To, Date: ………………… District Magistrate Allahabad, Uttar Pradesh Sub: Proposed earth extraction which to be used in Brick Kiln of M/s Jai Hanuman Brick Field from Khasra/Gata Nos. 1514, 1394, 818, 1629kh, Area – 3.5760 ha (8.8365 Acres) at Village – Bendau, Tehsil – Karchhana, District - Allahabad, Uttar Pradesh. Sir, Please, find herewith two copies of Mining Plan with Progressive Mine Closer Plan for proposed earth extraction which to be used in Brick Kiln of M/s Jai Hanuman Brick Field from Khasra/Gata Nos. 1514, 1394, 818, 1629kh, Area – 3.5760 ha (8.8365 Acres) at Village – Bendau, Tehsil – Karchhana, District - Allahabad, Uttar Pradesh of Sri Roopnarayan Patel S/o Sri Sukhdev R/o Village – Bendau, Mungari, Tehsil – Karchhana, District - Allahabad, Uttar Pradesh. Kindly approve the Mining Plan as earliest. Thanking You! (Authorized Signatory) Roopnarayan Patel S/o Sri Sukhdev R/o Village – Bendau, Mungari, Tehsil – Karchhana, District - Allahabad, Uttar Pradesh Encl:- Two copies of Mining Plan with Progressive Mine Closer Plan.

To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

To, Date: …………………District MagistrateAllahabad, Uttar PradeshSub: Proposed earth extraction which to be used in Brick Kiln of M/s Jai Hanuman BrickField from Khasra/Gata Nos. 1514, 1394, 818, 1629kh, Area – 3.5760 ha (8.8365 Acres) atVillage – Bendau, Tehsil – Karchhana, District - Allahabad, Uttar Pradesh.Sir,Please, find herewith two copies of Mining Plan with Progressive Mine Closer Plan forproposed earth extraction which to be used in Brick Kiln of M/s Jai Hanuman Brick Fieldfrom Khasra/Gata Nos. 1514, 1394, 818, 1629kh, Area – 3.5760 ha (8.8365 Acres) at Village– Bendau, Tehsil – Karchhana, District - Allahabad, Uttar Pradesh of Sri Roopnarayan PatelS/o Sri Sukhdev R/o Village – Bendau, Mungari, Tehsil – Karchhana, District - Allahabad,Uttar Pradesh.Kindly approve the Mining Plan as earliest.Thanking You!(Authorized Signatory)Roopnarayan PatelS/o Sri SukhdevR/o Village – Bendau, Mungari,Tehsil – Karchhana, District - Allahabad,Uttar PradeshEncl:- Two copies of Mining Plan with Progressive Mine Closer Plan.

Page 2: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

MINING PLANWITH

PROGRESSIVE MINE CLOSURE PLANFor

AGREEMENT PERIOD 5.0 YEARSPLAN PERIOD – 5.0 YEARS

PREPARED BYR B CHAUDHARYRQP/JABAL/169/2015/A

M/s Jai Hanuman Brick FieldBendau, Mungari, Karchhana, Allahabad, Uttar Pradesh

Area – 3.5760 ha (8.8365 Acres)

Brick Earth Mining from Khasra/Gata Nos. 1514, 1394, 818, 1629kh, Area –3.5760 ha (8.8365 Acres) at Village – Bendau, Tehsil – Karchhana, District -Allahabad, Uttar Pradesh.

APPLICANT/LESSEE:Sri Roopnarayan Patel S/o Sri Sukhdev R/o Village– Bendau, Mungari, Tehsil – Karchhana, District -Allahabad, Uttar Pradesh.

Page 3: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

AUTHORISATION LETTER BY THE PROPONENT

I Roopnarayan Patel S/o Sri Sukhdev R/o Village – Bendau, Mungari, Tehsil –Karchhana, District - Allahabad, Uttar Pradesh hereby authorized Sri R. B. Chaudhary,RQP/JABAL/169/2015/Ato prepare the Mining Plan with Mine Closer Plan under rule34(2) of amended rules of U.P. Minor Mineral Concession Rule 1963 and 1M, PFR & CSRPlan and presentation before DEAC in respect of proposed earth extraction which to beused in Brick Kiln of M/s Jai Hanuman Brick Field from Khasra/Gata Nos. 1514, 1394,818, 1629kh, Area – 3.5760 ha (8.8365 Acres) at Village – Bendau, Tehsil – Karchhana,District - Allahabad, Uttar Pradesh.I hereby solemnly affirm that all the information & documents given by me aretrue to the best of my knowledge and belief.I, request, the Director, Directorate of Geology & Mining, Lucknow to makefurther correspondence regarding modification and to collect the approved copies ofthe aforesaid Scheme of Mining, the said recognized person on his following address.

Sri R. B. Chaudhary58 Mini MIG GovindpurAllahabad - 211004Phone- 07706077778RQP/JABAL/169/2015/APlace-LucknowDate: …………………..Roopnarayan PatelS/o Sri SukhdevR/o Village – Bendau, Mungari,Tehsil – Karchhana, District - Allahabad,Uttar Pradesh

Page 4: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman
Page 5: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Mine Plan

Page 1 of 9

INTRODUCTIONBricks are produced in India in small or cottage scale brick kilns and Clamps, operates seasonally.The raw materials in the brick kilns include topsoil, coal, paddy husk, fly ash, wood & locallyavailable agro wastes to some extent. There are large variations in quality of soils available indifferent parts of the country and also in brick manufacturing process. Brick are good buildingmaterial for construction activities.It is one of the primary building materials known to mankind. Over time, bricks have appeared,gained prominence, lost importance and then come to the forefront again with various styles ofarchitecture. Burnt bricks were used in ancient Indian, Babylon, Egypt and Roman civilizations. Withthe increase of urbanization the demand for Bricks is growing in infrastructure sector in our country.Individual and private companies are increasingly demanding Brick for construction purposes andthis has immense pressure on brick clay resources. This increasing demand and extraction makesthis an environmental issue. As per Environment (Protection) Rules, 1986, vide S.O. 141(E), dated15th Jan, 2016,) the applicant is seeking prior environmental clearance, Therefore applicant hassubmitted for mine plan for proposed earth extraction which to be used in Brick Kiln of M/s Jai

Hanuman Brick Field from Khasra/Gata Nos. 1514, 1394, 818, 1629kh, Area – 3.5760 ha (8.8365Acres) at Village – Bendau, Tehsil – Karchhana, District - Allahabad, Uttar Pradesh.The applicant grants conditional agreement from different farmers which is enclosed as Annexure1.Hence, This Mining Plan including Progressive Mine Closer Plan is being submitted under rule 34 (2)of U.P. Minor Mineral (concession) Rules 1963.The authorization to prepare Mining Plan including progressive mine closer plan by applicant isenclosed.1.0 GENERAL:

A) Sri Roopnarayan Patel S/o Sri Sukhdev R/o Village – Bendau, Mungari, Tehsil – Karchhana,District - Allahabad, Uttar Pradesh.B) Status of Applicant: Private /PartnershipC) Mineral, occurring in the area & which Applicant Intends To Mine: Soil mining (extraction)which used in Brick KilnD) Period of mining lease: As per agreement from farmer and self affidavit enclosed as Annexure 1E) Name of R.Q.P. preparing the mining plans:Name – Sri R. B. ChaudharyF) Name of prospecting agency:The lease area is prospected by lessee under the guidance of Sri R. B. Chaudhary (RQP).Address - 58 Mini MIG GovindpurAllahabad - 211004Phone- 07706077778

Page 6: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Mine Plan

Page 2 of 9

Registration No: RQP/JABAL/169/2015/AG) Reference no & date of consent letter from the State Govt.

2.0 LOCATION AND ACCESSIBILITY

A) Details of area (with location map)Proposed earth extraction which to be used in Brick Kiln of M/s Jai Hanuman Brick Field fromKhasra/Gata Nos. 1514, 1394, 818, 1629kh, Area – 3.5760 ha (8.8365 Acres) at Village – Bendau,Tehsil – Karchhana, District - Allahabad, Uttar Pradesh.B) Whether the area is recorded to be in forest (please specify whether protected, reserved

etc.): The Agreement area is free from forest land.C) Ownership/Occupancy: Total lease area is completely outside of any restricted or protected areadeclared by any state or central government.D) Existence of public road /railway line, if any nearby and approximate distance:Soil miming area is located at Village – Bendau, Tehsil – Karchhana, District - Allahabad, UttarPradesh, Which is connected to NH-76 about 2.65 Km (SW), NH-27 about 14.0 Km (W), Karchhana –Pachdevra Road 1.9 Km (S), Kohdarghat Road 3.65 Km (SW) from excavation site and nearestAirport is Allahabad Airport – 28.0 km (NW) away from the area. Location Map on Plate No 1.E) Toposheet No. with latitude and longitude: Toposheet /Google Map the boundary points havebeen demarcated with the help of GPS as per revenue/ khasra map & coordinates of all the gata.

Table No 1 Co-ordinates of excavation GataKhasra/Gata Nos Latitude Longitude

1514 25°18'2.32"N 81°58'8.07"E1394 25°18'0.67"N 81°58'2.91"E818 25°17'59.50"N 81°58'2.42"E

1629kh 25°18'1.52"N 81°58'9.33"E3.0 GEOLOGY AND EXPLORATION:

a) Briefly describe the topography & general geology & local mine geology of the mineral

deposit including draining pattern.

3.1 TOPOGRAPHY & PHYSIOGRAPHYAgricultural plainAllahabad city, also known as Prayag, is an ancient holy city of India. The city of Allahabad is situatedat the confluence of two sacred rivers, the Yamuna and the Ganges. The confluence is known as

Page 7: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Mine Plan

Page 3 of 9

Sangam and is visited by thousands of Hindu pilgrims every year. Allahabad is among the largestcities of Uttar Pradesh in terms of population and area. The geographical area of Allahabad is about62 sq km (under Municipal Corporation). Its spatial extension falls at 25° 28’ N latitude and 81°54’ Elongitude. The district of Allahabad is surrounded by the Pratapgarh districts in the North, districtJaunpur in the Northeast, Sant Ravidas Nagar and Mirjapur in the east, Kaushambi and Chitrakoot inthe west and the state of Madhya Pradesh in the South.Allahabad has its own domestic airport, Bambruali, which is located 14 km from the city. Apart fromIndian Airlines, few private airlines also provide flight services to and from Allahabad. However,nearby cities, i.e. Varanasi (147 km) and Lucknow (210 km) also have airports. Allahabad is wellconnected by a network of trains to almost all major destinations throughout the country i.e. Kolkata,Delhi, Patna, Guwahati, Chennai, Mumbai, Gwalior, Meerut, Lucknow, Kanpur and Varanasi.Allahabad is located on National Highways 2 and 27. The government and private bus services areavailable to and from Allahabad to all nearby major destinations.3.2 GEOLOGY

Regional Geology:The Ganga basin has been dominated by transvers river system since Pliocene due to erosion duringuplift that is symmetric subsidence of foreland. Large plio-Pleistocene sediment combines with lessasymmetric subsidence and uplift of the proximal fore land let to the pro gradation of the drainagesystem that displaced the Yamuna River and after Allahabad Ganga River to edge of the forelandbasin. The Present river system consistent with erosion driven uplift adjacent Himalayan. Theregional geological setup is very well depicted in the map below;

Source: Singh I B 1996

Page 8: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Mine Plan

Page 4 of 9

Table: Geological Succession

Period Age Land Form(Geomorphology) Rock Type

QUATERNARY Upper Pleistocene toRecent New Alluvium Fine Sand And ClaysLower Pleistoceneto Upper Pleistocene Older Alluvium Sand of different grades andclay mixed with kankar- - - - - - - - - - - - - - - - - - - - - - - - - UNCONFORMITY- - - - - - - - - - - - - - - - - - - - - - - - - - - - -Vindhyan Sandstone (Proterozoic)- - - - - - - - - - - - - - - - - - - - - - - - - UNCONFORMITY- - - - - - - - - - - - - - - - - - - - - - - - - - - - -Bundelkhand Granitr (Archean)Local Geology:Geology map of Allahabad city shows the existence of Terrace Alluvium and Varanasi Alluvium asgeologic unit. The Varanasi Older Alluvium, a polycyclic sequence of yellowish brown clay- silt andfine sand with dissemination of kankar, is exposed in the north of Yamuna. The Newer Alluvium ischaracterized by unoxidised khaki and grey coloured sediments which consists predominantly ofmicaceous sand, silt and clay. It has been divided into Terrace and Channel Alluvium. The TerraceAlluvium of both Ganga and Yamuna are developed on a cut and eroded platform of Varanasi OlderAlluvium. The Terrace Alluvium of Ganga consists of multiple fill sequence of grayish sand, silt andclay while that of Yamuna consists of medium to fine grained quartzo- feldspathic and greymicaceous sand. Geology of the area is characterized by a thick pile of quaternary Alluviumconsisting of sand, grave land clay with occasional presence of thin to thick kankar intercalation.4.0 MINEABLE RESERVE:It shall be opencast semi mechanised mine involves scooping the mineral through use of handimplements like spade, pick axe, shovel and crowbar (JCB will be used if required) etc. In future topsoil shall be scrapped by means manually and shall be used for the purpose of making bundwall andrehabilitation/reclamation.Method of estimation of reserves:

Geological Reserve: Area (sqm) × Depth (m)Mineable Reserve: Geological Reserve – (Volume left in berm (cum) + Volume of top soil (cum))Volume of top soil: Area (sqm) – Area of berm left (sqm) × Thickness of top soil (m3)Mining shall be carried out from top to downward through the formation of benches. The height &width of benches shall be kept 1.0 m & 1.0 m with face slope.

Page 9: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Mine Plan

Page 5 of 9

Table No 2 Land Details

District Village GataNo

Area(ha)

Name of Landowner

Consent ofthe owner

Consentgiven

for thePeriod(Year)

Consentgiven forthe depthof mining

(m)

Allahabad Bendau1514 1.6040 Sanjay Shukla,JaiprakashShukla,DharmendraKumar Patel SriRoopnarayanPatel

5 2.001394 1.6990 Sukhdev, SmtPhulwa Devi 5 2.00818 0.2270 RoopnarayanPatel, Baijnath,Lalbabu,Sudarshan,Chintamani

5 2.001629kh 0.0460 5 2.00

Total Area 3.5760

Table No 3 Geological Reserves

Gata No Area(ha) Area(m2)depth ofmining

Geological Reserve(cum)1514 1.604 16040 2.0 320801394 1.699 16990 2.0 33980818 0.227 2270 2.0 45401629kh 0.046 460 2.0 920

Total 3.576 35760 71520

Table No 4 Minable Reserves

Gata No GeologicalReserve

Area ofberm

left(m2)

Volume leftin berm

(m3)

Thicknessof top soil

(m3)

Volume of topsoil(Total area-area in berm) *thickness of top

soil (cum)

MinableReserves

(m3)1514 32080 802 1604 0.15 2286 281901394 33980 850 1699 0.15 2421 29860818 4540 114 227 0.15 323 39901629kh 920 23 46 0.15 66 808Total 71520 1788 3576 5096 62848

DETAILS OF EXPLOITATION:Year Wise Production

Year Production Production(Cum) (Tonnes)First 6818 8182Second 6818 8182Third 6818 8182Fourth 6818 8182Fifth 6818 8182

Total 34091 40909

Page 10: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Mine Plan

Page 6 of 9

As per Brick Kiln capacity yearly production of bricks are 22.50 lacs bricks/ season for that therequired volume of brick clay will be 6818 cum/annum @ 330 brick in one cubic meter.B) Attach supporting composite plan & section showing pit layout, dumps, stacks of sub grade

mineral, if any etc:All quantities of brick-earth to be generated shall be used for the purpose of making brick except topsoil. Therefore no proposal of separate stacking of brick-earth has been envisaged. All quantities ofbrick earth to be exploited shall be used for making brick. Top soil shall be kept on bundwall whichwill spread out after the completion of mining.C) Indicate proposed rate of production when the mine is fully developed & the expected life

of mine & the year from which effected.As per Brick Kiln capacity yearly production of bricks are 22.50 lacs bricks/ season for that therequired volume of brick clay will be 6818 cum/annum @ 330 brick in one cubic meter.D) Conceptual Plan:The lease area is small & during plan period 34091 cum shall be explored. Remaining reserve will beexploration in next mining plan and agreement period if any. The ultimate shape of pit by the end ofconceptual period shall be same as the shape of area except bundwall.E) Waste ManagementTop soil exists within the area therefore its Preserved on bundwall and use in reclamation propose.F) Reclamation/Rehabilitation:The mined out area & reclamation / rehabilitation as on date, at the end of plan period & at the endof conceptual period Top soil shall be kept on bundwall which will spread out after the completion ofmining.5.0 BLASTING:As mentioned earlier there is simple Alluvium (soil) mining, mined mineral will be used for brickmaking .Therefore blasting not proposed/required.6.0 MINE DRAINAGE:One dug well is situated near by area. The top level of the well is 95 mRL & water table encounteredin the well is about 12-15 m. deep

Page 11: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Mine Plan

Page 7 of 9

7.0 DISPOSAL OF WASTEAll quantities of brick earth to be generated shall be used for the purpose of making brick except topsoil. Therefore no proposal of separate stacking of brick earth has been envisaged. All quantities ofbrick earth to be exploited shall be used for making brick.8.0 USE OF MINERAL:The brick earth below top soil in the agreement area is soft, medium to light in color alluviumtypically found in the Indo-gangetic plane. After removal of top soil, the excavated brick earth will beused for making the brick (simple earth brick).9.0 OTHER& SITE SERVICESThe following site services will be provided at mine site1. Office2. Drinking water shed3. Rest shelter4. First Aid Centre10.0 MINERAL PROCESSINGThe entire area consists of soil form & it is ready to making brick, no beneficiation of mineralprocessing will required. No Mineral beneficiation is involved within the lease area. .11. ENVIRONMENTAL MANAGEMENT PLAN:Attach a note on the status of base line information with regard to the following:I) Land Use:The existing land use of the area is almost agricultural waste lands.II) Water Regime:There is no perennial water body in the area. Water table loses its significance in this region due togreat depth. The depth of water table is about 15-20 m. below: general ground level.(III) Flora and Fauna:Vegetation and wild life are quite scanty. Trees of Neem, Jamun, Mango, Babul etc. are found only inand around the villages or in agriculture fields. Cows, donkeys, goats, sheep and buffalows are keptfor house hold requirements. Wild life comprises of rabbits, Squirrels, foxes, snakes, and lizard.Fishes, turtle, and crabs form aquatic life which occurs within a radius of 5 km. No wild life is foundwithin the lease area.

Page 12: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Mine Plan

Page 8 of 9

(IV) Quality of ambient air noise level and water:The proposed site is located in the remote area having a clean atmosphere. Therefore the quality ofambient air will be as good.12.0 Climatic dataThe study area is Allahabad Plateau zone and is subjected to vagaries of weather. The climate of theproject area is characterized by cool and dry climate. The year can be divided into three distinctseasons; winters last from October to March followed by summers from April to June.Temperaturerom February there is rapid increase in temperature, May is the hottest month with the mean dailymaximum temperature is 41.5°C and mean daily minimum temperature 26°C. After the onset of themonsoon there is appreciable drop in temperature, January is the coldest month with mean dailymaximum temperature is 26.20°C and mean daily minimum temperature is 9.3°C. The mean monthlymaximum temperature is 19.54°C and mean monthly minimum temperature is 6.23°.HumidityThe relative humidity is high during the southwest monsoon season, with mean monthly morningrelative humidity at 63.92% and mean monthly evening relative humidity at 48%.CloudinessIn the winter season the sky is generally clear or lightly clouded except for brief spells of a day ortwo each time when in association with the passage of western disturbances particularly in thenorthern parts of the district sky become cloudy. Sky is clear or lightly clouded in the summer andpost-monsoon seasons. Heavily clouded to overcast sky prevail in the monsoon seas.WindsWinds are generally high with some increase in force during summer and southwest monsoonseason. The mean wind velocity is 5.16 Km/hr and the potential evapo-transpiration rate is 1456.7mm.RainfallThe main rainy season is the southwest monsoon season, from about the last week of June toSeptember-mid, some rainfall much less in amount occurs in the cold season from December toFebruary in association with the passage of western disturbances, The average annual rainfall is 934mm. Climate is sub humid and is characterized by hot summer and pleasant monsoon and cold

Page 13: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Mine Plan

Page 9 of 9

season. About 90% of rainfall takes place from June to September. During monsoon surplus water isavailable for deep percolation to ground water.13.0 HUMAN SETTLEMENT& EMPLOYMENTS POTENTIALThe details of population, number of households, land, literacy etc. within a radius of 5 km. Humansettlements are distributed in fringes of buffer zone. The inhabitants belong to all the four castes. Themain occupation in 5 km. buffer zone is farming and mining. Poor literacy conditions prevail in thesurrounding of lease area & condition of literacy is more pathetic in females. Older generation wearDhoti Kurta while younger generation is adopting dresses like pant, shirts etc.14.0 SOCIOECONOMIC BENEFICIATE OUT OF MINING:The scale of operation is limited with 90% local employment. Hence some benefit to the localcommunity will occur on this aspect. Besides the direct employment, indirect employment willinclude tractor owners, truck drivers, shop keepers dhaba walas etc Year wise no of saplings to beplanted is as below: Along the approach roads and in the nearby villages i.e. with consultation theGram Panchayats The tree species recommended are Ficus religosa (peepal), Shorea robusta (Sal)may also be recommended. Mangifera indica (Aam), Emblica officinalis (Anwala), Aegle marmerlos(Ibei), Planting should be done in large sized 90 cm x 90 cm. due in advance and filled about 50 daysbefore planting. The plantation raised earlier should be carefully maintained. Mortalities should bereplaced by fresh planting.

Page 14: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Google Map

Fig: 500 m Radius Map

Page 15: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Google Map

Fig: 5.0 Km Radius Map

Page 16: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Progressive Mine Closure Plan

Page 1 of 6

PROGRESSIVE MINE CLOSURE PLAN

Name of Brick Kiln: M/s Jai Hanuman Brick Field

A) Name & address of applicantsSri Roopnarayan Patel S/o Sri Sukhdev R/o Village – Bendau, Mungari, Tehsil – Karchhana, District -Allahabad, Uttar Pradesh.B) Location:Soil miming area is located at Village – Bendau, Tehsil – Karchhana, District - Allahabad, Uttar Pradesh,Which is connected to NH-76 about 2.65 Km (SW), NH-27 about 14.0 Km (W), Karchhana – PachdevraRoad 1.9 Km (S), Kohdarghat Road 3.65 Km (SW) from excavation site and nearest Airport is AllahabadAirport – 28.0 km (NW) away from the area. Location Map on Plate No 1.

Proposed Method of Mining:The proposed project is to mine Brick Clay from plot (s) under agreement sustainably and scientifically.Mining will be opencast and manual using hand tools only in the allotted plots keeping the nearby plot (s)unaffected. Following geo-scientific methods are proposed to carry out the activity. Mining will beconfined to extraction of Brick Clay in its existing form from the allotted plot(s) only. Mining of Brick Clayfrom the allotted plot(s) will be restricted to a maximum depth of 2.0 m from the surface in proper benchform as per MCR-1960 and MMR 1961. The width and height of bench will be 1.0 m x 1.0 m. Topsoil up to6” depth will be preserved to spread it after mining activity is completed to restore the fertility of land.Reasons for Closure:At present there is no foreseeable reason regarding closure of mine. The progressive mine closure plan isbeing submitted, under amended rule under Rule 34 (6) & (7) of amended rules of U. P. Minor Mineral(Concession) Rules 1963Closure plan preparation:

A) Name and address of the ApplicantSri Roopnarayan Patel S/o Sri Sukhdev R/o Village – Bendau, Mungari, Tehsil – Karchhana, District -Allahabad, Uttar Pradesh.B) Name, address & Registration No. of R. Q. P.The lease area is prospected by lessee under the guidance of. Sri R. B. Chaudhary (RQP).Address - 56 Mini MIG GovindpurAllahabad - 211004Phone- 07706077778

Page 17: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Progressive Mine Closure Plan

Page 2 of 6

Registration No: RQP/JABAL/169/2015/AMine Description:

Topography:Agricultural plainAllahabad city, also known as Prayag, is an ancient holy city of India. The city of Allahabad is situated atthe confluence of two sacred rivers, the Yamuna and the Ganges. The confluence is known as Sangam andis visited by thousands of Hindu pilgrims every year. Allahabad is among the largest cities of UttarPradesh in terms of population and area. The geographical area of Allahabad is about 62 sq km (underMunicipal Corporation). Its spatial extension falls at 25° 28’ N latitude and 81°54’ E longitude. The districtof Allahabad is surrounded by the Pratapgarh districts in the North, district Jaunpur in the Northeast,Sant Ravidas Nagar and Mirjapur in the east, Kaushambi and Chitrakoot in the west and the state ofMadhya Pradesh in the South.Allahabad has its own domestic airport, Bambruali, which is located 14 km from the city. Apart fromIndian Airlines, few private airlines also provide flight services to and from Allahabad. However, nearbycities, i.e. Varanasi (147 km) and Lucknow (210 km) also have airports. Allahabad is well connected by anetwork of trains to almost all major destinations throughout the country i.e. Kolkata, Delhi, Patna,Guwahati, Chennai, Mumbai, Gwalior, Meerut, Lucknow, Kanpur and Varanasi. Allahabad is located onNational Highways 2 and 27. The government and private bus services are available to and fromAllahabad to all nearby major destinations.Geology:

Regional Geology:The Ganga basin has been dominated by transvers river system since Pliocene due to erosion duringuplift that is symmetric subsidence of foreland. Large plio-Pleistocene sediment combines with lessasymmetric subsidence and uplift of the proximal fore land let to the pro gradation of the drainagesystem that displaced the Yamuna River and after Allahabad Ganga River to edge of the foreland basin.The Present river system consistent with erosion driven uplift adjacent Himalayan. The regionalgeological setup is very well depicted in the map below;

Page 18: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Progressive Mine Closure Plan

Page 3 of 6

Source: Singh I B 1996

Table: Geological Succession

Period Age Land Form(Geomorphology) Rock Type

QUATERNARY Upper Pleistoceneto Recent New Alluvium Fine Sand And ClaysLower Pleistoceneto UpperPleistocene Older Alluvium Sand of different grades andclay mixed with kankar- - - - - - - - - - - - - - - - - - - - - - - - - UNCONFORMITY- - - - - - - - - - - - - - - - - - - - - - - - - - - - -Vindhyan Sandstone (Proterozoic)- - - - - - - - - - - - - - - - - - - - - - - - - UNCONFORMITY- - - - - - - - - - - - - - - - - - - - - - - - - - - - -Bundelkhand Granitr (Archean)Local Geology:Geology map of Allahabad city shows the existence of Terrace Alluvium and Varanasi Alluvium as geologicunit. The Varanasi Older Alluvium, a polycyclic sequence of yellowish brown clay- silt and fine sand withdissemination of kankar, is exposed in the north of Yamuna. The Newer Alluvium is characterized by un-oxidised khaki and grey coloured sediments which consists predominantly of micaceous sand, silt andclay. It has been divided into Terrace and Channel Alluvium. The Terrace Alluvium of both Ganga andYamuna are developed on a cut and eroded platform of Varanasi Older Alluvium. The Terrace Alluvium ofGanga consists of multiple fill sequence of grayish sand, silt and clay while that of Yamuna consists ofmedium to fine grained quartzo- feldspathic and grey micaceous sand. Geology of the area ischaracterized by a thick pile of quaternary Alluvium consisting of sand, gravel and clay with occasionalpresence of thin to thick kankar intercalation.

Page 19: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Progressive Mine Closure Plan

Page 4 of 6

MINEABLE RESERVE:It shall be opencast semi mechanised mine involves scooping the mineral through use of handimplements like spade, pick axe, shovel and crowbar (JCB will be used if required) etc. In future top soilshall be scrapped by means manually and shall be used for the purpose of making bundwall andrehabilitation/reclamation.Method of estimation of reserves:

Geological Reserve: Area (sqm) × Depth (m)Mineable Reserve: Geological Reserve – (Volume left in berm (cum) + Volume of top soil (cum))Volume of top soil: Area (sqm) – Area of berm left (sqm) × Thickness of top soil (m3)Mining shall be carried out from top to downward through the formation of benches. The height & widthof benches shall be kept 1.0 m & 1.0 m with face slope.

Table No 2 Land Details

District Village GataNo

Area(ha)

Name of Landowner

Consent ofthe owner

Consentgiven

for thePeriod(Year)

Consentgiven for

the depth ofmining (m)

Allahabad Bendau1514 1.6040 Sanjay Shukla,JaiprakashShukla,DharmendraKumar Patel SriRoopnarayanPatel

5 2.001394 1.6990 Sukhdev, SmtPhulwa Devi 5 2.00818 0.2270 RoopnarayanPatel, Baijnath,Lalbabu,Sudarshan,Chintamani

5 2.001629kh 0.0460 5 2.00

Total Area 3.5760

Table No 3 Geological Reserves

Gata No Area(ha) Area(m2)depth ofmining

Geological Reserve(cum)1514 1.604 16040 2.0 320801394 1.699 16990 2.0 33980818 0.227 2270 2.0 45401629kh 0.046 460 2.0 920

Total 3.576 35760 71520

Page 20: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Progressive Mine Closure Plan

Page 5 of 6

Table No 4 Minable Reserves

Gata No GeologicalReserve

Area ofberm

left(m2)

Volume leftin berm

(m3)

Thicknessof top soil

(m3)

Volume of topsoil(Total area-area in berm) *thickness of top

soil (cum)

MinableReserves

(m3)1514 32080 802 1604 0.15 2286 281901394 33980 850 1699 0.15 2421 29860818 4540 114 227 0.15 323 39901629kh 920 23 46 0.15 66 808Total 71520 1788 3576 5096 62848

DETAILS OF EXPLOITATION:Year Wise Production

Year Production Production(Cum) (Tonnes)First 6818 8182Second 6818 8182Third 6818 8182Fourth 6818 8182Fifth 6818 8182

Total 34091 40909As per Brick Kiln capacity yearly production of bricks are 22.50 lacs bricks/ season for that the requiredvolume of brick clay will be 6818 cum/annum @ 330 brick in one cubic meter.Closure Plan:

Mined out land:The mining has been proposed in already degraded land. Mining faces will advance from middle of thearea towards north-east & south- west directions. The height and width of benches will be kept 1.0 m to1.0 m, slope of mining faces will be kept 70 deg. and the overall slope of the pit will be kept 45 deg. Nowaste shall be generated, as all the ROM will be used as for brick making. Hence the reclamation will bedone only on mature benches by planting local species after the bench reaches to its maturity.Top Soil Management:Top soil exists within the area therefore its Preserved on bundwall and use in reclamation propose.Safety and Security:Each worker shall be provided with helmets & safety shoes.Safety belt shall be provided to workers on working the top benches.Hanging of loose boulders shall be removed from mine faces.The mining area shall be properly fenced to avoid any inadvertent entry in to mining pit.Working hours shall be displaced at conspicuous places.

Page 21: To, Date: ………………… District Magistrate Allahabad, Uttar ...environmentclearance.nic.in/writereaddata/District/approvedminplan/... · used in Brick Kiln of M/s Jai Hanuman

Progressive Mine Closure Plan

Page 6 of 6

Disaster Management and risk assessment:The mining will go up to a depth of 2.0 meter max. from the surface in the respective year and thereafterexcavated area shall be left open during monsoon to restore the topography of the area. The mining facesshall be dressed properly because loose material may create fatal accidents to the labourers whileworking in area.Any other information:Community Development: The expensed increased towards the socio-economic development is done byproponent time to time.