18
EAST LINK EXTENSION The purpose of tonight’s meeting is to: • Provide an opportunity for the community to meet with Sound Transit’s team of engineers, architects, planners and community outreach staff • Present and gather comments on updated design plans for the Downtown Bellevue segment, including the Bellevue Transit Center and Hospital stations • Share information about what to expect during the final design process and how to stay informed Agenda 5-7 p.m. Open house • Meet with project staff and view display boards and graphics featuring information about final design and design plans for the Downtown Bellevue Segment of East Link Extension 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns March 2014 WELCOME TO FINAL DESIGN

WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

EAST LINK EXTENSION

The purpose of tonight’s meeting is to:• Provide an opportunity for the community to meet with

Sound Transit’s team of engineers, architects, planners and community outreach staff

• Present and gather comments on updated design plans for the Downtown Bellevue segment, including the Bellevue Transit Center and Hospital stations

• Share information about what to expect during the final design process and how to stay informed

Agenda5-7 p.m. Open house

• Meet with project staff and view display boards and graphics featuring information about final design and design plans for the Downtown Bellevue Segment of East Link Extension

5:30 p.m. Overview presentation

7 p.m. Meeting adjourns

March 2014

WELCOME TO FINAL DESIGN

Page 2: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

EAST LINK EXTENSION

The Downtown Bellevue segment spans from Main Street to 120th Ave NE and includes the Bellevue Transit Center and Hospital stations.

Benefits:• Provides access to high quality, frequent transit service that

operates 20 hours per day• Approximately 7,000 daily boardings would occur in this segment

(2030)• Light rail in this area would serve the dense central business

district of downtown Bellevue, providing access to employment, education, recreation, and the growing medical district and Wilburton area

Travel times (from Bellevue Transit Center Station)

• International District/Chinatown = 20 minutes • University of Washington = 30 minutes • SeaTac Airport = 55 minutes (with transfer at

International District Station)• Overlake Transit Center = 10 minutes

March 2014

DOWNTOWN BELLEVUE SEGMENT OVERVIEW

Page 3: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

NEIGHBORHOOD CONTEXT PLAN

SITE & LANDSCAPE PLAN

1/4 MILE RADIUS

CITY HALL

MEYDENBAUER

CITY

CENTER

SKYLINE

BRAVERN

TRANSIT CTR

I-405

NE 6TH ST

11

0T

H A

VE

NE

COMMERCIAL

MULTI-FAMILY RESIDENTIAL

HOTEL

CIVIC / INSTITUTIONAL

PARKING STRUCTURE

LEGEND

BUS ROUTE

BICYCLE LANE

OFF STREET PATH

BICYCLE ROUTE

LIGHT RAIL TRACKS

STATION

PATRON CATCHMENT AREA

CITY OF BELLEVUE - 2009 PEDESTRIAN & BICYCLE TRANSPORTATION PLAN

CITY HALL

METRO SITE

112T

H A

VE

NE

EAST ENTRY

NE 6TH ST

MEYDENBAUER CENTERTHE BRAVERN

110T

H A

VE

NE

CITY HALL PLAZA

WEST ENTRY

BTC

CITYCENTER

BIKE CAGE

CANOPYWESTBOUND PLATFORM

EASTBOUND PLATFORM

EMERGENCY ACCESS RAMP

EAST LINK EXTENSION

March 2014

BELLEVUE TRANSIT CENTER STATION

Page 4: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

BB

A

A

SECTION A-A

NE 6TH ST

110T

H A

VE

NE

WEST ENTRANCE

BIKE CAGE

BIKE RACKS

TVMs

ELEVATORS

DN

DN

ELEVATORS

TVMs

CUSTOMER SIGNAGE

ENTRANCE CANOPY

PLAZA LEVEL

MECHANICAL LEVEL

PLATFORM LEVEL

LOWER STREET LEVEL

EAST ENTRANCE

WEST ENTRANCEENTRY CANOPY

PLATFORM CANOPIES

TVMs

SECTION B-B

SECTION D-D

PLATFORM LEVEL

PLAZA LEVEL BEYOND

NE 6TH ST

EAST LINK EXTENSION

March 2014

WEST ENTRANCE PLAN & SECTION

STATION LONGITUDINAL SECTION & PLATFORM CROSS SECTION

BELLEVUE TRANSIT CENTER STATION

Page 5: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

EAST ENTRYEMERGENCY VEHICLE ACCESS NE 6TH ST

B.O.H.

NE 6TH ST

WESTBOUND PLATFORM

EASTBOUND PLATFORM

B

C

C

D

D

MECHANICAL LEVEL PLAN

PLATFORM LEVEL PLAN

B

112T

H A

VE

NE

EAST ENTRY

NE 6TH ST

NE 6TH ST.

METRO SITE

B

C

C

B

B.O.H.

BIKE LOCKERS

TVMs

UP

UP

BIKE LOCKERS

SECTION C-C

PLATFORM LEVEL

EAST ENTRANCE

EAST LINK EXTENSION

March 2014

MECHANICAL & PLATFORM LEVEL PLANS

EAST ENTRANCE PLAN & SECTION

BELLEVUE TRANSIT CENTER STATION

Page 6: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

EAST LINK EXTENSION

March 2014

EAST ENTRANCE VIEW

PLATFORM VIEW

BELLEVUE TRANSIT CENTER STATION

Page 7: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

EAST LINK EXTENSION

March 2014

WEST ENTRANCE VIEW

AERIAL VIEW

BELLEVUE TRANSIT CENTER STATION

Page 8: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

UP

EB

554

+50.

00

CIP CONCRETE STAIRS TO PARK

UP

RETAINING WALLS, EXTENT TBD

HEADHOUSE ENTRY DOOR

HEADHOUSE ENTRY AREA

HEADHOUSE STAIRS DOWN TO SHAFT

(2) 4' x 8' ACCESS PANELS TO SHAFTBELOW

EXI

STIN

G S

IDEW

ALK

EXI

STIN

G S

IDEW

ALK

EXISTING PARK

EXISTING PARK

CMU-3

RETAINING WALL, EXTENT TBD

SCORED CONCRETE AT HEADHOUSE PLAZA

R 8' - 10"

HNDRL-1, TYP

CL TUNNEL BELOW

EB TRACKBELOW

WB TRACKBELOW

EL= +149' - 0"

CL ACCESSHATCH

CL

ACC

ESS

H

ATC

H

R 9

' - 1

0"

SUPPLY DUCT TOSHAFT, BELOW

STANDPIPE

4-WAY CONNECTION

EAST LINK EXTENSION

March 2014

PLAN

GROUND VIEW

MID-TUNNEL ACCESS SHAFT HEADHOUSE

Page 9: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

Tulip Tree Liriodendron tulipifera

Deciduous tree proposed for the western entrance to the BTC Station and plaza.

Scarlet OakQuercus coccinea

Deciduous tree proposed for southern planter adjacent to parking lot.

Alaskan Yellow CedarChamaecyparis nootkatensis

Evergreen tree proposed for the north side of the BTC Station within the raised planters.

Japanese SnowdropStyrax japonicus

Deciduous tree proposed for the south side of the BTC Station within the raised planter.

TREES

SHRUBS & GROUNDCOVERS

Deer Fern Blechnum spicant

Fern proposed as an accent plant throughout the raised planters on the north side of the BTC Station.

Apple Blossom Evergreen ClematisClematis armandii ‘Apple Blossom’

Flowering vine proposed along a retaining wall within the plaza area.

Tom Thumb Fuchsia Fuchsia x ‘Tom Thumb’

Deciduous shrub proposed for the raised planters on the north side of the BTC Station.

Stella de Oro Daylily Hemerocallis ‘Stella de Oro’

Flowering perennial proposed throughout the raised planter on the south side of the BTC Station.

Patty’s Purple Hebe Hebe patty’s purple

Evergreen shrub proposed for the raised planter on the south side of the BTC Station.

Vine MapleAcer circinatum

Deciduous tree proposed for the north side of the BTC Station within the raised planters.

Western Sword FernPolystichum munitum

Fern proposed as an accent plant throughout the raised planters on the north side of the BTC Station.

Redwood SorrelOxalis oregana

Groundcover proposed throughout the raised planters on the north side of the BTC Station.

Spring Cinquefoil Potentilla neumanniana ‘Nana’

Flowering perennial proposed for the raised planter on the south side of the BTC Station.

Inside-Out FlowerVancouveria hexandra

Groundcover proposed throughout the raised planters on the north side of the BTC Station.

Japanese Tassel FernPolystichum polyblepharum

Fern proposed as an accent plant for the raised planter on the south side of the BTC Station.

Kelseyi Dogwood Cornus sericea ‘Kelseyi’

Deciduous shrub proposed throughout the BTC Station raised planters.

EAST LINK EXTENSION

March 2014

BELLEVUE TRANSIT CENTER STATION PLANTINGS

Page 10: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

FUTURE NE 6TH ST EXTENSION

COMMERCIAL

COMMERCIAL

HOTEL

HOSPITAL

NE 8TH ST

NE 10TH PL

NE 10TH STREET

NE 6TH ST

LAKE BELLEVUE

405 116T

H A

VE

NE

120T

H A

VE

NE

112T

H A

VE

NE

120T

H A

VE

NE

NE 12TH ST

NE 12TH ST

NE 5TH ST

124T

H A

VE

NE

STURTE

VANT C

REEK

226 234 235

226 234 235

B Line B Line

226

226

LEGEND

EXISTING BUS ROUTE

LIGHT RAIL TRACK

STATION

PEDESTRIAN CIRCULATION

EXISTING BUS STOP

1/4 MILE RADIUS

FUTURE NE 6TH STEXTENSION

POTENTIAL ELEVATED TRAIL OR COMMUTER RAIL

SURFACE WATERWAYS

T

FLOOD PLAIN

FLOOD PLAIN

116TH AVE NE

118TH AVE NE

NE

8TH

STR

EET

PASSENGER DROP-OFF

STATION ACCESS FROM OVERLAKE HOSPITAL MEDICAL CENTER

PARATRANSIT STOP

STURTEVANT CREEKNORTH ACCESS PATH

BUS STOP

GUIDEWAY ABOVE

EXISTING BUILDING

EXISTING BUILDING

EXISTING BUILDINGEXISTINGBUILDING

EXISTINGBUILDING

B

A A

B

EAST LINK EXTENSION

March 2014

NEIGHBORHOOD CONTEXT PLAN

SITE PLAN

HOSPITAL STATION

Page 11: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

EAST LINK EXTENSION

March 2014

STATION VIEW LOOKING NORTHWEST

NORTH ENTRANCE

HOSPITAL STATION

Page 12: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

EAST LINK EXTENSION

March 2014

PLATFORM VIEW LOOKING SOUTH

APPROACH TO NORTH ENTRANCE

HOSPITAL STATION

APPROACHING STATION FROM NORTH ACCESS PATH ON BRIDGE CROSSING STRUTEVANT CREEK

APPROACHING STATION FROM NORTH ACCESS PATH AT TICKET VENDING MACHINES APPROACHING STATION FROM NORTH ACCESS PATH ENTERING NORTH STATION ENTRANCE

APPROACHING STATION FROM NORTH ACCESS PATH AT EDGE OF WHOLE FOODS PARKING LOT

Page 13: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

EAST LINK EXTENSION

March 2014

EAST & WEST ELEVATIONS

NORTH & SOUTH ELEVATIONS

HOSPITAL STATION

WEST ELEVATION

EAST ELEVATION

RED METAL PANEL GLAZING MASONRY UNITS METAL MESH CONCRETE WALL

METAL PANEL ROOF

HORIZONTAL LOUVRES TICKET VENDINGTICKET VENDING

RED METAL PANEL GLAZINGMASONRY UNITSCONCRETE WALL

METAL PANEL ROOF

HORIZONTAL LOUVRES

Grade At Entry148.00

15' -

4"

30' -

6"

Platform

Roof45’-10” Above Grade

SOUTH ELEVATION NORTH ELEVATION

RED METAL PANEL

METAL PANEL ROOF

MASONRY UNITS

GLAZING

P.L.

15' -

4"

32' -

4"

Platform

Roof

Grade At Entry146.50

47’-8” Above Grade

STURTEVANT CREEKSTURTEVANT CREEK

LOUVRES

MASONRY UNITS

LOUVRES

METAL PANEL ROOF

RED METAL PANEL

Page 14: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

EAST LINK EXTENSION

March 2014

GRADE LEVEL AND PLATFORM PLANS

CROSS SECTIONS

HOSPITAL STATION

LEGEND

WESTBOUND PLATFORM

EASTBOUND PLATFORM

SERVICE SPACE

VERTICAL TRANSPORTATION

PLATFORM

PLATFORM PLAN

GRADE LEVEL PLAN

TVM WALL

TVM WALL

SOUTH ENTRANCE

NORTH ENTRANCE

BIKE LOCKERS

NE

8TH

STR

EET

PASSENGER DROP-OFF

PARATRANSIT STOP

NORTH ACCESS PATH

BUS

STO

P

STURTEVANT CREEK

18TH AVENUE

B

CB

C

CB FUTURE RAILS TO TRAIL CORRIDOR

15' -

4"

32' -

4"

Platform

Roof

Grade At Entry146.50

47’-8” Above Grade

Grade At Entry148.00

15' -

4"

30' -

6"

Platform

Roof 45’-10” Above Grade

B

SOUTH ENTRANCE NORTH ENTRANCE

STURTEVANT CREEK

CB

C

SECTION BB - SOUTH ENTRANCE SECTION CC - NORTH ENTRANCE

SECTION AA

STURTEVANT CREEK

Page 15: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

EAST LINK EXTENSION

March 2014

HOSPITAL STATION PLANTING AND HARDSCAPE

TREES

SHRUBS & GROUNDCOVERS

Stella de Oro Daylily Hemerocallis ‘Stella de Oro’

Flowering perennial proposed as accent for the Hospital Station parking island.

Ginkgo TreeGinkgo biloba

Tree proposed for Hospital Station street frontage and parking island, providing fall color.

Western Sword FernPolystichum munitum

Fern proposed as an accent plant withing planting mix proposed for sloped planting behind southwestern retaining wall.

SalalGaultheria shallon

Evergreen shrub proposed within planting mix proposed for sloped planting behind southwestern retaining wall.

Evergreen HuckleberryVaccinium ovatum

Evergreen shrub proposed within planting mix proposed for sloped planting behind southwestern retaining wall.

Dagger-Leaf RushJuncus ensifolius

Rush proposed for drainage areas.

Kelseyi Dogwood Cornus sericea ‘Kelseyi’

Deciduous shrub proposed for drainage areas.

KinnikinnickArctostaphylos uva-ursi

Evergreen groundcover proposed throughout the Hospital Station eastern planting areas.

Venus DogwoodCornus kousa x nuttallii ‘Venus’

Tree proposed for eastern entrance to the Hospital Station along the vehicular drop-off zone.

GUARDRAILS & RAILINGS

WALL SCREENING

Virgina CreeperParthenocissus quinquefolia

Colorful and vigorous deciduous vine apt to grow over and up walls.

Mesh Wall Screen

Coated metal mesh panels support twining vines desirable to cover walls.

Cabled Wall Screen

Cabled assembly in patterns determined by user, used to support twining vines desirable to cover walls.

Fabricated Metal Guards on Wall to match Statiion accessories

Guard with graspable railing positioned on top of low wall to protect and buffer pedestrians from parking lot adjacent to trail.

Page 16: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

SITE SECTION AA SITE SECTION BB

EAST LINK EXTENSION

March 2014

HOSPITAL STATION: SITE SECTIONS

Page 17: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

EAST LINK EXTENSION

March 2014

VIEW FROM NE 6TH ST

SITE PLAN

112TH & 6TH SIGNAL HOUSE

SIGNAL HOUSEGUIDEWAY COLUMN

SCREEN WALL

BELLEVUE TRANSIT CENTER STATION

NE 6TH ST

112T

H A

VE

NE

Page 18: WELCOME TO FINAL DESIGN - Sound Transit...Mar 26, 2014  · Sound Transit’s team of engineers, architects, planners and ... 5:30 p.m. Overview presentation 7 p.m. Meeting adjourns

EAST LINK EXTENSION

March 2014

NORTH SOUTH SECTION

112TH & 6TH SIGNAL HOUSE

EAST ELEVATIONNORTH ELEVATION

WEST ELEVATION SOUTH ELEVATION

GUIDEWAY TRACK

GUIDEWAY COLUMN SCREEN WALL

SIGNAL HOUSE

SIGNAL HOUSE

SCREEN WALL

GUIDEWAY TRACKOCS POLE

GUIDEWAY COLUMN

SCREEN WALL

GUIDEWAY COLUMN

SCREEN WALL

GUIDEWAY TRACK

ELEVATIONS

GUIDEWAY TRACK

OCS CABLES

GUIDEWAY COLUMN

112TH AVE NE

SCREEN WALL

SIGNAL HOUSE