1 ASIA CONSTRUCT CONFERENCE 2013 Davy Davy Davy Davy Sukamta Sukamta Sukamta Sukamta, , , , Principal Davy Sukamta & Partners – Structural Engineers STATE STATE STATE STATE- - -OF OF OF OF- - -PRACTICE OF PRACTICE OF PRACTICE OF PRACTICE OF SEISMIC DESIGN AND CONSTRUCTION SEISMIC DESIGN AND CONSTRUCTION SEISMIC DESIGN AND CONSTRUCTION SEISMIC DESIGN AND CONSTRUCTION OF OF OF OF HIGH HIGH HIGH HIGH- - -RISE BUILDINGS RISE BUILDINGS RISE BUILDINGS RISE BUILDINGS IN INDONESIA IN INDONESIA IN INDONESIA IN INDONESIA ASIA CONSTRUCT CONFERENCE 2013 ISEMS, 7-8 November 2013 Why does the current code require improvements ? Why does the current code require improvements ? Why does the current code require improvements ? Why does the current code require improvements ? 1. To considers recent great earthquakes in Indonesia USGS Aceh Earthquake Mw=9.1 (December, 2004) Yogya Earthquake Mw=6.3 (May, 2006) Tasik Earthquake Mw=7.4 (Sept, 2009) Padang Earthquake Mw=7.6 (Sept, 2009) Jambi EarthquakeMw=6.6 (Oct, 2009) Nias Earthquake Mw=8.6 (March, 2005) ASIA CONSTRUCT CONFERENCE 2013

Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

Embed Size (px)

Citation preview

Page 1: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

1

ASIA CONSTRUCT CONFERENCE 2013

Davy Davy Davy Davy SukamtaSukamtaSukamtaSukamta, , , , PrincipalDavy Sukamta & Partners – Structural Engineers

STATESTATESTATESTATE----OFOFOFOF----PRACTICE OFPRACTICE OFPRACTICE OFPRACTICE OFSEISMIC DESIGN AND CONSTRUCTIONSEISMIC DESIGN AND CONSTRUCTIONSEISMIC DESIGN AND CONSTRUCTIONSEISMIC DESIGN AND CONSTRUCTION OFOFOFOF

HIGHHIGHHIGHHIGH----RISE BUILDINGSRISE BUILDINGSRISE BUILDINGSRISE BUILDINGS IN INDONESIAIN INDONESIAIN INDONESIAIN INDONESIA

ASIA CONSTRUCT CONFERENCE 2013

ISEMS, 7-8 November 2013

Why does the current code require improvements ?Why does the current code require improvements ?Why does the current code require improvements ?Why does the current code require improvements ?

1. To considers recent great earthquakes in Indonesia

USGS

Aceh Earthquake Mw=9.1 (December, 2004)

Yogya Earthquake Mw=6.3 (May, 2006)

Tasik Earthquake Mw=7.4 (Sept, 2009)

Padang Earthquake Mw=7.6 (Sept, 2009)

Jambi EarthquakeMw=6.6 (Oct, 2009)

Nias Earthquake Mw=8.6(March, 2005)

ASIA CONSTRUCT CONFERENCE 2013

Page 2: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

2

ASIA CONSTRUCT CONFERENCE 2013 ASIA CONSTRUCT CONFERENCE 2013

Advances in Seismic DesignAnd Construction for High-Rise Buildings

In Indonesia

1.Revision of Seismic Resistant Design Code 2012

2. Use of Performance-Based Seismic Design for High-Rise Buildings

3. Application of Base Isolation System for High-Rise Buildings

ASIA CONSTRUCT CONFERENCE 2013

1970 : Indonesian Loading Code – N.I-18

1983 : Seismic Resistant Design for Buildings, Code of Practice

2002 : Code on Seismic Resistant Design for Buildings, SNI 03-1726-2002

2012: New Seismic Resistant Design Code

ASIA CONSTRUCT CONFERENCE 2013

IBC 2011

ASCE 7-05ASCE 7-10

UPDATING THE CODERef.Prof.Masyhur Irsyam

Page 3: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

3

What are the changes?

3 maps for 500-yr EQ and 3 for 2500-yr EQa.PGAb.Spectra at 0.2 secc.Spectra at 1.0 sec

ASIA CONSTRUCT CONFERENCE 2013

( Irsyam et al,2010)

ASIA CONSTRUCT CONFERENCE 2013

( Irsyam et al,2010)

ISEMS, 7-8 November 2013

5. Toru

6. Angkola

8. Sumpur

1.Seulimeum

13. Dikit

14. Ketaun

11. Suliti 15. Musi

16. Manna

17. Kumering

18.Semangko

19.Sunda

9. Sianok

7. Barumun

4. Renun

2. Aceh

3. Tripa

10. Sumani

12. Siulak

Jawa-Sumba

Subduction

Philippine Subduction

Irian

Subduction

N. Sulawesi

Subduction

E. Molucca Subduction

Banda Sea

Collision

W. Molucca

Subduction

Timor Subduction

S. Sumatra

Subduction

N. Sumatra

Subduction56. Sulu thrust

50. Palu-Koro

53. Poso

58. Lawanopo

57. Gorontalo

52. Walanae 55. Tolo thrust

51. Matano

54. Batui thrust

73. Sorong-Maluku

72. Sula-Sorong

71. Tarera-Aidun

70. Yapen

75. Ransiki74. Sorong

79 Highland thrust belt

77. Manokwari trench

76. Membrano

thrust tbelt

78. Lowland34. Wetar back arc

36. Flores back arc

33. Semarang

34. Jogja30. Bumiayu

32. Cimandiri

31. Baribis

Well Identified Faults in Indonesia

( Irsyam et al,2010)

Page 4: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

4

ASIA CONSTRUCT CONFERENCE 2013

Many provisions of ASCE 7-10 has been included in the SNI 03-1726-2012

ASIA CONSTRUCT CONFERENCE 2013

New Provisions

Vertical Irregularities

Horizontal Irregularities

Seismic Design Categories

Redundancy Factors

Generating Design Response Spectrum

ASIA CONSTRUCT CONFERENCE 2013

PERFORMANCE-BASED SEISMIC DESIGN

Seismic Design of High-rise Buildings

Page 5: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

5

ASIA CONSTRUCT CONFERENCE 2013

SEAOC Vision 2000Earthquake Performance Level

Fully Operational Operationnal Life SafeNear

Collapse

Ear

thq

uak

e D

esig

n L

evel

Frequent(43 years)

Basic Objective Unacceptable Unacceptable Unacceptable

Occasional(72 years)

Essential/Hazardous Objective

Basic Objective Unacceptable Unacceptable

Rare(475 Years)

Safety Critical Objective

Essential/Hazardous objective

Basic Objective Unacceptable

Very Rare(2500 years) MCE

Not FeasibleSafety Critical

ObjectiveEssential/Hazardous objective

Basic Objective

ASIA CONSTRUCT CONFERENCE 2013

No. Of Floors : 50 storiesTotal Height : 250 mLateral Resisting System : RC core wall and outriggerBasement : 3 levelsFoundation system : Bored-pileStructural Engineer : Davy Sukamta & PartnersFoundation Engineer : Davy Sukamta & Partners

ASIA CONSTRUCT CONFERENCE 2013

PAKUBUWONO SIGNATURE

Floor-to-floor 3.85mRC Core wall and Outriggers, 25-55 MpaWall thickness 650 mmOutrigger Beam 3-story deepExpected inelastic action at coupling beams, base of core wall, both ends of outrigger columns

ASIA CONSTRUCT CONFERENCE 2013

3-D Nonlinear Model

core wall

hinge zones

Basement structure is includedModel is fixed at the mat foundation level

SSI is not included

Page 6: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

6

ASIA CONSTRUCT CONFERENCE 2013

• Analysis procedures and

acceptance criteria: follow the

PEER TBI Guidelines

• For this case study, we use

three suites of ground motions

and take the maximum value

• Selection and modification of

GM : Follow PEER GMSM

• The three GM represent

subduction, benioff and

background earthquake

ASIA CONSTRUCT CONFERENCE 2013

Event Characteristic Magnitude,Mw

Distance (km) ScaleFactor

PGA (g) Source

Chi Chi (1999) Megathrust zone 7.62 117 5.3 0.18 PEER

Chi Chi (1999) Benioff zone 7.62 118 5.7 0.26 PEER

Imperial

Valley(1994)

Shallow crustal 6.50 25 1.0 0.42 PEER

Selected Ground Motion

ASIA CONSTRUCT CONFERENCE 2013

CHICHI RECORD

3-D VIEW Y-AXIS X-AXIS

ASIA CONSTRUCT CONFERENCE 2013

IMPERIAL VALLEY RECORD

3-D VIEW Y-AXIS X-AXIS

Page 7: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

7

ASIA CONSTRUCT CONFERENCE 2013 ASIA CONSTRUCT CONFERENCE 2013

ASIA CONSTRUCT CONFERENCE 2013 ASIA CONSTRUCT CONFERENCE 2013

Page 8: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

8

ASIA CONSTRUCT CONFERENCE 2013 ASIA CONSTRUCT CONFERENCE 2013

Fundamental principle of base isolation: modify the response of the building so that the ground can move below the buildings without transmitting these motion into the building.

ASIA CONSTRUCT CONFERENCE 2013

The codes gives minimum design requirementsIt does not guarantee the building will not be damaged during earthquake

It does not protect the content from damage

ASIA CONSTRUCT CONFERENCE 2013

� Loma Prieta 1989 – $7 Billion

� $450 Million per Second

� Northridge 1994 - $30 Billion

� $2 billion per second!

� Kobe 1995 - $150 - $200 Billion

� $7.5 billion per second!!

Earthquakes can be Catastrophic and Very Expensive

Page 9: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

9

ASIA CONSTRUCT CONFERENCE 2013

Design Objectives of Base Isolation

Copyright © 2012 Bridgestone Corporation

ISEMS, 7-8 November 2013

No structural damage in seismically isolated building

Inside of a seismically isolated fire station

Inside of a seismically isolated apartment

Base-isolated apartment in Sendai City

Fixed-base office building in Sendai City

Shear cracks on the wall

No damage or turn over of furniture inside room

Structural damage in fixed-base building

Fixed-base apartment in Sendai City

Heavy damage inside room

4. Performance of Seismically Isolated Buildings in Tohoku Area

34

ASIA CONSTRUCT CONFERENCE 2013 ASIA CONSTRUCT CONFERENCE 2013

Page 10: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

10

ASIA CONSTRUCT CONFERENCE 2013

Podium

Tower

Base Isolation

Seismic Gap

Plan and SectionOf Gudang Garam Tower

Separation

Isolationlevel

ASIA CONSTRUCT CONFERENCE 2013

General Philosophy of Building Code Provision

ASIA CONSTRUCT CONFERENCE 2013

Each bearing is tested in the manufacturer’s lab

ASIA CONSTRUCT CONFERENCE 2013

Page 11: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

11

ASIA CONSTRUCT CONFERENCE 2013

Lateral Resistant System: RC Corewall+Outriggerand Seismic Steel Moment Frame, with HDRB

ASIA CONSTRUCT CONFERENCE 2013

Seismic design detailings are put in place with strict supervision to the works, starting from foundation:- Confinement of pile steel rebar- Diameter of bend- Length of hook

ASIA CONSTRUCT CONFERENCE 2013

Base plate with long anchors and shear studs

ASIA CONSTRUCT CONFERENCE 2013

Installation of lower base plate

Page 12: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

12

ASIA CONSTRUCT CONFERENCE 2013

Installation of lower base plate

ASIA CONSTRUCT CONFERENCE 2013

Installation of upper base plateTolerance in level is 2mm

ASIA CONSTRUCT CONFERENCE 2013 ASIA CONSTRUCT CONFERENCE 2013

Base plates in placeRC Mat ready for casting

Page 13: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

13

ASIA CONSTRUCT CONFERENCE 2013

Installation of coupling beamWith diagonal reinforcement

ASIA CONSTRUCT CONFERENCE 2013

Erection of Steel Structure

ASIA CONSTRUCT CONFERENCE 2013

Swing Recorder

ASIA CONSTRUCT CONFERENCE 2013

Prequalified Moment Connection:Reduced Beam Section

Page 14: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

14

ASIA CONSTRUCT CONFERENCE 2013

Detail of Column to Beam Connectionand RBS

Detail of Column ConnectionWith Full Penetration Weld

ASIA CONSTRUCT CONFERENCE 2013

ASIA CONSTRUCT CONFERENCE 2013

Opening to facilitatethe transportation of HDRBsshould they be replacedin the future

ASIA CONSTRUCT CONFERENCE 2013

Page 15: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

15

ASIA CONSTRUCT CONFERENCE 2013 ASIA CONSTRUCT CONFERENCE 2013

Isolated side

Non isolated

Isolated side

ASIA CONSTRUCT CONFERENCE 2013

Horizontal Displacement MeasurementDuring Final Inspection

ASIA CONSTRUCT CONFERENCE 2013

Vertical Displacement MeasurementDuring Final Inspection

Page 16: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

16

ASIA CONSTRUCT CONFERENCE 2013

Surface Temperature MeasurementDuring Final Inspection

ASIA CONSTRUCT CONFERENCE 2013

Gap Measurement

ASIA CONSTRUCT CONFERENCE 2013 ASIA CONSTRUCT CONFERENCE 2013

Examples of good detailing practice

Page 17: Why does the current code require · PDF fileSubduction Philippine Subduction Irian Subduction N. Sulawesi Subduction E. Molucca Subduction Banda Sea Collision ... Presentasi Asia

17

ASIA CONSTRUCT CONFERENCE 2013

PURI MATAHARI DJARUM HEAD OFFICE

Coming SoonASIA CONSTRUCT CONFERENCE 2013

http://www.davysukamta.com

TTTTHANK YOUHANK YOUHANK YOUHANK YOU

News / Articles / Asia Construct