 267 368Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 2 1Detector Template Left Thru Right Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 762: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA Perm pm+pt NA Prot NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 4 8 6 6Detector Phase 7 4 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 11.4 30.4 30.4 11.1 30.4 11.1 37.7 11.1 37.7 37.7Total Split (s) 14.0 61.6 61.6 11.4 59.0 32.0 54.9 17.1 40.0 40.0Total Split (%) 9.7% 42.5% 42.5% 7.9% 40.7% 22.1% 37.9% 11.8% 27.6% 27.6%Maximum Green (s) 7.9 55.5 55.5 5.3 52.9 25.9 48.8 11.0 33.9 33.9Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.4 -2.4 0.0 1.0 -2.4 1.0 -2.7 1.0 -2.7 -2.7Total Lost Time (s) 3.7 3.7 6.1 7.1 3.7 7.1 3.4 7.1 3.4 3.4Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.2 3.0 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min None Min Min Min Min Min MinWalk Time (s) 9.0 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 68.6 60.5 58.1 56.3 55.4 25.0 44.3 33.8 28.4 28.4Actuated g/C Ratio 0.50 0.44 0.42 0.41 0.40 0.18 0.32 0.25 0.21 0.21v/c Ratio 1.06 0.69 0.73 0.35 1.13 1.17 0.55 0.44 0.74 0.85Control Delay 99.5 35.5 21.5 28.2 106.1 143.0 40.9 32.6 63.8 47.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 99.5 35.5 21.5 28.2 106.1 143.0 40.9 32.6 63.8 47.5LOS F D C C F F D C E DApproach Delay 43.6 103.4 110.5 50.7Approach LOS D F F D

Intersection SummaryArea Type: OtherCycle Length: 145Actuated Cycle Length: 137.1Natural Cycle: 145Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 1.17Intersection Signal Delay: 74.8 Intersection LOS: EIntersection Capacity Utilization 97.5% ICU Level of Service FAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 763: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 354 988 538 53 1460 648 303 127 267 368v/c Ratio 1.06 0.69 0.73 0.35 1.13 1.17 0.55 0.44 0.74 0.85Control Delay 99.5 35.5 21.5 28.2 106.1 143.0 40.9 32.6 63.8 47.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 99.5 35.5 21.5 28.2 106.1 143.0 40.9 32.6 63.8 47.5Queue Length 50th (m) ~42.3 121.1 59.6 7.9 ~253.6 ~113.2 69.0 22.7 71.8 60.0Queue Length 95th (m) #82.6 162.1 120.1 17.7 #326.3 #164.7 99.4 36.9 103.8 101.5Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0 50.0 50.0Base Capacity (vph) 334 1438 742 153 1294 554 634 299 463 512Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 1.06 0.69 0.73 0.35 1.13 1.17 0.48 0.42 0.58 0.72

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 764: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 326 909 495 49 1262 81 596 211 68 117 246 339Future Volume (vph) 326 909 495 49 1262 81 596 211 68 117 246 339Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.7 3.7 6.1 7.1 3.7 7.1 3.4 7.1 3.4 3.4Lane Util. Factor 0.97 0.95 1.00 1.00 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 0.99 1.00 0.96 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 3193 3260 1344 1630 3194 3043 1667 1644 1733 1473Flt Permitted 0.07 1.00 1.00 0.16 1.00 0.95 1.00 0.58 1.00 1.00Satd. Flow (perm) 222 3260 1344 272 3194 3043 1667 996 1733 1473Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 354 988 538 53 1372 88 648 229 74 127 267 368RTOR Reduction (vph) 0 0 175 0 3 0 0 8 0 0 0 128Lane Group Flow (vph) 354 988 363 53 1457 0 648 295 0 127 267 240Confl. Peds. (#/hr) 24 11 11 24 3 3Heavy Vehicles (%) 1% 2% 5% 2% 3% 0% 6% 0% 3% 1% 1% 1%Turn Type pm+pt NA Perm pm+pt NA Prot NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 4 8 6 6Actuated Green, G (s) 66.0 58.1 58.1 58.6 54.4 26.0 41.6 35.8 25.7 25.7Effective Green, g (s) 70.8 60.5 58.1 56.6 56.8 25.0 44.3 33.8 28.4 28.4Actuated g/C Ratio 0.51 0.44 0.42 0.41 0.41 0.18 0.32 0.24 0.21 0.21Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 2.5 2.2 2.2 3.0 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 334 1425 564 142 1310 549 533 285 355 302v/s Ratio Prot c0.08 0.30 0.01 c0.46 c0.21 0.18 0.03 0.15v/s Ratio Perm 0.46 0.27 0.14 0.08 c0.16v/c Ratio 1.06 0.69 0.64 0.37 1.11 1.18 0.55 0.45 0.75 0.79Uniform Delay, d1 42.3 31.5 31.9 27.4 40.8 56.7 38.9 42.8 51.7 52.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 65.9 1.3 2.0 1.7 61.7 98.8 0.8 0.8 8.0 12.8Delay (s) 108.2 32.7 33.9 29.0 102.5 155.5 39.7 43.6 59.7 65.0Level of Service F C C C F F D D E EApproach Delay (s) 47.3 99.9 118.6 59.6Approach LOS D F F E

Intersection SummaryHCM 2000 Control Delay 78.0 HCM 2000 Level of Service EHCM 2000 Volume to Capacity ratio 1.08Actuated Cycle Length (s) 138.4 Sum of lost time (s) 21.3Intersection Capacity Utilization 97.5% ICU Level of Service FAnalysis Period (min) 15c Critical Lane Group

Page 765: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 226 760 108 9 689 198 438 258 13 147 250 265Future Volume (vph) 226 760 108 9 689 198 438 258 13 147 250 265Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 2 0 1 0 2 0 1 1Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 0.97 0.95 0.95 1.00 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 1.00 1.00 0.99 1.00 0.99Frt 0.981 0.967 0.993 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 3101 3160 0 1662 3110 0 3193 1728 0 1662 1733 1458Flt Permitted 0.950 0.299 0.950 0.513Satd. Flow (perm) 3069 3160 0 521 3110 0 3193 1728 0 886 1733 1458Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 19 36 3 230Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 16 7 7 16 17 17Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 4% 3% 1% 0% 3% 1% 1% 0% 9% 0% 1% 2%Adj. Flow (vph) 246 826 117 10 749 215 476 280 14 160 272 288Shared Lane Traffic (%)Lane Group Flow (vph) 246 943 0 10 964 0 476 294 0 160 272 288Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 766: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Prot NA Perm NA Prot NA pm+pt NA PermProtected Phases 7 4 8 5 2 1 6Permitted Phases 8 6 6Detector Phase 7 4 8 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 8.0 8.0 8.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 11.1 27.1 27.1 27.1 11.1 33.1 11.1 33.1 33.1Total Split (s) 14.8 49.8 35.0 35.0 20.2 41.6 13.6 35.0 35.0Total Split (%) 14.1% 47.4% 33.3% 33.3% 19.2% 39.6% 13.0% 33.3% 33.3%Maximum Green (s) 8.7 43.7 28.9 28.9 14.1 35.5 7.5 28.9 28.9Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -0.5 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 0.0Total Lost Time (s) 5.6 4.0 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lead/Lag Lead Lag Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min None Min None Min MinWalk Time (s) 8.0 8.0 8.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 9.2 45.9 31.1 31.1 16.2 28.9 31.9 22.3 20.2Actuated g/C Ratio 0.10 0.48 0.32 0.32 0.17 0.30 0.33 0.23 0.21v/c Ratio 0.83 0.62 0.06 0.94 0.89 0.57 0.43 0.68 0.59Control Delay 68.0 21.6 26.7 49.2 60.1 32.5 20.9 42.7 13.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 68.0 21.6 26.7 49.2 60.1 32.5 20.9 42.7 13.3LOS E C C D E C C D BApproach Delay 31.2 48.9 49.6 26.1Approach LOS C D D C

Intersection SummaryArea Type: OtherCycle Length: 105Actuated Cycle Length: 96.5Natural Cycle: 105Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.94Intersection Signal Delay: 38.8 Intersection LOS: DIntersection Capacity Utilization 77.4% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 767: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 246 943 10 964 476 294 160 272 288v/c Ratio 0.83 0.62 0.06 0.94 0.89 0.57 0.43 0.68 0.59Control Delay 68.0 21.6 26.7 49.2 60.1 32.5 20.9 42.7 13.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 68.0 21.6 26.7 49.2 60.1 32.5 20.9 42.7 13.3Queue Length 50th (m) 24.7 68.3 1.3 92.7 47.4 47.8 18.8 48.8 9.4Queue Length 95th (m) #51.1 105.3 5.9 #155.0 #85.8 73.5 31.9 75.6 33.8Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 50.0 50.0 25.0 25.0Base Capacity (vph) 296 1514 167 1026 537 677 370 558 598Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.83 0.62 0.06 0.94 0.89 0.43 0.43 0.49 0.48

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 768: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 226 760 108 9 689 198 438 258 13 147 250 265Future Volume (vph) 226 760 108 9 689 198 438 258 13 147 250 265Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 5.6 4.0 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lane Util. Factor 0.97 0.95 1.00 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00Frt 1.00 0.98 1.00 0.97 1.00 0.99 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 3101 3162 1655 3110 3193 1728 1653 1733 1458Flt Permitted 0.95 1.00 0.30 1.00 0.95 1.00 0.51 1.00 1.00Satd. Flow (perm) 3101 3162 521 3110 3193 1728 893 1733 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 246 826 117 10 749 215 476 280 14 160 272 288RTOR Reduction (vph) 0 10 0 0 24 0 0 2 0 0 0 182Lane Group Flow (vph) 246 933 0 10 940 0 476 292 0 160 272 106Confl. Peds. (#/hr) 16 7 7 16 17 17Heavy Vehicles (%) 4% 3% 1% 0% 3% 1% 1% 0% 9% 0% 1% 2%Turn Type Prot NA Perm NA Prot NA pm+pt NA PermProtected Phases 7 4 8 5 2 1 6Permitted Phases 8 6 6Actuated Green, G (s) 8.7 43.8 29.0 29.0 14.1 26.8 27.7 20.2 20.2Effective Green, g (s) 9.2 45.9 31.1 31.1 16.2 28.9 31.9 22.3 20.2Actuated g/C Ratio 0.10 0.48 0.32 0.32 0.17 0.30 0.33 0.23 0.21Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 295 1505 168 1003 536 518 371 400 305v/s Ratio Prot c0.08 0.30 c0.30 c0.15 0.17 0.04 c0.16v/s Ratio Perm 0.02 0.10 0.07v/c Ratio 0.83 0.62 0.06 0.94 0.89 0.56 0.43 0.68 0.35Uniform Delay, d1 42.8 18.8 22.5 31.7 39.2 28.4 23.9 33.8 32.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 18.0 0.8 0.1 15.3 16.3 1.4 0.8 4.7 0.7Delay (s) 60.8 19.5 22.7 47.0 55.5 29.8 24.7 38.5 33.2Level of Service E B C D E C C D CApproach Delay (s) 28.1 46.8 45.7 33.3Approach LOS C D D C

Intersection SummaryHCM 2000 Control Delay 37.8 HCM 2000 Level of Service DHCM 2000 Volume to Capacity ratio 0.84Actuated Cycle Length (s) 96.4 Sum of lost time (s) 17.6Intersection Capacity Utilization 77.4% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 769: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 120 603 197 153 433 151 238 212 136 115 177 224Future Volume (vph) 120 603 197 153 433 151 238 212 136 115 177 224Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95Frt 0.963 0.961 0.941 0.916Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3139 0 1630 3133 0 1630 3067 0 1630 2986 0Flt Permitted 0.271 0.176 0.320 0.457Satd. Flow (perm) 465 3139 0 302 3133 0 549 3067 0 784 2986 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 50 55 148 243Link Speed (k/h) 50 50 50 50Link Distance (m) 136.7 140.7 96.7 133.0Travel Time (s) 9.8 10.1 7.0 9.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 130 655 214 166 471 164 259 230 148 125 192 243Shared Lane Traffic (%)Lane Group Flow (vph) 130 869 0 166 635 0 259 378 0 125 435 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6

Page 770: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 7 4 3 8 5 2 1 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 11.1 24.3 11.1 24.3 11.1 24.3 11.1 24.3Total Split (s) 14.7 30.0 15.0 30.3 18.0 28.6 16.4 27.0Total Split (%) 16.3% 33.3% 16.7% 33.7% 20.0% 31.8% 18.2% 30.0%Maximum Green (s) 8.6 23.9 8.9 24.2 11.9 22.5 10.3 20.9Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) 1.0 -2.3 1.0 -2.3 1.0 -2.3 1.0 -2.3Total Lost Time (s) 7.1 3.8 7.1 3.8 7.1 3.8 7.1 3.8Lead/Lag Lead Lag Lead Lag Lead Lag Lead LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 29.0 25.3 30.4 26.0 23.3 15.8 17.8 13.1Actuated g/C Ratio 0.37 0.32 0.39 0.33 0.30 0.20 0.23 0.17v/c Ratio 0.47 0.83 0.68 0.59 0.84 0.51 0.48 0.62Control Delay 19.6 32.5 30.4 23.3 46.3 19.6 25.0 17.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.6 32.5 30.4 23.3 46.3 19.6 25.0 17.3LOS B C C C D B C BApproach Delay 30.8 24.8 30.5 19.0Approach LOS C C C B

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 78.8Natural Cycle: 90Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.84Intersection Signal Delay: 26.9 Intersection LOS: CIntersection Capacity Utilization 77.5% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 108: Stanley Avenue & Marine Land Pkway (RR 49)

Page 771: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT WBL WBT NBL NBT SBL SBTLane Group Flow (vph) 130 869 166 635 259 378 125 435v/c Ratio 0.47 0.83 0.68 0.59 0.84 0.51 0.48 0.62Control Delay 19.6 32.5 30.4 23.3 46.3 19.6 25.0 17.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.6 32.5 30.4 23.3 46.3 19.6 25.0 17.3Queue Length 50th (m) 11.3 62.6 14.8 39.8 31.6 17.0 13.9 14.6Queue Length 95th (m) 24.3 #104.8 #41.1 62.8 #62.4 30.4 26.1 28.8Internal Link Dist (m) 112.7 116.7 72.7 109.0Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 288 1083 251 1102 314 1072 290 1055Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.45 0.80 0.66 0.58 0.82 0.35 0.43 0.41

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 772: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Avenue & Marine Land Pkway (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 120 603 197 153 433 151 238 212 136 115 177 224Future Volume (vph) 120 603 197 153 433 151 238 212 136 115 177 224Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 7.1 3.8 7.1 3.8 7.1 3.8 7.1 3.8Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.95 1.00 0.95Frt 1.00 0.96 1.00 0.96 1.00 0.94 1.00 0.92Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1630 3139 1630 3134 1630 3068 1630 2987Flt Permitted 0.27 1.00 0.18 1.00 0.32 1.00 0.46 1.00Satd. Flow (perm) 465 3139 302 3134 549 3068 785 2987Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 130 655 214 166 471 164 259 230 148 125 192 243RTOR Reduction (vph) 0 34 0 0 37 0 0 118 0 0 203 0Lane Group Flow (vph) 130 835 0 166 598 0 259 260 0 125 233 0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Actuated Green, G (s) 31.0 23.0 32.4 23.7 25.2 13.5 19.8 10.8Effective Green, g (s) 29.0 25.3 30.4 26.0 23.2 15.8 17.8 13.1Actuated g/C Ratio 0.37 0.32 0.39 0.33 0.30 0.20 0.23 0.17Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 275 1010 246 1036 309 616 263 497v/s Ratio Prot 0.04 c0.27 c0.07 0.19 c0.11 0.08 0.05 0.08v/s Ratio Perm 0.13 0.19 c0.13 0.06v/c Ratio 0.47 0.83 0.67 0.58 0.84 0.42 0.48 0.47Uniform Delay, d1 17.4 24.6 18.2 21.8 23.7 27.4 25.5 29.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.3 5.6 7.1 0.8 17.7 0.5 1.4 0.7Delay (s) 18.7 30.3 25.3 22.5 41.4 27.9 26.8 30.3Level of Service B C C C D C C CApproach Delay (s) 28.8 23.1 33.4 29.5Approach LOS C C C C

Intersection SummaryHCM 2000 Control Delay 28.4 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.80Actuated Cycle Length (s) 78.6 Sum of lost time (s) 21.8Intersection Capacity Utilization 77.5% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 773: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 187 70 341 0 0 247Future Volume (vph) 187 70 341 0 0 247Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.959Flt Protected 0.965Satd. Flow (prot) 3010 0 3167 0 0 3325Flt Permitted 0.965Satd. Flow (perm) 3010 0 3167 0 0 3325Right Turn on Red Yes YesSatd. Flow (RTOR) 76Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 0% 5% 0% 5% 0%Adj. Flow (vph) 203 76 371 0 0 268Shared Lane Traffic (%)Lane Group Flow (vph) 279 0 371 0 0 268Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch Phase

Page 774: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group WBL WBR NBT NBR SBL SBTMinimum Initial (s) 8.0 8.0 8.0Minimum Split (s) 25.1 22.5 22.5Total Split (s) 27.0 23.0 23.0Total Split (%) 54.0% 46.0% 46.0%Maximum Green (s) 20.9 16.9 16.9Yellow Time (s) 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 10.3 10.6 10.6Actuated g/C Ratio 0.36 0.37 0.37v/c Ratio 0.25 0.32 0.22Control Delay 5.6 7.4 6.8Queue Delay 0.0 0.0 0.0Total Delay 5.6 7.4 6.8LOS A A AApproach Delay 5.6 7.4 6.8Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50Actuated Cycle Length: 28.9Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.32Intersection Signal Delay: 6.7 Intersection LOS: AIntersection Capacity Utilization 25.1% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 775: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group WBL NBT SBTLane Group Flow (vph) 279 371 268v/c Ratio 0.25 0.32 0.22Control Delay 5.6 7.4 6.8Queue Delay 0.0 0.0 0.0Total Delay 5.6 7.4 6.8Queue Length 50th (m) 3.0 5.9 4.1Queue Length 95th (m) 7.7 11.2 8.2Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2415 2086 2190Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.12 0.18 0.12

Intersection Summary

Page 776: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 32

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 187 70 341 0 0 247Future Volume (vph) 187 70 341 0 0 247Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 0.96 1.00 1.00Flt Protected 0.96 1.00 1.00Satd. Flow (prot) 3011 3167 3325Flt Permitted 0.96 1.00 1.00Satd. Flow (perm) 3011 3167 3325Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 203 76 371 0 0 268RTOR Reduction (vph) 49 0 0 0 0 0Lane Group Flow (vph) 230 0 371 0 0 268Heavy Vehicles (%) 6% 0% 5% 0% 5% 0%Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.1 8.5 8.5Effective Green, g (s) 10.2 10.6 10.6Actuated g/C Ratio 0.35 0.37 0.37Clearance Time (s) 6.1 6.1 6.1Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1066 1165 1223v/s Ratio Prot c0.08 c0.12v/s Ratio Perm 0.08v/c Ratio 0.22 0.32 0.22Uniform Delay, d1 6.5 6.5 6.3Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.0 0.1 0.1Delay (s) 6.5 6.6 6.3Level of Service A A AApproach Delay (s) 6.5 6.6 6.3Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.5 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.30Actuated Cycle Length (s) 28.8 Sum of lost time (s) 10.1Intersection Capacity Utilization 25.1% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 777: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 394 5 0 271 487 257Future Volume (vph) 394 5 0 271 487 257Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Ped Bike Factor 0.99Frt 0.998 0.948Flt Protected 0.953Satd. Flow (prot) 1648 0 0 3197 3020 0Flt Permitted 0.953Satd. Flow (perm) 1648 0 0 3197 3020 0Right Turn on Red Yes YesSatd. Flow (RTOR) 1 236Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 0% 0% 4% 5% 1%Adj. Flow (vph) 428 5 0 295 529 279Shared Lane Traffic (%)Lane Group Flow (vph) 433 0 0 295 808 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2

Page 778: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group EBL EBR NBL NBT SBT SBRDetector Phase 4 2 2 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 26.0 34.0 34.0 34.0Total Split (%) 43.3% 56.7% 56.7% 56.7%Maximum Green (s) 19.9 27.9 27.9 27.9Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 3.8 3.1 3.1Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 17.2 17.4 17.4Actuated g/C Ratio 0.41 0.42 0.42v/c Ratio 0.64 0.22 0.58Control Delay 15.4 8.9 8.7Queue Delay 0.0 0.0 0.0Total Delay 15.4 8.9 8.7LOS B A AApproach Delay 15.4 8.9 8.7Approach LOS B A A

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 41.8Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.64Intersection Signal Delay: 10.7 Intersection LOS: BIntersection Capacity Utilization 54.3% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 779: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group EBL NBT SBTLane Group Flow (vph) 433 295 808v/c Ratio 0.64 0.22 0.58Control Delay 15.4 8.9 8.7Queue Delay 0.0 0.0 0.0Total Delay 15.4 8.9 8.7Queue Length 50th (m) 22.8 6.9 15.1Queue Length 95th (m) 58.4 15.1 32.6Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 911 2461 2379Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.48 0.12 0.34

Intersection Summary

Page 780: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 36

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 394 5 0 271 487 257Future Volume (vph) 394 5 0 271 487 257Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.8 3.1 3.1Lane Util. Factor 1.00 0.95 0.95Frpb, ped/bikes 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 1.00 0.95Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1649 3197 3021Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 1649 3197 3021Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 428 5 0 295 529 279RTOR Reduction (vph) 1 0 0 0 137 0Lane Group Flow (vph) 432 0 0 295 671 0Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 1% 0% 0% 4% 5% 1%Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 14.8 14.2 14.2Effective Green, g (s) 17.1 17.2 17.2Actuated g/C Ratio 0.42 0.42 0.42Clearance Time (s) 6.1 6.1 6.1Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 684 1334 1261v/s Ratio Prot c0.26 0.09 c0.22v/s Ratio Permv/c Ratio 0.63 0.22 0.53Uniform Delay, d1 9.6 7.7 9.0Progression Factor 1.00 1.00 1.00Incremental Delay, d2 1.5 0.0 0.3Delay (s) 11.1 7.7 9.2Level of Service B A AApproach Delay (s) 11.1 7.7 9.2Approach LOS B A A

Intersection SummaryHCM 2000 Control Delay 9.5 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.58Actuated Cycle Length (s) 41.2 Sum of lost time (s) 6.9Intersection Capacity Utilization 54.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 781: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Future Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1716 0 1750 1651 1430 0 1750 0 3014 1458 0Flt Permitted 0.381 0.950Satd. Flow (perm) 667 1716 0 1750 1651 1430 0 1750 0 3014 1458 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 128 892Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 0% 6% 4% 0% 0% 0% 7% 0% 2%Adj. Flow (vph) 57 173 0 0 118 30 0 0 0 121 0 78Shared Lane Traffic (%)Lane Group Flow (vph) 57 173 0 0 118 30 0 0 0 121 78 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 782: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 14.1 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 15.0 51.0 36.0 36.0 36.0 40.0 40.0 39.0 39.0Total Split (%) 11.5% 39.2% 27.7% 27.7% 27.7% 30.8% 30.8% 30.0% 30.0%Maximum Green (s) 8.9 44.9 29.9 29.9 29.9 33.9 33.9 32.9 32.9Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 7.1 2.6 2.6 2.6 2.6 2.6 2.6 2.6Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 23.1 27.6 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.50 0.60 0.29 0.29 0.29 0.29v/c Ratio 0.12 0.17 0.25 0.06 0.14 0.07Control Delay 6.7 4.7 14.3 0.2 12.7 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 6.7 4.7 14.3 0.2 12.7 0.1LOS A A B A B AApproach Delay 5.2 11.4 7.8Approach LOS A B A

Intersection SummaryArea Type: OtherCycle Length: 130Actuated Cycle Length: 46.3Natural Cycle: 130Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.25Intersection Signal Delay: 7.7 Intersection LOS: AIntersection Capacity Utilization 24.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 783: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 57 173 118 30 121 78v/c Ratio 0.12 0.17 0.25 0.06 0.14 0.07Control Delay 6.7 4.7 14.3 0.2 12.7 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 6.7 4.7 14.3 0.2 12.7 0.1Queue Length 50th (m) 2.3 5.4 7.6 0.0 3.8 0.0Queue Length 95th (m) 6.3 11.5 17.5 0.0 8.5 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 502 1716 1190 1067 2368 1336Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.11 0.10 0.10 0.03 0.05 0.06

Intersection Summary

Page 784: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Future Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 7.1 2.6 2.6 2.6 2.6 2.6Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1716 1651 1430 3014 1458Flt Permitted 0.38 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 666 1716 1651 1430 3014 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 57 173 0 0 118 30 0 0 0 121 0 78RTOR Reduction (vph) 0 0 0 0 0 21 0 0 0 0 55 0Lane Group Flow (vph) 57 173 0 0 118 9 0 0 0 121 23 0Heavy Vehicles (%) 0% 2% 0% 0% 6% 4% 0% 0% 0% 7% 0% 2%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 24.1 24.1 10.0 10.0 10.0 10.0Effective Green, g (s) 23.1 27.6 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.50 0.60 0.29 0.29 0.29 0.29Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 482 1022 481 416 878 425v/s Ratio Prot 0.02 c0.10 c0.07 c0.04 0.02v/s Ratio Perm 0.04 0.01v/c Ratio 0.12 0.17 0.25 0.02 0.14 0.05Uniform Delay, d1 6.6 4.2 12.5 11.7 12.1 11.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.1 0.0 0.0 0.0Delay (s) 6.7 4.2 12.6 11.7 12.1 11.8Level of Service A A B B B BApproach Delay (s) 4.8 12.5 0.0 12.0Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 9.3 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.23Actuated Cycle Length (s) 46.3 Sum of lost time (s) 14.9Intersection Capacity Utilization 24.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 785: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 20 82 1 515 139 91 1 272 396 145 267 36Future Volume (vph) 20 82 1 515 139 91 1 272 396 145 267 36Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 115.0 0.0 0.0 100.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 100.0 7.5 100.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.999 0.941 0.850 0.982Flt Protected 0.990 0.950 0.950Satd. Flow (prot) 0 1598 0 1599 1533 0 0 1651 1390 1471 1683 0Flt Permitted 0.929 0.733 0.999 0.461Satd. Flow (perm) 0 1499 0 1233 1533 0 0 1650 1390 714 1683 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 1 64 430 11Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 9% 0% 4% 7% 8% 0% 6% 7% 13% 2% 3%Adj. Flow (vph) 22 89 1 560 151 99 1 296 430 158 290 39Shared Lane Traffic (%)Lane Group Flow (vph) 0 112 0 560 250 0 0 297 430 158 329 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 786: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 42.0 42.0 42.0 42.0 33.0 33.0 33.0 33.0 33.0Total Split (%) 56.0% 56.0% 56.0% 56.0% 44.0% 44.0% 44.0% 44.0% 44.0%Maximum Green (s) 35.9 35.9 35.9 35.9 26.9 26.9 26.9 26.9 26.9Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 3.8 3.8 3.8 3.8 3.8 3.8 3.8Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 36.4 36.4 36.4 24.1 24.1 24.1 24.1Actuated g/C Ratio 0.53 0.53 0.53 0.35 0.35 0.35 0.35v/c Ratio 0.14 0.85 0.29 0.51 0.56 0.63 0.55Control Delay 9.7 30.3 8.3 21.2 5.0 31.5 21.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.7 30.3 8.3 21.2 5.0 31.5 21.2LOS A C A C A C CApproach Delay 9.7 23.5 11.6 24.5Approach LOS A C B C

Intersection SummaryArea Type: OtherCycle Length: 75Actuated Cycle Length: 68.2Natural Cycle: 75Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.85Intersection Signal Delay: 19.0 Intersection LOS: BIntersection Capacity Utilization 80.9% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 787: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 112 560 250 297 430 158 329v/c Ratio 0.14 0.85 0.29 0.51 0.56 0.63 0.55Control Delay 9.7 30.3 8.3 21.2 5.0 31.5 21.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.7 30.3 8.3 21.2 5.0 31.5 21.2Queue Length 50th (m) 7.3 62.8 13.0 32.0 0.0 18.0 34.8Queue Length 95th (m) 16.6 #136.7 28.4 53.7 17.0 38.7 58.2Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 115.0 100.0 50.0Base Capacity (vph) 854 702 900 718 847 310 738Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.13 0.80 0.28 0.41 0.51 0.51 0.45

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 788: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 20 82 1 515 139 91 1 272 396 145 267 36Future Volume (vph) 20 82 1 515 139 91 1 272 396 145 267 36Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.8 3.8 3.8 3.8 3.8 3.8 3.8Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.94 1.00 0.85 1.00 0.98Flt Protected 0.99 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1598 1599 1533 1651 1390 1471 1683Flt Permitted 0.93 0.73 1.00 1.00 1.00 0.46 1.00Satd. Flow (perm) 1498 1233 1533 1650 1390 713 1683Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 22 89 1 560 151 99 1 296 430 158 290 39RTOR Reduction (vph) 0 0 0 0 30 0 0 0 278 0 7 0Lane Group Flow (vph) 0 112 0 560 220 0 0 297 152 158 322 0Heavy Vehicles (%) 6% 9% 0% 4% 7% 8% 0% 6% 7% 13% 2% 3%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 34.1 34.1 34.1 21.7 21.7 21.7 21.7Effective Green, g (s) 36.4 36.4 36.4 24.0 24.0 24.0 24.0Actuated g/C Ratio 0.54 0.54 0.54 0.35 0.35 0.35 0.35Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 801 660 820 582 490 251 594v/s Ratio Prot 0.14 0.19v/s Ratio Perm 0.07 c0.45 0.18 0.11 c0.22v/c Ratio 0.14 0.85 0.27 0.51 0.31 0.63 0.54Uniform Delay, d1 7.9 13.5 8.6 17.4 16.0 18.3 17.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 11.4 0.5 2.0 1.0 8.2 2.3Delay (s) 8.2 24.8 9.1 19.4 17.0 26.5 19.9Level of Service A C A B B C BApproach Delay (s) 8.2 20.0 18.0 22.0Approach LOS A B B C

Intersection SummaryHCM 2000 Control Delay 19.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.76Actuated Cycle Length (s) 68.0 Sum of lost time (s) 7.6Intersection Capacity Utilization 80.9% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 789: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 83 51 28 503 457 70Future Volume (vph) 83 51 28 503 457 70Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.949 0.982Flt Protected 0.970 0.997Satd. Flow (prot) 1447 0 0 1655 1609 0Flt Permitted 0.970 0.997Satd. Flow (perm) 1447 0 0 1655 1609 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 20% 50% 3% 6% 12%Adj. Flow (vph) 90 55 30 547 497 76Shared Lane Traffic (%)Lane Group Flow (vph) 145 0 0 577 573 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 68.6% ICU Level of Service CAnalysis Period (min) 15

Page 790: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 46

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 83 51 28 503 457 70Future Volume (Veh/h) 83 51 28 503 457 70Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 90 55 30 547 497 76PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1142 535 573vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1142 535 573tC, single (s) 6.5 6.4 4.6tC, 2 stage (s)tF (s) 3.6 3.5 2.7p0 queue free % 57 89 96cM capacity (veh/h) 209 512 801

Direction, Lane # EB 1 NB 1 SB 1Volume Total 145 577 573Volume Left 90 30 0Volume Right 55 0 76cSH 270 801 1700Volume to Capacity 0.54 0.04 0.34Queue Length 95th (m) 23.5 0.9 0.0Control Delay (s) 32.8 1.0 0.0Lane LOS D AApproach Delay (s) 32.8 1.0 0.0Approach LOS D

Intersection SummaryAverage Delay 4.1Intersection Capacity Utilization 68.6% ICU Level of Service CAnalysis Period (min) 15

Page 791: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 81 42 25 450 469 39Future Volume (vph) 81 42 25 450 469 39Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.954 0.990Flt Protected 0.968 0.997Satd. Flow (prot) 1518 0 0 1656 1596 0Flt Permitted 0.968 0.997Satd. Flow (perm) 1518 0 0 1656 1596 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 13% 48% 3% 8% 15%Adj. Flow (vph) 88 46 27 489 510 42Shared Lane Traffic (%)Lane Group Flow (vph) 134 0 0 516 552 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 62.2% ICU Level of Service BAnalysis Period (min) 15

Page 792: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 81 42 25 450 469 39Future Volume (Veh/h) 81 42 25 450 469 39Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 88 46 27 489 510 42PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1074 531 552vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1074 531 552tC, single (s) 6.4 6.3 4.6tC, 2 stage (s)tF (s) 3.5 3.4 2.6p0 queue free % 62 91 97cM capacity (veh/h) 234 527 824

Direction, Lane # EB 1 NB 1 SB 1Volume Total 134 516 552Volume Left 88 27 0Volume Right 46 0 42cSH 290 824 1700Volume to Capacity 0.46 0.03 0.32Queue Length 95th (m) 18.5 0.8 0.0Control Delay (s) 27.7 0.9 0.0Lane LOS D AApproach Delay (s) 27.7 0.9 0.0Approach LOS D

Intersection SummaryAverage Delay 3.5Intersection Capacity Utilization 62.2% ICU Level of Service BAnalysis Period (min) 15

Page 793: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 40 96 28 435 484 27Future Volume (vph) 40 96 28 435 484 27Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.904 0.993Flt Protected 0.986 0.997Satd. Flow (prot) 1406 0 0 1559 1649 0Flt Permitted 0.986 0.997Satd. Flow (perm) 1406 0 0 1559 1649 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 327.8 331.4Travel Time (s) 14.9 23.6 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 13% 42% 10% 4% 30%Adj. Flow (vph) 43 104 30 473 526 29Shared Lane Traffic (%)Lane Group Flow (vph) 147 0 0 503 555 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 65.3% ICU Level of Service CAnalysis Period (min) 15

Page 794: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 40 96 28 435 484 27Future Volume (Veh/h) 40 96 28 435 484 27Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 43 104 30 473 526 29PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 328pX, platoon unblocked 0.96vC, conflicting volume 1074 540 555vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1057 540 555tC, single (s) 6.5 6.3 4.5tC, 2 stage (s)tF (s) 3.6 3.4 2.6p0 queue free % 81 80 96cM capacity (veh/h) 227 521 843

Direction, Lane # EB 1 NB 1 SB 1Volume Total 147 503 555Volume Left 43 30 0Volume Right 104 0 29cSH 378 843 1700Volume to Capacity 0.39 0.04 0.33Queue Length 95th (m) 14.4 0.9 0.0Control Delay (s) 20.5 1.0 0.0Lane LOS C AApproach Delay (s) 20.5 1.0 0.0Approach LOS C

Intersection SummaryAverage Delay 2.9Intersection Capacity Utilization 65.3% ICU Level of Service CAnalysis Period (min) 15

Page 795: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 240 27 423 14 19 7 440 216 9 18 312 250Future Volume (vph) 240 27 423 14 19 7 440 216 9 18 312 250Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 40.0 0.0 0.0 0.0 40.0 0.0 30.0 30.0Storage Lanes 1 0 0 0 2 0 0 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00 1.00 1.00 1.00Frt 0.859 0.975 0.994 0.850Flt Protected 0.950 0.983 0.950 0.997Satd. Flow (prot) 1662 1339 0 0 1677 0 3014 1496 0 0 1660 1390Flt Permitted 0.728 0.609 0.950 0.973Satd. Flow (perm) 1274 1339 0 0 1039 0 3014 1496 0 0 1620 1390Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 460 8 5 272Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 327.8Travel Time (s) 8.5 7.8 70.5 23.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 13% 0% 0% 0% 7% 17% 0% 7% 5% 7%Adj. Flow (vph) 261 29 460 15 21 8 478 235 10 20 339 272Shared Lane Traffic (%)Lane Group Flow (vph) 261 489 0 0 44 0 478 245 0 0 359 272Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Prot NA Perm NA PermProtected Phases 4 8 5 2 6

Page 796: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 52

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 6 6Detector Phase 4 4 8 8 5 2 6 6 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 24.1 24.1 24.1 24.1 11.1 24.1 24.1 24.1 24.1Total Split (s) 24.1 24.1 24.1 24.1 16.0 40.9 24.9 24.9 24.9Total Split (%) 37.1% 37.1% 37.1% 37.1% 24.6% 62.9% 38.3% 38.3% 38.3%Maximum Green (s) 18.0 18.0 18.0 18.0 9.9 34.8 18.8 18.8 18.8Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode None None None None Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 17.5 17.5 17.5 12.2 34.7 18.5 16.3Actuated g/C Ratio 0.29 0.29 0.29 0.20 0.58 0.31 0.27v/c Ratio 0.71 0.68 0.14 0.79 0.28 0.73 0.47Control Delay 31.6 8.4 15.4 36.1 7.9 29.0 5.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 31.6 8.4 15.4 36.1 7.9 29.0 5.9LOS C A B D A C AApproach Delay 16.5 15.4 26.6 19.0Approach LOS B B C B

Intersection SummaryArea Type: OtherCycle Length: 65Actuated Cycle Length: 60.3Natural Cycle: 65Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.79Intersection Signal Delay: 20.6 Intersection LOS: CIntersection Capacity Utilization 72.5% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy

Page 797: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBT WBT NBL NBT SBT SBRLane Group Flow (vph) 261 489 44 478 245 359 272v/c Ratio 0.71 0.68 0.14 0.79 0.28 0.73 0.47Control Delay 31.6 8.4 15.4 36.1 7.9 29.0 5.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 31.6 8.4 15.4 36.1 7.9 29.0 5.9Queue Length 50th (m) 28.4 2.6 3.2 30.5 14.1 39.1 0.0Queue Length 95th (m) #58.6 27.1 10.1 #54.9 25.8 #69.2 15.6Internal Link Dist (m) 93.4 84.9 954.6 303.8Turn Bay Length (m) 40.0 40.0 30.0Base Capacity (vph) 429 756 356 607 929 568 625Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.61 0.65 0.12 0.79 0.26 0.63 0.44

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 798: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 240 27 423 14 19 7 440 216 9 18 312 250Future Volume (vph) 240 27 423 14 19 7 440 216 9 18 312 250Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lane Util. Factor 1.00 1.00 1.00 0.97 1.00 1.00 1.00Frt 1.00 0.86 0.98 1.00 0.99 1.00 0.85Flt Protected 0.95 1.00 0.98 0.95 1.00 1.00 1.00Satd. Flow (prot) 1662 1339 1678 3014 1495 1660 1390Flt Permitted 0.73 1.00 0.61 0.95 1.00 0.97 1.00Satd. Flow (perm) 1275 1339 1039 3014 1495 1621 1390Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 261 29 460 15 21 8 478 235 10 20 339 272RTOR Reduction (vph) 0 326 0 0 6 0 0 2 0 0 0 198Lane Group Flow (vph) 261 163 0 0 38 0 478 243 0 0 359 74Heavy Vehicles (%) 0% 0% 13% 0% 0% 0% 7% 17% 0% 7% 5% 7%Turn Type Perm NA Perm NA Prot NA Perm NA PermProtected Phases 4 8 5 2 6Permitted Phases 4 8 6 6Actuated Green, G (s) 15.4 15.4 15.4 10.0 32.5 16.4 16.4Effective Green, g (s) 17.5 17.5 17.5 12.1 34.6 18.5 16.4Actuated g/C Ratio 0.29 0.29 0.29 0.20 0.58 0.31 0.27Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 371 389 302 606 860 498 379v/s Ratio Prot 0.12 c0.16 0.16v/s Ratio Perm c0.20 0.04 c0.22 0.05v/c Ratio 0.70 0.42 0.13 0.79 0.28 0.72 0.20Uniform Delay, d1 19.0 17.2 15.7 22.8 6.5 18.5 16.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 6.0 0.7 0.2 6.8 0.2 5.1 0.3Delay (s) 24.9 17.9 15.9 29.5 6.6 23.6 17.0Level of Service C B B C A C BApproach Delay (s) 20.4 15.9 21.8 20.8Approach LOS C B C C

Intersection SummaryHCM 2000 Control Delay 20.9 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.73Actuated Cycle Length (s) 60.1 Sum of lost time (s) 12.0Intersection Capacity Utilization 72.5% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 799: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 77 40 40 219 315 119Future Volume (vph) 77 40 40 219 315 119Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.954 0.850Flt Protected 0.968 0.950Satd. Flow (prot) 1495 0 1614 1733 1716 1352Flt Permitted 0.968 0.950Satd. Flow (perm) 1495 0 1614 1733 1716 1352Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 18% 3% 1% 2% 10%Adj. Flow (vph) 84 43 43 238 342 129Shared Lane Traffic (%)Lane Group Flow (vph) 127 0 43 238 342 129Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 38.6% ICU Level of Service AAnalysis Period (min) 15

Page 800: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 56

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 77 40 40 219 315 119Future Volume (Veh/h) 77 40 40 219 315 119Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 84 43 43 238 342 129PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 666 342 471vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 666 342 471tC, single (s) 6.4 6.4 4.1tC, 2 stage (s)tF (s) 3.5 3.5 2.2p0 queue free % 79 94 96cM capacity (veh/h) 406 666 1086

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 127 43 238 342 129Volume Left 84 43 0 0 0Volume Right 43 0 0 0 129cSH 468 1086 1700 1700 1700Volume to Capacity 0.27 0.04 0.14 0.20 0.08Queue Length 95th (m) 8.7 1.0 0.0 0.0 0.0Control Delay (s) 15.5 8.5 0.0 0.0 0.0Lane LOS C AApproach Delay (s) 15.5 1.3 0.0Approach LOS C

Intersection SummaryAverage Delay 2.7Intersection Capacity Utilization 38.6% ICU Level of Service AAnalysis Period (min) 15

Page 801: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 159 21 238 145 66 290Future Volume (vph) 159 21 238 145 66 290Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.984 0.949Flt Protected 0.958 0.991Satd. Flow (prot) 1650 0 1604 0 0 1680Flt Permitted 0.958 0.991Satd. Flow (perm) 1650 0 1604 0 0 1680Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 2% 6% 0% 4%Adj. Flow (vph) 173 23 259 158 72 315Shared Lane Traffic (%)Lane Group Flow (vph) 196 0 417 0 0 387Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 64.7% ICU Level of Service CAnalysis Period (min) 15

Page 802: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 58

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 159 21 238 145 66 290Future Volume (Veh/h) 159 21 238 145 66 290Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 173 23 259 158 72 315PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 797 338 417vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 797 338 417tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 49 97 94cM capacity (veh/h) 336 709 1153

Direction, Lane # WB 1 NB 1 SB 1Volume Total 196 417 387Volume Left 173 0 72Volume Right 23 158 0cSH 358 1700 1153Volume to Capacity 0.55 0.25 0.06Queue Length 95th (m) 25.1 0.0 1.6Control Delay (s) 26.6 0.0 2.1Lane LOS D AApproach Delay (s) 26.6 0.0 2.1Approach LOS D

Intersection SummaryAverage Delay 6.0Intersection Capacity Utilization 64.7% ICU Level of Service CAnalysis Period (min) 15

Page 803: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 59

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 403 580 0 313 165Future Volume (vph) 0 403 580 0 313 165Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3292 3228 0 1599 1390Flt Permitted 0.950Satd. Flow (perm) 0 3292 3228 0 1599 1390Right Turn on Red Yes YesSatd. Flow (RTOR) 138Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 3% 0% 4% 7%Adj. Flow (vph) 0 438 630 0 340 179Shared Lane Traffic (%)Lane Group Flow (vph) 0 438 630 0 340 179Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Perm PermProtected Phases 4 8

Page 804: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 60

Lane Group EBL EBT WBT WBR SBL SBRPermitted Phases 6 6Detector Phase 4 8 6 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0Minimum Split (s) 24.1 24.1 24.1 24.1Total Split (s) 24.1 24.1 25.9 25.9Total Split (%) 48.2% 48.2% 51.8% 51.8%Maximum Green (s) 18.0 18.0 19.8 19.8Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode None None Max MaxWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 16.0 16.0 22.0 22.0Actuated g/C Ratio 0.35 0.35 0.48 0.48v/c Ratio 0.38 0.56 0.45 0.24Control Delay 12.1 14.2 11.2 4.0Queue Delay 0.0 0.0 0.0 0.0Total Delay 12.1 14.2 11.2 4.0LOS B B B AApproach Delay 12.1 14.2 8.7Approach LOS B B A

Intersection SummaryArea Type: OtherCycle Length: 50Actuated Cycle Length: 46Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.56Intersection Signal Delay: 11.8 Intersection LOS: BIntersection Capacity Utilization 42.9% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp

Page 805: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 61

Lane Group EBT WBT SBL SBRLane Group Flow (vph) 438 630 340 179v/c Ratio 0.38 0.56 0.45 0.24Control Delay 12.1 14.2 11.2 4.0Queue Delay 0.0 0.0 0.0 0.0Total Delay 12.1 14.2 11.2 4.0Queue Length 50th (m) 14.1 21.9 17.2 1.7Queue Length 95th (m) 22.9 34.0 39.8 10.9Internal Link Dist (m) 61.5 104.4 150.5Turn Bay Length (m) 40.0Base Capacity (vph) 1443 1415 763 736Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.30 0.45 0.45 0.24

Intersection Summary

Page 806: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 62

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 403 580 0 313 165Future Volume (vph) 0 403 580 0 313 165Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 0.95 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3292 3228 1599 1390Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 3292 3228 1599 1390Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 438 630 0 340 179RTOR Reduction (vph) 0 0 0 0 0 72Lane Group Flow (vph) 0 438 630 0 340 107Heavy Vehicles (%) 0% 1% 3% 0% 4% 7%Turn Type NA NA Perm PermProtected Phases 4 8Permitted Phases 6 6Actuated Green, G (s) 13.9 13.9 19.9 19.9Effective Green, g (s) 16.0 16.0 22.0 22.0Actuated g/C Ratio 0.35 0.35 0.48 0.48Clearance Time (s) 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1145 1122 764 664v/s Ratio Prot 0.13 c0.20v/s Ratio Perm c0.21 0.08v/c Ratio 0.38 0.56 0.45 0.16Uniform Delay, d1 11.3 12.2 8.0 6.8Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.6 1.9 0.5Delay (s) 11.5 12.8 9.8 7.3Level of Service B B A AApproach Delay (s) 11.5 12.8 9.0Approach LOS B B A

Intersection SummaryHCM 2000 Control Delay 11.2 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.52Actuated Cycle Length (s) 46.0 Sum of lost time (s) 10.1Intersection Capacity Utilization 42.9% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 807: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 63

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 678 0 0 994 191 459Future Volume (vph) 678 0 0 994 191 459Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3260 0 0 3228 1568 1473Flt Permitted 0.950Satd. Flow (perm) 3260 0 0 3228 1568 1473Right Turn on Red Yes YesSatd. Flow (RTOR) 97Link Speed (k/h) 50 50 50Link Distance (m) 104.2 91.9 169.0Travel Time (s) 7.5 6.6 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 3% 6% 1%Adj. Flow (vph) 737 0 0 1080 208 499Shared Lane Traffic (%)Lane Group Flow (vph) 737 0 0 1080 208 499Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Perm PermProtected Phases 4 8

Page 808: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 64

Lane Group EBT EBR WBL WBT NBL NBRPermitted Phases 2 2Detector Phase 4 8 2 2Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0Minimum Split (s) 24.1 24.1 24.1 24.1Total Split (s) 28.3 28.3 26.7 26.7Total Split (%) 51.5% 51.5% 48.5% 48.5%Maximum Green (s) 22.2 22.2 20.6 20.6Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0Lost Time Adjust (s) 0.0 0.0 -2.1 -2.1Total Lost Time (s) 6.1 6.1 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min None NoneWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 20.5 20.5 19.8 19.8Actuated g/C Ratio 0.41 0.41 0.39 0.39v/c Ratio 0.56 0.83 0.34 0.79Control Delay 14.0 21.2 12.9 22.1Queue Delay 0.0 0.0 0.0 0.0Total Delay 14.0 21.2 12.9 22.1LOS B C B CApproach Delay 14.0 21.2 19.4Approach LOS B C B

Intersection SummaryArea Type: OtherCycle Length: 55Actuated Cycle Length: 50.6Natural Cycle: 55Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.83Intersection Signal Delay: 18.6 Intersection LOS: BIntersection Capacity Utilization 59.6% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47)

Page 809: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 65

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 737 1080 208 499v/c Ratio 0.56 0.83 0.34 0.79Control Delay 14.0 21.2 12.9 22.1Queue Delay 0.0 0.0 0.0 0.0Total Delay 14.0 21.2 12.9 22.1Queue Length 50th (m) 29.8 50.8 14.0 33.6Queue Length 95th (m) 44.4 #85.2 27.3 #80.5Internal Link Dist (m) 80.2 67.9 145.0Turn Bay Length (m) 50.0Base Capacity (vph) 1459 1445 718 726Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.51 0.75 0.29 0.69

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 810: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 66

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 678 0 0 994 191 459Future Volume (vph) 678 0 0 994 191 459Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 6.1 6.1 4.0 4.0Lane Util. Factor 0.95 0.95 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3260 3228 1568 1473Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 3260 3228 1568 1473Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 737 0 0 1080 208 499RTOR Reduction (vph) 0 0 0 0 0 59Lane Group Flow (vph) 737 0 0 1080 208 440Heavy Vehicles (%) 2% 0% 0% 3% 6% 1%Turn Type NA NA Perm PermProtected Phases 4 8Permitted Phases 2 2Actuated Green, G (s) 20.5 20.5 17.7 17.7Effective Green, g (s) 20.5 20.5 19.8 19.8Actuated g/C Ratio 0.41 0.41 0.39 0.39Clearance Time (s) 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1325 1312 616 578v/s Ratio Prot 0.23 c0.33v/s Ratio Perm 0.13 c0.30v/c Ratio 0.56 0.82 0.34 0.76Uniform Delay, d1 11.5 13.3 10.7 13.3Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.5 4.3 0.3 5.9Delay (s) 12.0 17.6 11.0 19.1Level of Service B B B BApproach Delay (s) 12.0 17.6 16.8Approach LOS B B B

Intersection SummaryHCM 2000 Control Delay 15.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.84Actuated Cycle Length (s) 50.4 Sum of lost time (s) 12.2Intersection Capacity Utilization 59.6% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 811: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 67

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 432 244 172 216 265 483Future Volume (vph) 432 244 172 216 265 483Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.925 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1549 1598 0 1614 1403Flt Permitted 0.173 0.950Satd. Flow (perm) 303 1549 1598 0 1614 1403Right Turn on Red Yes YesSatd. Flow (RTOR) 82 525Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 13% 3% 0% 3% 6%Adj. Flow (vph) 470 265 187 235 288 525Shared Lane Traffic (%)Lane Group Flow (vph) 470 265 422 0 288 525Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 2 2 1 1Detector Template Left Thru Thru Left RightLeading Detector (m) 2.0 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type pm+pt NA NA Perm PermProtected Phases 7 4 8

Page 812: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 68

Lane Group EBL EBT WBT WBR SBL SBRPermitted Phases 4 6 6Detector Phase 7 4 8 6 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 11.1 24.1 24.1 24.1 24.1Total Split (s) 24.0 48.1 24.1 26.9 26.9Total Split (%) 32.0% 64.1% 32.1% 35.9% 35.9%Maximum Green (s) 17.9 42.0 18.0 20.8 20.8Yellow Time (s) 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead LagLead-Lag Optimize? Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0Recall Mode None None None Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 43.1 43.1 19.0 18.9 18.9Actuated g/C Ratio 0.62 0.62 0.27 0.27 0.27v/c Ratio 0.82 0.28 0.85 0.66 0.69Control Delay 28.9 7.9 39.1 31.0 7.6Queue Delay 0.0 0.0 0.0 0.0 0.0Total Delay 28.9 7.9 39.1 31.0 7.6LOS C A D C AApproach Delay 21.3 39.1 15.9Approach LOS C D B

Intersection SummaryArea Type: OtherCycle Length: 75Actuated Cycle Length: 70Natural Cycle: 75Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.85Intersection Signal Delay: 22.9 Intersection LOS: CIntersection Capacity Utilization 76.1% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102)

Page 813: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 69

Lane Group EBL EBT WBT SBL SBRLane Group Flow (vph) 470 265 422 288 525v/c Ratio 0.82 0.28 0.85 0.66 0.69Control Delay 28.9 7.9 39.1 31.0 7.6Queue Delay 0.0 0.0 0.0 0.0 0.0Total Delay 28.9 7.9 39.1 31.0 7.6Queue Length 50th (m) 45.9 16.3 46.7 36.0 0.0Queue Length 95th (m) #103.0 30.5 #100.1 60.7 23.7Internal Link Dist (m) 152.2 155.7 954.6Turn Bay Length (m) 50.0 50.0Base Capacity (vph) 578 984 521 532 814Starvation Cap Reductn 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.81 0.27 0.81 0.54 0.64

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 814: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 70

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 432 244 172 216 265 483Future Volume (vph) 432 244 172 216 265 483Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.92 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1549 1597 1614 1403Flt Permitted 0.17 1.00 1.00 0.95 1.00Satd. Flow (perm) 303 1549 1597 1614 1403Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 470 265 187 235 288 525RTOR Reduction (vph) 0 0 60 0 0 384Lane Group Flow (vph) 470 265 362 0 288 141Heavy Vehicles (%) 0% 13% 3% 0% 3% 6%Turn Type pm+pt NA NA Perm PermProtected Phases 7 4 8Permitted Phases 4 6 6Actuated Green, G (s) 41.0 41.0 17.0 16.7 16.7Effective Green, g (s) 43.1 43.1 19.1 18.8 18.8Actuated g/C Ratio 0.62 0.62 0.27 0.27 0.27Clearance Time (s) 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 575 955 436 434 377v/s Ratio Prot c0.23 0.17 0.23v/s Ratio Perm c0.27 c0.18 0.10v/c Ratio 0.82 0.28 0.83 0.66 0.37Uniform Delay, d1 14.8 6.2 23.9 22.7 20.8Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 8.8 0.2 12.7 3.8 0.6Delay (s) 23.6 6.4 36.6 26.5 21.4Level of Service C A D C CApproach Delay (s) 17.4 36.6 23.2Approach LOS B D C

Intersection SummaryHCM 2000 Control Delay 23.9 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.84Actuated Cycle Length (s) 69.9 Sum of lost time (s) 14.1Intersection Capacity Utilization 76.1% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 815: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 71

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 23 831 689 107 120 32Future Volume (vph) 23 831 689 107 120 32Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 50.0 50.0 0.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 3292 3228 1458 1614 1430Flt Permitted 0.342 0.950Satd. Flow (perm) 598 3292 3228 1458 1614 1430Right Turn on Red Yes YesSatd. Flow (RTOR) 116 35Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 3% 2% 3% 4%Adj. Flow (vph) 25 903 749 116 130 35Shared Lane Traffic (%)Lane Group Flow (vph) 25 903 749 116 130 35Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 2 2 1 1 1Detector Template Left Thru Thru Right Left RightLeading Detector (m) 2.0 10.0 10.0 2.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6 2.0 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Perm NA NA Perm Perm PermProtected Phases 4 8

Page 816: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 72

Lane Group EBL EBT WBT WBR SBL SBRPermitted Phases 4 8 6 6Detector Phase 4 4 8 8 6 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 24.1 24.1 24.1 24.1 24.1 24.1Total Split (s) 25.0 25.0 25.0 25.0 25.0 25.0Total Split (%) 50.0% 50.0% 50.0% 50.0% 50.0% 50.0%Maximum Green (s) 18.9 18.9 18.9 18.9 18.9 18.9Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode None None None None Min MinWalk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 17.3 17.3 17.3 17.3 10.5 10.5Actuated g/C Ratio 0.48 0.48 0.48 0.48 0.29 0.29v/c Ratio 0.09 0.57 0.48 0.15 0.28 0.08Control Delay 6.4 8.6 7.7 2.2 12.5 5.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 6.4 8.6 7.7 2.2 12.5 5.2LOS A A A A B AApproach Delay 8.5 7.0 10.9Approach LOS A A B

Intersection SummaryArea Type: OtherCycle Length: 50Actuated Cycle Length: 36Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.57Intersection Signal Delay: 8.0 Intersection LOS: AIntersection Capacity Utilization 38.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 212: Marineland Parkway & Portage Road

Page 817: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 73

Lane Group EBL EBT WBT WBR SBL SBRLane Group Flow (vph) 25 903 749 116 130 35v/c Ratio 0.09 0.57 0.48 0.15 0.28 0.08Control Delay 6.4 8.6 7.7 2.2 12.5 5.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 6.4 8.6 7.7 2.2 12.5 5.2Queue Length 50th (m) 0.7 18.2 14.2 0.0 6.4 0.0Queue Length 95th (m) 3.7 35.8 28.6 5.2 16.7 4.2Internal Link Dist (m) 26.4 78.7 82.3Turn Bay Length (m) 25.0 50.0 50.0Base Capacity (vph) 357 1966 1928 917 964 868Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.07 0.46 0.39 0.13 0.13 0.04

Intersection Summary

Page 818: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road No Crossing 2031 Summer with Improvements

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 74

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 23 831 689 107 120 32Future Volume (vph) 23 831 689 107 120 32Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 3292 3228 1458 1614 1430Flt Permitted 0.34 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 598 3292 3228 1458 1614 1430Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 25 903 749 116 130 35RTOR Reduction (vph) 0 0 0 60 0 25Lane Group Flow (vph) 25 903 749 56 130 10Heavy Vehicles (%) 0% 1% 3% 2% 3% 4%Turn Type Perm NA NA Perm Perm PermProtected Phases 4 8Permitted Phases 4 8 6 6Actuated Green, G (s) 15.1 15.1 15.1 15.1 8.4 8.4Effective Green, g (s) 17.2 17.2 17.2 17.2 10.5 10.5Actuated g/C Ratio 0.48 0.48 0.48 0.48 0.29 0.29Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 288 1586 1555 702 474 420v/s Ratio Prot c0.27 0.23v/s Ratio Perm 0.04 0.04 c0.08 0.01v/c Ratio 0.09 0.57 0.48 0.08 0.27 0.02Uniform Delay, d1 5.0 6.6 6.2 5.0 9.7 9.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.5 0.2 0.0 0.3 0.0Delay (s) 5.1 7.1 6.5 5.0 10.0 9.0Level of Service A A A A A AApproach Delay (s) 7.0 6.3 9.8Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.9 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.49Actuated Cycle Length (s) 35.7 Sum of lost time (s) 10.1Intersection Capacity Utilization 38.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 819: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 100 928 30 109 729 371 57 82 192 380 130 68Future Volume (vph) 100 928 30 109 729 371 57 82 192 380 130 68Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 1 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95Ped Bike Factor 1.00 0.98 1.00 0.97 1.00 0.98 1.00 1.00Frt 0.850 0.850 0.850 0.948Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1554 3260 1488 1646 3228 1458 1630 1750 1403 1646 2967 0Flt Permitted 0.352 0.124 0.617 0.699Satd. Flow (perm) 574 3260 1464 215 3228 1419 1057 1750 1380 1206 2967 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 76 403 209 74Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 5 5 5 5 2 5 5 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 7% 2% 0% 1% 3% 2% 2% 0% 6% 1% 4% 9%Adj. Flow (vph) 109 1009 33 118 792 403 62 89 209 413 141 74Shared Lane Traffic (%)Lane Group Flow (vph) 109 1009 33 118 792 403 62 89 209 413 215 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 1 2Detector Template Left Thru Right Left Thru Right Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 820: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Detector Phase 4 4 4 3 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.4 39.4 39.4 12.5 51.9 51.9 38.1 38.1 38.1 38.1 38.1Total Split (%) 43.8% 43.8% 43.8% 13.9% 57.7% 57.7% 42.3% 42.3% 42.3% 42.3% 42.3%Maximum Green (s) 33.1 33.1 33.1 9.5 45.6 45.6 31.8 31.8 31.8 31.8 31.8Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 0.0 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 31.5 31.5 31.5 42.5 42.5 40.2 32.1 32.1 32.1 32.1 32.1Actuated g/C Ratio 0.38 0.38 0.38 0.51 0.51 0.49 0.39 0.39 0.39 0.39 0.39v/c Ratio 0.50 0.81 0.05 0.51 0.48 0.45 0.15 0.13 0.32 0.88 0.18Control Delay 30.1 29.6 0.5 18.9 14.2 3.1 19.3 18.5 4.3 47.9 12.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 30.1 29.6 0.5 18.9 14.2 3.1 19.3 18.5 4.3 47.9 12.0LOS C C A B B A B B A D BApproach Delay 28.8 11.2 10.4 35.6Approach LOS C B B D

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 82.8Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.88Intersection Signal Delay: 21.4 Intersection LOS: CIntersection Capacity Utilization 81.6% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 821: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBTLane Group Flow (vph) 109 1009 33 118 792 403 62 89 209 413 215v/c Ratio 0.50 0.81 0.05 0.51 0.48 0.45 0.15 0.13 0.32 0.88 0.18Control Delay 30.1 29.6 0.5 18.9 14.2 3.1 19.3 18.5 4.3 47.9 12.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 30.1 29.6 0.5 18.9 14.2 3.1 19.3 18.5 4.3 47.9 12.0Queue Length 50th (m) 14.1 80.8 0.0 10.2 44.3 0.0 7.1 10.1 0.0 67.7 8.3Queue Length 95th (m) 32.2 108.7 0.9 19.1 59.1 14.1 16.5 20.6 13.8 #127.6 16.4Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 249 1418 679 259 1900 972 442 733 699 505 1286Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.44 0.71 0.05 0.46 0.42 0.41 0.14 0.12 0.30 0.82 0.17

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 822: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 100 928 30 109 729 371 57 82 192 380 130 68Future Volume (vph) 100 928 30 109 729 371 57 82 192 380 130 68Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 0.97 1.00 1.00 0.98 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.95Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1551 3260 1464 1646 3228 1420 1628 1750 1381 1640 2969Flt Permitted 0.35 1.00 1.00 0.12 1.00 1.00 0.62 1.00 1.00 0.70 1.00Satd. Flow (perm) 575 3260 1464 215 3228 1420 1058 1750 1381 1207 2969Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 109 1009 33 118 792 403 62 89 209 413 141 74RTOR Reduction (vph) 0 0 20 0 0 207 0 0 128 0 45 0Lane Group Flow (vph) 109 1009 13 118 792 196 62 89 81 413 170 0Confl. Peds. (#/hr) 5 5 5 5 2 5 5 2Heavy Vehicles (%) 7% 2% 0% 1% 3% 2% 2% 0% 6% 1% 4% 9%Turn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Actuated Green, G (s) 29.2 29.2 29.2 40.2 40.2 40.2 29.8 29.8 29.8 29.8 29.8Effective Green, g (s) 31.5 31.5 31.5 39.2 42.5 40.2 32.1 32.1 32.1 32.1 32.1Actuated g/C Ratio 0.38 0.38 0.38 0.47 0.51 0.49 0.39 0.39 0.39 0.39 0.39Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 219 1243 558 223 1660 691 411 680 536 469 1153v/s Ratio Prot c0.31 0.04 c0.25 0.05 0.06v/s Ratio Perm 0.19 0.01 0.21 0.14 0.06 0.06 c0.34v/c Ratio 0.50 0.81 0.02 0.53 0.48 0.28 0.15 0.13 0.15 0.88 0.15Uniform Delay, d1 19.5 22.9 15.9 15.7 12.9 12.6 16.4 16.3 16.4 23.5 16.4Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.3 4.0 0.0 1.7 0.2 0.2 0.1 0.1 0.1 17.2 0.0Delay (s) 20.8 26.9 16.0 17.4 13.1 12.8 16.5 16.3 16.5 40.7 16.4Level of Service C C B B B B B B B D BApproach Delay (s) 26.0 13.4 16.5 32.4Approach LOS C B B C

Intersection SummaryHCM 2000 Control Delay 21.4 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.82Actuated Cycle Length (s) 82.6 Sum of lost time (s) 12.0Intersection Capacity Utilization 81.6% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 823: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1168 33 180 955 0 0 0 0 731 63 254Future Volume (vph) 0 1168 33 180 955 0 0 0 0 731 63 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 0.98 1.00Frt 0.850 0.850Flt Protected 0.950 0.950 0.960Satd. Flow (prot) 0 4730 1488 1662 4638 0 0 0 0 1564 1566 1488Flt Permitted 0.134 0.950 0.960Satd. Flow (perm) 0 4730 1464 234 4638 0 0 0 0 1564 1566 1488Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 76 76Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 17.0 64.2 88.8Travel Time (s) 9.7 1.2 4.6 6.4Confl. Peds. (#/hr) 7 4 4 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 1% 7% 0%Adj. Flow (vph) 0 1270 36 196 1038 0 0 0 0 795 68 276Shared Lane Traffic (%) 46%Lane Group Flow (vph) 0 1270 36 196 1038 0 0 0 0 429 434 276Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 1 2 1 2 1Detector Template Thru Right Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0Turn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6

Page 824: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 4 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 36.3 12.5 36.3 36.3 36.3 36.3Total Split (s) 36.3 36.3 14.4 50.7 39.3 39.3 39.3Total Split (%) 40.3% 40.3% 16.0% 56.3% 43.7% 43.7% 43.7%Maximum Green (s) 30.0 30.0 11.4 44.4 33.0 33.0 33.0Yellow Time (s) 4.1 4.1 3.0 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 0.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 29.2 26.8 42.7 42.7 29.2 29.2 29.2Actuated g/C Ratio 0.36 0.33 0.53 0.53 0.36 0.36 0.36v/c Ratio 0.74 0.07 0.67 0.42 0.75 0.76 0.47Control Delay 26.0 1.2 26.0 12.5 32.2 32.6 17.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 26.0 1.2 26.0 12.5 32.2 32.6 17.0LOS C A C B C C BApproach Delay 25.3 14.7 28.7Approach LOS C B C

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 80.1Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.76Intersection Signal Delay: 22.8 Intersection LOS: CIntersection Capacity Utilization 69.2% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 825: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT EBR WBL WBT SBL SBT SBRLane Group Flow (vph) 1270 36 196 1038 429 434 276v/c Ratio 0.74 0.07 0.67 0.42 0.75 0.76 0.47Control Delay 26.0 1.2 26.0 12.5 32.2 32.6 17.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 26.0 1.2 26.0 12.5 32.2 32.6 17.0Queue Length 50th (m) 69.1 0.0 17.1 37.7 67.3 68.4 25.4Queue Length 95th (m) 90.3 1.5 #44.3 51.1 105.0 106.8 47.4Internal Link Dist (m) 110.1 0.1 64.8Turn Bay Length (m)Base Capacity (vph) 1962 610 315 2781 709 710 715Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.65 0.06 0.62 0.37 0.61 0.61 0.39

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 826: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1168 33 180 955 0 0 0 0 731 63 254Future Volume (vph) 0 1168 33 180 955 0 0 0 0 731 63 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 1.00 1.00 0.91 0.95 0.95 1.00Frpb, ped/bikes 1.00 0.98 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 0.96 1.00Satd. Flow (prot) 4730 1465 1662 4638 1564 1565 1488Flt Permitted 1.00 1.00 0.13 1.00 0.95 0.96 1.00Satd. Flow (perm) 4730 1465 234 4638 1564 1565 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 1270 36 196 1038 0 0 0 0 795 68 276RTOR Reduction (vph) 0 0 24 0 0 0 0 0 0 0 0 48Lane Group Flow (vph) 0 1270 12 196 1038 0 0 0 0 429 434 228Confl. Peds. (#/hr) 7 4 4 7Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 1% 7% 0%Turn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Actuated Green, G (s) 26.9 26.9 40.3 40.3 26.8 26.8 26.8Effective Green, g (s) 29.2 26.9 39.3 42.6 29.1 29.1 29.1Actuated g/C Ratio 0.37 0.34 0.49 0.53 0.37 0.37 0.37Clearance Time (s) 6.3 6.3 3.0 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1732 494 283 2479 571 571 543v/s Ratio Prot c0.27 c0.08 0.22v/s Ratio Perm 0.01 0.26 0.27 0.28 0.15v/c Ratio 0.73 0.02 0.69 0.42 0.75 0.76 0.42Uniform Delay, d1 21.9 17.6 14.6 11.1 22.1 22.2 19.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.6 0.0 7.1 0.1 5.5 5.9 0.5Delay (s) 23.5 17.7 21.7 11.2 27.7 28.1 19.5Level of Service C B C B C C BApproach Delay (s) 23.4 12.9 0.0 25.9Approach LOS C B A C

Intersection SummaryHCM 2000 Control Delay 20.6 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.74Actuated Cycle Length (s) 79.7 Sum of lost time (s) 12.0Intersection Capacity Utilization 69.2% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 827: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1700 0 0 1131 78 254Future Volume (vph) 1700 0 0 1131 78 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.91 1.00 1.00 0.91 0.97 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 4684 0 0 4684 3101 1458Flt Permitted 0.950Satd. Flow (perm) 4684 0 0 4684 3101 1458Right Turn on Red Yes YesSatd. Flow (RTOR) 9Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 2% 4% 2%Adj. Flow (vph) 1848 0 0 1229 85 276Shared Lane Traffic (%)Lane Group Flow (vph) 1848 0 0 1229 85 276Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Detector Phase 4 8 2 2Switch Phase

Page 828: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.6 35.6 24.4 24.4Total Split (%) 59.3% 59.3% 40.7% 40.7%Maximum Green (s) 29.3 29.3 18.1 18.1Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 29.3 29.3 17.0 17.0Actuated g/C Ratio 0.54 0.54 0.31 0.31v/c Ratio 0.73 0.49 0.09 0.60Control Delay 12.1 9.0 13.9 22.0Queue Delay 0.0 0.0 0.0 0.0Total Delay 12.1 9.0 13.9 22.0LOS B A B CApproach Delay 12.1 9.0 20.1Approach LOS B A C

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 54.5Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.73Intersection Signal Delay: 11.8 Intersection LOS: BIntersection Capacity Utilization 59.4% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 829: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 1848 1229 85 276v/c Ratio 0.73 0.49 0.09 0.60Control Delay 12.1 9.0 13.9 22.0Queue Delay 0.0 0.0 0.0 0.0Total Delay 12.1 9.0 13.9 22.0Queue Length 50th (m) 49.2 26.8 3.3 24.5Queue Length 95th (m) 72.9 40.5 7.4 45.8Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 2761 2761 1180 560Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.67 0.45 0.07 0.49

Intersection Summary

Page 830: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1700 0 0 1131 78 254Future Volume (vph) 1700 0 0 1131 78 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 0.91 0.97 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 4684 4684 3101 1458Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 4684 4684 3101 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1848 0 0 1229 85 276RTOR Reduction (vph) 0 0 0 0 0 6Lane Group Flow (vph) 1848 0 0 1229 85 270Heavy Vehicles (%) 2% 0% 0% 2% 4% 2%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 27.0 27.0 14.7 14.7Effective Green, g (s) 29.3 29.3 17.0 17.0Actuated g/C Ratio 0.54 0.54 0.31 0.31Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 2527 2527 970 456v/s Ratio Prot c0.39 0.26 0.03v/s Ratio Perm c0.19v/c Ratio 0.73 0.49 0.09 0.59Uniform Delay, d1 9.5 7.8 13.2 15.7Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 1.1 0.1 0.0 2.1Delay (s) 10.6 8.0 13.2 17.8Level of Service B A B BApproach Delay (s) 10.6 8.0 16.7Approach LOS B A B

Intersection SummaryHCM 2000 Control Delay 10.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.68Actuated Cycle Length (s) 54.3 Sum of lost time (s) 8.0Intersection Capacity Utilization 59.4% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 831: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 32 1495 471 344 1397 41 386 18 344 19 4 28Future Volume (vph) 32 1495 471 344 1397 41 386 18 344 19 4 28Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 100.0 0.0 15.0 0.0Storage Lanes 1 1 2 0 2 1 1 0Taper Length (m) 40.0 7.5 100.0 7.5Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.98 1.00 0.99 0.98 0.99 0.98Frt 0.850 0.996 0.850 0.868Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1662 3292 1473 3162 3249 0 3162 1750 1473 1662 1445 0Flt Permitted 0.135 0.950 0.950 0.744Satd. Flow (perm) 236 3292 1446 3158 3249 0 3145 1750 1447 1295 1445 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 293 3 227 30Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 4 4 3 3 3 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 1% 2% 2% 0% 2% 0% 1% 0% 0% 4%Adj. Flow (vph) 35 1625 512 374 1518 45 420 20 374 21 4 30Shared Lane Traffic (%)Lane Group Flow (vph) 35 1625 512 374 1563 0 420 20 374 21 34 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 832: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 9.5 32.0 32.0 32.0 32.0Total Split (s) 73.0 73.0 73.0 21.0 94.0 23.0 56.0 56.0 33.0 33.0Total Split (%) 48.7% 48.7% 48.7% 14.0% 62.7% 15.3% 37.3% 37.3% 22.0% 22.0%Maximum Green (s) 65.0 65.0 65.0 16.5 86.0 18.5 48.0 48.0 25.0 25.0Yellow Time (s) 4.5 4.5 4.5 3.5 4.5 3.5 4.5 4.5 4.5 4.5All-Red Time (s) 3.5 3.5 3.5 1.0 3.5 1.0 3.5 3.5 3.5 3.5Lost Time Adjust (s) -4.0 -4.0 -4.0 -0.5 -4.0 -0.5 -4.0 -4.0 -4.0 -4.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min None Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 69.0 69.0 69.0 17.0 90.0 19.0 35.7 35.7 12.7 12.7Actuated g/C Ratio 0.52 0.52 0.52 0.13 0.67 0.14 0.27 0.27 0.09 0.09v/c Ratio 0.29 0.96 0.58 0.93 0.71 0.94 0.04 0.68 0.17 0.21Control Delay 26.9 45.1 11.6 88.1 16.2 85.9 36.6 23.3 59.0 23.9Queue Delay 0.0 43.8 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 26.9 88.9 13.5 88.1 16.2 85.9 36.6 23.3 59.0 23.9LOS C F B F B F D C E CApproach Delay 70.1 30.1 55.9 37.3Approach LOS E C E D

Intersection SummaryArea Type: OtherCycle Length: 150Actuated Cycle Length: 133.7Natural Cycle: 150Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.96Intersection Signal Delay: 51.9 Intersection LOS: DIntersection Capacity Utilization 85.0% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 833: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 35 1625 512 374 1563 420 20 374 21 34v/c Ratio 0.29 0.96 0.58 0.93 0.71 0.94 0.04 0.68 0.17 0.21Control Delay 26.9 45.1 11.6 88.1 16.2 85.9 36.6 23.3 59.0 23.9Queue Delay 0.0 43.8 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 26.9 88.9 13.5 88.1 16.2 85.9 36.6 23.3 59.0 23.9Queue Length 50th (m) 5.3 217.7 37.8 53.4 130.1 59.9 4.1 36.5 5.5 1.0Queue Length 95th (m) 15.6 #290.1 75.6 #86.8 169.6 #95.2 11.0 74.1 14.4 11.9Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 50.0 100.0 15.0Base Capacity (vph) 121 1698 888 402 2187 449 680 701 280 336Starvation Cap Reductn 0 452 224 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.29 1.30 0.77 0.93 0.71 0.94 0.03 0.53 0.07 0.10

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 834: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 32 1495 471 344 1397 41 386 18 344 19 4 28Future Volume (vph) 32 1495 471 344 1397 41 386 18 344 19 4 28Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 1.00 1.00 0.98 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 1.00 1.00 0.85 1.00 0.87Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 3292 1447 3162 3248 3162 1750 1448 1654 1445Flt Permitted 0.13 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.74 1.00Satd. Flow (perm) 236 3292 1447 3162 3248 3162 1750 1448 1296 1445Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 35 1625 512 374 1518 45 420 20 374 21 4 30RTOR Reduction (vph) 0 0 142 0 1 0 0 0 166 0 27 0Lane Group Flow (vph) 35 1625 370 374 1562 0 420 20 208 21 7 0Confl. Peds. (#/hr) 4 4 3 3 3 3Heavy Vehicles (%) 0% 1% 1% 2% 2% 0% 2% 0% 1% 0% 0% 4%Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Actuated Green, G (s) 65.0 65.0 65.0 16.5 86.0 18.5 31.7 31.7 8.7 8.7Effective Green, g (s) 69.0 69.0 69.0 17.0 90.0 19.0 35.7 35.7 12.7 12.7Actuated g/C Ratio 0.52 0.52 0.52 0.13 0.67 0.14 0.27 0.27 0.09 0.09Clearance Time (s) 8.0 8.0 8.0 4.5 8.0 4.5 8.0 8.0 8.0 8.0Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 121 1698 746 402 2186 449 467 386 123 137v/s Ratio Prot c0.49 c0.12 0.48 c0.13 0.01 0.00v/s Ratio Perm 0.15 0.26 c0.14 0.02v/c Ratio 0.29 0.96 0.50 0.93 0.71 0.94 0.04 0.54 0.17 0.05Uniform Delay, d1 18.4 30.9 21.0 57.8 13.8 56.7 36.3 41.9 55.7 55.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.0 13.0 0.4 28.0 1.1 26.8 0.0 1.1 0.5 0.1Delay (s) 19.4 43.9 21.4 85.8 14.8 83.6 36.4 43.1 56.1 55.1Level of Service B D C F B F D D E EApproach Delay (s) 38.2 28.5 63.8 55.5Approach LOS D C E E

Intersection SummaryHCM 2000 Control Delay 38.8 HCM 2000 Level of Service DHCM 2000 Volume to Capacity ratio 0.92Actuated Cycle Length (s) 133.7 Sum of lost time (s) 16.0Intersection Capacity Utilization 85.0% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group

Page 835: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 399 794 665 95 634 142 491 270 73 168 261 356Future Volume (vph) 399 794 665 95 634 142 491 270 73 168 261 356Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 50.0 50.0 50.0 50.0 0.0 50.0 0.0Storage Lanes 2 1 1 0 2 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 0.97 0.95 1.00 1.00 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.96 0.99 0.99 0.99 0.99 0.98Frt 0.850 0.973 0.968 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 3101 3260 1473 1630 3183 0 3162 1661 0 1630 1716 1473Flt Permitted 0.950 0.279 0.334 0.233Satd. Flow (perm) 3101 3260 1414 476 3183 0 1101 1661 0 395 1716 1440Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 479 24 13 337Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 9 9 10 23 23 10Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 4% 2% 1% 2% 2% 0% 2% 1% 2% 2% 2% 1%Adj. Flow (vph) 434 863 723 103 689 154 534 293 79 183 284 387Shared Lane Traffic (%)Lane Group Flow (vph) 434 863 723 103 843 0 534 372 0 183 284 387Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 2 1Detector Template Left Thru Right Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 836: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Prot NA Perm pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6 6Detector Phase 7 4 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 9.5 30.4 30.4 9.5 30.4 9.5 37.7 9.5 37.7 37.7Total Split (s) 22.0 47.4 47.4 9.6 35.0 13.0 40.8 12.2 40.0 40.0Total Split (%) 20.0% 43.1% 43.1% 8.7% 31.8% 11.8% 37.1% 11.1% 36.4% 36.4%Maximum Green (s) 18.0 41.0 41.0 6.6 28.6 10.0 34.1 9.2 33.3 33.3Yellow Time (s) 3.0 4.1 4.1 3.0 4.1 3.0 4.1 3.0 4.1 4.1All-Red Time (s) 1.0 2.3 2.3 0.0 2.3 0.0 2.6 0.0 2.6 2.6Lost Time Adjust (s) 0.0 -2.4 0.0 1.0 -2.4 1.0 -2.7 1.0 -2.7 -2.7Total Lost Time (s) 4.0 4.0 6.4 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 16.9 41.2 38.7 35.1 29.7 37.4 28.3 35.2 27.2 27.2Actuated g/C Ratio 0.17 0.42 0.39 0.35 0.30 0.38 0.29 0.36 0.27 0.27v/c Ratio 0.82 0.64 0.86 0.44 0.87 0.88 0.77 0.77 0.60 0.61Control Delay 55.0 26.5 21.3 23.1 43.9 41.7 43.1 43.4 37.2 9.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 55.0 26.5 21.3 23.1 43.9 41.7 43.1 43.4 37.2 9.7LOS E C C C D D D D D AApproach Delay 30.8 41.7 42.3 26.1Approach LOS C D D C

Intersection SummaryArea Type: OtherCycle Length: 110Actuated Cycle Length: 99.1Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.88Intersection Signal Delay: 34.3 Intersection LOS: CIntersection Capacity Utilization 83.2% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 837: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 434 863 723 103 843 534 372 183 284 387v/c Ratio 0.82 0.64 0.86 0.44 0.87 0.88 0.77 0.77 0.60 0.61Control Delay 55.0 26.5 21.3 23.1 43.9 41.7 43.1 43.4 37.2 9.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 55.0 26.5 21.3 23.1 43.9 41.7 43.1 43.4 37.2 9.7Queue Length 50th (m) 45.3 72.8 48.5 10.6 85.0 40.5 68.9 25.2 51.4 7.8Queue Length 95th (m) #76.1 106.0 #145.8 22.8 #133.8 #61.2 103.5 #48.7 78.6 34.9Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0 50.0Base Capacity (vph) 571 1447 871 236 1025 605 633 244 631 742Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.76 0.60 0.83 0.44 0.82 0.88 0.59 0.75 0.45 0.52

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 838: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 399 794 665 95 634 142 491 270 73 168 261 356Future Volume (vph) 399 794 665 95 634 142 491 270 73 168 261 356Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 6.4 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 1.00 1.00 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.96 1.00 1.00 1.00 0.99 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 0.97 1.00 0.97 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 3101 3260 1417 1628 3182 3154 1662 1627 1716 1441Flt Permitted 0.95 1.00 1.00 0.28 1.00 0.33 1.00 0.23 1.00 1.00Satd. Flow (perm) 3101 3260 1417 478 3182 1108 1662 400 1716 1441Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 434 863 723 103 689 154 534 293 79 183 284 387RTOR Reduction (vph) 0 0 291 0 17 0 0 9 0 0 0 245Lane Group Flow (vph) 434 863 432 103 826 0 534 363 0 183 284 142Confl. Peds. (#/hr) 9 9 10 23 23 10Heavy Vehicles (%) 4% 2% 1% 2% 2% 0% 2% 1% 2% 2% 2% 1%Turn Type Prot NA Perm pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 16.9 38.8 38.8 33.7 27.3 35.6 25.5 33.4 24.4 24.4Effective Green, g (s) 16.9 41.2 38.8 31.7 29.7 33.6 28.2 31.4 27.1 27.1Actuated g/C Ratio 0.17 0.42 0.39 0.32 0.30 0.34 0.29 0.32 0.27 0.27Clearance Time (s) 4.0 6.4 6.4 3.0 6.4 3.0 6.7 3.0 6.7 6.7Vehicle Extension (s) 2.5 2.2 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 530 1359 556 216 956 565 474 226 470 395v/s Ratio Prot c0.14 0.26 0.03 c0.26 c0.09 0.22 0.07 0.17v/s Ratio Perm 0.31 0.13 c0.23 0.19 0.10v/c Ratio 0.82 0.64 0.78 0.48 0.86 0.95 0.77 0.81 0.60 0.36Uniform Delay, d1 39.5 22.8 26.2 24.4 32.6 30.1 32.3 27.7 31.2 28.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 9.3 0.8 6.3 1.2 8.0 24.8 6.7 18.4 1.6 0.3Delay (s) 48.8 23.6 32.5 25.6 40.7 54.8 39.0 46.2 32.8 29.2Level of Service D C C C D D D D C CApproach Delay (s) 32.2 39.0 48.3 34.0Approach LOS C D D C

Intersection SummaryHCM 2000 Control Delay 37.0 HCM 2000 Level of Service DHCM 2000 Volume to Capacity ratio 0.86Actuated Cycle Length (s) 98.8 Sum of lost time (s) 16.0Intersection Capacity Utilization 83.2% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group

Page 839: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 271 691 73 6 634 150 263 197 15 174 242 274Future Volume (vph) 271 691 73 6 634 150 263 197 15 174 242 274Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 2 0 1 0 2 0 1 1Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 0.97 0.95 0.95 1.00 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 1.00 1.00 1.00 0.99 1.00 1.00 0.98Frt 0.986 0.971 0.990 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 3162 3174 0 1662 3130 0 3162 1699 0 1646 1750 1458Flt Permitted 0.170 0.339 0.494 0.542Satd. Flow (perm) 565 3174 0 591 3130 0 1633 1699 0 936 1750 1432Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 21 37 5 298Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 5 6 6 5 7 5 5 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 3% 3% 0% 3% 2% 2% 2% 0% 1% 0% 2%Adj. Flow (vph) 295 751 79 7 689 163 286 214 16 189 263 298Shared Lane Traffic (%)Lane Group Flow (vph) 295 830 0 7 852 0 286 230 0 189 263 298Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 840: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Detector Phase 7 4 8 8 2 2 6 6 6Switch PhaseMinimum Initial (s) 6.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 17.0 27.1 27.1 27.1 33.1 33.1 33.1 33.1 33.1Total Split (s) 17.0 46.0 29.0 29.0 34.0 34.0 34.0 34.0 34.0Total Split (%) 21.3% 57.5% 36.3% 36.3% 42.5% 42.5% 42.5% 42.5% 42.5%Maximum Green (s) 14.0 39.9 22.9 22.9 27.9 27.9 27.9 27.9 27.9Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) 0.0 -2.1 0.0 -2.1 -2.1 -2.1 -2.1 -2.1 0.0Total Lost Time (s) 3.0 4.0 6.1 4.0 4.0 4.0 4.0 4.0 6.1Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 17.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 36.8 35.8 20.4 22.6 20.2 20.2 20.2 20.2 18.0Actuated g/C Ratio 0.57 0.56 0.32 0.35 0.31 0.31 0.31 0.31 0.28v/c Ratio 0.40 0.47 0.04 0.76 0.56 0.43 0.64 0.48 0.48Control Delay 9.2 10.2 19.3 24.5 23.3 20.2 30.7 21.4 5.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.2 10.2 19.3 24.5 23.3 20.2 30.7 21.4 5.5LOS A B B C C C C C AApproach Delay 10.0 24.5 21.9 17.4Approach LOS A C C B

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 64.3Natural Cycle: 80Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.76Intersection Signal Delay: 17.4 Intersection LOS: BIntersection Capacity Utilization 70.4% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 841: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 295 830 7 852 286 230 189 263 298v/c Ratio 0.40 0.47 0.04 0.76 0.56 0.43 0.64 0.48 0.48Control Delay 9.2 10.2 19.3 24.5 23.3 20.2 30.7 21.4 5.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.2 10.2 19.3 24.5 23.3 20.2 30.7 21.4 5.5Queue Length 50th (m) 8.1 29.0 0.6 46.6 15.9 23.1 21.1 27.6 0.0Queue Length 95th (m) 18.0 56.1 3.8 #94.2 28.4 42.7 43.8 49.3 15.9Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 50.0 50.0 25.0 25.0Base Capacity (vph) 909 2210 218 1283 789 824 452 846 807Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.32 0.38 0.03 0.66 0.36 0.28 0.42 0.31 0.37

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 842: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 271 691 73 6 634 150 263 197 15 174 242 274Future Volume (vph) 271 691 73 6 634 150 263 197 15 174 242 274Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.0 4.0 6.1 4.0 4.0 4.0 4.0 4.0 6.1Lane Util. Factor 0.97 0.95 1.00 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00Frt 1.00 0.99 1.00 0.97 1.00 0.99 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 3161 3173 1658 3131 3145 1698 1642 1750 1434Flt Permitted 0.17 1.00 0.34 1.00 0.49 1.00 0.54 1.00 1.00Satd. Flow (perm) 566 3173 592 3131 1636 1698 937 1750 1434Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 295 751 79 7 689 163 286 214 16 189 263 298RTOR Reduction (vph) 0 9 0 0 24 0 0 3 0 0 0 214Lane Group Flow (vph) 295 821 0 7 828 0 286 227 0 189 263 84Confl. Peds. (#/hr) 5 6 6 5 7 5 5 7Heavy Vehicles (%) 2% 3% 3% 0% 3% 2% 2% 2% 0% 1% 0% 2%Turn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 33.6 33.6 20.5 20.5 18.1 18.1 18.1 18.1 18.1Effective Green, g (s) 33.6 35.7 20.5 22.6 20.2 20.2 20.2 20.2 18.1Actuated g/C Ratio 0.53 0.56 0.32 0.35 0.32 0.32 0.32 0.32 0.28Clearance Time (s) 3.0 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 707 1772 189 1107 517 536 296 553 406v/s Ratio Prot 0.07 c0.26 c0.26 0.13 0.15v/s Ratio Perm 0.15 0.01 0.17 c0.20 0.06v/c Ratio 0.42 0.46 0.04 0.75 0.55 0.42 0.64 0.48 0.21Uniform Delay, d1 9.6 8.4 14.9 18.1 18.1 17.2 18.7 17.6 17.4Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.2 0.1 2.8 1.3 0.5 4.5 0.6 0.3Delay (s) 10.0 8.6 15.0 21.0 19.4 17.8 23.2 18.2 17.7Level of Service A A B C B B C B BApproach Delay (s) 9.0 20.9 18.7 19.3Approach LOS A C B B

Intersection SummaryHCM 2000 Control Delay 16.0 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.66Actuated Cycle Length (s) 63.9 Sum of lost time (s) 11.0Intersection Capacity Utilization 70.4% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 843: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 63 690 126 134 426 158 178 130 138 132 202 186Future Volume (vph) 63 690 126 134 426 158 178 130 138 132 202 186Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95Frt 0.977 0.959 0.923 0.928Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3185 0 1630 3126 0 1630 3009 0 1630 3025 0Flt Permitted 0.298 0.230 0.440 0.553Satd. Flow (perm) 511 3185 0 395 3126 0 755 3009 0 949 3025 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 31 78 150 202Link Speed (k/h) 50 50 50 50Link Distance (m) 136.7 140.7 105.6 128.9Travel Time (s) 9.8 10.1 7.6 9.3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 68 750 137 146 463 172 193 141 150 143 220 202Shared Lane Traffic (%)Lane Group Flow (vph) 68 887 0 146 635 0 193 291 0 143 422 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6

Page 844: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 7 4 3 8 5 2 1 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 9.5 24.3 9.5 24.3 9.5 24.3 9.5 24.3Total Split (s) 9.6 25.0 9.5 24.9 9.6 26.0 9.5 25.9Total Split (%) 13.7% 35.7% 13.6% 35.6% 13.7% 37.1% 13.6% 37.0%Maximum Green (s) 6.6 18.7 6.5 18.6 6.6 19.7 6.5 19.6Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1All-Red Time (s) 0.0 2.2 0.0 2.2 0.0 2.2 0.0 2.2Lost Time Adjust (s) 1.0 -2.3 1.0 -2.3 1.0 -2.3 1.0 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 25.8 20.5 26.2 20.7 18.0 12.4 17.7 12.2Actuated g/C Ratio 0.43 0.34 0.44 0.35 0.30 0.21 0.30 0.20v/c Ratio 0.21 0.80 0.51 0.56 0.62 0.39 0.42 0.54Control Delay 10.5 24.8 16.5 16.7 24.5 11.6 17.7 13.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 10.5 24.8 16.5 16.7 24.5 11.6 17.7 13.5LOS B C B B C B B BApproach Delay 23.8 16.6 16.8 14.5Approach LOS C B B B

Intersection SummaryArea Type: OtherCycle Length: 70Actuated Cycle Length: 59.9Natural Cycle: 70Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.80Intersection Signal Delay: 18.7 Intersection LOS: BIntersection Capacity Utilization 69.7% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 108: Stanley Ave & Marine Land Pkway (RR 49)

Page 845: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT WBL WBT NBL NBT SBL SBTLane Group Flow (vph) 68 887 146 635 193 291 143 422v/c Ratio 0.21 0.80 0.51 0.56 0.62 0.39 0.42 0.54Control Delay 10.5 24.8 16.5 16.7 24.5 11.6 17.7 13.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 10.5 24.8 16.5 16.7 24.5 11.6 17.7 13.5Queue Length 50th (m) 3.8 45.9 8.5 26.6 15.8 7.2 11.3 11.6Queue Length 95th (m) 10.6 #84.2 19.9 46.2 29.6 16.3 22.5 23.1Internal Link Dist (m) 112.7 116.7 81.6 104.9Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 328 1140 286 1150 309 1203 343 1238Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.21 0.78 0.51 0.55 0.62 0.24 0.42 0.34

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 846: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 63 690 126 134 426 158 178 130 138 132 202 186Future Volume (vph) 63 690 126 134 426 158 178 130 138 132 202 186Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.95 1.00 0.95Frt 1.00 0.98 1.00 0.96 1.00 0.92 1.00 0.93Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1630 3184 1630 3127 1630 3008 1630 3026Flt Permitted 0.30 1.00 0.23 1.00 0.44 1.00 0.55 1.00Satd. Flow (perm) 511 3184 394 3127 754 3008 950 3026Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 68 750 137 146 463 172 193 141 150 143 220 202RTOR Reduction (vph) 0 20 0 0 51 0 0 119 0 0 161 0Lane Group Flow (vph) 68 867 0 146 584 0 193 172 0 143 261 0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Actuated Green, G (s) 24.5 18.2 24.9 18.4 16.7 10.1 16.5 10.0Effective Green, g (s) 22.5 20.5 22.9 20.7 14.7 12.4 14.5 12.3Actuated g/C Ratio 0.38 0.34 0.38 0.35 0.25 0.21 0.24 0.21Clearance Time (s) 3.0 6.3 3.0 6.3 3.0 6.3 3.0 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 290 1089 264 1080 266 622 292 621v/s Ratio Prot 0.02 c0.27 c0.05 0.19 c0.07 0.06 0.04 0.09v/s Ratio Perm 0.07 0.16 c0.11 0.07v/c Ratio 0.23 0.80 0.55 0.54 0.73 0.28 0.49 0.42Uniform Delay, d1 12.4 17.8 13.5 15.8 19.6 20.0 18.9 20.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 4.1 2.5 0.6 9.4 0.2 1.3 0.5Delay (s) 12.8 21.9 16.0 16.3 29.1 20.2 20.2 21.2Level of Service B C B B C C C CApproach Delay (s) 21.3 16.3 23.8 20.9Approach LOS C B C C

Intersection SummaryHCM 2000 Control Delay 20.2 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.68Actuated Cycle Length (s) 59.9 Sum of lost time (s) 16.0Intersection Capacity Utilization 69.7% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 847: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 184 93 239 0 0 270Future Volume (vph) 184 93 239 0 0 270Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.950Flt Protected 0.968Satd. Flow (prot) 3061 0 3260 0 0 3260Flt Permitted 0.968Satd. Flow (perm) 3061 0 3260 0 0 3260Right Turn on Red Yes YesSatd. Flow (RTOR) 101Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 2% 2% 0% 0% 2%Adj. Flow (vph) 200 101 260 0 0 293Shared Lane Traffic (%)Lane Group Flow (vph) 301 0 260 0 0 293Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch Phase

Page 848: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group WBL WBR NBT NBR SBL SBTMinimum Initial (s) 8.0 8.0 8.0Minimum Split (s) 25.1 22.5 22.5Total Split (s) 27.0 23.0 23.0Total Split (%) 54.0% 46.0% 46.0%Maximum Green (s) 20.9 16.9 16.9Yellow Time (s) 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 10.2 10.3 10.3Actuated g/C Ratio 0.36 0.36 0.36v/c Ratio 0.26 0.22 0.25Control Delay 5.0 6.9 7.0Queue Delay 0.0 0.0 0.0Total Delay 5.0 6.9 7.0LOS A A AApproach Delay 5.0 6.9 7.0Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50Actuated Cycle Length: 28.5Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.26Intersection Signal Delay: 6.3 Intersection LOS: AIntersection Capacity Utilization 23.6% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 849: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group WBL NBT SBTLane Group Flow (vph) 301 260 293v/c Ratio 0.26 0.22 0.25Control Delay 5.0 6.9 7.0Queue Delay 0.0 0.0 0.0Total Delay 5.0 6.9 7.0Queue Length 50th (m) 2.9 4.0 4.5Queue Length 95th (m) 7.1 7.8 8.6Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2494 2177 2177Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.12 0.12 0.13

Intersection Summary

Page 850: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 32

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 184 93 239 0 0 270Future Volume (vph) 184 93 239 0 0 270Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 0.95 1.00 1.00Flt Protected 0.97 1.00 1.00Satd. Flow (prot) 3059 3260 3260Flt Permitted 0.97 1.00 1.00Satd. Flow (perm) 3059 3260 3260Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 200 101 260 0 0 293RTOR Reduction (vph) 65 0 0 0 0 0Lane Group Flow (vph) 236 0 260 0 0 293Heavy Vehicles (%) 2% 2% 2% 0% 0% 2%Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.1 8.2 8.2Effective Green, g (s) 10.2 10.3 10.3Actuated g/C Ratio 0.36 0.36 0.36Clearance Time (s) 6.1 6.1 6.1Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1094 1178 1178v/s Ratio Prot c0.08 0.08v/s Ratio Perm c0.09v/c Ratio 0.22 0.22 0.25Uniform Delay, d1 6.4 6.3 6.4Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.0 0.1 0.1Delay (s) 6.4 6.4 6.4Level of Service A A AApproach Delay (s) 6.4 6.4 6.4Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.4 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.26Actuated Cycle Length (s) 28.5 Sum of lost time (s) 10.1Intersection Capacity Utilization 23.6% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 851: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 443 14 2 304 308 455Future Volume (vph) 443 14 2 304 308 455Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Frt 0.996 0.911Flt Protected 0.954Satd. Flow (prot) 1663 0 0 3198 2981 0Flt Permitted 0.954 0.948Satd. Flow (perm) 1663 0 0 3032 2981 0Right Turn on Red Yes YesSatd. Flow (RTOR) 3 495Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 0% 4% 4% 0%Adj. Flow (vph) 482 15 2 330 335 495Shared Lane Traffic (%)Lane Group Flow (vph) 497 0 0 332 830 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot Perm NA NAProtected Phases 4 2 6Permitted Phases 2Detector Phase 4 2 2 6Switch Phase

Page 852: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group EBL EBR NBL NBT SBT SBRMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 26.0 34.0 34.0 34.0Total Split (%) 43.3% 56.7% 56.7% 56.7%Maximum Green (s) 19.7 27.0 27.0 27.0Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.9 2.9 2.9Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 18.6 15.2 15.2Actuated g/C Ratio 0.44 0.36 0.36v/c Ratio 0.67 0.30 0.59Control Delay 15.3 10.9 6.4Queue Delay 0.0 0.0 0.0Total Delay 15.3 10.9 6.4LOS B B AApproach Delay 15.3 10.9 6.4Approach LOS B B A

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 41.9Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.67Intersection Signal Delay: 10.0 Intersection LOS: AIntersection Capacity Utilization 59.4% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 853: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group EBL NBT SBTLane Group Flow (vph) 497 332 830v/c Ratio 0.67 0.30 0.59Control Delay 15.3 10.9 6.4Queue Delay 0.0 0.0 0.0Total Delay 15.3 10.9 6.4Queue Length 50th (m) 23.8 9.3 9.4Queue Length 95th (m) 64.1 17.8 21.7Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 892 2215 2311Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.56 0.15 0.36

Intersection Summary

Page 854: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 36

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 443 14 2 304 308 455Future Volume (vph) 443 14 2 304 308 455Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95Frt 1.00 1.00 0.91Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1662 3197 2979Flt Permitted 0.95 0.95 1.00Satd. Flow (perm) 1662 3031 2979Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 482 15 2 330 335 495RTOR Reduction (vph) 2 0 0 0 315 0Lane Group Flow (vph) 495 0 0 332 515 0Heavy Vehicles (%) 0% 0% 0% 4% 4% 0%Turn Type Prot Perm NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 16.2 12.1 12.1Effective Green, g (s) 18.5 15.1 15.1Actuated g/C Ratio 0.44 0.36 0.36Clearance Time (s) 6.3 7.0 7.0Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 739 1100 1081v/s Ratio Prot c0.30 c0.17v/s Ratio Perm 0.11v/c Ratio 0.67 0.30 0.48Uniform Delay, d1 9.1 9.5 10.2Progression Factor 1.00 1.00 1.00Incremental Delay, d2 2.0 0.1 0.2Delay (s) 11.1 9.6 10.4Level of Service B A BApproach Delay (s) 11.1 9.6 10.4Approach LOS B A B

Intersection SummaryHCM 2000 Control Delay 10.4 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.58Actuated Cycle Length (s) 41.6 Sum of lost time (s) 8.0Intersection Capacity Utilization 59.4% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 855: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Future Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1716 0 1750 1667 1403 0 1750 0 3101 1488 0Flt Permitted 0.473 0.950Satd. Flow (perm) 828 1716 0 1750 1667 1403 0 1750 0 3101 1488 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 131 888Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 0% 5% 6% 0% 0% 0% 4% 0% 0%Adj. Flow (vph) 75 80 0 0 121 46 0 0 0 252 0 96Shared Lane Traffic (%)Lane Group Flow (vph) 75 80 0 0 121 46 0 0 0 252 96 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 856: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 12.5 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 12.5 47.0 34.5 34.5 34.5 39.5 39.5 38.5 38.5Total Split (%) 10.0% 37.6% 27.6% 27.6% 27.6% 31.6% 31.6% 30.8% 30.8%Maximum Green (s) 9.5 39.5 27.0 27.0 27.0 32.0 32.0 31.0 31.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.9 24.9 13.6 13.6 13.6 13.6Actuated g/C Ratio 0.54 0.54 0.29 0.29 0.29 0.29v/c Ratio 0.13 0.09 0.25 0.09 0.28 0.09Control Delay 5.9 5.6 14.4 0.4 13.8 0.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.9 5.6 14.4 0.4 13.8 0.2LOS A A B A B AApproach Delay 5.8 10.5 10.0Approach LOS A B B

Intersection SummaryArea Type: OtherCycle Length: 125Actuated Cycle Length: 46.5Natural Cycle: 125Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.28Intersection Signal Delay: 9.2 Intersection LOS: AIntersection Capacity Utilization 25.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 857: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 75 80 121 46 252 96v/c Ratio 0.13 0.09 0.25 0.09 0.28 0.09Control Delay 5.9 5.6 14.4 0.4 13.8 0.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.9 5.6 14.4 0.4 13.8 0.2Queue Length 50th (m) 2.7 2.9 7.7 0.0 8.3 0.0Queue Length 95th (m) 7.2 7.6 18.5 0.0 16.2 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 595 1586 1093 965 2299 1333Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.13 0.05 0.11 0.05 0.11 0.07

Intersection Summary

Page 858: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Future Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1716 1667 1403 3101 1488Flt Permitted 0.47 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 828 1716 1667 1403 3101 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 75 80 0 0 121 46 0 0 0 252 0 96RTOR Reduction (vph) 0 0 0 0 0 32 0 0 0 0 68 0Lane Group Flow (vph) 75 80 0 0 121 14 0 0 0 252 28 0Heavy Vehicles (%) 0% 2% 0% 0% 5% 6% 0% 0% 0% 4% 0% 0%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 21.4 21.4 10.2 10.2 10.2 10.2Effective Green, g (s) 20.4 24.9 13.7 13.7 13.7 13.7Actuated g/C Ratio 0.44 0.53 0.29 0.29 0.29 0.29Clearance Time (s) 3.0 7.5 7.5 7.5 7.5 7.5Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 491 916 490 412 911 437v/s Ratio Prot c0.02 0.05 c0.07 c0.08 0.02v/s Ratio Perm 0.04 0.01v/c Ratio 0.15 0.09 0.25 0.03 0.28 0.06Uniform Delay, d1 7.9 5.3 12.5 11.7 12.6 11.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.1 0.0 0.1 0.0Delay (s) 8.0 5.3 12.7 11.7 12.7 11.9Level of Service A A B B B BApproach Delay (s) 6.6 12.4 0.0 12.5Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 11.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.27Actuated Cycle Length (s) 46.6 Sum of lost time (s) 16.0Intersection Capacity Utilization 25.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 859: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 58 2 309 73 93 4 161 255 123 260 18Future Volume (vph) 16 58 2 309 73 93 4 161 255 123 260 18Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 0.0 0.0 30.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.997 0.916 0.850 0.990Flt Protected 0.990 0.950 0.999 0.950Satd. Flow (prot) 0 1727 0 1630 1594 0 0 1731 1473 1646 1732 0Flt Permitted 0.934 0.704 0.992 0.644Satd. Flow (perm) 0 1630 0 1208 1594 0 0 1719 1473 1116 1732 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 2 101 277 8Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 0% 2% 0% 1% 0% 1% 1% 1% 0% 0%Adj. Flow (vph) 17 63 2 336 79 101 4 175 277 134 283 20Shared Lane Traffic (%)Lane Group Flow (vph) 0 82 0 336 180 0 0 179 277 134 303 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 860: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 28.2 28.2 28.2 28.2 31.8 31.8 31.8 31.8 31.8Total Split (%) 47.0% 47.0% 47.0% 47.0% 53.0% 53.0% 53.0% 53.0% 53.0%Maximum Green (s) 21.9 21.9 21.9 21.9 25.5 25.5 25.5 25.5 25.5Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 -2.3 -2.3 0.0 0.0 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 6.3 6.3 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 21.9 19.5 21.9 19.6 17.2 17.2 19.6Actuated g/C Ratio 0.44 0.39 0.44 0.39 0.35 0.35 0.39v/c Ratio 0.11 0.71 0.24 0.26 0.40 0.35 0.44Control Delay 9.9 25.0 6.1 11.6 3.8 15.2 13.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.9 25.0 6.1 11.6 3.8 15.2 13.3LOS A C A B A B BApproach Delay 9.9 18.4 6.8 13.9Approach LOS A B A B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 49.7Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.71Intersection Signal Delay: 13.1 Intersection LOS: BIntersection Capacity Utilization 60.7% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 861: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 82 336 180 179 277 134 303v/c Ratio 0.11 0.71 0.24 0.26 0.40 0.35 0.44Control Delay 9.9 25.0 6.1 11.6 3.8 15.2 13.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.9 25.0 6.1 11.6 3.8 15.2 13.3Queue Length 50th (m) 4.0 24.5 4.0 11.6 0.0 9.7 20.8Queue Length 95th (m) 13.0 #72.9 16.5 22.4 11.6 20.9 37.1Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 50.0 30.0 50.0Base Capacity (vph) 817 547 849 989 908 589 999Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.10 0.61 0.21 0.18 0.31 0.23 0.30

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 862: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 16 58 2 309 73 93 4 161 255 123 260 18Future Volume (vph) 16 58 2 309 73 93 4 161 255 123 260 18Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 6.3 6.3 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.92 1.00 0.85 1.00 0.99Flt Protected 0.99 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1726 1630 1594 1731 1473 1646 1733Flt Permitted 0.93 0.70 1.00 0.99 1.00 0.64 1.00Satd. Flow (perm) 1628 1207 1594 1718 1473 1117 1733Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 17 63 2 336 79 101 4 175 277 134 283 20RTOR Reduction (vph) 0 1 0 0 56 0 0 0 180 0 5 0Lane Group Flow (vph) 0 81 0 336 124 0 0 179 97 134 298 0Heavy Vehicles (%) 0% 0% 0% 2% 0% 1% 0% 1% 1% 1% 0% 0%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 19.5 19.5 19.5 17.2 17.2 17.2 17.2Effective Green, g (s) 21.8 19.5 21.8 19.5 17.2 17.2 19.5Actuated g/C Ratio 0.44 0.40 0.44 0.40 0.35 0.35 0.40Clearance Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 719 477 704 679 513 389 685v/s Ratio Prot 0.08 c0.17v/s Ratio Perm 0.05 c0.28 0.10 0.07 0.12v/c Ratio 0.11 0.70 0.18 0.26 0.19 0.34 0.44Uniform Delay, d1 8.1 12.5 8.3 10.1 11.2 11.9 10.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 6.8 0.3 0.6 0.5 1.5 1.2Delay (s) 8.3 19.3 8.7 10.6 11.7 13.4 12.1Level of Service A B A B B B BApproach Delay (s) 8.3 15.6 11.3 12.5Approach LOS A B B B

Intersection SummaryHCM 2000 Control Delay 13.0 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.54Actuated Cycle Length (s) 49.3 Sum of lost time (s) 8.0Intersection Capacity Utilization 60.7% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 863: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 57 26 38 389 385 77Future Volume (vph) 57 26 38 389 385 77Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.958 0.977Flt Protected 0.967 0.996Satd. Flow (prot) 1295 0 0 1679 1665 0Flt Permitted 0.967 0.996Satd. Flow (perm) 1295 0 0 1679 1665 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 14% 50% 33% 1% 2% 6%Adj. Flow (vph) 62 28 41 423 418 84Shared Lane Traffic (%)Lane Group Flow (vph) 90 0 0 464 502 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 66.7% ICU Level of Service CAnalysis Period (min) 15

Page 864: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 46

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 57 26 38 389 385 77Future Volume (Veh/h) 57 26 38 389 385 77Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 62 28 41 423 418 84PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 965 460 502vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 965 460 502tC, single (s) 6.5 6.7 4.4tC, 2 stage (s)tF (s) 3.6 3.8 2.5p0 queue free % 76 95 96cM capacity (veh/h) 257 513 920

Direction, Lane # EB 1 NB 1 SB 1Volume Total 90 464 502Volume Left 62 41 0Volume Right 28 0 84cSH 304 920 1700Volume to Capacity 0.30 0.04 0.30Queue Length 95th (m) 9.6 1.1 0.0Control Delay (s) 21.7 1.3 0.0Lane LOS C AApproach Delay (s) 21.7 1.3 0.0Approach LOS C

Intersection SummaryAverage Delay 2.4Intersection Capacity Utilization 66.7% ICU Level of Service CAnalysis Period (min) 15

Page 865: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 22 8 6 405 393 19Future Volume (vph) 22 8 6 405 393 19Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.963 0.994Flt Protected 0.965 0.999Satd. Flow (prot) 1569 0 0 1731 1676 0Flt Permitted 0.965 0.999Satd. Flow (perm) 1569 0 0 1731 1676 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 5% 0% 0% 1% 4% 0%Adj. Flow (vph) 24 9 7 440 427 21Shared Lane Traffic (%)Lane Group Flow (vph) 33 0 0 447 448 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 38.4% ICU Level of Service AAnalysis Period (min) 15

Page 866: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 22 8 6 405 393 19Future Volume (Veh/h) 22 8 6 405 393 19Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 24 9 7 440 427 21PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 892 438 448vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 892 438 448tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 92 99 99cM capacity (veh/h) 307 623 1123

Direction, Lane # EB 1 NB 1 SB 1Volume Total 33 447 448Volume Left 24 7 0Volume Right 9 0 21cSH 356 1123 1700Volume to Capacity 0.09 0.01 0.26Queue Length 95th (m) 2.4 0.2 0.0Control Delay (s) 16.1 0.2 0.0Lane LOS C AApproach Delay (s) 16.1 0.2 0.0Approach LOS C

Intersection SummaryAverage Delay 0.7Intersection Capacity Utilization 38.4% ICU Level of Service AAnalysis Period (min) 15

Page 867: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 6 18 7 405 395 6Future Volume (vph) 6 18 7 405 395 6Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.900 0.998Flt Protected 0.987 0.999Satd. Flow (prot) 1478 0 0 1716 1680 0Flt Permitted 0.987 0.999Satd. Flow (perm) 1478 0 0 1716 1680 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 327.8 331.4Travel Time (s) 14.9 23.6 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 7% 50% 1% 4% 0%Adj. Flow (vph) 7 20 8 440 429 7Shared Lane Traffic (%)Lane Group Flow (vph) 27 0 0 448 436 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 39.2% ICU Level of Service AAnalysis Period (min) 15

Page 868: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 6 18 7 405 395 6Future Volume (Veh/h) 6 18 7 405 395 6Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 20 8 440 429 7PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 328pX, platoon unblockedvC, conflicting volume 888 432 436vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 888 432 436tC, single (s) 6.4 6.3 4.6tC, 2 stage (s)tF (s) 3.5 3.4 2.7p0 queue free % 98 97 99cM capacity (veh/h) 314 613 910

Direction, Lane # EB 1 NB 1 SB 1Volume Total 27 448 436Volume Left 7 8 0Volume Right 20 0 7cSH 491 910 1700Volume to Capacity 0.05 0.01 0.26Queue Length 95th (m) 1.4 0.2 0.0Control Delay (s) 12.8 0.3 0.0Lane LOS B AApproach Delay (s) 12.8 0.3 0.0Approach LOS B

Intersection SummaryAverage Delay 0.5Intersection Capacity Utilization 39.2% ICU Level of Service AAnalysis Period (min) 15

Page 869: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 210 22 396 12 30 14 450 189 6 3 163 247Future Volume (vph) 210 22 396 12 30 14 450 189 6 3 163 247Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 40.0 0.0 0.0 0.0 40.0 0.0 0.0 30.0Storage Lanes 1 0 0 0 2 0 0 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00 1.00 1.00 1.00Frt 0.858 0.967 0.995 0.850Flt Protected 0.950 0.989 0.950 0.999Satd. Flow (prot) 1662 1372 0 0 1674 0 2932 1692 0 0 1682 1488Flt Permitted 0.717 0.840 0.950 0.993Satd. Flow (perm) 1255 1372 0 0 1421 0 2932 1692 0 0 1672 1488Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 430 15 4 268Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 327.8Travel Time (s) 8.5 7.8 70.5 23.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 10% 0% 0% 0% 10% 3% 0% 0% 4% 0%Adj. Flow (vph) 228 24 430 13 33 15 489 205 7 3 177 268Shared Lane Traffic (%)Lane Group Flow (vph) 228 454 0 0 61 0 489 212 0 0 180 268Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Prot NA Perm NA PermProtected Phases 4 8 5 2 6

Page 870: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 52

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 6 6Detector Phase 4 4 8 8 5 2 6 6 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 24.1 24.1 24.1 24.1 9.5 24.1 24.1 24.1 24.1Total Split (s) 24.1 24.1 24.1 24.1 11.0 35.9 24.9 24.9 24.9Total Split (%) 40.2% 40.2% 40.2% 40.2% 18.3% 59.8% 41.5% 41.5% 41.5%Maximum Green (s) 18.0 18.0 18.0 18.0 6.5 29.8 18.8 18.8 18.8Yellow Time (s) 4.1 4.1 4.1 4.1 3.5 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 1.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 2.4 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode None None None None None Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 15.6 15.6 15.6 8.8 24.1 12.8 12.8Actuated g/C Ratio 0.33 0.33 0.33 0.18 0.50 0.27 0.27v/c Ratio 0.56 0.62 0.13 0.91 0.25 0.40 0.45Control Delay 19.8 6.4 10.4 47.6 8.3 18.2 5.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.8 6.4 10.4 47.6 8.3 18.2 5.2LOS B A B D A B AApproach Delay 10.9 10.4 35.8 10.4Approach LOS B B D B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 47.9Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.91Intersection Signal Delay: 20.0 Intersection LOS: BIntersection Capacity Utilization 61.3% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy

Page 871: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBT WBT NBL NBT SBT SBRLane Group Flow (vph) 228 454 61 489 212 180 268v/c Ratio 0.56 0.62 0.13 0.91 0.25 0.40 0.45Control Delay 19.8 6.4 10.4 47.6 8.3 18.2 5.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.8 6.4 10.4 47.6 8.3 18.2 5.2Queue Length 50th (m) 15.9 1.4 2.7 22.6 9.8 13.3 0.0Queue Length 95th (m) 38.6 19.9 10.2 #59.0 22.3 29.0 13.7Internal Link Dist (m) 93.4 84.9 954.6 303.8Turn Bay Length (m) 40.0 40.0 30.0Base Capacity (vph) 540 835 620 540 1157 748 814Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.42 0.54 0.10 0.91 0.18 0.24 0.33

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 872: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 210 22 396 12 30 14 450 189 6 3 163 247Future Volume (vph) 210 22 396 12 30 14 450 189 6 3 163 247Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 2.4 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 0.97 1.00 1.00 1.00Frt 1.00 0.86 0.97 1.00 1.00 1.00 0.85Flt Protected 0.95 1.00 0.99 0.95 1.00 1.00 1.00Satd. Flow (prot) 1662 1371 1674 2932 1692 1682 1488Flt Permitted 0.72 1.00 0.84 0.95 1.00 0.99 1.00Satd. Flow (perm) 1255 1371 1422 2932 1692 1672 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 228 24 430 13 33 15 489 205 7 3 177 268RTOR Reduction (vph) 0 290 0 0 10 0 0 2 0 0 0 196Lane Group Flow (vph) 228 164 0 0 51 0 489 210 0 0 180 72Heavy Vehicles (%) 0% 0% 10% 0% 0% 0% 10% 3% 0% 0% 4% 0%Turn Type Perm NA Perm NA Prot NA Perm NA PermProtected Phases 4 8 5 2 6Permitted Phases 4 8 6 6Actuated Green, G (s) 13.4 13.4 13.4 6.7 21.9 10.7 10.7Effective Green, g (s) 15.5 15.5 15.5 8.8 24.0 12.8 12.8Actuated g/C Ratio 0.33 0.33 0.33 0.19 0.51 0.27 0.27Clearance Time (s) 6.1 6.1 6.1 4.5 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 409 447 464 543 854 450 400v/s Ratio Prot 0.12 c0.17 0.12v/s Ratio Perm c0.18 0.04 c0.11 0.05v/c Ratio 0.56 0.37 0.11 0.90 0.25 0.40 0.18Uniform Delay, d1 13.2 12.2 11.2 18.9 6.6 14.2 13.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.6 0.5 0.1 18.0 0.2 0.6 0.2Delay (s) 14.8 12.8 11.3 36.9 6.8 14.8 13.5Level of Service B B B D A B BApproach Delay (s) 13.5 11.3 27.8 14.0Approach LOS B B C B

Intersection SummaryHCM 2000 Control Delay 18.8 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.58Actuated Cycle Length (s) 47.5 Sum of lost time (s) 10.4Intersection Capacity Utilization 61.3% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 873: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 77 50 33 162 198 66Future Volume (vph) 77 50 33 162 198 66Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.947 0.850Flt Protected 0.970 0.950Satd. Flow (prot) 1507 0 1662 1733 1733 1282Flt Permitted 0.970 0.950Satd. Flow (perm) 1507 0 1662 1733 1733 1282Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 11% 0% 0% 1% 1% 16%Adj. Flow (vph) 84 54 36 176 215 72Shared Lane Traffic (%)Lane Group Flow (vph) 138 0 36 176 215 72Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 32.6% ICU Level of Service AAnalysis Period (min) 15

Page 874: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 56

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 77 50 33 162 198 66Future Volume (Veh/h) 77 50 33 162 198 66Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 84 54 36 176 215 72PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 463 215 287vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 463 215 287tC, single (s) 6.5 6.2 4.1tC, 2 stage (s)tF (s) 3.6 3.3 2.2p0 queue free % 84 93 97cM capacity (veh/h) 526 830 1287

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 138 36 176 215 72Volume Left 84 36 0 0 0Volume Right 54 0 0 0 72cSH 614 1287 1700 1700 1700Volume to Capacity 0.22 0.03 0.10 0.13 0.04Queue Length 95th (m) 6.9 0.7 0.0 0.0 0.0Control Delay (s) 12.6 7.9 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 12.6 1.3 0.0Approach LOS B

Intersection SummaryAverage Delay 3.2Intersection Capacity Utilization 32.6% ICU Level of Service AAnalysis Period (min) 15

Page 875: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 178 21 174 96 26 223Future Volume (vph) 178 21 174 96 26 223Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.986 0.952Flt Protected 0.957 0.995Satd. Flow (prot) 1622 0 1639 0 0 1702Flt Permitted 0.957 0.995Satd. Flow (perm) 1622 0 1639 0 0 1702Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 2% 1% 5% 2%Adj. Flow (vph) 193 23 189 104 28 242Shared Lane Traffic (%)Lane Group Flow (vph) 216 0 293 0 0 270Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 52.7% ICU Level of Service AAnalysis Period (min) 15

Page 876: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 58

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 178 21 174 96 26 223Future Volume (Veh/h) 178 21 174 96 26 223Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 193 23 189 104 28 242PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 539 241 293vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 539 241 293tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 61 97 98cM capacity (veh/h) 492 803 1252

Direction, Lane # WB 1 NB 1 SB 1Volume Total 216 293 270Volume Left 193 0 28Volume Right 23 104 0cSH 513 1700 1252Volume to Capacity 0.42 0.17 0.02Queue Length 95th (m) 16.5 0.0 0.5Control Delay (s) 17.0 0.0 1.0Lane LOS C AApproach Delay (s) 17.0 0.0 1.0Approach LOS C

Intersection SummaryAverage Delay 5.1Intersection Capacity Utilization 52.7% ICU Level of Service AAnalysis Period (min) 15

Page 877: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 59

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 388 211 0 397 264Future Volume (vph) 0 388 211 0 397 264Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3228 3197 0 1614 1458Flt Permitted 0.950Satd. Flow (perm) 0 3228 3197 0 1614 1458Right Turn on Red Yes YesSatd. Flow (RTOR) 287Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 3% 4% 0% 3% 2%Adj. Flow (vph) 0 422 229 0 432 287Shared Lane Traffic (%)Lane Group Flow (vph) 0 422 229 0 432 287Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Perm PermProtected Phases 4 8

Page 878: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 60

Lane Group EBL EBT WBT WBR SBL SBRPermitted Phases 6 6Detector Phase 4 8 6 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0Minimum Split (s) 24.1 24.1 29.0 29.0Total Split (s) 24.1 24.1 30.9 30.9Total Split (%) 43.8% 43.8% 56.2% 56.2%Maximum Green (s) 18.0 18.0 24.8 24.8Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode None None Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 12.8 12.8 17.8 17.8Actuated g/C Ratio 0.33 0.33 0.46 0.46v/c Ratio 0.40 0.22 0.59 0.35Control Delay 12.4 11.2 11.8 2.5Queue Delay 0.0 0.0 0.0 0.0Total Delay 12.4 11.2 11.8 2.5LOS B B B AApproach Delay 12.4 11.2 8.0Approach LOS B B A

Intersection SummaryArea Type: OtherCycle Length: 55Actuated Cycle Length: 39Natural Cycle: 55Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.59Intersection Signal Delay: 9.9 Intersection LOS: AIntersection Capacity Utilization 42.2% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp

Page 879: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 61

Lane Group EBT WBT SBL SBRLane Group Flow (vph) 422 229 432 287v/c Ratio 0.40 0.22 0.59 0.35Control Delay 12.4 11.2 11.8 2.5Queue Delay 0.0 0.0 0.0 0.0Total Delay 12.4 11.2 11.8 2.5Queue Length 50th (m) 10.8 5.5 18.9 0.0Queue Length 95th (m) 26.6 15.1 45.7 8.8Internal Link Dist (m) 61.5 104.4 150.5Turn Bay Length (m) 40.0Base Capacity (vph) 1739 1722 1163 1131Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.24 0.13 0.37 0.25

Intersection Summary

Page 880: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 62

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 388 211 0 397 264Future Volume (vph) 0 388 211 0 397 264Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 0.95 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3228 3197 1614 1458Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 3228 3197 1614 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 422 229 0 432 287RTOR Reduction (vph) 0 0 0 0 0 155Lane Group Flow (vph) 0 422 229 0 432 132Heavy Vehicles (%) 0% 3% 4% 0% 3% 2%Turn Type NA NA Perm PermProtected Phases 4 8Permitted Phases 6 6Actuated Green, G (s) 10.6 10.6 15.6 15.6Effective Green, g (s) 12.7 12.7 17.7 17.7Actuated g/C Ratio 0.33 0.33 0.46 0.46Clearance Time (s) 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1067 1057 743 672v/s Ratio Prot c0.13 0.07v/s Ratio Perm c0.27 0.09v/c Ratio 0.40 0.22 0.58 0.20Uniform Delay, d1 9.9 9.3 7.6 6.1Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.1 1.2 0.1Delay (s) 10.1 9.4 8.8 6.3Level of Service B A A AApproach Delay (s) 10.1 9.4 7.8Approach LOS B A A

Intersection SummaryHCM 2000 Control Delay 8.8 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.54Actuated Cycle Length (s) 38.4 Sum of lost time (s) 10.1Intersection Capacity Utilization 42.2% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 881: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 63

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 559 0 0 238 34 135Future Volume (vph) 559 0 0 238 34 135Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3228 0 0 3260 1554 1444Flt Permitted 0.950Satd. Flow (perm) 3228 0 0 3260 1554 1444Right Turn on Red Yes YesSatd. Flow (RTOR) 147Link Speed (k/h) 50 50 50Link Distance (m) 104.2 91.9 169.0Travel Time (s) 7.5 6.6 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 2% 7% 3%Adj. Flow (vph) 608 0 0 259 37 147Shared Lane Traffic (%)Lane Group Flow (vph) 608 0 0 259 37 147Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2

Page 882: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 64

Lane Group EBT EBR WBL WBT NBL NBRPermitted Phases 2Detector Phase 4 8 2 2Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0Minimum Split (s) 24.1 24.1 24.1 24.1Total Split (s) 25.0 25.0 25.0 25.0Total Split (%) 50.0% 50.0% 50.0% 50.0%Maximum Green (s) 18.9 18.9 18.9 18.9Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode None None Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 13.0 13.0 8.7 8.7Actuated g/C Ratio 0.43 0.43 0.29 0.29v/c Ratio 0.43 0.18 0.08 0.28Control Delay 7.0 5.6 9.1 4.0Queue Delay 0.0 0.0 0.0 0.0Total Delay 7.0 5.6 9.1 4.0LOS A A A AApproach Delay 7.0 5.6 5.0Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50Actuated Cycle Length: 29.9Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.43Intersection Signal Delay: 6.3 Intersection LOS: AIntersection Capacity Utilization 32.5% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47)

Page 883: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 65

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 608 259 37 147v/c Ratio 0.43 0.18 0.08 0.28Control Delay 7.0 5.6 9.1 4.0Queue Delay 0.0 0.0 0.0 0.0Total Delay 7.0 5.6 9.1 4.0Queue Length 50th (m) 8.9 3.3 1.2 0.0Queue Length 95th (m) 19.4 8.4 5.6 7.5Internal Link Dist (m) 80.2 67.9 145.0Turn Bay Length (m) 50.0Base Capacity (vph) 2304 2327 1109 1072Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.26 0.11 0.03 0.14

Intersection Summary

Page 884: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 66

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 559 0 0 238 34 135Future Volume (vph) 559 0 0 238 34 135Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.95 0.95 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 3228 3260 1554 1444Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 3228 3260 1554 1444Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 608 0 0 259 37 147RTOR Reduction (vph) 0 0 0 0 0 104Lane Group Flow (vph) 608 0 0 259 37 43Heavy Vehicles (%) 3% 0% 0% 2% 7% 3%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 10.9 10.9 6.6 6.6Effective Green, g (s) 13.0 13.0 8.7 8.7Actuated g/C Ratio 0.44 0.44 0.29 0.29Clearance Time (s) 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1412 1426 455 422v/s Ratio Prot c0.19 0.08 0.02v/s Ratio Perm c0.03v/c Ratio 0.43 0.18 0.08 0.10Uniform Delay, d1 5.8 5.1 7.6 7.7Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.1 0.1 0.1Delay (s) 6.0 5.2 7.7 7.8Level of Service A A A AApproach Delay (s) 6.0 5.2 7.7Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.1 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.30Actuated Cycle Length (s) 29.7 Sum of lost time (s) 8.0Intersection Capacity Utilization 32.5% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 885: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 67

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 391 304 213 235 236 334Future Volume (vph) 391 304 213 235 236 334Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.929 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1630 1716 1594 0 1630 1458Flt Permitted 0.175 0.950Satd. Flow (perm) 300 1716 1594 0 1630 1458Right Turn on Red Yes YesSatd. Flow (RTOR) 76 363Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 425 330 232 255 257 363Shared Lane Traffic (%)Lane Group Flow (vph) 425 330 487 0 257 363Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 2 2 1 1Detector Template Left Thru Thru Left RightLeading Detector (m) 2.0 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type pm+pt NA NA Perm PermProtected Phases 7 4 8Permitted Phases 4 6 6

Page 886: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 68

Lane Group EBL EBT WBT WBR SBL SBRDetector Phase 7 4 8 6 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 9.5 24.1 24.1 24.1 24.1Total Split (s) 21.0 48.0 27.0 27.0 27.0Total Split (%) 28.0% 64.0% 36.0% 36.0% 36.0%Maximum Green (s) 16.5 41.9 20.9 20.9 20.9Yellow Time (s) 3.5 4.1 4.1 4.1 4.1All-Red Time (s) 1.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 2.4 4.0 4.0 4.0 4.0Lead/Lag Lead LagLead-Lag Optimize? Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0Recall Mode None None None Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 44.3 42.7 21.9 17.5 17.5Actuated g/C Ratio 0.65 0.63 0.32 0.26 0.26v/c Ratio 0.77 0.31 0.87 0.62 0.56Control Delay 24.3 7.6 37.8 29.5 6.3Queue Delay 0.0 0.0 0.0 0.0 0.0Total Delay 24.3 7.6 37.8 29.5 6.3LOS C A D C AApproach Delay 17.0 37.8 16.0Approach LOS B D B

Intersection SummaryArea Type: OtherCycle Length: 75Actuated Cycle Length: 68.3Natural Cycle: 75Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.87Intersection Signal Delay: 22.1 Intersection LOS: CIntersection Capacity Utilization 75.5% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102)

Page 887: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 69

Lane Group EBL EBT WBT SBL SBRLane Group Flow (vph) 425 330 487 257 363v/c Ratio 0.77 0.31 0.87 0.62 0.56Control Delay 24.3 7.6 37.8 29.5 6.3Queue Delay 0.0 0.0 0.0 0.0 0.0Total Delay 24.3 7.6 37.8 29.5 6.3Queue Length 50th (m) 33.8 18.3 52.6 31.2 0.0Queue Length 95th (m) #89.4 37.4 #116.8 53.5 18.3Internal Link Dist (m) 152.2 155.7 954.6Turn Bay Length (m) 50.0 50.0Base Capacity (vph) 561 1117 592 554 735Starvation Cap Reductn 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0Reduced v/c Ratio 0.76 0.30 0.82 0.46 0.49

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 888: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) No Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 70

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 391 304 213 235 236 334Future Volume (vph) 391 304 213 235 236 334Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 2.4 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.93 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1630 1716 1594 1630 1458Flt Permitted 0.17 1.00 1.00 0.95 1.00Satd. Flow (perm) 299 1716 1594 1630 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 425 330 232 255 257 363RTOR Reduction (vph) 0 0 52 0 0 270Lane Group Flow (vph) 425 330 435 0 257 93Turn Type pm+pt NA NA Perm PermProtected Phases 7 4 8Permitted Phases 4 6 6Actuated Green, G (s) 40.6 40.6 19.8 15.4 15.4Effective Green, g (s) 42.7 42.7 21.9 17.5 17.5Actuated g/C Ratio 0.63 0.63 0.32 0.26 0.26Clearance Time (s) 4.5 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 546 1074 511 418 374v/s Ratio Prot c0.21 0.19 c0.27v/s Ratio Perm 0.28 c0.16 0.06v/c Ratio 0.78 0.31 0.85 0.61 0.25Uniform Delay, d1 13.4 5.9 21.6 22.4 20.1Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 6.9 0.2 12.9 2.7 0.4Delay (s) 20.4 6.1 34.6 25.1 20.5Level of Service C A C C CApproach Delay (s) 14.1 34.6 22.4Approach LOS B C C

Intersection SummaryHCM 2000 Control Delay 22.2 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.78Actuated Cycle Length (s) 68.2 Sum of lost time (s) 12.5Intersection Capacity Utilization 75.5% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 889: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway/Marinelane Parkway & Portage RoadNo Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 71

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 18 942 677 94 175 40Future Volume (vph) 18 942 677 94 175 40Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 50.0 50.0 0.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 3260 3260 1473 1646 1488Flt Permitted 0.343 0.950Satd. Flow (perm) 600 3260 3260 1473 1646 1488Right Turn on Red Yes YesSatd. Flow (RTOR) 102 43Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 2% 1% 1% 0%Adj. Flow (vph) 20 1024 736 102 190 43Shared Lane Traffic (%)Lane Group Flow (vph) 20 1024 736 102 190 43Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 2 2 1 1 1Detector Template Left Thru Thru Right Left RightLeading Detector (m) 2.0 10.0 10.0 2.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6 2.0 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Perm NA NA Perm Prot PermProtected Phases 4 8 6

Page 890: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway/Marinelane Parkway & Portage RoadNo Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 72

Lane Group EBL EBT WBT WBR SBL SBRPermitted Phases 4 8 6Detector Phase 4 4 8 8 6 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 24.1 24.1 24.1 24.1 24.1 24.1Total Split (s) 25.0 25.0 25.0 25.0 25.0 25.0Total Split (%) 50.0% 50.0% 50.0% 50.0% 50.0% 50.0%Maximum Green (s) 18.9 18.9 18.9 18.9 18.9 18.9Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode None None None None Min MinWalk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 18.8 18.8 18.8 18.8 12.0 12.0Actuated g/C Ratio 0.48 0.48 0.48 0.48 0.31 0.31v/c Ratio 0.07 0.65 0.47 0.13 0.38 0.09Control Delay 7.0 10.4 8.3 2.5 13.4 4.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 7.0 10.4 8.3 2.5 13.4 4.7LOS A B A A B AApproach Delay 10.3 7.6 11.8Approach LOS B A B

Intersection SummaryArea Type: OtherCycle Length: 50Actuated Cycle Length: 38.9Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.65Intersection Signal Delay: 9.4 Intersection LOS: AIntersection Capacity Utilization 45.5% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 212: Marineland Parkway/Marinelane Parkway & Portage Road

Page 891: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan212: Marineland Parkway/Marinelane Parkway & Portage RoadNo Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 73

Lane Group EBL EBT WBT WBR SBL SBRLane Group Flow (vph) 20 1024 736 102 190 43v/c Ratio 0.07 0.65 0.47 0.13 0.38 0.09Control Delay 7.0 10.4 8.3 2.5 13.4 4.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 7.0 10.4 8.3 2.5 13.4 4.7Queue Length 50th (m) 0.6 24.3 15.5 0.0 10.9 0.0Queue Length 95th (m) 3.6 48.9 31.8 5.5 23.0 4.4Internal Link Dist (m) 26.4 78.7 82.3Turn Bay Length (m) 25.0 50.0 50.0Base Capacity (vph) 330 1796 1796 857 907 839Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.06 0.57 0.41 0.12 0.21 0.05

Intersection Summary

Page 892: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan212: Marineland Parkway/Marinelane Parkway & Portage RoadNo Crossing 2031 Summer with Improvements

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 74

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 18 942 677 94 175 40Future Volume (vph) 18 942 677 94 175 40Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 3260 3260 1473 1646 1488Flt Permitted 0.34 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 600 3260 3260 1473 1646 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 20 1024 736 102 190 43RTOR Reduction (vph) 0 0 0 53 0 30Lane Group Flow (vph) 20 1024 736 49 190 13Heavy Vehicles (%) 0% 2% 2% 1% 1% 0%Turn Type Perm NA NA Perm Prot PermProtected Phases 4 8 6Permitted Phases 4 8 6Actuated Green, G (s) 16.6 16.6 16.6 16.6 9.8 9.8Effective Green, g (s) 18.7 18.7 18.7 18.7 11.9 11.9Actuated g/C Ratio 0.48 0.48 0.48 0.48 0.31 0.31Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 290 1579 1579 713 507 458v/s Ratio Prot c0.31 0.23 c0.12v/s Ratio Perm 0.03 0.03 0.01v/c Ratio 0.07 0.65 0.47 0.07 0.37 0.03Uniform Delay, d1 5.3 7.5 6.6 5.3 10.4 9.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.9 0.2 0.0 0.5 0.0Delay (s) 5.4 8.4 6.8 5.3 10.9 9.3Level of Service A A A A B AApproach Delay (s) 8.4 6.7 10.6Approach LOS A A B

Intersection SummaryHCM 2000 Control Delay 7.9 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.54Actuated Cycle Length (s) 38.6 Sum of lost time (s) 8.0Intersection Capacity Utilization 45.5% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 893: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Thundering Waters Transportation Master Plan | 151385 | July 2016

Paradigm Transportation Solutions Limited | Appendices

Appendix I

Future Total Traffic Operations with OPG Canal Crossing Reports

Page 894: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 95 656 87 29 528 243 86 117 131 210 98 82Future Volume (vph) 95 656 87 29 528 243 86 117 131 210 98 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 1 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95Ped Bike Factor 1.00 0.98Frt 0.850 0.850 0.850 0.932Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1525 3197 1390 1484 3167 1430 1471 1606 1250 1614 2853 0Flt Permitted 0.436 0.211 0.629 0.676Satd. Flow (perm) 699 3197 1390 330 3167 1409 974 1606 1250 1149 2853 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 77 264 142 89Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 4 4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 4% 7% 12% 5% 4% 13% 9% 19% 3% 5% 13%Adj. Flow (vph) 103 713 95 32 574 264 93 127 142 228 107 89Shared Lane Traffic (%)Lane Group Flow (vph) 103 713 95 32 574 264 93 127 142 228 196 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 1 2Detector Template Left Thru Right Left Thru Right Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 895: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Detector Phase 4 4 4 3 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.3 39.3 39.3 12.5 51.8 51.8 37.3 37.3 37.3 37.3 37.3Total Split (%) 44.1% 44.1% 44.1% 14.0% 58.1% 58.1% 41.9% 41.9% 41.9% 41.9% 41.9%Maximum Green (s) 33.0 33.0 33.0 9.5 45.5 45.5 31.0 31.0 31.0 31.0 31.0Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 0.0 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 21.4 21.4 21.4 31.0 31.0 28.6 19.9 19.9 19.9 19.9 19.9Actuated g/C Ratio 0.36 0.36 0.36 0.52 0.52 0.48 0.34 0.34 0.34 0.34 0.34v/c Ratio 0.41 0.62 0.17 0.12 0.35 0.32 0.28 0.24 0.28 0.59 0.19Control Delay 21.7 18.9 6.4 9.5 9.7 2.9 18.3 16.5 4.9 24.5 9.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 21.7 18.9 6.4 9.5 9.7 2.9 18.3 16.5 4.9 24.5 9.1LOS C B A A A A B B A C AApproach Delay 17.9 7.6 12.4 17.4Approach LOS B A B B

Intersection SummaryArea Type: OtherCycle Length: 89.1Actuated Cycle Length: 59.4Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.62Intersection Signal Delay: 13.6 Intersection LOS: BIntersection Capacity Utilization 59.9% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 896: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBTLane Group Flow (vph) 103 713 95 32 574 264 93 127 142 228 196v/c Ratio 0.41 0.62 0.17 0.12 0.35 0.32 0.28 0.24 0.28 0.59 0.19Control Delay 21.7 18.9 6.4 9.5 9.7 2.9 18.3 16.5 4.9 24.5 9.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 21.7 18.9 6.4 9.5 9.7 2.9 18.3 16.5 4.9 24.5 9.1Queue Length 50th (m) 8.1 32.2 1.2 1.5 17.2 0.0 7.3 9.8 0.0 20.2 4.1Queue Length 95th (m) 26.2 65.4 11.1 6.8 39.5 11.9 21.6 25.8 11.0 50.5 12.6Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 436 1999 898 346 2610 1173 574 947 795 677 1719Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.24 0.36 0.11 0.09 0.22 0.23 0.16 0.13 0.18 0.34 0.11

Intersection Summary

Page 897: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 95 656 87 29 528 243 86 117 131 210 98 82Future Volume (vph) 95 656 87 29 528 243 86 117 131 210 98 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.93Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1524 3197 1390 1484 3167 1410 1471 1606 1250 1614 2852Flt Permitted 0.44 1.00 1.00 0.21 1.00 1.00 0.63 1.00 1.00 0.68 1.00Satd. Flow (perm) 699 3197 1390 330 3167 1410 973 1606 1250 1148 2852Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 103 713 95 32 574 264 93 127 142 228 107 89RTOR Reduction (vph) 0 0 49 0 0 135 0 0 94 0 59 0Lane Group Flow (vph) 103 713 46 32 574 129 93 127 48 228 137 0Confl. Peds. (#/hr) 4 4Heavy Vehicles (%) 9% 4% 7% 12% 5% 4% 13% 9% 19% 3% 5% 13%Turn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Actuated Green, G (s) 19.1 19.1 19.1 28.6 28.6 28.6 17.5 17.5 17.5 17.5 17.5Effective Green, g (s) 21.4 21.4 21.4 27.6 30.9 28.6 19.8 19.8 19.8 19.8 19.8Actuated g/C Ratio 0.36 0.36 0.36 0.47 0.53 0.49 0.34 0.34 0.34 0.34 0.34Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 254 1165 506 263 1667 686 328 541 421 387 962v/s Ratio Prot c0.22 0.01 c0.18 0.08 0.05v/s Ratio Perm 0.15 0.03 0.05 0.09 0.10 0.04 c0.20v/c Ratio 0.41 0.61 0.09 0.12 0.34 0.19 0.28 0.23 0.11 0.59 0.14Uniform Delay, d1 13.9 15.3 12.3 9.3 8.0 8.5 14.3 14.0 13.4 16.1 13.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.8 0.8 0.1 0.2 0.1 0.1 0.3 0.2 0.1 1.9 0.0Delay (s) 14.7 16.1 12.3 9.4 8.1 8.6 14.6 14.2 13.5 18.0 13.6Level of Service B B B A A A B B B B BApproach Delay (s) 15.5 8.3 14.0 16.0Approach LOS B A B B

Intersection SummaryHCM 2000 Control Delay 12.9 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.58Actuated Cycle Length (s) 58.7 Sum of lost time (s) 12.0Intersection Capacity Utilization 59.9% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 898: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 995 1 50 618 0 0 0 0 328 148 164Future Volume (vph) 0 995 1 50 618 0 0 0 0 328 148 164Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 0 1 1 0 0 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 0.99 1.00 1.00 1.00 0.99Frt 0.850 0.850Flt Protected 0.950 0.950 0.981Satd. Flow (prot) 0 4638 1488 1662 4594 0 0 0 0 1519 1524 1430Flt Permitted 0.163 0.950 0.981Satd. Flow (perm) 0 4638 1467 285 4594 0 0 0 0 1515 1522 1412Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 81 178Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 32.2 64.2 88.8Travel Time (s) 9.7 2.3 4.6 6.4Confl. Peds. (#/hr) 2 2 3 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 3% 0% 0% 4% 0% 0% 0% 0% 4% 9% 4%Adj. Flow (vph) 0 1082 1 54 672 0 0 0 0 357 161 178Shared Lane Traffic (%) 29%Lane Group Flow (vph) 0 1082 1 54 672 0 0 0 0 253 265 178Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 1 2 1 2 1Detector Template Thru Right Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0

Page 899: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Detector Phase 4 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 36.3 12.5 36.3 36.3 36.3 36.3Total Split (s) 36.3 36.3 12.5 48.5 36.5 36.5 36.5Total Split (%) 42.6% 42.6% 14.7% 56.9% 42.8% 42.8% 42.8%Maximum Green (s) 30.0 30.0 9.5 42.2 30.2 30.2 30.2Yellow Time (s) 4.1 4.1 3.0 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 0.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 23.8 21.5 35.3 35.3 19.7 19.7 19.7Actuated g/C Ratio 0.38 0.34 0.56 0.56 0.31 0.31 0.31v/c Ratio 0.62 0.00 0.17 0.26 0.54 0.56 0.32Control Delay 18.2 0.0 9.0 8.2 23.3 23.9 4.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 18.2 0.0 9.0 8.2 23.3 23.9 4.8LOS B A A A C C AApproach Delay 18.2 8.3 18.8Approach LOS B A B

Intersection SummaryArea Type: OtherCycle Length: 85.3Actuated Cycle Length: 63.2Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.62Intersection Signal Delay: 15.5 Intersection LOS: BIntersection Capacity Utilization 52.2% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 900: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT EBR WBL WBT SBL SBT SBRLane Group Flow (vph) 1082 1 54 672 253 265 178v/c Ratio 0.62 0.00 0.17 0.26 0.54 0.56 0.32Control Delay 18.2 0.0 9.0 8.2 23.3 23.9 4.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 18.2 0.0 9.0 8.2 23.3 23.9 4.8Queue Length 50th (m) 37.3 0.0 2.7 13.8 25.8 27.3 0.0Queue Length 95th (m) 63.4 0.0 9.2 27.4 54.9 57.6 12.6Internal Link Dist (m) 110.1 8.2 64.8Turn Bay Length (m) 50.0Base Capacity (vph) 2453 761 350 3370 806 809 834Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.44 0.00 0.15 0.20 0.31 0.33 0.21

Intersection Summary

Page 901: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 995 1 50 618 0 0 0 0 328 148 164Future Volume (vph) 0 995 1 50 618 0 0 0 0 328 148 164Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 1.00 1.00 0.91 0.95 0.95 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 0.98 1.00Satd. Flow (prot) 4638 1468 1662 4594 1516 1522 1412Flt Permitted 1.00 1.00 0.16 1.00 0.95 0.98 1.00Satd. Flow (perm) 4638 1468 285 4594 1516 1522 1412Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 1082 1 54 672 0 0 0 0 357 161 178RTOR Reduction (vph) 0 0 1 0 0 0 0 0 0 0 0 122Lane Group Flow (vph) 0 1082 0 54 672 0 0 0 0 253 265 56Confl. Peds. (#/hr) 2 2 3 1Heavy Vehicles (%) 0% 3% 0% 0% 4% 0% 0% 0% 0% 4% 9% 4%Turn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Actuated Green, G (s) 21.6 21.6 32.9 32.9 17.3 17.3 17.3Effective Green, g (s) 23.9 21.6 31.9 35.2 19.6 19.6 19.6Actuated g/C Ratio 0.38 0.34 0.51 0.56 0.31 0.31 0.31Clearance Time (s) 6.3 6.3 3.0 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1765 504 304 2574 473 475 440v/s Ratio Prot c0.23 0.02 c0.15v/s Ratio Perm 0.00 0.07 0.17 0.17 0.04v/c Ratio 0.61 0.00 0.18 0.26 0.53 0.56 0.13Uniform Delay, d1 15.7 13.5 8.9 7.1 17.8 18.0 15.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.6 0.0 0.3 0.1 1.2 1.4 0.1Delay (s) 16.4 13.5 9.2 7.2 19.0 19.4 15.6Level of Service B B A A B B BApproach Delay (s) 16.3 7.3 0.0 18.3Approach LOS B A A B

Intersection SummaryHCM 2000 Control Delay 14.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.55Actuated Cycle Length (s) 62.8 Sum of lost time (s) 12.0Intersection Capacity Utilization 52.2% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 902: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 984 0 0 632 54 111Future Volume (vph) 984 0 0 632 54 111Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.91 1.00 1.00 0.91 0.97 1.00Ped Bike Factor 1.00 0.98Frt 0.850Flt Protected 0.950Satd. Flow (prot) 4684 0 0 4550 3162 1430Flt Permitted 0.950Satd. Flow (perm) 4684 0 0 4550 3151 1398Right Turn on Red Yes YesSatd. Flow (RTOR) 69Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Confl. Peds. (#/hr) 4 13Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 5% 2% 4%Adj. Flow (vph) 1070 0 0 687 59 121Shared Lane Traffic (%)Lane Group Flow (vph) 1070 0 0 687 59 121Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2

Page 903: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRDetector Phase 4 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.0 35.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7%Maximum Green (s) 28.7 28.7 18.7 18.7Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 17.7 17.7 12.5 12.5Actuated g/C Ratio 0.46 0.46 0.33 0.33v/c Ratio 0.49 0.33 0.06 0.24Control Delay 7.9 6.9 10.3 7.4Queue Delay 0.0 0.0 0.0 0.0Total Delay 7.9 6.9 10.3 7.4LOS A A B AApproach Delay 7.9 6.9 8.3Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 38.3Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.49Intersection Signal Delay: 7.6 Intersection LOS: AIntersection Capacity Utilization 36.1% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 904: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 1070 687 59 121v/c Ratio 0.49 0.33 0.06 0.24Control Delay 7.9 6.9 10.3 7.4Queue Delay 0.0 0.0 0.0 0.0Total Delay 7.9 6.9 10.3 7.4Queue Length 50th (m) 16.2 9.4 1.3 2.3Queue Length 95th (m) 24.5 15.2 4.6 12.0Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 3823 3714 1748 803Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.28 0.18 0.03 0.15

Intersection Summary

Page 905: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 984 0 0 632 54 111Future Volume (vph) 984 0 0 632 54 111Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 0.91 0.97 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 4684 4550 3162 1396Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 4684 4550 3162 1396Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1070 0 0 687 59 121RTOR Reduction (vph) 0 0 0 0 0 46Lane Group Flow (vph) 1070 0 0 687 59 75Confl. Peds. (#/hr) 4 13Heavy Vehicles (%) 2% 0% 0% 5% 2% 4%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 15.4 15.4 10.2 10.2Effective Green, g (s) 17.7 17.7 12.5 12.5Actuated g/C Ratio 0.46 0.46 0.33 0.33Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 2170 2108 1034 456v/s Ratio Prot c0.23 0.15 0.02v/s Ratio Perm c0.05v/c Ratio 0.49 0.33 0.06 0.16Uniform Delay, d1 7.1 6.5 8.8 9.1Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.1 0.0 0.2Delay (s) 7.3 6.6 8.8 9.3Level of Service A A A AApproach Delay (s) 7.3 6.6 9.1Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 7.2 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.36Actuated Cycle Length (s) 38.2 Sum of lost time (s) 8.0Intersection Capacity Utilization 36.1% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 906: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 67 773 256 135 768 25 102 4 93 15 2 22Future Volume (vph) 67 773 256 135 768 25 102 4 93 15 2 22Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 15.0 0.0Storage Lanes 1 1 2 0 2 1 1 0Taper Length (m) 40.0 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.98 1.00 0.97 0.99Frt 0.850 0.995 0.850 0.862Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3260 1458 3162 3244 0 3162 1716 1458 1630 1479 0Flt Permitted 0.329 0.950 0.950 0.755Satd. Flow (perm) 564 3260 1434 3154 3244 0 3162 1716 1422 1278 1479 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 278 5 101 24Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 5 5 12 12Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 73 840 278 147 835 27 111 4 101 16 2 24Shared Lane Traffic (%)Lane Group Flow (vph) 73 840 278 147 862 0 111 4 101 16 26 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NA

Page 907: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 9.5 32.0 32.0 32.0 32.0Total Split (s) 36.0 36.0 36.0 12.0 48.0 9.5 42.0 42.0 32.5 32.5Total Split (%) 40.0% 40.0% 40.0% 13.3% 53.3% 10.6% 46.7% 46.7% 36.1% 36.1%Maximum Green (s) 29.7 29.7 29.7 7.5 41.7 5.0 35.7 35.7 26.2 26.2Yellow Time (s) 4.1 4.1 4.1 3.5 4.1 3.5 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 1.0 2.2 1.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -0.5 -2.3 -0.5 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.4 24.4 24.4 7.6 36.1 5.5 20.0 20.0 10.4 10.4Actuated g/C Ratio 0.38 0.38 0.38 0.12 0.56 0.09 0.31 0.31 0.16 0.16v/c Ratio 0.34 0.68 0.39 0.39 0.47 0.41 0.01 0.20 0.08 0.10Control Delay 18.8 19.4 3.6 30.9 9.0 34.5 18.0 6.0 26.7 13.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 18.8 19.4 3.6 30.9 9.0 34.5 18.0 6.0 26.7 13.4LOS B B A C A C B A C BApproach Delay 15.7 12.2 20.9 18.5Approach LOS B B C B

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 64.1Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.68Intersection Signal Delay: 14.8 Intersection LOS: BIntersection Capacity Utilization 55.4% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 908: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 73 840 278 147 862 111 4 101 16 26v/c Ratio 0.34 0.68 0.39 0.39 0.47 0.41 0.01 0.20 0.08 0.10Control Delay 18.8 19.4 3.6 30.9 9.0 34.5 18.0 6.0 26.7 13.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 18.8 19.4 3.6 30.9 9.0 34.5 18.0 6.0 26.7 13.4Queue Length 50th (m) 6.3 44.7 0.0 8.9 29.7 7.0 0.4 0.0 1.7 0.2Queue Length 95th (m) 16.2 62.1 12.3 18.6 41.3 15.6 2.5 10.4 7.4 6.8Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 50.0 50.0 15.0Base Capacity (vph) 283 1640 859 398 2246 273 1025 890 572 676Starvation Cap Reductn 0 11 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.26 0.52 0.32 0.37 0.38 0.41 0.00 0.11 0.03 0.04

Intersection Summary

Page 909: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 67 773 256 135 768 25 102 4 93 15 2 22Future Volume (vph) 67 773 256 135 768 25 102 4 93 15 2 22Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 1.00 1.00 0.98 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 1.00Frt 1.00 1.00 0.85 1.00 1.00 1.00 1.00 0.85 1.00 0.86Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1630 3260 1436 3162 3244 3162 1716 1427 1614 1478Flt Permitted 0.33 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.76 1.00Satd. Flow (perm) 564 3260 1436 3162 3244 3162 1716 1427 1283 1478Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 73 840 278 147 835 27 111 4 101 16 2 24RTOR Reduction (vph) 0 0 172 0 2 0 0 0 70 0 20 0Lane Group Flow (vph) 73 840 106 147 860 0 111 4 31 16 6 0Confl. Peds. (#/hr) 5 5 12 12Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Actuated Green, G (s) 22.2 22.2 22.2 7.1 33.8 5.0 17.6 17.6 8.1 8.1Effective Green, g (s) 24.5 24.5 24.5 7.6 36.1 5.5 19.9 19.9 10.4 10.4Actuated g/C Ratio 0.38 0.38 0.38 0.12 0.56 0.09 0.31 0.31 0.16 0.16Clearance Time (s) 6.3 6.3 6.3 4.5 6.3 4.5 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 215 1247 549 375 1829 271 533 443 208 240v/s Ratio Prot c0.26 0.05 c0.27 c0.04 0.00 0.00v/s Ratio Perm 0.13 0.07 c0.02 0.01v/c Ratio 0.34 0.67 0.19 0.39 0.47 0.41 0.01 0.07 0.08 0.02Uniform Delay, d1 14.0 16.4 13.2 26.1 8.3 27.7 15.2 15.5 22.7 22.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.7 1.3 0.1 0.5 0.1 1.0 0.0 0.0 0.1 0.0Delay (s) 14.7 17.7 13.3 26.6 8.4 28.7 15.2 15.6 22.8 22.6Level of Service B B B C A C B B C CApproach Delay (s) 16.5 11.1 22.3 22.7Approach LOS B B C C

Intersection SummaryHCM 2000 Control Delay 14.9 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.50Actuated Cycle Length (s) 64.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 55.4% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 910: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 142 556 113 67 582 64 193 165 79 56 169 152Future Volume (vph) 142 556 113 67 582 64 193 165 79 56 169 152Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 2 0 1 0 1 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 0.97 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 0.99 1.00 1.00 0.99 1.00Frt 0.975 0.985 0.951 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 2959 2981 0 1599 3021 0 1630 1582 0 1630 1699 1417Flt Permitted 0.950 0.278 0.451 0.452Satd. Flow (perm) 2930 2981 0 467 3021 0 774 1582 0 774 1699 1417Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 22 11 24 165Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 12 5 5 12 4 4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 7% 14% 4% 8% 9% 2% 4% 6% 2% 3% 5%Adj. Flow (vph) 154 604 123 73 633 70 210 179 86 61 184 165Shared Lane Traffic (%)Lane Group Flow (vph) 154 727 0 73 703 0 210 265 0 61 184 165Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 911: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Detector Phase 7 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 9.5 30.4 9.5 30.4 9.5 37.7 9.5 37.7 37.7Total Split (s) 25.0 30.4 25.0 30.4 12.0 37.7 12.0 37.7 37.7Total Split (%) 23.8% 28.9% 23.8% 28.9% 11.4% 35.9% 11.4% 35.9% 35.9%Maximum Green (s) 21.0 24.0 22.0 24.0 9.0 31.0 9.0 31.0 31.0Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1 4.1All-Red Time (s) 1.0 2.3 0.0 2.3 0.0 2.6 0.0 2.6 2.6Lost Time Adjust (s) -4.0 -2.4 0.0 -2.4 1.0 -2.7 1.0 -2.7 0.0Total Lost Time (s) 0.0 4.0 3.0 4.0 4.0 4.0 4.0 4.0 6.7Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 13.1 27.3 32.0 24.1 27.6 19.6 23.3 17.5 14.7Actuated g/C Ratio 0.17 0.36 0.43 0.32 0.37 0.26 0.31 0.23 0.20v/c Ratio 0.30 0.66 0.24 0.72 0.56 0.61 0.20 0.46 0.40Control Delay 30.8 23.9 13.2 28.4 23.5 29.7 16.8 29.3 7.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 30.8 23.9 13.2 28.4 23.5 29.7 16.8 29.3 7.7LOS C C B C C C B C AApproach Delay 25.1 27.0 27.0 18.8Approach LOS C C C B

Intersection SummaryArea Type: OtherCycle Length: 105.1Actuated Cycle Length: 75Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.72Intersection Signal Delay: 25.0 Intersection LOS: CIntersection Capacity Utilization 59.5% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 912: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 154 727 73 703 210 265 61 184 165v/c Ratio 0.30 0.66 0.24 0.72 0.56 0.61 0.20 0.46 0.40Control Delay 30.8 23.9 13.2 28.4 23.5 29.7 16.8 29.3 7.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 30.8 23.9 13.2 28.4 23.5 29.7 16.8 29.3 7.7Queue Length 50th (m) 10.6 44.0 5.1 46.0 22.1 32.5 5.8 24.5 0.0Queue Length 95th (m) 21.8 80.6 14.6 84.0 40.5 61.1 13.9 44.7 14.7Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 1009 1166 578 1095 380 740 358 781 694Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.15 0.62 0.13 0.64 0.55 0.36 0.17 0.24 0.24

Intersection Summary

Page 913: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 142 556 113 67 582 64 193 165 79 56 169 152Future Volume (vph) 142 556 113 67 582 64 193 165 79 56 169 152Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 0.0 4.0 3.0 4.0 4.0 4.0 4.0 4.0 6.7Lane Util. Factor 0.97 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.97 1.00 0.99 1.00 0.95 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 2959 2981 1598 3023 1630 1583 1629 1699 1417Flt Permitted 0.95 1.00 0.28 1.00 0.45 1.00 0.45 1.00 1.00Satd. Flow (perm) 2959 2981 467 3023 774 1583 776 1699 1417Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 154 604 123 73 633 70 210 179 86 61 184 165RTOR Reduction (vph) 0 14 0 0 7 0 0 18 0 0 0 132Lane Group Flow (vph) 154 713 0 73 696 0 210 247 0 61 184 33Confl. Peds. (#/hr) 12 5 5 12 4 4Heavy Vehicles (%) 9% 7% 14% 4% 8% 9% 2% 4% 6% 2% 3% 5%Turn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Actuated Green, G (s) 9.0 24.9 28.7 21.8 25.9 16.9 21.5 14.7 14.7Effective Green, g (s) 13.0 27.3 28.7 24.2 23.9 19.6 19.5 17.4 14.7Actuated g/C Ratio 0.17 0.37 0.38 0.32 0.32 0.26 0.26 0.23 0.20Clearance Time (s) 4.0 6.4 3.0 6.4 3.0 6.7 3.0 6.7 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 515 1090 284 980 339 415 269 396 279v/s Ratio Prot c0.05 c0.24 0.02 0.23 c0.07 c0.16 0.02 0.11v/s Ratio Perm 0.08 0.13 0.04 0.02v/c Ratio 0.30 0.65 0.26 0.71 0.62 0.60 0.23 0.46 0.12Uniform Delay, d1 26.8 19.7 15.0 22.1 20.0 24.0 21.2 24.6 24.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 1.2 0.4 2.1 2.9 1.7 0.3 0.4 0.1Delay (s) 27.1 20.9 15.4 24.2 22.8 25.7 21.5 25.0 24.7Level of Service C C B C C C C C CApproach Delay (s) 22.0 23.3 24.4 24.4Approach LOS C C C C

Intersection SummaryHCM 2000 Control Delay 23.2 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.62Actuated Cycle Length (s) 74.6 Sum of lost time (s) 15.0Intersection Capacity Utilization 59.5% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 914: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 141 510 40 0 422 108 107 171 11 97 156 184Future Volume (vph) 141 510 40 0 422 108 107 171 11 97 156 184Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 1 0 1 0 0 0 1 1Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 1.00 1.00 1.00 1.00Frt 0.989 0.970 0.995 0.850Flt Protected 0.950 0.982 0.950Satd. Flow (prot) 1554 3063 0 1750 2970 0 0 1676 0 1630 1667 1417Flt Permitted 0.403 0.822 0.565Satd. Flow (perm) 657 3063 0 1750 2970 0 0 1403 0 969 1667 1417Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 13 51 3 200Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 5 3 3 5 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 7% 7% 9% 0% 9% 5% 1% 2% 11% 2% 5% 5%Adj. Flow (vph) 153 554 43 0 459 117 116 186 12 105 170 200Shared Lane Traffic (%)Lane Group Flow (vph) 153 597 0 0 576 0 0 314 0 105 170 200Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 915: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm NA Perm NA Perm NA PermProtected Phases 4 8 2 6Permitted Phases 4 8 2 6 6Detector Phase 4 4 8 8 2 2 6 6 6Switch PhaseMinimum Initial (s) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 27.1 27.1 27.1 27.1 33.1 33.1 33.1 33.1 33.1Total Split (s) 47.0 47.0 47.0 47.0 40.2 40.2 40.2 40.2 40.2Total Split (%) 53.9% 53.9% 53.9% 53.9% 46.1% 46.1% 46.1% 46.1% 46.1%Maximum Green (s) 40.9 40.9 40.9 40.9 34.1 34.1 34.1 34.1 34.1Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 13.0 17.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 22.2 22.2 22.2 20.0 20.0 20.0 17.6Actuated g/C Ratio 0.43 0.43 0.43 0.39 0.39 0.39 0.34v/c Ratio 0.54 0.45 0.44 0.57 0.28 0.26 0.32Control Delay 20.1 11.4 10.6 18.7 15.3 13.8 4.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 20.1 11.4 10.6 18.7 15.3 13.8 4.4LOS C B B B B B AApproach Delay 13.2 10.6 18.7 10.2Approach LOS B B B B

Intersection SummaryArea Type: OtherCycle Length: 87.2Actuated Cycle Length: 51.2Natural Cycle: 65Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.57Intersection Signal Delay: 12.6 Intersection LOS: BIntersection Capacity Utilization 64.5% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 916: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBL EBT WBT NBT SBL SBT SBRLane Group Flow (vph) 153 597 576 314 105 170 200v/c Ratio 0.54 0.45 0.44 0.57 0.28 0.26 0.32Control Delay 20.1 11.4 10.6 18.7 15.3 13.8 4.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 20.1 11.4 10.6 18.7 15.3 13.8 4.4Queue Length 50th (m) 8.9 17.0 15.0 19.7 5.8 9.4 0.0Queue Length 95th (m) 34.3 43.4 39.5 64.9 23.6 32.7 13.0Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 50.0 25.0Base Capacity (vph) 549 2564 2492 1073 741 1275 1090Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.28 0.23 0.23 0.29 0.14 0.13 0.18

Intersection Summary

Page 917: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 141 510 40 0 422 108 107 171 11 97 156 184Future Volume (vph) 141 510 40 0 422 108 107 171 11 97 156 184Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.99 0.97 0.99 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.98 0.95 1.00 1.00Satd. Flow (prot) 1551 3065 2970 1675 1629 1667 1417Flt Permitted 0.40 1.00 1.00 0.82 0.57 1.00 1.00Satd. Flow (perm) 658 3065 2970 1403 969 1667 1417Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 153 554 43 0 459 117 116 186 12 105 170 200RTOR Reduction (vph) 0 7 0 0 28 0 0 2 0 0 0 129Lane Group Flow (vph) 153 590 0 0 548 0 0 312 0 105 170 71Confl. Peds. (#/hr) 5 3 3 5 1 1Heavy Vehicles (%) 7% 7% 9% 0% 9% 5% 1% 2% 11% 2% 5% 5%Turn Type Perm NA Perm NA Perm NA Perm NA PermProtected Phases 4 8 2 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 19.8 19.8 19.8 17.6 17.6 17.6 17.6Effective Green, g (s) 21.9 21.9 21.9 19.7 19.7 19.7 17.6Actuated g/C Ratio 0.44 0.44 0.44 0.40 0.40 0.40 0.35Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 290 1353 1311 557 384 662 502v/s Ratio Prot 0.19 0.18 0.10v/s Ratio Perm c0.23 c0.22 0.11 0.05v/c Ratio 0.53 0.44 0.42 0.56 0.27 0.26 0.14Uniform Delay, d1 10.1 9.6 9.5 11.6 10.1 10.0 10.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.7 0.2 0.2 1.3 0.4 0.2 0.1Delay (s) 11.8 9.8 9.7 12.9 10.5 10.2 11.0Level of Service B A A B B B BApproach Delay (s) 10.2 9.7 12.9 10.6Approach LOS B A B B

Intersection SummaryHCM 2000 Control Delay 10.6 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.54Actuated Cycle Length (s) 49.6 Sum of lost time (s) 8.0Intersection Capacity Utilization 64.5% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 918: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 54 399 165 93 316 75 163 148 92 64 141 50Future Volume (vph) 54 399 165 93 316 75 163 148 92 64 141 50Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 80.0 0.0 80.0 0.0 80.0 0.0 80.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95Frt 0.956 0.971 0.943 0.961Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3116 0 1630 3165 0 1630 3074 0 1630 3133 0Flt Permitted 0.472 0.290 0.567 0.591Satd. Flow (perm) 810 3116 0 498 3165 0 973 3074 0 1014 3133 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 90 42 100 54Link Speed (k/h) 50 50 50 50Link Distance (m) 136.7 140.7 102.5 124.2Travel Time (s) 9.8 10.1 7.4 8.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 59 434 179 101 343 82 177 161 100 70 153 54Shared Lane Traffic (%)Lane Group Flow (vph) 59 613 0 101 425 0 177 261 0 70 207 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6

Page 919: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 7 4 3 8 5 2 1 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 9.5 24.3 9.5 24.3 9.5 24.3 9.5 24.3Total Split (s) 9.5 24.3 10.0 24.8 10.0 26.1 9.6 25.7Total Split (%) 13.6% 34.7% 14.3% 35.4% 14.3% 37.3% 13.7% 36.7%Maximum Green (s) 6.5 18.0 7.0 18.5 7.0 19.8 6.6 19.4Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1All-Red Time (s) 0.0 2.2 0.0 2.2 0.0 2.2 0.0 2.2Lost Time Adjust (s) 1.0 -2.3 1.0 -2.3 1.0 -2.3 1.0 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 21.9 16.6 22.7 17.1 17.2 11.2 15.9 10.6Actuated g/C Ratio 0.40 0.30 0.41 0.31 0.31 0.20 0.29 0.19v/c Ratio 0.15 0.61 0.31 0.42 0.47 0.37 0.20 0.32Control Delay 9.1 16.9 11.1 15.0 18.2 14.0 13.9 16.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.1 16.9 11.1 15.0 18.2 14.0 13.9 16.2LOS A B B B B B B BApproach Delay 16.2 14.2 15.7 15.6Approach LOS B B B B

Intersection SummaryArea Type: OtherCycle Length: 70Actuated Cycle Length: 55Natural Cycle: 70Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.61Intersection Signal Delay: 15.5 Intersection LOS: BIntersection Capacity Utilization 52.4% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 108: Stanley Ave & Marine Land Pkway (RR 49)

Page 920: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT WBL WBT NBL NBT SBL SBTLane Group Flow (vph) 59 613 101 425 177 261 70 207v/c Ratio 0.15 0.61 0.31 0.42 0.47 0.37 0.20 0.32Control Delay 9.1 16.9 11.1 15.0 18.2 14.0 13.9 16.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.1 16.9 11.1 15.0 18.2 14.0 13.9 16.2Queue Length 50th (m) 3.1 23.9 5.4 16.3 12.7 7.6 4.7 7.3Queue Length 95th (m) 8.7 41.2 13.3 28.8 27.5 17.4 12.6 16.1Internal Link Dist (m) 112.7 116.7 78.5 100.2Turn Bay Length (m) 80.0 80.0 80.0 80.0Base Capacity (vph) 409 1219 334 1236 377 1308 362 1283Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.14 0.50 0.30 0.34 0.47 0.20 0.19 0.16

Intersection Summary

Page 921: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 54 399 165 93 316 75 163 148 92 64 141 50Future Volume (vph) 54 399 165 93 316 75 163 148 92 64 141 50Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.95 1.00 0.95Frt 1.00 0.96 1.00 0.97 1.00 0.94 1.00 0.96Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1630 3117 1630 3165 1630 3072 1630 3132Flt Permitted 0.47 1.00 0.29 1.00 0.57 1.00 0.59 1.00Satd. Flow (perm) 810 3117 497 3165 973 3072 1013 3132Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 59 434 179 101 343 82 177 161 100 70 153 54RTOR Reduction (vph) 0 63 0 0 29 0 0 80 0 0 44 0Lane Group Flow (vph) 59 550 0 101 396 0 177 181 0 70 163 0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Actuated Green, G (s) 20.5 14.3 21.5 14.8 15.9 8.9 14.5 8.2Effective Green, g (s) 18.5 16.6 19.5 17.1 13.9 11.2 12.5 10.5Actuated g/C Ratio 0.34 0.30 0.36 0.31 0.25 0.20 0.23 0.19Clearance Time (s) 3.0 6.3 3.0 6.3 3.0 6.3 3.0 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 351 944 294 987 318 627 290 600v/s Ratio Prot 0.02 c0.18 c0.04 0.13 c0.06 0.06 0.02 0.05v/s Ratio Perm 0.04 0.09 c0.08 0.03v/c Ratio 0.17 0.58 0.34 0.40 0.56 0.29 0.24 0.27Uniform Delay, d1 12.5 16.2 12.4 14.8 17.1 18.4 17.1 18.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.9 0.7 0.3 2.1 0.3 0.4 0.2Delay (s) 12.7 17.1 13.1 15.1 19.2 18.7 17.5 19.1Level of Service B B B B B B B BApproach Delay (s) 16.7 14.7 18.9 18.7Approach LOS B B B B

Intersection SummaryHCM 2000 Control Delay 17.0 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.50Actuated Cycle Length (s) 54.8 Sum of lost time (s) 16.0Intersection Capacity Utilization 52.4% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 922: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 196 4 331 0 0 214Future Volume (vph) 196 4 331 0 0 214Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.997Flt Protected 0.953Satd. Flow (prot) 3162 0 3260 0 0 3260Flt Permitted 0.953Satd. Flow (perm) 3162 0 3260 0 0 3260Right Turn on Red Yes YesSatd. Flow (RTOR) 4Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 213 4 360 0 0 233Shared Lane Traffic (%)Lane Group Flow (vph) 217 0 360 0 0 233Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch PhaseMinimum Initial (s) 8.0 8.0 8.0

Page 923: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group WBL WBR NBT NBR SBL SBTMinimum Split (s) 24.2 22.5 22.5Total Split (s) 28.2 22.5 22.5Total Split (%) 55.6% 44.4% 44.4%Maximum Green (s) 23.0 17.0 17.0Yellow Time (s) 3.2 3.5 3.5All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -1.2 -1.5 -1.5Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 9.2 9.8 9.8Actuated g/C Ratio 0.34 0.36 0.36v/c Ratio 0.20 0.31 0.20Control Delay 6.8 6.9 6.4Queue Delay 0.0 0.0 0.0Total Delay 6.8 6.9 6.4LOS A A AApproach Delay 6.8 6.9 6.4Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50.7Actuated Cycle Length: 27Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.31Intersection Signal Delay: 6.7 Intersection LOS: AIntersection Capacity Utilization 23.3% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 924: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group WBL NBT SBTLane Group Flow (vph) 217 360 233v/c Ratio 0.20 0.31 0.20Control Delay 6.8 6.9 6.4Queue Delay 0.0 0.0 0.0Total Delay 6.8 6.9 6.4Queue Length 50th (m) 3.0 5.3 3.2Queue Length 95th (m) 6.7 9.4 6.3Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2837 2235 2235Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.08 0.16 0.10

Intersection Summary

Page 925: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 32

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 196 4 331 0 0 214Future Volume (vph) 196 4 331 0 0 214Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 1.00 1.00 1.00Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 3164 3260 3260Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 3164 3260 3260Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 213 4 360 0 0 233RTOR Reduction (vph) 3 0 0 0 0 0Lane Group Flow (vph) 214 0 360 0 0 233Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.0 8.3 8.3Effective Green, g (s) 9.2 9.8 9.8Actuated g/C Ratio 0.34 0.36 0.36Clearance Time (s) 5.2 5.5 5.5Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1078 1183 1183v/s Ratio Prot c0.07 c0.11v/s Ratio Perm 0.07v/c Ratio 0.20 0.30 0.20Uniform Delay, d1 6.3 6.2 5.9Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.0 0.1 0.0Delay (s) 6.3 6.2 5.9Level of Service A A AApproach Delay (s) 6.3 6.2 5.9Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.2 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.27Actuated Cycle Length (s) 27.0 Sum of lost time (s) 9.5Intersection Capacity Utilization 23.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 926: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 90 0 0 109 266 127Future Volume (vph) 90 0 0 109 266 127Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Ped Bike Factor 0.99Frt 0.952Flt Protected 0.950Satd. Flow (prot) 1614 0 0 2969 2992 0Flt Permitted 0.950Satd. Flow (perm) 1614 0 0 2969 2992 0Right Turn on Red Yes YesSatd. Flow (RTOR) 138Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 12% 7% 1%Adj. Flow (vph) 98 0 0 118 289 138Shared Lane Traffic (%)Lane Group Flow (vph) 98 0 0 118 427 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2

Page 927: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group EBL EBR NBL NBT SBT SBRDetector Phase 4 2 2 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 31.3 42.0 42.0 42.0Total Split (%) 42.7% 57.3% 57.3% 57.3%Maximum Green (s) 25.0 35.0 35.0 35.0Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.9 2.9 2.9Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 10.4 13.0 13.0Actuated g/C Ratio 0.33 0.41 0.41v/c Ratio 0.18 0.10 0.32Control Delay 8.5 5.9 4.9Queue Delay 0.0 0.0 0.0Total Delay 8.5 5.9 4.9LOS A A AApproach Delay 8.5 5.9 4.9Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 73.3Actuated Cycle Length: 31.4Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.32Intersection Signal Delay: 5.6 Intersection LOS: AIntersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 928: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group EBL NBT SBTLane Group Flow (vph) 98 118 427v/c Ratio 0.18 0.10 0.32Control Delay 8.5 5.9 4.9Queue Delay 0.0 0.0 0.0Total Delay 8.5 5.9 4.9Queue Length 50th (m) 3.5 1.7 4.6Queue Length 95th (m) 8.9 4.2 9.7Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1568 2969 2992Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.06 0.04 0.14

Intersection Summary

Page 929: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 36

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 90 0 0 109 266 127Future Volume (vph) 90 0 0 109 266 127Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95Frpb, ped/bikes 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 1.00 0.95Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1614 2969 2991Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 1614 2969 2991Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 98 0 0 118 289 138RTOR Reduction (vph) 0 0 0 0 81 0Lane Group Flow (vph) 98 0 0 118 346 0Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 3% 0% 0% 12% 7% 1%Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 8.1 10.0 10.0Effective Green, g (s) 10.4 13.0 13.0Actuated g/C Ratio 0.33 0.41 0.41Clearance Time (s) 6.3 7.0 7.0Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 534 1229 1238v/s Ratio Prot c0.06 0.04 c0.12v/s Ratio Permv/c Ratio 0.18 0.10 0.28Uniform Delay, d1 7.5 5.6 6.1Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.1Delay (s) 7.6 5.6 6.2Level of Service A A AApproach Delay (s) 7.6 5.6 6.2Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.3 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.24Actuated Cycle Length (s) 31.4 Sum of lost time (s) 8.0Intersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 930: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Future Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1667 0 1750 1716 1488 0 1750 0 2041 1488 0Flt Permitted 0.466 0.950Satd. Flow (perm) 816 1667 0 1750 1716 1488 0 1750 0 2041 1488 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 126 884Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 5% 0% 0% 2% 0% 0% 0% 0% 58% 0% 0%Adj. Flow (vph) 25 105 0 0 132 23 0 0 0 13 0 2Shared Lane Traffic (%)Lane Group Flow (vph) 25 105 0 0 132 23 0 0 0 13 2 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 931: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 12.5 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 18.0 52.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (%) 13.9% 40.5% 26.6% 26.6% 26.6% 29.7% 29.7% 29.7% 29.7%Maximum Green (s) 15.0 45.0 27.0 27.0 27.0 31.0 31.0 31.0 31.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.5 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.53 0.53 0.29 0.29 0.29 0.29v/c Ratio 0.04 0.12 0.26 0.04 0.02 0.00Control Delay 5.3 5.8 14.2 0.1 11.8 0.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.3 5.8 14.2 0.1 11.8 0.0LOS A A B A B AApproach Delay 5.7 12.1 10.2Approach LOS A B B

Intersection SummaryArea Type: OtherCycle Length: 129.5Actuated Cycle Length: 46Natural Cycle: 125Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.26Intersection Signal Delay: 9.3 Intersection LOS: AIntersection Capacity Utilization 35.0% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 932: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 25 105 132 23 13 2v/c Ratio 0.04 0.12 0.26 0.04 0.02 0.00Control Delay 5.3 5.8 14.2 0.1 11.8 0.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.3 5.8 14.2 0.1 11.8 0.0Queue Length 50th (m) 0.9 3.9 8.4 0.0 0.4 0.0Queue Length 95th (m) 3.2 9.2 18.8 0.0 1.8 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 692 1667 1137 1029 1530 1337Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.04 0.06 0.12 0.02 0.01 0.00

Intersection Summary

Page 933: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Future Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1667 1716 1488 2041 1488Flt Permitted 0.47 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 815 1667 1716 1488 2041 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 25 105 0 0 132 23 0 0 0 13 0 2RTOR Reduction (vph) 0 0 0 0 0 16 0 0 0 0 1 0Lane Group Flow (vph) 25 105 0 0 132 7 0 0 0 13 1 0Heavy Vehicles (%) 0% 5% 0% 0% 2% 0% 0% 0% 0% 58% 0% 0%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 21.0 21.0 10.0 10.0 10.0 10.0Effective Green, g (s) 20.0 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.43 0.53 0.29 0.29 0.29 0.29Clearance Time (s) 3.0 7.5 7.5 7.5 7.5 7.5Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 483 887 503 436 598 436v/s Ratio Prot 0.01 c0.06 c0.08 c0.01 0.00v/s Ratio Perm 0.01 0.00v/c Ratio 0.05 0.12 0.26 0.02 0.02 0.00Uniform Delay, d1 7.6 5.4 12.4 11.5 11.6 11.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.0 0.0 0.1 0.0 0.0 0.0Delay (s) 7.7 5.4 12.6 11.5 11.6 11.5Level of Service A A B B B BApproach Delay (s) 5.8 12.4 0.0 11.6Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 9.5 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.16Actuated Cycle Length (s) 46.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 35.0% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 934: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 77 1 263 72 303 2 172 444 270 172 33Future Volume (vph) 27 77 1 263 72 303 2 172 444 270 172 33Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 0.0 0.0 100.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.999 0.879 0.850 0.976Flt Protected 0.987 0.950 0.999 0.950Satd. Flow (prot) 0 1621 0 1525 1390 0 0 1682 1430 1433 1432 0Flt Permitted 0.863 0.731 0.998 0.634Satd. Flow (perm) 0 1417 0 1174 1390 0 0 1680 1430 956 1432 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 1 329 483 16Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 342.3 226.0 941.3Travel Time (s) 19.6 24.6 16.3 67.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 8% 6% 0% 9% 5% 12% 0% 4% 4% 16% 23% 0%Adj. Flow (vph) 29 84 1 286 78 329 2 187 483 293 187 36Shared Lane Traffic (%)Lane Group Flow (vph) 0 114 0 286 407 0 0 189 483 293 223 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 935: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0Total Split (%) 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0%Maximum Green (s) 33.7 33.7 33.7 33.7 33.7 33.7 33.7 33.7 33.7Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 0.0 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 6.3 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 28.0 28.0 28.0 29.2 26.8 29.2 29.2Actuated g/C Ratio 0.43 0.43 0.43 0.44 0.41 0.44 0.44v/c Ratio 0.19 0.57 0.52 0.25 0.56 0.69 0.35Control Delay 13.8 20.8 6.1 13.7 4.4 26.3 14.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 13.8 20.8 6.1 13.7 4.4 26.3 14.0LOS B C A B A C BApproach Delay 13.8 12.2 7.0 21.0Approach LOS B B A C

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 65.7Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.69Intersection Signal Delay: 12.8 Intersection LOS: BIntersection Capacity Utilization 66.3% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 936: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 114 286 407 189 483 293 223v/c Ratio 0.19 0.57 0.52 0.25 0.56 0.69 0.35Control Delay 13.8 20.8 6.1 13.7 4.4 26.3 14.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 13.8 20.8 6.1 13.7 4.4 26.3 14.0Queue Length 50th (m) 9.6 29.5 6.5 15.2 0.0 30.1 17.2Queue Length 95th (m) 20.6 56.5 26.6 31.8 17.3 #68.3 37.0Internal Link Dist (m) 248.1 318.3 202.0 917.3Turn Bay Length (m) 50.0 100.0 50.0Base Capacity (vph) 827 685 948 980 1000 558 842Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.14 0.42 0.43 0.19 0.48 0.53 0.26

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 937: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 77 1 263 72 303 2 172 444 270 172 33Future Volume (vph) 27 77 1 263 72 303 2 172 444 270 172 33Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 6.3 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.88 1.00 0.85 1.00 0.98Flt Protected 0.99 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1621 1525 1390 1682 1430 1433 1432Flt Permitted 0.86 0.73 1.00 1.00 1.00 0.63 1.00Satd. Flow (perm) 1418 1174 1390 1679 1430 957 1432Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 29 84 1 286 78 329 2 187 483 293 187 36RTOR Reduction (vph) 0 1 0 0 188 0 0 0 284 0 9 0Lane Group Flow (vph) 0 113 0 286 219 0 0 189 199 293 214 0Heavy Vehicles (%) 8% 6% 0% 9% 5% 12% 0% 4% 4% 16% 23% 0%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 25.5 25.5 25.5 26.8 26.8 26.8 26.8Effective Green, g (s) 27.8 27.8 27.8 29.1 26.8 29.1 29.1Actuated g/C Ratio 0.43 0.43 0.43 0.45 0.41 0.45 0.45Clearance Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 607 502 595 752 590 429 642v/s Ratio Prot 0.16 0.15v/s Ratio Perm 0.08 c0.24 0.11 0.14 c0.31v/c Ratio 0.19 0.57 0.37 0.25 0.34 0.68 0.33Uniform Delay, d1 11.5 14.0 12.6 11.1 13.0 14.2 11.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 3.1 1.1 0.5 1.0 6.7 0.9Delay (s) 11.9 17.1 13.7 11.6 14.0 20.9 12.5Level of Service B B B B B C BApproach Delay (s) 11.9 15.1 13.3 17.3Approach LOS B B B B

Intersection SummaryHCM 2000 Control Delay 14.9 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.63Actuated Cycle Length (s) 64.9 Sum of lost time (s) 8.0Intersection Capacity Utilization 66.3% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 938: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 75 2 2 329 342 58Future Volume (vph) 75 2 2 329 342 58Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.997 0.980Flt Protected 0.953Satd. Flow (prot) 1438 0 0 1592 1597 0Flt Permitted 0.953Satd. Flow (perm) 1438 0 0 1592 1597 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 16% 0% 0% 10% 8% 4%Adj. Flow (vph) 82 2 2 358 372 63Shared Lane Traffic (%)Lane Group Flow (vph) 84 0 0 360 435 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 34.7% ICU Level of Service AAnalysis Period (min) 15

Page 939: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 46

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 75 2 2 329 342 58Future Volume (Veh/h) 75 2 2 329 342 58Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 82 2 2 358 372 63PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 766 404 435vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 766 404 435tC, single (s) 6.6 6.2 4.1tC, 2 stage (s)tF (s) 3.6 3.3 2.2p0 queue free % 77 100 100cM capacity (veh/h) 351 651 1135

Direction, Lane # EB 1 NB 1 SB 1Volume Total 84 360 435Volume Left 82 2 0Volume Right 2 0 63cSH 355 1135 1700Volume to Capacity 0.24 0.00 0.26Queue Length 95th (m) 7.2 0.0 0.0Control Delay (s) 18.2 0.1 0.0Lane LOS C AApproach Delay (s) 18.2 0.1 0.0Approach LOS C

Intersection SummaryAverage Delay 1.8Intersection Capacity Utilization 34.7% ICU Level of Service AAnalysis Period (min) 15

Page 940: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 16 12 41 315 267 77Future Volume (vph) 16 12 41 315 267 77Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.941 0.970Flt Protected 0.972 0.994Satd. Flow (prot) 1239 0 0 1600 1593 0Flt Permitted 0.972 0.994Satd. Flow (perm) 1239 0 0 1600 1593 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 21% 40% 14% 8% 7% 5%Adj. Flow (vph) 17 13 45 342 290 84Shared Lane Traffic (%)Lane Group Flow (vph) 30 0 0 387 374 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 54.1% ICU Level of Service AAnalysis Period (min) 15

Page 941: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 12 41 315 267 77Future Volume (Veh/h) 16 12 41 315 267 77Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 13 45 342 290 84PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 764 332 374vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 764 332 374tC, single (s) 6.6 6.6 4.2tC, 2 stage (s)tF (s) 3.7 3.7 2.3p0 queue free % 95 98 96cM capacity (veh/h) 332 631 1122

Direction, Lane # EB 1 NB 1 SB 1Volume Total 30 387 374Volume Left 17 45 0Volume Right 13 0 84cSH 418 1122 1700Volume to Capacity 0.07 0.04 0.22Queue Length 95th (m) 1.8 1.0 0.0Control Delay (s) 14.3 1.3 0.0Lane LOS B AApproach Delay (s) 14.3 1.3 0.0Approach LOS B

Intersection SummaryAverage Delay 1.2Intersection Capacity Utilization 54.1% ICU Level of Service AAnalysis Period (min) 15

Page 942: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 20 41 91 336 234 45Future Volume (vph) 20 41 91 336 234 45Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.909 0.978Flt Protected 0.984 0.989Satd. Flow (prot) 1086 0 0 1639 1520 0Flt Permitted 0.984 0.989Satd. Flow (perm) 1086 0 0 1639 1520 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 298.3 331.4Travel Time (s) 14.9 21.5 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 28% 52% 4% 6% 15% 0%Adj. Flow (vph) 22 45 99 365 254 49Shared Lane Traffic (%)Lane Group Flow (vph) 67 0 0 464 303 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 54.9% ICU Level of Service AAnalysis Period (min) 15

Page 943: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 20 41 91 336 234 45Future Volume (Veh/h) 20 41 91 336 234 45Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 22 45 99 365 254 49PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 842 278 303vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 842 278 303tC, single (s) 6.7 6.7 4.1tC, 2 stage (s)tF (s) 3.8 3.8 2.2p0 queue free % 92 93 92cM capacity (veh/h) 278 655 1247

Direction, Lane # EB 1 NB 1 SB 1Volume Total 67 464 303Volume Left 22 99 0Volume Right 45 0 49cSH 453 1247 1700Volume to Capacity 0.15 0.08 0.18Queue Length 95th (m) 4.1 2.1 0.0Control Delay (s) 14.3 2.4 0.0Lane LOS B AApproach Delay (s) 14.3 2.4 0.0Approach LOS B

Intersection SummaryAverage Delay 2.5Intersection Capacity Utilization 54.9% ICU Level of Service AAnalysis Period (min) 15

Page 944: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 139 12 226 8 21 27 286 261 15 9 98 167Future Volume (vph) 139 12 226 8 21 27 286 261 15 9 98 167Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.919 0.936 0.996 0.918Flt Protected 0.982 0.993 0.975 0.998Satd. Flow (prot) 0 1150 0 0 1627 0 0 1638 0 0 1466 0Flt Permitted 0.982 0.993 0.975 0.998Satd. Flow (perm) 0 1150 0 0 1627 0 0 1638 0 0 1466 0Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 29.6Travel Time (s) 8.5 7.8 70.5 2.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 20% 0% 50% 0% 0% 0% 0% 7% 18% 13% 25% 0%Adj. Flow (vph) 151 13 246 9 23 29 311 284 16 10 107 182Shared Lane Traffic (%)Lane Group Flow (vph) 0 410 0 0 61 0 0 611 0 0 299 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 91.1% ICU Level of Service FAnalysis Period (min) 15

Page 945: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 52

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 139 12 226 8 21 27 286 261 15 9 98 167Future Volume (Veh/h) 139 12 226 8 21 27 286 261 15 9 98 167Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 151 13 246 9 23 29 311 284 16 10 107 182PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1172 1140 198 1384 1223 292 289 300vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1172 1140 198 1384 1223 292 289 300tC, single (s) 7.3 6.5 6.7 7.1 6.5 6.2 4.1 4.2tC, 2 stage (s)tF (s) 3.7 4.0 3.8 3.5 4.0 3.3 2.2 2.3p0 queue free % 0 91 67 85 83 96 76 99cM capacity (veh/h) 106 152 735 62 136 752 1284 1201

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 410 61 611 299Volume Left 151 9 311 10Volume Right 246 29 16 182cSH 222 172 1284 1201Volume to Capacity 1.84 0.35 0.24 0.01Queue Length 95th (m) 230.5 11.9 7.6 0.2Control Delay (s) 434.0 36.9 5.7 0.3Lane LOS F E A AApproach Delay (s) 434.0 36.9 5.7 0.3Approach LOS F E

Intersection SummaryAverage Delay 133.1Intersection Capacity Utilization 91.1% ICU Level of Service FAnalysis Period (min) 15

Page 946: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 62 59 83 269 343 67Future Volume (vph) 62 59 83 269 343 67Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.934 0.850Flt Protected 0.975 0.950Satd. Flow (prot) 1413 0 1299 1683 1683 1162Flt Permitted 0.975 0.950Satd. Flow (perm) 1413 0 1299 1683 1683 1162Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 25% 0% 28% 4% 4% 28%Adj. Flow (vph) 67 64 90 292 373 73Shared Lane Traffic (%)Lane Group Flow (vph) 131 0 90 292 373 73Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 42.2% ICU Level of Service AAnalysis Period (min) 15

Page 947: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 62 59 83 269 343 67Future Volume (Veh/h) 62 59 83 269 343 67Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 67 64 90 292 373 73PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 845 373 446vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 845 373 446tC, single (s) 6.6 6.2 4.4tC, 2 stage (s)tF (s) 3.7 3.3 2.5p0 queue free % 76 91 91cM capacity (veh/h) 277 678 989

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 131 90 292 373 73Volume Left 67 90 0 0 0Volume Right 64 0 0 0 73cSH 389 989 1700 1700 1700Volume to Capacity 0.34 0.09 0.17 0.22 0.04Queue Length 95th (m) 11.7 2.4 0.0 0.0 0.0Control Delay (s) 18.9 9.0 0.0 0.0 0.0Lane LOS C AApproach Delay (s) 18.9 2.1 0.0Approach LOS C

Intersection SummaryAverage Delay 3.4Intersection Capacity Utilization 42.2% ICU Level of Service AAnalysis Period (min) 15

Page 948: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 307 178 174 329 232 169Future Volume (vph) 307 178 174 329 232 169Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1488 1636 1488 1511 1699Flt Permitted 0.950 0.471Satd. Flow (perm) 1662 1488 1636 1488 749 1699Right Turn on Red Yes YesSatd. Flow (RTOR) 193 358Link Speed (k/h) 50 50 50Link Distance (m) 91.0 92.1 176.4Travel Time (s) 6.6 6.6 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 7% 0% 10% 3%Adj. Flow (vph) 334 193 189 358 252 184Shared Lane Traffic (%)Lane Group Flow (vph) 334 193 189 358 252 184Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 1 2 1 1 2Detector Template Left Right Thru Right Left ThruLeading Detector (m) 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot Perm NA Perm pm+pt NAProtected Phases 8 2 1 6

Page 949: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 56

Lane Group WBL WBR NBT NBR SBL SBTPermitted Phases 8 2 6Detector Phase 8 8 2 2 1 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 24.3 24.3 24.3 24.3 11.3 24.3Total Split (s) 28.0 28.0 26.0 26.0 16.0 42.0Total Split (%) 40.0% 40.0% 37.1% 37.1% 22.9% 60.0%Maximum Green (s) 21.7 21.7 19.7 19.7 9.7 35.7Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 18.2 18.2 14.5 14.5 30.1 30.1Actuated g/C Ratio 0.32 0.32 0.26 0.26 0.53 0.53v/c Ratio 0.62 0.32 0.45 0.55 0.46 0.20Control Delay 22.9 4.5 22.5 6.2 11.1 8.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 22.9 4.5 22.5 6.2 11.1 8.4LOS C A C A B AApproach Delay 16.1 11.8 10.0Approach LOS B B A

Intersection SummaryArea Type: OtherCycle Length: 70Actuated Cycle Length: 56.6Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.62Intersection Signal Delay: 12.8 Intersection LOS: BIntersection Capacity Utilization 52.4% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 208: Montrose Rd (RR 98) & Oakwood Dr

Page 950: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group WBL WBR NBT NBR SBL SBTLane Group Flow (vph) 334 193 189 358 252 184v/c Ratio 0.62 0.32 0.45 0.55 0.46 0.20Control Delay 22.9 4.5 22.5 6.2 11.1 8.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 22.9 4.5 22.5 6.2 11.1 8.4Queue Length 50th (m) 30.0 0.0 17.4 0.0 13.9 9.5Queue Length 95th (m) 61.8 12.3 36.8 17.5 31.0 22.0Internal Link Dist (m) 67.0 68.1 152.4Turn Bay Length (m) 50.0 50.0Base Capacity (vph) 725 757 654 809 564 1173Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.46 0.25 0.29 0.44 0.45 0.16

Intersection Summary

Page 951: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 58

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 307 178 174 329 232 169Future Volume (vph) 307 178 174 329 232 169Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 0.85 1.00 1.00Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1488 1636 1488 1511 1699Flt Permitted 0.95 1.00 1.00 1.00 0.47 1.00Satd. Flow (perm) 1662 1488 1636 1488 749 1699Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 334 193 189 358 252 184RTOR Reduction (vph) 0 131 0 265 0 0Lane Group Flow (vph) 334 62 189 93 252 184Heavy Vehicles (%) 0% 0% 7% 0% 10% 3%Turn Type Prot Perm NA Perm pm+pt NAProtected Phases 8 2 1 6Permitted Phases 8 2 6Actuated Green, G (s) 15.9 15.9 12.3 12.3 27.8 27.8Effective Green, g (s) 18.2 18.2 14.6 14.6 30.1 30.1Actuated g/C Ratio 0.32 0.32 0.26 0.26 0.53 0.53Clearance Time (s) 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 537 481 424 385 556 908v/s Ratio Prot c0.20 0.12 c0.09 0.11v/s Ratio Perm 0.04 0.06 c0.15v/c Ratio 0.62 0.13 0.45 0.24 0.45 0.20Uniform Delay, d1 16.1 13.5 17.5 16.5 7.6 6.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 2.2 0.1 0.7 0.3 0.6 0.1Delay (s) 18.4 13.6 18.2 16.8 8.2 6.9Level of Service B B B B A AApproach Delay (s) 16.6 17.3 7.7Approach LOS B B A

Intersection SummaryHCM 2000 Control Delay 14.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.56Actuated Cycle Length (s) 56.3 Sum of lost time (s) 12.0Intersection Capacity Utilization 52.4% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 952: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 59

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 603 339 0 205 299Future Volume (vph) 0 603 339 0 205 299Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3079 3079 0 1646 1488Flt Permitted 0.950Satd. Flow (perm) 0 3079 3079 0 1646 1488Link Speed (k/h) 50 50 50Link Distance (m) 83.6 136.5 174.5Travel Time (s) 6.0 9.8 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 8% 8% 0% 1% 0%Adj. Flow (vph) 0 655 368 0 223 325Shared Lane Traffic (%)Lane Group Flow (vph) 0 655 368 0 223 325Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 37.1% ICU Level of Service AAnalysis Period (min) 15

Page 953: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 60

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 0 603 339 0 205 299Future Volume (Veh/h) 0 603 339 0 205 299Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 655 368 0 223 325PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 5Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 368 696 184vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 368 696 184tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 41 61cM capacity (veh/h) 1202 378 833

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1Volume Total 328 328 184 184 548Volume Left 0 0 0 0 223Volume Right 0 0 0 0 325cSH 1700 1700 1700 1700 929Volume to Capacity 0.19 0.19 0.11 0.11 0.59Queue Length 95th (m) 0.0 0.0 0.0 0.0 31.8Control Delay (s) 0.0 0.0 0.0 0.0 18.3Lane LOS CApproach Delay (s) 0.0 0.0 18.3Approach LOS C

Intersection SummaryAverage Delay 6.4Intersection Capacity Utilization 37.1% ICU Level of Service AAnalysis Period (min) 15

Page 954: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 61

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 645 0 0 484 161 279Future Volume (vph) 645 0 0 484 161 279Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3023 0 0 3228 1471 1352Flt Permitted 0.950Satd. Flow (perm) 3023 0 0 3228 1471 1352Link Speed (k/h) 50 50 50Link Distance (m) 98.0 97.7 169.0Travel Time (s) 7.1 7.0 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 0% 0% 3% 13% 10%Adj. Flow (vph) 701 0 0 526 175 303Shared Lane Traffic (%)Lane Group Flow (vph) 701 0 0 526 175 303Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 44.8% ICU Level of Service AAnalysis Period (min) 15

Page 955: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 62

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (veh/h) 645 0 0 484 161 279Future Volume (Veh/h) 645 0 0 484 161 279Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 701 0 0 526 175 303PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 6Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 701 964 350vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 701 964 350tC, single (s) 4.1 7.1 7.1tC, 2 stage (s)tF (s) 2.2 3.6 3.4p0 queue free % 100 25 51cM capacity (veh/h) 905 234 623

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1Volume Total 350 350 263 263 478Volume Left 0 0 0 0 175Volume Right 0 0 0 0 303cSH 1700 1700 1700 1700 640Volume to Capacity 0.21 0.21 0.15 0.15 0.75Queue Length 95th (m) 0.0 0.0 0.0 0.0 53.4Control Delay (s) 0.0 0.0 0.0 0.0 30.4Lane LOS DApproach Delay (s) 0.0 0.0 30.4Approach LOS D

Intersection SummaryAverage Delay 8.5Intersection Capacity Utilization 44.8% ICU Level of Service AAnalysis Period (min) 15

Page 956: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 63

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 381 109 190 182 199 134Future Volume (vph) 381 109 190 182 199 134Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.934 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1525 1667 1565 0 1498 1162Flt Permitted 0.950 0.950Satd. Flow (perm) 1525 1667 1565 0 1498 1162Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 5% 2% 7% 11% 28%Adj. Flow (vph) 414 118 207 198 216 146Shared Lane Traffic (%)Lane Group Flow (vph) 414 118 405 0 216 146Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 67.8% ICU Level of Service CAnalysis Period (min) 15

Page 957: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 64

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 381 109 190 182 199 134Future Volume (vph) 381 109 190 182 199 134Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 414 118 207 198 216 146

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total (vph) 414 118 405 216 146Volume Left (vph) 414 0 0 216 0Volume Right (vph) 0 0 198 0 146Hadj (s) 0.65 0.09 -0.22 0.69 -0.22Departure Headway (s) 7.1 6.5 6.2 7.8 6.9Degree Utilization, x 0.82 0.21 0.70 0.47 0.28Capacity (veh/h) 500 537 562 432 492Control Delay (s) 33.2 10.1 22.2 16.4 11.4Approach Delay (s) 28.1 22.2 14.4Approach LOS D C B

Intersection SummaryDelay 22.4Level of Service CIntersection Capacity Utilization 67.8% ICU Level of Service CAnalysis Period (min) 15

Page 958: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 65

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 49 492 367 62 16 43Future Volume (vph) 49 492 367 62 16 43Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 50.0 50.0 0.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1458 3228 3228 1488 1583 1305Flt Permitted 0.950 0.950Satd. Flow (perm) 1458 3228 3228 1488 1583 1305Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 14% 3% 3% 0% 5% 14%Adj. Flow (vph) 53 535 399 67 17 47Shared Lane Traffic (%)Lane Group Flow (vph) 53 535 399 67 17 47Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 27.7% ICU Level of Service AAnalysis Period (min) 15

Page 959: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 66

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 49 492 367 62 16 43Future Volume (Veh/h) 49 492 367 62 16 43Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 53 535 399 67 17 47PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 399 772 200vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 399 772 200tC, single (s) 4.4 6.9 7.2tC, 2 stage (s)tF (s) 2.3 3.5 3.4p0 queue free % 95 95 94cM capacity (veh/h) 1075 313 772

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 SB 1 SB 2Volume Total 53 268 268 200 200 67 17 47Volume Left 53 0 0 0 0 0 17 0Volume Right 0 0 0 0 0 67 0 47cSH 1075 1700 1700 1700 1700 1700 313 772Volume to Capacity 0.05 0.16 0.16 0.12 0.12 0.04 0.05 0.06Queue Length 95th (m) 1.2 0.0 0.0 0.0 0.0 0.0 1.4 1.6Control Delay (s) 8.5 0.0 0.0 0.0 0.0 0.0 17.1 10.0Lane LOS A C AApproach Delay (s) 0.8 0.0 11.9Approach LOS B

Intersection SummaryAverage Delay 1.1Intersection Capacity Utilization 27.7% ICU Level of Service AAnalysis Period (min) 15

Page 960: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan213: Oakwood Dr & Thundering Water Access Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 67

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 120 441 362 0 0 123Future Volume (vph) 120 441 362 0 0 123Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 25.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 1630 3260 3260 0 1716 1458Flt Permitted 0.950Satd. Flow (perm) 1630 3260 3260 0 1716 1458Link Speed (k/h) 50 50 50Link Distance (m) 58.6 188.3 93.8Travel Time (s) 4.2 13.6 6.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 130 479 393 0 0 134Shared Lane Traffic (%)Lane Group Flow (vph) 130 479 393 0 0 134Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 25.8% ICU Level of Service AAnalysis Period (min) 15

Page 961: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan213: Oakwood Dr & Thundering Water Access Rail Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 68

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 120 441 362 0 0 123Future Volume (Veh/h) 120 441 362 0 0 123Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 130 479 393 0 0 134PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 150pX, platoon unblockedvC, conflicting volume 393 892 196vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 393 892 196tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 89 100 83cM capacity (veh/h) 1162 250 812

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 SB 1 SB 2Volume Total 130 240 240 262 131 0 134Volume Left 130 0 0 0 0 0 0Volume Right 0 0 0 0 0 0 134cSH 1162 1700 1700 1700 1700 1700 812Volume to Capacity 0.11 0.14 0.14 0.15 0.08 0.00 0.17Queue Length 95th (m) 3.0 0.0 0.0 0.0 0.0 0.0 4.7Control Delay (s) 8.5 0.0 0.0 0.0 0.0 0.0 10.3Lane LOS A A BApproach Delay (s) 1.8 0.0 10.3Approach LOS B

Intersection SummaryAverage Delay 2.2Intersection Capacity Utilization 25.8% ICU Level of Service AAnalysis Period (min) 15

Page 962: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 90 784 106 104 890 366 126 172 330 338 173 90Future Volume (vph) 90 784 106 104 890 366 126 172 330 338 173 90Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 1 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95Ped Bike Factor 1.00 0.98 1.00 0.98 0.99 1.00Frt 0.850 0.850 0.850 0.949Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1539 3228 1488 1568 3228 1473 1662 1651 1430 1646 3071 0Flt Permitted 0.285 0.137 0.571 0.610Satd. Flow (perm) 461 3228 1462 226 3228 1447 999 1651 1411 1056 3071 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 76 398 288 94Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 7 6 6 7 2 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 8% 3% 0% 6% 3% 1% 0% 6% 4% 1% 0% 8%Adj. Flow (vph) 98 852 115 113 967 398 137 187 359 367 188 98Shared Lane Traffic (%)Lane Group Flow (vph) 98 852 115 113 967 398 137 187 359 367 286 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 1 2Detector Template Left Thru Right Left Thru Right Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 963: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Detector Phase 4 4 4 3 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.4 39.4 39.4 12.5 51.9 51.9 38.1 38.1 38.1 38.1 38.1Total Split (%) 43.8% 43.8% 43.8% 13.9% 57.7% 57.7% 42.3% 42.3% 42.3% 42.3% 42.3%Maximum Green (s) 33.1 33.1 33.1 9.5 45.6 45.6 31.8 31.8 31.8 31.8 31.8Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 0.0 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 28.5 28.5 28.5 39.5 39.5 37.2 32.8 32.8 32.8 32.8 32.8Actuated g/C Ratio 0.35 0.35 0.35 0.49 0.49 0.46 0.41 0.41 0.41 0.41 0.41v/c Ratio 0.60 0.75 0.20 0.50 0.61 0.45 0.34 0.28 0.48 0.85 0.22Control Delay 39.5 27.6 8.6 19.0 16.7 3.1 21.2 18.9 7.1 44.6 11.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 39.5 27.6 8.6 19.0 16.7 3.1 21.2 18.9 7.1 44.6 11.7LOS D C A B B A C B A D BApproach Delay 26.6 13.2 13.1 30.2Approach LOS C B B C

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 80.5Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.85Intersection Signal Delay: 19.7 Intersection LOS: BIntersection Capacity Utilization 79.7% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 964: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBTLane Group Flow (vph) 98 852 115 113 967 398 137 187 359 367 286v/c Ratio 0.60 0.75 0.20 0.50 0.61 0.45 0.34 0.28 0.48 0.85 0.22Control Delay 39.5 27.6 8.6 19.0 16.7 3.1 21.2 18.9 7.1 44.6 11.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 39.5 27.6 8.6 19.0 16.7 3.1 21.2 18.9 7.1 44.6 11.7Queue Length 50th (m) 13.1 64.1 4.2 9.8 58.4 0.0 15.0 19.8 7.0 52.9 10.1Queue Length 95th (m) 32.2 87.2 15.2 18.6 76.7 14.0 33.7 40.0 30.5 #118.2 21.0Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 205 1440 694 254 1949 1001 429 709 770 454 1373Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.48 0.59 0.17 0.44 0.50 0.40 0.32 0.26 0.47 0.81 0.21

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 965: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 90 784 106 104 890 366 126 172 330 338 173 90Future Volume (vph) 90 784 106 104 890 366 126 172 330 338 173 90Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 0.98 1.00 1.00 0.99 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.95Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1537 3228 1463 1568 3228 1448 1662 1651 1411 1644 3070Flt Permitted 0.28 1.00 1.00 0.14 1.00 1.00 0.57 1.00 1.00 0.61 1.00Satd. Flow (perm) 461 3228 1463 226 3228 1448 999 1651 1411 1056 3070Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 98 852 115 113 967 398 137 187 359 367 188 98RTOR Reduction (vph) 0 0 49 0 0 214 0 0 170 0 56 0Lane Group Flow (vph) 98 852 66 113 967 184 137 187 189 367 230 0Confl. Peds. (#/hr) 7 6 6 7 2 2Heavy Vehicles (%) 8% 3% 0% 6% 3% 1% 0% 6% 4% 1% 0% 8%Turn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Actuated Green, G (s) 26.2 26.2 26.2 37.2 37.2 37.2 30.5 30.5 30.5 30.5 30.5Effective Green, g (s) 28.5 28.5 28.5 36.2 39.5 37.2 32.8 32.8 32.8 32.8 32.8Actuated g/C Ratio 0.35 0.35 0.35 0.45 0.49 0.46 0.41 0.41 0.41 0.41 0.41Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 163 1145 519 218 1587 670 408 674 576 431 1253v/s Ratio Prot c0.26 0.04 c0.30 0.11 0.08v/s Ratio Perm 0.21 0.05 0.19 0.13 0.14 0.13 c0.35v/c Ratio 0.60 0.74 0.13 0.52 0.61 0.28 0.34 0.28 0.33 0.85 0.18Uniform Delay, d1 21.2 22.7 17.5 15.4 14.8 13.3 16.3 15.8 16.2 21.5 15.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 5.2 2.5 0.1 1.6 0.6 0.2 0.4 0.2 0.2 14.7 0.1Delay (s) 26.4 25.2 17.6 16.9 15.4 13.4 16.6 16.0 16.5 36.3 15.2Level of Service C C B B B B B B B D BApproach Delay (s) 24.5 15.0 16.4 27.1Approach LOS C B B C

Intersection SummaryHCM 2000 Control Delay 19.9 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.79Actuated Cycle Length (s) 80.3 Sum of lost time (s) 12.0Intersection Capacity Utilization 79.7% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 966: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1407 45 94 1051 0 0 0 0 508 152 297Future Volume (vph) 0 1407 45 94 1051 0 0 0 0 508 152 297Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 50.0 0.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 0 1 1 0 0 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 0.98 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950 0.973Satd. Flow (prot) 0 4684 1488 1630 4684 0 0 0 0 1504 1489 1444Flt Permitted 0.120 0.950 0.973Satd. Flow (perm) 0 4684 1462 206 4684 0 0 0 0 1501 1488 1444Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 76 76Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 17.0 64.2 88.8Travel Time (s) 9.7 1.2 4.6 6.4Confl. Peds. (#/hr) 6 6 2 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 2% 2% 0% 0% 0% 0% 5% 13% 3%Adj. Flow (vph) 0 1529 49 102 1142 0 0 0 0 552 165 323Shared Lane Traffic (%) 36%Lane Group Flow (vph) 0 1529 49 102 1142 0 0 0 0 353 364 323Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 1 2 1 2 1Detector Template Thru Right Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0

Page 967: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Detector Phase 4 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 36.3 12.5 36.3 36.3 36.3 36.3Total Split (s) 39.0 39.0 13.6 52.6 37.4 37.4 37.4Total Split (%) 43.3% 43.3% 15.1% 58.4% 41.6% 41.6% 41.6%Maximum Green (s) 32.7 32.7 10.6 46.3 31.1 31.1 31.1Yellow Time (s) 4.1 4.1 3.0 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 0.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 32.6 30.3 44.5 44.5 26.8 26.8 26.8Actuated g/C Ratio 0.41 0.38 0.56 0.56 0.34 0.34 0.34v/c Ratio 0.80 0.08 0.40 0.44 0.70 0.73 0.60Control Delay 25.2 2.5 14.4 11.5 31.4 32.8 21.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 25.2 2.5 14.4 11.5 31.4 32.8 21.9LOS C A B B C C CApproach Delay 24.5 11.7 28.9Approach LOS C B C

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 79.5Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.80Intersection Signal Delay: 21.6 Intersection LOS: CIntersection Capacity Utilization 72.5% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 968: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT EBR WBL WBT SBL SBT SBRLane Group Flow (vph) 1529 49 102 1142 353 364 323v/c Ratio 0.80 0.08 0.40 0.44 0.70 0.73 0.60Control Delay 25.2 2.5 14.4 11.5 31.4 32.8 21.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 25.2 2.5 14.4 11.5 31.4 32.8 21.9Queue Length 50th (m) 77.2 0.0 7.5 37.8 51.8 54.1 32.6Queue Length 95th (m) 110.6 4.0 16.5 54.3 86.9 90.7 61.7Internal Link Dist (m) 110.1 0.1 64.8Turn Bay Length (m) 50.0Base Capacity (vph) 2102 657 290 2919 643 637 661Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.73 0.07 0.35 0.39 0.55 0.57 0.49

Intersection Summary

Page 969: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1407 45 94 1051 0 0 0 0 508 152 297Future Volume (vph) 0 1407 45 94 1051 0 0 0 0 508 152 297Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 1.00 1.00 0.91 0.95 0.95 1.00Frpb, ped/bikes 1.00 0.98 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 0.97 1.00Satd. Flow (prot) 4684 1463 1630 4684 1502 1488 1444Flt Permitted 1.00 1.00 0.12 1.00 0.95 0.97 1.00Satd. Flow (perm) 4684 1463 205 4684 1502 1488 1444Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 1529 49 102 1142 0 0 0 0 552 165 323RTOR Reduction (vph) 0 0 30 0 0 0 0 0 0 0 0 50Lane Group Flow (vph) 0 1529 19 102 1142 0 0 0 0 353 364 273Confl. Peds. (#/hr) 6 6 2 2Heavy Vehicles (%) 0% 2% 0% 2% 2% 0% 0% 0% 0% 5% 13% 3%Turn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Actuated Green, G (s) 30.4 30.4 42.2 42.2 24.5 24.5 24.5Effective Green, g (s) 32.7 30.4 41.2 44.5 26.8 26.8 26.8Actuated g/C Ratio 0.41 0.38 0.52 0.56 0.34 0.34 0.34Clearance Time (s) 6.3 6.3 3.0 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1931 560 246 2628 507 502 488v/s Ratio Prot c0.33 0.04 c0.24v/s Ratio Perm 0.01 0.17 0.24 0.24 0.19v/c Ratio 0.79 0.03 0.41 0.43 0.70 0.73 0.56Uniform Delay, d1 20.3 15.3 13.2 10.1 22.7 23.0 21.4Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 2.3 0.0 1.1 0.1 4.1 5.2 1.4Delay (s) 22.6 15.3 14.3 10.2 26.9 28.2 22.8Level of Service C B B B C C CApproach Delay (s) 22.4 10.6 0.0 26.1Approach LOS C B A C

Intersection SummaryHCM 2000 Control Delay 19.6 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.73Actuated Cycle Length (s) 79.3 Sum of lost time (s) 12.0Intersection Capacity Utilization 72.5% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 970: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1440 0 0 1068 89 148Future Volume (vph) 1440 0 0 1068 89 148Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.91 1.00 1.00 0.91 0.97 1.00Ped Bike Factor 0.99Frt 0.850Flt Protected 0.950Satd. Flow (prot) 4638 0 0 4684 3101 1430Flt Permitted 0.950Satd. Flow (perm) 4638 0 0 4684 3101 1410Right Turn on Red Yes YesSatd. Flow (RTOR) 18Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Confl. Peds. (#/hr) 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 2% 4% 4%Adj. Flow (vph) 1565 0 0 1161 97 161Shared Lane Traffic (%)Lane Group Flow (vph) 1565 0 0 1161 97 161Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2

Page 971: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRDetector Phase 4 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.0 35.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7%Maximum Green (s) 28.7 28.7 18.7 18.7Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 25.6 25.6 14.1 14.1Actuated g/C Ratio 0.54 0.54 0.29 0.29v/c Ratio 0.63 0.46 0.11 0.38Control Delay 9.2 7.6 13.9 16.2Queue Delay 0.0 0.0 0.0 0.0Total Delay 9.2 7.6 13.9 16.2LOS A A B BApproach Delay 9.2 7.6 15.3Approach LOS A A B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 47.8Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.63Intersection Signal Delay: 9.1 Intersection LOS: AIntersection Capacity Utilization 47.2% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 972: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 1565 1161 97 161v/c Ratio 0.63 0.46 0.11 0.38Control Delay 9.2 7.6 13.9 16.2Queue Delay 0.0 0.0 0.0 0.0Total Delay 9.2 7.6 13.9 16.2Queue Length 50th (m) 28.3 18.4 3.1 9.9Queue Length 95th (m) 51.7 34.3 8.2 25.3Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 3060 3091 1386 640Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.51 0.38 0.07 0.25

Intersection Summary

Page 973: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1440 0 0 1068 89 148Future Volume (vph) 1440 0 0 1068 89 148Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 0.91 0.97 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 4638 4684 3101 1409Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 4638 4684 3101 1409Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1565 0 0 1161 97 161RTOR Reduction (vph) 0 0 0 0 0 13Lane Group Flow (vph) 1565 0 0 1161 97 148Confl. Peds. (#/hr) 3Heavy Vehicles (%) 3% 0% 0% 2% 4% 4%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 23.3 23.3 11.7 11.7Effective Green, g (s) 25.6 25.6 14.0 14.0Actuated g/C Ratio 0.54 0.54 0.29 0.29Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 2494 2519 912 414v/s Ratio Prot c0.34 0.25 0.03v/s Ratio Perm c0.11v/c Ratio 0.63 0.46 0.11 0.36Uniform Delay, d1 7.7 6.8 12.2 13.3Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.5 0.1 0.1 0.5Delay (s) 8.2 6.9 12.3 13.8Level of Service A A B BApproach Delay (s) 8.2 6.9 13.2Approach LOS A A B

Intersection SummaryHCM 2000 Control Delay 8.1 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.53Actuated Cycle Length (s) 47.6 Sum of lost time (s) 8.0Intersection Capacity Utilization 47.2% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 974: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 36 1114 437 292 1313 15 421 26 218 21 14 96Future Volume (vph) 36 1114 437 292 1313 15 421 26 218 21 14 96Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 15.0 25.0Storage Lanes 1 1 2 0 2 1 1 0Taper Length (m) 40.0 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 0.97 1.00 1.00 0.99 0.99 1.00 0.98Frt 0.850 0.998 0.850 0.869Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1568 3197 1444 3162 3217 0 3162 1606 1458 1662 1417 0Flt Permitted 0.118 0.950 0.950 0.739Satd. Flow (perm) 195 3197 1405 3147 3217 0 3137 1606 1439 1292 1417 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 428 1 235 14Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 5 14 14 5 7 1 1 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 4% 3% 2% 3% 15% 2% 9% 2% 0% 8% 5%Adj. Flow (vph) 39 1211 475 317 1427 16 458 28 237 23 15 104Shared Lane Traffic (%)Lane Group Flow (vph) 39 1211 475 317 1443 0 458 28 237 23 119 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 975: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 9.5 32.0 32.0 32.0 32.0Total Split (s) 40.0 40.0 40.0 13.0 53.0 17.0 52.0 52.0 35.0 35.0Total Split (%) 38.1% 38.1% 38.1% 12.4% 50.5% 16.2% 49.5% 49.5% 33.3% 33.3%Maximum Green (s) 32.0 32.0 32.0 8.5 45.0 12.5 44.0 44.0 27.0 27.0Yellow Time (s) 4.5 4.5 4.5 3.5 4.5 3.5 4.5 4.5 4.5 4.5All-Red Time (s) 3.5 3.5 3.5 1.0 3.5 1.0 3.5 3.5 3.5 3.5Lost Time Adjust (s) -4.0 -4.0 -4.0 -0.5 -4.0 -0.5 -4.0 -4.0 -4.0 -4.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 36.1 36.1 36.1 9.0 49.1 13.0 32.9 32.9 15.9 15.9Actuated g/C Ratio 0.40 0.40 0.40 0.10 0.55 0.14 0.37 0.37 0.18 0.18v/c Ratio 0.50 0.95 0.58 1.00 0.82 1.00 0.05 0.35 0.10 0.46Control Delay 48.7 42.7 6.5 94.2 22.6 83.3 18.3 4.3 31.5 34.8Queue Delay 0.0 13.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 48.7 56.5 6.5 94.2 22.6 83.3 18.3 4.3 31.5 34.8LOS D E A F C F B A C CApproach Delay 42.5 35.5 54.9 34.3Approach LOS D D D C

Intersection SummaryArea Type: OtherCycle Length: 105Actuated Cycle Length: 90Natural Cycle: 120Control Type: Semi Act-UncoordMaximum v/c Ratio: 1.00Intersection Signal Delay: 41.5 Intersection LOS: DIntersection Capacity Utilization 78.0% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 976: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 39 1211 475 317 1443 458 28 237 23 119v/c Ratio 0.50 0.95 0.58 1.00 0.82 1.00 0.05 0.35 0.10 0.46Control Delay 48.7 42.7 6.5 94.2 22.6 83.3 18.3 4.3 31.5 34.8Queue Delay 0.0 13.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 48.7 56.5 6.5 94.2 22.6 83.3 18.3 4.3 31.5 34.8Queue Length 50th (m) 5.1 108.4 5.1 30.0 105.6 43.2 3.3 0.3 3.6 17.2Queue Length 95th (m) #22.4 #171.6 32.0 #62.3 158.4 #81.9 8.7 14.7 10.2 33.8Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 50.0 50.0 15.0Base Capacity (vph) 78 1280 819 316 1755 457 858 878 445 497Starvation Cap Reductn 0 93 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.50 1.02 0.58 1.00 0.82 1.00 0.03 0.27 0.05 0.24

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 977: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 36 1114 437 292 1313 15 421 26 218 21 14 96Future Volume (vph) 36 1114 437 292 1313 15 421 26 218 21 14 96Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.97 1.00 1.00 1.00 1.00 0.99 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 1.00 1.00 0.85 1.00 0.87Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1567 3197 1408 3162 3218 3162 1606 1439 1661 1418Flt Permitted 0.12 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.74 1.00Satd. Flow (perm) 195 3197 1408 3162 3218 3162 1606 1439 1292 1418Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 39 1211 475 317 1427 16 458 28 237 23 15 104RTOR Reduction (vph) 0 0 256 0 0 0 0 0 149 0 12 0Lane Group Flow (vph) 39 1211 219 317 1443 0 458 28 88 23 107 0Confl. Peds. (#/hr) 5 14 14 5 7 1 1 7Heavy Vehicles (%) 6% 4% 3% 2% 3% 15% 2% 9% 2% 0% 8% 5%Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Actuated Green, G (s) 32.1 32.1 32.1 8.5 45.1 12.5 28.9 28.9 11.9 11.9Effective Green, g (s) 36.1 36.1 36.1 9.0 49.1 13.0 32.9 32.9 15.9 15.9Actuated g/C Ratio 0.40 0.40 0.40 0.10 0.55 0.14 0.37 0.37 0.18 0.18Clearance Time (s) 8.0 8.0 8.0 4.5 8.0 4.5 8.0 8.0 8.0 8.0Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 78 1282 564 316 1755 456 587 526 228 250v/s Ratio Prot c0.38 c0.10 0.45 c0.14 0.02 c0.08v/s Ratio Perm 0.20 0.16 0.06 0.02v/c Ratio 0.50 0.94 0.39 1.00 0.82 1.00 0.05 0.17 0.10 0.43Uniform Delay, d1 20.2 26.0 19.1 40.5 16.8 38.5 18.4 19.3 31.1 33.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 3.6 13.9 0.3 51.4 3.2 43.2 0.0 0.1 0.1 0.9Delay (s) 23.8 39.9 19.4 91.9 20.0 81.7 18.5 19.4 31.2 33.9Level of Service C D B F C F B B C CApproach Delay (s) 33.9 33.0 58.9 33.4Approach LOS C C E C

Intersection SummaryHCM 2000 Control Delay 37.7 HCM 2000 Level of Service DHCM 2000 Volume to Capacity ratio 0.85Actuated Cycle Length (s) 90.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 78.0% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 978: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 326 865 185 49 931 81 351 262 68 117 246 339Future Volume (vph) 326 865 185 49 931 81 351 262 68 117 246 339Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 50.0Storage Lanes 2 0 1 0 1 0 1 0Taper Length (m) 50.0 50.0 50.0 50.0Lane Util. Factor 0.97 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 0.99 1.00 1.00 1.00 1.00Frt 0.974 0.988 0.969 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 3193 3134 0 1630 3186 0 1568 1680 0 1646 1733 1473Flt Permitted 0.950 0.129 0.264 0.287Satd. Flow (perm) 3155 3134 0 221 3186 0 436 1680 0 496 1733 1473Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 27 9 13 249Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 24 11 11 24 3 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 2% 5% 2% 3% 0% 6% 0% 3% 1% 1% 1%Adj. Flow (vph) 354 940 201 53 1012 88 382 285 74 127 267 368Shared Lane Traffic (%)Lane Group Flow (vph) 354 1141 0 53 1100 0 382 359 0 127 267 368Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 979: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Detector Phase 7 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 9.5 30.4 9.5 30.4 9.5 37.7 9.5 37.7 37.7Total Split (s) 18.0 47.4 9.6 39.0 15.0 42.1 10.9 38.0 38.0Total Split (%) 16.4% 43.1% 8.7% 35.5% 13.6% 38.3% 9.9% 34.5% 34.5%Maximum Green (s) 14.0 41.0 6.6 32.6 12.0 35.4 7.9 31.3 31.3Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1 4.1All-Red Time (s) 1.0 2.3 0.0 2.3 0.0 2.6 0.0 2.6 2.6Lost Time Adjust (s) 0.0 -2.4 1.0 -2.4 1.0 -2.7 1.0 -2.7 -2.7Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 13.6 43.7 40.3 35.2 38.6 27.9 30.2 23.5 23.5Actuated g/C Ratio 0.14 0.44 0.41 0.35 0.39 0.28 0.30 0.24 0.24v/c Ratio 0.81 0.82 0.33 0.97 1.29 0.75 0.56 0.65 0.68Control Delay 58.5 31.2 19.9 53.8 181.9 41.5 30.8 41.9 17.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 58.5 31.2 19.9 53.8 181.9 41.5 30.8 41.9 17.9LOS E C B D F D C D BApproach Delay 37.6 52.2 113.9 28.5Approach LOS D D F C

Intersection SummaryArea Type: OtherCycle Length: 110Actuated Cycle Length: 99.4Natural Cycle: 130Control Type: Semi Act-UncoordMaximum v/c Ratio: 1.29Intersection Signal Delay: 53.6 Intersection LOS: DIntersection Capacity Utilization 89.5% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 980: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 354 1141 53 1100 382 359 127 267 368v/c Ratio 0.81 0.82 0.33 0.97 1.29 0.75 0.56 0.65 0.68Control Delay 58.5 31.2 19.9 53.8 181.9 41.5 30.8 41.9 17.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 58.5 31.2 19.9 53.8 181.9 41.5 30.8 41.9 17.9Queue Length 50th (m) 36.2 102.0 4.9 113.7 ~73.1 64.3 16.9 49.1 20.2Queue Length 95th (m) #66.7 #168.4 13.4 #189.1 #158.9 96.4 29.4 75.4 52.4Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0 50.0Base Capacity (vph) 451 1396 170 1133 295 654 232 595 669Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.78 0.82 0.31 0.97 1.29 0.55 0.55 0.45 0.55

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 981: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 326 865 185 49 931 81 351 262 68 117 246 339Future Volume (vph) 326 865 185 49 931 81 351 262 68 117 246 339Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.97 1.00 0.99 1.00 0.97 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 3193 3134 1629 3186 1568 1680 1645 1733 1473Flt Permitted 0.95 1.00 0.13 1.00 0.26 1.00 0.29 1.00 1.00Satd. Flow (perm) 3193 3134 220 3186 436 1680 497 1733 1473Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 354 940 201 53 1012 88 382 285 74 127 267 368RTOR Reduction (vph) 0 15 0 0 6 0 0 9 0 0 0 190Lane Group Flow (vph) 354 1126 0 53 1094 0 382 350 0 127 267 178Confl. Peds. (#/hr) 24 11 11 24 3 3Heavy Vehicles (%) 1% 2% 5% 2% 3% 0% 6% 0% 3% 1% 1% 1%Turn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Actuated Green, G (s) 13.6 41.3 38.9 32.8 35.9 25.2 28.5 20.8 20.8Effective Green, g (s) 13.6 43.7 36.9 35.2 34.9 27.9 26.5 23.5 23.5Actuated g/C Ratio 0.14 0.44 0.37 0.35 0.35 0.28 0.27 0.24 0.24Clearance Time (s) 4.0 6.4 3.0 6.4 3.0 6.7 3.0 6.7 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 436 1377 153 1128 279 471 209 409 348v/s Ratio Prot c0.11 0.36 0.02 c0.34 c0.15 0.21 0.04 0.15v/s Ratio Perm 0.11 c0.33 0.12 0.12v/c Ratio 0.81 0.82 0.35 0.97 1.37 0.74 0.61 0.65 0.51Uniform Delay, d1 41.7 24.4 21.7 31.6 29.3 32.5 29.5 34.3 33.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 10.7 3.7 1.0 19.8 187.3 5.6 4.2 3.0 0.7Delay (s) 52.4 28.1 22.7 51.4 216.6 38.1 33.7 37.3 33.7Level of Service D C C D F D C D CApproach Delay (s) 33.8 50.1 130.2 34.9Approach LOS C D F C

Intersection SummaryHCM 2000 Control Delay 55.7 HCM 2000 Level of Service EHCM 2000 Volume to Capacity ratio 1.10Actuated Cycle Length (s) 99.4 Sum of lost time (s) 16.0Intersection Capacity Utilization 89.5% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group

Page 982: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 226 716 108 9 700 198 96 258 13 147 250 265Future Volume (vph) 226 716 108 9 700 198 96 258 13 147 250 265Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 1 0 1 0 0 0 1 1Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 1.00 1.00 0.99 1.00 0.99Frt 0.980 0.967 0.995 0.850Flt Protected 0.950 0.950 0.987 0.950Satd. Flow (prot) 1599 3158 0 1662 3115 0 0 1707 0 1662 1733 1458Flt Permitted 0.156 0.318 0.769 0.440Satd. Flow (perm) 262 3158 0 554 3115 0 0 1330 0 765 1733 1458Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 31 50 3 288Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 16 7 7 16 17 17Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 4% 3% 1% 0% 3% 1% 1% 0% 9% 0% 1% 2%Adj. Flow (vph) 246 778 117 10 761 215 104 280 14 160 272 288Shared Lane Traffic (%)Lane Group Flow (vph) 246 895 0 10 976 0 0 398 0 160 272 288Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 983: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Detector Phase 7 4 8 8 2 2 6 6 6Switch PhaseMinimum Initial (s) 5.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 9.5 27.1 27.1 27.1 33.1 33.1 33.1 33.1 33.1Total Split (s) 14.0 41.1 27.1 27.1 33.9 33.9 33.9 33.9 33.9Total Split (%) 18.7% 54.8% 36.1% 36.1% 45.2% 45.2% 45.2% 45.2% 45.2%Maximum Green (s) 9.5 35.0 21.0 21.0 27.8 27.8 27.8 27.8 27.8Yellow Time (s) 3.5 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 1.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -0.5 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 17.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 37.3 37.3 23.2 23.2 25.1 25.1 25.1 23.0Actuated g/C Ratio 0.53 0.53 0.33 0.33 0.36 0.36 0.36 0.33v/c Ratio 0.75 0.53 0.05 0.92 0.84 0.59 0.44 0.43Control Delay 29.4 12.7 19.3 38.6 37.4 28.0 19.4 4.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 29.4 12.7 19.3 38.6 37.4 28.0 19.4 4.5LOS C B B D D C B AApproach Delay 16.3 38.4 37.4 15.4Approach LOS B D D B

Intersection SummaryArea Type: OtherCycle Length: 75Actuated Cycle Length: 70.5Natural Cycle: 80Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.92Intersection Signal Delay: 25.4 Intersection LOS: CIntersection Capacity Utilization 91.3% ICU Level of Service FAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 984: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBL EBT WBL WBT NBT SBL SBT SBRLane Group Flow (vph) 246 895 10 976 398 160 272 288v/c Ratio 0.75 0.53 0.05 0.92 0.84 0.59 0.44 0.43Control Delay 29.4 12.7 19.3 38.6 37.4 28.0 19.4 4.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 29.4 12.7 19.3 38.6 37.4 28.0 19.4 4.5Queue Length 50th (m) 19.1 41.3 1.0 68.1 48.9 17.6 28.0 0.0Queue Length 95th (m) #57.2 62.0 4.5 #114.5 #93.8 37.1 47.4 14.8Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 50.0 50.0 25.0Base Capacity (vph) 329 1685 182 1060 569 326 739 752Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.75 0.53 0.05 0.92 0.70 0.49 0.37 0.38

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 985: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 226 716 108 9 700 198 96 258 13 147 250 265Future Volume (vph) 226 716 108 9 700 198 96 258 13 147 250 265Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00Frt 1.00 0.98 1.00 0.97 1.00 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.99 0.95 1.00 1.00Satd. Flow (prot) 1598 3160 1657 3116 1708 1652 1733 1458Flt Permitted 0.16 1.00 0.32 1.00 0.77 0.44 1.00 1.00Satd. Flow (perm) 263 3160 555 3116 1330 766 1733 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 246 778 117 10 761 215 104 280 14 160 272 288RTOR Reduction (vph) 0 15 0 0 34 0 0 2 0 0 0 194Lane Group Flow (vph) 246 880 0 10 942 0 0 396 0 160 272 94Confl. Peds. (#/hr) 16 7 7 16 17 17Heavy Vehicles (%) 4% 3% 1% 0% 3% 1% 1% 0% 9% 0% 1% 2%Turn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 35.2 35.2 21.1 21.1 23.0 23.0 23.0 23.0Effective Green, g (s) 35.7 37.3 23.2 23.2 25.1 25.1 25.1 23.0Actuated g/C Ratio 0.51 0.53 0.33 0.33 0.36 0.36 0.36 0.33Clearance Time (s) 4.5 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 324 1674 182 1026 474 273 617 476v/s Ratio Prot c0.11 0.28 c0.30 0.16v/s Ratio Perm 0.28 0.02 c0.30 0.21 0.06v/c Ratio 0.76 0.53 0.05 0.92 0.84 0.59 0.44 0.20Uniform Delay, d1 13.5 10.8 16.1 22.7 20.8 18.4 17.3 17.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 9.8 0.3 0.1 12.6 12.1 3.2 0.5 0.2Delay (s) 23.3 11.1 16.2 35.3 32.8 21.6 17.8 17.3Level of Service C B B D C C B BApproach Delay (s) 13.7 35.1 32.8 18.4Approach LOS B D C B

Intersection SummaryHCM 2000 Control Delay 23.6 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.86Actuated Cycle Length (s) 70.4 Sum of lost time (s) 12.0Intersection Capacity Utilization 91.3% ICU Level of Service FAnalysis Period (min) 15c Critical Lane Group

Page 986: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 120 603 153 153 433 151 249 212 136 115 177 224Future Volume (vph) 120 603 153 153 433 151 249 212 136 115 177 224Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95Frt 0.970 0.961 0.941 0.916Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3162 0 1630 3133 0 1630 3067 0 1630 2986 0Flt Permitted 0.288 0.201 0.303 0.528Satd. Flow (perm) 494 3162 0 345 3133 0 520 3067 0 906 2986 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 40 63 148 243Link Speed (k/h) 50 50 50 50Link Distance (m) 136.7 140.7 118.2 117.4Travel Time (s) 9.8 10.1 8.5 8.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 130 655 166 166 471 164 271 230 148 125 192 243Shared Lane Traffic (%)Lane Group Flow (vph) 130 821 0 166 635 0 271 378 0 125 435 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6

Page 987: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 7 4 3 8 5 2 1 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 9.5 24.3 9.5 24.3 9.5 24.3 9.5 24.3Total Split (s) 11.1 27.8 12.0 28.7 15.6 29.4 10.8 24.6Total Split (%) 13.9% 34.8% 15.0% 35.9% 19.5% 36.8% 13.5% 30.8%Maximum Green (s) 8.1 21.5 9.0 22.4 12.6 23.1 7.8 18.3Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1All-Red Time (s) 0.0 2.2 0.0 2.2 0.0 2.2 0.0 2.2Lost Time Adjust (s) 1.0 -2.3 1.0 -2.3 1.0 -2.3 1.0 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 29.0 22.5 30.6 23.3 27.3 17.0 19.0 12.5Actuated g/C Ratio 0.42 0.32 0.44 0.34 0.39 0.24 0.27 0.18v/c Ratio 0.42 0.78 0.58 0.58 0.72 0.44 0.40 0.59Control Delay 15.4 27.6 19.9 20.3 27.8 15.0 18.7 15.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 15.4 27.6 19.9 20.3 27.8 15.0 18.7 15.1LOS B C B C C B B BApproach Delay 25.9 20.2 20.4 15.9Approach LOS C C C B

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 69.5Natural Cycle: 70Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.78Intersection Signal Delay: 21.3 Intersection LOS: CIntersection Capacity Utilization 74.0% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 108: Stanley Ave & Marine Land Pkway (RR 49)

Page 988: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT WBL WBT NBL NBT SBL SBTLane Group Flow (vph) 130 821 166 635 271 378 125 435v/c Ratio 0.42 0.78 0.58 0.58 0.72 0.44 0.40 0.59Control Delay 15.4 27.6 19.9 20.3 27.8 15.0 18.7 15.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 15.4 27.6 19.9 20.3 27.8 15.0 18.7 15.1Queue Length 50th (m) 9.5 51.6 12.4 34.1 27.3 14.1 11.4 12.8Queue Length 95th (m) 21.3 #84.5 #26.8 55.7 #49.7 25.4 22.1 25.9Internal Link Dist (m) 112.7 116.7 94.2 93.4Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 328 1123 305 1168 393 1228 324 1066Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.40 0.73 0.54 0.54 0.69 0.31 0.39 0.41

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 989: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 120 603 153 153 433 151 249 212 136 115 177 224Future Volume (vph) 120 603 153 153 433 151 249 212 136 115 177 224Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.95 1.00 0.95Frt 1.00 0.97 1.00 0.96 1.00 0.94 1.00 0.92Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1630 3161 1630 3134 1630 3068 1630 2987Flt Permitted 0.29 1.00 0.20 1.00 0.30 1.00 0.53 1.00Satd. Flow (perm) 495 3161 345 3134 520 3068 905 2987Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 130 655 166 166 471 164 271 230 148 125 192 243RTOR Reduction (vph) 0 27 0 0 42 0 0 112 0 0 199 0Lane Group Flow (vph) 130 794 0 166 593 0 271 266 0 125 236 0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Actuated Green, G (s) 27.7 20.1 29.3 20.9 25.1 14.6 17.7 10.2Effective Green, g (s) 25.7 22.4 27.3 23.2 24.1 16.9 15.7 12.5Actuated g/C Ratio 0.37 0.32 0.39 0.34 0.35 0.24 0.23 0.18Clearance Time (s) 3.0 6.3 3.0 6.3 3.0 6.3 3.0 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 292 1023 273 1050 355 749 273 539v/s Ratio Prot 0.04 c0.25 c0.06 0.19 c0.12 0.09 0.04 0.08v/s Ratio Perm 0.12 0.17 c0.15 0.06v/c Ratio 0.45 0.78 0.61 0.56 0.76 0.36 0.46 0.44Uniform Delay, d1 15.1 21.1 15.3 18.9 18.2 21.6 22.4 25.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.1 3.8 3.8 0.7 9.4 0.3 1.2 0.6Delay (s) 16.2 24.9 19.1 19.6 27.6 21.9 23.6 25.8Level of Service B C B B C C C CApproach Delay (s) 23.7 19.5 24.3 25.3Approach LOS C B C C

Intersection SummaryHCM 2000 Control Delay 23.0 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.74Actuated Cycle Length (s) 69.2 Sum of lost time (s) 16.0Intersection Capacity Utilization 74.0% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 990: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 220 70 558 0 0 383Future Volume (vph) 220 70 558 0 0 383Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.964Flt Protected 0.963Satd. Flow (prot) 3014 0 3167 0 0 3325Flt Permitted 0.963Satd. Flow (perm) 3014 0 3167 0 0 3325Right Turn on Red Yes YesSatd. Flow (RTOR) 76Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 0% 5% 0% 5% 0%Adj. Flow (vph) 239 76 607 0 0 416Shared Lane Traffic (%)Lane Group Flow (vph) 315 0 607 0 0 416Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch Phase

Page 991: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group WBL WBR NBT NBR SBL SBTMinimum Initial (s) 8.0 8.0 8.0Minimum Split (s) 25.1 22.5 22.5Total Split (s) 28.2 22.5 22.5Total Split (%) 55.6% 44.4% 44.4%Maximum Green (s) 22.1 16.4 16.4Yellow Time (s) 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 10.6 12.7 12.7Actuated g/C Ratio 0.34 0.40 0.40v/c Ratio 0.30 0.47 0.31Control Delay 7.2 8.2 6.9Queue Delay 0.0 0.0 0.0Total Delay 7.2 8.2 6.9LOS A A AApproach Delay 7.2 8.2 6.9Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50.7Actuated Cycle Length: 31.4Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.47Intersection Signal Delay: 7.5 Intersection LOS: AIntersection Capacity Utilization 32.6% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 992: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group WBL NBT SBTLane Group Flow (vph) 315 607 416v/c Ratio 0.30 0.47 0.31Control Delay 7.2 8.2 6.9Queue Delay 0.0 0.0 0.0Total Delay 7.2 8.2 6.9Queue Length 50th (m) 4.2 10.6 6.7Queue Length 95th (m) 11.8 20.4 13.4Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2447 1885 1980Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.13 0.32 0.21

Intersection Summary

Page 993: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 32

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 220 70 558 0 0 383Future Volume (vph) 220 70 558 0 0 383Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 0.96 1.00 1.00Flt Protected 0.96 1.00 1.00Satd. Flow (prot) 3015 3167 3325Flt Permitted 0.96 1.00 1.00Satd. Flow (perm) 3015 3167 3325Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 239 76 607 0 0 416RTOR Reduction (vph) 50 0 0 0 0 0Lane Group Flow (vph) 265 0 607 0 0 416Heavy Vehicles (%) 6% 0% 5% 0% 5% 0%Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.4 10.6 10.6Effective Green, g (s) 10.5 12.7 12.7Actuated g/C Ratio 0.34 0.41 0.41Clearance Time (s) 6.1 6.1 6.1Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1014 1289 1353v/s Ratio Prot c0.09 c0.19v/s Ratio Perm 0.13v/c Ratio 0.26 0.47 0.31Uniform Delay, d1 7.5 6.8 6.3Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.1 0.2 0.1Delay (s) 7.6 6.9 6.3Level of Service A A AApproach Delay (s) 7.6 6.9 6.3Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.9 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.41Actuated Cycle Length (s) 31.2 Sum of lost time (s) 10.1Intersection Capacity Utilization 32.6% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 994: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 394 5 0 271 487 257Future Volume (vph) 394 5 0 271 487 257Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Ped Bike Factor 0.99Frt 0.998 0.948Flt Protected 0.953Satd. Flow (prot) 1648 0 0 3197 3020 0Flt Permitted 0.953Satd. Flow (perm) 1648 0 0 3197 3020 0Right Turn on Red Yes YesSatd. Flow (RTOR) 1 195Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 0% 0% 4% 5% 1%Adj. Flow (vph) 428 5 0 295 529 279Shared Lane Traffic (%)Lane Group Flow (vph) 433 0 0 295 808 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2

Page 995: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group EBL EBR NBL NBT SBT SBRDetector Phase 4 2 2 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 31.3 42.0 42.0 42.0Total Split (%) 42.7% 57.3% 57.3% 57.3%Maximum Green (s) 25.0 35.0 35.0 35.0Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.9 2.9 2.9Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 18.7 19.0 19.0Actuated g/C Ratio 0.40 0.41 0.41v/c Ratio 0.65 0.22 0.59Control Delay 16.9 10.1 10.4Queue Delay 0.0 0.0 0.0Total Delay 16.9 10.1 10.4LOS B B BApproach Delay 16.9 10.1 10.4Approach LOS B B B

Intersection SummaryArea Type: OtherCycle Length: 73.3Actuated Cycle Length: 46.2Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.65Intersection Signal Delay: 12.2 Intersection LOS: BIntersection Capacity Utilization 54.3% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 996: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group EBL NBT SBTLane Group Flow (vph) 433 295 808v/c Ratio 0.65 0.22 0.59Control Delay 16.9 10.1 10.4Queue Delay 0.0 0.0 0.0Total Delay 16.9 10.1 10.4Queue Length 50th (m) 26.5 7.7 18.2Queue Length 95th (m) 64.2 18.4 42.7Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1026 2664 2549Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.42 0.11 0.32

Intersection Summary

Page 997: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 36

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 394 5 0 271 487 257Future Volume (vph) 394 5 0 271 487 257Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95Frpb, ped/bikes 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 1.00 0.95Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1649 3197 3021Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 1649 3197 3021Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 428 5 0 295 529 279RTOR Reduction (vph) 1 0 0 0 114 0Lane Group Flow (vph) 432 0 0 295 694 0Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 1% 0% 0% 4% 5% 1%Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 16.3 15.9 15.9Effective Green, g (s) 18.6 18.9 18.9Actuated g/C Ratio 0.41 0.42 0.42Clearance Time (s) 6.3 7.0 7.0Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 674 1327 1254v/s Ratio Prot c0.26 0.09 c0.23v/s Ratio Permv/c Ratio 0.64 0.22 0.55Uniform Delay, d1 10.8 8.6 10.1Progression Factor 1.00 1.00 1.00Incremental Delay, d2 1.7 0.0 0.4Delay (s) 12.5 8.6 10.4Level of Service B A BApproach Delay (s) 12.5 8.6 10.4Approach LOS B A B

Intersection SummaryHCM 2000 Control Delay 10.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.60Actuated Cycle Length (s) 45.5 Sum of lost time (s) 8.0Intersection Capacity Utilization 54.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 998: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Future Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1716 0 1750 1651 1430 0 1750 0 3014 1458 0Flt Permitted 0.472 0.950Satd. Flow (perm) 826 1716 0 1750 1651 1430 0 1750 0 3014 1458 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 126 899Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 0% 6% 4% 0% 0% 0% 7% 0% 2%Adj. Flow (vph) 57 173 0 0 118 30 0 0 0 121 0 78Shared Lane Traffic (%)Lane Group Flow (vph) 57 173 0 0 118 30 0 0 0 121 78 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 999: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 12.5 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 18.0 52.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (%) 13.9% 40.5% 26.6% 26.6% 26.6% 29.7% 29.7% 29.7% 29.7%Maximum Green (s) 15.0 45.0 27.0 27.0 27.0 31.0 31.0 31.0 31.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.5 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.53 0.53 0.29 0.29 0.29 0.29v/c Ratio 0.10 0.19 0.24 0.06 0.14 0.07Control Delay 5.7 6.3 14.0 0.2 12.5 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.7 6.3 14.0 0.2 12.5 0.1LOS A A B A B AApproach Delay 6.1 11.2 7.7Approach LOS A B A

Intersection SummaryArea Type: OtherCycle Length: 129.5Actuated Cycle Length: 46Natural Cycle: 125Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.24Intersection Signal Delay: 8.0 Intersection LOS: AIntersection Capacity Utilization 24.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 1000: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 57 173 118 30 121 78v/c Ratio 0.10 0.19 0.24 0.06 0.14 0.07Control Delay 5.7 6.3 14.0 0.2 12.5 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.7 6.3 14.0 0.2 12.5 0.1Queue Length 50th (m) 2.0 6.6 7.5 0.0 3.8 0.0Queue Length 95th (m) 5.7 14.0 17.2 0.0 8.4 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 694 1716 1094 990 2260 1318Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.08 0.10 0.11 0.03 0.05 0.06

Intersection Summary

Page 1001: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Future Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1716 1651 1430 3014 1458Flt Permitted 0.47 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 825 1716 1651 1430 3014 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 57 173 0 0 118 30 0 0 0 121 0 78RTOR Reduction (vph) 0 0 0 0 0 21 0 0 0 0 55 0Lane Group Flow (vph) 57 173 0 0 118 9 0 0 0 121 23 0Heavy Vehicles (%) 0% 2% 0% 0% 6% 4% 0% 0% 0% 7% 0% 2%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 21.0 21.0 10.0 10.0 10.0 10.0Effective Green, g (s) 20.0 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.43 0.53 0.29 0.29 0.29 0.29Clearance Time (s) 3.0 7.5 7.5 7.5 7.5 7.5Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 486 913 484 419 884 427v/s Ratio Prot 0.02 c0.10 c0.07 c0.04 0.02v/s Ratio Perm 0.03 0.01v/c Ratio 0.12 0.19 0.24 0.02 0.14 0.05Uniform Delay, d1 7.8 5.6 12.4 11.6 12.0 11.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.1 0.1 0.0 0.0 0.0Delay (s) 7.9 5.6 12.5 11.6 12.0 11.7Level of Service A A B B B BApproach Delay (s) 6.2 12.3 0.0 11.9Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 9.7 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.22Actuated Cycle Length (s) 46.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 24.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 1002: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 34 68 1 494 122 322 1 289 379 421 288 53Future Volume (vph) 34 68 1 494 122 322 1 289 379 421 288 53Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 115.0 0.0 0.0 100.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 100.0 7.5 100.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.999 0.891 0.850 0.977Flt Protected 0.984 0.950 0.950Satd. Flow (prot) 0 1594 0 1599 1447 0 0 1651 1390 1471 1674 0Flt Permitted 0.748 0.580 0.999 0.283Satd. Flow (perm) 0 1212 0 976 1447 0 0 1650 1390 438 1674 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 151 412 12Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 9% 0% 4% 7% 8% 0% 6% 7% 13% 2% 3%Adj. Flow (vph) 37 74 1 537 133 350 1 314 412 458 313 58Shared Lane Traffic (%)Lane Group Flow (vph) 0 112 0 537 483 0 0 315 412 458 371 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA pm+pt NA Perm NA Perm pm+pt NAProtected Phases 4 3 8 2 1 6

Page 1003: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 3 8 2 2 2 1 6Switch PhaseMinimum Initial (s) 10.0 10.0 5.0 10.0 10.0 10.0 10.0 5.0 10.0Minimum Split (s) 26.3 26.3 9.5 26.3 31.3 31.3 31.3 9.5 31.3Total Split (s) 26.3 26.3 25.0 51.3 32.7 32.7 32.7 26.0 58.7Total Split (%) 23.9% 23.9% 22.7% 46.6% 29.7% 29.7% 29.7% 23.6% 53.4%Maximum Green (s) 20.0 20.0 20.5 45.0 26.4 26.4 26.4 21.5 52.4Yellow Time (s) 4.1 4.1 3.5 4.1 4.1 4.1 4.1 3.5 4.1All-Red Time (s) 2.2 2.2 1.0 2.2 2.2 2.2 2.2 1.0 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 2.2 4.0 4.0 4.0 2.2 4.0Lead/Lag Lag Lag Lead Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 6.0 6.0 3.0 6.0 6.0 6.0 6.0 3.0 6.0Recall Mode Min Min None Min Min Min Min None MinWalk Time (s) 8.0 8.0 8.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0Act Effct Green (s) 18.9 45.7 43.9 27.2 27.2 55.1 53.3Actuated g/C Ratio 0.18 0.43 0.42 0.26 0.26 0.52 0.51v/c Ratio 0.52 0.96 0.70 0.74 0.62 0.99 0.43Control Delay 48.5 57.7 23.2 47.9 7.8 61.2 18.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 48.5 57.7 23.2 47.9 7.8 61.2 18.3LOS D E C D A E BApproach Delay 48.5 41.4 25.2 42.0Approach LOS D D C D

Intersection SummaryArea Type: OtherCycle Length: 110Actuated Cycle Length: 105.3Natural Cycle: 100Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.99Intersection Signal Delay: 37.5 Intersection LOS: DIntersection Capacity Utilization 88.5% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 1004: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 112 537 483 315 412 458 371v/c Ratio 0.52 0.96 0.70 0.74 0.62 0.99 0.43Control Delay 48.5 57.7 23.2 47.9 7.8 61.2 18.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 48.5 57.7 23.2 47.9 7.8 61.2 18.3Queue Length 50th (m) 22.4 98.6 59.7 63.2 0.0 68.9 48.0Queue Length 95th (m) 41.2 #187.4 100.2 #99.7 27.0 #143.3 75.4Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 115.0 100.0 50.0Base Capacity (vph) 257 559 735 451 679 463 878Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.44 0.96 0.66 0.70 0.61 0.99 0.42

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1005: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 34 68 1 494 122 322 1 289 379 421 288 53Future Volume (vph) 34 68 1 494 122 322 1 289 379 421 288 53Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 2.2 4.0 4.0 4.0 2.2 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.89 1.00 0.85 1.00 0.98Flt Protected 0.98 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1593 1599 1448 1651 1390 1471 1673Flt Permitted 0.75 0.58 1.00 1.00 1.00 0.28 1.00Satd. Flow (perm) 1212 976 1448 1650 1390 439 1673Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 37 74 1 537 133 350 1 314 412 458 313 58RTOR Reduction (vph) 0 0 0 0 88 0 0 0 306 0 6 0Lane Group Flow (vph) 0 112 0 537 395 0 0 315 106 458 365 0Heavy Vehicles (%) 6% 9% 0% 4% 7% 8% 0% 6% 7% 13% 2% 3%Turn Type Perm NA pm+pt NA Perm NA Perm pm+pt NAProtected Phases 4 3 8 2 1 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 16.6 41.7 41.7 24.9 24.9 51.0 51.0Effective Green, g (s) 18.9 44.0 44.0 27.2 27.2 53.3 53.3Actuated g/C Ratio 0.18 0.42 0.42 0.26 0.26 0.51 0.51Clearance Time (s) 6.3 4.5 6.3 6.3 6.3 4.5 6.3Vehicle Extension (s) 6.0 3.0 6.0 6.0 6.0 3.0 6.0Lane Grp Cap (vph) 217 543 605 426 359 456 846v/s Ratio Prot c0.22 c0.27 c0.23 0.22v/s Ratio Perm 0.09 0.20 c0.19 0.08 0.28v/c Ratio 0.52 0.99 0.65 0.74 0.30 1.00 0.43Uniform Delay, d1 39.1 29.2 24.5 35.8 31.4 21.5 16.4Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 5.4 35.4 4.0 9.0 1.3 43.2 1.0Delay (s) 44.5 64.6 28.6 44.8 32.7 64.8 17.4Level of Service D E C D C E BApproach Delay (s) 44.5 47.5 37.9 43.6Approach LOS D D D D

Intersection SummaryHCM 2000 Control Delay 43.6 HCM 2000 Level of Service DHCM 2000 Volume to Capacity ratio 0.86Actuated Cycle Length (s) 105.3 Sum of lost time (s) 12.4Intersection Capacity Utilization 88.5% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group

Page 1006: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 109 20 2 488 406 77Future Volume (vph) 109 20 2 488 406 77Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.979 0.978Flt Protected 0.960Satd. Flow (prot) 1520 0 0 1696 1600 0Flt Permitted 0.960Satd. Flow (perm) 1520 0 0 1696 1600 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 20% 50% 3% 6% 12%Adj. Flow (vph) 118 22 2 530 441 84Shared Lane Traffic (%)Lane Group Flow (vph) 140 0 0 532 525 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 44.2% ICU Level of Service AAnalysis Period (min) 15

Page 1007: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 46

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 109 20 2 488 406 77Future Volume (Veh/h) 109 20 2 488 406 77Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 118 22 2 530 441 84PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1017 483 525vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1017 483 525tC, single (s) 6.5 6.4 4.6tC, 2 stage (s)tF (s) 3.6 3.5 2.7p0 queue free % 54 96 100cM capacity (veh/h) 258 549 837

Direction, Lane # EB 1 NB 1 SB 1Volume Total 140 532 525Volume Left 118 2 0Volume Right 22 0 84cSH 282 837 1700Volume to Capacity 0.50 0.00 0.31Queue Length 95th (m) 20.7 0.1 0.0Control Delay (s) 29.8 0.1 0.0Lane LOS D AApproach Delay (s) 29.8 0.1 0.0Approach LOS D

Intersection SummaryAverage Delay 3.5Intersection Capacity Utilization 44.2% ICU Level of Service AAnalysis Period (min) 15

Page 1008: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 81 42 25 409 387 39Future Volume (vph) 81 42 25 409 387 39Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.954 0.988Flt Protected 0.968 0.997Satd. Flow (prot) 1518 0 0 1653 1592 0Flt Permitted 0.968 0.997Satd. Flow (perm) 1518 0 0 1653 1592 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 13% 48% 3% 8% 15%Adj. Flow (vph) 88 46 27 445 421 42Shared Lane Traffic (%)Lane Group Flow (vph) 134 0 0 472 463 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 59.9% ICU Level of Service BAnalysis Period (min) 15

Page 1009: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 81 42 25 409 387 39Future Volume (Veh/h) 81 42 25 409 387 39Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 88 46 27 445 421 42PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 941 442 463vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 941 442 463tC, single (s) 6.4 6.3 4.6tC, 2 stage (s)tF (s) 3.5 3.4 2.6p0 queue free % 69 92 97cM capacity (veh/h) 282 593 895

Direction, Lane # EB 1 NB 1 SB 1Volume Total 134 472 463Volume Left 88 27 0Volume Right 46 0 42cSH 344 895 1700Volume to Capacity 0.39 0.03 0.27Queue Length 95th (m) 14.3 0.7 0.0Control Delay (s) 22.0 0.9 0.0Lane LOS C AApproach Delay (s) 22.0 0.9 0.0Approach LOS C

Intersection SummaryAverage Delay 3.1Intersection Capacity Utilization 59.9% ICU Level of Service BAnalysis Period (min) 15

Page 1010: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 40 96 28 394 402 27Future Volume (vph) 40 96 28 394 402 27Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.904 0.992Flt Protected 0.986 0.997Satd. Flow (prot) 1406 0 0 1556 1644 0Flt Permitted 0.986 0.997Satd. Flow (perm) 1406 0 0 1556 1644 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 298.3 331.4Travel Time (s) 14.9 21.5 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 13% 42% 10% 4% 30%Adj. Flow (vph) 43 104 30 428 437 29Shared Lane Traffic (%)Lane Group Flow (vph) 147 0 0 458 466 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 63.0% ICU Level of Service BAnalysis Period (min) 15

Page 1011: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 40 96 28 394 402 27Future Volume (Veh/h) 40 96 28 394 402 27Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 43 104 30 428 437 29PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 940 452 466vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 940 452 466tC, single (s) 6.5 6.3 4.5tC, 2 stage (s)tF (s) 3.6 3.4 2.6p0 queue free % 85 82 97cM capacity (veh/h) 279 586 915

Direction, Lane # EB 1 NB 1 SB 1Volume Total 147 458 466Volume Left 43 30 0Volume Right 104 0 29cSH 443 915 1700Volume to Capacity 0.33 0.03 0.27Queue Length 95th (m) 11.5 0.8 0.0Control Delay (s) 17.1 1.0 0.0Lane LOS C AApproach Delay (s) 17.1 1.0 0.0Approach LOS C

Intersection SummaryAverage Delay 2.8Intersection Capacity Utilization 63.0% ICU Level of Service BAnalysis Period (min) 15

Page 1012: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 225 29 378 14 21 5 319 192 9 16 283 199Future Volume (vph) 225 29 378 14 21 5 319 192 9 16 283 199Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.919 0.984 0.998 0.946Flt Protected 0.983 0.983 0.970 0.998Satd. Flow (prot) 0 1467 0 0 1693 0 0 1532 0 0 1561 0Flt Permitted 0.983 0.983 0.970 0.998Satd. Flow (perm) 0 1467 0 0 1693 0 0 1532 0 0 1561 0Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 29.6Travel Time (s) 8.5 7.8 70.5 2.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 13% 0% 0% 0% 7% 17% 0% 7% 5% 7%Adj. Flow (vph) 245 32 411 15 23 5 347 209 10 17 308 216Shared Lane Traffic (%)Lane Group Flow (vph) 0 688 0 0 43 0 0 566 0 0 541 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 118.1% ICU Level of Service HAnalysis Period (min) 15

Page 1013: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 52

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 225 29 378 14 21 5 319 192 9 16 283 199Future Volume (Veh/h) 225 29 378 14 21 5 319 192 9 16 283 199Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 245 32 411 15 23 5 347 209 10 17 308 216PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1374 1363 416 1785 1466 214 524 219vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1374 1363 416 1785 1466 214 524 219tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.2 4.2 4.2tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.3 2.3 2.3p0 queue free % 0 67 33 0 73 99 66 99cM capacity (veh/h) 72 97 614 12 84 831 1018 1321

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 688 43 566 541Volume Left 245 15 347 17Volume Right 411 5 10 216cSH 156 28 1018 1321Volume to Capacity 4.41 1.56 0.34 0.01Queue Length 95th (m) Err 40.8 12.2 0.3Control Delay (s) Err 590.4 7.9 0.4Lane LOS F F A AApproach Delay (s) Err 590.4 7.9 0.4Approach LOS F F

Intersection SummaryAverage Delay 3759.2Intersection Capacity Utilization 118.1% ICU Level of Service HAnalysis Period (min) 15

Page 1014: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 46 71 77 467 521 82Future Volume (vph) 46 71 77 467 521 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.918 0.850Flt Protected 0.981 0.950Satd. Flow (prot) 1406 0 1614 1733 1716 1352Flt Permitted 0.981 0.950Satd. Flow (perm) 1406 0 1614 1733 1716 1352Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 18% 3% 1% 2% 10%Adj. Flow (vph) 50 77 84 508 566 89Shared Lane Traffic (%)Lane Group Flow (vph) 127 0 84 508 566 89Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 51.9% ICU Level of Service AAnalysis Period (min) 15

Page 1015: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 46 71 77 467 521 82Future Volume (Veh/h) 46 71 77 467 521 82Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 50 77 84 508 566 89PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1242 566 655vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1242 566 655tC, single (s) 6.4 6.4 4.1tC, 2 stage (s)tF (s) 3.5 3.5 2.2p0 queue free % 71 84 91cM capacity (veh/h) 175 495 927

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 127 84 508 566 89Volume Left 50 84 0 0 0Volume Right 77 0 0 0 89cSH 287 927 1700 1700 1700Volume to Capacity 0.44 0.09 0.30 0.33 0.05Queue Length 95th (m) 17.2 2.4 0.0 0.0 0.0Control Delay (s) 27.1 9.3 0.0 0.0 0.0Lane LOS D AApproach Delay (s) 27.1 1.3 0.0Approach LOS D

Intersection SummaryAverage Delay 3.1Intersection Capacity Utilization 51.9% ICU Level of Service AAnalysis Period (min) 15

Page 1016: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 473 306 238 407 303 290Future Volume (vph) 473 306 238 407 303 290Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1488 1716 1403 1662 1683Flt Permitted 0.950 0.353Satd. Flow (perm) 1662 1488 1716 1403 618 1683Right Turn on Red Yes YesSatd. Flow (RTOR) 333 442Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 2% 6% 0% 4%Adj. Flow (vph) 514 333 259 442 329 315Shared Lane Traffic (%)Lane Group Flow (vph) 514 333 259 442 329 315Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 1 2 1 1 2Detector Template Left Right Thru Right Left ThruLeading Detector (m) 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot Perm NA Perm pm+pt NAProtected Phases 8 2 1 6

Page 1017: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 56

Lane Group WBL WBR NBT NBR SBL SBTPermitted Phases 8 2 6Detector Phase 8 8 2 2 1 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 24.3 24.3 24.3 24.3 9.5 24.3Total Split (s) 27.0 27.0 26.0 26.0 12.0 38.0Total Split (%) 41.5% 41.5% 40.0% 40.0% 18.5% 58.5%Maximum Green (s) 20.7 20.7 19.7 19.7 9.0 31.7Yellow Time (s) 4.1 4.1 4.1 4.1 3.0 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 0.0 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 1.0 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 22.0 22.0 16.5 16.5 28.5 28.5Actuated g/C Ratio 0.38 0.38 0.28 0.28 0.49 0.49v/c Ratio 0.82 0.43 0.54 0.62 0.74 0.39Control Delay 31.5 4.1 22.4 6.3 22.8 11.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 31.5 4.1 22.4 6.3 22.8 11.2LOS C A C A C BApproach Delay 20.7 12.3 17.2Approach LOS C B B

Intersection SummaryArea Type: OtherCycle Length: 65Actuated Cycle Length: 58.6Natural Cycle: 65Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.82Intersection Signal Delay: 17.0 Intersection LOS: BIntersection Capacity Utilization 70.3% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 208: Montrose Rd (RR 98) & Oakwood Dr

Page 1018: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group WBL WBR NBT NBR SBL SBTLane Group Flow (vph) 514 333 259 442 329 315v/c Ratio 0.82 0.43 0.54 0.62 0.74 0.39Control Delay 31.5 4.1 22.4 6.3 22.8 11.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 31.5 4.1 22.4 6.3 22.8 11.2Queue Length 50th (m) 51.7 0.0 25.1 0.0 22.8 21.5Queue Length 95th (m) #113.7 15.1 44.3 17.8 #46.7 37.3Internal Link Dist (m) 67.0 190.2 152.4Turn Bay Length (m) 50.0 50.0Base Capacity (vph) 659 791 651 806 444 987Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.78 0.42 0.40 0.55 0.74 0.32

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1019: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 58

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 473 306 238 407 303 290Future Volume (vph) 473 306 238 407 303 290Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 0.85 1.00 1.00Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1488 1716 1403 1662 1683Flt Permitted 0.95 1.00 1.00 1.00 0.35 1.00Satd. Flow (perm) 1662 1488 1716 1403 618 1683Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 514 333 259 442 329 315RTOR Reduction (vph) 0 208 0 317 0 0Lane Group Flow (vph) 514 125 259 125 329 315Heavy Vehicles (%) 0% 0% 2% 6% 0% 4%Turn Type Prot Perm NA Perm pm+pt NAProtected Phases 8 2 1 6Permitted Phases 8 2 6Actuated Green, G (s) 19.7 19.7 14.2 14.2 26.2 26.2Effective Green, g (s) 22.0 22.0 16.5 16.5 25.2 28.5Actuated g/C Ratio 0.38 0.38 0.28 0.28 0.43 0.49Clearance Time (s) 6.3 6.3 6.3 6.3 3.0 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 625 559 484 395 408 819v/s Ratio Prot c0.31 0.15 c0.11 0.19v/s Ratio Perm 0.08 0.09 c0.24v/c Ratio 0.82 0.22 0.54 0.32 0.81 0.38Uniform Delay, d1 16.5 12.4 17.8 16.6 12.6 9.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 8.6 0.2 1.1 0.5 11.1 0.3Delay (s) 25.1 12.6 18.9 17.0 23.7 9.8Level of Service C B B B C AApproach Delay (s) 20.2 17.7 16.9Approach LOS C B B

Intersection SummaryHCM 2000 Control Delay 18.4 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.81Actuated Cycle Length (s) 58.5 Sum of lost time (s) 12.0Intersection Capacity Utilization 70.3% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 1020: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 59

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 623 563 0 220 375Future Volume (vph) 0 623 563 0 220 375Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3292 3228 0 1599 1390Flt Permitted 0.950Satd. Flow (perm) 0 3292 3228 0 1599 1390Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 3% 0% 4% 7%Adj. Flow (vph) 0 677 612 0 239 408Shared Lane Traffic (%)Lane Group Flow (vph) 0 677 612 0 239 408Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 48.8% ICU Level of Service AAnalysis Period (min) 15

Page 1021: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 60

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 0 623 563 0 220 375Future Volume (Veh/h) 0 623 563 0 220 375Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 677 612 0 239 408PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 5Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 612 950 306vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 612 950 306tC, single (s) 4.1 6.9 7.0tC, 2 stage (s)tF (s) 2.2 3.5 3.4p0 queue free % 100 6 40cM capacity (veh/h) 977 254 675

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1Volume Total 338 338 306 306 647Volume Left 0 0 0 0 239Volume Right 0 0 0 0 408cSH 1700 1700 1700 1700 612Volume to Capacity 0.20 0.20 0.18 0.18 1.06Queue Length 95th (m) 0.0 0.0 0.0 0.0 143.4Control Delay (s) 0.0 0.0 0.0 0.0 78.3Lane LOS FApproach Delay (s) 0.0 0.0 78.3Approach LOS F

Intersection SummaryAverage Delay 26.2Intersection Capacity Utilization 48.8% ICU Level of Service AAnalysis Period (min) 15

Page 1022: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 61

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 554 0 0 623 212 438Future Volume (vph) 554 0 0 623 212 438Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3260 0 0 3228 1568 1473Flt Permitted 0.950Satd. Flow (perm) 3260 0 0 3228 1568 1473Link Speed (k/h) 50 50 50Link Distance (m) 104.2 91.9 169.0Travel Time (s) 7.5 6.6 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 3% 6% 1%Adj. Flow (vph) 602 0 0 677 230 476Shared Lane Traffic (%)Lane Group Flow (vph) 602 0 0 677 230 476Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 52.7% ICU Level of Service AAnalysis Period (min) 15

Page 1023: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 62

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (veh/h) 554 0 0 623 212 438Future Volume (Veh/h) 554 0 0 623 212 438Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 602 0 0 677 230 476PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 6Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 602 940 301vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 602 940 301tC, single (s) 4.1 6.9 6.9tC, 2 stage (s)tF (s) 2.2 3.6 3.3p0 queue free % 100 10 32cM capacity (veh/h) 985 255 698

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1Volume Total 301 301 338 338 706Volume Left 0 0 0 0 230Volume Right 0 0 0 0 476cSH 1700 1700 1700 1700 782Volume to Capacity 0.18 0.18 0.20 0.20 0.90Queue Length 95th (m) 0.0 0.0 0.0 0.0 97.6Control Delay (s) 0.0 0.0 0.0 0.0 38.6Lane LOS EApproach Delay (s) 0.0 0.0 38.6Approach LOS E

Intersection SummaryAverage Delay 13.7Intersection Capacity Utilization 52.7% ICU Level of Service AAnalysis Period (min) 15

Page 1024: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 63

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 304 244 172 216 265 409Future Volume (vph) 304 244 172 216 265 409Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.925 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1549 1598 0 1614 1403Flt Permitted 0.950 0.950Satd. Flow (perm) 1662 1549 1598 0 1614 1403Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 13% 3% 0% 3% 6%Adj. Flow (vph) 330 265 187 235 288 445Shared Lane Traffic (%)Lane Group Flow (vph) 330 265 422 0 288 445Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 68.4% ICU Level of Service CAnalysis Period (min) 15

Page 1025: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 64

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 304 244 172 216 265 409Future Volume (vph) 304 244 172 216 265 409Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 330 265 187 235 288 445

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total (vph) 330 265 422 288 445Volume Left (vph) 330 0 0 288 0Volume Right (vph) 0 0 235 0 445Hadj (s) 0.50 0.22 -0.31 0.55 -0.60Departure Headway (s) 8.0 7.7 6.9 8.0 6.8Degree Utilization, x 0.73 0.57 0.81 0.64 0.84Capacity (veh/h) 438 451 511 439 522Control Delay (s) 28.8 19.2 32.8 22.7 34.8Approach Delay (s) 24.5 32.8 30.0Approach LOS C D D

Intersection SummaryDelay 28.8Level of Service DIntersection Capacity Utilization 68.4% ICU Level of Service CAnalysis Period (min) 15

Page 1026: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 65

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 23 832 602 107 120 32Future Volume (vph) 23 832 602 107 120 32Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 50.0 50.0 0.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 3292 3228 1458 1614 1430Flt Permitted 0.950 0.950Satd. Flow (perm) 1662 3292 3228 1458 1614 1430Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 3% 2% 3% 4%Adj. Flow (vph) 25 904 654 116 130 35Shared Lane Traffic (%)Lane Group Flow (vph) 25 904 654 116 130 35Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 38.9% ICU Level of Service AAnalysis Period (min) 15

Page 1027: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 66

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 23 832 602 107 120 32Future Volume (Veh/h) 23 832 602 107 120 32Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 25 904 654 116 130 35PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 654 1156 327vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 654 1156 327tC, single (s) 4.1 6.9 7.0tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 97 29 95cM capacity (veh/h) 943 183 663

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 SB 1 SB 2Volume Total 25 452 452 327 327 116 130 35Volume Left 25 0 0 0 0 0 130 0Volume Right 0 0 0 0 0 116 0 35cSH 943 1700 1700 1700 1700 1700 183 663Volume to Capacity 0.03 0.27 0.27 0.19 0.19 0.07 0.71 0.05Queue Length 95th (m) 0.7 0.0 0.0 0.0 0.0 0.0 35.2 1.3Control Delay (s) 8.9 0.0 0.0 0.0 0.0 0.0 61.9 10.7Lane LOS A F BApproach Delay (s) 0.2 0.0 51.0Approach LOS F

Intersection SummaryAverage Delay 4.6Intersection Capacity Utilization 38.9% ICU Level of Service AAnalysis Period (min) 15

Page 1028: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan213: Oakwood Dr & TW Access Rd Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 67

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 211 499 599 0 0 180Future Volume (vph) 211 499 599 0 0 180Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 1630 3260 3260 0 1716 1458Flt Permitted 0.950Satd. Flow (perm) 1630 3260 3260 0 1716 1458Link Speed (k/h) 50 50 50Link Distance (m) 59.7 218.9 83.6Travel Time (s) 4.3 15.8 6.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 229 542 651 0 0 196Shared Lane Traffic (%)Lane Group Flow (vph) 229 542 651 0 0 196Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 37.3% ICU Level of Service AAnalysis Period (min) 15

Page 1029: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan213: Oakwood Dr & TW Access Rd Rail Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 68

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 211 499 599 0 0 180Future Volume (Veh/h) 211 499 599 0 0 180Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 229 542 651 0 0 196PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 151pX, platoon unblockedvC, conflicting volume 651 1380 326vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 651 1380 326tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 75 100 71cM capacity (veh/h) 931 102 670

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 SB 1 SB 2Volume Total 229 271 271 434 217 0 196Volume Left 229 0 0 0 0 0 0Volume Right 0 0 0 0 0 0 196cSH 931 1700 1700 1700 1700 1700 670Volume to Capacity 0.25 0.16 0.16 0.26 0.13 0.00 0.29Queue Length 95th (m) 7.7 0.0 0.0 0.0 0.0 0.0 9.7Control Delay (s) 10.1 0.0 0.0 0.0 0.0 0.0 12.6Lane LOS B A BApproach Delay (s) 3.0 0.0 12.6Approach LOS B

Intersection SummaryAverage Delay 3.0Intersection Capacity Utilization 37.3% ICU Level of Service AAnalysis Period (min) 15

Page 1030: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 100 840 118 109 655 316 131 137 224 315 195 68Future Volume (vph) 100 840 118 109 655 316 131 137 224 315 195 68Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 1 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95Ped Bike Factor 1.00 0.98 1.00 0.97 1.00 0.98 1.00 1.00Frt 0.850 0.850 0.850 0.961Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1554 3260 1488 1646 3228 1458 1630 1750 1403 1646 3024 0Flt Permitted 0.381 0.134 0.569 0.654Satd. Flow (perm) 622 3260 1464 232 3228 1419 975 1750 1380 1129 3024 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 76 343 243 62Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 5 5 5 5 2 5 5 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 7% 2% 0% 1% 3% 2% 2% 0% 6% 1% 4% 9%Adj. Flow (vph) 109 913 128 118 712 343 142 149 243 342 212 74Shared Lane Traffic (%)Lane Group Flow (vph) 109 913 128 118 712 343 142 149 243 342 286 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 1 2Detector Template Left Thru Right Left Thru Right Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 1031: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Detector Phase 4 4 4 3 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.4 39.4 39.4 12.5 51.9 51.9 38.1 38.1 38.1 38.1 38.1Total Split (%) 43.8% 43.8% 43.8% 13.9% 57.7% 57.7% 42.3% 42.3% 42.3% 42.3% 42.3%Maximum Green (s) 33.1 33.1 33.1 9.5 45.6 45.6 31.8 31.8 31.8 31.8 31.8Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 0.0 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 29.1 29.1 29.1 40.2 40.2 37.8 29.2 29.2 29.2 29.2 29.2Actuated g/C Ratio 0.37 0.37 0.37 0.52 0.52 0.49 0.38 0.38 0.38 0.38 0.38v/c Ratio 0.47 0.75 0.21 0.48 0.43 0.40 0.39 0.23 0.36 0.81 0.24Control Delay 28.0 26.1 9.5 17.3 13.0 2.9 23.1 19.0 4.4 40.0 14.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 28.0 26.1 9.5 17.3 13.0 2.9 23.1 19.0 4.4 40.0 14.3LOS C C A B B A C B A D BApproach Delay 24.5 10.5 13.5 28.3Approach LOS C B B C

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 77.7Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.81Intersection Signal Delay: 18.8 Intersection LOS: BIntersection Capacity Utilization 75.4% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 1032: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBTLane Group Flow (vph) 109 913 128 118 712 343 142 149 243 342 286v/c Ratio 0.47 0.75 0.21 0.48 0.43 0.40 0.39 0.23 0.36 0.81 0.24Control Delay 28.0 26.1 9.5 17.3 13.0 2.9 23.1 19.0 4.4 40.0 14.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 28.0 26.1 9.5 17.3 13.0 2.9 23.1 19.0 4.4 40.0 14.3Queue Length 50th (m) 13.9 70.2 5.7 10.2 38.5 0.0 16.7 16.3 0.0 49.2 12.7Queue Length 95th (m) 31.0 94.9 17.4 19.1 51.9 13.1 35.1 32.1 14.9 #102.2 23.4Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 294 1543 733 280 2068 999 444 798 761 514 1412Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.37 0.59 0.17 0.42 0.34 0.34 0.32 0.19 0.32 0.67 0.20

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1033: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 100 840 118 109 655 316 131 137 224 315 195 68Future Volume (vph) 100 840 118 109 655 316 131 137 224 315 195 68Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 0.97 1.00 1.00 0.98 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.96Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1550 3260 1465 1646 3228 1421 1628 1750 1381 1641 3025Flt Permitted 0.38 1.00 1.00 0.13 1.00 1.00 0.57 1.00 1.00 0.65 1.00Satd. Flow (perm) 622 3260 1465 232 3228 1421 975 1750 1381 1130 3025Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 109 913 128 118 712 343 142 149 243 342 212 74RTOR Reduction (vph) 0 0 47 0 0 175 0 0 152 0 39 0Lane Group Flow (vph) 109 913 81 118 712 168 142 149 91 342 247 0Confl. Peds. (#/hr) 5 5 5 5 2 5 5 2Heavy Vehicles (%) 7% 2% 0% 1% 3% 2% 2% 0% 6% 1% 4% 9%Turn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Actuated Green, G (s) 26.9 26.9 26.9 37.9 37.9 37.9 26.8 26.8 26.8 26.8 26.8Effective Green, g (s) 29.2 29.2 29.2 36.9 40.2 37.9 29.1 29.1 29.1 29.1 29.1Actuated g/C Ratio 0.38 0.38 0.38 0.48 0.52 0.49 0.38 0.38 0.38 0.38 0.38Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 234 1231 553 238 1678 696 367 658 519 425 1138v/s Ratio Prot c0.28 0.04 c0.22 0.09 0.08v/s Ratio Perm 0.18 0.06 0.19 0.12 0.15 0.07 c0.30v/c Ratio 0.47 0.74 0.15 0.50 0.42 0.24 0.39 0.23 0.18 0.80 0.22Uniform Delay, d1 18.2 20.8 15.8 13.9 11.4 11.4 17.6 16.4 16.1 21.6 16.4Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.1 2.3 0.1 1.2 0.1 0.1 0.5 0.1 0.1 10.3 0.1Delay (s) 19.2 23.1 15.9 15.1 11.6 11.5 18.1 16.6 16.2 31.9 16.4Level of Service B C B B B B B B B C BApproach Delay (s) 21.9 11.9 16.8 24.8Approach LOS C B B C

Intersection SummaryHCM 2000 Control Delay 18.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.75Actuated Cycle Length (s) 77.3 Sum of lost time (s) 12.0Intersection Capacity Utilization 75.4% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 1034: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1346 33 150 826 0 0 0 0 448 142 254Future Volume (vph) 0 1346 33 150 826 0 0 0 0 448 142 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 50.0 0.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 0 1 1 0 0 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 0.98 1.00Frt 0.850 0.850Flt Protected 0.950 0.950 0.974Satd. Flow (prot) 0 4730 1488 1662 4638 0 0 0 0 1564 1559 1488Flt Permitted 0.130 0.950 0.974Satd. Flow (perm) 0 4730 1465 227 4638 0 0 0 0 1564 1559 1488Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 81 109Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 17.0 64.2 88.8Travel Time (s) 9.7 1.2 4.6 6.4Confl. Peds. (#/hr) 7 4 4 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 1% 7% 0%Adj. Flow (vph) 0 1463 36 163 898 0 0 0 0 487 154 276Shared Lane Traffic (%) 35%Lane Group Flow (vph) 0 1463 36 163 898 0 0 0 0 317 324 276Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 1 2 1 2 1Detector Template Thru Right Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0

Page 1035: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Detector Phase 4 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 36.3 12.5 36.3 36.3 36.3 36.3Total Split (s) 36.3 36.3 12.5 48.5 36.5 36.5 36.5Total Split (%) 42.6% 42.6% 14.7% 56.9% 42.8% 42.8% 42.8%Maximum Green (s) 30.0 30.0 9.5 42.2 30.2 30.2 30.2Yellow Time (s) 4.1 4.1 3.0 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 0.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 29.9 27.6 41.9 41.9 23.4 23.4 23.4Actuated g/C Ratio 0.41 0.38 0.57 0.57 0.32 0.32 0.32v/c Ratio 0.76 0.06 0.58 0.34 0.64 0.65 0.50Control Delay 22.7 0.7 19.0 9.6 28.0 28.6 15.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 22.7 0.7 19.0 9.6 28.0 28.6 15.4LOS C A B A C C BApproach Delay 22.2 11.1 24.4Approach LOS C B C

Intersection SummaryArea Type: OtherCycle Length: 85.3Actuated Cycle Length: 73.5Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.76Intersection Signal Delay: 19.4 Intersection LOS: BIntersection Capacity Utilization 64.8% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 1036: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT EBR WBL WBT SBL SBT SBRLane Group Flow (vph) 1463 36 163 898 317 324 276v/c Ratio 0.76 0.06 0.58 0.34 0.64 0.65 0.50Control Delay 22.7 0.7 19.0 9.6 28.0 28.6 15.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 22.7 0.7 19.0 9.6 28.0 28.6 15.4Queue Length 50th (m) 65.3 0.0 10.4 23.4 43.1 44.4 19.4Queue Length 95th (m) 100.1 1.0 #30.2 40.2 70.4 72.3 41.1Internal Link Dist (m) 110.1 0.1 64.8Turn Bay Length (m) 50.0Base Capacity (vph) 2123 657 298 2887 706 703 732Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.69 0.05 0.55 0.31 0.45 0.46 0.38

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1037: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1346 33 150 826 0 0 0 0 448 142 254Future Volume (vph) 0 1346 33 150 826 0 0 0 0 448 142 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 1.00 1.00 0.91 0.95 0.95 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 0.97 1.00Satd. Flow (prot) 4730 1465 1662 4638 1564 1560 1488Flt Permitted 1.00 1.00 0.13 1.00 0.95 0.97 1.00Satd. Flow (perm) 4730 1465 228 4638 1564 1560 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 1463 36 163 898 0 0 0 0 487 154 276RTOR Reduction (vph) 0 0 22 0 0 0 0 0 0 0 0 74Lane Group Flow (vph) 0 1463 14 163 898 0 0 0 0 317 324 202Confl. Peds. (#/hr) 7 4 4 7Heavy Vehicles (%) 0% 1% 0% 0% 3% 0% 0% 0% 0% 1% 7% 0%Turn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Actuated Green, G (s) 27.7 27.7 39.6 39.6 21.1 21.1 21.1Effective Green, g (s) 30.0 27.7 38.6 41.9 23.4 23.4 23.4Actuated g/C Ratio 0.41 0.38 0.53 0.57 0.32 0.32 0.32Clearance Time (s) 6.3 6.3 3.0 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1935 553 274 2651 499 498 475v/s Ratio Prot c0.31 c0.06 0.19v/s Ratio Perm 0.01 0.25 0.20 0.21 0.14v/c Ratio 0.76 0.02 0.59 0.34 0.64 0.65 0.42Uniform Delay, d1 18.5 14.3 12.3 8.3 21.3 21.4 19.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.7 0.0 3.4 0.1 2.6 3.0 0.6Delay (s) 20.3 14.3 15.8 8.4 24.0 24.5 20.3Level of Service C B B A C C CApproach Delay (s) 20.1 9.5 0.0 23.0Approach LOS C A A C

Intersection SummaryHCM 2000 Control Delay 17.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.70Actuated Cycle Length (s) 73.3 Sum of lost time (s) 12.0Intersection Capacity Utilization 64.8% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 1038: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1229 0 0 972 78 254Future Volume (vph) 1229 0 0 972 78 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.91 1.00 1.00 0.91 0.97 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 4684 0 0 4684 3101 1458Flt Permitted 0.950Satd. Flow (perm) 4684 0 0 4684 3101 1458Right Turn on Red Yes YesSatd. Flow (RTOR) 33Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 2% 4% 2%Adj. Flow (vph) 1336 0 0 1057 85 276Shared Lane Traffic (%)Lane Group Flow (vph) 1336 0 0 1057 85 276Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Detector Phase 4 8 2 2Switch Phase

Page 1039: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.0 35.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7%Maximum Green (s) 28.7 28.7 18.7 18.7Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 23.5 23.5 16.1 16.1Actuated g/C Ratio 0.49 0.49 0.34 0.34v/c Ratio 0.58 0.46 0.08 0.54Control Delay 10.0 8.9 12.3 16.9Queue Delay 0.0 0.0 0.0 0.0Total Delay 10.0 8.9 12.3 16.9LOS B A B BApproach Delay 10.0 8.9 15.8Approach LOS B A B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 47.9Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.58Intersection Signal Delay: 10.3 Intersection LOS: BIntersection Capacity Utilization 49.5% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 1040: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 1336 1057 85 276v/c Ratio 0.58 0.46 0.08 0.54Control Delay 10.0 8.9 12.3 16.9Queue Delay 0.0 0.0 0.0 0.0Total Delay 10.0 8.9 12.3 16.9Queue Length 50th (m) 26.8 19.5 2.5 16.6Queue Length 95th (m) 46.4 34.6 7.3 42.0Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 3135 3135 1405 679Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.43 0.34 0.06 0.41

Intersection Summary

Page 1041: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1229 0 0 972 78 254Future Volume (vph) 1229 0 0 972 78 254Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 0.91 0.97 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 4684 4684 3101 1458Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 4684 4684 3101 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1336 0 0 1057 85 276RTOR Reduction (vph) 0 0 0 0 0 22Lane Group Flow (vph) 1336 0 0 1057 85 254Heavy Vehicles (%) 2% 0% 0% 2% 4% 2%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 21.2 21.2 13.7 13.7Effective Green, g (s) 23.5 23.5 16.0 16.0Actuated g/C Ratio 0.49 0.49 0.34 0.34Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 2317 2317 1044 491v/s Ratio Prot c0.29 0.23 0.03v/s Ratio Perm c0.17v/c Ratio 0.58 0.46 0.08 0.52Uniform Delay, d1 8.5 7.8 10.7 12.7Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.1 0.0 0.9Delay (s) 8.8 8.0 10.8 13.6Level of Service A A B BApproach Delay (s) 8.8 8.0 12.9Approach LOS A A B

Intersection SummaryHCM 2000 Control Delay 9.0 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.55Actuated Cycle Length (s) 47.5 Sum of lost time (s) 8.0Intersection Capacity Utilization 49.5% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 1042: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 32 1024 471 344 995 41 386 18 344 19 4 28Future Volume (vph) 32 1024 471 344 995 41 386 18 344 19 4 28Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 100.0 0.0 15.0 0.0Storage Lanes 1 1 2 0 2 1 1 0Taper Length (m) 40.0 7.5 100.0 7.5Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.98 1.00 1.00 0.98 1.00 0.99Frt 0.850 0.994 0.850 0.868Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1662 3292 1473 3162 3243 0 3162 1750 1473 1662 1447 0Flt Permitted 0.253 0.950 0.950 0.744Satd. Flow (perm) 443 3292 1449 3157 3243 0 3150 1750 1449 1297 1447 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 474 5 349 30Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 4 4 3 3 3 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 1% 2% 2% 0% 2% 0% 1% 0% 0% 4%Adj. Flow (vph) 35 1113 512 374 1082 45 420 20 374 21 4 30Shared Lane Traffic (%)Lane Group Flow (vph) 35 1113 512 374 1127 0 420 20 374 21 34 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 1043: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 9.5 32.0 32.0 32.0 32.0Total Split (s) 36.0 36.0 36.0 17.4 53.4 19.0 51.6 51.6 32.6 32.6Total Split (%) 34.3% 34.3% 34.3% 16.6% 50.9% 18.1% 49.1% 49.1% 31.0% 31.0%Maximum Green (s) 28.0 28.0 28.0 12.9 45.4 14.5 43.6 43.6 24.6 24.6Yellow Time (s) 4.5 4.5 4.5 3.5 4.5 3.5 4.5 4.5 4.5 4.5All-Red Time (s) 3.5 3.5 3.5 1.0 3.5 1.0 3.5 3.5 3.5 3.5Lost Time Adjust (s) -4.0 -4.0 -4.0 -0.5 -4.0 -0.5 -4.0 -4.0 -4.0 -4.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min None Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 32.0 32.0 32.0 13.4 49.4 15.0 31.1 31.1 12.1 12.1Actuated g/C Ratio 0.36 0.36 0.36 0.15 0.56 0.17 0.35 0.35 0.14 0.14v/c Ratio 0.22 0.94 0.62 0.78 0.62 0.79 0.03 0.51 0.12 0.15Control Delay 24.2 43.0 6.7 49.1 15.1 47.1 19.1 5.9 35.4 16.2Queue Delay 0.0 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 24.2 45.6 6.7 49.1 15.1 47.1 19.1 5.9 35.4 16.2LOS C D A D B D B A D BApproach Delay 33.1 23.6 27.5 23.5Approach LOS C C C C

Intersection SummaryArea Type: OtherCycle Length: 105Actuated Cycle Length: 88.5Natural Cycle: 110Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.94Intersection Signal Delay: 28.3 Intersection LOS: CIntersection Capacity Utilization 70.9% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 1044: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 35 1113 512 374 1127 420 20 374 21 34v/c Ratio 0.22 0.94 0.62 0.78 0.62 0.79 0.03 0.51 0.12 0.15Control Delay 24.2 43.0 6.7 49.1 15.1 47.1 19.1 5.9 35.4 16.2Queue Delay 0.0 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 24.2 45.6 6.7 49.1 15.1 47.1 19.1 5.9 35.4 16.2Queue Length 50th (m) 4.3 99.2 4.4 33.5 66.4 37.4 2.3 2.9 3.4 0.6Queue Length 95th (m) 12.3 #144.0 30.8 #54.5 88.3 #59.3 7.1 22.9 10.2 9.1Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 50.0 100.0 15.0Base Capacity (vph) 160 1189 826 478 1812 535 941 940 418 487Starvation Cap Reductn 0 33 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.22 0.96 0.62 0.78 0.62 0.79 0.02 0.40 0.05 0.07

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1045: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 32 1024 471 344 995 41 386 18 344 19 4 28Future Volume (vph) 32 1024 471 344 995 41 386 18 344 19 4 28Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 1.00 1.00 0.98 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 0.99 1.00 1.00 0.85 1.00 0.87Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 3292 1450 3162 3243 3162 1750 1450 1657 1447Flt Permitted 0.25 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.74 1.00Satd. Flow (perm) 442 3292 1450 3162 3243 3162 1750 1450 1298 1447Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 35 1113 512 374 1082 45 420 20 374 21 4 30RTOR Reduction (vph) 0 0 303 0 2 0 0 0 226 0 26 0Lane Group Flow (vph) 35 1113 209 374 1125 0 420 20 148 21 8 0Confl. Peds. (#/hr) 4 4 3 3 3 3Heavy Vehicles (%) 0% 1% 1% 2% 2% 0% 2% 0% 1% 0% 0% 4%Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Actuated Green, G (s) 28.0 28.0 28.0 12.9 45.4 14.5 27.1 27.1 8.1 8.1Effective Green, g (s) 32.0 32.0 32.0 13.4 49.4 15.0 31.1 31.1 12.1 12.1Actuated g/C Ratio 0.36 0.36 0.36 0.15 0.56 0.17 0.35 0.35 0.14 0.14Clearance Time (s) 8.0 8.0 8.0 4.5 8.0 4.5 8.0 8.0 8.0 8.0Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 159 1190 524 478 1810 535 614 509 177 197v/s Ratio Prot c0.34 c0.12 0.35 c0.13 0.01 0.01v/s Ratio Perm 0.08 0.14 c0.10 0.02v/c Ratio 0.22 0.94 0.40 0.78 0.62 0.79 0.03 0.29 0.12 0.04Uniform Delay, d1 19.6 27.3 21.1 36.1 13.2 35.2 18.8 20.7 33.5 33.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.5 13.3 0.4 7.9 0.6 7.4 0.0 0.2 0.2 0.1Delay (s) 20.1 40.6 21.4 44.0 13.8 42.6 18.8 21.0 33.7 33.2Level of Service C D C D B D B C C CApproach Delay (s) 34.2 21.3 32.1 33.4Approach LOS C C C C

Intersection SummaryHCM 2000 Control Delay 29.0 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.78Actuated Cycle Length (s) 88.5 Sum of lost time (s) 16.0Intersection Capacity Utilization 70.9% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 1046: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 399 773 241 95 721 142 302 295 73 168 261 356Future Volume (vph) 399 773 241 95 721 142 302 295 73 168 261 356Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 2 0 1 0 1 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 0.97 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 1.00 0.99 0.99 0.99 0.98Frt 0.964 0.975 0.970 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 3101 3120 0 1630 3189 0 1630 1665 0 1630 1716 1473Flt Permitted 0.950 0.138 0.349 0.195Satd. Flow (perm) 3101 3120 0 236 3189 0 595 1665 0 331 1716 1440Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 43 21 12 352Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 9 9 10 23 23 10Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 4% 2% 1% 2% 2% 0% 2% 1% 2% 2% 2% 1%Adj. Flow (vph) 434 840 262 103 784 154 328 321 79 183 284 387Shared Lane Traffic (%)Lane Group Flow (vph) 434 1102 0 103 938 0 328 400 0 183 284 387Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 1047: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Detector Phase 7 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 9.5 30.4 9.5 30.4 9.5 37.7 9.5 37.7 37.7Total Split (s) 22.6 45.5 13.3 36.2 11.8 40.2 11.0 39.4 39.4Total Split (%) 20.5% 41.4% 12.1% 32.9% 10.7% 36.5% 10.0% 35.8% 35.8%Maximum Green (s) 18.6 39.1 10.3 29.8 8.8 33.5 8.0 32.7 32.7Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1 4.1All-Red Time (s) 1.0 2.3 0.0 2.3 0.0 2.6 0.0 2.6 2.6Lost Time Adjust (s) 0.0 -2.4 1.0 -2.4 1.0 -2.7 1.0 -2.7 -2.7Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 17.2 42.4 39.6 32.4 37.8 29.9 36.1 29.1 29.1Actuated g/C Ratio 0.17 0.41 0.39 0.32 0.37 0.29 0.35 0.28 0.28v/c Ratio 0.84 0.84 0.55 0.92 1.10 0.81 0.89 0.58 0.59Control Delay 57.3 34.3 27.8 49.3 111.0 46.6 66.4 36.8 8.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 57.3 34.3 27.8 49.3 111.0 46.6 66.4 36.8 8.5LOS E C C D F D E D AApproach Delay 40.8 47.2 75.6 30.3Approach LOS D D E C

Intersection SummaryArea Type: OtherCycle Length: 110Actuated Cycle Length: 102.7Natural Cycle: 100Control Type: Semi Act-UncoordMaximum v/c Ratio: 1.10Intersection Signal Delay: 46.3 Intersection LOS: DIntersection Capacity Utilization 88.4% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 1048: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 434 1102 103 938 328 400 183 284 387v/c Ratio 0.84 0.84 0.55 0.92 1.10 0.81 0.89 0.58 0.59Control Delay 57.3 34.3 27.8 49.3 111.0 46.6 66.4 36.8 8.5Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 57.3 34.3 27.8 49.3 111.0 46.6 66.4 36.8 8.5Queue Length 50th (m) 46.7 106.8 10.9 101.9 ~59.6 76.7 26.1 51.8 5.5Queue Length 95th (m) #74.0 #163.3 23.2 #154.7 #119.7 113.9 #60.9 79.3 31.4Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 565 1319 222 1021 298 598 205 595 729Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.77 0.84 0.46 0.92 1.10 0.67 0.89 0.48 0.53

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1049: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 399 773 241 95 721 142 302 295 73 168 261 356Future Volume (vph) 399 773 241 95 721 142 302 295 73 168 261 356Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 0.99 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.96 1.00 0.98 1.00 0.97 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 3101 3122 1629 3190 1627 1667 1627 1716 1441Flt Permitted 0.95 1.00 0.14 1.00 0.35 1.00 0.20 1.00 1.00Satd. Flow (perm) 3101 3122 237 3190 598 1667 335 1716 1441Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 434 840 262 103 784 154 328 321 79 183 284 387RTOR Reduction (vph) 0 25 0 0 14 0 0 9 0 0 0 252Lane Group Flow (vph) 434 1077 0 103 924 0 328 391 0 183 284 135Confl. Peds. (#/hr) 9 9 10 23 23 10Heavy Vehicles (%) 4% 2% 1% 2% 2% 0% 2% 1% 2% 2% 2% 1%Turn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Actuated Green, G (s) 17.2 40.0 38.2 30.0 36.1 27.2 34.5 26.4 26.4Effective Green, g (s) 17.2 42.4 36.2 32.4 34.1 29.9 32.5 29.1 29.1Actuated g/C Ratio 0.17 0.41 0.35 0.32 0.33 0.29 0.32 0.28 0.28Clearance Time (s) 4.0 6.4 3.0 6.4 3.0 6.7 3.0 6.7 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 519 1290 181 1007 277 485 195 486 408v/s Ratio Prot c0.14 0.34 0.04 c0.29 c0.09 0.23 0.06 0.17v/s Ratio Perm 0.16 c0.30 0.23 0.09v/c Ratio 0.84 0.83 0.57 0.92 1.18 0.81 0.94 0.58 0.33Uniform Delay, d1 41.3 27.0 24.3 33.8 33.4 33.7 31.4 31.6 29.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 11.0 4.7 3.3 12.5 113.4 9.1 46.6 1.3 0.2Delay (s) 52.3 31.6 27.6 46.3 146.7 42.8 78.0 32.8 29.3Level of Service D C C D F D E C CApproach Delay (s) 37.5 44.5 89.6 40.9Approach LOS D D F D

Intersection SummaryHCM 2000 Control Delay 49.1 HCM 2000 Level of Service DHCM 2000 Volume to Capacity ratio 0.97Actuated Cycle Length (s) 102.6 Sum of lost time (s) 16.0Intersection Capacity Utilization 88.4% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group

Page 1050: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 271 670 73 6 616 150 68 197 15 174 242 274Future Volume (vph) 271 670 73 6 616 150 68 197 15 174 242 274Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 1 0 1 0 0 0 1 1Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.98Frt 0.985 0.971 0.993 0.850Flt Protected 0.950 0.950 0.988 0.950Satd. Flow (prot) 1630 3170 0 1662 3130 0 0 1684 0 1646 1750 1458Flt Permitted 0.172 0.347 0.811 0.487Satd. Flow (perm) 295 3170 0 605 3130 0 0 1381 0 842 1750 1432Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 21 38 4 298Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 5 6 6 5 7 5 5 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 3% 3% 0% 3% 2% 2% 2% 0% 1% 0% 2%Adj. Flow (vph) 295 728 79 7 670 163 74 214 16 189 263 298Shared Lane Traffic (%)Lane Group Flow (vph) 295 807 0 7 833 0 0 304 0 189 263 298Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 1051: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Detector Phase 7 4 8 8 2 2 6 6 6Switch PhaseMinimum Initial (s) 6.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 17.0 27.1 27.1 27.1 33.1 33.1 33.1 33.1 33.1Total Split (s) 17.0 45.0 28.0 28.0 35.0 35.0 35.0 35.0 35.0Total Split (%) 21.3% 56.3% 35.0% 35.0% 43.8% 43.8% 43.8% 43.8% 43.8%Maximum Green (s) 14.0 38.9 21.9 21.9 28.9 28.9 28.9 28.9 28.9Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) 0.0 -2.1 0.0 -2.1 -2.1 -2.1 -2.1 0.0Total Lost Time (s) 3.0 4.0 6.1 4.0 4.0 4.0 4.0 6.1Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 17.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 39.8 38.7 20.1 22.3 21.9 21.9 21.9 19.8Actuated g/C Ratio 0.58 0.56 0.29 0.32 0.32 0.32 0.32 0.29v/c Ratio 0.69 0.45 0.04 0.80 0.69 0.71 0.47 0.48Control Delay 21.9 10.6 21.5 29.1 29.2 36.4 21.9 5.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 21.9 10.6 21.5 29.1 29.2 36.4 21.9 5.3LOS C B C C C D C AApproach Delay 13.6 29.0 29.2 19.0Approach LOS B C C B

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 68.9Natural Cycle: 80Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.80Intersection Signal Delay: 20.8 Intersection LOS: CIntersection Capacity Utilization 86.4% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 1052: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBL EBT WBL WBT NBT SBL SBT SBRLane Group Flow (vph) 295 807 7 833 304 189 263 298v/c Ratio 0.69 0.45 0.04 0.80 0.69 0.71 0.47 0.48Control Delay 21.9 10.6 21.5 29.1 29.2 36.4 21.9 5.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 21.9 10.6 21.5 29.1 29.2 36.4 21.9 5.3Queue Length 50th (m) 19.3 30.7 0.7 52.8 36.7 23.3 29.6 0.0Queue Length 95th (m) #64.1 55.6 3.9 #96.2 62.4 46.2 49.3 15.7Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 50.0 50.0 25.0Base Capacity (vph) 449 1947 197 1145 640 389 809 786Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.66 0.41 0.04 0.73 0.47 0.49 0.33 0.38

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1053: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 271 670 73 6 616 150 68 197 15 174 242 274Future Volume (vph) 271 670 73 6 616 150 68 197 15 174 242 274Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 3.0 4.0 6.1 4.0 4.0 4.0 4.0 6.1Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.99 1.00 0.97 0.99 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.99 0.95 1.00 1.00Satd. Flow (prot) 1630 3172 1657 3129 1682 1643 1750 1433Flt Permitted 0.17 1.00 0.35 1.00 0.81 0.49 1.00 1.00Satd. Flow (perm) 296 3172 605 3129 1381 842 1750 1433Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 295 728 79 7 670 163 74 214 16 189 263 298RTOR Reduction (vph) 0 9 0 0 26 0 0 3 0 0 0 212Lane Group Flow (vph) 295 798 0 7 807 0 0 301 0 189 263 86Confl. Peds. (#/hr) 5 6 6 5 7 5 5 7Heavy Vehicles (%) 2% 3% 3% 0% 3% 2% 2% 2% 0% 1% 0% 2%Turn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 36.6 36.6 20.2 20.2 19.8 19.8 19.8 19.8Effective Green, g (s) 36.6 38.7 20.2 22.3 21.9 21.9 21.9 19.8Actuated g/C Ratio 0.53 0.56 0.29 0.33 0.32 0.32 0.32 0.29Clearance Time (s) 3.0 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 418 1789 178 1017 440 268 558 413v/s Ratio Prot c0.14 0.25 c0.26 0.15v/s Ratio Perm 0.24 0.01 0.22 c0.22 0.06v/c Ratio 0.71 0.45 0.04 0.79 0.68 0.71 0.47 0.21Uniform Delay, d1 11.5 8.7 17.3 21.1 20.3 20.5 18.7 18.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 5.4 0.2 0.1 4.3 4.4 8.2 0.6 0.3Delay (s) 16.8 8.9 17.4 25.4 24.7 28.7 19.3 18.7Level of Service B A B C C C B BApproach Delay (s) 11.0 25.3 24.7 21.4Approach LOS B C C C

Intersection SummaryHCM 2000 Control Delay 19.0 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.74Actuated Cycle Length (s) 68.6 Sum of lost time (s) 11.0Intersection Capacity Utilization 86.4% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group

Page 1054: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 63 690 105 134 426 158 160 130 138 132 202 186Future Volume (vph) 63 690 105 134 426 158 160 130 138 132 202 186Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95Frt 0.980 0.959 0.923 0.928Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3195 0 1630 3126 0 1630 3009 0 1630 3025 0Flt Permitted 0.299 0.230 0.444 0.552Satd. Flow (perm) 513 3195 0 395 3126 0 762 3009 0 947 3025 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 25 78 150 202Link Speed (k/h) 50 50 50 50Link Distance (m) 136.7 140.7 113.1 130.2Travel Time (s) 9.8 10.1 8.1 9.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 68 750 114 146 463 172 174 141 150 143 220 202Shared Lane Traffic (%)Lane Group Flow (vph) 68 864 0 146 635 0 174 291 0 143 422 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6

Page 1055: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 7 4 3 8 5 2 1 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 9.5 24.3 9.5 24.3 9.5 24.3 9.5 24.3Total Split (s) 10.0 25.0 10.0 25.0 9.6 25.4 9.6 25.4Total Split (%) 14.3% 35.7% 14.3% 35.7% 13.7% 36.3% 13.7% 36.3%Maximum Green (s) 7.0 18.7 7.0 18.7 6.6 19.1 6.6 19.1Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1All-Red Time (s) 0.0 2.2 0.0 2.2 0.0 2.2 0.0 2.2Lost Time Adjust (s) 1.0 -2.3 1.0 -2.3 1.0 -2.3 1.0 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 25.9 20.4 26.5 20.7 18.0 12.4 17.8 12.3Actuated g/C Ratio 0.43 0.34 0.44 0.34 0.30 0.21 0.30 0.20v/c Ratio 0.21 0.79 0.50 0.56 0.56 0.40 0.42 0.54Control Delay 10.4 24.7 15.6 16.8 22.3 11.8 17.9 13.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 10.4 24.7 15.6 16.8 22.3 11.8 17.9 13.6LOS B C B B C B B BApproach Delay 23.6 16.6 15.7 14.7Approach LOS C B B B

Intersection SummaryArea Type: OtherCycle Length: 70Actuated Cycle Length: 60.2Natural Cycle: 70Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.79Intersection Signal Delay: 18.4 Intersection LOS: BIntersection Capacity Utilization 67.9% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 108: Stanley Ave & Marine Land Pkway (RR 49)

Page 1056: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT WBL WBT NBL NBT SBL SBTLane Group Flow (vph) 68 864 146 635 174 291 143 422v/c Ratio 0.21 0.79 0.50 0.56 0.56 0.40 0.42 0.54Control Delay 10.4 24.7 15.6 16.8 22.3 11.8 17.9 13.6Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 10.4 24.7 15.6 16.8 22.3 11.8 17.9 13.6Queue Length 50th (m) 3.8 45.3 8.5 26.8 14.3 7.3 11.5 11.8Queue Length 95th (m) 10.6 #82.2 19.9 46.8 27.2 16.5 22.7 23.4Internal Link Dist (m) 112.7 116.7 89.1 106.2Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 337 1137 299 1158 309 1172 345 1211Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.20 0.76 0.49 0.55 0.56 0.25 0.41 0.35

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1057: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 63 690 105 134 426 158 160 130 138 132 202 186Future Volume (vph) 63 690 105 134 426 158 160 130 138 132 202 186Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.95 1.00 0.95Frt 1.00 0.98 1.00 0.96 1.00 0.92 1.00 0.93Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1630 3195 1630 3127 1630 3008 1630 3026Flt Permitted 0.30 1.00 0.23 1.00 0.44 1.00 0.55 1.00Satd. Flow (perm) 513 3195 394 3127 763 3008 947 3026Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 68 750 114 146 463 172 174 141 150 143 220 202RTOR Reduction (vph) 0 17 0 0 51 0 0 119 0 0 161 0Lane Group Flow (vph) 68 848 0 146 584 0 174 172 0 143 261 0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Actuated Green, G (s) 24.6 18.1 25.2 18.4 16.6 10.0 16.4 9.9Effective Green, g (s) 22.6 20.4 23.2 20.7 14.6 12.3 14.4 12.2Actuated g/C Ratio 0.38 0.34 0.39 0.34 0.24 0.21 0.24 0.20Clearance Time (s) 3.0 6.3 3.0 6.3 3.0 6.3 3.0 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 295 1086 271 1078 266 616 289 615v/s Ratio Prot 0.02 c0.27 c0.05 0.19 c0.06 0.06 0.05 0.09v/s Ratio Perm 0.07 0.16 c0.10 0.07v/c Ratio 0.23 0.78 0.54 0.54 0.65 0.28 0.49 0.42Uniform Delay, d1 12.4 17.8 13.3 15.8 19.3 20.1 19.0 20.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 3.7 2.1 0.6 5.7 0.2 1.3 0.5Delay (s) 12.8 21.5 15.4 16.4 25.0 20.4 20.3 21.3Level of Service B C B B C C C CApproach Delay (s) 20.9 16.2 22.1 21.1Approach LOS C B C C

Intersection SummaryHCM 2000 Control Delay 19.8 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.65Actuated Cycle Length (s) 60.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 67.9% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 1058: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 233 93 400 0 0 423Future Volume (vph) 233 93 400 0 0 423Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.957Flt Protected 0.965Satd. Flow (prot) 3074 0 3260 0 0 3260Flt Permitted 0.965Satd. Flow (perm) 3074 0 3260 0 0 3260Right Turn on Red Yes YesSatd. Flow (RTOR) 101Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 2% 2% 0% 0% 2%Adj. Flow (vph) 253 101 435 0 0 460Shared Lane Traffic (%)Lane Group Flow (vph) 354 0 435 0 0 460Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch Phase

Page 1059: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group WBL WBR NBT NBR SBL SBTMinimum Initial (s) 8.0 8.0 8.0Minimum Split (s) 25.1 22.5 22.5Total Split (s) 28.2 22.5 22.5Total Split (%) 55.6% 44.4% 44.4%Maximum Green (s) 22.1 16.4 16.4Yellow Time (s) 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 10.5 11.2 11.2Actuated g/C Ratio 0.35 0.38 0.38v/c Ratio 0.31 0.35 0.38Control Delay 5.9 7.6 7.8Queue Delay 0.0 0.0 0.0Total Delay 5.9 7.6 7.8LOS A A AApproach Delay 5.9 7.6 7.8Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50.7Actuated Cycle Length: 29.7Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.38Intersection Signal Delay: 7.2 Intersection LOS: AIntersection Capacity Utilization 29.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 1060: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group WBL NBT SBTLane Group Flow (vph) 354 435 460v/c Ratio 0.31 0.35 0.38Control Delay 5.9 7.6 7.8Queue Delay 0.0 0.0 0.0Total Delay 5.9 7.6 7.8Queue Length 50th (m) 3.9 7.1 7.6Queue Length 95th (m) 10.2 14.2 15.0Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2704 2040 2040Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.13 0.21 0.23

Intersection Summary

Page 1061: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 32

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 233 93 400 0 0 423Future Volume (vph) 233 93 400 0 0 423Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 0.96 1.00 1.00Flt Protected 0.97 1.00 1.00Satd. Flow (prot) 3076 3260 3260Flt Permitted 0.97 1.00 1.00Satd. Flow (perm) 3076 3260 3260Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 253 101 435 0 0 460RTOR Reduction (vph) 65 0 0 0 0 0Lane Group Flow (vph) 289 0 435 0 0 460Heavy Vehicles (%) 2% 2% 2% 0% 0% 2%Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.4 9.1 9.1Effective Green, g (s) 10.5 11.2 11.2Actuated g/C Ratio 0.35 0.38 0.38Clearance Time (s) 6.1 6.1 6.1Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1087 1229 1229v/s Ratio Prot c0.09 0.13v/s Ratio Perm c0.14v/c Ratio 0.27 0.35 0.37Uniform Delay, d1 6.8 6.6 6.7Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.1 0.1 0.1Delay (s) 6.9 6.8 6.8Level of Service A A AApproach Delay (s) 6.9 6.8 6.8Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.8 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.36Actuated Cycle Length (s) 29.7 Sum of lost time (s) 10.1Intersection Capacity Utilization 29.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 1062: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 443 14 2 304 308 455Future Volume (vph) 443 14 2 304 308 455Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Frt 0.996 0.911Flt Protected 0.954Satd. Flow (prot) 1663 0 0 3198 2981 0Flt Permitted 0.954 0.948Satd. Flow (perm) 1663 0 0 3032 2981 0Right Turn on Red Yes YesSatd. Flow (RTOR) 2 495Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 0% 4% 4% 0%Adj. Flow (vph) 482 15 2 330 335 495Shared Lane Traffic (%)Lane Group Flow (vph) 497 0 0 332 830 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot Perm NA NAProtected Phases 4 2 6Permitted Phases 2Detector Phase 4 2 2 6Switch Phase

Page 1063: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group EBL EBR NBL NBT SBT SBRMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 31.3 42.0 42.0 42.0Total Split (%) 42.7% 57.3% 57.3% 57.3%Maximum Green (s) 25.0 35.0 35.0 35.0Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.9 2.9 2.9Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 20.0 15.7 15.7Actuated g/C Ratio 0.45 0.36 0.36v/c Ratio 0.66 0.31 0.60Control Delay 14.5 12.0 6.9Queue Delay 0.0 0.0 0.0Total Delay 14.5 12.0 6.9LOS B B AApproach Delay 14.5 12.0 6.9Approach LOS B B A

Intersection SummaryArea Type: OtherCycle Length: 73.3Actuated Cycle Length: 44Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.66Intersection Signal Delay: 10.2 Intersection LOS: BIntersection Capacity Utilization 59.4% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 1064: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group EBL NBT SBTLane Group Flow (vph) 497 332 830v/c Ratio 0.66 0.31 0.60Control Delay 14.5 12.0 6.9Queue Delay 0.0 0.0 0.0Total Delay 14.5 12.0 6.9Queue Length 50th (m) 25.2 9.3 9.5Queue Length 95th (m) 64.7 21.2 26.5Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1065 2637 2657Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.47 0.13 0.31

Intersection Summary

Page 1065: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 36

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 443 14 2 304 308 455Future Volume (vph) 443 14 2 304 308 455Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95Frt 1.00 1.00 0.91Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1662 3197 2979Flt Permitted 0.95 0.95 1.00Satd. Flow (perm) 1662 3032 2979Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 482 15 2 330 335 495RTOR Reduction (vph) 1 0 0 0 318 0Lane Group Flow (vph) 496 0 0 332 512 0Heavy Vehicles (%) 0% 0% 0% 4% 4% 0%Turn Type Prot Perm NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 17.7 12.6 12.6Effective Green, g (s) 20.0 15.6 15.6Actuated g/C Ratio 0.46 0.36 0.36Clearance Time (s) 6.3 7.0 7.0Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 762 1084 1065v/s Ratio Prot c0.30 c0.17v/s Ratio Perm 0.11v/c Ratio 0.65 0.31 0.48Uniform Delay, d1 9.1 10.1 10.9Progression Factor 1.00 1.00 1.00Incremental Delay, d2 1.6 0.1 0.2Delay (s) 10.7 10.2 11.0Level of Service B B BApproach Delay (s) 10.7 10.2 11.0Approach LOS B B B

Intersection SummaryHCM 2000 Control Delay 10.8 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.58Actuated Cycle Length (s) 43.6 Sum of lost time (s) 8.0Intersection Capacity Utilization 59.4% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 1066: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Future Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1716 0 1750 1667 1403 0 1750 0 3101 1488 0Flt Permitted 0.473 0.950Satd. Flow (perm) 828 1716 0 1750 1667 1403 0 1750 0 3101 1488 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 126 896Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 0% 5% 6% 0% 0% 0% 4% 0% 0%Adj. Flow (vph) 75 80 0 0 121 46 0 0 0 252 0 96Shared Lane Traffic (%)Lane Group Flow (vph) 75 80 0 0 121 46 0 0 0 252 96 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 1067: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 12.5 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 18.0 52.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (%) 13.9% 40.5% 26.6% 26.6% 26.6% 29.7% 29.7% 29.7% 29.7%Maximum Green (s) 15.0 45.0 27.0 27.0 27.0 31.0 31.0 31.0 31.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.9 24.9 13.6 13.6 13.6 13.6Actuated g/C Ratio 0.54 0.54 0.29 0.29 0.29 0.29v/c Ratio 0.13 0.09 0.25 0.09 0.28 0.09Control Delay 5.9 5.6 14.4 0.4 13.8 0.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.9 5.6 14.4 0.4 13.8 0.2LOS A A B A B AApproach Delay 5.8 10.5 10.0Approach LOS A B B

Intersection SummaryArea Type: OtherCycle Length: 129.5Actuated Cycle Length: 46.5Natural Cycle: 125Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.28Intersection Signal Delay: 9.2 Intersection LOS: AIntersection Capacity Utilization 25.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 1068: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 75 80 121 46 252 96v/c Ratio 0.13 0.09 0.25 0.09 0.28 0.09Control Delay 5.9 5.6 14.4 0.4 13.8 0.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.9 5.6 14.4 0.4 13.8 0.2Queue Length 50th (m) 2.7 2.9 7.7 0.0 8.3 0.0Queue Length 95th (m) 7.2 7.6 18.5 0.2 16.2 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 693 1714 1093 963 2299 1335Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.11 0.05 0.11 0.05 0.11 0.07

Intersection Summary

Page 1069: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Future Volume (vph) 69 74 0 0 111 42 0 0 0 232 0 88Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1716 1667 1403 3101 1488Flt Permitted 0.47 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 828 1716 1667 1403 3101 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 75 80 0 0 121 46 0 0 0 252 0 96RTOR Reduction (vph) 0 0 0 0 0 32 0 0 0 0 68 0Lane Group Flow (vph) 75 80 0 0 121 14 0 0 0 252 28 0Heavy Vehicles (%) 0% 2% 0% 0% 5% 6% 0% 0% 0% 4% 0% 0%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 21.4 21.4 10.2 10.2 10.2 10.2Effective Green, g (s) 20.4 24.9 13.7 13.7 13.7 13.7Actuated g/C Ratio 0.44 0.53 0.29 0.29 0.29 0.29Clearance Time (s) 3.0 7.5 7.5 7.5 7.5 7.5Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 491 916 490 412 911 437v/s Ratio Prot c0.02 0.05 c0.07 c0.08 0.02v/s Ratio Perm 0.04 0.01v/c Ratio 0.15 0.09 0.25 0.03 0.28 0.06Uniform Delay, d1 7.9 5.3 12.5 11.7 12.6 11.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.1 0.0 0.1 0.0Delay (s) 8.0 5.3 12.7 11.7 12.7 11.9Level of Service A A B B B BApproach Delay (s) 6.6 12.4 0.0 12.5Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 11.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.27Actuated Cycle Length (s) 46.6 Sum of lost time (s) 16.0Intersection Capacity Utilization 25.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 1070: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 32 42 2 293 60 353 4 180 236 343 276 31Future Volume (vph) 32 42 2 293 60 353 4 180 236 343 276 31Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 0.0 0.0 100.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.997 0.872 0.850 0.985Flt Protected 0.979 0.950 0.999 0.950Satd. Flow (prot) 0 1708 0 1630 1513 0 0 1731 1473 1646 1724 0Flt Permitted 0.779 0.703 0.994 0.616Satd. Flow (perm) 0 1359 0 1206 1513 0 0 1723 1473 1067 1724 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 2 384 257 9Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 0% 2% 0% 1% 0% 1% 1% 1% 0% 0%Adj. Flow (vph) 35 46 2 318 65 384 4 196 257 373 300 34Shared Lane Traffic (%)Lane Group Flow (vph) 0 83 0 318 449 0 0 200 257 373 334 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 1071: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 44.0 44.0 44.0 44.0 36.0 36.0 36.0 36.0 36.0Total Split (%) 55.0% 55.0% 55.0% 55.0% 45.0% 45.0% 45.0% 45.0% 45.0%Maximum Green (s) 37.7 37.7 37.7 37.7 29.7 29.7 29.7 29.7 29.7Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 -2.3 -2.3 0.0 0.0 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 6.3 6.3 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 30.1 27.8 30.1 32.4 30.1 30.1 32.4Actuated g/C Ratio 0.43 0.39 0.43 0.46 0.43 0.43 0.46v/c Ratio 0.14 0.67 0.52 0.25 0.33 0.82 0.42Control Delay 11.9 24.8 4.8 14.9 3.8 38.6 16.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 11.9 24.8 4.8 14.9 3.8 38.6 16.4LOS B C A B A D BApproach Delay 11.9 13.1 8.6 28.1Approach LOS B B A C

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 70.6Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.82Intersection Signal Delay: 17.3 Intersection LOS: BIntersection Capacity Utilization 74.8% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 1072: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 83 318 449 200 257 373 334v/c Ratio 0.14 0.67 0.52 0.25 0.33 0.82 0.42Control Delay 11.9 24.8 4.8 14.9 3.8 38.6 16.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 11.9 24.8 4.8 14.9 3.8 38.6 16.4Queue Length 50th (m) 6.5 34.9 5.1 16.5 0.0 44.7 29.3Queue Length 95th (m) 14.1 60.9 20.9 36.7 14.5 #111.2 61.1Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 50.0 100.0 50.0Base Capacity (vph) 780 652 1031 790 775 454 796Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.11 0.49 0.44 0.25 0.33 0.82 0.42

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1073: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 32 42 2 293 60 353 4 180 236 343 276 31Future Volume (vph) 32 42 2 293 60 353 4 180 236 343 276 31Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 6.3 6.3 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.87 1.00 0.85 1.00 0.98Flt Protected 0.98 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1708 1630 1513 1731 1473 1646 1723Flt Permitted 0.78 0.70 1.00 0.99 1.00 0.62 1.00Satd. Flow (perm) 1358 1206 1513 1722 1473 1068 1723Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 35 46 2 318 65 384 4 196 257 373 300 34RTOR Reduction (vph) 0 1 0 0 220 0 0 0 147 0 5 0Lane Group Flow (vph) 0 82 0 318 229 0 0 200 110 373 329 0Heavy Vehicles (%) 0% 0% 0% 2% 0% 1% 0% 1% 1% 1% 0% 0%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 27.8 27.8 27.8 30.1 30.1 30.1 30.1Effective Green, g (s) 30.1 27.8 30.1 32.4 30.1 30.1 32.4Actuated g/C Ratio 0.43 0.39 0.43 0.46 0.43 0.43 0.46Clearance Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 579 475 645 791 628 455 791v/s Ratio Prot 0.15 0.19v/s Ratio Perm 0.06 c0.26 0.12 0.07 c0.35v/c Ratio 0.14 0.67 0.35 0.25 0.17 0.82 0.42Uniform Delay, d1 12.3 17.6 13.6 11.6 12.5 17.8 12.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 5.6 0.9 0.5 0.4 12.9 1.0Delay (s) 12.6 23.1 14.6 12.1 12.9 30.7 13.7Level of Service B C B B B C BApproach Delay (s) 12.6 18.1 12.6 22.7Approach LOS B B B C

Intersection SummaryHCM 2000 Control Delay 18.2 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.69Actuated Cycle Length (s) 70.5 Sum of lost time (s) 8.0Intersection Capacity Utilization 74.8% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 1074: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 70 2 8 358 349 92Future Volume (vph) 70 2 8 358 349 92Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.997 0.972Flt Protected 0.954 0.999Satd. Flow (prot) 1448 0 0 1719 1654 0Flt Permitted 0.954 0.999Satd. Flow (perm) 1448 0 0 1719 1654 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 14% 50% 33% 1% 2% 6%Adj. Flow (vph) 76 2 9 389 379 100Shared Lane Traffic (%)Lane Group Flow (vph) 78 0 0 398 479 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 38.4% ICU Level of Service AAnalysis Period (min) 15

Page 1075: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 46

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 70 2 8 358 349 92Future Volume (Veh/h) 70 2 8 358 349 92Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 76 2 9 389 379 100PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 836 429 479vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 836 429 479tC, single (s) 6.5 6.7 4.4tC, 2 stage (s)tF (s) 3.6 3.8 2.5p0 queue free % 76 100 99cM capacity (veh/h) 319 536 940

Direction, Lane # EB 1 NB 1 SB 1Volume Total 78 398 479Volume Left 76 9 0Volume Right 2 0 100cSH 322 940 1700Volume to Capacity 0.24 0.01 0.28Queue Length 95th (m) 7.4 0.2 0.0Control Delay (s) 19.7 0.3 0.0Lane LOS C AApproach Delay (s) 19.7 0.3 0.0Approach LOS C

Intersection SummaryAverage Delay 1.7Intersection Capacity Utilization 38.4% ICU Level of Service AAnalysis Period (min) 15

Page 1076: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 22 8 6 344 333 19Future Volume (vph) 22 8 6 344 333 19Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.963 0.993Flt Protected 0.965 0.999Satd. Flow (prot) 1569 0 0 1731 1674 0Flt Permitted 0.965 0.999Satd. Flow (perm) 1569 0 0 1731 1674 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 5% 0% 0% 1% 4% 0%Adj. Flow (vph) 24 9 7 374 362 21Shared Lane Traffic (%)Lane Group Flow (vph) 33 0 0 381 383 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 34.9% ICU Level of Service AAnalysis Period (min) 15

Page 1077: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 22 8 6 344 333 19Future Volume (Veh/h) 22 8 6 344 333 19Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 24 9 7 374 362 21PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 760 372 383vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 760 372 383tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 93 99 99cM capacity (veh/h) 367 678 1187

Direction, Lane # EB 1 NB 1 SB 1Volume Total 33 381 383Volume Left 24 7 0Volume Right 9 0 21cSH 420 1187 1700Volume to Capacity 0.08 0.01 0.23Queue Length 95th (m) 2.0 0.1 0.0Control Delay (s) 14.3 0.2 0.0Lane LOS B AApproach Delay (s) 14.3 0.2 0.0Approach LOS B

Intersection SummaryAverage Delay 0.7Intersection Capacity Utilization 34.9% ICU Level of Service AAnalysis Period (min) 15

Page 1078: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 6 18 7 344 335 6Future Volume (vph) 6 18 7 344 335 6Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.900 0.997Flt Protected 0.987 0.999Satd. Flow (prot) 1478 0 0 1714 1679 0Flt Permitted 0.987 0.999Satd. Flow (perm) 1478 0 0 1714 1679 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 298.3 331.4Travel Time (s) 14.9 21.5 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 7% 50% 1% 4% 0%Adj. Flow (vph) 7 20 8 374 364 7Shared Lane Traffic (%)Lane Group Flow (vph) 27 0 0 382 371 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 35.8% ICU Level of Service AAnalysis Period (min) 15

Page 1079: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 6 18 7 344 335 6Future Volume (Veh/h) 6 18 7 344 335 6Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 20 8 374 364 7PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 758 368 371vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 758 368 371tC, single (s) 6.4 6.3 4.6tC, 2 stage (s)tF (s) 3.5 3.4 2.7p0 queue free % 98 97 99cM capacity (veh/h) 375 667 966

Direction, Lane # EB 1 NB 1 SB 1Volume Total 27 382 371Volume Left 7 8 0Volume Right 20 0 7cSH 555 966 1700Volume to Capacity 0.05 0.01 0.22Queue Length 95th (m) 1.2 0.2 0.0Control Delay (s) 11.8 0.3 0.0Lane LOS B AApproach Delay (s) 11.8 0.3 0.0Approach LOS B

Intersection SummaryAverage Delay 0.5Intersection Capacity Utilization 35.8% ICU Level of Service AAnalysis Period (min) 15

Page 1080: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 179 23 321 12 32 12 361 161 6 2 140 211Future Volume (vph) 179 23 321 12 32 12 361 161 6 2 140 211Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.917 0.971 0.998 0.919Flt Protected 0.983 0.989 0.967Satd. Flow (prot) 0 1486 0 0 1681 0 0 1567 0 0 1583 0Flt Permitted 0.983 0.989 0.967Satd. Flow (perm) 0 1486 0 0 1681 0 0 1567 0 0 1583 0Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 29.6Travel Time (s) 8.5 7.8 70.5 2.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 10% 0% 0% 0% 10% 3% 0% 0% 4% 0%Adj. Flow (vph) 195 25 349 13 35 13 392 175 7 2 152 229Shared Lane Traffic (%)Lane Group Flow (vph) 0 569 0 0 61 0 0 574 0 0 383 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 103.6% ICU Level of Service GAnalysis Period (min) 15

Page 1081: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 52

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 179 23 321 12 32 12 361 161 6 2 140 211Future Volume (Veh/h) 179 23 321 12 32 12 361 161 6 2 140 211Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 195 25 349 13 35 13 392 175 7 2 152 229PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 1264 1236 266 1594 1348 178 381 182vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1264 1236 266 1594 1348 178 381 182tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.2 4.2 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.3 2.3 2.2p0 queue free % 0 78 54 55 65 99 65 100cM capacity (veh/h) 79 116 753 29 100 870 1135 1405

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 569 61 574 383Volume Left 195 13 392 2Volume Right 349 13 7 229cSH 181 75 1135 1405Volume to Capacity 3.15 0.82 0.35 0.00Queue Length 95th (m) Err 32.0 12.5 0.0Control Delay (s) Err 151.2 7.9 0.1Lane LOS F F A AApproach Delay (s) Err 151.2 7.9 0.1Approach LOS F F

Intersection SummaryAverage Delay 3593.7Intersection Capacity Utilization 103.6% ICU Level of Service GAnalysis Period (min) 15

Page 1082: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 42 85 63 358 430 36Future Volume (vph) 42 85 63 358 430 36Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.910 0.850Flt Protected 0.984 0.950Satd. Flow (prot) 1512 0 1662 1733 1733 1282Flt Permitted 0.984 0.950Satd. Flow (perm) 1512 0 1662 1733 1733 1282Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 11% 0% 0% 1% 1% 16%Adj. Flow (vph) 46 92 68 389 467 39Shared Lane Traffic (%)Lane Group Flow (vph) 138 0 68 389 467 39Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 46.6% ICU Level of Service AAnalysis Period (min) 15

Page 1083: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 42 85 63 358 430 36Future Volume (Veh/h) 42 85 63 358 430 36Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 46 92 68 389 467 39PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 992 467 506vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 992 467 506tC, single (s) 6.5 6.2 4.1tC, 2 stage (s)tF (s) 3.6 3.3 2.2p0 queue free % 81 85 94cM capacity (veh/h) 246 600 1069

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 138 68 389 467 39Volume Left 46 68 0 0 0Volume Right 92 0 0 0 39cSH 405 1069 1700 1700 1700Volume to Capacity 0.34 0.06 0.23 0.27 0.02Queue Length 95th (m) 11.9 1.6 0.0 0.0 0.0Control Delay (s) 18.4 8.6 0.0 0.0 0.0Lane LOS C AApproach Delay (s) 18.4 1.3 0.0Approach LOS C

Intersection SummaryAverage Delay 2.8Intersection Capacity Utilization 46.6% ICU Level of Service AAnalysis Period (min) 15

Page 1084: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 427 247 174 391 293 223Future Volume (vph) 427 247 174 391 293 223Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1630 1488 1716 1473 1583 1716Flt Permitted 0.950 0.444Satd. Flow (perm) 1630 1488 1716 1473 740 1716Right Turn on Red Yes YesSatd. Flow (RTOR) 268 425Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 2% 1% 5% 2%Adj. Flow (vph) 464 268 189 425 318 242Shared Lane Traffic (%)Lane Group Flow (vph) 464 268 189 425 318 242Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 1 2 1 1 2Detector Template Left Right Thru Right Left ThruLeading Detector (m) 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot Perm NA Perm pm+pt NAProtected Phases 8 2 1 6

Page 1085: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 56

Lane Group WBL WBR NBT NBR SBL SBTPermitted Phases 8 2 6Detector Phase 8 8 2 2 1 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 24.3 24.3 24.3 24.3 9.5 24.3Total Split (s) 24.3 24.3 25.7 25.7 10.0 35.7Total Split (%) 40.5% 40.5% 42.8% 42.8% 16.7% 59.5%Maximum Green (s) 18.0 18.0 19.4 19.4 7.0 29.4Yellow Time (s) 4.1 4.1 4.1 4.1 3.0 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 0.0 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 1.0 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 19.3 19.3 13.7 13.7 23.8 23.8Actuated g/C Ratio 0.38 0.38 0.27 0.27 0.46 0.46v/c Ratio 0.76 0.37 0.41 0.60 0.72 0.30Control Delay 25.5 3.9 18.4 6.0 20.9 9.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 25.5 3.9 18.4 6.0 20.9 9.8LOS C A B A C AApproach Delay 17.6 9.8 16.1Approach LOS B A B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 51.2Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.76Intersection Signal Delay: 14.6 Intersection LOS: BIntersection Capacity Utilization 63.3% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 208: Montrose Rd (RR 98) & Oakwood Dr

Page 1086: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group WBL WBR NBT NBR SBL SBTLane Group Flow (vph) 464 268 189 425 318 242v/c Ratio 0.76 0.37 0.41 0.60 0.72 0.30Control Delay 25.5 3.9 18.4 6.0 20.9 9.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 25.5 3.9 18.4 6.0 20.9 9.8Queue Length 50th (m) 36.1 0.0 15.3 0.0 19.8 14.0Queue Length 95th (m) #93.4 13.1 29.2 16.4 #39.2 25.8Internal Link Dist (m) 67.0 190.2 152.4Turn Bay Length (m) 50.0 50.0Base Capacity (vph) 653 757 736 874 443 1075Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.71 0.35 0.26 0.49 0.72 0.23

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1087: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 58

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 427 247 174 391 293 223Future Volume (vph) 427 247 174 391 293 223Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 0.85 1.00 1.00Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1630 1488 1716 1473 1583 1716Flt Permitted 0.95 1.00 1.00 1.00 0.44 1.00Satd. Flow (perm) 1630 1488 1716 1473 740 1716Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 464 268 189 425 318 242RTOR Reduction (vph) 0 167 0 311 0 0Lane Group Flow (vph) 464 101 189 114 318 242Heavy Vehicles (%) 2% 0% 2% 1% 5% 2%Turn Type Prot Perm NA Perm pm+pt NAProtected Phases 8 2 1 6Permitted Phases 8 2 6Actuated Green, G (s) 17.0 17.0 11.4 11.4 21.5 21.5Effective Green, g (s) 19.3 19.3 13.7 13.7 20.5 23.8Actuated g/C Ratio 0.38 0.38 0.27 0.27 0.40 0.47Clearance Time (s) 6.3 6.3 6.3 6.3 3.0 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 615 562 460 394 397 799v/s Ratio Prot c0.28 0.11 c0.10 0.14v/s Ratio Perm 0.07 0.08 c0.23v/c Ratio 0.75 0.18 0.41 0.29 0.80 0.30Uniform Delay, d1 13.8 10.6 15.4 14.8 12.6 8.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 5.2 0.2 0.6 0.4 11.0 0.2Delay (s) 19.1 10.8 16.0 15.2 23.6 8.7Level of Service B B B B C AApproach Delay (s) 16.0 15.5 17.2Approach LOS B B B

Intersection SummaryHCM 2000 Control Delay 16.2 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.78Actuated Cycle Length (s) 51.1 Sum of lost time (s) 12.0Intersection Capacity Utilization 63.3% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 1088: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 59

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 553 206 0 339 500Future Volume (vph) 0 553 206 0 339 500Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3228 3197 0 1614 1458Flt Permitted 0.950Satd. Flow (perm) 0 3228 3197 0 1614 1458Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 3% 4% 0% 3% 2%Adj. Flow (vph) 0 601 224 0 368 543Shared Lane Traffic (%)Lane Group Flow (vph) 0 601 224 0 368 543Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 46.5% ICU Level of Service AAnalysis Period (min) 15

Page 1089: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 60

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 0 553 206 0 339 500Future Volume (Veh/h) 0 553 206 0 339 500Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 601 224 0 368 543PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 5Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 224 524 112vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 224 524 112tC, single (s) 4.1 6.9 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 23 41cM capacity (veh/h) 1357 480 920

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1Volume Total 300 300 112 112 911Volume Left 0 0 0 0 368Volume Right 0 0 0 0 543cSH 1700 1700 1700 1700 1189Volume to Capacity 0.18 0.18 0.07 0.07 0.77Queue Length 95th (m) 0.0 0.0 0.0 0.0 64.0Control Delay (s) 0.0 0.0 0.0 0.0 21.9Lane LOS CApproach Delay (s) 0.0 0.0 21.9Approach LOS C

Intersection SummaryAverage Delay 11.5Intersection Capacity Utilization 46.5% ICU Level of Service AAnalysis Period (min) 15

Page 1090: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 61

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 466 0 0 189 58 111Future Volume (vph) 466 0 0 189 58 111Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3228 0 0 3260 1554 1444Flt Permitted 0.950Satd. Flow (perm) 3228 0 0 3260 1554 1444Link Speed (k/h) 50 50 50Link Distance (m) 104.2 91.9 169.0Travel Time (s) 7.5 6.6 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 2% 7% 3%Adj. Flow (vph) 507 0 0 205 63 121Shared Lane Traffic (%)Lane Group Flow (vph) 507 0 0 205 63 121Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 32.1% ICU Level of Service AAnalysis Period (min) 15

Page 1091: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 62

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (veh/h) 466 0 0 189 58 111Future Volume (Veh/h) 466 0 0 189 58 111Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 507 0 0 205 63 121PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 6Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 507 610 254vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 507 610 254tC, single (s) 4.1 6.9 7.0tC, 2 stage (s)tF (s) 2.2 3.6 3.3p0 queue free % 100 85 84cM capacity (veh/h) 1068 415 743

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1Volume Total 254 254 102 102 184Volume Left 0 0 0 0 63Volume Right 0 0 0 0 121cSH 1700 1700 1700 1700 1130Volume to Capacity 0.15 0.15 0.06 0.06 0.16Queue Length 95th (m) 0.0 0.0 0.0 0.0 4.6Control Delay (s) 0.0 0.0 0.0 0.0 12.3Lane LOS BApproach Delay (s) 0.0 0.0 12.3Approach LOS B

Intersection SummaryAverage Delay 2.5Intersection Capacity Utilization 32.1% ICU Level of Service AAnalysis Period (min) 15

Page 1092: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 63

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 293 304 213 235 236 236Future Volume (vph) 293 304 213 235 236 236Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.929 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1630 1716 1594 0 1630 1458Flt Permitted 0.950 0.950Satd. Flow (perm) 1630 1716 1594 0 1630 1458Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 318 330 232 255 257 257Shared Lane Traffic (%)Lane Group Flow (vph) 318 330 487 0 257 257Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 69.6% ICU Level of Service CAnalysis Period (min) 15

Page 1093: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 64

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 293 304 213 235 236 236Future Volume (vph) 293 304 213 235 236 236Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 318 330 232 255 257 257

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total (vph) 318 330 487 257 257Volume Left (vph) 318 0 0 257 0Volume Right (vph) 0 0 255 0 257Hadj (s) 0.53 0.03 -0.28 0.53 -0.67Departure Headway (s) 7.6 7.1 6.5 8.0 6.8Degree Utilization, x 0.67 0.65 0.89 0.57 0.49Capacity (veh/h) 464 492 541 429 511Control Delay (s) 23.7 21.2 41.0 20.2 14.9Approach Delay (s) 22.4 41.0 17.5Approach LOS C E C

Intersection SummaryDelay 26.4Level of Service DIntersection Capacity Utilization 69.6% ICU Level of Service CAnalysis Period (min) 15

Page 1094: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway/Marinelane Parkway & Portage Road Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 65

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 18 939 579 94 175 40Future Volume (vph) 18 939 579 94 175 40Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 50.0 50.0 0.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 3260 3260 1473 1646 1488Flt Permitted 0.950 0.950Satd. Flow (perm) 1662 3260 3260 1473 1646 1488Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 2% 1% 1% 0%Adj. Flow (vph) 20 1021 629 102 190 43Shared Lane Traffic (%)Lane Group Flow (vph) 20 1021 629 102 190 43Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 45.4% ICU Level of Service AAnalysis Period (min) 15

Page 1095: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan212: Marineland Parkway/Marinelane Parkway & Portage Road Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 66

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 18 939 579 94 175 40Future Volume (Veh/h) 18 939 579 94 175 40Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 20 1021 629 102 190 43PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 629 1180 314vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 629 1180 314tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 98 0 94cM capacity (veh/h) 963 181 687

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 SB 1 SB 2Volume Total 20 510 510 314 314 102 190 43Volume Left 20 0 0 0 0 0 190 0Volume Right 0 0 0 0 0 102 0 43cSH 963 1700 1700 1700 1700 1700 181 687Volume to Capacity 0.02 0.30 0.30 0.18 0.18 0.06 1.05 0.06Queue Length 95th (m) 0.5 0.0 0.0 0.0 0.0 0.0 72.2 1.6Control Delay (s) 8.8 0.0 0.0 0.0 0.0 0.0 133.8 10.6Lane LOS A F BApproach Delay (s) 0.2 0.0 111.1Approach LOS F

Intersection SummaryAverage Delay 13.0Intersection Capacity Utilization 45.4% ICU Level of Service AAnalysis Period (min) 15

Page 1096: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan213: Oakwood Dr/Thundering Waters Access & Oakwood Drive Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 67

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 211 499 475 0 0 199Future Volume (vph) 211 499 475 0 0 199Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 25.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 1630 3260 3260 0 1716 1458Flt Permitted 0.950Satd. Flow (perm) 1630 3260 3260 0 1716 1458Link Speed (k/h) 50 50 50Link Distance (m) 61.0 214.6 61.6Travel Time (s) 4.4 15.5 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 229 542 516 0 0 216Shared Lane Traffic (%)Lane Group Flow (vph) 229 542 516 0 0 216Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 34.3% ICU Level of Service AAnalysis Period (min) 15

Page 1097: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan213: Oakwood Dr/Thundering Waters Access & Oakwood Drive Rail Crossing 2031 Summer

Timing Plan: SAT Peak Hour Synchro 9 ReportPTSL Page 68

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 211 499 475 0 0 199Future Volume (Veh/h) 211 499 475 0 0 199Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 229 542 516 0 0 216PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m) 152pX, platoon unblockedvC, conflicting volume 516 1245 258vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 516 1245 258tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 78 100 71cM capacity (veh/h) 1046 130 741

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 SB 1 SB 2Volume Total 229 271 271 344 172 0 216Volume Left 229 0 0 0 0 0 0Volume Right 0 0 0 0 0 0 216cSH 1046 1700 1700 1700 1700 1700 741Volume to Capacity 0.22 0.16 0.16 0.20 0.10 0.00 0.29Queue Length 95th (m) 6.7 0.0 0.0 0.0 0.0 0.0 9.7Control Delay (s) 9.4 0.0 0.0 0.0 0.0 0.0 11.8Lane LOS A A BApproach Delay (s) 2.8 0.0 11.8Approach LOS B

Intersection SummaryAverage Delay 3.1Intersection Capacity Utilization 34.3% ICU Level of Service AAnalysis Period (min) 15

Page 1098: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Thundering Waters Transportation Master Plan | 151385 | July 2016

Paradigm Transportation Solutions Limited | Appendices

Appendix J

Future Total Traffic Operations with Welland River Crossing Reports

Page 1099: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 95 725 18 29 584 285 30 75 96 261 47 82Future Volume (vph) 95 725 18 29 584 285 30 75 96 261 47 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 1 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95Ped Bike Factor 1.00 0.98Frt 0.850 0.850 0.850 0.905Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1525 3197 1390 1484 3167 1430 1471 1606 1250 1614 2733 0Flt Permitted 0.411 0.184 0.663 0.704Satd. Flow (perm) 659 3197 1390 288 3167 1409 1027 1606 1250 1196 2733 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 77 310 104 89Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 4 4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 4% 7% 12% 5% 4% 13% 9% 19% 3% 5% 13%Adj. Flow (vph) 103 788 20 32 635 310 33 82 104 284 51 89Shared Lane Traffic (%)Lane Group Flow (vph) 103 788 20 32 635 310 33 82 104 284 140 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 1 2Detector Template Left Thru Right Left Thru Right Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 1100: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Detector Phase 4 4 4 3 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.3 39.3 39.3 12.5 51.8 51.8 37.3 37.3 37.3 37.3 37.3Total Split (%) 44.1% 44.1% 44.1% 14.0% 58.1% 58.1% 41.9% 41.9% 41.9% 41.9% 41.9%Maximum Green (s) 33.0 33.0 33.0 9.5 45.5 45.5 31.0 31.0 31.0 31.0 31.0Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 0.0 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 24.1 24.1 24.1 33.8 33.8 31.4 22.6 22.6 22.6 22.6 22.6Actuated g/C Ratio 0.37 0.37 0.37 0.52 0.52 0.48 0.35 0.35 0.35 0.35 0.35v/c Ratio 0.42 0.66 0.04 0.13 0.38 0.37 0.09 0.15 0.21 0.68 0.14Control Delay 23.0 20.6 0.1 10.3 10.8 2.9 16.4 16.4 5.1 28.6 7.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 23.0 20.6 0.1 10.3 10.8 2.9 16.4 16.4 5.1 28.6 7.4LOS C C A B B A B B A C AApproach Delay 20.4 8.3 11.0 21.6Approach LOS C A B C

Intersection SummaryArea Type: OtherCycle Length: 89.1Actuated Cycle Length: 64.8Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.68Intersection Signal Delay: 15.1 Intersection LOS: BIntersection Capacity Utilization 64.2% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 1101: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBTLane Group Flow (vph) 103 788 20 32 635 310 33 82 104 284 140v/c Ratio 0.42 0.66 0.04 0.13 0.38 0.37 0.09 0.15 0.21 0.68 0.14Control Delay 23.0 20.6 0.1 10.3 10.8 2.9 16.4 16.4 5.1 28.6 7.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 23.0 20.6 0.1 10.3 10.8 2.9 16.4 16.4 5.1 28.6 7.4Queue Length 50th (m) 9.1 41.1 0.0 1.8 22.8 0.0 2.6 6.7 0.0 28.9 2.1Queue Length 95th (m) 27.0 74.8 0.0 6.9 45.1 12.7 9.8 18.8 9.9 67.6 8.8Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 378 1835 830 315 2426 1122 555 869 724 647 1520Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.27 0.43 0.02 0.10 0.26 0.28 0.06 0.09 0.14 0.44 0.09

Intersection Summary

Page 1102: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 95 725 18 29 584 285 30 75 96 261 47 82Future Volume (vph) 95 725 18 29 584 285 30 75 96 261 47 82Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.90Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1524 3197 1390 1484 3167 1410 1471 1606 1250 1614 2732Flt Permitted 0.41 1.00 1.00 0.18 1.00 1.00 0.66 1.00 1.00 0.70 1.00Satd. Flow (perm) 659 3197 1390 287 3167 1410 1027 1606 1250 1196 2732Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 103 788 20 32 635 310 33 82 104 284 51 89RTOR Reduction (vph) 0 0 12 0 0 158 0 0 68 0 58 0Lane Group Flow (vph) 103 788 8 32 635 152 33 82 36 284 82 0Confl. Peds. (#/hr) 4 4Heavy Vehicles (%) 9% 4% 7% 12% 5% 4% 13% 9% 19% 3% 5% 13%Turn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Actuated Green, G (s) 21.9 21.9 21.9 31.4 31.4 31.4 20.1 20.1 20.1 20.1 20.1Effective Green, g (s) 24.2 24.2 24.2 30.4 33.7 31.4 22.4 22.4 22.4 22.4 22.4Actuated g/C Ratio 0.38 0.38 0.38 0.47 0.53 0.49 0.35 0.35 0.35 0.35 0.35Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 248 1206 524 238 1665 690 358 561 436 417 954v/s Ratio Prot c0.25 0.01 c0.20 0.05 0.03v/s Ratio Perm 0.16 0.01 0.05 0.11 0.03 0.03 c0.24v/c Ratio 0.42 0.65 0.01 0.13 0.38 0.22 0.09 0.15 0.08 0.68 0.09Uniform Delay, d1 14.7 16.5 12.5 10.2 9.0 9.3 14.0 14.3 14.0 17.8 14.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.8 1.1 0.0 0.2 0.1 0.1 0.1 0.1 0.1 4.2 0.0Delay (s) 15.5 17.6 12.5 10.4 9.1 9.5 14.1 14.4 14.0 22.0 14.0Level of Service B B B B A A B B B C BApproach Delay (s) 17.3 9.3 14.2 19.3Approach LOS B A B B

Intersection SummaryHCM 2000 Control Delay 14.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.65Actuated Cycle Length (s) 64.1 Sum of lost time (s) 12.0Intersection Capacity Utilization 64.2% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 1103: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1080 1 64 716 0 0 0 0 432 86 164Future Volume (vph) 0 1080 1 64 716 0 0 0 0 432 86 164Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 50.0 50.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 0 1 1 0 0 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 0.99 1.00 1.00 1.00 0.99Frt 0.850 0.850Flt Protected 0.950 0.950 0.967Satd. Flow (prot) 0 4638 1488 1662 4594 0 0 0 0 1519 1522 1430Flt Permitted 0.153 0.950 0.967Satd. Flow (perm) 0 4638 1467 268 4594 0 0 0 0 1515 1519 1412Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 81 155Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 32.2 64.2 88.8Travel Time (s) 9.7 2.3 4.6 6.4Confl. Peds. (#/hr) 2 2 3 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 3% 0% 0% 4% 0% 0% 0% 0% 4% 9% 4%Adj. Flow (vph) 0 1174 1 70 778 0 0 0 0 470 93 178Shared Lane Traffic (%) 41%Lane Group Flow (vph) 0 1174 1 70 778 0 0 0 0 277 286 178Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 1 2 1 2 1Detector Template Thru Right Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0

Page 1104: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Detector Phase 4 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 36.3 12.5 36.3 36.3 36.3 36.3Total Split (s) 36.3 36.3 12.5 48.5 36.5 36.5 36.5Total Split (%) 42.6% 42.6% 14.7% 56.9% 42.8% 42.8% 42.8%Maximum Green (s) 30.0 30.0 9.5 42.2 30.2 30.2 30.2Yellow Time (s) 4.1 4.1 3.0 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 0.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 25.5 23.2 37.1 37.1 21.1 21.1 21.1Actuated g/C Ratio 0.38 0.35 0.56 0.56 0.32 0.32 0.32v/c Ratio 0.66 0.00 0.23 0.30 0.58 0.59 0.32Control Delay 19.6 0.0 10.2 8.9 24.8 25.3 6.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.6 0.0 10.2 8.9 24.8 25.3 6.3LOS B A B A C C AApproach Delay 19.6 9.0 20.5Approach LOS B A C

Intersection SummaryArea Type: OtherCycle Length: 85.3Actuated Cycle Length: 66.5Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.66Intersection Signal Delay: 16.6 Intersection LOS: BIntersection Capacity Utilization 55.2% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 1105: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT EBR WBL WBT SBL SBT SBRLane Group Flow (vph) 1174 1 70 778 277 286 178v/c Ratio 0.66 0.00 0.23 0.30 0.58 0.59 0.32Control Delay 19.6 0.0 10.2 8.9 24.8 25.3 6.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 19.6 0.0 10.2 8.9 24.8 25.3 6.3Queue Length 50th (m) 43.9 0.0 3.8 17.7 31.2 32.4 2.1Queue Length 95th (m) 74.7 0.0 12.0 34.2 61.0 63.0 15.3Internal Link Dist (m) 110.1 8.2 64.8Turn Bay Length (m) 50.0 50.0Base Capacity (vph) 2334 729 334 3207 767 769 791Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.50 0.00 0.21 0.24 0.36 0.37 0.23

Intersection Summary

Page 1106: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1080 1 64 716 0 0 0 0 432 86 164Future Volume (vph) 0 1080 1 64 716 0 0 0 0 432 86 164Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 1.00 1.00 0.91 0.95 0.95 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 0.97 1.00Satd. Flow (prot) 4638 1468 1662 4594 1516 1521 1412Flt Permitted 1.00 1.00 0.15 1.00 0.95 0.97 1.00Satd. Flow (perm) 4638 1468 267 4594 1516 1521 1412Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 1174 1 70 778 0 0 0 0 470 93 178RTOR Reduction (vph) 0 0 1 0 0 0 0 0 0 0 0 106Lane Group Flow (vph) 0 1174 0 70 778 0 0 0 0 277 286 72Confl. Peds. (#/hr) 2 2 3 1Heavy Vehicles (%) 0% 3% 0% 0% 4% 0% 0% 0% 0% 4% 9% 4%Turn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Actuated Green, G (s) 23.2 23.2 34.7 34.7 18.7 18.7 18.7Effective Green, g (s) 25.5 23.2 33.7 37.0 21.0 21.0 21.0Actuated g/C Ratio 0.39 0.35 0.51 0.56 0.32 0.32 0.32Clearance Time (s) 6.3 6.3 3.0 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1791 516 294 2575 482 483 449v/s Ratio Prot c0.25 0.03 c0.17v/s Ratio Perm 0.00 0.09 0.18 0.19 0.05v/c Ratio 0.66 0.00 0.24 0.30 0.57 0.59 0.16Uniform Delay, d1 16.6 13.9 9.7 7.7 18.8 18.9 16.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.9 0.0 0.4 0.1 1.7 1.9 0.2Delay (s) 17.5 13.9 10.1 7.7 20.4 20.9 16.3Level of Service B B B A C C BApproach Delay (s) 17.5 7.9 0.0 19.6Approach LOS B A A B

Intersection SummaryHCM 2000 Control Delay 15.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.59Actuated Cycle Length (s) 66.0 Sum of lost time (s) 12.0Intersection Capacity Utilization 55.2% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 1107: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1224 0 0 744 54 111Future Volume (vph) 1224 0 0 744 54 111Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.91 1.00 1.00 0.91 0.97 1.00Ped Bike Factor 1.00 0.98Frt 0.850Flt Protected 0.950Satd. Flow (prot) 4684 0 0 4550 3162 1430Flt Permitted 0.950Satd. Flow (perm) 4684 0 0 4550 3151 1398Right Turn on Red Yes YesSatd. Flow (RTOR) 34Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Confl. Peds. (#/hr) 4 13Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 2% 0% 0% 5% 2% 4%Adj. Flow (vph) 1330 0 0 809 59 121Shared Lane Traffic (%)Lane Group Flow (vph) 1330 0 0 809 59 121Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2

Page 1108: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRDetector Phase 4 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.0 35.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7%Maximum Green (s) 28.7 28.7 18.7 18.7Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 21.8 21.8 12.9 12.9Actuated g/C Ratio 0.51 0.51 0.30 0.30v/c Ratio 0.56 0.35 0.06 0.27Control Delay 8.1 6.6 12.5 11.9Queue Delay 0.0 0.0 0.0 0.0Total Delay 8.1 6.6 12.5 11.9LOS A A B BApproach Delay 8.1 6.6 12.1Approach LOS A A B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 42.9Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.56Intersection Signal Delay: 7.9 Intersection LOS: AIntersection Capacity Utilization 37.7% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 1109: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 1330 809 59 121v/c Ratio 0.56 0.35 0.06 0.27Control Delay 8.1 6.6 12.5 11.9Queue Delay 0.0 0.0 0.0 0.0Total Delay 8.1 6.6 12.5 11.9Queue Length 50th (m) 21.7 11.4 1.6 4.9Queue Length 95th (m) 35.2 19.6 5.6 17.3Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 3436 3338 1571 712Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.39 0.24 0.04 0.17

Intersection Summary

Page 1110: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1224 0 0 744 54 111Future Volume (vph) 1224 0 0 744 54 111Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 0.91 0.97 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 4684 4550 3162 1395Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 4684 4550 3162 1395Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1330 0 0 809 59 121RTOR Reduction (vph) 0 0 0 0 0 24Lane Group Flow (vph) 1330 0 0 809 59 97Confl. Peds. (#/hr) 4 13Heavy Vehicles (%) 2% 0% 0% 5% 2% 4%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 19.5 19.5 10.6 10.6Effective Green, g (s) 21.8 21.8 12.9 12.9Actuated g/C Ratio 0.51 0.51 0.30 0.30Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 2391 2322 955 421v/s Ratio Prot c0.28 0.18 0.02v/s Ratio Perm c0.07v/c Ratio 0.56 0.35 0.06 0.23Uniform Delay, d1 7.1 6.2 10.6 11.2Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 0.1 0.0 0.3Delay (s) 7.4 6.3 10.6 11.5Level of Service A A B BApproach Delay (s) 7.4 6.3 11.2Approach LOS A A B

Intersection SummaryHCM 2000 Control Delay 7.3 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.44Actuated Cycle Length (s) 42.7 Sum of lost time (s) 8.0Intersection Capacity Utilization 37.7% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 1111: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 67 1013 256 135 864 25 102 4 93 15 2 22Future Volume (vph) 67 1013 256 135 864 25 102 4 93 15 2 22Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 15.0 0.0Storage Lanes 1 1 2 0 2 1 1 0Taper Length (m) 40.0 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.98 1.00 0.97 0.99Frt 0.850 0.996 0.850 0.862Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3260 1458 3162 3247 0 3162 1716 1458 1630 1479 0Flt Permitted 0.296 0.950 0.950 0.755Satd. Flow (perm) 508 3260 1434 3157 3247 0 3162 1716 1422 1278 1479 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 278 4 101 24Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 5 5 12 12Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 73 1101 278 147 939 27 111 4 101 16 2 24Shared Lane Traffic (%)Lane Group Flow (vph) 73 1101 278 147 966 0 111 4 101 16 26 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NA

Page 1112: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 9.5 32.0 32.0 32.0 32.0Total Split (s) 36.0 36.0 36.0 12.0 48.0 9.5 42.0 42.0 32.5 32.5Total Split (%) 40.0% 40.0% 40.0% 13.3% 53.3% 10.6% 46.7% 46.7% 36.1% 36.1%Maximum Green (s) 29.7 29.7 29.7 7.5 41.7 5.0 35.7 35.7 26.2 26.2Yellow Time (s) 4.1 4.1 4.1 3.5 4.1 3.5 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 1.0 2.2 1.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -0.5 -2.3 -0.5 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 30.9 30.9 30.9 7.6 42.6 5.5 19.8 19.8 10.3 10.3Actuated g/C Ratio 0.44 0.44 0.44 0.11 0.61 0.08 0.28 0.28 0.15 0.15v/c Ratio 0.33 0.77 0.35 0.43 0.49 0.45 0.01 0.21 0.09 0.11Control Delay 18.1 21.1 3.2 33.9 8.8 37.9 19.0 6.1 28.1 13.8Queue Delay 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 18.1 21.3 3.2 33.9 8.8 37.9 19.0 6.1 28.1 13.8LOS B C A C A D B A C BApproach Delay 17.6 12.1 22.7 19.2Approach LOS B B C B

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 70.4Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.77Intersection Signal Delay: 15.9 Intersection LOS: BIntersection Capacity Utilization 58.7% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 1113: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 73 1101 278 147 966 111 4 101 16 26v/c Ratio 0.33 0.77 0.35 0.43 0.49 0.45 0.01 0.21 0.09 0.11Control Delay 18.1 21.1 3.2 33.9 8.8 37.9 19.0 6.1 28.1 13.8Queue Delay 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 18.1 21.3 3.2 33.9 8.8 37.9 19.0 6.1 28.1 13.8Queue Length 50th (m) 6.4 65.7 0.0 10.2 34.9 7.9 0.4 0.0 2.0 0.3Queue Length 95th (m) 16.9 89.8 12.3 18.6 48.1 15.6 2.5 10.4 7.4 6.8Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 50.0 50.0 15.0Base Capacity (vph) 231 1482 804 359 2032 247 927 814 517 613Starvation Cap Reductn 0 31 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.32 0.76 0.35 0.41 0.48 0.45 0.00 0.12 0.03 0.04

Intersection Summary

Page 1114: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 67 1013 256 135 864 25 102 4 93 15 2 22Future Volume (vph) 67 1013 256 135 864 25 102 4 93 15 2 22Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 1.00 1.00 0.98 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 1.00Frt 1.00 1.00 0.85 1.00 1.00 1.00 1.00 0.85 1.00 0.86Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1630 3260 1435 3162 3246 3162 1716 1426 1613 1478Flt Permitted 0.30 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.76 1.00Satd. Flow (perm) 509 3260 1435 3162 3246 3162 1716 1426 1282 1478Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 73 1101 278 147 939 27 111 4 101 16 2 24RTOR Reduction (vph) 0 0 156 0 2 0 0 0 73 0 20 0Lane Group Flow (vph) 73 1101 122 147 964 0 111 4 28 16 6 0Confl. Peds. (#/hr) 5 5 12 12Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Actuated Green, G (s) 28.7 28.7 28.7 7.1 40.3 5.0 17.5 17.5 8.0 8.0Effective Green, g (s) 31.0 31.0 31.0 7.6 42.6 5.5 19.8 19.8 10.3 10.3Actuated g/C Ratio 0.44 0.44 0.44 0.11 0.61 0.08 0.28 0.28 0.15 0.15Clearance Time (s) 6.3 6.3 6.3 4.5 6.3 4.5 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 224 1435 631 341 1964 247 482 401 187 216v/s Ratio Prot c0.34 0.05 c0.30 c0.04 0.00 0.00v/s Ratio Perm 0.14 0.09 c0.02 0.01v/c Ratio 0.33 0.77 0.19 0.43 0.49 0.45 0.01 0.07 0.09 0.03Uniform Delay, d1 12.9 16.7 12.1 29.4 7.8 31.0 18.2 18.6 26.0 25.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.6 2.4 0.1 0.6 0.1 1.3 0.0 0.1 0.1 0.0Delay (s) 13.5 19.1 12.2 30.0 8.0 32.3 18.2 18.6 26.1 25.8Level of Service B B B C A C B B C CApproach Delay (s) 17.5 10.9 25.6 25.9Approach LOS B B C C

Intersection SummaryHCM 2000 Control Delay 15.6 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.58Actuated Cycle Length (s) 70.4 Sum of lost time (s) 16.0Intersection Capacity Utilization 58.7% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 1115: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 142 475 413 67 567 64 304 165 79 56 169 152Future Volume (vph) 142 475 413 67 567 64 304 165 79 56 169 152Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 2 0 1 0 1 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 0.97 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 0.99 1.00 1.00 0.99 1.00Frt 0.930 0.985 0.951 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 2959 2764 0 1599 3021 0 1630 1582 0 1630 1699 1417Flt Permitted 0.950 0.149 0.353 0.596Satd. Flow (perm) 2929 2764 0 250 3021 0 606 1582 0 1020 1699 1417Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 221 12 28 165Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 12 5 5 12 4 4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 7% 14% 4% 8% 9% 2% 4% 6% 2% 3% 5%Adj. Flow (vph) 154 516 449 73 616 70 330 179 86 61 184 165Shared Lane Traffic (%)Lane Group Flow (vph) 154 965 0 73 686 0 330 265 0 61 184 165Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 1116: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Detector Phase 7 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 9.5 30.4 9.5 30.4 9.5 37.7 9.5 37.7 37.7Total Split (s) 10.4 38.0 9.6 37.2 18.0 47.9 9.6 39.5 39.5Total Split (%) 9.9% 36.2% 9.1% 35.4% 17.1% 45.6% 9.1% 37.6% 37.6%Maximum Green (s) 6.4 31.6 6.6 30.8 15.0 41.2 6.6 32.8 32.8Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1 4.1All-Red Time (s) 1.0 2.3 0.0 2.3 0.0 2.6 0.0 2.6 2.6Lost Time Adjust (s) -4.0 -2.4 0.0 -2.4 1.0 -2.7 1.0 -2.7 0.0Total Lost Time (s) 0.0 4.0 3.0 4.0 4.0 4.0 4.0 4.0 6.7Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 10.6 30.6 36.5 29.3 33.8 24.5 21.5 16.3 13.5Actuated g/C Ratio 0.13 0.37 0.45 0.36 0.41 0.30 0.26 0.20 0.17v/c Ratio 0.40 0.82 0.34 0.63 0.79 0.54 0.20 0.54 0.44Control Delay 39.0 25.2 16.3 24.7 34.2 26.4 18.1 36.9 9.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 39.0 25.2 16.3 24.7 34.2 26.4 18.1 36.9 9.4LOS D C B C C C B D AApproach Delay 27.1 23.9 30.8 23.1Approach LOS C C C C

Intersection SummaryArea Type: OtherCycle Length: 105.1Actuated Cycle Length: 81.8Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.82Intersection Signal Delay: 26.4 Intersection LOS: CIntersection Capacity Utilization 74.3% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 1117: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 154 965 73 686 330 265 61 184 165v/c Ratio 0.40 0.82 0.34 0.63 0.79 0.54 0.20 0.54 0.44Control Delay 39.0 25.2 16.3 24.7 34.2 26.4 18.1 36.9 9.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 39.0 25.2 16.3 24.7 34.2 26.4 18.1 36.9 9.4Queue Length 50th (m) 12.9 59.2 6.0 47.6 41.9 34.5 6.4 29.2 0.0Queue Length 95th (m) 24.0 95.2 14.7 73.3 #76.9 58.3 14.0 49.9 16.2Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 382 1296 223 1254 428 876 316 750 675Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.40 0.74 0.33 0.55 0.77 0.30 0.19 0.25 0.24

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1118: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 142 475 413 67 567 64 304 165 79 56 169 152Future Volume (vph) 142 475 413 67 567 64 304 165 79 56 169 152Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 0.0 4.0 3.0 4.0 4.0 4.0 4.0 4.0 6.7Lane Util. Factor 0.97 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.93 1.00 0.98 1.00 0.95 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 2959 2768 1598 3021 1630 1583 1628 1699 1417Flt Permitted 0.95 1.00 0.15 1.00 0.35 1.00 0.60 1.00 1.00Satd. Flow (perm) 2959 2768 251 3021 605 1583 1021 1699 1417Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 154 516 449 73 616 70 330 179 86 61 184 165RTOR Reduction (vph) 0 138 0 0 8 0 0 20 0 0 0 138Lane Group Flow (vph) 154 827 0 73 678 0 330 245 0 61 184 27Confl. Peds. (#/hr) 12 5 5 12 4 4Heavy Vehicles (%) 9% 7% 14% 4% 8% 9% 2% 4% 6% 2% 3% 5%Turn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Actuated Green, G (s) 6.5 28.1 33.0 26.8 31.0 21.8 19.7 13.5 13.5Effective Green, g (s) 10.5 30.5 33.0 29.2 30.0 24.5 17.7 16.2 13.5Actuated g/C Ratio 0.13 0.37 0.41 0.36 0.37 0.30 0.22 0.20 0.17Clearance Time (s) 4.0 6.4 3.0 6.4 3.0 6.7 3.0 6.7 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 381 1037 204 1083 392 476 260 338 235v/s Ratio Prot c0.05 c0.30 0.03 0.22 c0.14 0.16 0.01 0.11v/s Ratio Perm 0.12 c0.17 0.04 0.02v/c Ratio 0.40 0.80 0.36 0.63 0.84 0.52 0.23 0.54 0.12Uniform Delay, d1 32.6 22.7 16.6 21.6 20.8 23.5 25.9 29.3 28.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.5 4.1 0.8 0.9 14.8 0.5 0.3 1.1 0.1Delay (s) 33.1 26.8 17.4 22.5 35.6 24.1 26.2 30.4 29.0Level of Service C C B C D C C C CApproach Delay (s) 27.7 22.0 30.5 29.2Approach LOS C C C C

Intersection SummaryHCM 2000 Control Delay 27.0 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.78Actuated Cycle Length (s) 81.4 Sum of lost time (s) 15.0Intersection Capacity Utilization 74.3% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 1119: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 141 429 40 0 354 108 160 171 11 97 156 184Future Volume (vph) 141 429 40 0 354 108 160 171 11 97 156 184Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 1 0 1 0 0 0 1 1Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 1.00 1.00 1.00 1.00 1.00Frt 0.987 0.965 0.996 0.850Flt Protected 0.950 0.977 0.950Satd. Flow (prot) 1554 3055 0 1750 2957 0 0 1672 0 1630 1667 1417Flt Permitted 0.439 0.773 0.546Satd. Flow (perm) 716 3055 0 1750 2957 0 0 1323 0 936 1667 1417Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 16 65 2 200Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 5 3 3 5 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 7% 7% 9% 0% 9% 5% 1% 2% 11% 2% 5% 5%Adj. Flow (vph) 153 466 43 0 385 117 174 186 12 105 170 200Shared Lane Traffic (%)Lane Group Flow (vph) 153 509 0 0 502 0 0 372 0 105 170 200Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 1120: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm NA Perm NA Perm NA PermProtected Phases 4 8 2 6Permitted Phases 4 8 2 6 6Detector Phase 4 4 8 8 2 2 6 6 6Switch PhaseMinimum Initial (s) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 27.1 27.1 27.1 27.1 33.1 33.1 33.1 33.1 33.1Total Split (s) 47.0 47.0 47.0 47.0 40.2 40.2 40.2 40.2 40.2Total Split (%) 53.9% 53.9% 53.9% 53.9% 46.1% 46.1% 46.1% 46.1% 46.1%Maximum Green (s) 40.9 40.9 40.9 40.9 34.1 34.1 34.1 34.1 34.1Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 13.0 17.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 21.4 21.4 21.4 22.9 22.9 22.9 20.6Actuated g/C Ratio 0.40 0.40 0.40 0.43 0.43 0.43 0.39v/c Ratio 0.53 0.41 0.41 0.65 0.26 0.24 0.30Control Delay 21.5 12.6 11.3 19.9 13.7 12.2 3.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 21.5 12.6 11.3 19.9 13.7 12.2 3.8LOS C B B B B B AApproach Delay 14.7 11.3 19.9 9.0Approach LOS B B B A

Intersection SummaryArea Type: OtherCycle Length: 87.2Actuated Cycle Length: 53.2Natural Cycle: 65Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.65Intersection Signal Delay: 13.5 Intersection LOS: BIntersection Capacity Utilization 65.9% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 1121: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBL EBT WBT NBT SBL SBT SBRLane Group Flow (vph) 153 509 502 372 105 170 200v/c Ratio 0.53 0.41 0.41 0.65 0.26 0.24 0.30Control Delay 21.5 12.6 11.3 19.9 13.7 12.2 3.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 21.5 12.6 11.3 19.9 13.7 12.2 3.8Queue Length 50th (m) 10.2 16.1 14.1 24.7 5.7 9.1 0.0Queue Length 95th (m) 34.5 38.0 34.4 76.2 21.6 29.7 12.0Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 50.0 25.0Base Capacity (vph) 583 2493 2422 969 685 1220 1053Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.26 0.20 0.21 0.38 0.15 0.14 0.19

Intersection Summary

Page 1122: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 141 429 40 0 354 108 160 171 11 97 156 184Future Volume (vph) 141 429 40 0 354 108 160 171 11 97 156 184Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.99 0.97 1.00 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.98 0.95 1.00 1.00Satd. Flow (prot) 1551 3057 2958 1671 1629 1667 1417Flt Permitted 0.44 1.00 1.00 0.77 0.55 1.00 1.00Satd. Flow (perm) 717 3057 2958 1321 936 1667 1417Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 153 466 43 0 385 117 174 186 12 105 170 200RTOR Reduction (vph) 0 9 0 0 39 0 0 1 0 0 0 120Lane Group Flow (vph) 153 500 0 0 463 0 0 371 0 105 170 80Confl. Peds. (#/hr) 5 3 3 5 1 1Heavy Vehicles (%) 7% 7% 9% 0% 9% 5% 1% 2% 11% 2% 5% 5%Turn Type Perm NA Perm NA Perm NA Perm NA PermProtected Phases 4 8 2 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 19.0 19.0 19.0 20.6 20.6 20.6 20.6Effective Green, g (s) 21.1 21.1 21.1 22.7 22.7 22.7 20.6Actuated g/C Ratio 0.41 0.41 0.41 0.44 0.44 0.44 0.40Clearance Time (s) 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 292 1245 1204 578 410 730 563v/s Ratio Prot 0.16 0.16 0.10v/s Ratio Perm c0.21 c0.28 0.11 0.06v/c Ratio 0.52 0.40 0.38 0.64 0.26 0.23 0.14Uniform Delay, d1 11.6 10.9 10.8 11.4 9.2 9.1 10.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.7 0.2 0.2 2.4 0.3 0.2 0.1Delay (s) 13.3 11.1 11.0 13.8 9.5 9.3 10.1Level of Service B B B B A A BApproach Delay (s) 11.6 11.0 13.8 9.7Approach LOS B B B A

Intersection SummaryHCM 2000 Control Delay 11.4 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.58Actuated Cycle Length (s) 51.8 Sum of lost time (s) 8.0Intersection Capacity Utilization 65.9% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 1123: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 54 399 84 93 316 75 95 148 92 64 141 50Future Volume (vph) 54 399 84 93 316 75 95 148 92 64 141 50Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95Frt 0.974 0.971 0.943 0.961Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3175 0 1630 3165 0 1630 3074 0 1630 3133 0Flt Permitted 0.477 0.329 0.614 0.591Satd. Flow (perm) 818 3175 0 564 3165 0 1053 3074 0 1014 3133 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 36 43 100 54Link Speed (k/h) 50 50 50 50Link Distance (m) 136.7 140.7 128.5 129.6Travel Time (s) 9.8 10.1 9.3 9.3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 59 434 91 101 343 82 103 161 100 70 153 54Shared Lane Traffic (%)Lane Group Flow (vph) 59 525 0 101 425 0 103 261 0 70 207 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6

Page 1124: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 7 4 3 8 5 2 1 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 9.5 24.3 9.5 24.3 9.5 24.3 10.0 24.3Total Split (s) 9.6 24.3 10.7 25.4 10.0 25.0 10.0 25.0Total Split (%) 13.7% 34.7% 15.3% 36.3% 14.3% 35.7% 14.3% 35.7%Maximum Green (s) 6.6 18.0 7.7 19.1 7.0 18.7 7.0 18.7Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1All-Red Time (s) 0.0 2.2 0.0 2.2 0.0 2.2 0.0 2.2Lost Time Adjust (s) 1.0 -2.3 1.0 -2.3 1.0 -2.3 1.0 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 21.1 15.8 22.4 16.4 16.6 10.9 16.3 10.7Actuated g/C Ratio 0.39 0.29 0.41 0.30 0.31 0.20 0.30 0.20v/c Ratio 0.15 0.56 0.29 0.43 0.27 0.38 0.19 0.31Control Delay 9.4 18.0 10.8 15.3 14.4 14.0 13.5 16.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.4 18.0 10.8 15.3 14.4 14.0 13.5 16.0LOS A B B B B B B BApproach Delay 17.1 14.4 14.1 15.3Approach LOS B B B B

Intersection SummaryArea Type: OtherCycle Length: 70Actuated Cycle Length: 54.4Natural Cycle: 70Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.56Intersection Signal Delay: 15.4 Intersection LOS: BIntersection Capacity Utilization 45.6% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 108: Stanley Ave & Marine Land Pkway (RR 49)

Page 1125: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT WBL WBT NBL NBT SBL SBTLane Group Flow (vph) 59 525 101 425 103 261 70 207v/c Ratio 0.15 0.56 0.29 0.43 0.27 0.38 0.19 0.31Control Delay 9.4 18.0 10.8 15.3 14.4 14.0 13.5 16.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.4 18.0 10.8 15.3 14.4 14.0 13.5 16.0Queue Length 50th (m) 3.1 22.2 5.4 16.4 6.9 7.5 4.6 7.2Queue Length 95th (m) 8.9 38.2 13.4 29.0 17.3 17.7 12.8 16.2Internal Link Dist (m) 112.7 116.7 104.5 105.6Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 407 1223 373 1288 393 1264 382 1259Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.14 0.43 0.27 0.33 0.26 0.21 0.18 0.16

Intersection Summary

Page 1126: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 54 399 84 93 316 75 95 148 92 64 141 50Future Volume (vph) 54 399 84 93 316 75 95 148 92 64 141 50Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.95 1.00 0.95Frt 1.00 0.97 1.00 0.97 1.00 0.94 1.00 0.96Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1630 3175 1630 3165 1630 3072 1630 3132Flt Permitted 0.48 1.00 0.33 1.00 0.61 1.00 0.59 1.00Satd. Flow (perm) 818 3175 564 3165 1053 3072 1013 3132Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 59 434 91 101 343 82 103 161 100 70 153 54RTOR Reduction (vph) 0 26 0 0 30 0 0 80 0 0 43 0Lane Group Flow (vph) 59 499 0 101 395 0 103 181 0 70 164 0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Actuated Green, G (s) 19.7 13.4 21.1 14.1 15.3 8.6 15.1 8.5Effective Green, g (s) 17.7 15.7 19.1 16.4 13.3 10.9 13.1 10.8Actuated g/C Ratio 0.33 0.29 0.35 0.30 0.25 0.20 0.24 0.20Clearance Time (s) 3.0 6.3 3.0 6.3 3.0 6.3 3.0 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 346 919 316 957 319 617 308 624v/s Ratio Prot 0.02 c0.16 c0.04 0.12 c0.03 c0.06 0.02 0.05v/s Ratio Perm 0.04 0.08 0.05 0.03v/c Ratio 0.17 0.54 0.32 0.41 0.32 0.29 0.23 0.26Uniform Delay, d1 12.8 16.2 12.3 15.1 16.5 18.4 16.3 18.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.7 0.6 0.3 0.6 0.3 0.4 0.2Delay (s) 13.0 16.9 12.8 15.4 17.1 18.6 16.7 18.6Level of Service B B B B B B B BApproach Delay (s) 16.5 14.9 18.2 18.1Approach LOS B B B B

Intersection SummaryHCM 2000 Control Delay 16.6 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.41Actuated Cycle Length (s) 54.2 Sum of lost time (s) 16.0Intersection Capacity Utilization 45.6% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 1127: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 148 4 198 0 0 94Future Volume (vph) 148 4 198 0 0 94Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.996Flt Protected 0.953Satd. Flow (prot) 3159 0 3260 0 0 3260Flt Permitted 0.953Satd. Flow (perm) 3159 0 3260 0 0 3260Right Turn on Red Yes YesSatd. Flow (RTOR) 4Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 161 4 215 0 0 102Shared Lane Traffic (%)Lane Group Flow (vph) 165 0 215 0 0 102Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch PhaseMinimum Initial (s) 8.0 8.0 8.0

Page 1128: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group WBL WBR NBT NBR SBL SBTMinimum Split (s) 24.2 22.5 22.5Total Split (s) 28.2 22.5 22.5Total Split (%) 55.6% 44.4% 44.4%Maximum Green (s) 23.0 17.0 17.0Yellow Time (s) 3.2 3.5 3.5All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -1.2 -1.5 -1.5Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 9.2 9.5 9.5Actuated g/C Ratio 0.34 0.36 0.36v/c Ratio 0.15 0.19 0.09Control Delay 6.3 6.4 6.0Queue Delay 0.0 0.0 0.0Total Delay 6.3 6.4 6.0LOS A A AApproach Delay 6.3 6.4 6.0Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50.7Actuated Cycle Length: 26.7Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.19Intersection Signal Delay: 6.3 Intersection LOS: AIntersection Capacity Utilization 20.0% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 1129: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group WBL NBT SBTLane Group Flow (vph) 165 215 102v/c Ratio 0.15 0.19 0.09Control Delay 6.3 6.4 6.0Queue Delay 0.0 0.0 0.0Total Delay 6.3 6.4 6.0Queue Length 50th (m) 2.2 3.0 1.3Queue Length 95th (m) 4.7 6.0 3.3Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2863 2258 2258Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.06 0.10 0.05

Intersection Summary

Page 1130: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 32

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 148 4 198 0 0 94Future Volume (vph) 148 4 198 0 0 94Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 1.00 1.00 1.00Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 3162 3260 3260Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 3162 3260 3260Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 161 4 215 0 0 102RTOR Reduction (vph) 3 0 0 0 0 0Lane Group Flow (vph) 162 0 215 0 0 102Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.0 8.0 8.0Effective Green, g (s) 9.2 9.5 9.5Actuated g/C Ratio 0.34 0.36 0.36Clearance Time (s) 5.2 5.5 5.5Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1089 1159 1159v/s Ratio Prot c0.05 c0.07v/s Ratio Perm 0.03v/c Ratio 0.15 0.19 0.09Uniform Delay, d1 6.0 5.9 5.7Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.0 0.0 0.0Delay (s) 6.1 6.0 5.7Level of Service A A AApproach Delay (s) 6.1 6.0 5.7Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.0 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.18Actuated Cycle Length (s) 26.7 Sum of lost time (s) 9.5Intersection Capacity Utilization 20.0% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 1131: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 90 0 0 109 266 127Future Volume (vph) 90 0 0 109 266 127Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Ped Bike Factor 0.99Frt 0.952Flt Protected 0.950Satd. Flow (prot) 1614 0 0 2969 2992 0Flt Permitted 0.950Satd. Flow (perm) 1614 0 0 2969 2992 0Right Turn on Red Yes YesSatd. Flow (RTOR) 138Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 12% 7% 1%Adj. Flow (vph) 98 0 0 118 289 138Shared Lane Traffic (%)Lane Group Flow (vph) 98 0 0 118 427 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2

Page 1132: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group EBL EBR NBL NBT SBT SBRDetector Phase 4 2 2 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 31.3 42.0 42.0 42.0Total Split (%) 42.7% 57.3% 57.3% 57.3%Maximum Green (s) 25.0 35.0 35.0 35.0Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.9 2.9 2.9Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 10.4 13.0 13.0Actuated g/C Ratio 0.33 0.41 0.41v/c Ratio 0.18 0.10 0.32Control Delay 8.5 5.9 4.9Queue Delay 0.0 0.0 0.0Total Delay 8.5 5.9 4.9LOS A A AApproach Delay 8.5 5.9 4.9Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 73.3Actuated Cycle Length: 31.4Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.32Intersection Signal Delay: 5.6 Intersection LOS: AIntersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 1133: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group EBL NBT SBTLane Group Flow (vph) 98 118 427v/c Ratio 0.18 0.10 0.32Control Delay 8.5 5.9 4.9Queue Delay 0.0 0.0 0.0Total Delay 8.5 5.9 4.9Queue Length 50th (m) 3.5 1.7 4.6Queue Length 95th (m) 8.9 4.2 9.7Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1568 2969 2992Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.06 0.04 0.14

Intersection Summary

Page 1134: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 36

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 90 0 0 109 266 127Future Volume (vph) 90 0 0 109 266 127Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95Frpb, ped/bikes 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 1.00 0.95Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1614 2969 2991Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 1614 2969 2991Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 98 0 0 118 289 138RTOR Reduction (vph) 0 0 0 0 81 0Lane Group Flow (vph) 98 0 0 118 346 0Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 3% 0% 0% 12% 7% 1%Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 8.1 10.0 10.0Effective Green, g (s) 10.4 13.0 13.0Actuated g/C Ratio 0.33 0.41 0.41Clearance Time (s) 6.3 7.0 7.0Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 534 1229 1238v/s Ratio Prot c0.06 0.04 c0.12v/s Ratio Permv/c Ratio 0.18 0.10 0.28Uniform Delay, d1 7.5 5.6 6.1Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.1Delay (s) 7.6 5.6 6.2Level of Service A A AApproach Delay (s) 7.6 5.6 6.2Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.3 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.24Actuated Cycle Length (s) 31.4 Sum of lost time (s) 8.0Intersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 1135: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Future Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1667 0 1750 1716 1488 0 1750 0 2041 1488 0Flt Permitted 0.466 0.950Satd. Flow (perm) 816 1667 0 1750 1716 1488 0 1750 0 2041 1488 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 126 884Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 5% 0% 0% 2% 0% 0% 0% 0% 58% 0% 0%Adj. Flow (vph) 25 105 0 0 132 23 0 0 0 13 0 2Shared Lane Traffic (%)Lane Group Flow (vph) 25 105 0 0 132 23 0 0 0 13 2 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 1136: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 12.5 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 18.0 52.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (%) 13.9% 40.5% 26.6% 26.6% 26.6% 29.7% 29.7% 29.7% 29.7%Maximum Green (s) 15.0 45.0 27.0 27.0 27.0 31.0 31.0 31.0 31.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.5 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.53 0.53 0.29 0.29 0.29 0.29v/c Ratio 0.04 0.12 0.26 0.04 0.02 0.00Control Delay 5.3 5.8 14.2 0.1 11.8 0.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.3 5.8 14.2 0.1 11.8 0.0LOS A A B A B AApproach Delay 5.7 12.1 10.2Approach LOS A B B

Intersection SummaryArea Type: OtherCycle Length: 129.5Actuated Cycle Length: 46Natural Cycle: 125Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.26Intersection Signal Delay: 9.3 Intersection LOS: AIntersection Capacity Utilization 35.0% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 1137: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 25 105 132 23 13 2v/c Ratio 0.04 0.12 0.26 0.04 0.02 0.00Control Delay 5.3 5.8 14.2 0.1 11.8 0.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.3 5.8 14.2 0.1 11.8 0.0Queue Length 50th (m) 0.9 3.9 8.4 0.0 0.4 0.0Queue Length 95th (m) 3.2 9.2 18.8 0.0 1.8 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 692 1667 1137 1029 1530 1337Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.04 0.06 0.12 0.02 0.01 0.00

Intersection Summary

Page 1138: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Future Volume (vph) 23 97 0 0 121 21 0 0 0 12 0 2Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1667 1716 1488 2041 1488Flt Permitted 0.47 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 815 1667 1716 1488 2041 1488Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 25 105 0 0 132 23 0 0 0 13 0 2RTOR Reduction (vph) 0 0 0 0 0 16 0 0 0 0 1 0Lane Group Flow (vph) 25 105 0 0 132 7 0 0 0 13 1 0Heavy Vehicles (%) 0% 5% 0% 0% 2% 0% 0% 0% 0% 58% 0% 0%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 21.0 21.0 10.0 10.0 10.0 10.0Effective Green, g (s) 20.0 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.43 0.53 0.29 0.29 0.29 0.29Clearance Time (s) 3.0 7.5 7.5 7.5 7.5 7.5Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 483 887 503 436 598 436v/s Ratio Prot 0.01 c0.06 c0.08 c0.01 0.00v/s Ratio Perm 0.01 0.00v/c Ratio 0.05 0.12 0.26 0.02 0.02 0.00Uniform Delay, d1 7.6 5.4 12.4 11.5 11.6 11.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.0 0.0 0.1 0.0 0.0 0.0Delay (s) 7.7 5.4 12.6 11.5 11.6 11.5Level of Service A A B B B BApproach Delay (s) 5.8 12.4 0.0 11.6Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 9.5 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.16Actuated Cycle Length (s) 46.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 35.0% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 1139: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 15 89 1 276 82 107 2 157 459 114 159 23Future Volume (vph) 15 89 1 276 82 107 2 157 459 114 159 23Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 0.0 0.0 100.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.999 0.915 0.850 0.981Flt Protected 0.993 0.950 0.999 0.950Satd. Flow (prot) 0 1634 0 1525 1470 0 0 1682 1430 1433 1429 0Flt Permitted 0.953 0.684 0.997 0.648Satd. Flow (perm) 0 1568 0 1098 1470 0 0 1678 1430 978 1429 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 1 107 499 12Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 8% 6% 0% 9% 5% 12% 0% 4% 4% 16% 23% 0%Adj. Flow (vph) 16 97 1 300 89 116 2 171 499 124 173 25Shared Lane Traffic (%)Lane Group Flow (vph) 0 114 0 300 205 0 0 173 499 124 198 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 1140: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0Total Split (%) 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0% 50.0%Maximum Green (s) 33.7 33.7 33.7 33.7 33.7 33.7 33.7 33.7 33.7Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 0.0 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 6.3 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 24.6 24.6 24.6 20.0 17.5 20.0 20.0Actuated g/C Ratio 0.46 0.46 0.46 0.38 0.33 0.38 0.38v/c Ratio 0.16 0.59 0.28 0.28 0.62 0.34 0.36Control Delay 9.9 17.2 6.2 14.3 5.6 16.6 14.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.9 17.2 6.2 14.3 5.6 16.6 14.8LOS A B A B A B BApproach Delay 9.9 12.8 7.8 15.5Approach LOS A B A B

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 53.2Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.62Intersection Signal Delay: 11.0 Intersection LOS: BIntersection Capacity Utilization 61.7% ICU Level of Service BAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 1141: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 114 300 205 173 499 124 198v/c Ratio 0.16 0.59 0.28 0.28 0.62 0.34 0.36Control Delay 9.9 17.2 6.2 14.3 5.6 16.6 14.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.9 17.2 6.2 14.3 5.6 16.6 14.8Queue Length 50th (m) 5.6 19.0 4.8 11.2 0.0 8.3 12.5Queue Length 95th (m) 18.1 56.1 19.7 29.8 18.4 24.8 33.6Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 50.0 100.0 50.0Base Capacity (vph) 1130 791 1089 1209 1131 704 1033Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.10 0.38 0.19 0.14 0.44 0.18 0.19

Intersection Summary

Page 1142: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 15 89 1 276 82 107 2 157 459 114 159 23Future Volume (vph) 15 89 1 276 82 107 2 157 459 114 159 23Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 6.3 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.92 1.00 0.85 1.00 0.98Flt Protected 0.99 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1634 1525 1470 1682 1430 1433 1430Flt Permitted 0.95 0.68 1.00 1.00 1.00 0.65 1.00Satd. Flow (perm) 1568 1098 1470 1678 1430 977 1430Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 16 97 1 300 89 116 2 171 499 124 173 25RTOR Reduction (vph) 0 1 0 0 57 0 0 0 332 0 7 0Lane Group Flow (vph) 0 113 0 300 148 0 0 173 167 124 191 0Heavy Vehicles (%) 8% 6% 0% 9% 5% 12% 0% 4% 4% 16% 23% 0%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 22.2 22.2 22.2 17.5 17.5 17.5 17.5Effective Green, g (s) 24.5 24.5 24.5 19.8 17.5 19.8 19.8Actuated g/C Ratio 0.47 0.47 0.47 0.38 0.33 0.38 0.38Clearance Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 734 514 688 635 478 369 541v/s Ratio Prot 0.10 c0.13v/s Ratio Perm 0.07 c0.27 0.10 0.12 0.13v/c Ratio 0.15 0.58 0.22 0.27 0.35 0.34 0.35Uniform Delay, d1 8.0 10.2 8.2 11.3 13.1 11.6 11.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 3.2 0.4 0.7 1.2 1.5 1.1Delay (s) 8.2 13.4 8.7 11.9 14.4 13.1 12.8Level of Service A B A B B B BApproach Delay (s) 8.2 11.5 13.7 12.9Approach LOS A B B B

Intersection SummaryHCM 2000 Control Delay 12.5 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.48Actuated Cycle Length (s) 52.3 Sum of lost time (s) 8.0Intersection Capacity Utilization 61.7% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 1143: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan114: Lyons Creek Rd & TW Access Rd Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 323 823 597 92 76 266Future Volume (vph) 323 823 597 92 76 266Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 50.0 0.0 0.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1630 1716 1716 1458 1630 1458Flt Permitted 0.145 0.950Satd. Flow (perm) 249 1716 1716 1458 1630 1458Right Turn on Red Yes YesSatd. Flow (RTOR) 79 289Link Speed (k/h) 50 50 50Link Distance (m) 814.9 254.1 222.4Travel Time (s) 58.7 18.3 16.0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 351 895 649 100 83 289Shared Lane Traffic (%)Lane Group Flow (vph) 351 895 649 100 83 289Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 2 2 1 1 1Detector Template Left Thru Thru Right Left RightLeading Detector (m) 2.0 10.0 10.0 2.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6 2.0 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type pm+pt NA NA Perm Prot PermProtected Phases 7 4 8 6Permitted Phases 4 8 6

Page 1144: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan114: Lyons Creek Rd & TW Access Rd Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 46

Lane Group EBL EBT WBT WBR SBL SBRDetector Phase 7 4 8 8 6 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 9.5 24.3 24.3 24.3 24.3 24.3Total Split (s) 21.0 64.0 43.0 43.0 26.0 26.0Total Split (%) 23.3% 71.1% 47.8% 47.8% 28.9% 28.9%Maximum Green (s) 18.0 57.7 36.7 36.7 19.7 19.7Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) 1.0 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 53.9 53.9 33.7 33.7 12.0 12.0Actuated g/C Ratio 0.73 0.73 0.45 0.45 0.16 0.16v/c Ratio 0.73 0.72 0.83 0.14 0.32 0.61Control Delay 23.2 10.3 29.4 5.2 33.0 10.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 23.2 10.3 29.4 5.2 33.0 10.0LOS C B C A C AApproach Delay 13.9 26.2 15.1Approach LOS B C B

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 74.1Natural Cycle: 90Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.83Intersection Signal Delay: 18.0 Intersection LOS: BIntersection Capacity Utilization 68.1% ICU Level of Service CAnalysis Period (min) 15

Splits and Phases: 114: Lyons Creek Rd & TW Access Rd

Page 1145: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan114: Lyons Creek Rd & TW Access Rd Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBL EBT WBT WBR SBL SBRLane Group Flow (vph) 351 895 649 100 83 289v/c Ratio 0.73 0.72 0.83 0.14 0.32 0.61Control Delay 23.2 10.3 29.4 5.2 33.0 10.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 23.2 10.3 29.4 5.2 33.0 10.0Queue Length 50th (m) 26.1 57.0 80.6 1.7 12.1 0.0Queue Length 95th (m) #75.0 130.8 #158.6 10.4 24.8 20.7Internal Link Dist (m) 790.9 230.1 198.4Turn Bay Length (m) 50.0 50.0Base Capacity (vph) 506 1390 927 824 496 645Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.69 0.64 0.70 0.12 0.17 0.45

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1146: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan114: Lyons Creek Rd & TW Access Rd Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 323 823 597 92 76 266Future Volume (vph) 323 823 597 92 76 266Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1630 1716 1716 1458 1630 1458Flt Permitted 0.14 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 248 1716 1716 1458 1630 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 351 895 649 100 83 289RTOR Reduction (vph) 0 0 0 43 0 242Lane Group Flow (vph) 351 895 649 57 83 47Turn Type pm+pt NA NA Perm Prot PermProtected Phases 7 4 8 6Permitted Phases 4 8 6Actuated Green, G (s) 51.6 51.6 31.5 31.5 9.6 9.6Effective Green, g (s) 50.6 53.9 33.8 33.8 11.9 11.9Actuated g/C Ratio 0.69 0.73 0.46 0.46 0.16 0.16Clearance Time (s) 3.0 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 471 1253 785 667 262 235v/s Ratio Prot 0.16 c0.52 c0.38 c0.05v/s Ratio Perm 0.35 0.04 0.03v/c Ratio 0.75 0.71 0.83 0.09 0.32 0.20Uniform Delay, d1 15.0 5.6 17.4 11.3 27.4 26.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 6.3 2.0 7.1 0.1 0.7 0.4Delay (s) 21.3 7.6 24.6 11.3 28.1 27.2Level of Service C A C B C CApproach Delay (s) 11.4 22.8 27.4Approach LOS B C C

Intersection SummaryHCM 2000 Control Delay 17.5 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.72Actuated Cycle Length (s) 73.8 Sum of lost time (s) 12.0Intersection Capacity Utilization 68.1% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 1147: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 38 2 2 298 305 14Future Volume (vph) 38 2 2 298 305 14Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.994 0.994Flt Protected 0.954Satd. Flow (prot) 1440 0 0 1592 1613 0Flt Permitted 0.954Satd. Flow (perm) 1440 0 0 1592 1613 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 16% 0% 0% 10% 8% 4%Adj. Flow (vph) 41 2 2 324 332 15Shared Lane Traffic (%)Lane Group Flow (vph) 43 0 0 326 347 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 28.8% ICU Level of Service AAnalysis Period (min) 15

Page 1148: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 38 2 2 298 305 14Future Volume (Veh/h) 38 2 2 298 305 14Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 41 2 2 324 332 15PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 668 340 347vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 668 340 347tC, single (s) 6.6 6.2 4.1tC, 2 stage (s)tF (s) 3.6 3.3 2.2p0 queue free % 90 100 100cM capacity (veh/h) 402 707 1223

Direction, Lane # EB 1 NB 1 SB 1Volume Total 43 326 347Volume Left 41 2 0Volume Right 2 0 15cSH 410 1223 1700Volume to Capacity 0.10 0.00 0.20Queue Length 95th (m) 2.8 0.0 0.0Control Delay (s) 14.8 0.1 0.0Lane LOS B AApproach Delay (s) 14.8 0.1 0.0Approach LOS B

Intersection SummaryAverage Delay 0.9Intersection Capacity Utilization 28.8% ICU Level of Service AAnalysis Period (min) 15

Page 1149: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 16 12 41 284 230 77Future Volume (vph) 16 12 41 284 230 77Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.941 0.966Flt Protected 0.972 0.994Satd. Flow (prot) 1239 0 0 1599 1587 0Flt Permitted 0.972 0.994Satd. Flow (perm) 1239 0 0 1599 1587 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 21% 40% 14% 8% 7% 5%Adj. Flow (vph) 17 13 45 309 250 84Shared Lane Traffic (%)Lane Group Flow (vph) 30 0 0 354 334 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 50.3% ICU Level of Service AAnalysis Period (min) 15

Page 1150: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 52

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 16 12 41 284 230 77Future Volume (Veh/h) 16 12 41 284 230 77Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 13 45 309 250 84PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 691 292 334vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 691 292 334tC, single (s) 6.6 6.6 4.2tC, 2 stage (s)tF (s) 3.7 3.7 2.3p0 queue free % 95 98 96cM capacity (veh/h) 368 666 1161

Direction, Lane # EB 1 NB 1 SB 1Volume Total 30 354 334Volume Left 17 45 0Volume Right 13 0 84cSH 456 1161 1700Volume to Capacity 0.07 0.04 0.20Queue Length 95th (m) 1.7 1.0 0.0Control Delay (s) 13.4 1.4 0.0Lane LOS B AApproach Delay (s) 13.4 1.4 0.0Approach LOS B

Intersection SummaryAverage Delay 1.2Intersection Capacity Utilization 50.3% ICU Level of Service AAnalysis Period (min) 15

Page 1151: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 20 41 91 305 197 45Future Volume (vph) 20 41 91 305 197 45Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.909 0.975Flt Protected 0.984 0.989Satd. Flow (prot) 1086 0 0 1640 1521 0Flt Permitted 0.984 0.989Satd. Flow (perm) 1086 0 0 1640 1521 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 298.3 331.4Travel Time (s) 14.9 21.5 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 28% 52% 4% 6% 15% 0%Adj. Flow (vph) 22 45 99 332 214 49Shared Lane Traffic (%)Lane Group Flow (vph) 67 0 0 431 263 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 51.1% ICU Level of Service AAnalysis Period (min) 15

Page 1152: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 20 41 91 305 197 45Future Volume (Veh/h) 20 41 91 305 197 45Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 22 45 99 332 214 49PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 768 238 263vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 768 238 263tC, single (s) 6.7 6.7 4.1tC, 2 stage (s)tF (s) 3.8 3.8 2.2p0 queue free % 93 93 92cM capacity (veh/h) 309 692 1290

Direction, Lane # EB 1 NB 1 SB 1Volume Total 67 431 263Volume Left 22 99 0Volume Right 45 0 49cSH 492 1290 1700Volume to Capacity 0.14 0.08 0.15Queue Length 95th (m) 3.8 2.0 0.0Control Delay (s) 13.5 2.4 0.0Lane LOS B AApproach Delay (s) 13.5 2.4 0.0Approach LOS B

Intersection SummaryAverage Delay 2.6Intersection Capacity Utilization 51.1% ICU Level of Service AAnalysis Period (min) 15

Page 1153: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 108 12 150 8 21 27 93 261 15 9 98 130Future Volume (vph) 108 12 150 8 21 27 93 261 15 9 98 130Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.925 0.936 0.995 0.926Flt Protected 0.980 0.993 0.988 0.998Satd. Flow (prot) 0 1168 0 0 1627 0 0 1628 0 0 1459 0Flt Permitted 0.980 0.993 0.988 0.998Satd. Flow (perm) 0 1168 0 0 1627 0 0 1628 0 0 1459 0Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 29.6Travel Time (s) 8.5 7.8 70.5 2.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 20% 0% 50% 0% 0% 0% 0% 7% 18% 13% 25% 0%Adj. Flow (vph) 117 13 163 9 23 29 101 284 16 10 107 141Shared Lane Traffic (%)Lane Group Flow (vph) 0 293 0 0 61 0 0 401 0 0 258 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 70.1% ICU Level of Service CAnalysis Period (min) 15

Page 1154: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 56

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 108 12 150 8 21 27 93 261 15 9 98 130Future Volume (Veh/h) 108 12 150 8 21 27 93 261 15 9 98 130Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 117 13 163 9 23 29 101 284 16 10 107 141PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 732 700 178 861 762 292 248 300vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 732 700 178 861 762 292 248 300tC, single (s) 7.3 6.5 6.7 7.1 6.5 6.2 4.1 4.2tC, 2 stage (s)tF (s) 3.7 4.0 3.8 3.5 4.0 3.3 2.2 2.3p0 queue free % 56 96 78 95 93 96 92 99cM capacity (veh/h) 267 335 756 198 309 752 1330 1201

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 293 61 401 258Volume Left 117 9 101 10Volume Right 163 29 16 141cSH 424 385 1330 1201Volume to Capacity 0.69 0.16 0.08 0.01Queue Length 95th (m) 41.0 4.5 2.0 0.2Control Delay (s) 30.5 16.1 2.5 0.4Lane LOS D C A AApproach Delay (s) 30.5 16.1 2.5 0.4Approach LOS D C

Intersection SummaryAverage Delay 10.9Intersection Capacity Utilization 70.1% ICU Level of Service CAnalysis Period (min) 15

Page 1155: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 78 43 69 120 161 81Future Volume (vph) 78 43 69 120 161 81Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.952 0.850Flt Protected 0.969 0.950Satd. Flow (prot) 1391 0 1299 1683 1683 1162Flt Permitted 0.969 0.950Satd. Flow (perm) 1391 0 1299 1683 1683 1162Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 25% 0% 28% 4% 4% 28%Adj. Flow (vph) 85 47 75 130 175 88Shared Lane Traffic (%)Lane Group Flow (vph) 132 0 75 130 175 88Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 30.9% ICU Level of Service AAnalysis Period (min) 15

Page 1156: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 58

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 78 43 69 120 161 81Future Volume (Veh/h) 78 43 69 120 161 81Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 85 47 75 130 175 88PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 455 175 263vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 455 175 263tC, single (s) 6.6 6.2 4.4tC, 2 stage (s)tF (s) 3.7 3.3 2.5p0 queue free % 83 95 94cM capacity (veh/h) 489 874 1164

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 132 75 130 175 88Volume Left 85 75 0 0 0Volume Right 47 0 0 0 88cSH 580 1164 1700 1700 1700Volume to Capacity 0.23 0.06 0.08 0.10 0.05Queue Length 95th (m) 7.0 1.6 0.0 0.0 0.0Control Delay (s) 13.0 8.3 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 13.0 3.0 0.0Approach LOS B

Intersection SummaryAverage Delay 3.9Intersection Capacity Utilization 30.9% ICU Level of Service AAnalysis Period (min) 15

Page 1157: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 59

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 117 6 183 97 23 169Future Volume (vph) 117 6 183 97 23 169Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.993 0.953Flt Protected 0.955 0.994Satd. Flow (prot) 1660 0 1595 0 0 1675Flt Permitted 0.955 0.994Satd. Flow (perm) 1660 0 1595 0 0 1675Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 7% 0% 10% 3%Adj. Flow (vph) 127 7 199 105 25 184Shared Lane Traffic (%)Lane Group Flow (vph) 134 0 304 0 0 209Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 44.8% ICU Level of Service AAnalysis Period (min) 15

Page 1158: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 60

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 117 6 183 97 23 169Future Volume (Veh/h) 117 6 183 97 23 169Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 127 7 199 105 25 184PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 486 252 304vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 486 252 304tC, single (s) 6.4 6.2 4.2tC, 2 stage (s)tF (s) 3.5 3.3 2.3p0 queue free % 76 99 98cM capacity (veh/h) 533 792 1213

Direction, Lane # WB 1 NB 1 SB 1Volume Total 134 304 209Volume Left 127 0 25Volume Right 7 105 0cSH 542 1700 1213Volume to Capacity 0.25 0.18 0.02Queue Length 95th (m) 7.7 0.0 0.5Control Delay (s) 13.8 0.0 1.1Lane LOS B AApproach Delay (s) 13.8 0.0 1.1Approach LOS B

Intersection SummaryAverage Delay 3.2Intersection Capacity Utilization 44.8% ICU Level of Service AAnalysis Period (min) 15

Page 1159: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 61

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 489 352 0 370 113Future Volume (vph) 0 489 352 0 370 113Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3079 3079 0 1646 1488Flt Permitted 0.950Satd. Flow (perm) 0 3079 3079 0 1646 1488Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 8% 8% 0% 1% 0%Adj. Flow (vph) 0 532 383 0 402 123Shared Lane Traffic (%)Lane Group Flow (vph) 0 532 383 0 402 123Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 43.6% ICU Level of Service AAnalysis Period (min) 15

Page 1160: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 62

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 0 489 352 0 370 113Future Volume (Veh/h) 0 489 352 0 370 113Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 532 383 0 402 123PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 5Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 383 649 192vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 383 649 192tC, single (s) 4.1 6.8 6.9tC, 2 stage (s)tF (s) 2.2 3.5 3.3p0 queue free % 100 1 85cM capacity (veh/h) 1187 405 824

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1Volume Total 266 266 192 192 525Volume Left 0 0 0 0 402Volume Right 0 0 0 0 123cSH 1700 1700 1700 1700 498Volume to Capacity 0.16 0.16 0.11 0.11 1.05Queue Length 95th (m) 0.0 0.0 0.0 0.0 126.6Control Delay (s) 0.0 0.0 0.0 0.0 84.3Lane LOS FApproach Delay (s) 0.0 0.0 84.3Approach LOS F

Intersection SummaryAverage Delay 30.7Intersection Capacity Utilization 43.6% ICU Level of Service AAnalysis Period (min) 15

Page 1161: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 63

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 848 0 0 531 142 298Future Volume (vph) 848 0 0 531 142 298Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 50.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 0.95 1.00 1.00 0.95 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 3023 0 0 3228 1471 1352Flt Permitted 0.950Satd. Flow (perm) 3023 0 0 3228 1471 1352Link Speed (k/h) 50 50 50Link Distance (m) 104.2 58.2 169.0Travel Time (s) 7.5 4.2 12.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 10% 0% 0% 3% 13% 10%Adj. Flow (vph) 922 0 0 577 154 324Shared Lane Traffic (%)Lane Group Flow (vph) 922 0 0 577 154 324Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 52.2% ICU Level of Service AAnalysis Period (min) 15

Page 1162: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan210: QEW WB Off-Ramp & Lyons Creek Rd (RR 47) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 64

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (veh/h) 848 0 0 531 142 298Future Volume (Veh/h) 848 0 0 531 142 298Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 922 0 0 577 154 324PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh) 6Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 922 1210 461vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 922 1210 461tC, single (s) 4.1 7.1 7.1tC, 2 stage (s)tF (s) 2.2 3.6 3.4p0 queue free % 100 4 38cM capacity (veh/h) 749 160 526

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1Volume Total 461 461 288 288 478Volume Left 0 0 0 0 154Volume Right 0 0 0 0 324cSH 1700 1700 1700 1700 496Volume to Capacity 0.27 0.27 0.17 0.17 0.96Queue Length 95th (m) 0.0 0.0 0.0 0.0 98.4Control Delay (s) 0.0 0.0 0.0 0.0 53.2Lane LOS FApproach Delay (s) 0.0 0.0 53.2Approach LOS F

Intersection SummaryAverage Delay 12.9Intersection Capacity Utilization 52.2% ICU Level of Service AAnalysis Period (min) 15

Page 1163: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 65

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 265 173 267 105 135 122Future Volume (vph) 265 173 267 105 135 122Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 1.0 50.0 0.0Storage Lanes 1 0 1 1Taper Length (m) 50.0 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.962 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1525 1667 1628 0 1498 1162Flt Permitted 0.950 0.950Satd. Flow (perm) 1525 1667 1628 0 1498 1162Link Speed (k/h) 50 50 50Link Distance (m) 176.2 179.7 978.6Travel Time (s) 12.7 12.9 70.5Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 9% 5% 2% 7% 11% 28%Adj. Flow (vph) 288 188 290 114 147 133Shared Lane Traffic (%)Lane Group Flow (vph) 288 188 404 0 147 133Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Stop Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 56.3% ICU Level of Service BAnalysis Period (min) 15

Page 1164: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan211: Lyons Creek Rd (RR 47) & Stanley Ave (RR 102) Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 66

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 265 173 267 105 135 122Future Volume (vph) 265 173 267 105 135 122Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 288 188 290 114 147 133

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total (vph) 288 188 404 147 133Volume Left (vph) 288 0 0 147 0Volume Right (vph) 0 0 114 0 133Hadj (s) 0.65 0.09 -0.11 0.69 -0.22Departure Headway (s) 6.7 6.1 5.8 7.5 6.6Degree Utilization, x 0.53 0.32 0.65 0.31 0.24Capacity (veh/h) 523 571 608 443 511Control Delay (s) 15.9 10.7 18.9 12.6 10.5Approach Delay (s) 13.9 18.9 11.6Approach LOS B C B

Intersection SummaryDelay 15.1Level of Service CIntersection Capacity Utilization 56.3% ICU Level of Service BAnalysis Period (min) 15

Page 1165: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 67

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 49 492 444 62 16 43Future Volume (vph) 49 492 444 62 16 43Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 50.0 50.0 0.0Storage Lanes 1 1 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1458 3228 3228 1488 1583 1305Flt Permitted 0.950 0.950Satd. Flow (perm) 1458 3228 3228 1488 1583 1305Link Speed (k/h) 50 50 50Link Distance (m) 50.4 102.7 106.3Travel Time (s) 3.6 7.4 7.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 14% 3% 3% 0% 5% 14%Adj. Flow (vph) 53 535 483 67 17 47Shared Lane Traffic (%)Lane Group Flow (vph) 53 535 483 67 17 47Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 30.0% ICU Level of Service AAnalysis Period (min) 15

Page 1166: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan212: Marineland Parkway & Portage Road Lyons Creek Crossing 2031 Summer

Timing Plan: AM Peak Hour Synchro 9 ReportPTSL Page 68

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (veh/h) 49 492 444 62 16 43Future Volume (Veh/h) 49 492 444 62 16 43Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 53 535 483 67 17 47PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 483 856 242vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 483 856 242tC, single (s) 4.4 6.9 7.2tC, 2 stage (s)tF (s) 2.3 3.5 3.4p0 queue free % 95 94 94cM capacity (veh/h) 996 275 724

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 SB 1 SB 2Volume Total 53 268 268 242 242 67 17 47Volume Left 53 0 0 0 0 0 17 0Volume Right 0 0 0 0 0 67 0 47cSH 996 1700 1700 1700 1700 1700 275 724Volume to Capacity 0.05 0.16 0.16 0.14 0.14 0.04 0.06 0.06Queue Length 95th (m) 1.3 0.0 0.0 0.0 0.0 0.0 1.6 1.7Control Delay (s) 8.8 0.0 0.0 0.0 0.0 0.0 18.9 10.3Lane LOS A C BApproach Delay (s) 0.8 0.0 12.6Approach LOS B

Intersection SummaryAverage Delay 1.1Intersection Capacity Utilization 30.0% ICU Level of Service AAnalysis Period (min) 15

Page 1167: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 90 862 28 104 984 436 32 102 265 396 115 90Future Volume (vph) 90 862 28 104 984 436 32 102 265 396 115 90Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 25.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 1 1 1 1 1 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95 0.95Ped Bike Factor 1.00 0.98 1.00 0.98 0.99 1.00Frt 0.850 0.850 0.850 0.934Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1539 3228 1488 1568 3228 1473 1662 1651 1430 1646 3000 0Flt Permitted 0.234 0.129 0.612 0.685Satd. Flow (perm) 379 3228 1462 213 3228 1447 1071 1651 1411 1185 3000 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 76 474 276 72Link Speed (k/h) 50 50 50 50Link Distance (m) 424.1 131.9 130.0 140.6Travel Time (s) 30.5 9.5 9.4 10.1Confl. Peds. (#/hr) 7 6 6 7 2 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 8% 3% 0% 6% 3% 1% 0% 6% 4% 1% 0% 8%Adj. Flow (vph) 98 937 30 113 1070 474 35 111 288 430 125 98Shared Lane Traffic (%)Lane Group Flow (vph) 98 937 30 113 1070 474 35 111 288 430 223 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 1 2 1 1 2Detector Template Left Thru Right Left Thru Right Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 1168: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Detector Phase 4 4 4 3 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 39.3 39.3 39.3 12.5 39.3 39.3 37.3 37.3 37.3 37.3 37.3Total Split (s) 39.4 39.4 39.4 12.5 51.9 51.9 38.1 38.1 38.1 38.1 38.1Total Split (%) 43.8% 43.8% 43.8% 13.9% 57.7% 57.7% 42.3% 42.3% 42.3% 42.3% 42.3%Maximum Green (s) 33.1 33.1 33.1 9.5 45.6 45.6 31.8 31.8 31.8 31.8 31.8Yellow Time (s) 4.1 4.1 4.1 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 0.0 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 1.0 -2.3 0.0 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag LeadLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min Min MinWalk Time (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0Flash Dont Walk (s) 21.0 21.0 21.0 21.0 21.0 19.0 19.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 30.5 30.5 30.5 41.5 41.5 39.2 33.3 33.3 33.3 33.3 33.3Actuated g/C Ratio 0.37 0.37 0.37 0.50 0.50 0.47 0.40 0.40 0.40 0.40 0.40v/c Ratio 0.71 0.79 0.05 0.51 0.66 0.51 0.08 0.17 0.39 0.90 0.18Control Delay 52.5 29.1 0.2 19.5 17.7 3.3 18.1 18.4 4.7 50.3 12.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 52.5 29.1 0.2 19.5 17.7 3.3 18.1 18.4 4.7 50.3 12.1LOS D C A B B A B B A D BApproach Delay 30.4 13.7 9.3 37.3Approach LOS C B A D

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 82.9Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.90Intersection Signal Delay: 21.9 Intersection LOS: CIntersection Capacity Utilization 78.5% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 101: Montrose Rd (RR 98) & McLeod Rd (RR 49)

Page 1169: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 3

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBTLane Group Flow (vph) 98 937 30 113 1070 474 35 111 288 430 223v/c Ratio 0.71 0.79 0.05 0.51 0.66 0.51 0.08 0.17 0.39 0.90 0.18Control Delay 52.5 29.1 0.2 19.5 17.7 3.3 18.1 18.4 4.7 50.3 12.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 52.5 29.1 0.2 19.5 17.7 3.3 18.1 18.4 4.7 50.3 12.1Queue Length 50th (m) 13.9 73.0 0.0 9.8 67.6 0.0 3.6 12.0 1.2 67.8 8.4Queue Length 95th (m) #40.7 98.9 0.2 18.6 88.3 15.1 10.5 25.1 17.7 #136.4 17.2Internal Link Dist (m) 400.1 107.9 106.0 116.6Turn Bay Length (m) 50.0 25.0 50.0 50.0 50.0Base Capacity (vph) 163 1392 674 246 1884 1014 445 686 747 492 1289Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.60 0.67 0.04 0.46 0.57 0.47 0.08 0.16 0.39 0.87 0.17

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1170: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 90 862 28 104 984 436 32 102 265 396 115 90Future Volume (vph) 90 862 28 104 984 436 32 102 265 396 115 90Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00 0.95Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 0.98 1.00 1.00 0.99 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.93Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1538 3228 1463 1568 3228 1448 1662 1651 1411 1644 3000Flt Permitted 0.23 1.00 1.00 0.13 1.00 1.00 0.61 1.00 1.00 0.69 1.00Satd. Flow (perm) 378 3228 1463 212 3228 1448 1072 1651 1411 1186 3000Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 98 937 30 113 1070 474 35 111 288 430 125 98RTOR Reduction (vph) 0 0 19 0 0 250 0 0 165 0 43 0Lane Group Flow (vph) 98 937 11 113 1070 224 35 111 123 430 180 0Confl. Peds. (#/hr) 7 6 6 7 2 2Heavy Vehicles (%) 8% 3% 0% 6% 3% 1% 0% 6% 4% 1% 0% 8%Turn Type Perm NA Perm pm+pt NA Perm Perm NA Perm Perm NAProtected Phases 4 3 8 2 6Permitted Phases 4 4 8 8 2 2 6Actuated Green, G (s) 28.1 28.1 28.1 39.1 39.1 39.1 31.0 31.0 31.0 31.0 31.0Effective Green, g (s) 30.4 30.4 30.4 38.1 41.4 39.1 33.3 33.3 33.3 33.3 33.3Actuated g/C Ratio 0.37 0.37 0.37 0.46 0.50 0.47 0.40 0.40 0.40 0.40 0.40Clearance Time (s) 6.3 6.3 6.3 3.0 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 138 1186 537 212 1615 684 431 664 568 477 1207v/s Ratio Prot c0.29 0.05 c0.33 0.07 0.06v/s Ratio Perm 0.26 0.01 0.20 0.15 0.03 0.09 c0.36v/c Ratio 0.71 0.79 0.02 0.53 0.66 0.33 0.08 0.17 0.22 0.90 0.15Uniform Delay, d1 22.4 23.3 16.7 15.9 15.4 13.6 15.3 15.8 16.2 23.2 15.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 14.8 3.5 0.0 2.0 0.9 0.2 0.1 0.1 0.1 20.0 0.0Delay (s) 37.2 26.9 16.7 17.9 16.4 13.8 15.3 15.9 16.3 43.2 15.7Level of Service D C B B B B B B B D BApproach Delay (s) 27.5 15.7 16.1 33.8Approach LOS C B B C

Intersection SummaryHCM 2000 Control Delay 22.2 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.84Actuated Cycle Length (s) 82.7 Sum of lost time (s) 12.0Intersection Capacity Utilization 78.5% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 1171: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 5

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1487 45 116 1215 0 0 0 0 602 82 297Future Volume (vph) 0 1487 45 116 1215 0 0 0 0 602 82 297Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 50.0 0.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 0 1 1 0 0 0 1 1Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 1.00 1.00 1.00 1.00 0.95 0.95 1.00Ped Bike Factor 0.98 1.00 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950 0.963Satd. Flow (prot) 0 4684 1488 1630 4684 0 0 0 0 1504 1498 1444Flt Permitted 0.116 0.950 0.963Satd. Flow (perm) 0 4684 1462 199 4684 0 0 0 0 1501 1496 1444Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 76 76Link Speed (k/h) 50 50 50 50Link Distance (m) 134.1 17.0 64.2 88.8Travel Time (s) 9.7 1.2 4.6 6.4Confl. Peds. (#/hr) 6 6 2 2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 2% 2% 0% 0% 0% 0% 5% 13% 3%Adj. Flow (vph) 0 1616 49 126 1321 0 0 0 0 654 89 323Shared Lane Traffic (%) 44%Lane Group Flow (vph) 0 1616 49 126 1321 0 0 0 0 366 377 323Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 2 1 1 2 1 2 1Detector Template Thru Right Left Thru Left Thru RightLeading Detector (m) 10.0 2.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 2.0 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0

Page 1172: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 6

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Detector Phase 4 4 3 8 6 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 8.0 10.0 10.0 10.0 10.0Minimum Split (s) 36.3 36.3 12.5 36.3 36.3 36.3 36.3Total Split (s) 39.0 39.0 13.6 52.6 37.4 37.4 37.4Total Split (%) 43.3% 43.3% 15.1% 58.4% 41.6% 41.6% 41.6%Maximum Green (s) 32.7 32.7 10.6 46.3 31.1 31.1 31.1Yellow Time (s) 4.1 4.1 3.0 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 0.0 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 0.0 1.0 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag LeadLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min MinWalk Time (s) 10.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 20.0 20.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0Act Effct Green (s) 33.7 31.3 45.8 45.8 27.4 27.4 27.4Actuated g/C Ratio 0.41 0.38 0.56 0.56 0.34 0.34 0.34v/c Ratio 0.83 0.08 0.50 0.50 0.72 0.75 0.60Control Delay 27.2 2.5 17.4 12.3 33.1 34.4 22.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 27.2 2.5 17.4 12.3 33.1 34.4 22.2LOS C A B B C C CApproach Delay 26.4 12.7 30.3Approach LOS C B C

Intersection SummaryArea Type: OtherCycle Length: 90Actuated Cycle Length: 81.3Natural Cycle: 90Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.83Intersection Signal Delay: 22.7 Intersection LOS: CIntersection Capacity Utilization 75.3% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49)

Page 1173: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 7

Lane Group EBT EBR WBL WBT SBL SBT SBRLane Group Flow (vph) 1616 49 126 1321 366 377 323v/c Ratio 0.83 0.08 0.50 0.50 0.72 0.75 0.60Control Delay 27.2 2.5 17.4 12.3 33.1 34.4 22.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 27.2 2.5 17.4 12.3 33.1 34.4 22.2Queue Length 50th (m) 87.2 0.0 9.6 47.6 55.0 57.2 33.1Queue Length 95th (m) #120.9 4.0 21.9 65.4 91.1 94.6 61.7Internal Link Dist (m) 110.1 0.1 64.8Turn Bay Length (m) 50.0Base Capacity (vph) 2046 641 283 2842 626 624 646Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.79 0.08 0.45 0.46 0.58 0.60 0.50

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1174: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan102: Niagara Square Dr/QEW EB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 0 1487 45 116 1215 0 0 0 0 602 82 297Future Volume (vph) 0 1487 45 116 1215 0 0 0 0 602 82 297Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 6.3 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 1.00 1.00 0.91 0.95 0.95 1.00Frpb, ped/bikes 1.00 0.98 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 0.96 1.00Satd. Flow (prot) 4684 1463 1630 4684 1502 1496 1444Flt Permitted 1.00 1.00 0.12 1.00 0.95 0.96 1.00Satd. Flow (perm) 4684 1463 199 4684 1502 1496 1444Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 1616 49 126 1321 0 0 0 0 654 89 323RTOR Reduction (vph) 0 0 30 0 0 0 0 0 0 0 0 50Lane Group Flow (vph) 0 1616 19 126 1321 0 0 0 0 366 377 273Confl. Peds. (#/hr) 6 6 2 2Heavy Vehicles (%) 0% 2% 0% 2% 2% 0% 0% 0% 0% 5% 13% 3%Turn Type NA Perm pm+pt NA Perm NA PermProtected Phases 4 3 8 6Permitted Phases 4 8 6 6Actuated Green, G (s) 31.4 31.4 43.5 43.5 25.1 25.1 25.1Effective Green, g (s) 33.7 31.4 42.5 45.8 27.4 27.4 27.4Actuated g/C Ratio 0.42 0.39 0.52 0.56 0.34 0.34 0.34Clearance Time (s) 6.3 6.3 3.0 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1943 565 246 2641 506 504 487v/s Ratio Prot c0.35 0.05 c0.28v/s Ratio Perm 0.01 0.22 0.24 0.25 0.19v/c Ratio 0.83 0.03 0.51 0.50 0.72 0.75 0.56Uniform Delay, d1 21.2 15.5 14.2 10.7 23.6 23.8 22.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 3.2 0.0 1.8 0.1 5.1 6.0 1.4Delay (s) 24.4 15.5 16.0 10.9 28.7 29.8 23.4Level of Service C B B B C C CApproach Delay (s) 24.2 11.3 0.0 27.5Approach LOS C B A C

Intersection SummaryHCM 2000 Control Delay 20.6 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.77Actuated Cycle Length (s) 81.2 Sum of lost time (s) 12.0Intersection Capacity Utilization 75.3% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 1175: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 9

Lane Group EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1689 0 0 1254 89 148Future Volume (vph) 1689 0 0 1254 89 148Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.91 1.00 1.00 0.91 0.97 1.00Ped Bike Factor 0.99Frt 0.850Flt Protected 0.950Satd. Flow (prot) 4638 0 0 4684 3101 1430Flt Permitted 0.950Satd. Flow (perm) 4638 0 0 4684 3101 1410Right Turn on Red Yes YesSatd. Flow (RTOR) 8Link Speed (k/h) 50 50 50Link Distance (m) 72.6 48.7 79.4Travel Time (s) 5.2 3.5 5.7Confl. Peds. (#/hr) 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 0% 0% 2% 4% 4%Adj. Flow (vph) 1836 0 0 1363 97 161Shared Lane Traffic (%)Lane Group Flow (vph) 1836 0 0 1363 97 161Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 0.0 0.0 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 15 25 25 15Number of Detectors 2 2 1 1Detector Template Thru Thru Left RightLeading Detector (m) 10.0 10.0 2.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 0.6 0.6 2.0 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2

Page 1176: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 10

Lane Group EBT EBR WBL WBT NBL NBRDetector Phase 4 8 2 2Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0Minimum Split (s) 33.3 33.3 24.0 24.0Total Split (s) 35.0 35.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7%Maximum Green (s) 28.7 28.7 18.7 18.7Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 3.0 3.0 3.0 3.0Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0Flash Dont Walk (s) 17.0 17.0Pedestrian Calls (#/hr) 0 0Act Effct Green (s) 28.7 28.7 14.3 14.3Actuated g/C Ratio 0.56 0.56 0.28 0.28v/c Ratio 0.70 0.52 0.11 0.40Control Delay 10.2 8.0 14.6 18.3Queue Delay 0.0 0.0 0.0 0.0Total Delay 10.2 8.0 14.6 18.3LOS B A B BApproach Delay 10.2 8.0 16.9Approach LOS B A B

Intersection SummaryArea Type: OtherCycle Length: 60Actuated Cycle Length: 51Natural Cycle: 60Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.70Intersection Signal Delay: 9.8 Intersection LOS: AIntersection Capacity Utilization 49.9% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 103: QEW WB Off-Ramp & McLeod Rd (RR 49)

Page 1177: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 11

Lane Group EBT WBT NBL NBRLane Group Flow (vph) 1836 1363 97 161v/c Ratio 0.70 0.52 0.11 0.40Control Delay 10.2 8.0 14.6 18.3Queue Delay 0.0 0.0 0.0 0.0Total Delay 10.2 8.0 14.6 18.3Queue Length 50th (m) 37.4 23.6 3.8 12.6Queue Length 95th (m) 67.4 43.1 8.2 26.2Internal Link Dist (m) 48.6 24.7 55.4Turn Bay Length (m)Base Capacity (vph) 2847 2875 1289 591Starvation Cap Reductn 0 0 0 0Spillback Cap Reductn 0 0 0 0Storage Cap Reductn 0 0 0 0Reduced v/c Ratio 0.64 0.47 0.08 0.27

Intersection Summary

Page 1178: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan103: QEW WB Off-Ramp & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 12

Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsTraffic Volume (vph) 1689 0 0 1254 89 148Future Volume (vph) 1689 0 0 1254 89 148Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0Lane Util. Factor 0.91 0.91 0.97 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00Frt 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00Satd. Flow (prot) 4638 4684 3101 1409Flt Permitted 1.00 1.00 0.95 1.00Satd. Flow (perm) 4638 4684 3101 1409Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1836 0 0 1363 97 161RTOR Reduction (vph) 0 0 0 0 0 6Lane Group Flow (vph) 1836 0 0 1363 97 155Confl. Peds. (#/hr) 3Heavy Vehicles (%) 3% 0% 0% 2% 4% 4%Turn Type NA NA Prot PermProtected Phases 4 8 2Permitted Phases 2Actuated Green, G (s) 26.3 26.3 11.9 11.9Effective Green, g (s) 28.6 28.6 14.2 14.2Actuated g/C Ratio 0.56 0.56 0.28 0.28Clearance Time (s) 6.3 6.3 6.3 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 2611 2637 866 393v/s Ratio Prot c0.40 0.29 0.03v/s Ratio Perm c0.11v/c Ratio 0.70 0.52 0.11 0.40Uniform Delay, d1 8.0 6.8 13.6 14.8Progression Factor 1.00 1.00 1.00 1.00Incremental Delay, d2 0.9 0.2 0.1 0.7Delay (s) 8.9 7.0 13.7 15.5Level of Service A A B BApproach Delay (s) 8.9 7.0 14.8Approach LOS A A B

Intersection SummaryHCM 2000 Control Delay 8.6 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.60Actuated Cycle Length (s) 50.8 Sum of lost time (s) 8.0Intersection Capacity Utilization 49.9% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 1179: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 13

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 36 1363 437 292 1471 15 421 26 218 21 14 96Future Volume (vph) 36 1363 437 292 1471 15 421 26 218 21 14 96Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 15.0 25.0Storage Lanes 1 1 2 0 2 1 1 0Taper Length (m) 40.0 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.97 1.00 1.00 0.99 0.99 1.00 0.98Frt 0.850 0.999 0.850 0.869Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1568 3197 1444 3162 3220 0 3162 1606 1458 1662 1417 0Flt Permitted 0.123 0.950 0.950 0.739Satd. Flow (perm) 203 3197 1405 3151 3220 0 3137 1606 1439 1292 1417 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 330 1 237 12Link Speed (k/h) 50 50 50 50Link Distance (m) 92.8 615.8 309.8 194.6Travel Time (s) 6.7 44.3 22.3 14.0Confl. Peds. (#/hr) 5 14 14 5 7 1 1 7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 4% 3% 2% 3% 15% 2% 9% 2% 0% 8% 5%Adj. Flow (vph) 39 1482 475 317 1599 16 458 28 237 23 15 104Shared Lane Traffic (%)Lane Group Flow (vph) 39 1482 475 317 1615 0 458 28 237 23 119 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 1 2 1 2 1 1 2Detector Template Left Thru Right Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 1180: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 14

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Detector Phase 4 4 4 3 8 5 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 6.0 10.0 5.0 8.0 8.0 8.0 8.0Minimum Split (s) 36.0 36.0 36.0 10.5 36.0 9.5 32.0 32.0 32.0 32.0Total Split (s) 36.0 36.0 36.0 17.0 53.0 20.0 52.0 52.0 32.0 32.0Total Split (%) 34.3% 34.3% 34.3% 16.2% 50.5% 19.0% 49.5% 49.5% 30.5% 30.5%Maximum Green (s) 28.0 28.0 28.0 12.5 45.0 15.5 44.0 44.0 24.0 24.0Yellow Time (s) 4.5 4.5 4.5 3.5 4.5 3.5 4.5 4.5 4.5 4.5All-Red Time (s) 3.5 3.5 3.5 1.0 3.5 1.0 3.5 3.5 3.5 3.5Lost Time Adjust (s) -4.0 -4.0 -4.0 -0.5 -4.0 -0.5 -4.0 -4.0 -4.0 -4.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lag Lag Lag Lead Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Recall Mode Min Min Min Min Min Min Min Min Min MinWalk Time (s) 11.0 11.0 11.0 11.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 14.0 14.0 14.0 14.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 32.5 32.5 32.5 12.6 49.1 16.0 36.2 36.2 16.2 16.2Actuated g/C Ratio 0.35 0.35 0.35 0.14 0.53 0.17 0.39 0.39 0.17 0.17v/c Ratio 0.56 1.33 0.67 0.74 0.95 0.84 0.04 0.34 0.10 0.47Control Delay 60.4 184.0 13.8 51.1 35.9 53.7 17.6 3.9 32.8 37.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 60.4 184.0 13.8 51.1 35.9 53.7 17.6 3.9 32.8 37.0LOS E F B D D D B A C DApproach Delay 141.1 38.4 36.0 36.4Approach LOS F D D D

Intersection SummaryArea Type: OtherCycle Length: 105Actuated Cycle Length: 93.3Natural Cycle: 150Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 1.33Intersection Signal Delay: 80.8 Intersection LOS: FIntersection Capacity Utilization 82.7% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 104: Oakwood Dr & McLeod Rd (RR 49)

Page 1181: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 15

Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBTLane Group Flow (vph) 39 1482 475 317 1615 458 28 237 23 119v/c Ratio 0.56 1.33 0.67 0.74 0.95 0.84 0.04 0.34 0.10 0.47Control Delay 60.4 184.0 13.8 51.1 35.9 53.7 17.6 3.9 32.8 37.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 60.4 184.0 13.8 51.1 35.9 53.7 17.6 3.9 32.8 37.0Queue Length 50th (m) 5.9 ~193.4 20.1 29.7 143.2 43.4 3.3 0.0 3.7 18.3Queue Length 95th (m) #24.6 #257.8 63.1 #51.5 #226.4 #75.5 8.7 14.1 10.6 35.2Internal Link Dist (m) 68.8 591.8 285.8 170.6Turn Bay Length (m) 50.0 50.0 50.0 15.0Base Capacity (vph) 70 1113 704 441 1693 543 827 856 388 434Starvation Cap Reductn 0 9 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.56 1.34 0.67 0.72 0.95 0.84 0.03 0.28 0.06 0.27

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1182: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan104: Oakwood Dr & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 16

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 36 1363 437 292 1471 15 421 26 218 21 14 96Future Volume (vph) 36 1363 437 292 1471 15 421 26 218 21 14 96Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 0.97 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 0.97 1.00 1.00 1.00 1.00 0.99 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 1.00 1.00 0.85 1.00 0.87Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00Satd. Flow (prot) 1567 3197 1407 3162 3219 3162 1606 1439 1661 1418Flt Permitted 0.12 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.74 1.00Satd. Flow (perm) 203 3197 1407 3162 3219 3162 1606 1439 1292 1418Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 39 1482 475 317 1599 16 458 28 237 23 15 104RTOR Reduction (vph) 0 0 215 0 0 0 0 0 145 0 10 0Lane Group Flow (vph) 39 1482 260 317 1615 0 458 28 92 23 109 0Confl. Peds. (#/hr) 5 14 14 5 7 1 1 7Heavy Vehicles (%) 6% 4% 3% 2% 3% 15% 2% 9% 2% 0% 8% 5%Turn Type Perm NA Perm Prot NA Prot NA Perm Perm NAProtected Phases 4 3 8 5 2 6Permitted Phases 4 4 2 6Actuated Green, G (s) 28.5 28.5 28.5 12.1 45.1 15.5 32.2 32.2 12.2 12.2Effective Green, g (s) 32.5 32.5 32.5 12.6 49.1 16.0 36.2 36.2 16.2 16.2Actuated g/C Ratio 0.35 0.35 0.35 0.14 0.53 0.17 0.39 0.39 0.17 0.17Clearance Time (s) 8.0 8.0 8.0 4.5 8.0 4.5 8.0 8.0 8.0 8.0Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 3.0 2.5 2.5 2.5 2.5Lane Grp Cap (vph) 70 1113 490 427 1694 542 623 558 224 246v/s Ratio Prot c0.46 0.10 c0.50 c0.14 0.02 c0.08v/s Ratio Perm 0.19 0.18 0.06 0.02v/c Ratio 0.56 1.33 0.53 0.74 0.95 0.85 0.04 0.16 0.10 0.44Uniform Delay, d1 24.6 30.4 24.3 38.8 21.0 37.4 17.8 18.7 32.4 34.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 7.5 155.4 0.9 6.5 12.5 11.6 0.0 0.1 0.1 0.9Delay (s) 32.1 185.8 25.2 45.3 33.5 49.0 17.8 18.8 32.6 35.4Level of Service C F C D C D B B C DApproach Delay (s) 144.6 35.4 37.9 35.0Approach LOS F D D C

Intersection SummaryHCM 2000 Control Delay 81.2 HCM 2000 Level of Service FHCM 2000 Volume to Capacity ratio 1.00Actuated Cycle Length (s) 93.3 Sum of lost time (s) 16.0Intersection Capacity Utilization 82.7% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group

Page 1183: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 17

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 326 773 503 49 996 81 444 262 68 117 246 339Future Volume (vph) 326 773 503 49 996 81 444 262 68 117 246 339Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 50.0Storage Lanes 2 0 1 0 1 0 1 0Taper Length (m) 50.0 50.0 50.0 50.0Lane Util. Factor 0.97 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 0.98 1.00 1.00 1.00Frt 0.941 0.989 0.969 0.850Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 3193 2979 0 1630 3189 0 1568 1680 0 1646 1733 1473Flt Permitted 0.950 0.126 0.264 0.289Satd. Flow (perm) 3159 2979 0 216 3189 0 436 1680 0 500 1733 1473Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 162 8 13 199Link Speed (k/h) 50 50 50 50Link Distance (m) 615.8 1046.3 818.5 318.8Travel Time (s) 44.3 75.3 58.9 23.0Confl. Peds. (#/hr) 24 11 11 24 3 3Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 2% 5% 2% 3% 0% 6% 0% 3% 1% 1% 1%Adj. Flow (vph) 354 840 547 53 1083 88 483 285 74 127 267 368Shared Lane Traffic (%)Lane Group Flow (vph) 354 1387 0 53 1171 0 483 359 0 127 267 368Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 7.2 7.2 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 1184: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 18

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Detector Phase 7 4 3 8 5 2 1 6 6Switch PhaseMinimum Initial (s) 5.0 10.0 5.0 10.0 5.0 8.0 5.0 8.0 8.0Minimum Split (s) 11.4 30.4 9.5 30.4 9.5 37.7 9.5 37.7 37.7Total Split (s) 18.0 47.4 9.6 39.0 15.0 42.1 10.9 38.0 38.0Total Split (%) 16.4% 43.1% 8.7% 35.5% 13.6% 38.3% 9.9% 34.5% 34.5%Maximum Green (s) 11.6 41.0 6.6 32.6 12.0 35.4 7.9 31.3 31.3Yellow Time (s) 4.1 4.1 3.0 4.1 3.0 4.1 3.0 4.1 4.1All-Red Time (s) 2.3 2.3 0.0 2.3 0.0 2.6 0.0 2.6 2.6Lost Time Adjust (s) -2.4 -2.4 1.0 -2.4 1.0 -2.7 1.0 -2.7 -2.7Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 9.0 9.0 12.0 12.0 12.0Flash Dont Walk (s) 15.0 15.0 19.0 19.0 19.0Pedestrian Calls (#/hr) 0 0 0 0 0Act Effct Green (s) 14.1 44.1 40.2 35.2 38.6 28.0 30.2 23.6 23.6Actuated g/C Ratio 0.14 0.44 0.40 0.35 0.39 0.28 0.30 0.24 0.24v/c Ratio 0.79 0.99 0.34 1.04 1.65 0.75 0.56 0.65 0.74Control Delay 56.4 47.2 20.2 70.6 329.4 41.8 30.8 42.1 24.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 56.4 47.2 20.2 70.6 329.4 41.8 30.8 42.1 24.8LOS E D C E F D C D CApproach Delay 49.0 68.4 206.8 31.9Approach LOS D E F C

Intersection SummaryArea Type: OtherCycle Length: 110Actuated Cycle Length: 99.9Natural Cycle: 150Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 1.65Intersection Signal Delay: 80.4 Intersection LOS: FIntersection Capacity Utilization 99.4% ICU Level of Service FAnalysis Period (min) 15

Splits and Phases: 105: Dorchester Rd & McLeod Rd (RR 49)

Page 1185: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 19

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 354 1387 53 1171 483 359 127 267 368v/c Ratio 0.79 0.99 0.34 1.04 1.65 0.75 0.56 0.65 0.74Control Delay 56.4 47.2 20.2 70.6 329.4 41.8 30.8 42.1 24.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 56.4 47.2 20.2 70.6 329.4 41.8 30.8 42.1 24.8Queue Length 50th (m) 36.2 131.7 4.9 ~135.1 ~117.7 64.3 16.9 49.1 31.5Queue Length 95th (m) #66.7 #218.5 13.4 #207.6 #220.3 96.4 29.4 75.4 65.1Internal Link Dist (m) 591.8 1022.3 794.5 294.8Turn Bay Length (m) 50.0 50.0 50.0 50.0 50.0Base Capacity (vph) 449 1406 167 1127 293 651 231 592 634Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.79 0.99 0.32 1.04 1.65 0.55 0.55 0.45 0.58

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1186: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan105: Dorchester Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 20

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 326 773 503 49 996 81 444 262 68 117 246 339Future Volume (vph) 326 773 503 49 996 81 444 262 68 117 246 339Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.94 1.00 0.99 1.00 0.97 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 3193 2981 1630 3189 1568 1680 1645 1733 1473Flt Permitted 0.95 1.00 0.13 1.00 0.26 1.00 0.29 1.00 1.00Satd. Flow (perm) 3193 2981 216 3189 436 1680 500 1733 1473Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 354 840 547 53 1083 88 483 285 74 127 267 368RTOR Reduction (vph) 0 90 0 0 5 0 0 9 0 0 0 152Lane Group Flow (vph) 354 1297 0 53 1166 0 483 350 0 127 267 216Confl. Peds. (#/hr) 24 11 11 24 3 3Heavy Vehicles (%) 1% 2% 5% 2% 3% 0% 6% 0% 3% 1% 1% 1%Turn Type Prot NA pm+pt NA pm+pt NA pm+pt NA PermProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 8 2 6 6Actuated Green, G (s) 11.7 41.7 38.8 32.7 36.0 25.4 28.5 20.9 20.9Effective Green, g (s) 14.1 44.1 36.8 35.1 35.0 28.1 26.5 23.6 23.6Actuated g/C Ratio 0.14 0.44 0.37 0.35 0.35 0.28 0.27 0.24 0.24Clearance Time (s) 6.4 6.4 3.0 6.4 3.0 6.7 3.0 6.7 6.7Vehicle Extension (s) 2.5 2.2 2.5 2.2 2.5 2.2 2.5 2.2 2.2Lane Grp Cap (vph) 450 1315 151 1120 278 472 208 409 347v/s Ratio Prot c0.11 c0.43 0.02 0.37 c0.19 0.21 0.04 0.15v/s Ratio Perm 0.11 c0.41 0.12 0.15v/c Ratio 0.79 0.99 0.35 1.04 1.74 0.74 0.61 0.65 0.62Uniform Delay, d1 41.4 27.6 23.9 32.4 29.5 32.6 29.7 34.5 34.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 8.5 21.3 1.0 38.1 346.4 5.6 4.5 3.0 2.7Delay (s) 50.0 48.9 24.9 70.5 375.9 38.2 34.2 37.5 36.9Level of Service D D C E F D C D DApproach Delay (s) 49.1 68.6 231.9 36.6Approach LOS D E F D

Intersection SummaryHCM 2000 Control Delay 85.9 HCM 2000 Level of Service FHCM 2000 Volume to Capacity ratio 1.28Actuated Cycle Length (s) 99.9 Sum of lost time (s) 16.0Intersection Capacity Utilization 99.4% ICU Level of Service FAnalysis Period (min) 15c Critical Lane Group

Page 1187: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 21

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 226 624 108 9 590 198 271 258 13 147 250 265Future Volume (vph) 226 624 108 9 590 198 271 258 13 147 250 265Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 25.0 0.0 25.0 0.0Storage Lanes 1 0 1 0 0 0 1 1Taper Length (m) 7.5 7.5 50.0 50.0Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00Ped Bike Factor 0.99 1.00 1.00 0.99 1.00 1.00Frt 0.978 0.962 0.997 0.850Flt Protected 0.950 0.950 0.976 0.950Satd. Flow (prot) 1599 3151 0 1662 3083 0 0 1690 0 1662 1733 1458Flt Permitted 0.160 0.351 0.614 0.473Satd. Flow (perm) 268 3151 0 612 3083 0 0 1063 0 824 1733 1458Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 37 63 2 288Link Speed (k/h) 50 50 50 50Link Distance (m) 1046.3 598.4 829.6 295.9Travel Time (s) 75.3 43.1 59.7 21.3Confl. Peds. (#/hr) 16 7 7 16 17 17Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 4% 3% 1% 0% 3% 1% 1% 0% 9% 0% 1% 2%Adj. Flow (vph) 246 678 117 10 641 215 295 280 14 160 272 288Shared Lane Traffic (%)Lane Group Flow (vph) 246 795 0 10 856 0 0 589 0 160 272 288Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2 1Detector Template Left Thru Left Thru Left Thru Left Thru RightLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0 2.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6 2.0Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0

Page 1188: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 22

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTurn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Detector Phase 7 4 8 8 2 2 6 6 6Switch PhaseMinimum Initial (s) 5.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0Minimum Split (s) 9.5 27.1 27.1 27.1 33.1 33.1 33.1 33.1 33.1Total Split (s) 14.0 41.1 27.1 27.1 33.9 33.9 33.9 33.9 33.9Total Split (%) 18.7% 54.8% 36.1% 36.1% 45.2% 45.2% 45.2% 45.2% 45.2%Maximum Green (s) 9.5 35.0 21.0 21.0 27.8 27.8 27.8 27.8 27.8Yellow Time (s) 3.5 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 1.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lost Time Adjust (s) -0.5 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 0.0Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 13.0 13.0 13.0 17.0 17.0 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 36.6 36.6 22.6 22.6 29.9 29.9 29.9 27.8Actuated g/C Ratio 0.49 0.49 0.30 0.30 0.40 0.40 0.40 0.37v/c Ratio 0.79 0.51 0.05 0.87 1.38 0.48 0.39 0.40Control Delay 34.3 13.5 19.4 34.5 208.9 23.0 18.1 4.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 34.3 13.5 19.4 34.5 208.9 23.0 18.1 4.1LOS C B B C F C B AApproach Delay 18.5 34.4 208.9 13.6Approach LOS B C F B

Intersection SummaryArea Type: OtherCycle Length: 75Actuated Cycle Length: 74.5Natural Cycle: 80Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 1.38Intersection Signal Delay: 56.5 Intersection LOS: EIntersection Capacity Utilization 98.1% ICU Level of Service FAnalysis Period (min) 15

Splits and Phases: 106: Drummond Rd & McLeod Rd (RR 49)

Page 1189: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 23

Lane Group EBL EBT WBL WBT NBT SBL SBT SBRLane Group Flow (vph) 246 795 10 856 589 160 272 288v/c Ratio 0.79 0.51 0.05 0.87 1.38 0.48 0.39 0.40Control Delay 34.3 13.5 19.4 34.5 208.9 23.0 18.1 4.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 34.3 13.5 19.4 34.5 208.9 23.0 18.1 4.1Queue Length 50th (m) 20.6 37.4 1.0 58.3 ~120.1 17.3 28.0 0.0Queue Length 95th (m) #56.5 52.5 4.5 #91.8 #181.8 35.7 47.4 14.8Internal Link Dist (m) 1022.3 574.4 805.6 271.9Turn Bay Length (m) 50.0 50.0 25.0Base Capacity (vph) 310 1588 189 999 427 330 695 724Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.79 0.50 0.05 0.86 1.38 0.48 0.39 0.40

Intersection Summary~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1190: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan106: Drummond Rd & McLeod Rd (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 24

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 226 624 108 9 590 198 271 258 13 147 250 265Future Volume (vph) 226 624 108 9 590 198 271 258 13 147 250 265Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 6.1Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.98 1.00 0.96 1.00 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.98 0.95 1.00 1.00Satd. Flow (prot) 1598 3151 1656 3084 1689 1655 1733 1458Flt Permitted 0.16 1.00 0.35 1.00 0.61 0.47 1.00 1.00Satd. Flow (perm) 269 3151 612 3084 1062 825 1733 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 246 678 117 10 641 215 295 280 14 160 272 288RTOR Reduction (vph) 0 19 0 0 44 0 0 1 0 0 0 181Lane Group Flow (vph) 246 776 0 10 812 0 0 588 0 160 272 107Confl. Peds. (#/hr) 16 7 7 16 17 17Heavy Vehicles (%) 4% 3% 1% 0% 3% 1% 1% 0% 9% 0% 1% 2%Turn Type pm+pt NA Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 8 2 6 6Actuated Green, G (s) 34.5 34.5 20.5 20.5 27.8 27.8 27.8 27.8Effective Green, g (s) 35.0 36.6 22.6 22.6 29.9 29.9 29.9 27.8Actuated g/C Ratio 0.47 0.49 0.30 0.30 0.40 0.40 0.40 0.37Clearance Time (s) 4.5 6.1 6.1 6.1 6.1 6.1 6.1 6.1Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 304 1548 185 935 426 331 695 544v/s Ratio Prot c0.11 0.25 c0.26 0.16v/s Ratio Perm 0.27 0.02 c0.55 0.19 0.07v/c Ratio 0.81 0.50 0.05 0.87 1.38 0.48 0.39 0.20Uniform Delay, d1 15.2 12.8 18.4 24.5 22.3 16.6 15.8 15.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 14.6 0.3 0.1 8.6 185.1 1.1 0.4 0.2Delay (s) 29.8 13.0 18.5 33.2 207.4 17.7 16.2 16.0Level of Service C B B C F B B BApproach Delay (s) 17.0 33.0 207.4 16.4Approach LOS B C F B

Intersection SummaryHCM 2000 Control Delay 56.1 HCM 2000 Level of Service EHCM 2000 Volume to Capacity ratio 1.11Actuated Cycle Length (s) 74.5 Sum of lost time (s) 12.0Intersection Capacity Utilization 98.1% ICU Level of Service FAnalysis Period (min) 15c Critical Lane Group

Page 1191: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 25

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 120 603 153 153 433 151 249 212 136 115 177 224Future Volume (vph) 120 603 153 153 433 151 249 212 136 115 177 224Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 50.0 0.0 50.0 0.0 50.0 0.0 50.0 0.0Storage Lanes 1 0 1 0 1 0 1 0Taper Length (m) 7.5 7.5 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95Frt 0.970 0.961 0.941 0.916Flt Protected 0.950 0.950 0.950 0.950Satd. Flow (prot) 1630 3162 0 1630 3133 0 1630 3067 0 1630 2986 0Flt Permitted 0.288 0.201 0.303 0.528Satd. Flow (perm) 494 3162 0 345 3133 0 520 3067 0 906 2986 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 40 63 148 243Link Speed (k/h) 50 50 50 50Link Distance (m) 136.7 140.7 123.4 131.2Travel Time (s) 9.8 10.1 8.9 9.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 130 655 166 166 471 164 271 230 148 125 192 243Shared Lane Traffic (%)Lane Group Flow (vph) 130 821 0 166 635 0 271 378 0 125 435 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 2Detector Template Left Thru Left Thru Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6

Page 1192: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 26

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRDetector Phase 7 4 3 8 5 2 1 6Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 9.5 24.3 9.5 24.3 9.5 24.3 9.5 24.3Total Split (s) 11.1 27.8 12.0 28.7 15.6 29.4 10.8 24.6Total Split (%) 13.9% 34.8% 15.0% 35.9% 19.5% 36.8% 13.5% 30.8%Maximum Green (s) 8.1 21.5 9.0 22.4 12.6 23.1 7.8 18.3Yellow Time (s) 3.0 4.1 3.0 4.1 3.0 4.1 3.0 4.1All-Red Time (s) 0.0 2.2 0.0 2.2 0.0 2.2 0.0 2.2Lost Time Adjust (s) 1.0 -2.3 1.0 -2.3 1.0 -2.3 1.0 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lead Lag Lead Lag Lead LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Min None Min Min Min Min Min MinWalk Time (s) 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0Act Effct Green (s) 29.0 22.5 30.6 23.3 27.3 17.0 19.0 12.5Actuated g/C Ratio 0.42 0.32 0.44 0.34 0.39 0.24 0.27 0.18v/c Ratio 0.42 0.78 0.58 0.58 0.72 0.44 0.40 0.59Control Delay 15.4 27.6 19.9 20.3 27.8 15.0 18.7 15.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 15.4 27.6 19.9 20.3 27.8 15.0 18.7 15.1LOS B C B C C B B BApproach Delay 25.9 20.2 20.4 15.9Approach LOS C C C B

Intersection SummaryArea Type: OtherCycle Length: 80Actuated Cycle Length: 69.5Natural Cycle: 70Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.78Intersection Signal Delay: 21.3 Intersection LOS: CIntersection Capacity Utilization 74.0% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 108: Stanley Ave & Marine Land Pkway (RR 49)

Page 1193: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 27

Lane Group EBL EBT WBL WBT NBL NBT SBL SBTLane Group Flow (vph) 130 821 166 635 271 378 125 435v/c Ratio 0.42 0.78 0.58 0.58 0.72 0.44 0.40 0.59Control Delay 15.4 27.6 19.9 20.3 27.8 15.0 18.7 15.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 15.4 27.6 19.9 20.3 27.8 15.0 18.7 15.1Queue Length 50th (m) 9.5 51.6 12.4 34.1 27.3 14.1 11.4 12.8Queue Length 95th (m) 21.3 #84.5 #26.8 55.7 #49.7 25.4 22.1 25.9Internal Link Dist (m) 112.7 116.7 99.4 107.2Turn Bay Length (m) 50.0 50.0 50.0 50.0Base Capacity (vph) 328 1123 305 1168 393 1228 324 1066Starvation Cap Reductn 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.40 0.73 0.54 0.54 0.69 0.31 0.39 0.41

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1194: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan108: Stanley Ave & Marine Land Pkway (RR 49) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 28

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 120 603 153 153 433 151 249 212 136 115 177 224Future Volume (vph) 120 603 153 153 433 151 249 212 136 115 177 224Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.95 1.00 0.95Frt 1.00 0.97 1.00 0.96 1.00 0.94 1.00 0.92Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1630 3161 1630 3134 1630 3068 1630 2987Flt Permitted 0.29 1.00 0.20 1.00 0.30 1.00 0.53 1.00Satd. Flow (perm) 495 3161 345 3134 520 3068 905 2987Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 130 655 166 166 471 164 271 230 148 125 192 243RTOR Reduction (vph) 0 27 0 0 42 0 0 112 0 0 199 0Lane Group Flow (vph) 130 794 0 166 593 0 271 266 0 125 236 0Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NAProtected Phases 7 4 3 8 5 2 1 6Permitted Phases 4 8 2 6Actuated Green, G (s) 27.7 20.1 29.3 20.9 25.1 14.6 17.7 10.2Effective Green, g (s) 25.7 22.4 27.3 23.2 24.1 16.9 15.7 12.5Actuated g/C Ratio 0.37 0.32 0.39 0.34 0.35 0.24 0.23 0.18Clearance Time (s) 3.0 6.3 3.0 6.3 3.0 6.3 3.0 6.3Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 292 1023 273 1050 355 749 273 539v/s Ratio Prot 0.04 c0.25 c0.06 0.19 c0.12 0.09 0.04 0.08v/s Ratio Perm 0.12 0.17 c0.15 0.06v/c Ratio 0.45 0.78 0.61 0.56 0.76 0.36 0.46 0.44Uniform Delay, d1 15.1 21.1 15.3 18.9 18.2 21.6 22.4 25.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.1 3.8 3.8 0.7 9.4 0.3 1.2 0.6Delay (s) 16.2 24.9 19.1 19.6 27.6 21.9 23.6 25.8Level of Service B C B B C C C CApproach Delay (s) 23.7 19.5 24.3 25.3Approach LOS C B C C

Intersection SummaryHCM 2000 Control Delay 23.0 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.74Actuated Cycle Length (s) 69.2 Sum of lost time (s) 16.0Intersection Capacity Utilization 74.0% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 1195: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 29

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 172 70 329 0 0 247Future Volume (vph) 172 70 329 0 0 247Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 0.97 0.95 0.95 1.00 1.00 0.95Frt 0.957Flt Protected 0.966Satd. Flow (prot) 3010 0 3167 0 0 3325Flt Permitted 0.966Satd. Flow (perm) 3010 0 3167 0 0 3325Right Turn on Red Yes YesSatd. Flow (RTOR) 76Link Speed (k/h) 50 50 50Link Distance (m) 73.1 82.4 61.6Travel Time (s) 5.3 5.9 4.4Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 0% 5% 0% 5% 0%Adj. Flow (vph) 187 76 358 0 0 268Shared Lane Traffic (%)Lane Group Flow (vph) 263 0 358 0 0 268Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 7.2 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Number of Detectors 1 2 2Detector Template Left Thru ThruLeading Detector (m) 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Detector Phase 6 8 4Switch Phase

Page 1196: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 30

Lane Group WBL WBR NBT NBR SBL SBTMinimum Initial (s) 8.0 8.0 8.0Minimum Split (s) 25.1 22.5 22.5Total Split (s) 28.2 22.5 22.5Total Split (%) 55.6% 44.4% 44.4%Maximum Green (s) 22.1 16.4 16.4Yellow Time (s) 4.1 4.1 4.1All-Red Time (s) 2.0 2.0 2.0Lost Time Adjust (s) -2.1 -2.1 -2.1Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.1 2.3 2.3Recall Mode Min Min MinWalk Time (s) 8.0Flash Dont Walk (s) 11.0Pedestrian Calls (#/hr) 0Act Effct Green (s) 10.2 10.5 10.5Actuated g/C Ratio 0.36 0.37 0.37v/c Ratio 0.24 0.31 0.22Control Delay 5.4 7.3 6.8Queue Delay 0.0 0.0 0.0Total Delay 5.4 7.3 6.8LOS A A AApproach Delay 5.4 7.3 6.8Approach LOS A A A

Intersection SummaryArea Type: OtherCycle Length: 50.7Actuated Cycle Length: 28.7Natural Cycle: 50Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.31Intersection Signal Delay: 6.6 Intersection LOS: AIntersection Capacity Utilization 24.3% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 110: Montrose Rd (RR 98) & Niagara Square Dr

Page 1197: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 31

Lane Group WBL NBT SBTLane Group Flow (vph) 263 358 268v/c Ratio 0.24 0.31 0.22Control Delay 5.4 7.3 6.8Queue Delay 0.0 0.0 0.0Total Delay 5.4 7.3 6.8Queue Length 50th (m) 2.7 5.7 4.1Queue Length 95th (m) 7.1 10.5 8.0Internal Link Dist (m) 49.1 58.4 37.6Turn Bay Length (m)Base Capacity (vph) 2800 2041 2143Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.09 0.18 0.13

Intersection Summary

Page 1198: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan110: Montrose Rd (RR 98) & Niagara Square Dr Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 32

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 172 70 329 0 0 247Future Volume (vph) 172 70 329 0 0 247Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 0.97 0.95 0.95Frt 0.96 1.00 1.00Flt Protected 0.97 1.00 1.00Satd. Flow (prot) 3008 3167 3325Flt Permitted 0.97 1.00 1.00Satd. Flow (perm) 3008 3167 3325Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 187 76 358 0 0 268RTOR Reduction (vph) 49 0 0 0 0 0Lane Group Flow (vph) 214 0 358 0 0 268Heavy Vehicles (%) 6% 0% 5% 0% 5% 0%Turn Type Prot NA NAProtected Phases 6 8Permitted Phases 4Actuated Green, G (s) 8.1 8.4 8.4Effective Green, g (s) 10.2 10.5 10.5Actuated g/C Ratio 0.36 0.37 0.37Clearance Time (s) 6.1 6.1 6.1Vehicle Extension (s) 2.1 2.3 2.3Lane Grp Cap (vph) 1069 1158 1216v/s Ratio Prot c0.07 c0.11v/s Ratio Perm 0.08v/c Ratio 0.20 0.31 0.22Uniform Delay, d1 6.4 6.5 6.3Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.0 0.1 0.1Delay (s) 6.5 6.6 6.3Level of Service A A AApproach Delay (s) 6.5 6.6 6.3Approach LOS A A A

Intersection SummaryHCM 2000 Control Delay 6.5 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.28Actuated Cycle Length (s) 28.7 Sum of lost time (s) 10.1Intersection Capacity Utilization 24.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 1199: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 33

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 394 5 0 271 487 257Future Volume (vph) 394 5 0 271 487 257Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 0.95 0.95 0.95 0.95Ped Bike Factor 0.99Frt 0.998 0.948Flt Protected 0.953Satd. Flow (prot) 1648 0 0 3197 3020 0Flt Permitted 0.953Satd. Flow (perm) 1648 0 0 3197 3020 0Right Turn on Red Yes YesSatd. Flow (RTOR) 1 195Link Speed (k/h) 50 50 50Link Distance (m) 117.2 130.2 309.8Travel Time (s) 8.4 9.4 22.3Confl. Peds. (#/hr) 1 1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 1% 0% 0% 4% 5% 1%Adj. Flow (vph) 428 5 0 295 529 279Shared Lane Traffic (%)Lane Group Flow (vph) 433 0 0 295 808 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Number of Detectors 1 1 2 2Detector Template Left Left Thru ThruLeading Detector (m) 2.0 2.0 10.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 2.0 0.6 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4Detector 2 Size(m) 0.6 0.6Detector 2 Type Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2

Page 1200: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 34

Lane Group EBL EBR NBL NBT SBT SBRDetector Phase 4 2 2 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0Minimum Split (s) 24.3 34.0 34.0 34.0Total Split (s) 31.3 42.0 42.0 42.0Total Split (%) 42.7% 57.3% 57.3% 57.3%Maximum Green (s) 25.0 35.0 35.0 35.0Yellow Time (s) 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.9 2.9 2.9Lost Time Adjust (s) -2.3 -3.0 -3.0Total Lost Time (s) 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 2.2 2.2 2.2 2.2Recall Mode Min Min Min MinWalk Time (s) 10.0 10.0 10.0Flash Dont Walk (s) 17.0 17.0 17.0Pedestrian Calls (#/hr) 0 0 0Act Effct Green (s) 18.7 19.0 19.0Actuated g/C Ratio 0.40 0.41 0.41v/c Ratio 0.65 0.22 0.59Control Delay 16.9 10.1 10.4Queue Delay 0.0 0.0 0.0Total Delay 16.9 10.1 10.4LOS B B BApproach Delay 16.9 10.1 10.4Approach LOS B B B

Intersection SummaryArea Type: OtherCycle Length: 73.3Actuated Cycle Length: 46.2Natural Cycle: 60Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.65Intersection Signal Delay: 12.2 Intersection LOS: BIntersection Capacity Utilization 54.3% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 111: Oakwood Dr & Walmart North Driveway

Page 1201: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 35

Lane Group EBL NBT SBTLane Group Flow (vph) 433 295 808v/c Ratio 0.65 0.22 0.59Control Delay 16.9 10.1 10.4Queue Delay 0.0 0.0 0.0Total Delay 16.9 10.1 10.4Queue Length 50th (m) 26.5 7.7 18.2Queue Length 95th (m) 64.2 18.4 42.7Internal Link Dist (m) 93.2 106.2 285.8Turn Bay Length (m)Base Capacity (vph) 1026 2664 2549Starvation Cap Reductn 0 0 0Spillback Cap Reductn 0 0 0Storage Cap Reductn 0 0 0Reduced v/c Ratio 0.42 0.11 0.32

Intersection Summary

Page 1202: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan111: Oakwood Dr & Walmart North Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 36

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 394 5 0 271 487 257Future Volume (vph) 394 5 0 271 487 257Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0Lane Util. Factor 1.00 0.95 0.95Frpb, ped/bikes 1.00 1.00 0.99Flpb, ped/bikes 1.00 1.00 1.00Frt 1.00 1.00 0.95Flt Protected 0.95 1.00 1.00Satd. Flow (prot) 1649 3197 3021Flt Permitted 0.95 1.00 1.00Satd. Flow (perm) 1649 3197 3021Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 428 5 0 295 529 279RTOR Reduction (vph) 1 0 0 0 114 0Lane Group Flow (vph) 432 0 0 295 694 0Confl. Peds. (#/hr) 1 1Heavy Vehicles (%) 1% 0% 0% 4% 5% 1%Turn Type Prot NA NAProtected Phases 4 2 6Permitted Phases 2Actuated Green, G (s) 16.3 15.9 15.9Effective Green, g (s) 18.6 18.9 18.9Actuated g/C Ratio 0.41 0.42 0.42Clearance Time (s) 6.3 7.0 7.0Vehicle Extension (s) 2.2 2.2 2.2Lane Grp Cap (vph) 674 1327 1254v/s Ratio Prot c0.26 0.09 c0.23v/s Ratio Permv/c Ratio 0.64 0.22 0.55Uniform Delay, d1 10.8 8.6 10.1Progression Factor 1.00 1.00 1.00Incremental Delay, d2 1.7 0.0 0.4Delay (s) 12.5 8.6 10.4Level of Service B A BApproach Delay (s) 12.5 8.6 10.4Approach LOS B A B

Intersection SummaryHCM 2000 Control Delay 10.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.60Actuated Cycle Length (s) 45.5 Sum of lost time (s) 8.0Intersection Capacity Utilization 54.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 1203: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 37

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Future Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 25.0 0.0 15.0 0.0 0.0 0.0 0.0 0.0Storage Lanes 1 0 1 1 0 0 2 0Taper Length (m) 50.0 30.0 7.5 7.5Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1.00Frt 0.850 0.850Flt Protected 0.950 0.950Satd. Flow (prot) 1662 1716 0 1750 1651 1430 0 1750 0 3014 1458 0Flt Permitted 0.472 0.950Satd. Flow (perm) 826 1716 0 1750 1651 1430 0 1750 0 3014 1458 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 126 899Link Speed (k/h) 50 50 50 50Link Distance (m) 68.3 112.7 49.3 93.4Travel Time (s) 4.9 8.1 3.5 6.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 2% 0% 0% 6% 4% 0% 0% 0% 7% 0% 2%Adj. Flow (vph) 57 173 0 0 118 30 0 0 0 121 0 78Shared Lane Traffic (%)Lane Group Flow (vph) 57 173 0 0 118 30 0 0 0 121 78 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 7.2 7.2Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 1 2 1 2Detector Template Left Thru Left Thru Right Left Thru Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 2.0 10.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 2.0 0.6 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6

Page 1204: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 38

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 8 2Detector Phase 7 4 8 8 8 2 2 6 6Switch PhaseMinimum Initial (s) 8.0 10.0 10.0 10.0 10.0 8.0 8.0 10.0 10.0Minimum Split (s) 12.5 34.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (s) 18.0 52.5 34.5 34.5 34.5 38.5 38.5 38.5 38.5Total Split (%) 13.9% 40.5% 26.6% 26.6% 26.6% 29.7% 29.7% 29.7% 29.7%Maximum Green (s) 15.0 45.0 27.0 27.0 27.0 31.0 31.0 31.0 31.0Yellow Time (s) 3.0 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 0.0 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4Lost Time Adjust (s) 1.0 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5 -3.5Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesVehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Recall Mode Min Min Min Min Min None None Min MinWalk Time (s) 10.0 10.0 10.0 10.0 11.0 11.0 11.0 11.0Flash Dont Walk (s) 17.0 17.0 17.0 17.0 20.0 20.0 20.0 20.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0Act Effct Green (s) 24.5 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.53 0.53 0.29 0.29 0.29 0.29v/c Ratio 0.10 0.19 0.24 0.06 0.14 0.07Control Delay 5.7 6.3 14.0 0.2 12.5 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.7 6.3 14.0 0.2 12.5 0.1LOS A A B A B AApproach Delay 6.1 11.2 7.7Approach LOS A B A

Intersection SummaryArea Type: OtherCycle Length: 129.5Actuated Cycle Length: 46Natural Cycle: 125Control Type: Semi Act-UncoordMaximum v/c Ratio: 0.24Intersection Signal Delay: 8.0 Intersection LOS: AIntersection Capacity Utilization 24.8% ICU Level of Service AAnalysis Period (min) 15

Splits and Phases: 112: Oakwood Dr & Walmart South Driveway

Page 1205: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 39

Lane Group EBL EBT WBT WBR SBL SBTLane Group Flow (vph) 57 173 118 30 121 78v/c Ratio 0.10 0.19 0.24 0.06 0.14 0.07Control Delay 5.7 6.3 14.0 0.2 12.5 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 5.7 6.3 14.0 0.2 12.5 0.1Queue Length 50th (m) 2.0 6.6 7.5 0.0 3.8 0.0Queue Length 95th (m) 5.7 14.0 17.2 0.0 8.4 0.0Internal Link Dist (m) 44.3 88.7 69.4Turn Bay Length (m) 25.0Base Capacity (vph) 694 1716 1094 990 2260 1318Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.08 0.10 0.11 0.03 0.05 0.06

Intersection Summary

Page 1206: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan112: Oakwood Dr & Walmart South Driveway Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 40

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Future Volume (vph) 52 159 0 0 109 28 0 0 0 111 0 72Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 0.97 1.00Frt 1.00 1.00 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1662 1716 1651 1430 3014 1458Flt Permitted 0.47 1.00 1.00 1.00 0.95 1.00Satd. Flow (perm) 825 1716 1651 1430 3014 1458Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 57 173 0 0 118 30 0 0 0 121 0 78RTOR Reduction (vph) 0 0 0 0 0 21 0 0 0 0 55 0Lane Group Flow (vph) 57 173 0 0 118 9 0 0 0 121 23 0Heavy Vehicles (%) 0% 2% 0% 0% 6% 4% 0% 0% 0% 7% 0% 2%Turn Type pm+pt NA Perm NA Perm Split NAProtected Phases 7 4 8 2 6 6Permitted Phases 4 8 8 2Actuated Green, G (s) 21.0 21.0 10.0 10.0 10.0 10.0Effective Green, g (s) 20.0 24.5 13.5 13.5 13.5 13.5Actuated g/C Ratio 0.43 0.53 0.29 0.29 0.29 0.29Clearance Time (s) 3.0 7.5 7.5 7.5 7.5 7.5Vehicle Extension (s) 2.4 2.2 2.2 2.2 2.2 2.2Lane Grp Cap (vph) 486 913 484 419 884 427v/s Ratio Prot 0.02 c0.10 c0.07 c0.04 0.02v/s Ratio Perm 0.03 0.01v/c Ratio 0.12 0.19 0.24 0.02 0.14 0.05Uniform Delay, d1 7.8 5.6 12.4 11.6 12.0 11.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.1 0.1 0.1 0.0 0.0 0.0Delay (s) 7.9 5.6 12.5 11.6 12.0 11.7Level of Service A A B B B BApproach Delay (s) 6.2 12.3 0.0 11.9Approach LOS A B A B

Intersection SummaryHCM 2000 Control Delay 9.7 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.22Actuated Cycle Length (s) 46.0 Sum of lost time (s) 16.0Intersection Capacity Utilization 24.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 1207: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 41

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 20 82 1 515 139 106 1 272 396 157 267 36Future Volume (vph) 20 82 1 515 139 106 1 272 396 157 267 36Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 115.0 0.0 0.0 100.0 50.0 0.0Storage Lanes 0 0 1 0 0 1 1 0Taper Length (m) 7.5 100.0 7.5 100.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.999 0.935 0.850 0.982Flt Protected 0.990 0.950 0.950Satd. Flow (prot) 0 1598 0 1599 1523 0 0 1651 1390 1471 1683 0Flt Permitted 0.925 0.685 0.999 0.467Satd. Flow (perm) 0 1493 0 1153 1523 0 0 1650 1390 723 1683 0Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 1 74 430 11Link Speed (k/h) 50 50 50 50Link Distance (m) 272.1 331.0 226.0 929.4Travel Time (s) 19.6 23.8 16.3 66.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 9% 0% 4% 7% 8% 0% 6% 7% 13% 2% 3%Adj. Flow (vph) 22 89 1 560 151 115 1 296 430 171 290 39Shared Lane Traffic (%)Lane Group Flow (vph) 0 112 0 560 266 0 0 297 430 171 329 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 3.6 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Number of Detectors 1 2 1 2 1 2 1 1 2Detector Template Left Thru Left Thru Left Thru Right Left ThruLeading Detector (m) 2.0 10.0 2.0 10.0 2.0 10.0 2.0 2.0 10.0Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Size(m) 2.0 0.6 2.0 0.6 2.0 0.6 2.0 2.0 0.6Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(m) 9.4 9.4 9.4 9.4Detector 2 Size(m) 0.6 0.6 0.6 0.6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6

Page 1208: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 42

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRPermitted Phases 4 8 2 2 6Detector Phase 4 4 8 8 2 2 2 6 6Switch PhaseMinimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0Minimum Split (s) 26.3 26.3 26.3 26.3 31.3 31.3 31.3 31.3 31.3Total Split (s) 42.0 42.0 42.0 42.0 33.0 33.0 33.0 33.0 33.0Total Split (%) 56.0% 56.0% 56.0% 56.0% 44.0% 44.0% 44.0% 44.0% 44.0%Maximum Green (s) 35.7 35.7 35.7 35.7 26.7 26.7 26.7 26.7 26.7Yellow Time (s) 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1All-Red Time (s) 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2Lost Time Adjust (s) -2.3 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lead/LagLead-Lag Optimize?Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Recall Mode Min Min Min Min Min Min Min Min MinWalk Time (s) 8.0 8.0 8.0 8.0 10.0 10.0 10.0 10.0 10.0Flash Dont Walk (s) 12.0 12.0 12.0 12.0 15.0 15.0 15.0 15.0 15.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0Act Effct Green (s) 36.3 36.3 36.3 24.6 24.6 24.6 24.6Actuated g/C Ratio 0.53 0.53 0.53 0.36 0.36 0.36 0.36v/c Ratio 0.14 0.92 0.32 0.51 0.56 0.67 0.54Control Delay 10.0 41.5 8.5 21.1 5.0 33.5 21.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 10.0 41.5 8.5 21.1 5.0 33.5 21.1LOS B D A C A C CApproach Delay 10.0 30.9 11.5 25.3Approach LOS B C B C

Intersection SummaryArea Type: OtherCycle Length: 75Actuated Cycle Length: 69Natural Cycle: 75Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 0.92Intersection Signal Delay: 22.0 Intersection LOS: CIntersection Capacity Utilization 80.9% ICU Level of Service DAnalysis Period (min) 15

Splits and Phases: 113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47)

Page 1209: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Queues Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 43

Lane Group EBT WBL WBT NBT NBR SBL SBTLane Group Flow (vph) 112 560 266 297 430 171 329v/c Ratio 0.14 0.92 0.32 0.51 0.56 0.67 0.54Control Delay 10.0 41.5 8.5 21.1 5.0 33.5 21.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 10.0 41.5 8.5 21.1 5.0 33.5 21.1Queue Length 50th (m) 8.0 72.9 14.7 32.2 0.0 19.9 35.0Queue Length 95th (m) 16.8 #143.7 30.0 54.0 17.1 #46.8 58.5Internal Link Dist (m) 248.1 307.0 202.0 905.4Turn Bay Length (m) 115.0 100.0 50.0Base Capacity (vph) 836 646 886 705 840 309 726Starvation Cap Reductn 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0Reduced v/c Ratio 0.13 0.87 0.30 0.42 0.51 0.55 0.45

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 1210: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Signalized Intersection Capacity Analysis Thundering Waters Secondary Plan113: Montrose Rd (RR 98) & Biggar Rd/Lyons Creek Rd (RR 47) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 44

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 20 82 1 515 139 106 1 272 396 157 267 36Future Volume (vph) 20 82 1 515 139 106 1 272 396 157 267 36Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.94 1.00 0.85 1.00 0.98Flt Protected 0.99 0.95 1.00 1.00 1.00 0.95 1.00Satd. Flow (prot) 1598 1599 1523 1651 1390 1471 1683Flt Permitted 0.93 0.68 1.00 1.00 1.00 0.47 1.00Satd. Flow (perm) 1493 1152 1523 1650 1390 724 1683Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 22 89 1 560 151 115 1 296 430 171 290 39RTOR Reduction (vph) 0 0 0 0 35 0 0 0 276 0 7 0Lane Group Flow (vph) 0 112 0 560 231 0 0 297 154 171 322 0Heavy Vehicles (%) 6% 9% 0% 4% 7% 8% 0% 6% 7% 13% 2% 3%Turn Type Perm NA Perm NA Perm NA Perm Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 33.9 33.9 33.9 22.3 22.3 22.3 22.3Effective Green, g (s) 36.2 36.2 36.2 24.6 24.6 24.6 24.6Actuated g/C Ratio 0.53 0.53 0.53 0.36 0.36 0.36 0.36Clearance Time (s) 6.3 6.3 6.3 6.3 6.3 6.3 6.3Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0Lane Grp Cap (vph) 785 606 801 589 497 258 601v/s Ratio Prot 0.15 0.19v/s Ratio Perm 0.07 c0.49 0.18 0.11 c0.24v/c Ratio 0.14 0.92 0.29 0.50 0.31 0.66 0.54Uniform Delay, d1 8.3 15.0 9.1 17.3 16.0 18.6 17.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 21.2 0.6 1.9 1.0 9.7 2.2Delay (s) 8.6 36.3 9.7 19.2 17.0 28.3 19.7Level of Service A D A B B C BApproach Delay (s) 8.6 27.7 17.9 22.7Approach LOS A C B C

Intersection SummaryHCM 2000 Control Delay 22.3 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.82Actuated Cycle Length (s) 68.8 Sum of lost time (s) 8.0Intersection Capacity Utilization 80.9% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 1211: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 45

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 49 20 2 438 364 27Future Volume (vph) 49 20 2 438 364 27Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.960 0.991Flt Protected 0.966Satd. Flow (prot) 1474 0 0 1696 1630 0Flt Permitted 0.966Satd. Flow (perm) 1474 0 0 1696 1630 0Link Speed (k/h) 50 50 50Link Distance (m) 216.2 600.6 677.2Travel Time (s) 15.6 43.2 48.8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 20% 50% 3% 6% 12%Adj. Flow (vph) 53 22 2 476 396 29Shared Lane Traffic (%)Lane Group Flow (vph) 75 0 0 478 425 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 37.7% ICU Level of Service AAnalysis Period (min) 15

Page 1212: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan203: Stanley Ave (RR 102) & Ramsey Rd Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 46

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 49 20 2 438 364 27Future Volume (Veh/h) 49 20 2 438 364 27Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 53 22 2 476 396 29PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 890 410 425vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 890 410 425tC, single (s) 6.5 6.4 4.6tC, 2 stage (s)tF (s) 3.6 3.5 2.7p0 queue free % 83 96 100cM capacity (veh/h) 307 604 919

Direction, Lane # EB 1 NB 1 SB 1Volume Total 75 478 425Volume Left 53 2 0Volume Right 22 0 29cSH 359 919 1700Volume to Capacity 0.21 0.00 0.25Queue Length 95th (m) 6.2 0.1 0.0Control Delay (s) 17.7 0.1 0.0Lane LOS C AApproach Delay (s) 17.7 0.1 0.0Approach LOS C

Intersection SummaryAverage Delay 1.4Intersection Capacity Utilization 37.7% ICU Level of Service AAnalysis Period (min) 15

Page 1213: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 47

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 81 42 25 359 345 39Future Volume (vph) 81 42 25 359 345 39Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.954 0.986Flt Protected 0.968 0.997Satd. Flow (prot) 1518 0 0 1647 1587 0Flt Permitted 0.968 0.997Satd. Flow (perm) 1518 0 0 1647 1587 0Link Speed (k/h) 50 50 50Link Distance (m) 252.6 331.4 600.6Travel Time (s) 18.2 23.9 43.2Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 13% 48% 3% 8% 15%Adj. Flow (vph) 88 46 27 390 375 42Shared Lane Traffic (%)Lane Group Flow (vph) 134 0 0 417 417 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 57.1% ICU Level of Service BAnalysis Period (min) 15

Page 1214: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan204: Stanley Ave (RR 102) & Progess St Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 48

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 81 42 25 359 345 39Future Volume (Veh/h) 81 42 25 359 345 39Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 88 46 27 390 375 42PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 840 396 417vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 840 396 417tC, single (s) 6.4 6.3 4.6tC, 2 stage (s)tF (s) 3.5 3.4 2.6p0 queue free % 73 93 97cM capacity (veh/h) 324 630 934

Direction, Lane # EB 1 NB 1 SB 1Volume Total 134 417 417Volume Left 88 27 0Volume Right 46 0 42cSH 389 934 1700Volume to Capacity 0.34 0.03 0.25Queue Length 95th (m) 12.0 0.7 0.0Control Delay (s) 19.0 0.9 0.0Lane LOS C AApproach Delay (s) 19.0 0.9 0.0Approach LOS C

Intersection SummaryAverage Delay 3.0Intersection Capacity Utilization 57.1% ICU Level of Service BAnalysis Period (min) 15

Page 1215: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 49

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 40 96 28 344 360 27Future Volume (vph) 40 96 28 344 360 27Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.904 0.991Flt Protected 0.986 0.996Satd. Flow (prot) 1406 0 0 1551 1639 0Flt Permitted 0.986 0.996Satd. Flow (perm) 1406 0 0 1551 1639 0Link Speed (k/h) 50 50 50Link Distance (m) 207.2 298.3 331.4Travel Time (s) 14.9 21.5 23.9Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 6% 13% 42% 10% 4% 30%Adj. Flow (vph) 43 104 30 374 391 29Shared Lane Traffic (%)Lane Group Flow (vph) 147 0 0 404 420 0Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 60.2% ICU Level of Service BAnalysis Period (min) 15

Page 1216: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan205: Stanley Ave (RR 102) & Don Murie St Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 50

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 40 96 28 344 360 27Future Volume (Veh/h) 40 96 28 344 360 27Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 43 104 30 374 391 29PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 840 406 420vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 840 406 420tC, single (s) 6.5 6.3 4.5tC, 2 stage (s)tF (s) 3.6 3.4 2.6p0 queue free % 87 83 97cM capacity (veh/h) 320 622 954

Direction, Lane # EB 1 NB 1 SB 1Volume Total 147 404 420Volume Left 43 30 0Volume Right 104 0 29cSH 487 954 1700Volume to Capacity 0.30 0.03 0.25Queue Length 95th (m) 10.1 0.8 0.0Control Delay (s) 15.5 1.0 0.0Lane LOS C AApproach Delay (s) 15.5 1.0 0.0Approach LOS C

Intersection SummaryAverage Delay 2.8Intersection Capacity Utilization 60.2% ICU Level of Service BAnalysis Period (min) 15

Page 1217: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 51

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 175 29 256 14 21 5 122 192 9 16 283 157Future Volume (vph) 175 29 256 14 21 5 122 192 9 16 283 157Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.925 0.984 0.996 0.953Flt Protected 0.981 0.983 0.981 0.998Satd. Flow (prot) 0 1481 0 0 1693 0 0 1517 0 0 1574 0Flt Permitted 0.981 0.983 0.981 0.998Satd. Flow (perm) 0 1481 0 0 1693 0 0 1517 0 0 1574 0Link Speed (k/h) 50 50 50 50Link Distance (m) 117.4 108.9 978.6 29.6Travel Time (s) 8.5 7.8 70.5 2.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 13% 0% 0% 0% 7% 17% 0% 7% 5% 7%Adj. Flow (vph) 190 32 278 15 23 5 133 209 10 17 308 171Shared Lane Traffic (%)Lane Group Flow (vph) 0 500 0 0 43 0 0 352 0 0 496 0Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(m) 0.0 0.0 3.6 3.6Link Offset(m) 0.0 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15 25 15 25 15Sign Control Stop Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 92.3% ICU Level of Service FAnalysis Period (min) 15

Page 1218: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan206: Stanley Ave (RR 102) & Dorchester Rd/Chippawa Pkwy Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 52

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (veh/h) 175 29 256 14 21 5 122 192 9 16 283 157Future Volume (Veh/h) 175 29 256 14 21 5 122 192 9 16 283 157Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 190 32 278 15 23 5 133 209 10 17 308 171PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 924 912 394 1202 993 214 479 219vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 924 912 394 1202 993 214 479 219tC, single (s) 7.1 6.5 6.3 7.1 6.5 6.2 4.2 4.2tC, 2 stage (s)tF (s) 3.5 4.0 3.4 3.5 4.0 3.3 2.3 2.3p0 queue free % 8 87 56 80 89 99 87 99cM capacity (veh/h) 206 238 632 74 213 831 1058 1321

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 500 43 352 496Volume Left 190 15 133 17Volume Right 278 5 10 171cSH 334 135 1058 1321Volume to Capacity 1.50 0.32 0.13 0.01Queue Length 95th (m) 220.3 10.1 3.4 0.3Control Delay (s) 267.9 43.5 4.2 0.4Lane LOS F E A AApproach Delay (s) 267.9 43.5 4.2 0.4Approach LOS F E

Intersection SummaryAverage Delay 98.8Intersection Capacity Utilization 92.3% ICU Level of Service FAnalysis Period (min) 15

Page 1219: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 53

Lane Group EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (vph) 65 52 55 219 315 104Future Volume (vph) 65 52 55 219 315 104Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 50.0 50.0Storage Lanes 1 0 1 1Taper Length (m) 7.5 50.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.940 0.850Flt Protected 0.973 0.950Satd. Flow (prot) 1459 0 1614 1733 1716 1352Flt Permitted 0.973 0.950Satd. Flow (perm) 1459 0 1614 1733 1716 1352Link Speed (k/h) 50 50 50Link Distance (m) 445.6 254.0 265.5Travel Time (s) 32.1 18.3 19.1Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 3% 18% 3% 1% 2% 10%Adj. Flow (vph) 71 57 60 238 342 113Shared Lane Traffic (%)Lane Group Flow (vph) 128 0 60 238 342 113Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Left Left RightMedian Width(m) 3.6 3.6 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 38.7% ICU Level of Service AAnalysis Period (min) 15

Page 1220: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan207: Montrose Rd (RR 98) & Chippawa Creek Rd (RR 63) Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 54

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 65 52 55 219 315 104Future Volume (Veh/h) 65 52 55 219 315 104Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 71 57 60 238 342 113PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 700 342 455vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 700 342 455tC, single (s) 6.4 6.4 4.1tC, 2 stage (s)tF (s) 3.5 3.5 2.2p0 queue free % 81 91 95cM capacity (veh/h) 382 666 1100

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 128 60 238 342 113Volume Left 71 60 0 0 0Volume Right 57 0 0 0 113cSH 471 1100 1700 1700 1700Volume to Capacity 0.27 0.05 0.14 0.20 0.07Queue Length 95th (m) 8.7 1.4 0.0 0.0 0.0Control Delay (s) 15.5 8.5 0.0 0.0 0.0Lane LOS C AApproach Delay (s) 15.5 1.7 0.0Approach LOS C

Intersection SummaryAverage Delay 2.8Intersection Capacity Utilization 38.7% ICU Level of Service AAnalysis Period (min) 15

Page 1221: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 55

Lane Group WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (vph) 159 21 253 145 66 290Future Volume (vph) 159 21 253 145 66 290Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.984 0.951Flt Protected 0.958 0.991Satd. Flow (prot) 1650 0 1609 0 0 1680Flt Permitted 0.958 0.991Satd. Flow (perm) 1650 0 1609 0 0 1680Link Speed (k/h) 50 50 50Link Distance (m) 91.0 214.2 176.4Travel Time (s) 6.6 15.4 12.7Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 0% 2% 6% 0% 4%Adj. Flow (vph) 173 23 275 158 72 315Shared Lane Traffic (%)Lane Group Flow (vph) 196 0 433 0 0 387Enter Blocked Intersection No No No No No NoLane Alignment Left Right Left Right Left LeftMedian Width(m) 3.6 0.0 0.0Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 15 25Sign Control Stop Free Free

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 65.5% ICU Level of Service CAnalysis Period (min) 15

Page 1222: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

HCM Unsignalized Intersection Capacity Analysis Thundering Waters Secondary Plan208: Montrose Rd (RR 98) & Oakwood Dr Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 56

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsTraffic Volume (veh/h) 159 21 253 145 66 290Future Volume (Veh/h) 159 21 253 145 66 290Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 173 23 275 158 72 315PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 813 354 433vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 813 354 433tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 47 97 94cM capacity (veh/h) 328 694 1137

Direction, Lane # WB 1 NB 1 SB 1Volume Total 196 433 387Volume Left 173 0 72Volume Right 23 158 0cSH 350 1700 1137Volume to Capacity 0.56 0.25 0.06Queue Length 95th (m) 26.1 0.0 1.6Control Delay (s) 27.6 0.0 2.1Lane LOS D AApproach Delay (s) 27.6 0.0 2.1Approach LOS D

Intersection SummaryAverage Delay 6.1Intersection Capacity Utilization 65.5% ICU Level of Service CAnalysis Period (min) 15

Page 1223: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report

Lanes, Volumes, Timings Thundering Waters Secondary Plan209: Lyons Creek Rd (RR 47) & QEW EB Off-Ramp Lyons Creek Crossing 2031 Summer

Timing Plan: PM Peak Hour Synchro 9 ReportPTSL Page 57

Lane Group EBL EBT WBT WBR SBL SBRLane ConfigurationsTraffic Volume (vph) 0 415 595 0 429 165Future Volume (vph) 0 415 595 0 429 165Ideal Flow (vphpl) 1750 1750 1750 1750 1750 1750Storage Length (m) 0.0 0.0 0.0 40.0Storage Lanes 0 0 1 1Taper Length (m) 7.5 7.5Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00Frt 0.850Flt Protected 0.950Satd. Flow (prot) 0 3292 3228 0 1599 1390Flt Permitted 0.950Satd. Flow (perm) 0 3292 3228 0 1599 1390Link Speed (k/h) 50 50 50Link Distance (m) 85.5 128.4 174.5Travel Time (s) 6.2 9.2 12.6Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Heavy Vehicles (%) 0% 1% 3% 0% 4% 7%Adj. Flow (vph) 0 451 647 0 466 179Shared Lane Traffic (%)Lane Group Flow (vph) 0 451 647 0 466 179Enter Blocked Intersection No No No No No NoLane Alignment Left Left Left Right Left RightMedian Width(m) 0.0 0.0 3.6Link Offset(m) 0.0 0.0 0.0Crosswalk Width(m) 4.8 4.8 4.8Two way Left Turn LaneHeadway Factor 1.11 1.11 1.11 1.11 1.11 1.11Turning Speed (k/h) 25 15 25 15Sign Control Free Free Stop

Intersection SummaryArea Type: OtherControl Type: UnsignalizedIntersection Capacity Utilization 50.3% ICU Level of Service AAnalysis Period (min) 15

Page 1224: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1225: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1226: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1227: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1228: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1229: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1230: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1231: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1232: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1233: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1234: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1235: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1236: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1237: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1238: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1239: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1240: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1241: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1242: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1243: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1244: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1245: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1246: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1247: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1248: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1249: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1250: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1251: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1252: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1253: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1254: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1255: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1256: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1257: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1258: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1259: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1260: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1261: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1262: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1263: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1264: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1265: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1266: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1267: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1268: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1269: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1270: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1271: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1272: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1273: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1274: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1275: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1276: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1277: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1278: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1279: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1280: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1281: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1282: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1283: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1284: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1285: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1286: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1287: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1288: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1289: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1290: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1291: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1292: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1293: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1294: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1295: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1296: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1297: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1298: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1299: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1300: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1301: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1302: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1303: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1304: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1305: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1306: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1307: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1308: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1309: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1310: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1311: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1312: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1313: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1314: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1315: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1316: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1317: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1318: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1319: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1320: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1321: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1322: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1323: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1324: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1325: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1326: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1327: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1328: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1329: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1330: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1331: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1332: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1333: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1334: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1335: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1336: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1337: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1338: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1339: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1340: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1341: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1342: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1343: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1344: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1345: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1346: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1347: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1348: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1349: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1350: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1351: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1352: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1353: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1354: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1355: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1356: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1357: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1358: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1359: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1360: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1361: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1362: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1363: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1364: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1365: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1366: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1367: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1368: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1369: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1370: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1371: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1372: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1373: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1374: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1375: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1376: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1377: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1378: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1379: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1380: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1381: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1382: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1383: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1384: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1385: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1386: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1387: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1388: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1389: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1390: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1391: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1392: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1393: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1394: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1395: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1396: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1397: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1398: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1399: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1400: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1401: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1402: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1403: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1404: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1405: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1406: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1407: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1408: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1409: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1410: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1411: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1412: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1413: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1414: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1415: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1416: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1417: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1418: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1419: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1420: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1421: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1422: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1423: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1424: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1425: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1426: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1427: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1428: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1429: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1430: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1431: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1432: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1433: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1434: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1435: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1436: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1437: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1438: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1439: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1440: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1441: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1442: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1443: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1444: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1445: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1446: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1447: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1448: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1449: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1450: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1451: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1452: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1453: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1454: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1455: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1456: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1457: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1458: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1459: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1460: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1461: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1462: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1463: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1464: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1465: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1466: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1467: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1468: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1469: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1470: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1471: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1472: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1473: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1474: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1475: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1476: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1477: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1478: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1479: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1480: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1481: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1482: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1483: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1484: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1485: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1486: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1487: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1488: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1489: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1490: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1491: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1492: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1493: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1494: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1495: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1496: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1497: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1498: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1499: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1500: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1501: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1502: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1503: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1504: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1505: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1506: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1507: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1508: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1509: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1510: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1511: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1512: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1513: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1514: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1515: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1516: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1517: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1518: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1519: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1520: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1521: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1522: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1523: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1524: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1525: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1526: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1527: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1528: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1529: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1530: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1531: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1532: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1533: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1534: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1535: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1536: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1537: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1538: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1539: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1540: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1541: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1542: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1543: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1544: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1545: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1546: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1547: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1548: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1549: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1550: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1551: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1552: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1553: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1554: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1555: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1556: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1557: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1558: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1559: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1560: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1561: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1562: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1563: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1564: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1565: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1566: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1567: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1568: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1569: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1570: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1571: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1572: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1573: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1574: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1575: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1576: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1577: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1578: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1579: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1580: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1581: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1582: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1583: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1584: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1585: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1586: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1587: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1588: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1589: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1590: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1591: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1592: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1593: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1594: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1595: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1596: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1597: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1598: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1599: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1600: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1601: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1602: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1603: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1604: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1605: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1606: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1607: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1608: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1609: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1610: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1611: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1612: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1613: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1614: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1615: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1616: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1617: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1618: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1619: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1620: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1621: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1622: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1623: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1624: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1625: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1626: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1627: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1628: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1629: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1630: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1631: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1632: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1633: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1634: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1635: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1636: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1637: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1638: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1639: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1640: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1641: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1642: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1643: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1644: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1645: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1646: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1647: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1648: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1649: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1650: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1651: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1652: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1653: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1654: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1655: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1656: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1657: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1658: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1659: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1660: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1661: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1662: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1663: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1664: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1665: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1666: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1667: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1668: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1669: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1670: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1671: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1672: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1673: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1674: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1675: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1676: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1677: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1678: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1679: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1680: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1681: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1682: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1683: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1684: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1685: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1686: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1687: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1688: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1689: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1690: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1691: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1692: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1693: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1694: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1695: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1696: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1697: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1698: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1699: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1700: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1701: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1702: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1703: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1704: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1705: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1706: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1707: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1708: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1709: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1710: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1711: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1712: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1713: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1714: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1715: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1716: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1717: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1718: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1719: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1720: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1721: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1722: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1723: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1724: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1725: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1726: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1727: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1728: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1729: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1730: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1731: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1732: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1733: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1734: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1735: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1736: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1737: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1738: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1739: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1740: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1741: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1742: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1743: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1744: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1745: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1746: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1747: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1748: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1749: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1750: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1751: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1752: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1753: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1754: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1755: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1756: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1757: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1758: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1759: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1760: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1761: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1762: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1763: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1764: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1765: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1766: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1767: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1768: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1769: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1770: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1771: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1772: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1773: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1774: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1775: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1776: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1777: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1778: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1779: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1780: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1781: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1782: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1783: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1784: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1785: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1786: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1787: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1788: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1789: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1790: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1791: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1792: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1793: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1794: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1795: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1796: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1797: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1798: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1799: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1800: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1801: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1802: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1803: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1804: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report
Page 1805: Thundering Waters Technical Appendix...Queues Thundering Waters Secondary Plan 101: Montrose Rd (RR 98) & McLeod Rd (RR 49) Existing Summer Timing Plan: AM Peak Hour Synchro 9 Report