Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present and Future Views T.A. Blasingame (02 September 2009) Slide — 1/24 Tight Gas/Shale Gas Well Performance Analysis — Present and Future Views Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tom BLASINGAME Department of Petroleum Engineering Texas A&M University College Station, TX 77843-3116 (USA) +1.979.845.2292 — [email protected]

Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

  • Upload
    dinhanh

  • View
    220

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—1/

24

Tight Gas/Shale Gas Well Performance Analysis —Present and Future Views

Presentation at Shell (Houston) 02 September 2009 — Houston, TX

Tom BLASINGAMEDepartment of Petroleum Engineering

Texas A&M UniversityCollege Station, TX 77843-3116 (USA)

+1.979.845.2292 — [email protected]

Page 2: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—2/

24

Tight Gas/Shale Gas Well Performance Analysis:

Present Views

Presentation at Shell (Houston) 02 September 2009 — Houston, TX

Tom BLASINGAMEDepartment of Petroleum Engineering

Texas A&M UniversityCollege Station, TX 77843-3116 (USA)

+1.979.845.2292 — [email protected]

Page 3: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—3/

24

Decline Analysis — Arps Relations: Base Relations

Case Rate-Time Relation Cumulative-Time Relation

]exp[ tDqq igig −=

)/1()(1 bi

gig

tbD

qq

+=

)(1 tDq

qi

gig +=

Exponential: (b=0)

Hyperbolic: (0<b<1)

Harmonic: (b=1)

]]exp[[1 tDDq

G ii

gip −−=

])(1[1 )(1

)/1(1 bi

i

gip tbD

Dbq

G −+−−

=

)ln(1 tDDq

G ii

gip +=

Loss Ratio:

Loss Ratio Derivative:

]exp[ /

1 tDqqdtdq

qD igig

g

g −=→−≡

)/1()(1

/ bi

gig

g

g

tbD

qq

dtdqq

dtdb

+=→

⎥⎥⎦

⎢⎢⎣

⎡−≡

Trans., AIME (1945) 160, 228-247.Analysis of Decline CurvesJ.J. Arps

Question(s):●How were the Arps' rate relations derived?

The BASIS for the Arps' relations — i.e., the behavior of the D- and b- parameters, is derived from OBSERVATIONS. These are empirical results.

Page 4: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—4/

24

x

yPressure

MonitoringPoint No. 1

PressureMonitoringPoint No. 2

HydraulicFracture

Wellbore

X

X

x

y

x

yPressure

MonitoringPoint No. 1

PressureMonitoringPoint No. 2

HydraulicFracture

Wellbore

X

X

Numerical Model Considers:●Reservoir Layering.●kv/kh ratio.●Fracture Length, xf.●Fracture Conductivity, FcD.Analysis/Validation Approach:●Fit q(t) with Arps' hyperbolic relation.●Compare reserves to model at 30 years.

Decline Analysis: Tight Gas SystemsSPE 109625 (2007)Estimating Reserves in Tight Gas Sands at HP/HT Reservoir Conditions: Use and Misuse of an Arps Decline Curve MethodologyJ.A. Rushing, A.D. Perego, R.B. Sullivan, Anadarko Petroleum, and T.A. Blasingame, Texas A&M U.

Page 5: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—5/

24

Exponential: (b=0)

Hyperbolic: (0<b<1)

Harmonic: (b=1)

⎥⎦

⎤⎢⎣

−≡⎥

⎤⎢⎣

⎡−= −

i

gibpgig Db

qG

GG

qq)(1

1 )1(1

⎥⎥⎦

⎢⎢⎣

⎡−= pgii

gig GqDqq exp

Case Plotting Function

pGgq versus

⎥⎥⎦

⎢⎢⎣

⎡−GpG

gq 1log versus)log(

pGgq versus)log(

⎥⎥⎦

⎢⎢⎣

⎡≡−=

i

giDq

GpGiDgiqgq

Decline Analysis: EUR Plots (Arps' relations)SPE 98042 (2005)A Production-Based Method for Direct Estimation of Gas-in-Place and ReservesT.A. Blasingame, Texas A&M U. andJ.A. Rushing, Anadarko Petroleum.

Question(s):●Graphical extrapolations of EUR? Family of "EUR

plots" derived from the Arps' exponential and hyperbolic relations. Hyperbolic "EUR plot" requires a modular computing environment (e.g., a spreadsheet), as multiple variables are established simultaneously.

Page 6: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—6/

24

⎥⎥⎦

⎢⎢⎣

⎡≡−=

i

giDq

GpGiDgiqgq⎥⎦

⎤⎢⎣

−≡⎥

⎤⎢⎣

⎡−= −

i

gibpgig Db

qG

GG

qq)(1

1 )1(1

Hyperbolic Decline: (0<b<1) Exponential Decline: (b=0)

a. "Hyperbolic Plot:" (log-log format) —Provides a straight-line for ALL cases.

b. "Hyperbolic Plot:" (Cartesian format) —Provides a straight-line ONLY for b=0 case.

Decline Analysis: Blasingame-Rushing EUR PlotSPE 98042 (2005)A Production-Based Method for Direct Estimation of Gas-in-Place and ReservesT.A. Blasingame, Texas A&M U. andJ.A. Rushing, Anadarko Petroleum.

Question(s):● Is there a distinctly unique mechanism for

establishing the validity of the hyperbolic relation? Yes, the "hyperbolic" decline "type curve" plot yields straight-line trends.

Page 7: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—7/

24

Theory:●pi < 6000 psia.●pwf = constant.

Rate-Cumulative Result:

Gzpzp

qD

GGD

GDqq

ii

wfwf

gii

pi

pigig

⎥⎥

⎢⎢

⎡⎥⎦

⎤⎢⎣

⎡−

=

+−=

2

2

//

1

2

where21

) (gas 1

eq.) flow ( 22

MBEGG

zp

zp

PSSzp

zpCq

p

ii

wf

wfg

⎥⎥⎦

⎢⎢⎣

⎡−=

⎥⎥⎥

⎢⎢⎢

⎥⎥⎦

⎢⎢⎣

⎡−⎥⎦

⎤⎢⎣⎡=

Buba Gas Reserves Estimation Plot:

a. The "Buba" method utilizes only rate-time data (cumulative is cal-culated) in order to create a series of semi-analytical plotting functions for the estimation of gas reserves.

b. The "Buba" approach is based on the Ansah et al result for a semi-analyti-cal gas flow solution.

Decline Analysis: Buba Rate-Cumulative RelationM.S Thesis, Texas A&M University, College Station, TX (2003)Direct Estimation of Gas Reserves Using Production DataI.M. Buba, Texas A&M U.

Question(s):● Is there a semi-rigorous mechanism for correlating

qg and Gp? Yes, the "Buba" relation and associated plots provide a unique extrapolation of gas-in-place.

Page 8: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—8/

24

Theory:●Palacio and Blasingame [1993]●Mattar and McNeil [1997]●Agarwal et al [1999]

Advantages:●Straightforward and intuitive.●Shut-in pressures NOT required.●Direct estimation of contacted

gas-in-place.

Limitations:●Boundary-dominated flow

regime must exist.

"Flowing Material Balance" Plot:

a. The "Flowing Material Balance" (Normalized Rate-Cumula-tive Function Plot) formulation is derived using the solution for the diffusivity equation during boundary-dominated flow regime. This formulation provides a direct estimate of the contacted gas-in-place using time, flowing wellbore pres-sure, and flowrate data.

Decline Analysis: "Flowing Material Balance" PlotJCPT (June 1997), 52-55.The 'Flowing' Gas Material BalanceL. Mattar and R. McNeil, Fekete Associates

Question(s):●What is the "Flowing Material Balance" plot? In

simple terms, pwf(t) data are "converted" to pavg(t)data using the pseudosteady-state flow equation, then plotted as a straight-line extrapolation function and "solved" for gas-in-place.

Page 9: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—9/

24

Transient Stems: (left)Numerical or analytical model (pwf = constant).q(t) is concave up.

Depletion Stems: (right)q(t) is concave down.b=0: pwf = con.b=1: qo = con. (qo/Δp).b>1: transient flow or external drive energy.λ: numerical gas flow solutions (λ =f(pwf/(pi)).

Reservoir Properties:k — y-axis match.G — x&y-axis matches.s — reD match.

a. Original format Fetkovich-Carter type curve — most important observation is that 0<b<1. For cases where b>1; either transient flow OR external energy is being added to the reservoir system.

swwa

wae

gigi

wfiDd

wae

wewtigi

Dd

err

rrB.

ppkhtqq

rr

rrrc

kt.t

−=

⎥⎥⎦

⎢⎢⎣

⎡−⎥

⎤⎢⎣

−=

⎥⎥⎦

⎢⎢⎣

⎡−⎥

⎤⎢⎣

⎡⎥⎥

⎢⎢

⎡−⎥

⎤⎢⎣

⎡=

21ln 2141

)( )(

21ln 1

21

1 006330 22

μ

φμ

Variables for the Carter Decline Type Curve

Decline Analysis: Fetkovich-Carter Type CurveSPEJ (October 1985) 719-728.Type Curves for Finite Radial and Linear Gas Flow Systems: Constant Terminal Pressure CaseR.D. Carter, Amoco Production

JPT (June 1980) 1065-1077.Decline Curve Analysis Using Type CurvesM.J. Fetkovich, Phillips Petroleum

Page 10: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—10

/24b. "Transformed" data shows fractured well

response at early times, very strong evidence of closed system at late times.

a. Raw (daily) rate and pressure data — bottomhole pressures are calculated, note the effect of liquid loading.

(1/4) )(

⎥⎥⎦

⎢⎢⎣

⎡≈

⎥⎥⎦

⎢⎢⎣

⎡Δ

g

ppss,g

transg qG

m̂qpm

(1) )(

⎥⎥⎦

⎢⎢⎣

⎡≈

⎥⎥⎦

⎢⎢⎣

⎡Δ

g

ppss,g

bdfg qG

m̂qpm

Boundary-DominatedFlow

TransientFlow

Question(s):●Can the well-reservoir model be inferred

from such data? Yes.● Is diagnosis sufficient? No, we must also

be able to model/history match data with a model (complete process).

Decline Analysis: Palacio Material Balance Time

? )(1 )/1( bi

gig

tbD

qq

+=

SPE 25909 (1993)Decline Curve Analysis Using Type Curves —Analysis of Gas Well Production DataJ.C. Palacio and T. Blasingame, Texas A&M U.

Page 11: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—11

/24

SPE 116731: Inadequacy of Arps' Rate RelationsASSUMPTION: The Arps decline para-

meter, b, defines the decline behavior...

REALITY: Difficult to identify the correct b-parameter during the early decline period —greatly impacts reserve estimates.

b. (Log-log plot) Production forecast of a tight gas well.a. (Semilog plot) Production forecast of a tight gas well.

SPE 116731 (2008)Exponential vs. Hyperbolic Decline in Tight Gas Sands — Understanding the Origin and Implications for Reserve Estimates Using Arps' Decline Curves.D. Ilk, Texas A&M U., J.A. Rushing and A.D. Perego, Anadarko Petroleum, and T.A. Blasingame, Texas A&M U.

Page 12: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—12

/24

●Rate Function Definitions:– Loss Ratio:

– Derivative of Loss Ratio:

– Exponential and Hyperbolic Rate Relations:

●Cause and Effect:– Hyperbolic relation is mis-applied to transient data.– What is the "characteristic behavior" of the D and

b-parameters? Evaluate continuously using data.

or /

1⎥⎦

⎤⎢⎣

⎡−≡−≡dQdqD

dtdqq

D

⎥⎦

⎤⎢⎣

⎡⎥⎦⎤

⎢⎣⎡≡⎥

⎤⎢⎣

⎡−≡⎥⎦

⎤⎢⎣⎡≡

DdQdqb

dtdqq

dtd

Ddtdb 1or

/1

)/1(][1 con or ; ]exp[ con b

i

iii

tbD

qqbtDqqD

+=→=−=→=

SPE 116731: Definitions of Rate Functions

(Exponential Decline) (Hyperbolic Decline)

Page 13: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—13

/24

[ ]Bni AtDtDnD

dtdq

qD −

∞−−

∞ +≈+≈−≡ ˆ1 )1(

●Observed Behavior of the "Decline" Parameter [D(t)]:

●Solving for Flowrate [q(t)] Using the D(t) Relation:

] ˆ exp[ ˆ nii tDtDqq −−= ∞

●Solving for the "Hyperbolic" Parameter [b(t)]:

nn

i

i ttDDn

nDnb −

−∞+

−= 2)1( ] ˆ[

)1(ˆ

SPE 116731: "Power-Law Exponential" Rate Result

Page 14: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—14

/24

●Discussion: Small "Waterfrac" Gas Well■ Liquid loading effects are obvious in the latter portion of the flowrate data.■ The onset of the boundary-dominated flow regime is observed.■ We observe a very good match of the flowrate data using D∞=0.

SPE 116731: q-D-b Plot — Small WF Tight Gas Well

Page 15: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—15

/24

●Discussion: Large "Waterfrac" Gas Well■ Erratic rate behavior caused by liquid loading is seen at late times.■ Outstanding matches of the computed D- and b-parameters with the

power-law exponential model are observed.

SPE 116731: q-D-b Plot — Large WF Tight Gas Well

Page 16: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—16

/24

Tight Gas/Shale Gas Well Performance Analysis:

Future View

Presentation at Shell (Houston) 02 September 2009 — Houston, TX

Tom BLASINGAMEDepartment of Petroleum Engineering

Texas A&M UniversityCollege Station, TX 77843-3116 (USA)

+1.979.845.2292 — [email protected]

Page 17: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—17

/24

b. Elliptical flow type curve solution — high fracture conductivity case.

a. Elliptical flow type curve solution — low fracture conductivity case.

Vertical TG/SG Wells: Elliptical Flow Domination

c. Elliptical boundary configurations (finite con-ductivity fracture case [Amini, et al (2007)].

SPE 106308 (2007)Evaluation of the Elliptical Flow Period forHydraulically-Fractured Wells in Tight GasSands — Theoretical Aspects and PracticalConsiderationsS. Amini, D. Ilk, and T. A. Blasingame,SPE, Texas A&M U.

Page 18: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—18

/24

a. Pressure profile at 0 year (0 hr).

b. Pressure profile at 1 year (8768 hr).

c. Pressure profile at 5.59 years (49,010 hr).

d. Pressure profile at 9.26 years (81,200 hr).

e. Pressure profile at 18.44 years (161,700 hr).

f. Pressure profile at 44.10 years (386,600 hr).

Results Generated Using:Ecrin Product Suite, Kappa Engineering, Sophia-Antipolis, France (2008).

Vertical TG/SG Wells: Elliptical Flow Domination

Page 19: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—19

/24

a. Rate performance behavior for a horizontal well with 4 trans-verse fractures — infinite-acting reservoir (analog to van Kruysdijk and Dullaert work). Fine-scale numerical model .

Horizontal TG/SG Wells: Compound Linear Flow

c. Schematic diagram for the "compound linear flow" concept [van Kruysdijk and Dullaert (1989)].

Presented at the 2nd European Conference on the Mathematics of Oil Recovery, Cambridge, England (1989).A Boundary Element Solution of the Transient Pressure Response of Multiply Fractured Horizontal WellsC.P.J.W. van Kruysdijk and G.M. Dullaert, Shell

b. Specialized derivative plot (ref: van Kruysdijk and Dullaert) for a horizontal well with 4 transverse fractures — infinite- and finite-acting reservoir cases. Fine-scale numerical model .

Page 20: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—20

/24

Base Simulation Modelfor Horizontal Well with Multiple Hydraulic Fractures

Top View HorizontalWell

MultipleVertical

Fractures

SPE 119897: Schematic Model for Simulation

Page 21: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—21

/24

●Discussion: Horizontal Wells with Transverse Fractures■ Very high resolution simulation case.■ Very good D-parameter and good b-parameter computed from results.■ Excellent rate match using the new model (all regimes).

SPE 119897: q-D-b Plot — Numerical SimulationFinite-Acting

Reservoir Case

Page 22: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—22

/24

●Discussion: Horizontal Wells with Transverse Fractures■ Very high resolution simulation case.■ Transient D- and b-parameters at late times (quasi-radial flow).■ Impossible to predict reserves.

SPE 119897: q-D-b Plot — Numerical SimulationInfinite-Acting

Reservoir Case

Page 23: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—23

/24

Horizontal TG/SG Wells: Diagnostics?Q1.Compound Linear Flow Domination? (transient flow)A1. Possibilities for estimating reservoir properties:

a. Just give up — impossible to resolve anything. (default)b. "Lump" k, xf, and Lwell into a "parameter." ("mechanistic model")c. Develop testing practices to estimate properties. (maybe…)d. Other model concepts (e.g., propagating ellipse). (very tedious)

Q2.Estimating Reserves?A2. Issues:

a. Extremely long transition to boundary-dominated flow. (reality)b. Hyperbolic rate relation will overestimate reserves. (as always)c. Power-law/exponential rate relation? (more validation)

Q3.Role of simulation/modeling?A3. In the short-term, simulation/modeling is the primary

tool at our disposal — the analogy of using a hammer in place of a screwdriver comes to mind… (sometimes effective, but always a sub-optimal solution — particu-larly in the hands of children).

Page 24: Tight Gas/Shale Gas Well Performance Analysis — … · Presentation at Shell (Houston) 02 September 2009 — Houston, TX Tight Gas/Shale Gas Well Performance Analysis — Present

Presentation at Shell (Houston)02 September 2009 — Houston, TX

Tight Gas/Shale Gas Well Performance Analysis — Present and Future ViewsT.A. Blasingame (02 September 2009) Sl

ide

—24

/24

Tight Gas/Shale Gas Well Performance Analysis —Present and Future Views

End of Presentation

Presentation at Shell (Houston) 02 September 2009 — Houston, TX

Tom BLASINGAMEDepartment of Petroleum Engineering

Texas A&M UniversityCollege Station, TX 77843-3116 (USA)

+1.979.845.2292 — [email protected]