Presentation Structure
Project Introduction and Background
Recommendations
Justification Stakeholders and Communications
Key Variables and Controls
Risk Assessment and Management Quality Assurance methods
7/31/2019 TREND BizCase Presentation
3/19
8/16/12
Project Introduction &Background
Project proposal and study requested by VP ofTechnology
Red team proposed TREND: TechnologyRevitalization and Efficiency at NewwDeal.
TREND = Energy costs, Efficiency
Achieves savings through
Virtualization
Green IT
Achieves efficiency through
ITIL
Lean process improvement
7/31/2019 TREND BizCase Presentation
4/19
8/16/12
Project Introduction &Background
Power Consumption Considerations:
Power consumed is approximately double eachservers load
UPS inefficiencies, whether at the PC or rack Internal power supply inefficiencies
Network equipment (firewalls, routers, switches)
Cooling
Source: US EPA report to Congress August2, 2007
Average server CPUusage only 5-15%
Will consume 60-90% of
its power at low usagelevels
Power consumedconverted directly toheat
Lifetime power & cooling cost more than themachine!
7/31/2019 TREND BizCase Presentation
5/19
8/16/12
Our investigation showed:
Mixed brands, ages of computers
Inconsistent capabilities
Difficult to plan upgrades
Administrators supporting
Different operating systems Different software products, versions
Older systems
Slower
Recommendations
7/31/2019 TREND BizCase Presentation
6/19
8/16/12
Recommendations
Increase NewwDeal efficiencywith:
Reducehardware size &
complexity Lower power costsand carbonfootprint Integrate IT
servicesmanagement
Virtualization + Green IT= Synergy!
7/31/2019 TREND BizCase Presentation
7/19
8/16/12
Virtualization and Green IT = Major savings
Lower power consumption Less heat for a/c to remove
Less real estate for systems
Green initiatives = good Public Relations
Project pays for itself almost right away!
Justification
7/31/2019 TREND BizCase Presentation
8/19
7/31/2019 TREND BizCase Presentation
9/19
8/16/12
Stakeholders &Communications
Stakeholder communications requirements. Information to be communicated, including format,
content, and level of detail. Who will receive, produce the information. Suggested methods or technologies for conveying
the information.
Frequency of communication. Escalation procedures for resolving issues. Revision procedures for updating the
communications management plan.
TREND Stakeholder CommunicationPlan
7/31/2019 TREND BizCase Presentation
10/19
8/16/12
Stakeholders &CommunicationsTREND Stakeholder Communication
Plan
7/31/2019 TREND BizCase Presentation
11/19
8/16/12
Key variables: Cost, Scope, and Schedule
Key variable: COST
Cost and Scope controlled through Earned Value
Management EVM contributes to:
Improving communication and visibility withstakeholders
Preventing scope creep
Reducing risk
Profitability analysis
Project forecasting
Key Variables & Controls
7/31/2019 TREND BizCase Presentation
12/19
8/16/12
Key Variables & Controls
Schedule Variable
Managed with Microsoft Project
Easy to tie back to Earned Value Management
Easy to assess actual vs expected progress
7/31/2019 TREND BizCase Presentation
13/19
8/16/12
Risk Assessment &Management
Refer to TREND Risk Management Plan andRisk Register
7/31/2019 TREND BizCase Presentation
14/19
8/16/12
Risk Assessment &Management
TREND risk management process includes Monitoring Communication Consultation
7/31/2019 TREND BizCase Presentation
15/19
8/16/12
Quality AssuranceMethods
We have to get these right EVERY time
7/31/2019 TREND BizCase Presentation
16/19
8/16/12
Quality AssuranceMethods
Lean methodology value mapping:
Identify wait times, wasted steps Pre-build, pre-test Focus on value to customer (Lean
+ ITIL)
7/31/2019 TREND BizCase Presentation
17/19
8/16/12
In Summary
Recommended Technology and EfficiencyMeasures
Virtualization & thin clients
Green IT ITIL
Justified TREND via
Cost Savings
ROI Materialized in 1.3 years
How We Will Engage Stakeholders
Controlling Key Variables
Mana in Pro ect and Information RisksTREND Is Going To Produce Results forNewwDeal
7/31/2019 TREND BizCase Presentation
18/19
8/16/12
Next Steps
Board Approval for TREND project
Firm Up Project Plan
Assemble TREND Key Leads Project Kickoff
Execute to Plan
Keep Risk under Control
7/31/2019 TREND BizCase Presentation
19/19
8/16/12
Credits
Slide 4, chart: Report to Congress on Server and Data Center EnergyEfficiency by US EPA, August 2, 2007.
Slide 5, Sherlock Holmes image:http://worldoffancydress.com/index.php?main_page=product_info&products_id=5
Slide 7, Green leaf @ sign: http://www.templates.com/
Slide 8, Worried woman:http://www.itsasmartdecision.com/2010/06/changeyourbottomline/
Slide 9, Handshake image http://www.brighthub.com/office/project-management/articles/15148.aspx?image=7444
Slide 16, Value map: http://www.matthewlai.co.uk/tips_excelvsm.html Slide 17, Bullhorn guy: www.fotolia.com
Slide 18, Leaning guy: www.fotolia.com
http://worldoffancydress.com/index.php?main_page=product_info&products_id=540http://worldoffancydress.com/index.php?main_page=product_info&products_id=540http://worldoffancydress.com/index.php?main_page=product_info&products_id=540http://www.templates.com/http://www.itsasmartdecision.com/2010/06/changeyourbottomline/http://www.brighthub.com/office/project-management/articles/15148.aspx?image=74440http://www.brighthub.com/office/project-management/articles/15148.aspx?image=74440http://www.matthewlai.co.uk/tips_excelvsm.htmlhttp://www.fotolia.com/http://www.fotolia.com/http://www.matthewlai.co.uk/tips_excelvsm.htmlhttp://www.brighthub.com/office/project-management/articles/15148.aspx?image=74440http://www.brighthub.com/office/project-management/articles/15148.aspx?image=74440http://www.itsasmartdecision.com/2010/06/changeyourbottomline/http://www.templates.com/http://worldoffancydress.com/index.php?main_page=product_info&products_id=540