TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

1

Research & development Series production

TURBOMECA BORDES

Page 2: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

2

BORDES SITE 70 YEARS OF KNOW-HOW

Turbomeca’s 1st R&D and production center

Created in 1938, Turbomeca set up in Bordes in 1942, near Pau.

There are now more than 2,600 employees on the site.

At the Turbomeca headquarters in Bordes, the Research &

Development and Series Production units work side by side: • 40% of manufacture is carried out internally

• Assembly, tests and final assembly

• 800 engineers and technicians dedicated to R&D

Site Management includes the following entities: • Human resources,

• General Resources and Buildings/New Works Dept.,

• Corporate security,

• Occupational health services,

• Safety-Environment.

Page 3: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

3

BORDES SITE KEY FIGURES

2,639 employees (April 30, 2014)

Distribution by Division:

Operational divisions:

• Operations Division: 1176

• Engineering Division: 863

• Airframers Sales Division: 87

• Support and Services Division: 69

Steering divisions :

• Programs Division: 42

• Quality and process Excellence Division: 96

Support Functions: 306 (Human Resources Division, Corporate Office,...)

Distribution by socio-

professional category:

• Managerial staff: 1,246

• Employees,

technicians and

supervisors: 831

• Workers: 562

628 sub-contractors present

on site (December 2013)

Page 4: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

4

BORDES SITE AN ADAPTED ORGANIZATION

Organization oriented towards "families of parts" in order to:

• Optimize our industrial tool (reduction of design and production

cycles, improvement of Quality/Costs/Lead times/HSE)

• Achieve the operational objectives required by our customers (deliver

new engines and spare parts within the leadtimes, reduce the

development timescales of our engines).

Page 5: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

5

BORDES SITE AN ADAPTED ORGANIZATION

6 Competence Centers based in Bordes:

CCI Structures

CCI Veine d'air (Air path)

CCI Hydromécanique

(Hydromechanics)

CCI Ensembles Tournants

(Rotating Assemblies)

CCI Réducteurs

(Reduction gearboxes)

CCI Combustion

(Combustion)

CCI Procédés Spéciaux et

pièces spécifiques

(Special Processes and

dedicated parts)

CC Intégration / montage

(Integration / assembly)

CC Système de Régulation

(Control System)

Page 6: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

6

BORDES SITE AN ADAPTED ORGANIZATION

What is a Competence Center (CC):

• A CC is focused on a single family of parts or equipment.

• A CCI groups all the specialties and resources around these parts:

Engineering, Industrialization, Production, Purchasing, Provisioning,

Quality, Planning, Management Control, Human Resources.

Mission:

• Design and industrialize, validate and qualify, produce or purchase

components, parts and equipment.

Page 7: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

7

BORDES SITE HEALTH SAFETY ENVIRONMENT

An integral part of Turbomeca development, the integration of Health, Safety and Environment (HSE)

issues, is translated within the Bordes site into actions and results, including:

Reductions in environmental impacts: • 65% of our non-hazardous industrial waste recycled.

• 80% of volatile organic compound emissions between 1998 and 2008.

• 250 K€ invested in an evaporator-concentrator for treatment of dye penetrant inspection water.

An internal HSE organization and a site certified ISO 14001 since 2003

Improvements in work conditions: • An integrated approach with the HSE, CHSCT (hygiene, safety and working conditions committee),

and project follow-up commission sectors.

• Deployment of ergonomic analyses both for current workstations and those under design.

• Adoption of the HSE approach by our major sub-contractors (HSE passport).

Cross-sector projects: • Prevention of psycho-social risks, addictive behavior, Site transport plan, etc.

Page 8: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

8

BORDES SITE HEALTH SAFETY ENVIRONMENT

Physical and chemical

hazards

Risk analysis Access and circulation

Handling and loads

Dimensioning

and posture

Prevention policies

Occupational illnesses

Accidentology

Time constraints

Optimize the process and industrial flows and improve working conditions Working groups comprising the operator, the ergonomist, the Progress Actions controller, the HSE officer and the HR advisor

are implemented to optimize the process and the industrial flows and improve working conditions.

Operator Operator

HR

advisor

HSE

officer

Progress

Actions

Controlle

r

Ergonomist Optimization of

the process and

the industrial

flows.

Improvement of

working

conditions.

Page 9: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

9

A MODERN PLANT FOR OPTIMAL INDUSTRIAL EFFICIENCY

JOSEPH SZYDLOWSKI BUILDINGS

Page 10: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

10

JOSEPH SZYDLOWSKI BUILDING WHY WAS THIS NEW SITE BUILT?

A site built in 1942, due for modernization in phase with the

demands of a modern industrial organization

For Turbomeca:

a modern plant for optimal industrial efficiency

• Reduce production cycles by more than half by optimizing

flows and reducing manufacturing cycles

• Bring design teams and production teams together

• Achieve the highest HSE standards: a plant that is both human and

environmentally friendly

For local and regional authorities

• Sustain Turbomeca's activities in the region

• Give impetus to a cluster of industrial activities and services around the

Turbomeca site: Aeropolis within Aerospace Valley

Page 11: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

11

JOSEPH SZYDLOWSKI BUILDING A MODERN PLANT, OPTIMAL INDUSTRIAL EFFICIENCY

1,300 persons:

• 800 in the central offices

• 500 in the production units

5 production

centers:

Reduction gearboxes

Rotating assemblies

Combustion

Integration / assembly

Safran investment: 100 M€

Special Processes

5

5

Page 12: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

12

JOSEPH SZYDLOWSKI BUILDING THE FIVE PRODUCTION CENTERS

Production activities for each family of parts

Reduction

gearboxes

Rotating

assemblies

Combustion

• Reduction gearbox pinions

(air intake reduction gears)

• Accessory gearbox pinions

• Turbine discs

• Injection and axial wheels

• Centrifugal compressors

• Shafts

• Combustion chambers

• Flame tubes

• Parts for shaped and welded

assemblies

Page 13: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

13

JOSEPH SZYDLOWSKI BUILDING THE FIVE PRODUCTION CENTERS

Production activities for each family of parts

Integration

/ Assembly

Series production

• Build new engines using parts and

sub-assemblies taken from the

logistics system

• Check their conformity by testing,

check and document their configuration,

ensuring excellence in terms of

Quality/Lead time/Cost performance for integrator

customers.

R&D

• Perform experimental activities

to provide results for the Engine and

Research Project teams in the context

of support, certification and technology

demonstrators.

Page 14: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

14

JOSEPH SZYDLOWSKI BUILDING THE FIVE PRODUCTION CENTERS

Production activities for each family of parts

Special Processes

and dedicated parts

Special processes and dedicated parts

• Treat the various engine parts to give them

mechanical properties (hardness, resistance)

and manufacture small series production parts.

Activities

• Heat treatments on different types of steels and

alloys (aluminum, copper, titanium).

• Assembly of components by furnace and

induction brazing.

• Surface treatment and Non-destructive Testing

and machining.

5

Page 15: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

15

JOSEPH SZYDLOWSKI BUILDING INDUSTRIAL PRODUCTION FLOWS

Objective: production cycles reduced by more than half in 3 years

Separate paths for personnel and parts

Production centers organized in production lines (Lean)

R&D and production teams working in close synergy

Page 16: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

16

JOSEPH SZYDLOWSKI BUILDING OPTIMIZING INDUSTRIAL EFFICIENCY

Five production centers linked by a private road

around the perimeter of the site

• Private road for the movement of parts

• Inner streets for personnel

Four centers built along the same design but with

different dimensions

Production facilities and design offices integrated in

the plant and located in the central building

Page 17: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

17

JOSEPH SZYDLOWSKI BUILDING COMBINING WORKING COMFORT AND ENERGY SAVINGS

A plant that is both human and environmentally friendly

Working in optimal conditions

• Treatment of vapor emissions

• Adapted lighting

• Controlled temperature

Environmentally friendly site

• Example: energy & fluids station including wood-fired heating

Page 18: TURBOMECA BORDES · 2014. 11. 5. · Turbomeca’s 1st R&D and production center Created in 1938, Turbomeca set up in Bordes in 1942, near Pau. There are now more than 2,600 employees

18