1
Waverley Elementary School Feasibility StudyFREDERICK COUNTY PUBLIC SCHOOLS
Feasibility Study Meeting #5January 4, 2018
2
1. PROJECT OVERVIEW – schedule, status of ALTA survey and existing conditions report
2. FEASIBILITY STUDY – REVISED AND ADDITIONAL 725 STUDENT OPTIONS• Waverly Building Renovation/ Addition (revised addressing previous comments)• Replacement Building (moved closer to entry drive w/ parking in rear)• Rock Creek Building renovation/ addition (new option)
3. FEASIBILITY STUDY – INITIAL 1019 STUDENT OPTIONS• Waverley Building renovation/ addition• Replacement Building• Combined Waverley and Rock Creek Building renovation/ addition
4. 1/11 COMMUNITY MEETING – review agenda and exhibits for meeting
AGENDA Waverley ES Feasibility Study
3
FEASIBILITYSCHEDULE
Waverley ES Feasibility Study
NOV DEC JAN FEB MAR2017 2018
Building/ Site Analysis
Develop Concept Options
Community Visioning Session (12/11/17)
50% Community Presentation (1/11/18)
Feasibility Study Report
Refine Concept Options
95% Community Presentation (2/15/18)
4
1. Renovate Waverley Building – 725 StudentsStrategic renovations to the exterior and interior with minimal demolition and additional space.
2. Renovation/ Addition to Waverley Building Complete renovation of the existing facility, extensive demolition of existing partitions, and construction of additional space to meet the Ed Spec requirements.
• 725 Students (Approximately 97,128 GSF) • 1019 Students (GSF TBD)
3. Demolish and Replace Waverley BuildingConstruction of an entirely new facility on the existing site to meet the Ed Spec requirements.
• 725 Students (Approximately 97,128 GSF) • 1019 Students (GSF TBD)
4. Renovate/ Demolish and/or Addition to Waverley and Rock Creek Building – 1019 Students Selective demolition of whole portions of the existing buildings, extensive demolition of existing partitions and complete renovation in areas to remain, and construction of additional space to meet the Ed Spec requirements.
FEASIBILITY STUDY OPTIONS
Waverley ES Feasibility Study
5
DESIGN OPTIONS
Waverley ES Feasibility Study
Site Design Requirements – 725 Students
• Ground Floor Footprint – approximately 64,000 - 67,000 GSF
• Approximately 130 parking spaces
• 150’ x 300’ Play Field
• (2) Hard Surface Play areas (24,000 SF?)
• (2) Play areas with equipment (24,000 SF?)Service
Outdoor Play Outdoor
Play
North
Site Design Requirements – 1019 Students
• Ground Floor Footprint – approximately 96,000 - 106,000 GSF
• Approximately 180 parking spaces
• 150’ x 300’ Play Field
• (2) Hard Surface Play areas (24,000 SF?)
• (2) Play areas with equipment (24,000 SF?)
6
DESIGN OPTIONS
Waverley ES Feasibility Study
Waverley Building Renovation-Addition
Option 1 (725 Students)[Revised Floor Plans]
Pros:• Reuses 2 of 3 existing wings• New construction allows for second floor expansion • Addition has better ceiling height for classes• New right sized gym• Orientation of new classroom wing is best for
quality natural light
Cons:• Inefficiencies due to renovation of existing spaces• New gym difficult to integrate with the existing
building• Classrooms in existing wing lack natural light
without major renovation of the façade • Complex phasing because of the need to renovate
kitchen/dining area while it is being used
FIRST FLOOR PLAN SECOND FLOOR PLANNorth
Entry
CommunityEntry
7
DESIGN OPTIONS
Waverley ES Feasibility Study
Waverley Building Renovation-Addition
Option 1 (725 Students)[Revised Site Plan]
• Demolish west classroom wing• Reconfigure cafeteria/ gym wing• Reconfigure central classroom wing• New two-story classroom addition• New gym addition
Demolition – 9,500 GSF (+/-)Reconfigured/ renovated – 44,500 GSF (+/-)New construction – 54,000 GSF (+/-)
Play Field
Play
PlayPlay Play
Car parking (130)
SWM
Existing
SITE PLAN
North
Addition
Addition
8
DESIGN OPTIONS
Waverley ES Feasibility Study
Replace Waverley Building
Option 1 (725 Students)[Revised Site Plan]
• Demolish Rock Creek building• New building on former Rock Creek
building location• Demolish Waverley building and
redevelop site as outdoor play areas and additional parking
Ground Floor – 66,000 GSF (+/-)Second Floor – 31,500 GSF (+/-)
Service
Play FieldPlay
PlayPlay
Play
Car parking (90)
New School
SITE PLAN
North
Car parking (40)
SWM
9
DESIGN OPTIONS
Waverley ES Feasibility Study
Rock Creek Building Renovation-Addition
Option 1 (725 Students)• Reconfigure Rock Creek building • New classroom additions• New cafetorium addition• New gym addition• Demolish Waverley building and
redevelop site as outdoor play areas and additional parking
Demolition – 5,000 GSF (+/-)Reconfigured/ renovated – 50,500 GSF (+/-)New construction – 44,500 GSF (+/-)
Play Field
Play
Play
Play
Play
Car parking (90)
SWM
Existing Addition
SITE PLAN
North
Addition
Addition
Car parking (50)
Service
10
DESIGN OPTIONS
Waverley ES Feasibility Study
Rock Creek Building Renovation-Addition
Option 1 (725 Students)Pros:• Reuses nearly all of the existing building• New right sized gym• New right sized cafetorium• Allows renovation/ new construction while
Waverley building is in use
Cons:• Inefficiencies due to renovation of existing
spaces• New gym and cafetorium are not connected• Classrooms have varying orientations with
some not ideal for natural lighting• Attention to redesign of the existing exterior
façade is required so that it looks integrated with the new additions FLOOR PLAN
North
Entry
CommunityEntry
Entry
11
DESIGN OPTIONS
Waverley ES Feasibility Study
Waverley Building Renovation-Addition
Option 1 (1019 Students)• Demolish west classroom wing• Reconfigure cafeteria/ gym wing• Reconfigure central classroom wing• New two-story classroom addition• New gym addition
Demolition – 9,500 GSF (+/-)Reconfigured/ renovated – 44,500 GSF (+/-)New construction – 92,500 GSF (+/-)
Play Field
Play
PlayPlay
Play
Car parking (100)
SWM
Existing
SITE PLAN
North
Addition
AdditionCar parking
(80)
12
DESIGN OPTIONS
Waverley ES Feasibility Study
Waverley Building Renovation-Addition
Option 1 (1019 Students)Pros:• Reuses 2 of 3 existing wings• New construction allows for second floor
expansion • Addition has better ceiling height for
classes• New right sized gym• Classroom corridors kept as short as
possible
Cons:• Inefficiencies due to renovation of existing
spaces• Classrooms in existing wing lack natural
light without major renovation of the façade • Complex phasing because of the need to
renovate kitchen/dining area while it is being used
• More extensive renovation required in existing central wing to accommodate PK-K SECOND FLOOR PLAN
Community EntryEntry
NorthFIRST FLOOR PLAN
13
DESIGN OPTIONS
Waverley ES Feasibility Study
Replace Waverley Building
Option 1 (1019 Students)• Demolish Rock Creek building• New building on former Rock Creek
building location• Demolish Waverley building and
redevelop site as outdoor play areas and additional parking
Ground Floor – 104,500 GSF (+/-)Second Floor – 31,500 GSF (+/-)
Play Field
Play
Service
Play
Play
Car parking (130)
SWM
SITE PLAN
North
Car parking (50)
New School
15
DESIGN OPTIONS
Waverley ES Feasibility Study
Replace Waverley Building
Option 1 (1019 Students)Alternate Site Plan
• Demolish Rock Creek building• New building on former Rock Creek
building location• Demolish Waverley building and
redevelop site as outdoor play areas and additional parking
Ground Floor – 106,500 GSF (+/-)Second Floor – 31,500 GSF (+/-)
Play Field
Play
Service
Play
Play
Car parking (180)
SWM
SITE PLAN
North
New School
Play
16
DESIGN OPTIONS
Waverley ES Feasibility Study
Waverley-Rock Creek Building Renovation-Addition
Option 1 (1019 Students)• Demolish cafeteria/ gym of Waverley
building• Reconfigure central and west classroom
wing of Waverley building• Reconfigure Rock Creek building • New classroom additions• New cafetorium addition• New gym addition
Demolition:• WB – 23,000 GSF (+/-)• RCB – 5,000 GSF (+/-)
Reconfigured/ renovated: • WB – 31,500 GSF (+/-)• RCB – 50,500 GSF (+/-)
New construction – 58,500 GSF (+/-)
Play Field
Play
Play
Play
Play
Car parking (130)
SWM
Existing Addition
SITE PLAN
North
Addition
Addition
Car parking (50)
ServicePlay
Existing
17
DESIGN OPTIONS
Waverley ES Feasibility Study
Waverley-Rock Creek Building Renovation-Addition
Option 1 (1019 Students)Pros:• Reuses portions of both existing wings• New right sized gym and cafetorium
Cons:• Inefficiencies due to renovation of existing
spaces• New gym and cafetorium are not connected• Classrooms in existing wing lack natural
light without major renovation of the façade• Attention to redesign of the existing exterior
façade is required so that it looks integrated with the new additions
• Complex phasing requires students to construction inefficiencies which will extend the construction timeline FLOOR PLAN
North
EntryCommunity
EntryEntry
18
COMMUNITY PRESENTATION
Waverley ES Feasibility Study
(725 Students)Replace Waverley Building (725 Students)
Front
Front Rear
(1019 Students)
Rear(1019 Students)
Station 1
Agenda
1. Recap of first meeting • What was discussed• What surveys were provided
2. Provide handout of each study option• Key on “big picture” attributes • Explain what happens with each option
3. Discuss redistricting• What is the current plan?• What will happen Butterfly Ridge reaches
capacity?
4. Break-out into 4 groups• Posters with site plan and brief description of
option on the walls• Design team station at each grouping of
posters to answer questions
5. Reconvene for final group comments and questions
19
COMMUNITY PRESENTATION
Waverley ES Feasibility Study
Rock Creek Renovation-Addition (725 Students)
Front
Rear
WB Renovation-Addition (725 Students)
(1019 Students)
Combined Waverley-Rock Creek (1019 Students)
Station 4Station 3
Station 2