11
PAGE 1 2/3/2016 11:43 Selected staff and resumes of coworkers with WHL Archtiects*Planners, Inc. WHL Architects

WHL Team Presentation with WHL Staff 2016

Embed Size (px)

Citation preview

Page 1: WHL Team Presentation with WHL Staff 2016

PAGE 1 2/3/2016 11:43

Selected staff and resumes

of coworkers with WHL

Archtiects*Planners, Inc.

WHL Architects

Page 2: WHL Team Presentation with WHL Staff 2016

PAGE 2 2/3/2016 11:43

Priti Patil has worked with

WHL for nearly 2 years and

has provided extensive CAD

drafting for numerous pro-

jects.

WHL Architects & Planners Lenthor Engineering Milpiatas, CA 30,000 sq.ft. space for a new upgraded facili-

ty for flexible printed circuit board produc-

tion.

Unidentified Client Mountain View, CA CAD drafting support for:

IRIS Lab Expansion

FA Lab Expansion

Battery Lab Expansion

IRIS Lab Expansion

X Labs at RAILS

GLS Expansion

Priti Patil

CAD Drafting - Documents

Page 3: WHL Team Presentation with WHL Staff 2016

PAGE 3 2/3/2016 11:43

Priti Patil has worked with

WHL for nearly 1.5 years

and has provided extensive

CAD drafting for numerous

projects.

WHL Architects & Planners Pearl Therapeutics Redwood City, CA 70,000 gsf biomed office, lab, support space,

and manufacturing facility.

Unidentified Client Mountian View, CA Household Products Subsidiary Test Build-

ing. Sunnyvale, CA

Household Products Subsidiary Test Build-ing, Palo Alto, CA X Labs at RAILS

Leslie Zheng

CAD Drafting - Documents

Page 4: WHL Team Presentation with WHL Staff 2016

PAGE 4 2/3/2016 11:43

Kartikey Patel has worked

with WHL for nearly 1 year-

and has provided extensive

CAD drafting for numerous

projects.

WHL Architects & Planners Alta Devices Sunnyvale, CA 70,000 gsf photovoltaics office, lab, support

space, and manufacturing facility.

Unidentified Client Mountian View, CA Household Products Subsidiary Test Build-ing, Palo Alto, CA

Kartikey Patel

CAD Drafting - Documents

Page 5: WHL Team Presentation with WHL Staff 2016

PAGE 5 2/3/2016 11:43

Amisha Ambani is a creative

and organized, detail orient-

ed individual with a well

rounded exposure to theo-

retical, educational and

practical aspects of archi-

tecture.

Passionate about energy

conscious architecture and

the use of climatology.

Architectural experience on

a diverse variety of projects

ranging from biotech, phar-

maceutical, microelectron-

ics and medical devices to

commercial and residential.

Educational experience of 4

years having taught 1st and

2nd year B.Arch. students-

architectural design, clima-

tology, building technology

and a number of workshops.

WHL Architects & Planners Bioseek South San Francisco, CA 14,000 sq.ft. space for a biotech firm was

designed for tissue culture, molecular biology

and robot labs with ancillary spaces like

equipment areas, break rooms, offices and

conference rooms.

Ranjitsinh Associates Mumbai, India Lead Planner for Northpoint Center of Learn-

ing, Khandala for designing a 100,000 sq.ft.

training institute with conference rooms, syn-

dicate rooms, dining and recreational areas,

health club and accommodation facilities.

Design process was extensive and research

oriented with a lot of collaboration with con-

sultants.

Auroville, India

Worked with Alternative Building Technolo-gy on the project of ‘legomes’. Construction experience – constructed brick structures with brick domes built using the Nubian Technique. Albenberg Hockstein Architect New Jersey, USA Design development for various residential

projects, offices, factories.

Amisha Ambani

CAD Drafting - Documents

Page 6: WHL Team Presentation with WHL Staff 2016

PAGE 6 2/3/2016 11:43

Years Experience

30

Education

Bachelor of Archi-

etcture – 1985 Univer-

sity of Southern Cali-

fornia,

Registrations/

Organizations

Mr. Garg is a California

Registered Archtitect

Mr. Garg has over 30 years

experience, including docu-

mentation, design, project

management, and firm man-

agement. Project types in-

clude commercial, multifam-

ily residen-

tial, and insti-

tutional.

Alta Devices Sunnyvale, CA 70,000 sq.ft. space for a new upgraded facili-

ty for photvoltaic production.

Intarcia Thereapeutics Hayward, CA 70,000 sq.ft. space for a new upgraded facili-

ty for biomendical production.

Unidentified Client Mountain View, CA GLS Expansion

Project Architectural and CAD drafting sup-

port for:

Household Products Subsidiary Test Build-ing, Palo Alto, CA

Mohit Garg, AIA

Project Architect - Documents

Page 7: WHL Team Presentation with WHL Staff 2016

PAGE 7 2/3/2016 11:43

Anna Yahn Jones supports

WHL in position as consult-

ant. Her firm, SKB of Wash-

ington, D.C., is a long time

collaborator and associate

firm to WHL—through the

professional relationship be-

tween Douglas White and

Mark Baughman, Founder

and Principal of SKB.

WHL Architects & Planners Pearl Therapeutics Redwood City, CA 70,000 gsf biomed office, lab, support space,

and manufacturing facility.

Guardant Health Redwood City, CA 40,000 gsf biomed office, lab, support space,

and manufacturing facility.

Alta Devices Sunnyvale, CA 70,000 sq.ft. space for a new upgraded facili-

ty for photvoltaic production.

Unidentified Client Mountian View, CA Household Products Subsidiary Test Build-

ing. Sunnyvale, CA

Household Products Subsidiary Test Build-ing, Palo Alto, CA

Anna Yahn Jones

Consultant to WHL from SKB

Architects

Washington, DC

Project Manager and Interior

Designer

Page 8: WHL Team Presentation with WHL Staff 2016

PAGE 8 2/3/2016 11:43

Years Experience

43

Education

Bachelor of Arts, Ar-

chitecture – 1972 Uni-

versity of California,

Berkeley

Registrations/

Organizations

Mr. Procter is a Califor-

nia registered NCARB

Certified

Member of San Francis-

co Global Trade Council

Mr. Procter has over 43 years ex-

perience, including documenta-

tion, design, project management,

and firm management. Project

types include commercial, multi-

family residential, and institution-

al.

Alza Corporation Mountain View, CA Muli-Layer Tablet Press Installation Fluid Bed Granulator Installation Amgen, Inc. Thousand Oaks, CA Building 20X & 31 - T.I. design and docu-mentation for 15,000 s.f. of CLCP Relocation Boston Scientific Fremont, CA

T.I. design and documentation for Building 1 & 4 -25,000 s.f. manufacturing, R&D meet-ing room addition Chiron Corporation Emeryville, CA T.I. design and documentation for M3 Labor-atory expansion - Project included new labor-atory for cardiovascular research, and QA Millenium Pharmaceuticals S. San Francisco, CA Process Chemistry Laboratories T.I. Masterplanning Drawbridge/Newcastle Partners S. San Francisco, CA

Tim Procter, AIA

Project Architect - Documents

Page 9: WHL Team Presentation with WHL Staff 2016

PAGE 9 2/3/2016 11:43

Years Experience

31

Education

Ph.D. .Urban Planning,

Scientific Research and

Urban Planning Institute

MA Architecture, Acad-

emy of Architecture and

Engineering

Bachelor Degree of

Liberal Arts,

Academy of Art

Registrations/ Organiza-

tions

Member of California

Hospital Association

Political Action Com-

mittee

Mr. Vartanian has over 20

years of experience in the

design, documentation and

project management of a va-

riety of industrial, master

planning, commercial/

offices, hospitality, pharma-

ceuticals and healthcare

projects. As a project man-

ager he is responsible for

project schedule and budg-

et, consultant coordination

and development of major

design projects and con-

struction documents pro-

duced within the office. His

experience encompasses a

wide range of building types

with a thorough knowledge

of the construction process,

code analysis, and building

systems.

Prior to W HL Architects VA Palo Alto Health Care System New Centers for Ambulatory Care and Polytrauma Rehabilitation VA Medical Center, Palo Alto, CA Documentation for both phases of a large project by the VA: Phase 1 consisted of a 93,000 sf Polytrauma Rehabilitation Center, a 64,000 sf Blind Rehabilitation Center, a 600 car parking structure, a 20,000 sf energy plant. Phase 2 of the project consisting of 375,000 sf Ambulatory Care Center, a new Research Center and 750 car parking struc-ture. development of the comprehensive long term site development plan for the future of the Palo Alto Medical Center campus through 2025. Enlisting a multidiscipline project team with specialized expertise, the team analyze long-term site development. The projected VA expenditures this plan will encompass are in excess of $1.0 billion. Project Manager Lucile Packard Children’s Hospital Oncol-ogy and Pediatric Surgery Suite Renova-tion Stanford, California Programming, plan­ning, architectural and

interior design services for these two major

renovation projects. The projects were con­

structed simultaneously within the fully op­

erational Lucile Packard Chil­dren’s Hospital

at Stanford University Medical Center. Com­

bined, the projects total more than 108,000

sf and are being constructed at a cost of $60

million. Construction completed in 2008.

David Vartanian, Ph.D

Project Manager – Program-

ming

and Masterplanning Labs

Page 10: WHL Team Presentation with WHL Staff 2016

PAGE 10 2/3/2016 11:43

Years Experience

31

Education

Ph.D. .Urban Planning,

Scientific Research and

Urban Planning Institute

MA Architecture, Acad-

emy of Architecture and

Engineering

Bachelor Degree of

Liberal Arts,

Academy of Art

Registrations/ Organiza-

tions

Member of California

Hospital Association

Political Action Com-

mittee

Mr. Vartanian has over 20

years of experience in the

design, documentation and

project management of a va-

riety of industrial, master

planning, commercial/

offices, hospitality, pharma-

ceuticals and healthcare

projects. As a project man-

ager he is responsible for

project schedule and budg-

et, consultant coordination

and development of major

design projects and con-

struction documents pro-

duced within the office. His

experience encompasses a

wide range of building types

with a thorough knowledge

of the construction process,

code analysis, and building

systems.

Prior to W HL Architects VA Palo Alto Health Care System New Centers for Ambulatory Care and Polytrauma Rehabilitation VA Medical Center, Palo Alto, CA Documentation for both phases of a large project by the VA: Phase 1 consisted of a 93,000 sf Polytrauma Rehabilitation Center, a 64,000 sf Blind Rehabilitation Center, a 600 car parking structure, a 20,000 sf energy plant. Phase 2 of the project consisting of 375,000 sf Ambulatory Care Center, a new Research Center and 750 car parking struc-ture. development of the comprehensive long term site development plan for the future of the Palo Alto Medical Center campus through 2025. Enlisting a multidiscipline project team with specialized expertise, the team analyze long-term site development. The projected VA expenditures this plan will encompass are in excess of $1.0 billion. Project Manager Lucile Packard Children’s Hospital Oncol-ogy and Pediatric Surgery Suite Renova-tion Stanford, California Programming, plan­ning, architectural and

interior design services for these two major

renovation projects. The projects were con­

structed simultaneously within the fully op­

erational Lucile Packard Chil­dren’s Hospital

at Stanford University Medical Center. Com­

bined, the projects total more than 108,000

sf and are being constructed at a cost of $60

million. Construction completed in 2008.

Caroline Serpa—Office Man-

agement and Administration

Page 11: WHL Team Presentation with WHL Staff 2016

PAGE 11 2/3/2016 11:43

Years Experience 38 Education Master of Architecture - 1976 University of Texas, Austin Bachelor of Arts in En-vironmental Design - 1975 University of Cali-fornia, Berkeley Registrations/ Organi-zations Mr. White is a registered Architect in California, Florida, Pennsylvania, Illinois, New York, New Jersey, North Carolina and Texas. NCARB Accredited. Member of American Institute of Architects Member of International Society for Pharmaceu-tical Engineering Mem-ber of International Con-ference of Building Of-ficials Member of Construction Specifica-

tions Institute

Mr. White's 38 year career in

architectural practice start-

ed immediately after receipt

of his M. Arch Degree, and

has been continuous and

without interruption. He

maintains management and

overall responsibility con-

sisting of direct participa­

tion in the design, documen-

tation and construction of

projects, monitoring the pro-

ject budget and schedule,

and financial and contractu-

al obligations to the client

and engineering consult-

ants. Mr. White's project ex-

perience with electronics

and computer facilities be-

gan in 1978.

Special Research Labs BL-1 to BL-4 Tissue Culture Labs/Suites Animal rooms/Housing/Research Labs Necropsy /Surgery/Quarantine/Microisolator Greenhouses AIDS Research Labs Organic Synthesis/Chemistry/Protein Chemistry Hazardous Occupancies: H-2, H-7, and H-8 Microinjection

Process Development/GMP Manufactur-ing Fermentation Areas (Mammalian and Bacterial) Change Rooms/Gown Rooms/Air Locks Sterile Prep/Sterile Fill/Sterile Processing Cold Processing Rooms Clean Rooms CL-100, CL-1,000, CL-10,000 Biomedical Products Assembly Biomedical Subassembly Hazardous Occupancies, H-2, H-7 and H-8 WFI/Clean Steam Systems Coordination Blood Fractionation, Purification Areas Recovery/Purification, Isolation, Extraction Chemical Synthesis

Research/Manufacturing Support Environmental - Cold/warm humidity controlled rooms Instrument rooms/Equipment Rooms Centrifugation/Chromatography/Fermentation Glassware prep/Wash/Dry/Autoclave Cage wash and animal facility support Hazardous Materials/Chemical Storage - H-2 HPLC NMR/Mass Spec. Engineering Support Validation Media Prep

Dark Rooms

Solar R + D and Manufacturing:

Site Masterplanning and Building Architecture

Process flow and facility planning for manufacturing.

PV Panel Assembly and Manufacturing, MOCVD Thin film equipment and other tool Fit Ups, Robotics

All manufacturiing ISO class 3, 4, 5, 6, 7, and 8.

H-2, H-4, H-5, H-8 (Ca) Hazardous Occupancies

Microelectronics and Electronics R + D

and Manufacturing:

Integrated circuits, hybrid circuits, detectors.

PCB and periferal manufacturiing.

All manufacturiing ISO class 4, 5, 6, 7, and 8.

H-2, H-4, H-5

Douglas White, AIA

Founder and President, WHL