Toward the Trigger-Less DAQ: EMS and STT joint readout M. Kavatsyuk, V. Rodin, P. Schakel KVI-CART, University of Groningen for the PANDA collaboration

Toward the Trigger-Less DAQ: EMS and STT joint readout€¦ · Toward the Trigger-Less DAQ: EMS and STT joint readout M. Kavatsyuk, V. Rodin, P. Schakel KVI-CART, University of Groningen

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Toward the Trigger-Less DAQ: EMS and STT joint readout€¦ · Toward the Trigger-Less DAQ: EMS and STT joint readout M. Kavatsyuk, V. Rodin, P. Schakel KVI-CART, University of Groningen

Toward the Trigger-Less DAQ: EMS and STT joint readout

M. Kavatsyuk, V. Rodin, P. SchakelKVI-CART, University of Groningen

for the PANDA collaboration

Page 2: Toward the Trigger-Less DAQ: EMS and STT joint readout€¦ · Toward the Trigger-Less DAQ: EMS and STT joint readout M. Kavatsyuk, V. Rodin, P. Schakel KVI-CART, University of Groningen

2

EMC ReadoutA

nalo

gue

fro

nt-e

nd

Intelligentfront-end

(~1300 Digitizers)

Intelligentfront-end

(~60 Concentrators)

Single Clock-source for

complete detector

... ...

Event-building network with data pre-processing

(FPGA-based compute nodes)

Physics-event reconstruction,

filtering

PC farm,final event

filtering

Page 3: Toward the Trigger-Less DAQ: EMS and STT joint readout€¦ · Toward the Trigger-Less DAQ: EMS and STT joint readout M. Kavatsyuk, V. Rodin, P. Schakel KVI-CART, University of Groningen

3

EMC ReadoutA

nalo

gue

fro

nt-e

nd

Intelligentfront-end

(~1300 Digitizers)

Intelligentfront-end

(~60 Concentrators)

Single Clock-source for

complete detector

... ...

Event-building network with data pre-processing

(FPGA-based compute nodes)

Physics-event reconstruction,

filtering

PC farm,final event

filtering

Hit-detection step:

● Hit detection● Time/energy determination● Pile-up detection● Pile-up recovery

● Acquiring debugging data (raw,base-line subtracted, filteredwaveforms)

Page 4: Toward the Trigger-Less DAQ: EMS and STT joint readout€¦ · Toward the Trigger-Less DAQ: EMS and STT joint readout M. Kavatsyuk, V. Rodin, P. Schakel KVI-CART, University of Groningen

4

EMC ReadoutA

nalo

gue

fro

nt-e

nd

Intelligentfront-end

(~1300 Digitizers)

Intelligentfront-end

(~60 Concentrators)

Single Clock-source for

complete detector

... ...

Event-building network with data pre-processing

(FPGA-based compute nodes)

Physics-event reconstruction,

filtering

PC farm,final event

filtering

Data-concentration step:

● Calibrate data ● Combine data (two LAAPDS/cr.)● Pre-clustering

● Synchronisation, slow control,FEE configuration

Page 5: Toward the Trigger-Less DAQ: EMS and STT joint readout€¦ · Toward the Trigger-Less DAQ: EMS and STT joint readout M. Kavatsyuk, V. Rodin, P. Schakel KVI-CART, University of Groningen

5

EMC ReadoutA

nalo

gue

fro

nt-e

nd

Intelligentfront-end

(~1300 Digitizers)

Intelligentfront-end

(~60 Concentrators)

Single Clock-source for

complete detector

... ...

Event-building network with data pre-processing

(FPGA-based compute nodes)

Physics-event reconstruction,

filtering

PC farm,final event

filtering

Burst building:

● Network switch● Combine data● Pre-clustering

Page 6: Toward the Trigger-Less DAQ: EMS and STT joint readout€¦ · Toward the Trigger-Less DAQ: EMS and STT joint readout M. Kavatsyuk, V. Rodin, P. Schakel KVI-CART, University of Groningen

6

EMC ReadoutA

nalo

gue

fro

nt-e

nd

Intelligentfront-end

(~1300 Digitizers)

Intelligentfront-end

(~60 Concentrators)

Single Clock-source for

complete detector

... ...

Event-building network with data pre-processing

(FPGA-based compute nodes)

Physics-event reconstruction,

filtering

PC farm,final event

filtering

Event building:

● Clustering● Event selection

Page 7: Toward the Trigger-Less DAQ: EMS and STT joint readout€¦ · Toward the Trigger-Less DAQ: EMS and STT joint readout M. Kavatsyuk, V. Rodin, P. Schakel KVI-CART, University of Groningen

7

Readout DemonstratorA

nalo

gue

fro

nt-e

nd

Intelligentfront-end

(2 Digitizers)

Intelligentfront-end

(1 Concentrator)

Single Clock-source for

complete detector

Event-building network with data pre-processing

(FPGA-based compute nodes)

Physics-event reconstruction,

filtering

PC,event

filtering

TRB-basedSTT readout

Page 8: Toward the Trigger-Less DAQ: EMS and STT joint readout€¦ · Toward the Trigger-Less DAQ: EMS and STT joint readout M. Kavatsyuk, V. Rodin, P. Schakel KVI-CART, University of Groningen

8

The Setup

FW endcap subunit of 9 crystals + dummies Each crystal read out by 2 LAAPDs

Page 9: Toward the Trigger-Less DAQ: EMS and STT joint readout€¦ · Toward the Trigger-Less DAQ: EMS and STT joint readout M. Kavatsyuk, V. Rodin, P. Schakel KVI-CART, University of Groningen

9

DAQ Demonstrator

Looking for coincidences in EMC and STT:

● cosmics,● light pulser.

Aim for the EMC readout

● Reliability test for:● Hit detection● Feature

extraction● Calibration● Combining hits● Pre-clustering● Clustering● Buffer depthEMC

Page 10: Toward the Trigger-Less DAQ: EMS and STT joint readout€¦ · Toward the Trigger-Less DAQ: EMS and STT joint readout M. Kavatsyuk, V. Rodin, P. Schakel KVI-CART, University of Groningen

10

EMC Data-Sample

Crystal #1LAAPD #1

Crystal #1LAAPD #2

Deposited energy Deposited energy

Deposited energy

Crystal #1LAAPD #2

Cluster size>1

Time difference between crystals

Page 11: Toward the Trigger-Less DAQ: EMS and STT joint readout€¦ · Toward the Trigger-Less DAQ: EMS and STT joint readout M. Kavatsyuk, V. Rodin, P. Schakel KVI-CART, University of Groningen

11

Summary

First multi-system readout is set up and perform up to expectations (in terms of synchronization). Buffer depth and throughput are being optimized.

EMC readout performs up to expectation. Looking for rare bugs, e.g. wrong cluster size reported once per few GB of data.

To be done:● Extend complexity of the readout (more ADC and DC modules):

requires more hardware.● Optimize parameters for the feature extraction:

requires “final” version of the EMC subunit.● Decent slow control software● Official PANDA readout interface (CN ↔ PC farm)

Tests with proton beams are scheduled for September 2018.