    Langkah 1 : Menentukan Dimensi Dinding Penahan

    h1 1.9

    B1 1.25 m h2 7.1

    B2 (0,3 s/d HT/12) 0.3 0.88 h3 0.3

    0.6 m h4 1.25

    B3 1 m h5 1.25

    B4 B/3 2.30 m h6 1

    B5 (>B1) 1.50 m hw1 1.25

    B6 (B-(B4+B5) 3.20 m hw2 3.4

    Rb1 0.5B1 0.625 m Rh1 0.95

    HT 10.55

    BT (>6m) 0,5 s/d 0,7HT 0.5 7.39

    7.00 mQ 20

    SLOPE 1: 3 P1 10

    0.77 2.42 18.43 P2 75

    Langkah 2 : Menentukan Kondisi Tanah Berdasar Soal

    isi sendiri

    *TUGAS REKAYASA PONDASI*

  • 8/13/2019 Tubes Rek Pon - Revisi

    2/35

    Data Tanah

    Parameter b (KN/m3)

    sat(KN/m3)

    '(KN/m3)

    c (KN/m3)

    (o)

    Tanah 1 18.1 19.1 9.3 0.75 45

    Tanah 2 17.5 18.2 8.4 2.81 40

    Tanah 3 18.4 19.4 9.6 3.41 25

    Tanah 4 17.8 18.2 8.4 4.31 23Tanah 5 16.8 17 7.2 3.51 28

    H1 7.4 m

    H2 1.25 m

    H3 7.15 m

    H4 3.4 m

    Langkah 3 : Menentukan Koefisien Tanah Aktif dan Pasif

    Ka = tg2(45 - f/2)

    Kp (2,3) = tg2(45 + f/2) Kp1 =

    kw = 1

    Parameter (o) Ka Kp

    Tanah 1 45 0.190 4.743 Ka1 =

    Tanah 2 40 0.217 4.599

    Tanah 3 25 0.406 2.464

    Tanah 4 23 0.438 2.283

    Tanah 5 28 0.361 2.770

    Langkah 4 : Perhitungan Gaya Vertikal dan Gaya Momen terhadap Titik O

    cos

    cos

  • 8/13/2019 Tubes Rek Pon - Revisi

    3/35

    DINDING

    w(kN/m3)

    9.81

    beton (kN/m 24

    W1 B2 x h1 x beton

    = 27.36

    W2 (B1B2) x h5 x beton

    = 55.5

    W3 0.5 x B3 x h6 x beton

    = 12

    W4 ((B1B2)-B3) x (h2-h5) x beton

    0.85 = 119.34

    W5 [B5-((B1+B2)-B3)] x (H2-(H5+H6)) x beton

    = 75.7

    W6 0.5 x B4 x h3x beton

    = 8.28

    W7 B5 x h3 x beton

    = 10.8

    W8 0.5 x B6 x h3 x beton

    = 11.52

    W9 BT x h4 x beton

    = 210

    W10a [(B5+B6)-(B1+B2)] x (h1+h5) x b2

    = 157.106

    W10b [(B5+B6)-(B1+B2)] x h6 x b2

    = 49.875

    W11 0.5 x B3 x h6 x b2

    = 8.750

    W12

    0.7632 = 13.356

    W13

    0.5839 = 10.218

    W14

    0.2293 = 4.219

    W15a B6 x *(h2h3h4)-(hw2h5h6)+ x b2

    KODE

    GAYA VERTIKAL

    KN/m

  • 8/13/2019 Tubes Rek Pon - Revisi

    4/35

    = 168

    W15b B6 x (hw2-(h3h4) x b3

    = 108.928

    W16 0.5 x B6 x h3 x b3

    = 8.832

    W17 0.5 x B4 x h7 x b1

    = 15.9582

    W18 B4 x h8 x b1

    = 263.66

    W19 0.5 x B4 x h3 x b1

    = 6.24

    Pv 750 = 750

    Q 570 570

    = 2665.603953

    2095.60395

    AKIBAT GAYA PADA Ph

    Ph : 100 KN

    KODE

    Ph = 100

    100

    TANAH

    TEKANAN TANAH AKTIF

    Untuk tekanan tanah aktif lapis 2

    c = 2.81

    = 40

    harus dicari tinggi kritis nya (hc)

    2 c

    b2(ka)0.5

    5.62

    8.160

    : 0.689

    H3' 6.461

    TEKANAN TANAH AKTIF

    Untuk tekanan tanah aktif lapis 3

    c = 3.41

    = 25

    harus dicari tinggi kritis nya (hc)

    2 c

    b3(ka)0.5

    6.82

    zc :

    GAYA

    zc :

    :

    -zc)/3

  • 8/13/2019 Tubes Rek Pon - Revisi

    5/35

    11.72

    : 0.582

    H4' 2.818

    Pa : 0.5 x x H2

    x Ka-2c (Ka)^0.5

    Pa1 Q x Ka2 x H3 H3/2 + H4

    310.943

    Pa2 Q x Ka3 x H4 H4/2

    275.984

    Pa3 (0.5 x b2 x Ka2 x H3 x H3)-(2 c2x H3 (ka2)0.5

    ) H3'/3 + H4

    78.529

    Pa4 b2x Ka2 x H3 x H4 H4/2

    92.506

    Pa5 (0.5 x b3 x Ka3 x H4 x H4)-(2c3 x H4 (ka3)0.5

    ) H4'/3

    = 28.391

    786.353

    TEKANAN TANAH PASIF

    Pp1 2 c1 x (Kp1)0.5x H124.175

    Pp1 sin 7.645

    Pp1 cos 22.935

    Pp2 0.5 x H1 x H1 x Kp1 x b1

    2350.733

    Pp2 sin 743.367

    Pp2 cos 2230.101

    Pp3 b1 x H1 x H2 x Kp1

    794.167

    Pp4 2 c1 x (Kp1)0.5

    x H2

    4.084

    Pp5 0.5 x H2 x H2 x Kp1 x '1

    34.427

    Pp6 0.5 x w x H2 x H2 x Kw

    7.664

    3844.388

    KN

    KODE

    KODE

    TEKANAN TANAH AKTIF

    KN

    TEKANAN TANAH PASIF

    -zc)/3

  • 8/13/2019 Tubes Rek Pon - Revisi

    6/35

    Langkah 5 : REKAPITULASI masing-masing elemen

    DINDING

    W : 2665.604 KN

    MW : 10276.841 KN.mAKIBAT Ph

    W : 100 KN

    MW : 960.000 KN.m

    TANAH

    TANAH AKTIF

    Pa : 786.353 KN

    Ma : 3258.066 KN.m

    TANAH PASIF

    Pp : 3844.388 KN

    M pasif : 6099.666 KN.m

    Langkah 6 : Stabilitas terhadap geser

    Untuk tanah dengan > 0 dan c > 0

    Rh : Ca . B + W tg b

    Untuk nilai b antara 1/3 sampai 2/3, untuk itu di ambil nilai b adala

    : 2/3 C4 . B + W tg (2/3)

    Rh : 751.0072 KN

    gaya penahan = PP + Rh 4595.396

    gaya pendorong = Pa + Ph 886.353

    gaya penahan

    gaya pendorong

    : 4595.396

    886.353

    : 5.18 > 2

    AMAN TERHADAP GESER

    Langkah 7 : Stabilitas terhadap penggulingan

    momen penahan = MP + M pasif 16376.507

    momen pengguling = Ma + Mh 4218.066

    SF :

  • 8/13/2019 Tubes Rek Pon - Revisi

    7/35

    momen

    penahan

    momen

    pengguling

    : 16376.507

    4218.066

    : 3.88 > 2AMAN TERHADAP GULING

    Langkah 8 : Stabilitas terhadap keruntuhan kapasitas dukung

    momen penahan - momen pengguling

    : 4.561 m

    B

    2

    : 7.00

    2

    : 1.061 m < 1.167

    Bila e B/6

    W

    BBila e B/6

    2W

    3(B-2e)

    karena nilai e < B/6

    W

    B

    2665.604

    7.00

    : 727.19 Kn/m2

    W

    B

    2665.604

    7.00

    : 34.41 Kn/m2

    : 0.09037

    : 1.90963

    q : ( 1 6e/B)

    q min : ( 1 - 6e/B)

    q mak :

    q max : ( 1 + 6e/B)

    :

    |e | : -

    -

    12158.441

    2665.604

    Xe

    4.561

    Xe

    SF :

    :W

  • 8/13/2019 Tubes Rek Pon - Revisi

    8/35

    TABEL KAPASITAS DUKUNG TERZAGHI

    Nc Nq N Nc'

    0 5.7 1 0 5.7

    5 7.3 1.6 0.5 6.710 9.6 2.7 1.2 8

    15 12.9 4.4 2.5 9.7

    20 17.7 7.4 5 11.8

    25 25.1 12.7 9.7 14.8

    30 37.2 22.5 19.7 19

    34 52.6 36.5 35 23.7

    35 57.8 41.4 42.4 25.2

    40 95.7 81.3 100.4 34.9

    45 172.3 173.3 297.5 51.2

    48 258.3 287.9 780.1 66.8

    50 347.6 415.1 1153.2 81.3

    Tabel 3.1 halaman 94 Tek

    4 : 23

    Nc : 22.1

    Nq : 10.6

    N : 7.8

    qu : c4Nc + q Nq + 0.5 B b4N

    q : ('1(Df-dw1)+b1dw1)+qo 387.685

    363.2035

    qu : 4425.30243 Kn/m2

    >>> Tekanan pondasi ke tanah dasar terbagi merata

    W

    B-2e

    : 2665.604

    4.878

    : 546.507 Kn/m2

    >>> Faktor Amanqu

    qmax

    4425.30243

    727.188

    : 6.09 3

    OKE AMAN

    :

    Keruntuhan geser umum

    q' :

    SF :

    Kerun

  • 8/13/2019 Tubes Rek Pon - Revisi

    9/35

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    ton/m 200 KN/m

    ton 100 KN

    ton 750 KN

  • 8/13/2019 Tubes Rek Pon - Revisi

    10/35

    1.5811

    0.3162

    0.3162

    1.5811

    cos(cos2-cos

    2)

    0.5

    cos-(cos2-cos

    2)

    0.5

    cos-(cos2-cos

    2)

    0.5

    cos(cos2-cos

    2)

    0.5= 0.9487 x

    0.9487 x

  • 8/13/2019 Tubes Rek Pon - Revisi

    11/35

    MOMEN

    O

    KN.m 1.8

    0.5B2 + B1 + B4

    3.85 = 3.850 105.336 49.248

    (B1+B2)/2 + B4 0

    = 3.225 178.988 99.9

    1/3B3 +((B1+B2)-B3) + B4 0

    = 3.483 41.800 21.6

    ((B1+B2)-B3)/2 + B4 0

    = 2.725 325.202 214.812

    (B5-((B1+B2)-B3)/3) + ((B1+B2)-B3) + B4 0

    = 3.367 254.722 136.188

    2/3B4 0

    = 1.533 12.696 14.904

    B5/2 + B4 0

    = 3.050 32.940 19.44

    B6/3 + B5 + B4 0

    = 4.867 56.064 20.736

    BT/2 0

    = 3.500 735.000 378

    0

    = 5.575 875.867 282.7913

    0

    = 5.575 278.053 89.775

    0

    = 3.483 30.479 15.750

    = 3.673 49.054 24.0408

    0

    = 3.282 33.535 18.39285

    0

    = 3.635 15.335 7.5944

    B6/2 + B5 +B4 0

    JARAK DARI O

    (m)

  • 8/13/2019 Tubes Rek Pon - Revisi

    12/35

    = 5.400 907.200 302.4

    B6/2 + B5 +B4 0

    = 5.400 588.211 196.0704

    2/3 B6 + B5 +B4 0

    = 5.933 52.403 15.8976

    2/3 B4 0

    = 1.533 24.464 28.7247B4/2 0

    = 1.150 303.205 474.582

    1/3 B4 0

    = 0.767 4.787 11.2401

    B1/2 + B4 = 2.925 2193.750 127.9621

    B1+B2+B4+(1/2*(B-(B1+B2+B4)) 5.575 3177.750 360

    = 10276.841

    2910.049

    MOMEN

    Rh1+h2+h3+h4 = 9.6 960

    960.000

    JARAK DARI O

  • 8/13/2019 Tubes Rek Pon - Revisi

    13/35

    MOMEN 1.8

    O

    KN.m

    = 6.975 2168.829 559.6978

    0

    = 1.700 469.172 496.7708

    0

    = 5.554 436.134 141.3527

    0

    = 1.700 157.260 166.5101

    0

    = 0.939 26.671 51.10466

    3258.066

    1415.436

    MOMEN

    O

    KN.m

    H1/2

    3.700 84.858 41.28216

    H1/3

    2.467 5500.916 4014.182

    H2/2 0

    0.625 496.354 1429.5

    0

    0

    H2/2 0

    0.000 0.000 7.350543

    H2/3 0

    0.417 14.345 61.96829

    H2/3 0

    0.417 3.193 13.79531

    6099.666 5568.078

    JARAK DARI O

    (m)

    JARAK DARI O

    (m)

  • 8/13/2019 Tubes Rek Pon - Revisi

    14/35

    h 2/3, maka

  • 8/13/2019 Tubes Rek Pon - Revisi

    15/35

    (B/6)

  • 8/13/2019 Tubes Rek Pon - Revisi

    16/35

    Nq ' N'

    1 0

    1.4 0.21.9 0.5

    2.7 0.9

    3.9 1.7

    5.6 3.2

    8.3 5.7

    11.7 9

    12.6 10.1

    20.5 18.8

    35.1 37.7

    50.5 60.4

    65.6 87.7

    nik fondasi 1

    tuhan geser lokal

  • 8/13/2019 Tubes Rek Pon - Revisi

    17/35

  • 8/13/2019 Tubes Rek Pon - Revisi

    18/35

  • 8/13/2019 Tubes Rek Pon - Revisi

    19/35

    0.170616

    0.35 17.24

    0.00-0.275 -27.47

    0.00

    -0.017 -0.37

    0.00

    -0.775 -166.48

    0.00

    -0.133 -18.11

    0.00

    -1.967 -29.32

    0.00

    -0.45 -8.75

    0.00

    1.367 28.35

    0.00

    0 0.00

    0.00

    2.075 586.79

    0.00

    2.075 186.28

    0.00

    0.32 5.040.00

    0.1728 4.15

    0.00

    -0.0863 -1.59

    0.00

    0.2174 1.65

    0.00

  • 8/13/2019 Tubes Rek Pon - Revisi

    20/35

    1.9 574.56

    0.00

    1.9 372.53

    0.00

    2.433 38.68

    0.00

    -1.9667 -56.490.00

    -2.35 -1115.27

    0.00

    -2.733 -30.72

    -0.575 -73.58

    2.075 747.00

    1034.134

  • 8/13/2019 Tubes Rek Pon - Revisi

    21/35

    3903.893

    0

    844.5104

    0

    785.0404

    0

    283.0672

    0

    48.0076

    0

    5864.518

    x kuadrat 64.8 163.7915

    sigma W 2910.049

    n 16 My 6312.806

    -2.7 bar 1 Q -81.1555

    -0.9 bar 2 Q 94.20022

    152.744 0.9 bar 3 Q 269.5559

    0

    0 2.7 bar 4 Q 444.9116

    0

    9901.648 Q 7118.586

    0

    893.4373 Qa

    0

    0 P group Q

    0 33702.58 7118.586

    0

    0

    25.82012

    0

    5.748047

    10979.4

  • 8/13/2019 Tubes Rek Pon - Revisi

    22/35

    Langkah 1 : Data lapisan tanah

    tanah 4 tanah 5

    4 : 17.8 Kn/m3

    5 :

    w : 9.81 Kn/m

    3

    w :

    sat : 18.2 Kn/m3

    sat :

    c : 4.31 c :

    : 23 :

    4' : 8.39 Kn/m3

    5' :

    Langkah 2 : Pondasi Tiang Pancang

    Lapisan Tanah 4

    Lapisan Tanah 5

    13,8 kN/m3

    f 12,6

    TANAH ASLI

    9,7 kN/m3

    sat 18 ,5 kN/m36,8

    f 25,7

    H2 = 3,4 m

    H1 = 2,5 m

    q=120 kN/m2

    beton 25 kN/m3

    H6 = 6,3 m

    Lapisan Tanah 4

    Lapisan Tanah 5

  • 8/13/2019 Tubes Rek Pon - Revisi

    23/35

    Kedalaman 45 m (asumsi sam

    Kedalaman kritis 10d - 20d

    digunakan kedalaman kritis 20 d

    Zc 12 m

    DIAGRAM TEKANAN VERTIKAL

    Tabel Po

    Kedalaman

    (m)

    14 Po1 = d1 x 4'

    (Zc) 12 Po2 = Po1 + d2 x 5'

    45 Po3 = Po2 + d3 x 5'

    karena letak Po3 dibawah zc, maka nilai Po3 = Po2 =

    Langkah 3a : Tahanan ujung tiang

    Qb : Ab ( Cb Nc + Pb Nq + 0.5 d N) (RUMUS U

    Lapis 1 Lapis 2

    23 29

    Cu 43.1 56

    Nc' 13.600 18.160

    Nq' 4.920 7.760

    N' 2.600 5.200

    TABEL KAPASITAS DUKUNG TERZAGHI

    Nc Nq N

    0 5.7 1 0

    5 7.3 1.6 0.5

    10 9.6 2.7 1.2

    15 12.9 4.4 2.5

    20 17.7 7.4 5

    25 25.1 12.7 9.7

    Keruntuhan geser umum

    Lapisan Tanah 4

    Lapisan Tanah 5

    Zc

    H2 = 6,3 m

  • 8/13/2019 Tubes Rek Pon - Revisi

    24/35

    30 37.2 22.5 19.7

    34 52.6 36.5 35

    35 57.8 41.4 42.4

    40 95.7 81.3 100.4

    45 172.3 173.3 297.5

    48 258.3 287.9 780.1

    50 347.6 415.1 1153.2

    Tabel 3.1 ha

    Ab : 1/4 d2

    : 0.2829 m2

    Qb : Ab ( 1.3 Cu5 Nc + Pb Nq + 0.3 ' d N) (JIKA DIGUN

    :

    : 569.110 kN

    Qb akibat komponen gesekan (granuler)

    Sehingga nilai c = 0, maka nilai Pada suku 1 akan hilang, sedangkan suku ke 3 bisa dihilan

    karena berbandingan kedalaman dengan diameter sangatlah kecil nyaris mendekati nol

    Qb1 : Ab Pb' Nq interpolasi

    : Nq'

    : 191.138 Kn

    Qb akibat komponen kohesi

    Karena lempung dalam kondisi jenuh, maka adhesi antar tanah dengan tiang menjadi no

    Sehingga suku pertama dan suku ke 3 dapat dihikangkan

    Qb2 : Ab (cu5. Nc + Pb)

    :

    : 454.073 Kn

    Qb total

    Qb : Qb1 + Qb2

    : 454.073 Kn

    Langkah 3b : CEK tahanan ujung satuan maksimum

    Batas : 10700 Kn/m2

    : Qb

    Ab

    : 454.073

    0.2829

    : 1605.310 10700 Kn/m2

    Langkah 4 : Tahanan gesek tiang (Qs)

    Granuler

    kepadatan Kd ' (tiang beton)

    0,75Kd tg

    0 14 23 rendah 1 17.333333 13 0.23

    14 12 29 rendah 1 25.333333 19 0.34

    Kedalaman (m)

    10700

    fs 10700

  • 8/13/2019 Tubes Rek Pon - Revisi

    25/35

    12 45 29 rendah 1 25.333333 19 0.34

    Qs = As Kd tg Po` Po`(Po rata-rata)keliling tiang=d 1.885

    1 357.81065 kN

    2 -132.7551 kN

    3 1865.1138 kN

    Qs 2090.1693 kN

    Kohesif BACA SENDIRI DI GAMBAR 2.2 BUKU REKPON II H

    Cu4 43.1 kPa ad = 0.78

    Cu5 56 kPa ad = 0.86

    Qs= ad Cu As

    1 887.15812 kN

    2 2814.1633 kN

    Qs 3701.3214 kN

    QS TOTAL

    Qs : + 3701.321

    : 3701.321 Kn

    Langkah 4b : CEK tahanan gesek satuan maksimum

    Batas : 107 Kn/m2

    Qs

    d l

    : 3701.321

    84.823

    : 43.636 107 Kn/m2

    Langkah 5 : Berat Tiang

    tiang : 0.6 m

    panjang : 45 m

    beton : 24 Kn/m3

    BERAT : 1/4d2

    x panjang x eton

    : 305.486 Kn

    Langkah 6a : Kapasitas dukung ultimate 1 tiang

    Qu : Qb + Qs

    Qu : Ab ( 1.3 C Nc + Pb Nq + 0.3 d N) + As ( Po Kd tg d)

    Qb : 454.073 Kn

    fs : 107

    107

  • 8/13/2019 Tubes Rek Pon - Revisi

    26/35

    Qs : 3701.321 Kn

    W : 305.486 Kn

    Qu : 3849.909 Kn

    Langkah 6b : Kapasitas dukung ijin1 tiang

    SF : 3

    Qu

    SF

    : 3849.909

    3

    : 1283.303

    Langkah 7a : Perencanaan pondasi tiang kelompok

    lebar pilecap 7.00

    panjang pile cap 7.00

    berat abutment 2095.6040 KN/m 2665.604 1915.604

    Pv 750 KN 2095.60395

    W = (berat abutment x L) +Pv

    = 14159.2277 KN

    W

    Qa

    14159.228

    1283.303

    : 11.033: 16 pembulatan disesuaikan

    Langkah 7b : Perencanaan pondasi tiang kelompok

    s : 3 d (Asumsi)

    : 1.8 m

    Barishorizontal n' : 4 m

    vertikal m : 4 m

    Langkah 7c : kapasistas dukung izin tiang tunggal

    d/s : 0.33333333

    arctan d/s : 18.4349

    efisiensi kelompok

    Qa :

    n :

    n :

  • 8/13/2019 Tubes Rek Pon - Revisi

    27/35

    eg : 0.6928

    Kapasitas dukung tiang kelompok (Qa)

    Qa : 14224.1484 KN

    Qa W

    cek 14224.1484 > 14159.2277

    ok

    Kapasitas dukung izin berdasarkan kelompok tiang

    Qg = 2D (B+L) C+ 1,3 CbNc5 B L

    D = 45 m

    B = 6.00 m

    L = 6.00 m

    C = 49.55

    Cb5 = 56

    Qg = 101107.728 KN

    SF = 3Qa=Qg/SF = 33702.576

    Qa W

    cek 33702.576 > 14159.2277

    ok

  • 8/13/2019 Tubes Rek Pon - Revisi

    28/35

    Kedalaman

    16.8 Kn/m3

    H6 14 m

    9.81 Kn/m3

    H7 45 m

    25 Kn/m3

    (s/d tak terhingga)

    5.6

    29 beton 24 Kn/m3

    15.19 Kn/m3

    13,8 kN/m3w 9,81 kN/m3

    sat 17,5 kN/m33,9

    f 16,8

    H4 = 1,5 m

    H5 = 2,0 m

    5,9 ton

    8,9 tonH3 = 2,4 m

  • 8/13/2019 Tubes Rek Pon - Revisi

    29/35

    pai kapasitas daya dukung tiang aman)

    Po

    (Kn/m2)

    117.46 Po rata rata

    87.08 Kedalaman

    588.35 (m)

    14 Po1' = (Po awal + Po1)/2

    87.08 12 Po2' = (Po1 + Po2)/2

    45 Po3' = (Po2 + Po3)/2

    UM)

    Nc' Nq ' N'

    5.7 1 0

    6.7 1.4 0.2

    8 1.9 0.5

    9.7 2.7 0.9

    11.8 3.9 1.7

    14.8 5.6 3.2

    Keruntuhan geser lokal

    Lapisan Tanah 4

    Lapisan Tanah 5

    H2 = 6,3 m

    c

  • 8/13/2019 Tubes Rek Pon - Revisi

    30/35

    19 8.3 5.7

    23.7 11.7 9

    25.2 12.6 10.1

    34.9 20.5 18.8

    51.2 35.1 37.7

    66.8 50.5 60.4

    81.3 65.6 87.7

    laman 94 Teknik fondasi 1

    AKAN RUMUS UMUM)

    gkan

    = 29 - 25 x - 5.6

    30 - 25 8.3 - 5.6

    = 7.760

    .

    OK

    =

  • 8/13/2019 Tubes Rek Pon - Revisi

    31/35

    LAMAN 103

    OK

  • 8/13/2019 Tubes Rek Pon - Revisi

    32/35

    engan panjang abutmen

    Keruntuhan KERUNTUHAN TUNGGAL

  • 8/13/2019 Tubes Rek Pon - Revisi

    33/35

  • 8/13/2019 Tubes Rek Pon - Revisi

    34/35

  • 8/13/2019 Tubes Rek Pon - Revisi

    35/35

    Po

    (Kn/m2)

    58.73

    102.27

    87.08

    Zc