Charlie Chong/ Fion Zhang Readings on APIICP650 Reading 12 - Q&A Practices My Pre-exam Self Study Notes 17 th March 2016

Understanding api icp653 reading 12 worksheet 8

Embed Size (px)

DESCRIPTION

Understanding api icp653 reading 12 worksheet-8

Citation preview

Page 1: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Readings on APIICP650 Reading 12 - Q&A PracticesMy Pre-exam Self Study Notes17th March 2016

Page 2: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Petroleum Upstream

Page 3: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Petroleum Upstream

Page 4: Understanding api icp653 reading 12 worksheet 8

API 653 Exam Administration -- Publications Effectivity Sheet FOR: November 2015, March 2016 and July 2016 Listed below are the effective editions of the publications required for this exam for the date(s) shown above. API Recommended Practice 571, Damage Mechanisms Affecting Fixed Equipment in the Refining Industry, Second Edition, April 2011

Charlie Chong/ Fion Zhang

Page 5: Understanding api icp653 reading 12 worksheet 8

ATTENTION: Only the following sections / mechanisms from RP 571 are included on the exam:

1. Section 3, Definitions 2. Par. 4.2.7 Brittle Fracture 3. 4.2.16 Mechanical Fatigue 4. 4.3.2 Atmospheric Corrosion 5. 4.3.3 Corrosion Under insulation (CUI) 6. 4.3.8 Microbiologically Induced Corrosion (MIC) 7. 4.3.9 Soil Corrosion 8. 4.3.10 Caustic Corrosion 9. 4.5.1 Chloride Stress Corrosion Cracking (Cl-SCC) 10. 4.5.3 Caustic Stress Corrosion Cracking (Caustic Embrittlement) 11. 5.1.1.10 Sour Water Corrosion (Acidic) 12. 5.1.1.11 Sulfuric Acid Corrosion

Charlie Chong/ Fion Zhang

Page 6: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

API Recommended Practice 575, Inspection of Atmospheric and Low-Pressure Storage Tanks, Third Edition, April 2014

API Recommended Practice 577 – Welding Inspection and Metallurgy, Second Edition, December 2013

API Standard 650, Welded Tanks for Oil Storage, Twelfth Edition, March 2013 with Addendum 1 (September 2014), Errata 1 (July 2013), andErrata 2 (December 2014).

API Recommended Practice 651, Cathodic Protection of AbovegroundPetroleum Storage Tanks, Fourth Edition, September 2014.

API Recommended Practice 652, Lining of Aboveground Petroleum Storage Tank Bottoms, Fourth Edition, September 2014

API Standard 653, Tank Inspection, Repair, Alteration, and Reconstruction, Fifth Edition, November 2014.

Page 7: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code, 2013 Edition i. ASME Section V, Nondestructive Examination, Articles 1, 2, 6, 7 and

23 (section SE-797 only) ii. Section IX, Welding and Brazing Qualifications (Welding Only)

See end of this study note for API Official BOK

Page 8: Understanding api icp653 reading 12 worksheet 8

http://independent.academia.edu/CharlieChong1http://www.yumpu.com/zh/browse/user/charliechonghttp://issuu.com/charlieccchong

Charlie Chong/ Fion Zhang

Page 9: Understanding api icp653 reading 12 worksheet 8

http://greekhouseoffonts.com/Charlie Chong/ Fion Zhang

Page 10: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

The Magical Book of Tank Inspection ICP

Page 11: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Page 12: Understanding api icp653 reading 12 worksheet 8

闭门练功

Charlie Chong/ Fion Zhang

Page 13: Understanding api icp653 reading 12 worksheet 8

Fion Zhang at Xitang17th March 2016

Charlie Chong/ Fion Zhang

Page 14: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

SME- Subject Matter Expert我们的大学,其实应该聘请这些能干的退休教授. 或许在职的砖头怕被排斥.http://cn.bing.com/videos/search?q=Walter+Lewin&FORM=HDRSC3https://www.youtube.com/channel/UCiEHVhv0SBMpP75JbzJShqw

Page 15: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Q&A Practice

Page 16: Understanding api icp653 reading 12 worksheet 8

Exercise-001Open Book

Charlie Chong/ Fion Zhang

Page 17: Understanding api icp653 reading 12 worksheet 8

Q1. AST fabricated to API 650 (Basic Standard) is normally designed not to exceed an operating temperature of:

1. 260 deg C 2. 100 deg C 3. 90 deg C4. 21 deg C

Q2. Minimum size of fillet welds in the construction or repairs of an AST built to API Standard 650 is:

1. Higher of 6 mm (0.25”) or half of the thickness of thinner plate joined.2. Higher of 9 mm (0.25”) or one third of the thickness of thicker plate joined.3. Higher of 5 mm (0.1875”) or one third of the thickness of thinner plate

joined.4. Lower of 6 mm (0.25”) or half of the thickness of thinner plate joined.

Charlie Chong/ Fion Zhang

Page 18: Understanding api icp653 reading 12 worksheet 8

API650: 5.1.3.3 The minimum size of fillet welds shall be as follows: On plates 5 mm (3/16 in.) thick, the weld shall be a full-fillet weld, and on plates more than 5 mm (3/16 in.) thick, the weld thickness shall not be less than one-third the thickness of the thinner plate at the joint and shall be at least 5 mm (3/16 in.).

Charlie Chong/ Fion Zhang

fillet size greater of 5mm or 1/3 tthinner

Page 19: Understanding api icp653 reading 12 worksheet 8

Q3. As per API Standard 650, the overlap at lap-welded joints shall be at least five times the nominal thickness of the thinner plate, but need not exceed,

a. 2” for single-welded lap joints and 4” for double welded lap jointsb. 1” for single-welded lap joints and 2” for double welded lap jointsc. 1.5” for single-welded lap joints and 2” for double welded lap jointsd. 1.5” for single-welded lap joints and 1” for double welded lap joints

API650: 5.1.3 Restrictions on Joints5.1.3.5 Lap-welded joints, as tack-welded, shall be lapped at least five times the nominal thickness of the thinner plate joined; however, with double-welded lap joints, the lap need not exceed 50 mm (2 in.), and with single-welded lap joints, the lap need not exceed 25 mm (1 in.).

Charlie Chong/ Fion Zhang

Page 20: Understanding api icp653 reading 12 worksheet 8

Q4. Calculate by the 1-Foot method the design shell thickness Td in inches, of the following description of tank built to API Standard 650:

Shell Material ASTM A36M H = Design liquid level = 50 feet D = Nominal Tank Diameter = 180 feet G = Design Specific Gravity = 0.86 CA = Corrosion Allowance = 0. 0625”Sd = Allowable stress in design condition, in psi (23200psi)td = design shell thickness, inches St = Allowable stress for hydrostatic test condition, in psitt = hydrostatic test shell thickness, inch(es).

td = 2.6 (H-1) DG/Sd + CA = 0.913

a. 0.912”b. 0.850”c. 1”d. 0.922

Charlie Chong/ Fion Zhang

Page 21: Understanding api icp653 reading 12 worksheet 8

Q5. Calculate by the 1-Foot method the hydrostatic test shell thickness Tt in inches, of the above referred tank, when water is used for the test :

tt = 2.6(H-1)D/St = 0.922St = 24900psi

a. 0.935”b. 0.985”c. 1”d. 0.922”

NOTE: for hydrostatic testing, CA need not to be considered.

Charlie Chong/ Fion Zhang

Page 22: Understanding api icp653 reading 12 worksheet 8

Q6. Maximum Reinforcement thickness of vertical butt joints of a tank shell plate of 28mm, of an AST built to API Standard 650 shall be:

a. 5mm b. 2.4mm c. 1.6mm d. 3mm

Q7. Vertical joints of a 28mm thick shell of an AST built to API Std. 650 shall be radiographed to the extent as given below :

a. Full b. Partial c. Spot d. Nil

c) Vertical joints in which the shell plates are greater than 25 mm (1 in.) thick shall be fully radiographed. All junctions of vertical and horizontal joints in this thickness range shall be radiographed; each film shall clearly show not less than 75 mm (3 in.) of vertical weld and 50 mm (2 in.) of weld length on each side of the vertical intersection (see the bottom panel of Figure 8.1).

Charlie Chong/ Fion Zhang

Page 23: Understanding api icp653 reading 12 worksheet 8

Q8. In an AST built to API Standard 650, the bottom annular plates have radial weld joints, and are single butt welded with permanent back-up bar, in which case, the extent of radiographing radial joints shall be,

a. One spot on 50% of radial joint b. One spot on 10% of radial jointsc. Full radiography of all radial jointsd. RT – Nil; only MT of 100% joints is adequate.8.1.2.9 When bottom annular plates are required by 5.5.1, or by M.4.1, the radial joints shall be radiographed as follows: (a) For double-welded butt joints, one spot radiograph shall be taken on 10 % of the radial joints; (b) For single-welded butt joints with permanent or removable back-up bar, one spot radiograph shall be taken on 50 % of the radial joints. Extra care must be exercised in the interpretation of radiographs of single-welded joints that have a permanent back-up bar. In some cases, additional exposures taken at an angle may determine whether questionable indications are acceptable. The minimum radiographic length of each radial joint shall be 150 mm (6 in.). Locations of radiographs shall preferably be at the outer edge of the joint where the shell plate and annular plate join.

Q9. As per API Std. 650, personnel who perform and evaluate radiographic examinations (RT) shall have a minimum qualification as follows :

a. Shall have a vision of Jaeger No.2b. Shall be qualified as Level II of ASNT SNT-TC-1A c. Shall not be color blindd. Shall have an experience of at least ten years in RT.

Charlie Chong/ Fion Zhang

Page 24: Understanding api icp653 reading 12 worksheet 8

Q10. The minimum required shell thickness of a Tank of 60 Meter diameter (200 ft. diameter), built to API Standard 650, shall be:

a. Design shell thickness plus corrosion allowanceb. Hydrostatic Test shell thicknessc. 8 mm (5/16”) d. Greater of a, b, c

Q11. Determine whether impact testing is required for A516 gr 70 normalised plates 1 inch thick, Design temp = 0 degree F (-18 degree C):

a. Not requiredb. Requiredc. Depends on opinion of design engineerd. Depends on opinion of tank inspector

Working: mtls group Group V Normalized, Killed Fine-Grain Practice

Charlie Chong/ Fion Zhang

Page 25: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Page 26: Understanding api icp653 reading 12 worksheet 8

Q12. Which of the following sets of the Transverse Charpy V-notch Impact Test Values of a fully killed 0.75 “ thick plate of ASTM A 516 gr 60 for a design metal temperature of -34 degree C, is acceptable as per API 650? Plates are not normalized.

a. 20, 11, 12 Joules b. 18, 24, 12 Joules c. 24, 22, 10 Joules d. 20, 10, 27 Joules

Working:ASTM A 516 gr 60 Not Normalized – Transverse specimens

Charlie Chong/ Fion Zhang

4.2.9.3 An impact test shall be performed on three specimens taken from a single test coupon or test location. The average value of the specimens (with no more than one specimen value being less than the specified minimum value) shall comply with the specified minimum value. If more than one value is less than the specified minimum value (2/3 x18= 12J) , or if one value is less than two-thirds the specified minimum value, three additional specimens shall be tested, and each of these must have a value greater than or equal to the specified minimum value.

Page 27: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Page 28: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Page 29: Understanding api icp653 reading 12 worksheet 8

Exercise-002Closed Book

Charlie Chong/ Fion Zhang

Page 30: Understanding api icp653 reading 12 worksheet 8

Q1. Maximum design internal pressure in an AST referred to by API 650 and API 653 is:a. Not exceeding 2.5 psig b. 15 psig approximately c. Not exceeding 5.00 psigd. None of the above

Q2. As per API 650, the design metal temperature of an AST is based on the lowest one-day mean temperature in the locality where the tank is installed, it is:a. 15ºC above the lowest one day mean temperature of the localityb. 8ºC above the lowest one day mean temperature of the localityc. Same as the lowest one day mean temperature of the localityd. 5ºC below the lowest one day mean temperature of the locality3.6 design metal temperature The lowest temperature considered in the design, which, unless experience or special local conditions justify another assumption, shall be assumed to be 8 °C (15 °F) above the lowest one-day mean ambient temperature of the locality where the tank is to be installed. Isothermal lines of lowest one-day mean temperature are shown in Figure 4.2. The temperatures are not related to refrigerated-tank temperatures (see 1.1.1).

Charlie Chong/ Fion Zhang

Page 31: Understanding api icp653 reading 12 worksheet 8

Q3. In an AST built to API Standard 650, the minimum nominal thickness of bottom plates, exclusive of specified corrosion allowance shall be:

a. 12.7 mm (1/2”)b. 8 mm (5/16”)c. 6.0 mm (1/4”)d. 5 mm (3/16”)5.4 Bottom Plates 5.4.1 All bottom plates shall have a corroded thickness of not less than 6 mm (0.236 in.) [49.8 kg/m2 (9.6 lbf/ft2) (see 4.2.1.2)]. Unless otherwise agreed to by the Purchaser, all rectangular and sketch plates (bottom plates on which the shell rests that have one end rectangular) shall have a nominal width of not less than 1800 mm (72 in.).

Q4. The full course width for shell plate as per API 650 shall be minimum:

a. 72”b. 96”c. 60”d. 90”

Charlie Chong/ Fion Zhang

Page 32: Understanding api icp653 reading 12 worksheet 8

Q5. In accordance with API Standard 653, Repairs and Alteration have been defined as distinct activities. State which of the following activities does not constitute an Alteration? a. The addition of man-ways and nozzles greater than NPS 12 b. Increase and decrease in tank shell height c. Replacement of damaged flange on nozzle by flange of same size

and material d. All of the above

Q6. In accordance with API Standard 653, Repairs and Alteration have been defined as distinct activities. Activity which entails any work necessary to maintain or restore a tank to a condition suitable for safe operation. State which of the following activities does not constitute repair?

a. Re-leveling and/or jacking of a tank shell, bottom or roofb. Addition of reinforcing plate/s to existing shell penetration/s c. Changing the content with higher specific gravityd. Repair of flaws, such as tears or gouges, by grinding followed by

welding

Charlie Chong/ Fion Zhang

Page 33: Understanding api icp653 reading 12 worksheet 8

Q7. From the data of Figure 2, which of the plane above will be considered to calculate t1?

Plane aPlane bPlane cPlane d

Q8. What will be the value of t1 for above question?

a. 0.380”b. 0.397”c. 0.468”d. 0.371”

Charlie Chong/ Fion Zhang

Page 34: Understanding api icp653 reading 12 worksheet 8

Q7. In accordance with API Standard 653, Critical Zone for repairs to a tank bottom is that portion which is:

a. Measured vertically upwards along shell, within 6” of tank bottom b. Measured radially inward, within 3” of the inside edge of shell c. Measured radially outward within 1 ½” of outside edge of shell d. A circular area measurable radially within 12” from center of tank bottom

Q8. Normally the corrosion rates of the tank bottom control the inspection interval, which are based on the actual or anticipated rates of corrosion. In the case of a tank, where corrosion rates are not known, and where similar service experience is not available, the actual thickness of the bottom is to be determined by due inspections within:

a. 20 years b. 5 yearsc. 10 yearsd. 2 years

Charlie Chong/ Fion Zhang

Page 35: Understanding api icp653 reading 12 worksheet 8

Q9. In case of the following conditions, the risk of failure by brittle fracture in an AST built to API Standards is minimal:

a. Tank shell thickness 5/8” and shell metal temperatures at 20°F and aboveb. Tank shell thickness ½” and shell metal temperatures at 60°F and abovec. Tank shell thickness ¾” and shell metal temperatures at 32°F and aboved. Tank shell thickness 1” and shell metal temperatures at 0°F and above

Q10. As per API Standard 653, a routine, in service, close visual external inspection of an aboveground storage tank (AST) shall be done, at an interval not exceeding:

a. One yearb. Five yearsc. One month d. Ten years

Charlie Chong/ Fion Zhang

Page 36: Understanding api icp653 reading 12 worksheet 8

Q11. As AST has a measured shell thickness of 0.75”; and its minimum required thickness is 0.5”. The known rate of corrosion of shell is 5 mils per year. As per API Standard 653, when should the external visual inspection by an Authorized Inspector be carried out at an interval not exceeding?

a. One yearb. Five yearsc. Twelve and half yearsd. Ten years

Q12. An AST has a measured shell thickness of 0.75; and its minimum required thickness is 0.5”. The rate of corrosion of shell is not known. As per API Standard 653, the external ultrasonic thickness measurement shall be carried out an interval not exceeding:

a. One year b. Five years c. Six & half years d. Ten years

Charlie Chong/ Fion Zhang

Page 37: Understanding api icp653 reading 12 worksheet 8

Q13. An AST has a measured shell thickness of 0.75”; and its minimum required thickness is 0.5”. The known rate of corrosion of shell is 5 mils per year. As per API Standard 653, the external ultrasonic thickness measurement shall be carried out at an interval not exceeding:a. One yearb. Twenty-five yearsc. Fifteen yearsd. Ten yearsInterval: N known, RCA/4N = 0.25/2·0.005 = 25 years used 15 yearsb) When the corrosion rate is known, the maximum interval shall be the smaller of RCA/2N years (where RCA is the difference between the measured shell thickness and the minimum required thickness in mils, and N is the shell corrosion rate in mils per year) or 15 years.

Q14. Corrosion on the bottom side of floor plates in aboveground storage tanks is affected most by:a. Composition of the contents stored in the tankb. Welding procedures used during construction of the tankc. The metal used for construction of the tank floord. Soil characteristics directly underneath the tank

Charlie Chong/ Fion Zhang

Page 38: Understanding api icp653 reading 12 worksheet 8

Q15. If arc strikes, gouges, or tears from temporary attachments are identified, they:

a. Must be evaluated on a case-by-case basisb. Must be repaired by welding with an appropriate repair procedurec. Must be repaired by removing the plate area containing the scars and welding in a butt-welded patchd. Are acceptable, provided they are more than 2 feet from any weld seam

Q16. Reinforcement pads shall be tested by applying pressure between the tank shell and reinforcement plate using the telltale hole. How much pressure is used to perform this inspection?

a. 15 psig hydrostatic pressureb. 5 psig pneumatic pressurec. 5 psig hydrostatic pressured. 15 psig pneumatic pressure

Charlie Chong/ Fion Zhang

Page 39: Understanding api icp653 reading 12 worksheet 8

Q17. According to API 653, authorized inspection agency is:

a. Inspection organization of jurisdictionb. Inspection organization of insurance company which underwrites insurance of storage tanksc. Inspection organization of owner-operatord. Any of the above

Q18. For all repairs and alterations under API 653, the ultimate responsibility rests with:

a. Owner-operatorb. API Committeec. API 653 Inspectord. Jurisdiction Authority

Charlie Chong/ Fion Zhang

Page 40: Understanding api icp653 reading 12 worksheet 8

Q19. In API 653, the term “RBI” means:

a. Repairing Before Inspectionb. Report Based Inspectionc. Repair Based Inspectiond. Risk Based Inspection

Q20. Partial or complete jacking of a tank shell is considered:

a. Routine maintenanceb. An alterationc. A repaird. None of the above

Charlie Chong/ Fion Zhang

Page 41: Understanding api icp653 reading 12 worksheet 8

Q21. A corroded area of a tank bottom plate is filled-up by welding overlay. There is no change in the rating and no change is made on the nameplate. Which of the following is the correct term to describe this process?

a. Repairb. Alterationc. Can be repair or alterationd. Neither repair or alteration

Q22. Under which of the conditions listed below is external inspection of tank bottom plate permitted to be done in lieu of internal inspection?

a) In cases where constructions size or other aspects allow external access to the tank bottom to determine plate thickness.

b) External inspection to determine bottom plate thickness is never permitted in lieu of internal inspection

c) For tanks made of materials which have excellent chemical resistanced) All of the above

Charlie Chong/ Fion Zhang

Page 42: Understanding api icp653 reading 12 worksheet 8

Exercise-003Open Book

Charlie Chong/ Fion Zhang

Page 43: Understanding api icp653 reading 12 worksheet 8

Q1. Typical corroded areas on a shell plate are exhibited below in Figure 1 with measured thickness in inches indicated on the sketch. The minimum required thickness of the shell plate is 0.750” and C.A. required is 0.15”.

Charlie Chong/ Fion Zhang

The total length of arrow line drawn is 8 inches. The length of the line in each of the corroded areas A, B and C are 1.5”, 0.3” and 0.2” respectively. Comment on the acceptability of the corroded condition.a. Acceptableb. Not acceptablec. Conduct a patch plate repaird.The pitting can be ignored as a case of widely scattered pitting

Working: acceptance criteriat’min = t min + CA ≥ 0.9mm (not OK)t2 ≥ 06 (tmin + CA) ≥ 0.54mm (OK)

Page 44: Understanding api icp653 reading 12 worksheet 8

Standard Answer:Q1. The pits are acceptable if:

Thickness at bottom of pit (excluding C.A.) ≥ ½ tmin.; andSum of dimensions in 8” length ≤ 2”

In the example,

The minimum thickness at bottom of the pit = 0.54”The thickness excluding C.A. = 0.54 – 0.15 = 0.39”This thickness ≥ ½ tmin0.39” ≥ ½ (0.75), i.e., 0.39” ≥ 0.375” ---------- OK

b. Total sum = 1.5 +0.3+ 0.2 = 2” - - - - - - - - - OK

ANSWER: A

Charlie Chong/ Fion Zhang

Page 45: Understanding api icp653 reading 12 worksheet 8

API653: 4.3.2 Actual Thickness Determination4.3.2.1 c) The authorized inspector shall visually or otherwise decide which vertical plane(s) in the area is likely to be the most affected by corrosion. Profile measurements shall be taken along each vertical plane for a distance, L. In the plane(s), determine the lowest average thickness, t1, averaged over a length of L, using at least five equally spaced measurements over length L.

e) The criteria for continued operation is as follows:I.the value t1 shall be greater than or equal to tmin (see 4.3.3 or 4.3.4), subject to verification of all other loadings listed in 4.3.3.5;II.the value t2 shall be greater than or equal to 60 % of tmin; andIII.any corrosion allowance required for service until the time of the next inspection shall be added to tmin and 60 % of tmin.

4.3.2.2 Widely scattered pits may be ignored provided that:a)no pit depth results in the remaining shell thickness being less than one-half the minimum acceptable tank shell thickness exclusive of the corrosion allowance; andb)the sum of their dimensions along any vertical line does not exceed 2 in. in an 8-in. length (see Figure 4.2).

Charlie Chong/ Fion Zhang

Page 46: Understanding api icp653 reading 12 worksheet 8

Q2. A tank is constructed as per API 650. Its original thickness is 0.500 inch. Its diameter is 25 feet and height is 15 feet. After 10 years, the tank is inspected and the following readings are recorded on the shell. Figure 2 exhibits a corroded portion of the developed shell of the tank from the inside. The designed corrosion allowance is CA=0.125”. Minimum thickness (t2) is among the following readings.

Charlie Chong/ Fion Zhang

What is the minimum thickness recorded?

a)0.315”b)0.275”c)0.330”d)all of the above

Page 47: Understanding api icp653 reading 12 worksheet 8

Q3. Calculate the critical L dimension for this conditiona. 9.7”b. 40”c. 12”d. All of the aboveL = 3.7√(Dt2) = 9.70”Q4. For the same conditions of Figure 2 if the location of the bottom of the critical length is 2 feet from the tank floor and the designed liquid height is 12 feet what is the value of H in the formula for calculating tmin?a. 3 feetb. 15 feetc. 10 feetd. 13 feetH is the height from the bottom of the shell course under consideration to the maximum liquid level when evaluating an entire shell course, in feet (ft); or is the height from the bottom of the length L (see 4.3.2.1) from the lowest point of the bottom of L of the locally thinned area to the maximum liquid level, in feet (ft); or is the height from the lowest point within any location of interest to the maximum liquid level, in feet (ft);

Charlie Chong/ Fion Zhang

Page 48: Understanding api icp653 reading 12 worksheet 8

Q5. Find the value of S which may be assumed for the lower course of old tank for calculating tmin considering the fact that the material is A516 gr 70.

a. 30,000 psib. 18,000 psic. 23,995 psid. 23,595 psi

Q6. Find the value of the allowable stress in the first shell course (means bottom course) of the conditions of the tank considered in above question if material is not known.a. 4680 psib. 23600 psic. 2550 psid. 30000 psi

Charlie Chong/ Fion Zhang

first shell course

Page 49: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Page 50: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Page 51: Understanding api icp653 reading 12 worksheet 8

API650: 5.1.5.2 Vertical Shell Joints a)Vertical shell joints shall be butt joints with complete penetration and complete fusion attained by double welding or other means that will obtain the same quality of deposited weld metal on the inside and outside weld surfaces to meet the requirements of 7.2.1 and 7.2.3. The suitability of the plate preparation and welding procedure shall be determined in accordance with 9.2. b)Vertical joints in adjacent shell courses shall not be aligned, but shall be offset from each other a minimum distance of 5t, where t is the plate thickness of the thicker course at the point of offset.

Charlie Chong/ Fion Zhang

5tthicker min

Page 52: Understanding api icp653 reading 12 worksheet 8

Q7. From the data of Figure 2, which of the plane above will be considered to calculate t1?

a. Plane ab. Plane bc. Plane cd. Plane d

Q8. What will be the value of t1 for above question?

a. 0.380”b. 0.397”c.0.468”d.0.371”

Standard answer: Q8. Value of t1 = 2.73 / 7 = 0.371” ANSWER: D

Charlie Chong/ Fion Zhang

Page 53: Understanding api icp653 reading 12 worksheet 8

Q9. A corroded roof plate is found to have an average thickness of 0.1" measured over an area of 100 sq. inches. This area shall be:

a. Repaired or replacedb. Found to be acceptablec. Repair is prohibitedd. Replacement is mandated

Q10.When determining average thickness in a corroded area of a shell, a minimum of equally paced measurements shall be taken over a length of L.

a. 10b. 5c. 8d. 6

Charlie Chong/ Fion Zhang

Page 54: Understanding api icp653 reading 12 worksheet 8

Q11. Vertical welds must be fully radiographed if the shell thickness exceeds inches:

a. 3/4 b. 1c. 1 - 1/4d. 1 - ½c) Vertical joints in which the shell plates are greater than 25 mm (1 in.) thick shall be fully radiographed. All junctions of vertical and horizontal joints in this thickness range shall be radiographed; each film shall clearly show not less than 75 mm (3 in.) of vertical weld and 50 mm (2 in.) of weld length on each side of the vertical intersection (see the bottom panel of Figure 8.1).

Q12. Anticipated minimum thickness of tank bottom where bottom / foundation design provides for leak detection and containment is:

a. 0.10 inchb. 0.05 inchc. 0.09 inchd. same as without leak detection and containment

Charlie Chong/ Fion Zhang

Page 55: Understanding api icp653 reading 12 worksheet 8

Exercise-004Closed Book

Charlie Chong/ Fion Zhang

Page 56: Understanding api icp653 reading 12 worksheet 8

Q1. A hydrostatic test for a relocated tank:a. May be waived by the Owner/Operatorb. Is requiredc. May be waived by the Inspectord. Is not necessary

Q2. Minimum thickness of tank bottom in critical zone shall be at least 0.1 inch but also it shall be:a. Greater of: ½ tmin for lowest shell course and half of original thickness in critical zoneb. Smaller of: ½ tmin for lowest shell course and half of original thickness in critical zonec. 0.1” onlyd.0.05” as from Table 6-1, if leak detection system is provided

4.4.5.4 Unless a stress analysis is performed, the minimum bottom plate thickness in the critical zone of the tank bottom defined in 9.10.1.2 shall be the smaller of one-half the original bottom plate thickness (not including the original corrosion allowance) or 50 % of tmin of the lower shell course per 4.3.3.1 but not less than 0.1 in. Isolated pitting will not appreciably affect the strength of the plate.

Charlie Chong/ Fion Zhang

Page 57: Understanding api icp653 reading 12 worksheet 8

Q3. During the hydrostatic test, no less than _______ settlement measurement points shall be surveyed.

a. 8b. 10c. 15d. 5

Q4. For vacuum box test, a partial vacuum of at least _______ shall be used using _________ to check the cracks.

a. 3 psi, penetrating oilb. 5 psi, water immersionc. 3 psi, film solutiond. 5 psi, liquid penetrant

Charlie Chong/ Fion Zhang

Page 58: Understanding api icp653 reading 12 worksheet 8

Q5. Which tests are usually conducted to verify acceptability of shell to bottom plate welds?

a. Penetrating oilb. RTc. Vacuum box testd. “a” and “c”

Q6. Except for cast iron parts, internal coils and supports may be:

a Dye penetrant testedb. Leak testedc. Hammer testedd. Magnetic particle tested

Charlie Chong/ Fion Zhang

Page 59: Understanding api icp653 reading 12 worksheet 8

Q7. At the next out-of-service inspection on a tank that has had a hot tap performed, the visual inspection should include:

a. Size of the hot tap nozzle holesb. Thickness of the plate at the hot tapc. Height of the hot tap from the tank bottomd. Trimming of the hot tap nozzle holes

Q8. The term “roof drain” is applicable for which type of tanks?

a. Tanks with a breather device installed on the roofb. High octane fuel tanks (Dome roof tanks)c. Tanks with floating roofs (open top-tanks)d. Tanks with internal floating roof

Charlie Chong/ Fion Zhang

Page 60: Understanding api icp653 reading 12 worksheet 8

Q9. Industry experience and laboratory test have shown that a membrane stress in tank shell plates of at least _______ is required to cause failure due to brittle fracture?

a.500 psib.100 Mpac.7 ksid.18 kg/mm2

Q10. Which of the following is an advantage of magnetic particle testing over penetrant testing?a.it can detect surface discontinuities with foreign material imbedded in themb.It is faster on individual partsc.It can detect near-surface discontinuitiesd.All of the above

Charlie Chong/ Fion Zhang

Page 61: Understanding api icp653 reading 12 worksheet 8

Q11.Which of the following types of discontinuities is not normally detected by radiography?

a. Cracksb. Incomplete penetration c. Laminationsd. Slag

Q12.The reason for periodical inspection of ASTs is to:

a. Determine their physical conditionb. Determine the rate of deteriorationc. Maintain safe operating conditions d. All of the above

Charlie Chong/ Fion Zhang

Page 62: Understanding api icp653 reading 12 worksheet 8

Q13. Resistance of grounding connection shall not be,

a.more than 25 Ohmsb.less than 1 Meg-Ohmc.less than 25 Ohmsd.more than 5 Ohms

Q14. Internal inspection is primarily to:

a.All of the belowb.Ensure that the bottom is not corroded and leaking;c.Gather data for shell assessmentd.Identify and evaluate bottom settlement.

Charlie Chong/ Fion Zhang

Page 63: Understanding api icp653 reading 12 worksheet 8

Q15. Repairs on butt welds shall be radiographically examined by:a. Full radiography over entire repaired length of weldb. 1 spot on repair portion for each vertical weldc. 1 spot on each 50’ for horizontal weldd. “b” and “c”12.2.1.1 For vertical joints:a.new replacement shell plates to new shell plates, no additional radiographs required, other than those required by API 650, Section 8.1.2.2 and Figure 8-1 for new construction;b.new replacement shell plates to existing shell plates, one additional radiograph shall be taken in each joint; c.repaired joints in existing shell plates shall have one additional radiograph taken in each joint.12.2.1.2 For horizontal joints:a.a) new replacement shell plates to new shell plates, no additional radiographs required, other than those required by API 650, Section 8.1.2.3 and Figure 8-11 for new construction;b.new replacement shell plates to existing shell plates, one additional radiograph for each 50 ft of repaired horizontal weld;c.repaired joints in existing shell plates shall have one additional radiograph taken for each 50 ft of repaired horizontal weld.

Q16. The API 653 standard covers the maintenance inspection, repairs,alteration, relocation and reconstruction of tanks constructed to ____________ as basic standards though it may be adopted for other tanks also.a. ASMEb. API 651c. API 652d. API 650

Charlie Chong/ Fion Zhang

Page 64: Understanding api icp653 reading 12 worksheet 8

8.1.2 Number and Location of Radiographs 8.1.2.2 The following requirements apply to vertical joints. a) For butt-welded joints in which the thinner shell plate is less than or equal to 10 mm (3/8 in.) thick, one spot radiograph shall be taken in the first 3 m (10 ft) of completed vertical joint of each type and thickness welded by each welder or welding operator. The spot radiographs taken in the vertical joints of the lowest course may be used to meet the requirements of Note 3 in Figure 8.1 for individual joints. Thereafter, without regard to the number of welders or welding operators, one additional spot radiograph shall be taken in each additional 30 m (100 ft) (approximately) and any remaining major fraction of vertical joint of the same type and thickness. At least 25 % of the selected spots shall be at junctions of vertical and horizontal joints, with a minimum of two such intersections per tank. In addition to the foregoing requirements, one random spot radiograph shall be taken in each vertical joint in the lowest course (see the top panel of Figure 8.1).

b) For butt-welded joints in which the thinner shell plate is greater than 10 mm (3/8 in.) but less than or equal to 25 mm (1 in.) in thickness, spot radiographs shall be taken according to Item a. In addition, all junctions of vertical and horizontal joints in plates in this thickness range shall be radiographed; each film shall clearly show not less than 75 mm (3 in.) of vertical weld and 50 mm (2 in.) of weld length on each side of the vertical intersection. In the lowest course, two spot radiographs shall be taken in each vertical joint: one of the radiographs shall be as close to the bottom as is practicable, and the other shall be taken at random (see the center panel of Figure 8.1).

c) Vertical joints in which the shell plates are greater than 25 mm (1 in.) thick shall be fully radiographed. All junctions of vertical and horizontal joints in this thickness range shall be radiographed; each film shall clearly show not less than 75 mm (3 in.) of vertical weld and 50 mm (2 in.) of weld length on each side of the vertical intersection (see the bottom panel of Figure 8.1).

8.1.2.3 One spot radiograph shall be taken in the first 3 m (10 ft) of completed horizontal butt joint of the same type and thickness (based on the thickness of the thinner plate at the joint) without regard to the number of welders or welding operators. Thereafter, one radiograph shall be taken in each additional 60 m (200 ft) (approximately) and any remaining major fraction of horizontal joint of the same type and thickness. These radiographs are in addition to the radiographs of junctions of vertical joints required by Item c of 8.1.2.2 (see Figure 8.1).

Charlie Chong/ Fion Zhang

Page 65: Understanding api icp653 reading 12 worksheet 8

Q17. The complete or partial removal and replacement of more than 12 inches of a vertical weld joining shell plates is considered a:a.minor alterationb.minor repairc.major alterationd.major repair

Q18. The difference between peaking and banding is:a.peaking pertains to the roof;b.banding is external to the tank;c.peaking pertains to vertical weld seams, banding pertains to horizontal weld seams;d.peaking pertains to horizontal weld seams, banding pertains to vertical weld seams.

Charlie Chong/ Fion Zhang

Page 66: Understanding api icp653 reading 12 worksheet 8

Q19. The minimum (maximum?) interval for external inspection by a qualified inspector is ____ years or at the quarter corrosion-rate life of the shell, whichever is less:a.Twentyb.Fivec.Tend.Fifteen

Q20. The minimum retirement thickness of an annular plate ring is usually greater than:

a. 0.10 inchb. 0.25 inchc. 0.0625 inchd. 0.1875 inch

Charlie Chong/ Fion Zhang

Page 67: Understanding api icp653 reading 12 worksheet 8

Exercise-005Closed Book

Charlie Chong/ Fion Zhang

Page 68: Understanding api icp653 reading 12 worksheet 8

Q1. Guided bend test represents:a. Ductility of weldb. Strength of weldc. Soundness of weldd. Both soundness and ductility of weld

Q2. All positions of groove welds are qualified bya. pipe positions 1G and 5Gb. pipe positions 2G and 5Gc. pipe position 6G onlyd. b and c

Charlie Chong/ Fion Zhang

Page 69: Understanding api icp653 reading 12 worksheet 8

Q3. According to ASME Sec. IX, A welder for SMAW can be qualified byfollowing minimum tests:a. 1 tensile and 2 bend tests b. 2 bend tests onlyc. 2 tensile tests and 1 bend tests d. 1 tensile and 1 radiography

Q4. Procedure Qualification Record is a document which can be revised time to time.

a. True b. Falsec. Depends on company policyd. Depends on client of the company

Charlie Chong/ Fion Zhang

Page 70: Understanding api icp653 reading 12 worksheet 8

Q5. Use of Radiography is made for:a. Performance qualification only.b. Procedure qualification onlyc. Both a and bd. Use of Radiography is not permitted by ASME Sec. IX.

Q6. Procedure Qualification is done by:a. 1 Tensile and 2 bend testsb. 1 tensile and 1radiographyc. 1 bend test and 1 radiographyd. 2 Tensile and 4 bend tests

Charlie Chong/ Fion Zhang

Page 71: Understanding api icp653 reading 12 worksheet 8

Q7. Which of the following represent grouping of weld-metals in ASME IX?a. P - Nosb. F - Nosc. S - Nosd. A - Nos

Q8. For A 516 gr 60 (SMTS = 60000 psi) material, following results were obtained for two tensile test specimens in PQR qualification.

Specimen T1: failed in B.M. at 57,400 psi Specimen T2: failed in weld metal, at 59,500 psi

Your assessment is:a. PQR test is ok since both are within acceptance criteria b. PQR test is rejected as both T1 and T2 are not within acceptance criteriac. PQR in rejected because T1 is ok but T2 has failedd. PQR in rejected because T1 is failed thoughT2 is ok

Charlie Chong/ Fion Zhang

Page 72: Understanding api icp653 reading 12 worksheet 8

Q9. Based on a measured corrosion of 0.006" annually and using a corrosion allowance of 0.120", what is the interval for the next UT thickness measurements on shell are required for AST?

(a) 10 years(b) 6.5 years(c) 20 years(d) 15 years

Q10. Per API 650, calculation of shell thickness by the 1-foot method cannot be used for tanks:(a) Under 200 ft. in diameter(b) Over 200 ft. in diameter(c) Under 150 ft. in diameter(d) Of any size

Charlie Chong/ Fion Zhang

Page 73: Understanding api icp653 reading 12 worksheet 8

Q11. Impressed current system results in following advantages compared to Galvanic System.a. Can be used for large structuresb. Maintenance cost is lowerc. Installation is cheaper and easierd. No external power supply required

Q12. Power source for impressed current system shall be checked at intervals not exceeding:a. Annuallyb. Six monthsc. Two months d. Five years

Charlie Chong/ Fion Zhang

Page 74: Understanding api icp653 reading 12 worksheet 8

Q13. Thick film lining means thickness:a. Greater than 10 milsb. Equal or greater than 20 milsc. Greater than 20 milsd. Equal or greater than 10 mils

Q14. Sand blasting and painting operations shall not be performed if humidity exceeds:

a. 90%b. 80%c. 85%d. 95%

Charlie Chong/ Fion Zhang

Page 75: Understanding api icp653 reading 12 worksheet 8

Q15. Which of the following statement is correct?a) Soil resistivity is a measure of resistance offered by soil to drilling operation

for oil exploration and it has no connection with corrosivity of soil.b) Lower soil resistivity indicates less corrosive soil.c) Soil resistivity has nothing to do with corrosiveness of soil because soil

corrosion depends on the amount of corrosive chemicals present in the soil.d) Higher soil resistivity indicates less corrosive soil.

Q16. The preferred method for inspecting non-metallic coating is:a. Visual inspection onlyb. Holiday detectionc. M.P. checkd. D.P. check

Charlie Chong/ Fion Zhang

Page 76: Understanding api icp653 reading 12 worksheet 8

Q17. The accuracy of a piece of magnetizing equipment that is equipped with an ammeter shall be verified:

a. Each yearb. Each two yearsc. When possibled. Every 6 months

Q18. It is decided to carryout a surface NDT for austenitic S.S. welds. Choose a best combination.

a. Penetrant testing with Halogen free developerb. Penetrant testing with any aqueous developerc. Magnetic particle testing with wet particlesd. Magnetic particle testing with dry particles

Charlie Chong/ Fion Zhang

Page 77: Understanding api icp653 reading 12 worksheet 8

Q19. In ultrasonic testing, for thickness measurement on corroded surface, use:

a. CRT read out b. Digital read outc. Any of aboved. None of above

Q20. For which of the following can yoke technique be used?

a. Sub-surface cracksb. Surface cracksc. Both a and bd. For none of a and b

Charlie Chong/ Fion Zhang

Page 78: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Page 79: Understanding api icp653 reading 12 worksheet 8

Exercise-006Closed Book

Charlie Chong/ Fion Zhang

Page 80: Understanding api icp653 reading 12 worksheet 8

Q1. Which condition below best describes the result of tensile tests reported on the PQR?a.Test T1 & T2 are acceptable b.Test T1 & T2 are unacceptable c.Test T1 is acceptable & T2 is unacceptabled.Test T1 is unacceptable & T2 is acceptable

Q2. What condition below describes the results of the guided bend test?a.The three bend test is acceptable and the fourt one is not acceptable b.The test result overall is acceptablec.The test result is not acceptable due to the linear indication d.The bend test result is indeterminable

Charlie Chong/ Fion Zhang

Page 81: Understanding api icp653 reading 12 worksheet 8

Q3. The minimum qualified preheat temperature for the WPS is: a. 200° F b. 100° Fc. 75° F d. 5 mm (3/16”)

Charlie Chong/ Fion Zhang

Page 82: Understanding api icp653 reading 12 worksheet 8

Q4.The full course width for shell plate as per API 650 shall be minimum

a. 72”b. 96”c. 60”d. 90”

Q5.In accordance with API Standard 653, Repairs and Alteration have been defined as distinct activities. State which of the following activities does not constitute an Alteration?

a) The addition of man-ways and nozzles greater than NPS 12b) Increase and decrease in tank shell heightc) Replacement of damaged flange on nozzle by flange of same size and

materiald) All of the above

Charlie Chong/ Fion Zhang

Page 83: Understanding api icp653 reading 12 worksheet 8

Q6.In accordance with API Standard 653, Repairs and Alteration have been defined as distinct activities. Activity which entails any work necessary to maintain or restore a Tank to a condition suitable for safe operation. State which of the following activities does not constitute a Repair?

a. Re-leveling and/or jacking of a Tank shell, bottom or roofb. Addition of reinforcing plate/s to existing shell penetration/s.c. Changing the content with higher specific gravityd. Repair of flaws, such as tears or gouges, by grinding followed by welding

Q7.In accordance with API Standard 653, Critical Zone for repairs to a Tank Bottom is that portion, which is,

a. Measured vertically upwards along shell, within 6” of tank bottom. b. Measured radially inward, within 3” of the inside edge of shell.c. Measured radially outward within 1 ½” of outside edge of shell.d. A circular area measurable radially within 12” from centre of tank bottom.

Charlie Chong/ Fion Zhang

Page 84: Understanding api icp653 reading 12 worksheet 8

Q8. Normally the corrosion rates of the Tank Bottom control the inspection intervals, which are based on the actual or anticipated rates of corrosion. In the case of a Tank, where corrosion rates are not known, and where similar service experience is not available, the actual thickness of the Bottom is to be determined by due inspections within:a. 20 years b. 5 years c. 10 years d. 2 years

Q9. In case of the following conditions, the risk of failure by brittle fracture in an AST built to API Standards is minimal:a. Tank shell thickness 5/8” and shell metal temperatures at 20ºF and aboveb. Tank shell thickness ½” and shell metal temperatures at 60ºF and abovec. Tank shell thickness ¾” and shell metal temperatures at 32ºF and aboved. Tank shell thickness 1” and shell metal temperatures at 0ºF and above

Charlie Chong/ Fion Zhang

Page 85: Understanding api icp653 reading 12 worksheet 8

Q10.As per API Standard 653, a routine, in-service, close visual external inspection of an above ground storage tank (AST) shall be done, at an interval not exceeding:

a. One year b. Five years c. One month d. Ten years

Q11.An AST has a measured shell thickness of 0.75”; and its minimum required thickness is 0.5”. The known rate of corrosion of shell is 5 mils per year. As per API Standard 653, when should the external visual inspection by an Authorized Inspector shall be carried out at an interval not exceeding:

b. One year c. Five years d. Twelve & Half years e. Ten years6.3.2 External Inspection6.3.2.1 All tanks shall be given a visual external inspection by an authorized inspector. This inspection shall be

called the external inspection and must be conducted at least every five years or RCA/4N years (where RCA is the difference between the measured shell thickness and the minimum required thickness in mils, and N is the shell corrosion rate in mils per year) whichever is less. Tanks may be in operation during this inspection.

Charlie Chong/ Fion Zhang

Page 86: Understanding api icp653 reading 12 worksheet 8

Q12. An AST has a measured shell thickness of 0.75”; and its minimum required thickness is 0.5”. The rate of corrosion of shell is not known. As per API Standard 653, the external ultrasonic thickness measurement shall be carried out at an interval not exceeding:

a. One year b. Five years c. Six & Half years d. Ten years

Q13. An AST has a measured shell thickness of 0.75”; and its minimum required thickness is 0.5”. The known rate of corrosion of shell is 5 mils per year. As per API Standard 653, the external ultrasonic thicknessmeasurement shall be carried out at an interval not exceeding ,

a. One year b. Twenty five years c. Fifteen years d. Ten years

Charlie Chong/ Fion Zhang

Page 87: Understanding api icp653 reading 12 worksheet 8

Q14. Corrosion on the bottom side of floor plates in aboveground storage tanks is affected most by:a. composition of the contents stored in the tank.b. welding procedures used during construction of the tankc. the metal used for construction of the tank floord. soil characteristics directly underneath the tank.

Q15. If arc strikes, gouges, or tears from temporary attachments are identified, they:a. must be evaluated on a case-by-case basis.b. must be repaired by welding with an appropriate repair procedure.c. must be repaired by removing the plate area containing the scars and welding in a butt-welded patch.d. are acceptable, provided they are more than 2 feet from any weld seam.

Charlie Chong/ Fion Zhang

Page 88: Understanding api icp653 reading 12 worksheet 8

Q16.When a tank is being dismantled for relocation, the roof, shell, and bottom plates may be cut:

a. to one-half the size of the original platesb. along the existing weld seams for transportation to the new site.c. to a size no smaller than one-half the maximum weight allowed by the

transporting vehicle including the crane.d. to any size suitable for transportation

Q17.According to API 653, authorized inspection agency is:a) Inspection organization of jurisdictionb) Inspection organisation of Insurance company which under writes insurance

of storage tanks c) Inspection organization of owner-operatord) Any of above

Charlie Chong/ Fion Zhang

Page 89: Understanding api icp653 reading 12 worksheet 8

Q18. For all repairs and alterations under API 653, the ultimate responsibility rests with:a.Owner-operatorb.API Committeec.API-653 Inspector d.Jurisdiction authority

19. In API-653, the term “RBI “means:a.Repairing Before Inspectionb.Report Based Inspectionc.Repair Based Inspectiond.Risk Based Inspection

Charlie Chong/ Fion Zhang

Page 90: Understanding api icp653 reading 12 worksheet 8

Q20. Partial or complete jacking of a tank shell is considered:a. Routine maintenance.b. A alteration.c. A repair.d. None of the above

Q21. A corroded area of a tank bottom plate is filled-up by welding overlay. There is no change in the rating and no change is made on the nameplate. Which of the following is the correct term to describe this process?a. Repairb. Alterationc. Can be repair or alterationd. Neither repair or alteration

Charlie Chong/ Fion Zhang

Page 91: Understanding api icp653 reading 12 worksheet 8

Q22. Under which of the conditions listed below is external inspection of tank bottom plate permitted to be done in lieu of internal inspection?

a) In cases where construction size or other aspects allow externalaccess to the tank bottom to determine bottom plate thickness.

b) External inspection to determine bottom plate thickness is never permitted in lieu of internal inspection.

c) For tanks made of materials which have excellent chemical resistanced) All of the above

Charlie Chong/ Fion Zhang

Page 92: Understanding api icp653 reading 12 worksheet 8

Exercise-007Closed Book

Charlie Chong/ Fion Zhang

Page 93: Understanding api icp653 reading 12 worksheet 8

Q1. A hydrostatic test for a relocated tank:

a. May be waived by the Owner/Operatorb. Is requiredc. May be waived by the Inspectord. Is not necessary

Q2. Cathodic protection is achieved by directing the flow of current from:

a. A cathode to anodeb. An anode to cathodec. Both installations are acceptabled. Neither of a and b

Charlie Chong/ Fion Zhang

Page 94: Understanding api icp653 reading 12 worksheet 8

Q3. During the hydrostatic test, no less than _______ settlement measurement points shall be surveyed.

a. 8b. 10c. 15d. 5

Q4. Reinforcement pads shall be tested by applying pressure between the tank shell and reinforcement plate using the telltale hole. How much pressure is used to perform this inspection?

a. 15 psig hydrostatic pressureb. 15 psig pneumatic pressurec. 5 psig hydrostatic pressured. 5 psig pneumatic pressure

Charlie Chong/ Fion Zhang

Page 95: Understanding api icp653 reading 12 worksheet 8

Q5. Which tests are usually conducted to verify acceptability of shell to bottom plate welds?

a. Diesel testb. RTc. Vacuum box testd. “a” and “c”

Q6. Except for cast iron parts, internal coils and supports may be:a dye penetrant testedb. leak testedc. hammer testedd. magnetic particle tested

Charlie Chong/ Fion Zhang

Page 96: Understanding api icp653 reading 12 worksheet 8

Q7. At the next out-of-service inspection on a tank that has had a hot tap performed, the visual inspection should include:

a. size of the hot tap nozzle holesb. thickness of the plate at the hot tapc. height of the hot tap from the tank bottomd. trimming of the hot tap nozzle holes

Q8. The term “windgirder” is applicable for which type of tanks?

a. Tanks which a wind measuring device installed at the top of the tank.b. High octane fuel tanksc. Tanks with floating roofsd. None of the above

Charlie Chong/ Fion Zhang

Page 97: Understanding api icp653 reading 12 worksheet 8

Q9. Industry experience and laboratory test have shown that a membrane stress in tank shell plates of at least _______ is required to cause failure due to brittle fracture?

a. 500 psib. 100 Mpa c. 7 ksid. 18 kg/mm2

Q10. Which of the following is an advantage of magnetic particle testing over penetrant testing?

a. it can detect surface discontinuities with foreign material imbedded in themb. It is faster on individual partsc. It can detect near-surface discontinuitiesd. All of the above

Charlie Chong/ Fion Zhang

Page 98: Understanding api icp653 reading 12 worksheet 8

Q11. Which of the following types of discontinuities is not normally detected by radiography?

a. Cracksb. Incomplete penetration c. Laminationsd. Slag

Q12. The reason for periodical inspection of ASTs is to:

a. Determine their physical conditionb. Determine the rate of deteriorationc. Maintain safe operating conditions d. All of the above

Charlie Chong/ Fion Zhang

Page 99: Understanding api icp653 reading 12 worksheet 8

Q13. Resistance of grounding connection shall not be,

a. more than 25 Ohmsb. less than 1 Meg-Ohmc. less than 25 Ohmsd. more than 5 Ohms

Q14. Internal inspection is primarily to:

a. All of the belowb. Ensure that the bottom is not corroded and leaking;c. Gather data for shell assessmentd. Identify and evaluate bottom settlement.

Charlie Chong/ Fion Zhang

Page 100: Understanding api icp653 reading 12 worksheet 8

Q15. Vacuum box tests require ____ psig of partial vacuum.

a. 3.0 psib. 15 psic. 21 psid. 30 psi

Q16. The API 653 standard covers the maintenance inspection, repairs,alteration, relocation and reconstruction of tanks constructed to which one of the following standards:a. ASMEb. API 651c. API 652d. API 650

Charlie Chong/ Fion Zhang

Page 101: Understanding api icp653 reading 12 worksheet 8

Q17. The complete or partial removal and replacement of more than 12 inches of a vertical weld joining shell plates is considered a :-

a. minor alterationb. minor repairc. major alterationd. major repair

Q18. The difference between peaking and banding is:a. peaking pertains to the roof;b. banding is external to the tank;c. peaking pertains to vertical weld seams, banding pertains to horizontal weld seams;d. peaking pertains to horizontal weld seams, banding pertains to vertical weld seams.

Charlie Chong/ Fion Zhang

Page 102: Understanding api icp653 reading 12 worksheet 8

Q19. The minimum interval for external inspection by a qualified inspector is ____ years or at the quarter corrosion-rate life of the shell, whichever is less:a.Twentyb.Fivec.Tend.Fifteen

Q20. The minimum retirement thickness of an annular plate ring is usually greater than:a. 0.10b. 0.25c. 0.0625d. 0.1875

Charlie Chong/ Fion Zhang

Page 103: Understanding api icp653 reading 12 worksheet 8

Exercise-008Closed Book

Charlie Chong/ Fion Zhang

Page 104: Understanding api icp653 reading 12 worksheet 8

Q1. Guided bend test represents:

a. Ductility of weldb. Strength of weldc. Soundness of weldd. Both soundness and ductility of weld

Q2. All positions of groove welds are qualified bya. pipe positions 1G and 5Gb. pipe positions 2G and 5Gc. pipe position 6G onlyd. b and c

Charlie Chong/ Fion Zhang

Page 105: Understanding api icp653 reading 12 worksheet 8

Q3. According to ASME Sec. IX, A welder for SMAW can be qualified byfollowing minimum tests:a. 1 tensile and 2 bend tests b. 2 bend tests onlyc. 2 tensile tests and 1 bend tests d. 1 tensile and 1 radiography

Q4. Procedure Qualification Record is a document which can be revised time to time.

a. True b. Falsec. Depends on company policyd. Depends on client of the company

Charlie Chong/ Fion Zhang

Page 106: Understanding api icp653 reading 12 worksheet 8

Q5. Use of Radiography is made for:

a. Performance qualification only.b. Procedure qualification onlyc. Both a and bd. Use of Radiography is not permitted by ASME Sec. IX.

Q6. Procedure Qualification is done by:

a. 1 Tensile and 2 bend testsb. 1 tensile and 1radiographyc. 1 bend test and 1 radiographyd. 2 Tensile and 4 bend tests

Charlie Chong/ Fion Zhang

Page 107: Understanding api icp653 reading 12 worksheet 8

Q7. Which of the following represent grouping of weld-metals in ASME IX ?a. P - Nosb. F - Nosc. S - Nosd. A - Nos

Q8. For A 516 gr 60 (SMTS = 60000 psi) material, following results were obtained for two tensile test specimens in PQR qualification.

Specimen T1: failed in B.M. at 57,400 psi Specimen T2: failed in weld metal, at 59,500 psiYour assessment is:

a. PQR test is ok since both are within acceptance criteria b. PQR test is rejected as both T1 and T2 are not within acceptancecriteriac. PQR in rejected because T1 is ok but T2 has failedd. PQR in rejected because T1 is failed thoughT2 is ok

Charlie Chong/ Fion Zhang

Page 108: Understanding api icp653 reading 12 worksheet 8

Q9. Based on a measured corrosion of 0.006" annually and using a corrosion allowance of 0.120", how long before the next UT thickness measurements are required?

(a) 10 years(b) 6.5 years(c) 20 years(d) 15 years

Q10. Per API 650, calculation of shell thickness by the 1-foot method cannot be used for tanks:(a) under 200 ft. in diameter(b) over 200 ft. in diameter(c) under 150 ft. in diameter(d) of any size

Charlie Chong/ Fion Zhang

Page 109: Understanding api icp653 reading 12 worksheet 8

Exercise-009Closed Book

Charlie Chong/ Fion Zhang

Page 110: Understanding api icp653 reading 12 worksheet 8

Q1. Open-top type tanks (with floating roof) are typically adopted for storing petroleum products that are :

a. Non-volatileb. Heavy distillates (e.g. Bitumen, asphalt etc)c. Volatiled. All of above

Q2. The term “Critical Zone” in storage tanks refers to:a. Lower part of shell interior, which is welded to bottomb. Upper part of shell interior, which is welded to roofc. Lower part of roof exterior, which is welded to shelld. Annular part of bottom interior, which is welded to shell

Charlie Chong/ Fion Zhang

Page 111: Understanding api icp653 reading 12 worksheet 8

Q3. API 650 code is tank construction code for:a. Atmospheric Storage tanksb. Tanks with pressure up to 15 psigc. Aboveground tanks including Refrigerated tanksd. All of above

Q4. The terms “Sketch plates” and “annular plates” refer to _____Plates in:a. Tank roofb. Tank bottomc. Tank shelld. None of above

Charlie Chong/ Fion Zhang

Page 112: Understanding api icp653 reading 12 worksheet 8

Q5. Hydrostatic testing of tank shells is:a. Basically water fill testb. Conducted at 1.1 times the static column pressure of productc. Conducted at 1.0 times the static column pressure of productd. Highest Pressure value of a, b, c above

Q6. Internal inspection of tanks during shut-down is essentially ____ for inspection of:

a. Tank roofb. Tank bottomc. Tank shelld. Tank Nozzles

Charlie Chong/ Fion Zhang

Page 113: Understanding api icp653 reading 12 worksheet 8

Q7. During tank inspection, the inspector should be more strict ____ while inspecting:

a. The shell Horizontal welds b. The shell vertical weldsc. Both a and b. are equally criticald. The roof welds

Q8. Cathodic protection is provided to tanks normally for guarding the: a. The tank shell against product corrosionb. The tank bottom against product corrosionc. The tank bottom against soil corrosiond. Both b and c

Charlie Chong/ Fion Zhang

Page 114: Understanding api icp653 reading 12 worksheet 8

Q9. For the new tanks to be constructed to the API 650-Basic _____ Standard, radiography for shell butt-welds is:

a. Optional and its extent depends on the Joint efficiency used for designb. Optional and its extent depends on the Plate thickness used for shellc. Mandatory and its extent depends on Joint efficiency used for designd. Mandatory and its extent depends on the plate thickness used for shell

Q10. “Vacuum box testing” is Typical testing, normally applied for:a. Bottom welds b. Mandatory for shell welds, optional for bottom weldsc. Mandatory for shell welds, optional for roof weldsd. Pad testing

Charlie Chong/ Fion Zhang

Page 115: Understanding api icp653 reading 12 worksheet 8

Q11.When the tank is empty, the floating roof of open-top tank isa. At its top-most positionb. Resting on the bottomc. Resting on the legsd. May be at any location

Q12.Since the tank is neither a pressure vessel, nor the piping, the welding procedures and welders for API 650 tanks are qualified as per:a. AWS D 1.1b. API 1104c. Still use ASME IXd. Any of above is OK

Charlie Chong/ Fion Zhang

Page 116: Understanding api icp653 reading 12 worksheet 8

Q13. Which of the following is/are mandatory appurtenances for Storage tanks?a. Tank level gaugeb. Tank ventsc. Pressure guaged. Temperature gauge / thermometer

Q14.Hot tapping for the tanks are provided in:a. Vapour space onlyb. Liquid space onlyc. Any of a or bd. Hot taps are not permitted for storage tanks.

Charlie Chong/ Fion Zhang

Page 117: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Q15. API 650 covers:a. Cylindrical, welded, above ground tanks onlyb. Cylindrical welded and riveted tanksc. Cylindrical & rectangular, welded & riveted tanksd. Cylindrical & rectangular, aboveground and underground tanks

Page 118: Understanding api icp653 reading 12 worksheet 8

Exercise-010Closed Book

Charlie Chong/ Fion Zhang

Page 119: Understanding api icp653 reading 12 worksheet 8

Q1.The complete or partial removal and replacement of more than 12 inches of a vertical weld joining shell plates is considered a:(a) minor alteration; (b) minor repair;(c) major alteration; (d) major repair.

Q2. A single film technique was used to make a radiograph using a Cobalt-60 source. The minimum permitted density in the area of interest is:a. 4.0b. 1.8 (x-ray)c. 2.0 (γ-ray)d. 1.3

Charlie Chong/ Fion Zhang

Page 120: Understanding api icp653 reading 12 worksheet 8

Q3.Cathodic protection is achieved by directing the flow of current from:a. A cathode to anodeb. An anode to cathodec. Both installations are acceptabled. Neither of a and b

Q4. __________ is a change from previous operating conditions involving different properties of the stored product such as specific gravity or corrosivity and / or different service conditions of temperature and / or pressure:(a) Re-rating; (b) Change in service;(c) Repair; (d) Reconstruction

Charlie Chong/ Fion Zhang

Page 121: Understanding api icp653 reading 12 worksheet 8

Q5. Describe how a liquid penetrant examination should be performed in order to detect discontinuities which are open to the surface.

a. Clean the part, apply the developer, apply the penetrant, remove excesspenetrant, inspect the part, clean the part

b. Clean the part, apply penetrant, remove excess penetrant, apply thedeveloper, inspect the part, clean the part

c. Clean the part, apply the developer, apply the penetrant, inspect the part, remove excess penetrant, clean the part

d. Clean the part, apply the developer, apply the penetrant, inspect the part, clean the part

Q6. A radiographic technique in which radiation passed through two walls and both the walls are viewed on the same radiograph (double wall, double image – ellipse) the limitation for the outside diameter is:

a. 3-1/2”b. 2”c. 4”d. Any diameter possible

Charlie Chong/ Fion Zhang

Page 122: Understanding api icp653 reading 12 worksheet 8

Q7. Information needed when determining the rate of corrosion:a. Original thickness or last inspection thicknessb. Current thicknessc. Length of time in serviced. All the above

Q8. The maximum acceptable undercutting for base metal in reconstructedtank for horizontal welds is:

(a) 1/64"; (b) 1/32"; (c) 1/16"; (d) 1/8"

Charlie Chong/ Fion Zhang

Page 123: Understanding api icp653 reading 12 worksheet 8

Q9. Tank was inspected in 1985 and the thickness was observed to be 0.32 inch. The thickness observed during inspection in 1995 was 0.30 inch. What is corrosion rate?

a. 2 mpyb. 20 mpyc. 0.2 mpyd. 1 mpy

Q10. If remaining corrosion allowance (RCA) at present is 0.05 inch, the next thickness inspection (UT) due for above tank shall not be later than:

a. 10 yearsb. 15 yearsc. 6 years d. 12.5 years

Interval = RCA/2N

Charlie Chong/ Fion Zhang

Page 124: Understanding api icp653 reading 12 worksheet 8

Q11. A corroded area of a tank bottom plate is repaired by welding overlay. There is no change in the rating and no change is made on the nameplate. Which of the following is the correct term to describe this process?a. Reconstruction b. Repairc. Alterationd. None of the above

Q12. The maximum interval between internal inspections shall not exceed ____ years when corrosion rate is known:(a) 10; (b) 20; (c) 5; (d) 15.

Q13. Hot taps are not permitted under which of the following conditions?a. On plates requiring PWHT.b. On ultrasonically sound platec. On tanks with dia. more than 80 feet.d. None of the above.

Charlie Chong/ Fion Zhang

Page 125: Understanding api icp653 reading 12 worksheet 8

Q14. A tank of 160 ft diameter is to be checked for shell settlement. Minimum number of equally spaced settlement points to be checked will be:

a. 16b. 20c. 24d. 12

Q15. For a tank made by reconstruction, under what circumstances may a new shell-to-bottom weld be exempt from hydrostatic testing?

a. When the root pass has been visually inspected and the final weld is fully examined, visually and radiographically.

b. Reconstructed tank is never exempted from hydrostatic testing.c. When the root pass has been visually inspected and the final weld is fully

examined, visually and by vacuum box.d. When the welding method has been reviewed and approved by an engineer

experienced in tank design in accordance with API Standard 650.

Charlie Chong/ Fion Zhang

Page 126: Understanding api icp653 reading 12 worksheet 8

Q16. In atmospheric conditions, bottom coatings may be applied if the steel temperature is:

a. 2⁰F above the dew pointb. 5⁰F below the dew point.c. 10⁰F above the dew point.d. At the dew point.

Q17. Procedure qualification for welding during repair of tanks is done in accordance with:

a. AWS D1.1b. API 1104c. ASME Section IXd. All of the above

Charlie Chong/ Fion Zhang

Page 127: Understanding api icp653 reading 12 worksheet 8

Q18. Widely scattered pits may be ignored under the following conditions a. Where the service fluid is corrosive or hard to hold.b. If sum of pit lengths along any 8” vertical line does not exceed 2”c. When no pit has depth which results in the minimum thickness being less

than one-half the minimum acceptable thickness of the shell plate exclusive of corrosion allowance

d. b and c

Q19. For verification of radiographic sensitivity and image quality, which of the following are used:

a. Cassettes b. Penetrametersc. Camerasd. Collimators

Charlie Chong/ Fion Zhang

Page 128: Understanding api icp653 reading 12 worksheet 8

Q20. Internal corrosion in the vapour space above liquid level occurs due to:a. Hydrogen Sulphide vapourb. Water vapourc. Oxygen d. Any combination of the above three

Q21. API 650: Appendix M provides requirements for Tanks designed to operate at the following range of temperatures:a. Exceeding 260⁰C b. Above 90° - 260⁰Cc. Below 90°Cd. Below 0°C

Charlie Chong/ Fion Zhang

Page 129: Understanding api icp653 reading 12 worksheet 8

Q22. For a reconstructed tank as per API 653 Verticality (out-of-plumbness) of top of the shell shall not exceed,

a. 1/300 of total tank height b. 1/250 of total tank height c. 1/400 of total tank heightd. None of the above

Q23. When lining is applied to bottom on inside of tank, the lining shall extend ___________ up the shell.

a. 6” minb. 12” minc. 18” mind. 3” min

Charlie Chong/ Fion Zhang

Page 130: Understanding api icp653 reading 12 worksheet 8

Q24. Hot tap can be performed on:a. Vapour space in the shellb. On the roofc. In the shell below liquid leveld. Anywhere on the tank

Q25. A radiograph was having density near the penetrameter equal to 3.0. Hence the acceptable density range of the radiograph is:

a. 1.7 to 4b. 2.55 to 3.9c. 2.0 to 4.0d. None of the above

T-282.2 Density Variation(a) General. If the density of the radiograph anywhere through the area of interest varies by more

than minus 15% or plus 30% from the density through the body of the hole IQI or adjacent to the designated wire of a wire IQI, within the minimum/maximum allowable density ranges specified in T-282.1, then an additional IQI shall be used for each exceptional area or areas and the radiograph retaken. When calculating the allowable variation in density, the calculation may be rounded to the nearest 0.1 within the range specified in T- 82.1.

Charlie Chong/ Fion Zhang

Page 131: Understanding api icp653 reading 12 worksheet 8

Q26. The examiner for conducting magnetic particle testing on the tank welds shall be:

a. Qualified as per ASNT Level II or IIIb. Able to read Jagger-2c. Qualified as per ASME Sec. Vd. None of the above

Q27. In atmospheric conditions, grit blasting can be done at temperature of atleast:

a. 2°F above the dew point.b. 5°F below the dew pointc. 5°F above the dew pointd. At the dew point

Charlie Chong/ Fion Zhang

Page 132: Understanding api icp653 reading 12 worksheet 8

Q28. How many equally spaced measurements are required for the thickness averaging technique?(a) 2 (b) 5 (c) 4 (d) 3

Q29. How many specimens must be used for impact tests from a single test coupon or test location?(a) 1 (b) 2 (c) 3 (d) 4

Q30. Hydrostatic tests shall be held for ____ hours for the reconstructed tank.(a) 2 (b) 8 (c) 24 (d) 72

Charlie Chong/ Fion Zhang

Page 133: Understanding api icp653 reading 12 worksheet 8

Q31. In a radiographic film of a weld, how is back scatter checked? (a) By use of a penetrameter(b) By film density(c) Using lead letter “B”(d) All of the above

Q32. In general, if shell thickness does not exceed ____ inch, it does not require further assessment for brittle fracture:

(a) 0.25 (b) 0.75(c) 1.00 (d) 0.50

Charlie Chong/ Fion Zhang

Page 134: Understanding api icp653 reading 12 worksheet 8

Q33. Potential for brittle fracture exists for tanks constructed according to:(a) API 650 – 7th edition(b) API 650 – latest edition(c) API 650 – 4th edition(d) None of the above

Q34. Three types of external inspections are:(a) Scheduled, routine and liquid penetrant(b) Scheduled, routine and UT thickness(c) Scheduled out of service, routine and UT thickness(d) Unscheduled, routine and liquid penetrant

Charlie Chong/ Fion Zhang

Page 135: Understanding api icp653 reading 12 worksheet 8

Q35. Welders qualifications shall expire as they do not weld: (a) Within a given process for a 6 month period(b) Using a given procedure for a 6 month period;(c) On a tank for 6 months;(d) For a 3 month period.

Q36. What are penetrameters used for:(a) A penetrameter is used for radiographic technique in that it serves as

an image quality indicator(b) It indicates the magnetic properties of the materials(c) To check penetrant quality in PT inspection(d) To check weld penetration during welding

Charlie Chong/ Fion Zhang

Page 136: Understanding api icp653 reading 12 worksheet 8

Q37. Unless otherwise agreed to by the purchaser, what is the minimumnominal width of a shell plate?(a) 36 inches (b) 48 inches(c) 72 inches (d) 96 inches

Q38. “Each vertical weld must be radiographed (either spot or full radiography) for the bottom shell course (i.e., course no. 1) for all tanks constructed to current API 650 Basic Standard.” This statement is:a. Falseb. Truec. Whether any radiography is required or not depends on shell thickness.d. Depends on tank design Engineer’s opinion

Charlie Chong/ Fion Zhang

Page 137: Understanding api icp653 reading 12 worksheet 8

Q39. According to ASME Sec. IX, welding filler metals are grouped into groupings (based on their usability) as:(a) P-numbers (b) F-numbers(c) Z-numbers (d) ASTM spec.

Q40. When reviewing a radiograph, a light image of the letter B can be seen on the film with dark background.(a) This is cause for rejection(b) This is not cause for rejection(c) This is the same as a light letter B(d) An unusual safety hazard existed during the exposure

Charlie Chong/ Fion Zhang

Page 138: Understanding api icp653 reading 12 worksheet 8

Q41.Which of the following penetrant system is generally considered least sensitive?

a. Water-washable – visible dyeb. Solvent removable – visible dyec. Water-washable – fluorescent dyed. Post-emulsification – visible dye

Q42.The nondestructive examination method to be used for a particular inspection should be determined by the:

a. Availability of certified NDE examinersb. Length of time since the last inspectionc. Age of the component to be inspectedd. Type, location, and orientation of the expected flaws

Charlie Chong/ Fion Zhang

Page 139: Understanding api icp653 reading 12 worksheet 8

Q43. Out of the following four options in LPT, most sensitive results can be obtained by:

a. Visible penetrant – water washableb. Fluroscent penetrant – post emulsifying typec. Visible – solvent removable typed. Visible – post emulsifying type

Q44. A PQR was qualified in 5G position using a new welder. But production welding is to be done in 2G position. Which of the following are applicable as a minimum?

a. Both procedure and welder shall be re-qualified in 2G position.b. The qualified procedure can be used ,only welder needs to be re-

qualifiedc. The welder is qualified, but the procedure needs re-qualification d. Both procedure and welder need not be re-qualified.

Charlie Chong/ Fion Zhang

Page 140: Understanding api icp653 reading 12 worksheet 8

Q45. Minimum thickness evaluation may be conducted by?a. Use of an external micrometer onlyb. Ultrasonic testingc. D.P. Checkb. None of above

Q46. For procedure qualification documentation:a. WPS gives the procedure test data and results of tensile/bend testb. PQR gives ranges qualified by procedure testc. PQR gives procedure test data and WPS gives ranges qualifiedd. WPS and PQR both give test data and ranges qualified

Charlie Chong/ Fion Zhang

Page 141: Understanding api icp653 reading 12 worksheet 8

Q47. Identify correct statement from following:a. Tensile test for procedure qualification is passed only if base metal failure

occurs at or above Specified Minimum Tensile Strength (SMTS) of base metal

b. Tensile test for procedure qualification is passed only if base metal failure occurs above SMTS of base metal

c. Tensile test for procedure qualification is passed even if weld metal failure occurs above 95% ( ≥ 95%) of SMTS of base metal

d. None of the aboveQW153-1 (d) if the specimen breaks in the base metal outside of the weld or weld interface, the test shall be accepted as meeting the

requirements, provided the strength is not more than 5% below the minimum specified tensile strength of the base metal.

Q48. When using radiographs to qualify welder, the acceptance standards used are found in:

a. ASME Section Vb. ASME Section IXc. ASME Section VIIId. The referencing code

Charlie Chong/ Fion Zhang

Page 142: Understanding api icp653 reading 12 worksheet 8

Q49. An RBI assessment can be used to alter the internal inspection strategy provided:

a) RBI is performed considering likelihood of failure and consequence of failure.b) The RBI is fully documented.c) A third party conducts the RBI.d) Both “a” and “b” above

Q50. You are reviewing a WPQ for a welder. The test results indicate the following:

a. Satisfactory side bendb. Face bend satisfactoryc. Visual satisfactory

Will these tests qualify the welder?a. Yesb. No, because bend tests are not correct type.c. Not enough information givend. No, because radiography is essential for welder qualification

Charlie Chong/ Fion Zhang

Page 143: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Page 144: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Page 145: Understanding api icp653 reading 12 worksheet 8

Exercise-011Assorted

Charlie Chong/ Fion Zhang

Page 146: Understanding api icp653 reading 12 worksheet 8

Q1) __________ is a change from previous operating conditions involvingdifferent properties of the stored product such as specific gravity orcorrosivity and / or different service conditions of temperature and / orpressure"(a) Re-rating; (b) Change in service;(c) Repair; (d) ReconstructionREF : API-653, - 1.5.4ANS : (b)

Q2) A __________ is a device used to determine the image quality of aradiograph.(a) A step wedge comparison film; (b) A densitometer;(c) A penetramter (d) All of the above.REF : Section V, T-233ANS : (c)

Charlie Chong/ Fion Zhang

Page 147: Understanding api icp653 reading 12 worksheet 8

Q3) A corroded roof plate is found to have an average thickness of 0.1"measured over an area of 100 sq. inches. This area shall be :-(a) Repaired or replaced; (b) Found to be acceptable;(c) Repair is prohibited; (d) Replacement is mandatedREF : API-653, 2.2.1.2ANS : (b)

Q4) A double-welded butt joint is defined as :-(a) A joint between two members that intersect at an angle between0 degrees (a butt joint) and 90 degrees (a corner joint).(b) A joint between two abutting parts lying in approximately the sameplane that is welded from both sides.(c) A joint whose size is equal to the thickness of the thinner jointedmember.(d) A joint between two overlapping members in which the overlappededge is welded.REF : 650 3.1.1.1 ANS : (b)

Charlie Chong/ Fion Zhang

Page 148: Understanding api icp653 reading 12 worksheet 8

Q5) An external floating roof shall be provided with at least one manhole havinga minimum inside diameter of __________ inches.(a) 18; (b) 15; (c) 24; (d) 30.REF : 650 APP. C. 3.11ANS : (c)

Q6) A formal Visual External inspection by a qualified inspector shall be doneAt least :-(a) Every 5 years of ¼ CR life whichever is less(b) Every 5 years of ½ CR life whichever is less(c) Every 2 years(d) Every 1- years or ¼ CR life whichever is greaterREF : 653 4.3.2.1ANS : (a)

Charlie Chong/ Fion Zhang

Page 149: Understanding api icp653 reading 12 worksheet 8

Q7) A full hydrostatic test (when required) shall be held for __________hours :-(a) 24; (b) 8; (c) 18; (d) 12REF : 653 10.3.1.1ANS : (a)

Q8) A full-fillet weld is a weld that :-(a) not less than 1/3 the thinner plate;(b) the legs equal the thickness of the thinner plate;(c) the largest isosceles triangle that can be inscribed within the crosssection of the weld(d) is at least the thickness of the thicker plateREF : API 650 3.1.1.7ANS : (b)

Charlie Chong/ Fion Zhang

Page 150: Understanding api icp653 reading 12 worksheet 8

Q9) A hot tap in a 1.25" thick tank with a minimum metal temperature of 65oFat time of hot tap, without having material toughness data is :-(a) not permitted; (b) permitted;(c) not enough information; (d) not addressed by the codeREF : API 653 – 7.13.4 & Fig. 7-5ANS : (a)10.4.2.3 No welding of any kind shall be performed when the surfaces of the parts to be welded are wet from rain, snow, or ice; when rain or snow is falling on such surfaces; or during periods of high winds unless the welder and the work are properly shielded. No welding of any kind shall be performed when the temperature of the base metal is less than 0 °F. When the temperature of the base metal is between 0 °F and 32 °F or the thickness is in excess of 1 in., the base metal within 3 in. of the place where welding is to be started shall be heated to a temperature warm to the hand (approximately 140 °F) before welding. (See 10.4.4.3 for preheat requirements for shell plates over 1 1/2-in. thick.)

Q10) A hydrostatic test for a relocated tank :-(a) may be waived by the Owner / Operator; (b) is required;(c) may be waived by the Inspector; (d) is not necessaryREF : 653 10.3.1.1 (a)ANS : (b)

Charlie Chong/ Fion Zhang

Page 151: Understanding api icp653 reading 12 worksheet 8

Q11) A liquid penetrant examiner must have vision to enable him to read JaggerType 2 standard chart at a distance of not less than 12 inches and iscapable of distinguishing and differentiating contrast between colours used.Examiners shall be checked __________ to ensure that they meet theserequirements :-(a) Quarterly; (b) Semi-Annually;(c) Annually; (d) Bi-Annually.REF : 650 6.4.3 (a)ANS : (c)

Q12) A procedure qualification record (PQR) shall address :-(a) non-essential variables;(b) essential variables;(c) supplemental essential variables (when required);(d) both (b) and (c)REF : IX QW-200.2ANS : (d)

Charlie Chong/ Fion Zhang

Page 152: Understanding api icp653 reading 12 worksheet 8

Q13) A radiograph is made using an X-ray source and two films in each filmholder. For composite viewing, each film of the composite shall have aminimum density of :-(a) 4.0; (b) 1.8; (c) 2.0; (d) 1.3REF : Section V, T-282.1ANS : (b) (d?)

Q14) A reconstructed tank with a total height of 25' has been determined tohave an out-of-plumbness of 2 ¾". This is :-(a) acceptable; (b) unacceptable;(c) not covered by the code (d) corrected by eternalstrengtheningREF : API-653, 8.5.2.1ANS : (a)Lesser of 5” or 25x12/100 = 3”

Charlie Chong/ Fion Zhang

Page 153: Understanding api icp653 reading 12 worksheet 8

Q15) A riveted tank shell with a butt joint has 3 rows. What is the jointefficiency ?(a) 0.75"; (b) 0.85"; (c) 0.90; (d) 0.91.REF : API-653, Table 2-1ANS : (b)

Q16) A SAW welding operator is attempting to quality by radiography on a 6inch thick test coupon. Elongated slag inclusions are measured to be 0.2inch long.(a) Must weld 2 additional coupons; (b) meets the requirements (passes)(c) slag must not exceed 0.5" (d) slag is not acceptable.REF : Section IX, QW-191.2.2ANS : (b)

Charlie Chong/ Fion Zhang

Page 154: Understanding api icp653 reading 12 worksheet 8

Q17) A self-supporting cone roof :-(a) is formed approximately to the surface of a right cone;(b) both a and d(c) has columns and / or rafters on trusses(d) is supported at the periphery.REF : API 650 3.10.1 (a)ANS : (b)

Q18) A shell to bottom fillet weld for a Grade IV material shall be(a) made with at least 2 passed; (b) may be made with 1 pass(c) shall be at least 3 / 16" (d) both (a) and (c) aboveREF : API 650 3.1.5.7 cANS : (a)

Q19) A single film technique was used to make a radiograph using a Cobalt-60source. The minimum permitted density in the area of interest is :(a) 4.0; (b) 1.8; (c) 2.0; (d) 1.3.REF : Section V, T-282ANS : (c)

Charlie Chong/ Fion Zhang

Page 155: Understanding api icp653 reading 12 worksheet 8

Q20) A supported cone roof :-(a) is formed approximately to the surface of a right cone;(b) both (a) and (c);(c) has columns and / or rafters on trusses;(d) is supported at the peripheryREF : API 650 3.10.1 (a)ANS : (b)

Q21) A tank bottom depression is 9.125" deep, radius of depression is 22.5 feet.What is the maximum depth of depression ?(a) 7.825"; (b) 8.062"; (c) 8.125"; (d) 8.325"REF : 653 APP. “B” B-6ANS : (d)BB = 0.37R = 0.37x 22.5 = 8.325”

Charlie Chong/ Fion Zhang

Page 156: Understanding api icp653 reading 12 worksheet 8

Q22) A tank bottom lining with a measured thickness of 15 mils should be testedwith :-(a) A high voltage detector in accordance with NACE RP0188;(b) A low voltage (67.5 volts) wet sponge detector;(c) A calibrated Ultrasonic tester;(d) An Eddy Current lift-off detector;REF : API-652, 7.3.2ANS : (b)

Q23) A weld shall be unacceptable by Visual Inspection if the inspection showswhich of the following ?a) The weld has no crater cracks or other surface cracks.b) Undercutting exceeds the limits given in 5.2.1.4 for vertical or horizontal butt

joints.c) The frequency of surface porosity in the weld does not exceed one cluster

(one or more pores) in any four inches of length, and the diameter of each cluster does not exceed 3/32 inch.

d) All of the above;REF : 650 6.5.1ANS : (b)

Charlie Chong/ Fion Zhang

Page 157: Understanding api icp653 reading 12 worksheet 8

Q24) A weld with a nominal thickness of 1.5 inch is to be radiographed using afilm side penetrameter, hole type. The penetrameter designation shouldbe :-(a) 25; (b) 30; (c) 35; (d) Both (a) and (b) areresponsible;REF : Section V, T-276ANS : (a)

Q25) A welder may deviate from the parameters specified in WPS if they arenonessential variables :-(a) Provided authorization from inspection is documented;(b) Provided the welding supervisor approves;(c) No;(d) Nonessential variables only apply to PQRsREF : Section IX, QW-200.1ANS : (c)

Charlie Chong/ Fion Zhang

Page 158: Understanding api icp653 reading 12 worksheet 8

Q26) A welder qualifies in the 3G position on a plate coupon, he is then qualifiedto weld in the position(s) on NPS 6 pipe :-(a) F, V; (b) F only; (c) F, V, O; (d) ALLREF : IX QW-461.9ANS : (b)

Q27) A welder who is qualified using a double-groove weld :-(a) is also qualified to make a single V-groove weld without backing;(b) is also qualified to make a single V-groove weld with backing;(c) may weld in the 6G position;(d) must requalify every 2 monthsREF : Section IX, QW-402.2ANS : (b)

Charlie Chong/ Fion Zhang

Page 159: Understanding api icp653 reading 12 worksheet 8

Q28) A welder's ID must be placed at intervals not exceeding along completedwelds :-(a) One foot; (b) One and a half feet; (c) Two feet; (d) Three feet.REF : API-653, 9.2.2ANS : (d)

Q29) A welding procedure qualified on ¼ inch thick plate can be used to weldgroove welds in materials from to :-(a) 3/16 to 3/4; (b) 1/16 to 3/4;(c) 3/8 to 3/4; (d) 1/16 to 1/2.REF : QW-451.1ANS : (d)

Charlie Chong/ Fion Zhang

Page 160: Understanding api icp653 reading 12 worksheet 8

Q30) A welding procedure qualified on 3/8" thick plate can be used to weldgroove welds in materials :-(a) 3/16 to 3/4; (b) 1/16 to 3/4;(c) 3/8 to 3/4; (d) 1/16 to 3/8.REF : IX QW-451.1ANS : (b)

Q31) A welding procedure qualified under the 1965 ASME Code Section IX :(a) Is obsolete;(b) Is still applicable;(c) Must be re-qualified every 3 years when code is re-issued;(d) is not addressed by the codeREF : Section IX ForwardANS : (b)

Charlie Chong/ Fion Zhang

Page 161: Understanding api icp653 reading 12 worksheet 8

Q32) Above-ground storage tank is defined as a stationary container with abarrel capacity greater than :-(a) 2000 barrels; (b) 300 barrels;(c) 500 barrels; (d) 750 barrels.REF : API 651-1.2.1ANS : (c)

Q33) Acceptance standards for MT examination shall be per :-(a) AWS D-1.1;(b) SNT-TC-1A;(c) Appendix 6 of ASME Sect VII, div. 1(d) Article 7 of ASME Sect VREF :650 6.2.4ANS : (c)

Charlie Chong/ Fion Zhang

Page 162: Understanding api icp653 reading 12 worksheet 8

Q34) All tanks shall be given a formal visual external inspection by an inspectorat least :-(a) every 3 years or at quarter corrosion rate;(b) every 5 years or at quarter corrosion rate;(c) every 3 years or at half corrosion rate;(d) every 5 years or at half corrosion rate.REF : API-653-4.3.2.1ANS : (b)

Q35) An external inspection may be used as an alternative to the internalinspection only when :-(a) operations dictate;(b) construction allows external access to the tank bottom to determinethickness;(c) all insulation is removed from the tank;(d) no alternate is allowed.REF : 653 4.5ANS : (b)

Charlie Chong/ Fion Zhang

Page 163: Understanding api icp653 reading 12 worksheet 8

Q36) Anticipated minimum thickness of tank bottom where bottom / foundationdesign provides for leak detection and containment is :-(a) 0.10"; (b) 0.05"; (c) 0.09";(d) same as without leak detection and containment.REF : API 653 Table 4-1ANS : (b)

Q37) Radiographic location markers are to be placed(a) on the exposure holder / cassette; (b) on the part;(c) between the part and the film; (d) either (b) or (c) aboveREF :ASME Section V-T375ANS : (d)

Charlie Chong/ Fion Zhang

Page 164: Understanding api icp653 reading 12 worksheet 8

Q38) At what design metal temperature must impact tests be made for all weldmetal and procedures to be used ?(a) Below 32oF; (b) Below 20oF; (c) Below 15oF; (d) Below10oF.REF : API 650-7.2.2.4ANS : (b)

Q39) At what level is the atmosphere considered oxygen-deficient ?(a) less than 19.5 %; (b) less than 21.9 %;(c) less than 24.9 %; (d) less than 16.0 %REF : API 2015 – 3.3ANS : (a)

Charlie Chong/ Fion Zhang

Page 165: Understanding api icp653 reading 12 worksheet 8

Q40) Base metals are grouped into groupings according to their weldingcharacteristics :-(a) F-number; (b) AWS;(c) A-number; (d) P-number.REF : IX QW-421ANS : (d)

Q41) Based on a measured corrosion of 0.006" annually and using a corrosionallowance of 0.120", how long before the next UT thicknessmeasurements are required ?(a) 10 years; (b) 36.5 years;(c) 20 years; (d) 15 years.REF : API-653 4.3.3.2ANS : (d)

Charlie Chong/ Fion Zhang

Page 166: Understanding api icp653 reading 12 worksheet 8

Q42) Based on variable-design point method, calculate the first coursethickness, exclusive of CA, for a 200 foot diameter tank, purchaserspecified specific gravity of 1, 56 feet in height, using 96 inch courses withmaterial stress of 23,000 psi. Design is based on test conditions :-(a) 0.853; (b) 0.934; (c) 1.239; (d) 1.220REF : API 650-3.6.4ANS : (c)

Q43) Before elevating the operating temperature of a shell tank to a temperaturabove 200 degrees F, what document must be considered ?(a) API RP 650, Welded Steel Tanks for Oil Storage;(b) API 650, Appendix M;(c) API RO 650, Lining of Aboveground Petroleum Tanks;(d) Publication 2207, Preparing Tank Bottoms for Work.REF : API-653, 2.2.4.4ANS : (b)

Charlie Chong/ Fion Zhang

Page 167: Understanding api icp653 reading 12 worksheet 8

Q44) Bimetallic corrosion can occur when :-(a) A bronze check valve is joined to steel piping;(b) Either stainless steel or copper is connected to a steel tank;(c) Neither (a) or (b);(d) Both (a) and (b).REF : API 651 2.2.2ANS : (d)

Q45) Bottom leak detection :-(a) can be detected by installation of cathodic protection;(b) can be detected by observation at a tell-tale hole;(c) is a hazard that can not be detected;(d) never happens when lining are properly installed.REF : API 651 2.2.2ANS : (b)

Charlie Chong/ Fion Zhang

Page 168: Understanding api icp653 reading 12 worksheet 8

Q46) Bottoms exceeding 100' diameter in tanks operating above 200oF shallhave :-(a) butt-welded annular bottom plates;(b) be made of a Group IV, V or VI material;(c) have a modulus of elasticity of 30,000,000;(d) all of the above.REF : API 650< M.4.1ANS : (a)

Q47) Hot works is defined as :-(a) Work than can lead to fever;(b) an operation that can produce a spark or flake hot enough to igniteflammable vapours;(c) an atmosphere between the LEL and UEL;(d) both (a) and (c) above.REF : API 2207, 1.1ANS : (b)

Charlie Chong/ Fion Zhang

Page 169: Understanding api icp653 reading 12 worksheet 8

Q48) Cathodic protection is achieved by directing the flow of current from :-(a) A cathode to an anode; (b) An anode to a cathode;(c) Both installations are unacceptable; (d) Neither (a) or (b).REF : 651 5.2.1ANS : (b)

Q49) Concrete rings shall be inspected for :-(a) broken concrete, spalling, cracks; (b) vegetation against tank;(c) holidays in paint; (d) only (a) and (b).REF : API 653 Appendix C, C.1.1.1ANS : (d).

Q50) Construction, inspection and repair records shall be maintained by the :-(a) Manufacturer; (b) Inspector;(c) Owner / Operator; (d) Jurisdiction.REF : 653 11.2.1ANS : (c)

Charlie Chong/ Fion Zhang

Page 170: Understanding api icp653 reading 12 worksheet 8

Q51) Describe how a liquid penetrant examination should be performed in orderto detect discontinuities, which are open to the surface :-a) clean the part, apply the developer, apply the penetrant, remove excess

penetrant, inspect the part, clean the part;b) clean the part, apply the penetrant, remove excess penetrant, apply the

developer, inspect the part, clean the part;c) clean the part, apply the developer, apply the penetrant, inspect the part,

remove excess penetrant, clean the part;d) clean the part, apply the developer, apply the penetrant, inspect the part,

clean the part.REF : Section V-T620ANS : (b)

Q52) Determine the exact interval for ultrasonic thickness measurements for atank with 17 mils of the original 25 mils corrosion allowance still remainingafter 15 years ?(a) 5 years; (b) 15 years; (c) 23.875 years; (d) 31.875 years.REF : 653 4.3.3.2 (c)ANS : (b)

Charlie Chong/ Fion Zhang

Page 171: Understanding api icp653 reading 12 worksheet 8

Q53) Determine the maximum allowable height for a 90 foot diameter tankbased on a maximum shell plate thickness of 0.5 inch and maximumallowable stress of 21,000 psi, with a joint efficiency of 0.85, and nocorrosion allowance :-(a) 29.6; (b) 35.3; (c) 39.1; (d) 43.9REF : API 650-Table A-4ANS : (c)tmin = 2.6(H-1)DG/SE H= tminSE/(2.6xDG) +1 = 38.14’

Q54) Differential settlement leads to :-(a) potential floating roof hang up; (b) lack of circularity at the top;(c) oval shape at the top; (d) all of the above.REF : API 653 Appendix B.2.2.3ANS : (d)

Charlie Chong/ Fion Zhang

Page 172: Understanding api icp653 reading 12 worksheet 8

Q55) Distorted anchor bolts may indicate :-(a) overpressure uplift condition; (b) foundation settlement;(c) both (a) and (b) above; (d) anchor bolts do not distort.REF : API 653, 2.5.3ANS : (c)

Q56) During an inspection, you are required to calculate the retirementthickness for the bottom course of a tank. The information available is asfollows :-Diameter = 150 feetHeight = 40 feetSpecific gravity of contents = 0.77Joint efficiency = 0.7Material tensile strength is unknownMaterial tensile strength is unknown;Material maximum allowable stress is unknown. (used 23600)(a) 0.050; (b) 0.7141; (c) 0.500; (d) 0.5625REF : API 653 2.3.3.1ANS : (c) tmin = 2.6(H-1)DG/SE = 0.472

Charlie Chong/ Fion Zhang

Page 173: Understanding api icp653 reading 12 worksheet 8

Q57) During hydrostatic test, no less than ______ settlementmeasurement points shall be surveyed :-(a) 8; (b) 10; (c) 15; (d) 5.REF : 653 10.5.1.2ANS : (a)

Q58) E7018 electrodes are classified as F number :-(a) 1; (b) 2; (c) 4; (d) 5.REF : IX QW-432ANS : (c)

Charlie Chong/ Fion Zhang

Page 174: Understanding api icp653 reading 12 worksheet 8

Q59) Essential variable on a welding procedure specification :-(a) those in which a change, as described in the specific variables, is considered to affect the mechanical properties of the weldment;(b) variable are listed in section IX of the ASME CODE;(c) both (a) and (b) above.(d) are the same for all procedures.REF : Section IX, QW 251.2ANS : (c)

Q60) Examiners who perform ultrasonic examinations under API-650 shall bequalified and certified by the manufacturers as meeting the requirements ofcertification as outlined in ?(a) ASME; (b) ASNT-TC-1A; (c) API-650; (d) API-653.REF : 650 6.3.3ANS : (b)

Charlie Chong/ Fion Zhang

Page 175: Understanding api icp653 reading 12 worksheet 8

Q61) Except as modifed in Section 6 of API-650, the radiographic methodemployed shall be in accordance with which Section and article of the ASMEcode ?(a) Section II, Article 2; (b) Section III, Article 1;(c) Section V, Article 2; (d) Section IX, Article 1.REF : 650 6.1.3.1ANS : (c)

Q62) Exclusive of corrosion allowance, what is the minimum nominal thicknessfor all new construction bottom plates ?(a) 1/2 inch; (b) 1/4 inch; (c) 3/16 inch; (d) 5/8 inch.REF : API 650-3.4.1ANS : (b)

Charlie Chong/ Fion Zhang

Page 176: Understanding api icp653 reading 12 worksheet 8

Q63) Existing shells shall be analysed by experienced personnel for :-a) fluid static head, internal and external pressure, wind loads, settlement and

business needs;b) wind loads, settlement, fluid static head, internal and external pressure and

nozzle loads;c) internal and external pressure, wind loads, fluid static head, settlement and if

it convenient.d) only (a) and (b) above.REF : API 653, 2.3.1.2ANS : (b)

Q64) External tank bottom inspection is permitted :-(a) when required by the inspector;(b) only when reassembly is being done.(c) where construction, size or other aspects allow;(d) is not permitted.REF : API-653, Table 4-1; 4.5ANS : (c)

Charlie Chong/ Fion Zhang

Page 177: Understanding api icp653 reading 12 worksheet 8

Q65) Find the capacity of a small tank, with a joint efficiency of 0.85, specificgravity = 1.0, no corrosion allowance, diameter is 40 feet, height is 30 feetwith 5 completed 72" courses.(a) 5,370; (b) 5,140; (c) 6,710; (d) 7,350.REF : API 650 – Appendix A.2.2 Table A-1ANS : (c)C = 0.14D2H

Q66) Flaws such as cracks in the weld in shell-to-bottom of a tank are :-(a) not critical;(b) acceptable if length is less than twice the width;(c) to be removed and repaired;(d) welded over without needing to be removed.REF : API-653, 2.3.6ANS : (c)

Charlie Chong/ Fion Zhang

Page 178: Understanding api icp653 reading 12 worksheet 8

Q68) For a 30 inch shell manhole, 0.5 inches thick shell and reinforcing plate,what minimum neck thickness is required ?(a) 3/16; (b) 3/8; (c) 1/2; (d) 5/16.REF : API 650 – 3.7.5.1 (Table 3-5)ANS : (d)

Charlie Chong/ Fion Zhang

Page 179: Understanding api icp653 reading 12 worksheet 8

Q69) For an existing 150 foot diameter storage tank, which has been in servicefor 28 years, known joint efficiency is 1.0, contents have been the same,with a specific gravity of 1.0, material yield of plate is 30,000 and tensilestrength is 55,000, liquid fill level is 50 feet, calculate the minimumallowable thickness for the second course :- used S =23600psi(a) 0.6789; (b) 0.7962; (c) 0.8056; (d) 0.8156.REF : API 653 2.3.3.1ANS : (d) 0.809”

Q70) For butt-welded joints in which the thinner shell plate is 3/8 inch or less,how many spot radiographs shall be taken in the first 10 feet of completedvertical joint of each type and thickness welded by each welder orwelding operator ?(a) One; (b) Two; (c) Three; (d) Four.REF : API 650 – 6.1.2.2ANS : (a)

Charlie Chong/ Fion Zhang

Page 180: Understanding api icp653 reading 12 worksheet 8

Q72) For impact testing materials, what is the minimum transverse value ofGroup IV materials, 1.5" thick ?(a) 13 foot – pounds; (b) 15 foot – ponds;(c) 20 foot – pounds; (d) 25 foot – pounds;REF : API-650 Table 2-4ANS : (c)

Q73) For impact testing materials, what is the minimum longitudinal value for a1.8" thick A-516-70 as rolled material for a WPS ?(a) 50 foot – pounds; (b) 15 foot – pounds;(c) 42 foot – pounds; (d) 40 foot – pounds.REF : 650 7.2.2.5 or Table 2-3ANS : (c) 35 ft-lbf

Charlie Chong/ Fion Zhang

Page 181: Understanding api icp653 reading 12 worksheet 8

API573-70

Charlie Chong/ Fion Zhang

Page 182: Understanding api icp653 reading 12 worksheet 8

Q74) For new or repaired shell horizontal joints, how many radiographs shall betaken for each 50 feet of horizontal joint, not including those required atintersections of vertical and horizontal joints ?(a) 1; (b) 2; (c) 3; (d) 5.REF : API 653 – 10.2.1.2ANS : (a)

Q75) For welds that attach nozzles, manholes, cleanout openings andpermanent attachments, undercut shall not exceed ______ inch.(a) 3/32; (b) 1/8; (c) 3/16; (d) 1/64.REF : 650 6.5.1ANS : (d)

Charlie Chong/ Fion Zhang

Page 183: Understanding api icp653 reading 12 worksheet 8

Q76) Foundations of relocated tanks specified as true to horizontal planewithout ringwalls shall be true :-(a) ± 1/8" in any 30' and ± 1/4" in the total circumference;(b) ± 1/8" in any 30' and ± 1/2" in the total circumference;(c) ± 1/8" in any 10' and ± 1/2" in the total circumference;(d) ± 1.4" in any 30' and ± 1/2" in the total circumference.REF : API 653 8.5.6.2 bANS : (c)

Q77) From what type of material should shims be fabricated when they are tobe used to radiograph welds ?(a) Malleable materials capable of being drilled;(b) From the same heat number as the material being inspected;(c) Fabricated of radiographically similar material to the object to be inspected;(d) All of the above.REF : Section V, T277.3ANS : (c)

Charlie Chong/ Fion Zhang

Page 184: Understanding api icp653 reading 12 worksheet 8

Q78) Generally, tank bottom linings cover the entire tank bottom and extend____ inches up the shell of the tank :-(a) 10 – 15 inches; (b) 12 - 18 inches; (c) 18 – 24 inches; (d) 24 – 30inches.REF : API 652 4.4ANS : (c)

Q79) Hot taps are not permitted :-(a) on the roof of a tank or within the gas / vapour space of a tank;(b) where heat of welding may cause environmental cracking;(c) (a) and (b);(d) (a) only.REF : API 653 – 7.13ANS : (c)

Charlie Chong/ Fion Zhang

Page 185: Understanding api icp653 reading 12 worksheet 8

Q80) Safe entry administrative controls include :-(a) an emergency plan; (b) atmospheric testing;(c) ventilation procedures; (d) all of the above.REF : API 2015, 2.1ANS : (d)

Q81) How does the calculation of minimum thickness for a riveted tank shelldiffer from that of a welded tank shell :-a) The formula for the calculation of minimum thickness of a riveted tank shell is the

same as for a welded tank shell except that the maximum allowable stress (S) is 21,000 lbs / sq. inch and the efficiency equals 1 for the shell plate 6 inches away from rivets;

b) The formula for the calculation of minimum thickness of a riveted tank shell is exactly the same for a welded tank;

c) The formula for the calculation of minimum thickness of a riveted tank shell is the same as for a welded tank shell except the minimum allowable stress (S) is 21,000 lbs /s q. inch and the efficiency equals 0.85 for the shell plate 6 inches away from the rivets.

d) API does not set minimum thickness.REF : API-653, 2.3.4.1ANS : (a)

Charlie Chong/ Fion Zhang

Page 186: Understanding api icp653 reading 12 worksheet 8

Q82) How many equally spaced measurement are required for the thicknessaveraging technique ?(a) 2; (b) 5; (c) 4; (d) 3.REF : API 653, 2.3.2.1ANS : (b)

Q83) How many impact specimens must be broken for an average value for P1,Group 1, 2, 3 material ?(a) 2; (b) 3; (c) 4; (d) 6.REF : API-650, 2.2.8.3ANS : (b)

Charlie Chong/ Fion Zhang

Page 187: Understanding api icp653 reading 12 worksheet 8

Q84) How many inches must project beyond the outside edge of the weldattaching t he bottom sketch plate to the shell plate ?(a) At least 1/2 inch; (b) at least 2 inches;(c) At least 9/16 inch; (d) at least 1.0 inchREF : API 650 – 3.4.2ANS : (d)

API650: 5.4 Bottom Plates5.4.1 All bottom plates shall have a corroded thickness of not less than 6 mm (0.236 in.) [49.8 kg/m2 (9.6 lbf/ft2) (see 4.2.1.2)]. Unless otherwise agreed to by the Purchaser, all rectangular and sketch plates (bottom plates on which the shell rests that have one end rectangular) shall have a nominal width of not less than 1800 mm (72 in.).5.4.2 Bottom plates of sufficient size shall be ordered so that, when trimmed, at least a 50 mm (2 in.) width will project outside the shell or meet requirements given in 5.1.5.7 d whichever is greater.

Charlie Chong/ Fion Zhang

Page 188: Understanding api icp653 reading 12 worksheet 8

Q85) How many settlement measurement points are required for a tank thatmeasures 200 ft. in diameter ?(a) 30; (b) 8; (c) 21; (d) 10.REF : 653 APP. “B” B-2ANS : (c) 20N = D/10whereD is the tank diameter, in feet (ft).N is the minimum required number of settlement measurement points, but no less than eight. All values of N shall be rounded to the next higher even whole number. The maximum spacing between settlement measurement points shall be 32 ft.

Q86) How many specimens and impact tests must be performed from a singletest coupon or test location ?(a) 1; (b) 2; (c) 3; (d) 4.REF : API 650 2.2.8.3ANS : (c)

Charlie Chong/ Fion Zhang

Page 189: Understanding api icp653 reading 12 worksheet 8

Q87) How many specimens must be broken for an average value for P1, Group1, 2, 3 material ?(a) 2; (b) 3; (c) 4; (d) 6.REF : 650 2.2.8.3ANS : (b)

Q88) Hydrochloric acid may be formed by :-(a) Sodium and potassium; (b) Magnesium and calcium chlorides;(c) Calcium chlorides and sodium; (d) Potassium and Magnesium.REF : API Chapter II, 202.022ANS : (b)

Q89) Hydrostatic tests shall be held for ____ hours :-(a) 2; (b) 8; (c) 24; (d) 72.REF : API 653 10.3.1.1ANS : (c)

Charlie Chong/ Fion Zhang

Page 190: Understanding api icp653 reading 12 worksheet 8

Q90) If penetrameters are not placed adjacent to the welds, what rules apply ?a) The penetrameter should be placed on the source side of the materialb) being radiographed.c) The penetrameter may be placed on the film side of the material beingd) radiographed.e) Lead letter "F" at least as high as the identification number is placedf) adjacent to the film side penetrameter;g) All of the above.REF : Section V, T277ANS : (d)

Q91) In a radiographic film of a weld, how is film sensitivity or quality measured ?(a) by use of a penetrameter; (b) by film density;(c) comparing to known defects; (d) all of the above.REF : Section V, T282, T283ANS : (a)

Charlie Chong/ Fion Zhang

Page 191: Understanding api icp653 reading 12 worksheet 8

Q92) In a riveted tank shell, a butt joint has 3 rows. What is the joint efficiency ?(a) 0.75; (b) 0.85; (c) 0.90; (d) 0.91.REF : 653 Table 2-1ANS : (b)

Q93) In accordance with Section V, intensifying screens :-(a) Can always be used;(b) Can be used unless restricted by the referencing Code;(c) Can never be used;(d) Can be used only with Type 1 film.REF : Section V T-232ANS : (b)

Charlie Chong/ Fion Zhang

Page 192: Understanding api icp653 reading 12 worksheet 8

Q94) In general, if shell thickness does not exceed ____ inch, it does notrequire further assessment for brittle fracture :-(a) 0.25; b) 0.75; (c) 1.00; (d) 0.50REF : 653 Notes for FIG. 3-1ANS : (d)

Q95) In tank floors, the maximum depth of bulge or edge settlement isdependent upon :-(a) Floor thickness; (b) The radius of an inscribed circle in the area;(c) tank diameter; (d) Tank height.REF : 653 APP. “B”ANS : (b)

Q96) Information needed when determining the rate of corrosion :-(a) Original thickness or last inspection thickness;(b) Current thickness;(c) Length of time in service;(d) All of the above.REF : AI 653,ANS : (d)

Charlie Chong/ Fion Zhang

Page 193: Understanding api icp653 reading 12 worksheet 8

Q97) Inspection history as required in the tank records is :-(a) all measurements taken, condition of all parts inspected and a record of all tests and examinations;(b) personnel certification;(c) training records;(d) the as built record from the erector.REF : API 653, 4.8.3ANS : (a)

Q98) ______ inspection may be substituted for a program of external UTthickness measurements :-(a) Hydrostatic; (b) External; (c) Acoustic; (d) Internal.REF : 653 4.3.3.3ANS : (d)

Charlie Chong/ Fion Zhang

Page 194: Understanding api icp653 reading 12 worksheet 8

Q99) Inspection of emergency P/V hatches includes :-(a) Servicing; (b) Removing oil from seals;(c) Action to prevent chattering; (d) Only (a) and (c) above.REF : API 653, appendix C.2.7.4ANS : (d)

Q100) Inspection of insulation :-(a) is not required;(b) is done in routine in-service inspections;(c) requires material traceability records;(d) only (b) and (c) above.REF : API 653, 4.3.1.3ANS : (b)

Charlie Chong/ Fion Zhang

Page 195: Understanding api icp653 reading 12 worksheet 8

Q101) Insulated tanks shall have their insulation removed :-(a) completely prior to inspection;(b) yearly;(c) from welded joints only;(d) to extent necessary to determine the external condition.REF : 653 4.3.2.2ANS : (d)

Q102) Interference current problems in cathodic protection are can beapproached by :-(a) drainage of collected current to sacrificial anodes;(b) design to mimnimise exposure;(c) provide metallic return of collected current to a foreign structured;(d) all of the above.REF : API 651 8.4.1ANS : (d)

Charlie Chong/ Fion Zhang

Page 196: Understanding api icp653 reading 12 worksheet 8

Q103) Internal inspection intervals are determined by corrosion rates. Normally,the corrosion rates govern :-(a) roof; (b) upper shell; (c) bottom; (d) lower shell.REF : API 653 4.4.2.1ANS : (c)

Q104) Internal inspection intervals normally :-(a) are controlled by bottom corrosion rates;(b) shall not exceed 20 years;(c) owner / user is free to set any convenient material;(d) both (a) and (b) above.REF : API 653 4.4.2.1ANS : (d)

Charlie Chong/ Fion Zhang

Page 197: Understanding api icp653 reading 12 worksheet 8

Q105) Internal inspection is primarily to :-(a) all of the below;(b) Ensure that the bottom is not corroded and leaking;(c) Gather data for assessment;(d) Identify and evaluate bottom settlement.REF : API – 653, 4.4.1ANS : (a)

Q106) Intervals between internal inspections shall be determined by thecorrosion rate. Normally, bottom corrosion rates control the inspectioninterval. However, in no case shall the interval inspection interval exceed____ years :-(a) 10; (b) 15; (c) 20; (d) 25.REF : API 653 – 4.4.2.1ANS : (c)

Charlie Chong/ Fion Zhang

Page 198: Understanding api icp653 reading 12 worksheet 8

Quick ReminderCorrosiveness ohm/cm <500 Very corrosive 500-1000 corrosive 1000-2000 moderately corrosive 2000-1000 mildly corrosive >10000 progressive less corrosive

Charlie Chong/ Fion Zhang

Page 199: Understanding api icp653 reading 12 worksheet 8

Q107) Letters and numerals on nameplates shall not be less than inch high.(a) 5/32; (b) 5/16; (c) 3/16; (d) 1/8.REF : 650 8.1.1ANS : (a)

Q108) Liquid penetrant examiners shall be qualified in accordance with ____ :-(a) ASME Section VIII, div. 1 Appendix 8.(b) API 650;(c) ASNT proc. SNT-TC-1A(d) ASME SECTION V, Art 6.REF : 650 6.4.3ANS : (b)

Q109) Magnetic particle examination shall be performed in accordance with awritten procedure that is in compliance with the requirements of :-(a) ASME Section V, Art. 7; (b) ASME Sectin IX, Art. 2;(c) SNT-TC-1A; (d) Appendix C, API 653.REF : 650 6.2.1ANS : (a)

Charlie Chong/ Fion Zhang

Page 200: Understanding api icp653 reading 12 worksheet 8

Q110) Measurement of film thickness of tank bottom linings are taken :-(a) only when the film has completely dried;(b) both before and after the film has dried;(c) in accordance with ASNT;(d) only if there is reason to believe it is thin.REF : API-652, 7.3.2.2ANS : (b).

Q111) Minimum spacing between toes of welds for a radius (R) on a penetrationand other welds of 1.25" plate must be :-(a) 6"; (b) 7.5"; (c) 3"; (d) 1.25"REF : API 653 Figure 7-1ANS : (b)

Charlie Chong/ Fion Zhang

Page 201: Understanding api icp653 reading 12 worksheet 8

Figure 9.1—Acceptable Details for Replacement of Shell Plate Material

Charlie Chong/ Fion Zhang

Page 202: Understanding api icp653 reading 12 worksheet 8

SSPC-SP1—Solvent Cleaning.SSPC-SP3—Power Tool Cleaning.SSPC-SP5 or NACE 1—White Metal Blast Cleaning.SSPC-SP6 or NACE 3—Commercial Blast Cleaning.SSPC-SP7 or NACE 4—Brush-Off Blast Cleaning.SSPC-SP10 or NACE 2—Near-White Blast Cleaning.SSPC-SP11—Power Tool Cleaning to Bare Metal.

Charlie Chong/ Fion Zhang

Page 203: Understanding api icp653 reading 12 worksheet 8

Q112) Minimum thickness calculation for shells of tanks 200 ft. or less in diameter shall be done using ____ :-(a) the variable design point method of API 650;(b) ASME section VII, div. 1;(c) the formula given in API 653;(d) either (a) or (c) may be used.REF : 653 2.3.3.2ANS : (d)

Q113) Acceptance criteria for NDT of reconstructed tanks are to be inaccordance with :-(a) ASME Section VIII; (b) ASME Section V;(c) API 653; (d) API 650.REF : API 650 6.1.5, 6.2.4, 6.3.4ANS : (d)

Charlie Chong/ Fion Zhang

Page 204: Understanding api icp653 reading 12 worksheet 8

Q114) Of the following welding processes, which one is not permitted for welding on above ground storage tanks :-(a) SMAW; (b) GMAW; (c) OFW; (d) SAW.REF : 650 5.2.1.1 ANS : (c)

Q115) On plates more than 3/16 inch thick, the fillet weld thickness shall not beless than 1/3 the thickness of the thinner plat at the joint and shall beAt least :-(a) 1/2 inch; (b) 1/4 inch; (c) 3/16 inch; (d) 9/32 inch.REF : API 650 – 3.1.3.3 ANS : (c)

Q116) On the drawing that the manufacturer shall furnish the purchase, youwould expect to see which of the following information :-a) The required shell thickness for both the design condition (including

corrosiono allowance) and the hydrostatic test condition;b) The nominal thickness used;c) The material specification and allowable stresses;d) All the above.REF : 650 3.6.1.8 ANS : (d)

Charlie Chong/ Fion Zhang

Page 205: Understanding api icp653 reading 12 worksheet 8

Q117) Opening in tank shells larger than required to accommodate a _____ inchstandard-weight coupling shall be reinforced :-(a) 1.0 inch; (b) 1.5 inch; (c) 2.0 inch; (d) 2.5 inch.REF : API 650 – 3.7.2.1ANS : (c)

Q118) Pan-type, pontoon-type and double-deck-type are examples of :-(a) internal roofs; (b) external roofs;(c) both internal and external roofs; (d) roofs on tanks < 200' in dia.REF : API 650 appendixes C & HANS : (c)

Charlie Chong/ Fion Zhang

Page 206: Understanding api icp653 reading 12 worksheet 8

Q119) Per API 650, calculation of shell thickness by the 1-foot method cannot be for tanks :-(a) under 200 ft. in diameter; (b) over 200 ft. in diameter;(c) under 150 ft. in diameter. (d) of any size.REF : 650 3.6.3.1ANS : (b)

Q120) Pinhole leaks or porosity in tank bottom joints may be repaired by :-(a) grinding and out area; (b) penning over affected area;(c) applying additional weld bead over area; (d) mechanical caulking.REF : API 650 – 5.4.2ANS : (c)

Charlie Chong/ Fion Zhang

Page 207: Understanding api icp653 reading 12 worksheet 8

Q121) Piping connections such as nozzles shall be inspected for :-(a) structural adequacy; (b) thickness of component;(c) reinforcement; (d) all of the above.REF : API 653, 2.3.9ANS : (d)

Q122) Plate material thicker than ____ inches shall be normalised or quenchtempered, killed, made to fine grain practice and impact tested :-(a) 2.00; (b) 1.75; (c) 1.50; (d) 1.00REF : 650 2.2.1.4ANS : (c)

Q123) Plates found to be thinner than those in the course above it are :-(a) not allowed;(b) permitted;(c) permitted provided they were so designed;(d) need to be calculated for suitability for service.REF : API 650, 3.6.1.5ANS : (a)

Charlie Chong/ Fion Zhang

Page 208: Understanding api icp653 reading 12 worksheet 8

Q124) Procedure qualification for welding on a tank of unknown or obsoletematerial shall be done using test coupons of :-(a) any P-1 material; (b) any similar type material;(c) material from the same P number grouping; (d) actual material from the tank.REF : 653 9.1.2ANS : (d)

Q125) Procedure requirements for ultrasonic examination of welds :-(a) shall be performed to a written procedure; (b) approved by ASNT;(c) proven to the satisfaction of the inspector; (d) both (a) and (c) above.REF : Section V, T150 cANS : (d)

Q126) Pure hydrocarbon fluids :-(a) usually cause corrosion; (b) require special corrosion control;(b) both (a) and (b); (c) (d) are usually not corrosive.REF : API-651, 1.1.3ANS : (d)

Charlie Chong/ Fion Zhang

Page 209: Understanding api icp653 reading 12 worksheet 8

Q127) Radiographic acceptance standards are found in :-(a) ASME Section VIII, div. 1, para UW-51;(b) ASME Section V, Article 2;(c) API 650, Section 3;(d) API 653, Appendix D.REF : 650 6.1.5ANS : (a)

Q128) Reinforcement pads shall be tested by applying pressure between thetank shell and reinforcement plate using the telltale hole. How much pressure is used to perform this inspection :-(a) 15 psig hydrostatic pressure; (b) 15 psig pneumatic pressure;(c) 5 psig hydrostatic pressure; (d) 5 psig pneumatic pressure.REF : API 650 – 5.3.5ANS : (b)

Charlie Chong/ Fion Zhang

Page 210: Understanding api icp653 reading 12 worksheet 8

Q129) Repairs of cracks in the shell-to-bottom :-(a) are only necessary if they exceed 0.25" in length;(b) are performed on an individual basis, according to extent of damage;(c) may be welded over and left as is without reinspection;(d) both (b) and (c) above.REF : API-653, 2.3.6ANS : (b)

Q130) Resistivity of surrounding soil may be used to determine the probability ofcorrosion on tank bottoms. Which of the following resistivity ranges isconsidered to be very corosive :-(a) < 500; (b) 500 – 1000; (c) 1000 – 2000; (d) < 10,000REF : API 651 – 3.3.1.3 (Table – 1)ANS : (a)

Charlie Chong/ Fion Zhang

Page 211: Understanding api icp653 reading 12 worksheet 8

Q131) Rewelding vertical joints requires cutting horizontal welds back from thejoint a minimum of ____ inches :-(a) 1/2; (b) 1; (c) 2; (d) 12.REF : API 653 Figure 7-1ANS : (d)

132) Flame arresters are to be inspected :-(a) semi-annually;(b) annually;(c) at intervals determined by experience locally;(d) every 5 years.REF : API Chapter XIII 13.4.2.11ANS : (c)

Charlie Chong/ Fion Zhang

Page 212: Understanding api icp653 reading 12 worksheet 8

Q133) Routine visual inspection by Owner / Operator personnel shall be done atleast :-(a) annually; (b) bi-monthly; (c) monthly; (d) semi-annually.REF : 653 4.3.1.2ANS : (c)

134) With a vertical sweep board 36 inches long, banding on reconstructedtanks shall not exceed ____ inch(s) :-(a) 1/2"; (b) 3/4"; (c) 1"; (d) 1 ½".REF : API-653, 8.5.5ANS : (c)

Q135) Scheduled external inspections shall be performed at least :-(a) the lesser of every 5 years of 1/2 corrosion rate of the shell life;(b) the lesser of every 5 years or 1/4 corrosion rate of the shell life;(c) the lesser of every 10 years or 1/2 corrosion rate of the shell life;(d) the lesser of every 10 years or 1/4 corrosion rate of the shell life.REF : API 653 4.3.2.1ANS : (c) (b?)

Charlie Chong/ Fion Zhang

Page 213: Understanding api icp653 reading 12 worksheet 8

Q136) Seal material shall be placed :-(a) between the outer periphery of the roof and the tank shell;(b) around columns, ladders and gauge pipes that penetrate the deck;(c) the seal shall be flexible;(d) all of the above.REF : API 650 Appendix H.3.5ANS : (d)

Q137) Shell penetrations experiencing corrosion must be assessed and :-(a) tank rerated; (b) repair procedures established;(c) tank removed from service; (d) both (a) and (b) above.REF : API 653, 2.3.9ANS : (d)

Q138) Small punctures in floating roof systems :-(a) may be ignored if they have been determined to be non-critical;(b) shall be repaired; (c) shall be replaced;(d) Either (b) or (c) above.REF : API-653 2.2.3.1ANS : (d)

Charlie Chong/ Fion Zhang

Page 214: Understanding api icp653 reading 12 worksheet 8

Q139) Tack welds shall be made using a procedure qualified in accordance withASME Section IX :-(a) Fillet weld; (b) Groove or fillet weld; (c) Special; (d) Butt weld.REF : 650 5.2.1.8ANS : (b)

Q140) Tank grounding shunts shall be inspected :-(a) visually; (b) infrared camera;(c) by a certified electrician; (d) need no inspection.REF : API 653, 4.3.2.4ANS : (a)

Q141) Tanks reconstructed in accordance to API-653 shall be identified with acorrosion-resistant metal nameplate with letters not less than ____" high :-(a) 5/32; (b) 7/32; (c) 9/32; (d) 3/32.REF :-653, 11.1.1ANS : (a)

Charlie Chong/ Fion Zhang

Page 215: Understanding api icp653 reading 12 worksheet 8

Q142) Tests for leaks in reinforcing plate welds require ____ psig :-(a) upto 2.5; (b) upto 15; (c) upto 21; (d) upto 30.REF : API 653/10.4 & 650 5.3.5ANS : (b)

Q143) The "critical zone" for tank bottom repairs is the area within the annularplate ring, within inches of the shell or within inches of the inside edge ofthe annular plate ring:-(a) 12, 6; (b) 6, 12; (c) 12, 12; (d) 6, 6REF : 653, 7.9.11ANS : (c)

Charlie Chong/ Fion Zhang

Page 216: Understanding api icp653 reading 12 worksheet 8

Q144) The "L" in actual thickness determination for each shell course :(a) may be greater than 40";(b) is valid only when corroded area is less than 40";(c) applies even if corroded area is greater than L;(d) requires converting "D" from feet to inches.REF : API 653, 2.3.2.1 See NoteANS : (c)

145) The 6 G position for welding is a :-(a) Qualification position; (b) Production welding position;(c) Rod position; (d) Rank position.REF : IX QW-120ANS : (a)

Q146) The API 653 standard covers the maintenance inspection, repairs,alteration, relocation and reconstruction of tanks constructed to which oneof the following standards :-(a) ASME; (b) API 651; (c) API 65; (d) API 650.REF : 653 1.1.1ANS : (d)

Charlie Chong/ Fion Zhang

Page 217: Understanding api icp653 reading 12 worksheet 8

Q147) The assessment period for inspection of tank bottom integrity is :-(a) is always 5 years;(b) is fixed by corrosion rate;(c) less than or equal to the appropriate internal inspection interval givenin API-653 4.4.2(d) determined by the designer.REF : API-653, 2.4.1ANS : (c)

Q148) The complete or partial removal and replacement of more than 12 inchesof a vertical weld joining shell plates is considered a :-(a) minor alteration; (b) minor repair;(c) major alteration; (d) major repair.REF : 653 10.3.1.2 (c)ANS : (d)

Charlie Chong/ Fion Zhang

Page 218: Understanding api icp653 reading 12 worksheet 8

Q149) The definition of a confined space is :-(a) large enough to enter;(b) restricted means of entry;(c) not designed for continuous occupancy;(d) (d) all of the above are required.REF : API 2015 1.4ANS : (d)

Q150) The determining factor for intervals between internal and externalinspections :-a) Change of service to a higher specific gravity;b) Tank service history provided earlier inspection is not required by special

reasons;c) Corrosion activity either known or suspected.d) Governmental regulationsREF : 653 4.4.2.1ANS : (b)

Charlie Chong/ Fion Zhang

Page 219: Understanding api icp653 reading 12 worksheet 8

Q151) The difference between peaking and banding is :-(a) peaking pertains to the roof;(b) (b) banding is external to the tank;(c) peaking pertains to vertical weld seams, banding pertains to horizontal weld

seams;(d) peaking pertains to horizontal weld seams, banding pertains to vertical weld

seams.REF : General KnowledgeANS : (c)

Q152) The first checks for tanks out-of-service are :-(a) (b) and (d) below; (b) cleaned, gas freed and safe for entry;(c) hammer test the roof; (d) complete isolation.REF : API 653 Table C-2.1 a & bANS : (a)

Charlie Chong/ Fion Zhang

Page 220: Understanding api icp653 reading 12 worksheet 8

Q153) The flammable range is when a vapour exists :-(a) above the ambient temperature;(b) between the lower flammable limit and the upper flammable limit;(c) between the extremes of the lower flammable limit;(d) between the extremes of the upper flammable limit;REF : API 20151.3.10ANS : (b)

Q154) The formula for maximum bulge or depression of a tank bottom is :-(a) B = 0.37 R, gives an Answer in feet;(b) B = 0.37 R gives an Answer in inches;(c) B + 0.37" is the minimum;(d) B = 0.37 + RREF : API 653 B.3.3ANS : (d) (b?)

Charlie Chong/ Fion Zhang

Page 221: Understanding api icp653 reading 12 worksheet 8

Q155) The general shape of gas cavities on a radiograph :(a) appear darker in contrast with areas of defect-free material;(b) are generally round in shape;(c) are acceptable;(d) both a and b.REF : General KnowledgeANS : (d)

Q156) The Heat Affected Zone is :-(a) that portion of the base metal which has not been melted;(b) whose mechanical properties or micro structures have been altered by the

heat of welding;(c) is least likely to contain discontinuities;(d) both (a) and (b) above.REF : Section IX, QW-492ANS : (d)

Charlie Chong/ Fion Zhang

Page 222: Understanding api icp653 reading 12 worksheet 8

Q157) The inspection interval for a tank is determined by :-(a) size; (b) service history;(b) the manufacturer; (d) type of tank.REF : 653 4.2.2ANS : (b)

Q158) The lower flammable limit (LFL) is the concentration of a flammablevapour in air that will ignite :-(a) approximate; (b) maximum; (c) average; (d) minimum.REF : 2015 1.3.1ANS : (d)

Q159) The maximum acceptable undercutting for base metal in repaired oraltered horizontal welds is :-(a) 1/64"; (b) 1/32"; (c) 1/16"; (d) 1/8"REF : API-653, 8.4.2.5ANS : (b)

Charlie Chong/ Fion Zhang

Page 223: Understanding api icp653 reading 12 worksheet 8

Q160) The maximum acceptable undercutting for base metal in vertical weldsis :-(a) 1/64"; (b) 1/32"; (c) 1/16"; (d) 1/8,ANS : (a)

Q161) The maximum interval between internal inspections shall not exceed ____years :-(a) 10; (b) 20; (c) 5; (d) 15.REF : 653 4.4.2.1ANS : (b) (25 W.O RPB/ 30 RBB)

Q162) The maximum spacing between settlement measurement points shall be :-(a) 30 ft.; (b) 20 ft.; (c) 40 ft.; (d) 25 ft.REF : 653 APP. “B”ANS : (a) (32’)

Charlie Chong/ Fion Zhang

Page 224: Understanding api icp653 reading 12 worksheet 8

Q163) The minimum dimension for replacement shell plate is 12 times t or ____inches :-(a) 8; (b) 18; (c) 6; (d) 12.REF : API 653 7.2.2.1ANS : (d)

Q164) The minimum (maximum) interval for external inspection by a qualified inspector is____ years or at the quarter corrosion-rate life of the shell, whichever is less :-(a) Twenty; (b) Five; (c) Ten; (d) Fifteen.REF : API-653, 4.3.2.1, 4.4.2.1ANS : (b)

Charlie Chong/ Fion Zhang

Page 225: Understanding api icp653 reading 12 worksheet 8

Q165) The minimum size of a fillet weld is which of the following :-(a) On plate 3/16 inch thick, the weld shall be a full-fillet weld, and on plates

more than 3/16 inch thick, the weld thickness shall not be less than 1/3 the thickness of the thinner plate at the joint and shall be at least 3/16 inch.

(b) On plate 5/16 inch thick, the weld shall be a full-fillet weld, and on plates more than 5/16 inch thick, the weld thickness shall not be less than 1/3 the thickness of the thinner plate at hte joint and shall be at least 3/16 inch.

(c) On plate 3/16 inch thick, the weld shall be a full-fillet weld, and on plates more than 5/16 inch thick, the weld thickness shall not be less than 1/3 the thickness of the thinner plate at the joint and shall be at least 5/16 inch.

(d) On plate 1/4 inch thick, the weld thickness shall not be less than 1/3 the thickness of the thinner plate at the joint and shall be at least 1/4 inch. REF : API-650 3.1.3.3

ANS : (a)

Q166) The minimum thickness of an annular plate ring is usually greater than :-(a) 0.10; (b) 0.25; (c) 0.0625; (d) 0.1875.REF : 653 2.4.8.1ANS : (a)

Charlie Chong/ Fion Zhang

Page 226: Understanding api icp653 reading 12 worksheet 8

Q167) The permissible exposure limit (PEL) is the maximum ____ time-weighedaverage of any airborne contaminant to which an employee may beexposed :-(a) 8 hour; (b) 24 hour; (c) 4 hour; (d) 1 hour.REF : 2015 1.3.8ANS : (a)Q168) The proper method for dismantling tank bottoms that are to be reusedshall be cut by:-(a) deseaming of lap welds;(b) cutting alongside remaining welds at a minimum of 2 inches from existing

welds;(c) cutting alongside remaining welds at a minimum of 3 inches from existing

welds;(d) Both (a) and (b) are acceptable.REF : API 653-8.3.2.1ANS : (d)

Charlie Chong/ Fion Zhang

Page 227: Understanding api icp653 reading 12 worksheet 8

Q169) The purchaser has not specified the use of 1-foot method for calculatingthickness and L/H≤ 2, therefore, what is the shell plate thickness for the firstcourse for the following tank design ?Height = 40 feetDiameter = 260 feetStress @ test condition = 30,000 psiSpecific gravity = 1.0Course Length = 8 feetCorrosion Allowance = 0Joint Efficiency = .0(a) 1.209"; (b) 1.171"; (c) 0.856"; (d) 1.038“REF : 650 3.6.4.3 Table K-2ANS : (c)

Q170) The purpose of electrical grounding of A/C power connections is :-(a) protect against lightening; (b) corrosion control for tank bottoms;(c) personal safety; (d) corrosion control for tank shells;REF : API 651, 1.1.1ANS : (c)

Charlie Chong/ Fion Zhang

Page 228: Understanding api icp653 reading 12 worksheet 8

Q171) The root opening for square grooves for butt-welded bottom plate shall not be less than :-(a) 1/2 inch; (b) 1/4 inch; (c) 3/16 inch; (d) 9/32 inch.REF : API 650 – 3.1.5.5ANS : (b)

Q172) The sequence of welding of the shell-to-bottom :-(a) is the welder's option;(b) is not addressed;(c) is completed after the bottom joints are fully welded;(d) must be completed before the welding of bottom joints.REF : API-653, 8.4.3.2ANS : (d)

Charlie Chong/ Fion Zhang

Page 229: Understanding api icp653 reading 12 worksheet 8

Q173) The shell plate formula tmin = 2.6(H-1)DG/SE(a) only (b) and (c) below;(b) is only valid if tmin is not les than 0.1";(c) applies only to tanks less than 200' in diameter;(d) does not apply to riveted construction.REF : API 653 2.3.3.1ANS : (c) (a?)

Q174) The tank shall be cleaned and ____ prior to commencement ofdismantling :-(a) gas-freed; (b) inspected; (c) surveyed; (d) cleaned;REF : API-653, - 8.2ANS : (a)

Q175) The thickness to be used for each shell course when checking the tankdesign after reconstruction shall be based on measurements taken within____ days prior to relocation :-(a) 45; (b) 90; (c) 180; (d) 360.REF : API-653, 6.4.1ANS : (c)

Charlie Chong/ Fion Zhang

Page 230: Understanding api icp653 reading 12 worksheet 8

Q176) The types of tanks covered by API 653 are :-(a) non-refrigerated;(b) vertical, cylindrical, above ground closed and open top;(c) built to API 650 and 12 C;(d) All of the above.REF : API 650-1.1.1 and 653-1.1.1ANS : (d)

Q177) The upper flammable limit (UFL) is the concentration of a flammablevapour in air that will ignite :-(a) approximate; (b) maximum; (c) average; (d) minimum.REF : 2015 1.3.2ANS : (b)

Q178) The variable design point method shall be used for tanks greater than____ in diameter :-(a) 50'; (b) 200'; (c) 150'; (d) 200'.REF : API-653, 2.3.3.3ANS : (d)

Charlie Chong/ Fion Zhang

Page 231: Understanding api icp653 reading 12 worksheet 8

Q179) Thick-film internal linings :-(a) are frequently used as an alternative to replacing the steel bottom;(b) are prohibited from use as an alternative to replacing the steel bottom;(c) removes the need for external cathodic protection;(d) removes the need for external anodic protection.REF : API 651 3.4.4ANS : (a)

Q180) Thickness readings taken on a tank shell after 5 years of service show aminimum thickness of 0.420 inches. The data sheet shows the originalthickness as 0.5 inches. What is the corrosion rate for the tank :-(a) 0.008; (b) 0.0016; (c) 0.016; (d) 0REF : API-653 4.3.3.22ANS : (c)

Charlie Chong/ Fion Zhang

Page 232: Understanding api icp653 reading 12 worksheet 8

Q181) Three different methods of conducting "Visual Examinations" (VT) :-(a) Direct, indirect and previously recorded;(b) Translucent, direct and previously recorded;(c) Translucent, direct and indirect or (remote visual examination)(d) all of the above.REF : Sec. V, T940, T941, T942, T943ANS : (c)

Q182) Three types of external inspections are :-(a) scheduled, routine and liquid penetrant;(b) scheduled, routine and UT thickness;(c) scheduled out of service, routine and UT thickness;(d) unscheduled, routine and liquid penetrant.REF : API 653-4.3.1, 4.3.2 & 4.3.3ANS : (b)

Charlie Chong/ Fion Zhang

Page 233: Understanding api icp653 reading 12 worksheet 8

Q183) To be an alteration a nozzle must be :-(a) 12" or greater NPS nozzles; (b) greater than 12" NPS nozzles;(c) greater than 2" NPS nozzles; (d) greater than 10" NPS nozzles.REF : API 653, 1.5.1 (a)ANS : (b)

Q184) To be certified under the program which of the following educational andexperience requirements must be met :-(a) A degree in engineering plus 6 months of experience in inspection of tanks,

pressure vessels, or piping;(b) A two-year certificate in engineering or technical college and two years of

experience in construction, repair, operation, or inspection of tanks, pressure vessels or piping;

(c) The equivalent of a high school education and three years of experience in construction, repair, operation or inspection of which one year must be in inspection of tanks, pressure vessels or piping;

(d) Four years of experience in the inspection of above ground storage tanks in petroleum / chemical industries.

REF : 653 4.10ANS : (c)

Charlie Chong/ Fion Zhang

Page 234: Understanding api icp653 reading 12 worksheet 8

Q185) To evaluate tank settlement, elevation measurements are performed andcompared with measurements marked just after construction. Where arethese measurements made ?(a) Tank circumference, tank height; (b) Tank diameter, tank height;(c) Tank height, tank base; (d) Tank circumference, tank diameter.REF : API-653, Appendix B.2.ANS : (d) (?)

Q186) To qualify a GMAW, short circuit transfer, welding procedure :-(a) Radiography may be used;(b) Tension tests and transverse bend test are required;(c) May be omitted if another manufacturer has a qualified WPS;(d) Require bend tests only.REF : Section IX, QW-202.1ANS : (b)

Charlie Chong/ Fion Zhang

Page 235: Understanding api icp653 reading 12 worksheet 8

Q187) Top decks of external floating roofs (double deck or pontoon type) whichare designed with are designed with a permanent slope for drainage shallhave a minimum slope of ____ inch in 12 inches :-(a) 3/16; (b) 1/2; (c) 1/4; (d) 3/8.REF : API-650 APP-C C.3.3.4ANS : (a) (1:64)

Q188) Underun on plate not more than inch from the computed design thicknessor minimum permitted thickness is acceptable :-(a) 0.01; (b) 0.02; (c) 0.03; (d) 0.04.REF : API 650, 2.2.1.2.3ANS : (a)

Charlie Chong/ Fion Zhang

Page 236: Understanding api icp653 reading 12 worksheet 8

Q189) Unless otherwise agreed to by the purchaser, what is the minimumnominal width of a shell plate ?(a) 36 inches; (b) 48 inches; (c) 72 inches; (d) 96 inches.REF : 650 3.6.1.2ANS : (c) (72’ x 48’)

Q190) UT examination methods shall be in accordance with :-(a) ASME Code Section V, Article 5; (b) ASME Code Section II, Article 5;(c) API 653; (d) ASME Code Section IX, Article 2.REF : 650 6.3.1ANS : (a)

Q191) Vertical welds must be fully radiographed if the shell thickness exceedsinches :-(a) 3/4; (b) 1; (c) 1 1/4; (d) 1 1/2.REF : API-650 6.1.2.2 (C)ANS : (b)

Charlie Chong/ Fion Zhang

Page 237: Understanding api icp653 reading 12 worksheet 8

Q192) Visual examination shall be done in accordance with :-(a) ASME Section V, Article 9; (b) API 650;(c) AWS Guidelines; (d) ASME B-31.1, Chapter VI.REF : 650 5.2.1.8 & 6.5ANS : (b) (b-ok)

Q193) Welded joints that have experienced metal loss due to corrosion :-(a) must be X-Rayed prior to further use;(b) may be repaired by welding;(c) may be repaired by grinding;(d) all of the above.REF : API 653, 7.5.3ANS : (b)

Q194) Welder identification is not required for :-(a) lap welds; (b) corner joints;(c) fillet welds around opening; (d) roof plate welds.REF : 650 7.4ANS : (d) (d-ok)

Charlie Chong/ Fion Zhang

Page 238: Understanding api icp653 reading 12 worksheet 8

Q195) Welder or welding operator's identification marks shall be located adjacent to completed welds at intervals not exceeding :-(a) 9 feet;(b) 6 feet;(c) 3 feet;(d) As identified on the approved welding procedure specification.REF : API 653 – 9.2.1ANS : (c)

Q196) Welders qualifications shall expire as they do not weld :-(a) within a given process for a 6 month period;(b) using a given procedure for a 6 month period;(c) on a tank for 6 months;(d) for a 3 month period.REF : IX QW-322ANS : (a)

Charlie Chong/ Fion Zhang

Page 239: Understanding api icp653 reading 12 worksheet 8

Q197) Welding filler metals are grouped into groupings based on their AWSclassification:-(a) P-numbers; (b) F-numbers;(c) Z-numbers; (d) ASTM spec.REF : IX QW-432ANS : (b)

Q198) Welding Procedure Specifications (WPS), and welders and weldingoperators must be qualified in accordance with ____ :-(a) API-653; (b) API-650;(c) Section V of the ASME; (d) Section IX of the ASMEREF : API-653, 9.1.1ANS : (d)

Charlie Chong/ Fion Zhang

Page 240: Understanding api icp653 reading 12 worksheet 8

Q199) Welding procedures are qualified in accordance with ____(a) ASME Section IX, Art. 3; (b) ASME Section V, Art. 2;(c) ASME Section IX, Art. 2; (d) AWS D-1.1REF : IX Article 2ANS : (c)

Q200) What are penetrameters used for :-(a) A penetrameter is used for evaluating radiographic technique in that it serves

as an image quality indicator;(b) It indicates the magnetic properties of the materials;(c) Is the same as penetration in Ultrasonic Inspection;(d) both (a) and (c) above.REF : SECTION V, T233, T262ANS : (a)

Charlie Chong/ Fion Zhang

Page 241: Understanding api icp653 reading 12 worksheet 8

Q201) What are the two general approaches for determining minimumthicknesses of tank bottom plate and briefly describe their differences :-(a) Deterministic and Probabilistic;(b) Probabilistic and Actualistic;(c) Actualistic and Deterministic;(d) Variable design and Actual thickness determination.REF : API-653, 2.4.7ANS : (a)

Q202) What are the two methods of guided-bend tests permitted by ASMESection IX ?(a) Bottom ejection method and Wrap around method;(b) Top ejection method and Bottom ejection method;(c) Side ejection method and Wrap around method;(d) All to the above.REF : Section IX, QW-162ANS : (a)

Charlie Chong/ Fion Zhang

Page 242: Understanding api icp653 reading 12 worksheet 8

Q203) What diameter bolt circle is required and how many bolts for a 24 inch roof manhole?(a) 26.0 inch diameter bolt circle and 18 bolts;(b) 25.5 inch diameter bolt circle and 20 bolts;(c) 27.5 inch diameter bolt circle and 16 bolts;(d) 27.5 inch diameter bolt circle and 20 bolts.REF : API 650 – 3.8.4ANS : (d)

Q204) What F number is E70T1 electrodes classified as :-(a) 1; (b) 2; (c) 4; (d) 6.REF : QW-432ANS : (d)

Charlie Chong/ Fion Zhang

Page 243: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Page 244: Understanding api icp653 reading 12 worksheet 8

Q205) What is calcination :-(a) An accumulation of a mineral coating on the lining of the tank;(b) Increase of water of hydration;(c) Loss of water of hydration;(d) Form of tank deterioration.REF : API-653, 2.5.1.2ANS : (c)

Q206) What is meant by "non destructive examination" of a welded joint ?(a) An examination of a welded joint that will disclose surface and subsurface

discontinuities without physical harm to the welded joint;(b) An examination of a bolted joint;(c) An examination of a welded joint that will disclose surface and subsurface

discontinuities that may cause physical harm to the welded joint.(d) An examination of a welded joint that will disclose only surface

discontinuities without physical harm to the welded joint.REF : Section V, T110ANS : (a)

Charlie Chong/ Fion Zhang

Page 245: Understanding api icp653 reading 12 worksheet 8

Q207) What is MRT2 as used by the deterministic method ?(a) Minimum remaining thickness due to maximum internal pitting and average

external pitting;(b) Maximum remaining thickness that can be used for calculations;(c) Maximum reported thickness minus all corrosion;(d) Minimum remaining thickness due to average internal p itting andmaximum external pitting.REF : 2.4.7.1ANS : (a) (?)

Q208) What is the 42 gallon barrel capacity of a tank 110 feet in diameter, 24 feet high, joint efficiency is 0.85, specific gravity = 1.0, corrosion allowance = 0.(a) 34,303; (b) 38,909; (c) 39,910; (d) 40,656.REF : API 650 – Appendix A Table A-1 C = 0.14D2HANS : (d) (C = 0.14D2H)

Charlie Chong/ Fion Zhang

Page 246: Understanding api icp653 reading 12 worksheet 8

Q209) What is the allowable stress at root of anchor bolt threads for a tank with a design pressure up to 2.5 psig ? Uplift is based on tank design pressureand wind.(a) 15,000; (b) 20,000; (c) 25,000; (d) 30,000.REF : API 650 – F.7, Table F-1ANS : (b)

Q210) What is the capacity of a tank 110 feet in diameter, 24 feet high, jointefficiency is 0.85, specific gravity is 1.0, corrosion allowance = 0 ?(a) 34,303; (b) 38,909; (c) 39,910; (d) 40,656.REF : 650 Table A-1ANS : (d)(C = 0.14D2H)

Q211) What is the distance from the centre pipe to shell for a 3 inch nominal pipe size, 36 diameter draw off sump, which is 18 inched deep ?(a) 2.1875'; (b) 3.2343'; (c) 5.0000'; (d) 5.3780'REF : API 650 - 3.8.6ANS : (c)

Charlie Chong/ Fion Zhang

Page 247: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Page 248: Understanding api icp653 reading 12 worksheet 8

Q212) What is the distance in inches, that both a roof plate or a shell bottommust be cut from the weld when dismantling a shell tank :-(a) One; (b) Two; (c) Four; (d) Six.REF : API-653, 8.3.2; API-653, 8.3.4.1ANS : (b)

Q213) What is the expected service life for a properly applied tank bottom lining ?(a) 5 – 10 years; (b) 10 – 15 years;(c) 10 – 20 years; (d) 20 – 30 years.REF : API 652 3.6 and 8.1ANS : (c)

Q214) What is the flammable range for Methane ?(a) 1 – 5; (b) 2 – 8; (c) 2 – 9; (d) 5 – 15.REF : 2015 – 3.2 (Table – 1)ANS : (d)

Charlie Chong/ Fion Zhang

Page 249: Understanding api icp653 reading 12 worksheet 8

Q215) What is the maximum acceptable undercutting of new constructed basemetal for vertical butt joints ?(a) 1/4 inch; (b) 1/8 inch; (c) 9/32 inch; (d) 1/64 inch.REF : API 650 - 5.2.1.4ANS : (d)

Q216) What is the maximum acceptable undercutting of new construction basemetal for horizontal joints ?(a) 1/4 inch; (b) 1/8 inch; (c) 1/32 inch; (d) 1/64 inch.REF : API 650 – 5.2.1.4ANS : (c)

Charlie Chong/ Fion Zhang

Page 250: Understanding api icp653 reading 12 worksheet 8

Q217) What is the maximum depth of a depreciation, oval in shape, whichmeasures 18 feet long by 11 feet wide ?(a) 6.6"; (b) 24.42"; (c) 4.07"; (d) 2.035".REF : 653 APP. “B” B-5ANS : (d) (BB=0.37R = 2.035)

Q218) What is the maximum depth of edge settlement if the distance from theinside of the shell to the bend point of the depression is 7 feet ?(a) 2.59"; (b) 1.295"; (c) 5.18"; (d) 31.08".REF : 653 APP. “B”ANS : (a) (D=?)

Charlie Chong/ Fion Zhang

Page 251: Understanding api icp653 reading 12 worksheet 8

Q219) What is the maximum interval between external UT thicknessmeasurements for a tank, given the following information ? Remaining CA= 0.064", Corrosion rate is 0.008" per year.(a) 5 yrs; (b) 4 yrs;(c) 8 yrs; (d) 3 – 1/2 yrs.REF : 653 4.3.3.2ANS : (b)

Q220) What is the maximum out-of-plumbness of a new tank from the top of shell relative to the bottom of the shell ?(a) 1/100 of the total tank height; (b) 1/50 of the total tank height;(c) 1/60 of the total tank height; (d) 1/200 of the total tank height.REF : API 650 – 5.5.2ANS : (d)

Charlie Chong/ Fion Zhang

Page 252: Understanding api icp653 reading 12 worksheet 8

Q221) What is the maximum reinforcement allowed on a 1/2" thick vertical buttweld made on a reconstructed tank ?(a) 3/16; (b) 3/32; (c) 1/8; (d) 1/4.REF : API-653, 8.4.2.6ANS : (b)

Q222) What is the maximum spacing between settlement measurement points ?(a) 20 feet; (b) 30 feet; (c) 35 feet; (d) 50 feet.REF : API 653 – 10.5.1.2ANS : (b) (32)

Q223) What is the maximum thickness of weld reinforcement for a 0.5625 inchplate ?(a) 1/16; (b) 3/32; (c) 1/8; (d) 3/16.REF : API 650 – 6.1.3.4ANS : (b) (RT?)

Charlie Chong/ Fion Zhang

Page 253: Understanding api icp653 reading 12 worksheet 8

Q224) What is the minimum acceptable shell plate thickness for a tank shellmade of A 283 grade C material, 70 feet in diameter and 50 feet high ?Specific gravity of contents is 0.8. Original joint efficiency was 100 %.(a) 0.356; (b) 0.339; (c) 0.480; (d) 0.304.REF : API-653 2.3.3.1ANS : (d) (S=23600, tmin=0.302”)

Q225) What is the minimum allowable density through the image of thepenetrameter for radiographs made with a 2000 kv tube ?(a) 1.8 – 4.0; (b) 1.3 – 2.8; (c) 2.0 – 4.0; (d) 1.3 – 1.8;REF : Sec. V, T-282.1 ANS (a)REF : Sec. V, T-282.1ANS : (b) 2.0 – 4.0 (for any gamma source – anything besides a tube)(a?)

Charlie Chong/ Fion Zhang

Page 254: Understanding api icp653 reading 12 worksheet 8

Q226) Windgirders are evaluated for :-(a) Corrosion of structural elements; (b) attachment welds;(c) the same evaluation as for shell stiffeners; (d) all of the above.REF : API 653 2.3.7ANS : (d)

Q227) What is the minimum nominal shell thickness required when the normaltank diameter is less than 50 feet ?(a) 3/16; (b) 1/4; (c) 5/16; (d) 3/8.REF : API-650 3.6.1.1ANS : (a)

Q228) What is the minimum nominal thickness for bottom plates, exclusive of anycorrosion allowance ?(a) 3/16 inch; (b) 1/4 inch; (c) 5/16 inch; (d) 7/16 inch.REF : 650 3.4.1ANS : (b)

Charlie Chong/ Fion Zhang

Page 255: Understanding api icp653 reading 12 worksheet 8

Q229) What is the minimum number of settlement measurement points ?(a) 4; (b) 6; (b) 8; (d) 10.REF : API 653 – 10.5.1.2ANS : (c)

Q230) What is the minimum permissible design metal temperature for a 280 footdiameter tank, 75 feet high, tank radius is 1,680 inches, plate materialordered is 1.125" (including corrosion allowance) A 516 – 555 as rolled,killed fine-grain practice without impact testing :-(a) + 8; (b) 0;(c) – 4; (d) All Material must be impact tested.REF :API 650 - 2.2.9.2 (Fig. 2-1)ANS : (c)

Q231) What it the minimum permitted density of radiographic film using anIridium source ?(a) 2.0; (b) 1.8; (c) 1.3; (d) 4.0REF : V-T282.1ANS : (a)

Charlie Chong/ Fion Zhang

Page 256: Understanding api icp653 reading 12 worksheet 8

Q232) What is the minimum required number of settlement measurement pointsfor a 200' diameter tank ?(a) 10; (b) 8; (c) 21; (d) 20.REF : API 653 – 10.5.1.2ANS : (c) (d?)

Q233) What is the minimum thickness of bolting flange and cover plate for a 24 × 24 size flush-type cleanout to be installed in a tank having maximum height of53 feet :-(a) 1/16; (b) 1/8; (c) 3/16; (d) 9/16.REF : API 650 – 3.7.7 (Table 3-12)ANS : (d)

Charlie Chong/ Fion Zhang

Page 257: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Page 258: Understanding api icp653 reading 12 worksheet 8

Q234) What is the calculated minimum thickness of shell plates from the stresson vertical joints for a field-erected small capacity tank, which has adiameter of 30 feet, height of 36 feet, joint efficiency is 0.85, specificgravity is 1.0, with a corrosion allowance of 0.125 ?(a) t = 0.1529; (b) t = 0.1875;(c) t = 0.2779; (d) t = 0.3125.REF : API 650 – A.4 (See 3.6.1.1)ANS : (c) (d?)

Q235) What is the minimum weld length that must be shown oneach radiograph ?(a) 2 inches; (b) 3 inches; (c) 4 inches; (d) 5 inches.REF : API 650 – 6.1.2.8ANS : (b) (minimum diagnostic length= 6”?)

Charlie Chong/ Fion Zhang

Page 259: Understanding api icp653 reading 12 worksheet 8

Q236) What is the most common protective cushion for aboveground storagetanks ?(a) Clean sand; (b) Clay; (c) Gravel; (d) Carbonaceous.REF : API – 651, Section 3ANS : (a)

Q237) What is the nominal shell thickness required when the nominal tankdiameter is less than 50 feet ?(a) 3/16 inch; (b) 1/4 inch; (c) 5/16 inch; (d) 3/8 inch.REF : 650 3.6.1.1ANS : (a)

Charlie Chong/ Fion Zhang

Page 260: Understanding api icp653 reading 12 worksheet 8

Q238) What is the radii tolerance measured at 1 foot above the shell to bottomfor a reconstructed 125 foot diameter tank ?(a) +/- 1/2; (b) +/- 3/4; (c) +/- 1; (d) +/- 1 1/4.REF : 653 8.5.3ANS : (b)

Q239) What is the title of API Publication 2015A ?(a) "Guide for Controlling the Lead Hazard Associated with Tank Entry andCleaning.“(b) "Cleaning Open-Top and Covered Floating-Roof Tanks"(c) "Guidelines for Confined Space Work in the Petroleum Industry"(d) "Welded Steel Tanks for Oil Storage"REF : API-653, 1.6ANS : (a)

Charlie Chong/ Fion Zhang

Page 261: Understanding api icp653 reading 12 worksheet 8

Q240) What must be done to the tank prior to dismantling to insure properalignment after the tank is reconstructed ?(a) At least four sets of matching centre punch marks should be placed at the

top and bottom edges of each shell plate.(b) At least two sets of matching centre punch marks shall be placed at the top

and bottom edges of each shell plate.(c) At least three alignment tabs shall be tack welded to the top and bottom

edges of the each shell plate.(d) At least two sets of matching centre punch marks may be placed at the top

and side edges of each shell plate.REF : API-653, 8.3.5.2ANS : (b)

Q241) What are NDE methods and to what extent shall they be used for theexamination of repairs to butt welds ?(a) MT and PT over full length; (b) MT and PT spot;(c) UT and RT over full length; (d) UT or RT over full length.REF : API 653 – 10.1.3.2ANS : (d)

Charlie Chong/ Fion Zhang

Page 262: Understanding api icp653 reading 12 worksheet 8

Q242) What of the following are not principal causes of shell distortion :-(a) Thinning caused by corrosion; (b) Foundation settlement;(c) Over-or under-pressuring; (d) High wind.REF : API-653, 2.3.5ANS : (a)

Q243) What percentage of selected spot radiography shall be at junctions ofvertical and horizontal joints ?(a) 15 %; (b) 20 %; (c) 25 %; (d) 50 %.REF : API 650 – 6.1.2.2ANS : (c)

Q244) What size diameter cover plate is required for a 20 inch roof manhole ?(a) 22 inch; (b) 24 inch; (c) 26 inch; (d) 28 inch.REF : API 650 3.8.4ANS : (c)

Charlie Chong/ Fion Zhang

Page 263: Understanding api icp653 reading 12 worksheet 8

Q245) What size penetrameter is required for RT of a tank 0.75 inches thick ?(a) 17; (b) 20; (c) 25; (d) 1.REF : ASME V Article 2ANS : (a)

Q246) What spacing must be used for a settlement survey of a 100’ diametertank ?(a) 31.4’; (b) 30’; (c) 28.56’; (d) 31’4”.REF : API 653 2.3.3.1ANS : (c)

Charlie Chong/ Fion Zhang

Page 264: Understanding api icp653 reading 12 worksheet 8

Q247) When a new nameplate is attached, the existing nameplate :-(a) is removed;(b) is covered by the new name plated;(c) is located next to the new name plate;(d) is left for the owner / user to keep on fileREF : API-653, 11.1.2ANS : (c)

Q248) When alternative inspection intervals are selected, the owner / user :-(a) shall document the procedure and make it part of the permanent record;(b) alternatives are not allowed;(c) alternative method shall include method for determining bottom plate

thickness;(d) both (a) and (c) above.REF : API 653 4.4.3ANS : (d)

Charlie Chong/ Fion Zhang

Page 265: Understanding api icp653 reading 12 worksheet 8

Q249) When calculating the maximum liquid level for reconstructed tanks, therequired corrosion allowance shall be :-(a) deducted from the actual thickness before calculating maximum liquid level;(b) added to actual thickness before calculating maximum liquid level;(c) not be considered when calculating maximum liquid level;(d) deducted from the original design thickness.REF : API 653 – 6.4.4ANS : (a)

Q250) When changing a non-essential variable on a welding procedure, theprocedure must be :-(a) revised; (b) requalified;(c) no action required; (d) re-written as a new procedure.REF : IX QW-200.1ANS : (a)

Charlie Chong/ Fion Zhang

Page 266: Understanding api icp653 reading 12 worksheet 8

Q251) When concrete ringwalls are provided under the shell, the top of theringwall shall be level with ______ inch in the total circumferencemeasured from the average elevation :-(a) 1/4; (b) 1/8; (c) 3/8; (d) 5/16.REF : API 650 – 5.5.5.2 aANS : (a)

Q252) When determining average thickness in a corroded area of a shell, aminimum of equally paced measurements shall be taken over a length of L.(a) 10; (b) 5; (c) 8; (d) 6.REF : 653 2.3.2.1 (c)ANS : (b)

Charlie Chong/ Fion Zhang

Page 267: Understanding api icp653 reading 12 worksheet 8

Q253) When evaluating roof support systems, special attention should be paid to:(a) Rafters; (b) Prior repairs;(c) Distortions; (d) The possibility of severe internal corrosion of pipe columns.REF : API – 653, 2.2.2ANS : (d)

Q254) When is pitting an important factor in determining tank shell acceptability ?(a) When pits are 1/4" in diameter;(b) When the pits are 1/8” in diameter.(c) When the pits are present in a severe form in close proximity.(d) Pitting always represents a significant threat.REF : API-653, 2.3.1.3; 2.3.2.2ANS : (c)

Q255) When liquid penetrant is specified, the method of examination shall be inaccordance with one of the following :-(a) ASME, Section V, Article 6; (b) API-650, Section 6;(c) API-653, Section 6; (d) ASME, Section 8, Article 6.REF : 650 6.4.1 ANS : (a)

Charlie Chong/ Fion Zhang

Page 268: Understanding api icp653 reading 12 worksheet 8

Q256) When preparing the surface for lining, the abrasive blasting should not beperformed if the temperature of the steel surface is less than ____ abovethe dew point or if the relative humidity is greater than ____ %.(a) 10 degrees, 75 %; (b) 5 degrees, 80 %;(c) 10 degrees, 80 %; (d) 5 degrees, 75 %.REF :API-652, 5.4ANS : (b)

Q257) When replacing rim-mounted shoe seals on a floating roof, no more than____ of the seal should be out of service at any one time.(a) 1/4; (b) 1/2; (c) 1/3; (d) 1/8.REF : API-653 7.12.1ANS : (a)

258) When required, a set of Charpay V-notch impact specimens shall betaken :-(a) Before heat treatment; (b) After heat treatment;(c) Either before or after; (d) Both before and after heat treatment.REF : API 650 2.2.8.1 ANS : (b)

Charlie Chong/ Fion Zhang

Page 269: Understanding api icp653 reading 12 worksheet 8

Q259) When required, how long shall a full hydrostatic be held ?(a) 18 hours; (b) 24 hours; (c) 36 hours; (d) 38 hours.REF : API 653 – 10.3.1.1ANS : (b)

Q260) When reusing the entire bottom in the intact condition, the shell cut shallbe a minimum of ____ inch(es) above the top of the bottom plate :-(a) 1/2; (b) 6 except where crossing existing welds;(c) 12; (d) 12 is the maximum.REF : API 653 8.3.2.2ANS : (c) (a?)

Q261) When reviewing a radiograph, a dark image of the letter B can be seen on the film(a) This is cause for rejection;(b) This is not cause for rejection;(c) This is the same as a light letter B;(d) An unusual safety hazard existed during the exposure.REF : Section V, T-284 ANS : (b)

Charlie Chong/ Fion Zhang

Page 270: Understanding api icp653 reading 12 worksheet 8

Q262) When the corrosion rate is not known or determinable from similar service experience, actual bottom plate thickness shall be determined byinspection within the next ____ years of operation :-(a) 10; (b) 7; (c) 5; (d) 3.REF : 653 4.4.2.2ANS : (a)

Q263) When the tank is out of service, additional bottom plate examinationincludes :-(a) All of the below; (b) ultrasonic; (c) hammer testing; (d) turning of coupons.REF : API 653 Appendix C, C.1.1.4ANS : (a)

Q264) When two (2) welders weld opposite sides of the same butt joint :-(a) 2 spot radiographs shall be taken;(b) heat generated by twin arc removes the need to radiograph;(c) shall be inspected by ultrasonics;(d) 1 spot radiograph shall be taken .REF : API 650 – 6.1.2.5ANS : (d)

Charlie Chong/ Fion Zhang

Page 271: Understanding api icp653 reading 12 worksheet 8

Q265) When two or more tanks are installed concurrently in the same location for the same purchase :-

(a) spot radiographs to be taken is based on each tanks footage of the welds;(b) spot radiographs may be omitted in tank # 2 if no defects were found in tank

# 1;(c) spot radiographs may be taken based on the aggregate footage of the welds

of the same type and thickness;(d) spot radiographs to be taken be based on the aggregate footage of the

welds regardless of weld type and thicknesss;REF : API 650 – 6.1.2.5ANS : (c)

Q266) When ultrasonic thickness measurements are used to take in-servicethickness measurements, what is the maximum interval for reinspectionon a tank corroding at a rate of 1.13 mils per year and has a remainingcorrosion allowance of 22 mils ?(a) 5 years; (b) 9 years; (c) 15 years; (d) 20 years.REF : API 653 – 4.3.3.2ANS : (b)

Charlie Chong/ Fion Zhang

Page 272: Understanding api icp653 reading 12 worksheet 8

Q267) When used, in-service UT thickness measurements shall be taken :-(a) 10 years after commissioning;(b) 15 year intervals where corrosion rate is unknown;(c) the smaller of RCA/2N or 15 years;(d) all of the above.REF : API 653 4.3.3.2ANS : (c)

Q268) When vacuum testing is performed, a partial vacuum of at least psigshould be used :-(a) 2; (b) 3; (c) 4; (d) 5.REF : 650 5.3.3.4ANS : (a) (b?)

Charlie Chong/ Fion Zhang

Page 273: Understanding api icp653 reading 12 worksheet 8

Q269) Which below best describes how surfaces shall be prepared for Ultrasonic examination :-

(a) The finished contact surfaces shall be free from weld splatter and anyroughness that would interfere with free movement of the search unit orimpair the transmission of ultrasonic vibrations;

(b) The weld surfaces shall be finished so they cannot mask or be confused with reflections from defects, and should merge smoothly into the surfaces of the adjacent base materials;

(c) The volume of base material through which the sound will travel in angle beam examination shall be completely scanned with a straight beam search unit to detect reflectors which might affect interpretation of angle beam results;

(d) all of the above.REF : Section V, T-542.7.1ANS : (d)

Charlie Chong/ Fion Zhang

Page 274: Understanding api icp653 reading 12 worksheet 8

Q270) Which below option Thin-Film lining system shall be used for the following service conditions; Temperature 200 degrees F, product contents are distillates,

(a) Coal tar epoxy; (b) Epoxy amine;(c) Epoxy polyamide; (d) Epoxy PolyamidoamineREF : API 652 – 4.3, Table 1ANS : (b)

Charlie Chong/ Fion Zhang

Page 275: Understanding api icp653 reading 12 worksheet 8

Q271) Which is not a factor in determining intervals between internal inspectionsfor storage tanks :-(a) Measured during previous inspection;(b) Based on experience with similar tanks;(c) Anticipated corrosion rate;(d) Consistent with conditions at a particular site.REF : API-653, 4.4.2ANS : (d)

Q272) Which item is not found on a gauge well ?(a) hold-off distance; (b) marker vapour control float;(c) blow-down valve; (d) pipe seal system.REF : API 653, Appendix C.2.1.1.1ANS : (c)

Charlie Chong/ Fion Zhang

Page 276: Understanding api icp653 reading 12 worksheet 8

Q273) Which of the following equations refer to an anodic reaction :-(a) O2 + 2 H2) + 4 e- > 4 OH-(b) Fe + 2 e- ____ Fe2(c) H2O2 + Fe > 2 e(d) Fe --> Fe-2 +2 e-REF : API-651, 2.1.1ANS : (d)

Q274) Which of the following is a cause for tank bottom failure ?(a) Erosion corrosion; (b) Concentration Cell corrosion;(c) Sulphate-reducing bacteria; (d) All are causes.REF : API-652, Section 2ANS : (d)

Charlie Chong/ Fion Zhang

Page 277: Understanding api icp653 reading 12 worksheet 8

Q275) Which of the following is a factor in the effectiveness of cathodicprotection :-(a) Concrete foundation;(b) An impervious lining between tank anode such as a secondary containment

system(c) High resistance soil or rock formations;(d) All are factors.REF : API-651 3.1.4ANS : (d)

Q276) Which of the following is a principle cause of concrete foundationdeterioration :-(a) Attack by frost; (b) Rusting; (c) Wind load; (d) Floods.REF : API-653, 2.5ANS : (a)

Charlie Chong/ Fion Zhang

Page 278: Understanding api icp653 reading 12 worksheet 8

Q277) The difference between peaking and banding is :-(a) peaking pertains to the roof;(b) banding is external to the tank;(c) peaking pertains to vertical weld seams, banding pertains to horizontalweld seams(d) peaking pertains to horizontal weld seams, banding pertains to verticalweld seams.REF : General KnowledgeANS : (c)

Q278) Which of the following is not a cause of bottom failure :-(a) Stresses placed on the bottom plates by roof support loads and shell

settlement;(b) Inadequate drainage;(c) Rock or gravel foundation pads with inadequately filled-in surface voids;(d) Operating conditions.REF : API-653, 2.4.2ANS : (d)

Charlie Chong/ Fion Zhang

Page 279: Understanding api icp653 reading 12 worksheet 8

Q279) Which of the following is not a factor in determining suitability for service of shell tanks :-(a) Internal corrosion due to the product or water bottoms;(b) Location relative to other tanks;(c) Chemical analysis and mechanical properties of the materials ofconstruction;(d) Tank foundation, soil and settlement conditions.REF : API-653, 2.1.3ANS : (b)

Q280) Which of the following is not a shell distortion ?(a) undersize weld; (b) out of roundness;(c) flat spots; (d) buckled areas.REF : API 653, 2.3.5.1ANS : (a)

Charlie Chong/ Fion Zhang

Page 280: Understanding api icp653 reading 12 worksheet 8

Q281) Which of the following is not required information on a nameplate :-(a) Edition and revision number; (b) Shell material for shell course;(c) Nominal diameter; (d) Test Pressure.REF : API-653, 11.1.1ANS : (d)

Q282) Which of the following is not true regarding dismantling of the shell :-(a) Temporary attachments welds must be ground flush;(b) Shell stiffener rings, including wind girders and top angles, may be removed;(c) Shell stiffener rings, including wind girders and top angles, may be left

attached;(d) Temporary attachments welds need not be ground flush.REF : API-653, 8.3.3.2ANS : (d)

Charlie Chong/ Fion Zhang

Page 281: Understanding api icp653 reading 12 worksheet 8

Q283) Which of the following is not true regarding small punctures in a floatingroof plate :-(a) May be ignored if they have been determined to be non-critical;(b) Shall be repaired;(c) Shall have affected sections replaced;(d) Is considered a change from the original condition.REF : API-653 2.2.3.1ANS : (a)

Q284) Which of the following types of welds do not need welder identification ?(a) Shell vertical welds; (b) Roof Plate welds;(c) Flange-to-nozzle-neck welds; (d) Both (b) and (c)REF : API-653, 9.2.2 ANS : (d)

Q285) Which thin-film lining system shall be used for the following serviceconditions : Temperature 200 degrees F, product contents are distillates :-(a) Coal tar epoxy; (b) Epoxy amine;(c) Epoxy polyamide; (d) Epoxy polyamidomine.REF : 652 4.3 Table 1 ANS : (b)

Charlie Chong/ Fion Zhang

Page 282: Understanding api icp653 reading 12 worksheet 8

Q286) Which tool would least likely be used in an in-service inspection ?(a) UT thickness device; (b) X-ray equipment;(c) Steel rule; (d) paint or crayon.REF : API Chapter XIII 13.4.1ANS : (b)

Q287) Who is responsible for preparing the Welding Procedure Specification ?(a) Purchasing; (b) Erector / Manufacturer / Repairer;(c) Weld Testing Laboratory; (d) A qualified welderREF : IX QW-200.1ANS : (b)

Q288) Who is responsible for qualifying the welders used to repair an aboveground storage tank ?(a) The tank manufacturer; (b) The repair concern;(c) The inspector; (d) The test laboratory.REF : IX QW-103.1ANS : (b)

Charlie Chong/ Fion Zhang

Page 283: Understanding api icp653 reading 12 worksheet 8

Q289) Who is responsible for stating the design metal temperature (based onambient temperatures), the design specific gravity, the corrosionallowance (if any), and the design wind velocity ?(a) PURCHASER; (b) FABRICATOR;(c) INSPECTOR; (d) ERECTOR.REF : 650 XIIIANS : (a)

Q290) Widely scattered pits may be ignored provided that the sum of theirdimensions along any vertical line does not exceed 2 inch in an 8 inchlength and no pit depth results in a shell thickness of less than of theminimum thickness exclusive of corrosion allowance :-(a) 5/8; (b) 3/4; (c) 1/2; (d) 2/3.REF : API-653 2.3.2.2ANS : (c)

Charlie Chong/ Fion Zhang

Page 284: Understanding api icp653 reading 12 worksheet 8

西塘古镇

Charlie Chong/ Fion Zhang

Page 285: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Space Station

Page 286: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Space Station

Page 287: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhanghttps://www.yumpu.com/en/browse/user/charliechong

Page 288: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Page 289: Understanding api icp653 reading 12 worksheet 8

Charlie Chong/ Fion Zhang

Page 290: Understanding api icp653 reading 12 worksheet 8

Charlie C

hong/ Fion Zhang