34
N SCALE, FEET ALIGNMENT 253 254 255 256 257 258 through the National Environmental Policy Act evaluation process. This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street) Village of Ephraim Preliminary Concept 0 10 20 SHEET OF 1 34 WI S 42 ( WA TE R S T R EET ) S OU T H B OUND WI S 42 ( WA TE R S T R EET ) NO R T H B OUND HI GHL AND R OAD C oun t yA Park. between County A and Peninsula State shared-use path would extend shared-use path limits. The potential south from the Village of Ephraim Door County will add a path extending Further study is needed to determine if LEGEND Limits of Construction Crosswalk Grading Easement Estimated Temporary Estimated Right of Way Acquisition Sidewalk/Shared-Use Path Parking Roadway/Bicycle Lane

WIS 42 (Water Street) Village of Ephraim Preliminary Concept

  • Upload
    buidien

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

Page 1: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

ALIGNMENT

253

254

255256

257 258

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF1 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

HIG

HLA

ND R

OA

D

County A

Park.

between County A and Peninsula State

shared-use path would extend

shared-use path limits. The potential

south from the Village of Ephraim

Door County will add a path extending

Further study is needed to determine if

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 2: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

Deborah Eckert

ALIGNMENT

258 259 260 261 262263

264

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF2 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

Park.

between County A and Peninsula State

shared-use path would extend

shared-use path limits. The potential

south from the Village of Ephraim

Door County will add a path extending

Further study is needed to determine if

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 3: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

John Balistreri

Deborah Eckert

Ryan Belonger

Marilee Hickey

Steven & Kaaren Oreck

Andrew & Tami Moore

(WIDNR)

Peninsula State Park

ALIGNMENT

264

265

266

267 268

269

270

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF3 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

MAPLE G

RO

VE R

OA

D

Park.

between County A and Peninsula State

shared-use path would extend

shared-use path limits. The potential

south from the Village of Ephraim

Door County will add a path extending

Further study is needed to determine if

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 4: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

Andrew & Tami Moore

Marilee Hickey

David & Lucy Thompson

Albert & Barbara Fox

Rebmann

Robert & Virginia

Revocable Trust

Cunnigham Family

ALIGNMENT

270

271

272

273

274275

276

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF4 34

WIS 42 (WATER STREE

T) SOUTHBOUND

WIS 42 (WATER STREE

T) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

Park.

between County A and Peninsula State

shared-use path would extend

shared-use path limits. The potential

south from the Village of Ephraim

Door County will add a path extending

Further study is needed to determine if

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 5: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Marilee Hickey

Cunnigham Family Revocable Trust

Rebmann

Robert & Virginia

Ephraim Historical Foundation

(WIDNR)

Peninsula State Park

(WIDNR)

Peninsula State Park

(WIDNR)

Peninsula State Park

ALIGNMENT

276

277

278 279

280

281

282

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF5 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

HO

LA

ND R

OA

D

SH

OR

E R

OA

D

PROPOSED RIGHT OF WAY

TEMPORARY EASEMENT

Park.

between County A and Peninsula State

shared-use path would extend

shared-use path limits. The potential

south from the Village of Ephraim

Door County will add a path extending

Further study is needed to determine if

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 6: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

(WIDNR)

Peninsula State Park

New Par 3 Golf Course

(WIDNR)

Peninsula State Park

ALIGNMENT

283 284 285 286 287 288

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF6 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

Holand R

oad

PROPOSED RIGHT OF WAY

PROPOSED RIGHT OF WAY

TEMPORARY EASEMENT

Drive could be moved to here

Golf course, the crossing at Shore

future between Peninsula State Park

If an underpass of WIS 42 is built in the

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 7: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

(WIDNR)

Peninsula State Park

(WIDNR)

Peninsula State Park

Berjouhi Vartanian

Lake Shores Condo

ALIGNMENT

289 290 291 292 293 294 295

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF7 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

HO

LA

ND R

OA

D

CR

YST

AL S

PRIN

GS R

OA

D

PROPOSED RIGHT OF WAY

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 8: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Lowel & Betsy Wolf

Five J's Trust

Berjouhi Vartanian

Daniel & Deborah Shannon

(Village of Ephraim)

Ephraim Wetlands Preserve

ALIGNMENT

295 296 297 298 299 300

301

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF8 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

TEMPORARY EASEMENT

PROPOSED RIGHT OF WAY

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 9: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

John & Grace Held

Sip

William, Jr. & Elizabeth

Hedvig Heise

Cushing Family Trust

Harbor

Ephraim Yacht

Harbor

Ephraim Yacht

Shannon

Daniel & Deborah

Cushing Family Trust

Hedvig HeiseSip

& Elizabeth

William, Jr.

Shannon

Daniel & Deborah

NEW BOX CULVERTALIGNMENT

PROPOSED RIGHT OF WAY

301

302303 304 305 306

307

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF9 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

TEMPORARY EASEMENT

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY EXISTING RIGHT OF WAY

EAGLE HARBOR

TEM

PORARY EAS

EMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 10: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Ephraim Yacht Harbor

Old Banking Grounds Condominium

Old Banking Grounds Condominium

Marilee & Dean Hickey

Bay Breeze Resort Properties LLC

Marilee Hickey

Judith Walch

Ephraim Condominium

ALIGNMENT

307

308

309 310 311 312 313

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF10 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

TEMPORARY EASEMENT

EXISTING RIGHT OF WAY

EAGLE HARBOR

BR

OO

KSID

E L

AN

E

RIG

HT O

F W

AY

PR

OP

OSE

D

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 11: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Russel Bath

Ephraim Condominium

Ephraim Condominium

Katherine Pyeatt

Gary & Lisa Carlson

Stoehr Cottage Trust

BTC Holdings II LLC

Robert Evanson

Christian & Kirsten Bungener

Schwengel

James & Judy

(Village of Ephraim)

Ephraim Public Beach (Village of Ephraim)

Ephraim Public Beach

ALIGNMENT

313 314 315 316 317318

319

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF11 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

TEMPORARY EASEMENT

EXISTING RIGHT OF WAY

EAGLE HARBOR

PROPOSED RIGHT OF WAY

( + 9 Parking Spaces )

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 12: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Schwengel

James & Judy

Ann Abbott

Cottages LLC

Ephraim Village

United Ventures Luv LLC

BTC Holdings I LLC

John & Victoria Cultra Jeffrey Price

David Schroeder

Tony & Barbara Schmeltz

David & Elizabeth Chomeau

Bernal Chomeau

Geoffrey & Anna Lardiere

Lawrence & Anne Crowe

Russell Zabler

(Village of Ephraim)

Ephraim Public Beach

ALIGNMENT

320

321

322 323

324

325

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF12 34

WIS 42 (WATER STREET) SOUTHBOUNDWIS 42 (WATER STREET) NORTHBOUND

TEMPORARY EASEMENTPROPOSED RIGHT OF WAY

EXISTING RIGHT OF WAY

EAGLE HARBOR

HID

DEN S

PRIN

G R

OA

D

TEMPORARY EASEMENT

Pedestrian activated crossing

( + 3 Parking Spaces )

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 13: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Russell Zabler

Lawrenve & Anne Crowe James Crane

Eagle Harbor Inn Condominium

Log Craft Condo Kerstin Conner

Log Craft CondoShorewood Village Condominiums

Shorewood Inn Partners LLCThomas Munns

Carol Gresko-Bacigalupo

Roy & Leslie Harsch

Bridenhagen

Fredric & Stacy

ALIGNMENT

326 327 328 329330

331

332

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF13 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

TEMPORARY EASEMENT

PROPOSED RIGHT OF WAY

EXISTING RIGHT OF WAY

EAGLE HARBORLEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 14: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Fredric & Stacy Bridenhagen

Roy & Leslie Harsch

Kevin & Wanda McDonald

Hotel Ephraim LLC

Evergreen Beach Real Estate LLCRoppuld

Paul & Marianne

Roppuld

Paul & Marianne

Patricia Fess

Patricia Fess

John & Amy Murphy

Murphy

John & Amy

ALIGNMENT

332

333334 335

336

337

338

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF14 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

TEMPORARY EASEMENT

PROPOSED RIGHT OF WAY

EXISTING RIGHT OF WAY

EAGLE HARBOR

GE

RM

AN R

OA

D

MORAVIA STREET

PROPOSED RIGHT OF WAYTEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 15: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

John & Amy Murphy

John & Amy Murphy

Ephraim Foundation Inc

Moravian Church

Ephraim

Village of

Trust

Family

Webb

Village of Ephraim

Roland OlsonOlson

Roland

Webb Family Trust

Village of Ephraim

ALIGNMENT

Village of EphraimVillage of Ephraim

338

339

340 341

342

343

344

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF15 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EAGLE HARBOR

MORAVIA STREET

EXISTING RIGHT OF WAY

PROPOSE

D RI

GHT OF

WAY

PROPOSE

D RIG

HT OF W

AY

PROPOSED RIGHT OF WAYTE

MPORARY

EASEM

ENT

TEM

PORARY EAS

EMENT

TEMPORARY EASEMENT

impacts to Moravia Street

Retaining wall needed to reduce

to Morvia Street

Possible future path to connect WIS 42

( + 10 Parking Spaces )

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 16: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Roland Olson

Olson

Roland

Village of Ephraim

Webb Family Trust

Village of Ephraim

Village of Ephraim

South Shore Pier LLC

Roy & Diane Elquist

Timothy & Nancy Christofferson

Village of Ephraim

Village of Ephraim

Mary Knowles

ALIGNMENT

(Village of Ephraim)

Harborside Park

344

345

346

347

348

349

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF16 34

WIS 42 (WATER ST

REET) SOUTHBOUND

WIS 42 (WATER ST

REET) NORTHBOUND

EXISTING RIG

HT OF WAY

EAGLE HARBOR

CHER

RY ST

REE

T

PIO

NEE

R L

ANE

PROPOSED RIGHT OF WAY

TEMPORARY EASEMENT

OF W

AY

PROPOSED RIG

HT

TEMPORARY EASEMENT

( + 10 Parking Spaces )

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 17: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Village of Ephraim

Village of Ephraim

Oneson Trust of 1994

Mary Knowles

Village of Ephraim

Village of Ephraim

of 1994

Oneson Trust

Brad & Amy Russell

Brad & Amy Russell

Ephraim Shores Inc

Ephraim Shores Inc

(Village of Ephraim)

Olson Park

Onseson Trust of 1994

ALIGNMENT

349

350

351

352

353

354

355

356

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF17 34

WIS 4

2 (WATE

R STR

EET)

SOUTHBOUND

WIS 4

2 (WATE

R STR

EET)

NORTHBOUND

EXISTING RIGHT OF WAY

EAGLE HARBOR

CH

UR

CH S

TR

EET

PIO

NEE

R L

AN

E

EXISTING RIGHT OF WAY

PROPOSED RIGHT OF WAY

PROPOSED RIGHT OF WAY

TEMPORARY EASEMENT

TEMPORARY EASEMENT

Pedestrian activated crossing

( - 23 Parking Spaces )

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 18: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Shores Inc

Ephraim

Edgewater Resort Condo

Edgewater Resort CondoEphraim

Village of

Ephraim

Village of

Ephraim

Village of

Ephraim Foundation Inc

Anne Tuohy

Ephraim Yacht Harbor Inc

(Village of Ephraim)

Visitor Information CenterALIGNMENT

356

357

358

359

360361 362

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF18 34

WIS 42 (WATER STREET) SOUTHBOUNDWIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EAGLE HARBOR

SP

RU

CE S

TR

EET

CE

DA

R S

TR

EET

EXISTING RIGHT OF WAY

PROPOSED RIGHT OF WAY

PROPOSED RIGHT OF WAY

TEMPORARY EASEMENT

TEMPORARY EASEMENT

street.

Ephraim Yacht Harbor across the

spots would need to be removed from

acquistion from this parcel, parking

In order to avoid Right of way

( - 6 Parking Spaces )

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 19: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTIONEphraim Yacht Harbor Inc

Ephraim Yacht Harbor Condominium

Village of Ephraim

Door County Dev LLC

Door County Dev LLC

Schoendorf Door County RSDNC Trust

Beetle and Poker Condominium

RETAINING WALL

ALIGNMENT

363

364

365366

367 368

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF19 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EAGLE HARBOR

PROPOSED RIGHT OF WAY

TEMPORARY EASEMENT

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 20: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Condominium

Beetle and Poker

Charles & Elinor Pearson

Wendell & Shana Ellsworth

Paul & Judith Flottman

Paul & Judith Flottman

Village of Ephraim

Ephraim Foundation Inc

Anderson Family Properties LLC

Anderson Family Properties LLC

Bruce Timmons

Bruce Timmons

ALIGNMENT

369

370

371

372

373

374

375

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF20 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EAGLE HARBOR

EXISTING RIG

HT OF WAY

AN

DE

RS

ON L

AN

E

PROPOSED RIGHT OF WAY

TEMPORARY EASEMENT

TEMPORARY EASEMENT

Pedestrian activated crossing

roadway instead of impacting the west side.

ROW is required from the east side of the

and the addition of sidewalk/shared use path,

Due to constraints on the west side of WIS 42

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 21: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Bruce Timmons

Bruce Timmons

Enterprise Realty Group LLC

Cynthia Reifenrath

Catherine O'Brien

Thomas & Mary Afflerbach

Enterprise Realty Group LLC

Pfeifer QUAL PRSNL RSDNC TRST

Door County Land Trust Inc

Steele

& Elizabeth

Jeffrey

ALIGNMENT

376

377378 379 380 381

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF21 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

MORAVI

A ST

REET

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 22: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Jeffrey & Elizabeth Steele

Wendy Tinnon Yeomans Cottages LLC

Knudson House Condo

Javier & Maria Sandoval

Carol Slusser

Mary Hernecheck

Plouff

Thomas

ALIGNMENT

382

383 384

385

386

387

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF22 34

WIS 42 (WATER STRE

ET) SOUTHBOUND

WIS 42 (WATER STRE

ET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

MORAVIA STR

EET

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 23: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Carol Slusser

Richard Volkmann

Thomas Plouff

Jeffrey & Elizabeth Steele

Bonnie Watlington

Watlington

Bonnie

Richard & Susan Christensen

Pamela MacMullen

Larry & Conalee Herbst

William Gleiss

ALIGNMENT

388

389

390

391392 393 394

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF23 34

WIS 42 (WATER ST

REET) SOUTHBOUND

WIS 42 (WATER ST

REET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

ME

AD

OW L

AN

E

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 24: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Larry & Conalee Herbst

Hellmuth & Doris Dieterle

William Gleiss

David, Jr. & Julia Uihlein

Aring Ephraim Prtnr

Kevin & Lori Free

Crum Trust

David & Julia Uihlein

Struart F Trst Exog

Struart F Trst Exog

Thomas & Amie Brey

ALIGNMENT

394

395

396

397

398 399

400

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF24 34

WIS 42 (WATER STR

EET) SOUTHBOUND

WIS 42 (WATER STR

EET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

AMUNDSON ROAD

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 25: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Crum Trust

Robert & Joy Talsma

Thomas & Amie Brey

Kathy Hollister

Astrada Silins

Jon Von Briesen

ALIGNMENT

400

401

402403

404

405

406

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF25 34

WIS 42 (WATER STR

EET) SOUTHBOUND

WIS 42 (WATER STR

EET) NORTHBOUND

EXISTING RIGHT OF WAY

AM

UN

DSO

N R

OAD

BR

OD

D L

AN

E

EXISTING RIGHT OF WAY

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 26: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Astrada Silins

Frances E Marital Trust

Robert & Joy Talsma

Jon Von Briesen

Morrie & Leslee Goldman

Michael & Sarah Novotny

Richard & Claire Bierman

ALIGNMENT

406

407

408 409 410 411 412

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF26 34

WIS 42 (WATER STR

EET) SOUTHBOUND

WIS 42 (WATER STR

EET) NORTHBOUND

EXISTING RIGHT OF WAY

N C

OR

AL HIL

L R

OA

D

EXISTING RIGHT OF WAY

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 27: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

William P Trust

Bierman

Richard & Claire

Richard & Claire Bierman

Margaret Lott

Jon & Elizabeth Dahlman

Jon & Elizabeth Dahlman

Nicholas Hilmers

Richard & Claire Bierman Trust

ALIGNMENT412 413 414 415 416 417 418

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF27 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 28: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Nicholas Hilmers

Richard & Karen Bierman

Richard & Claire Bierman Trust

Larry & Jane Long

Blue Dolphin LTD

Waterbury Inn Condo

ALIGNMENT

418

419

420

421 422

423

424

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF28 34

EXISTING RIGHT OF WAY

EXISTIN

G RIGHT O

F WAY

OR

CH

AR

D S

TREET

OR

CH

AR

D S

TREET

PROPOSED RIGHT OF WAY WIS 4

2 (WATER

STRE

ET) SO

UTHBOUND

WIS 4

2 (WATER

STRE

ET) NORT

HBOUND

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 29: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Blue Dolphin LTD

Waterbury Inn Condo

Paul & Frances Burton

Cliffhanger LLC

ALIGNMENT

424 425 426 427 428 429

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF29 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY EXISTING RIGHT OF WAY

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 30: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Cliffhanger LLC

Paul & Frances Burton

Paul & Frances Burton

Unitarian Universalist Fllshp DC

Green Gables Condominium

Salvador & Karen Cruz

ALIGNMENT

430 431 432 433 434 435 436

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF30 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 31: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Salvador & Karen Cruz

Paul & Frances Burton

Francis Chen

Connie Hatch

High Point Inn Condominium

of Door County LLC

A & M Properties

Francis Chen

ALIGNMENT

436 437 438 439 440 441 442

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF31 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 32: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTIONHigh Point Inn Condominium

A & M Properties of Door County LLC

Robert Yttri

Inn the Door LLC

Robert Yttri

ALIGNMENT

442 443 444 445 446 447 448

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF32 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 33: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Inn the Door LLC

Joseph Hammer

Robert Yttri

Richard & Kathleen Luther

Armando Jauregui

Carol Gresko-Lyons

Richard & Celeste Wegman

ALIGNMENT

449 450 451 452 453 454

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF33 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane

Page 34: WIS 42 (Water Street) Village of Ephraim Preliminary Concept

N

SCALE, FEET

LIMITS OF CONSTRUCTION

Richard & Celeste Wegman

North Ephraim Condo

Associated Bank of Green Bay

Field Property IRR Trust

McKeefry & Yeomans Landscaping LLP

ALIGNMENT

455 456457

458

459

460

461

through the National Environmental Policy Act evaluation process.

This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)

Village of Ephraim Preliminary Concept

0 10 20

SHEET OF34 34

WIS 42 (WATER STREET) SOUTHBOUND

WIS 42 (WATER STREET) NORTHBOUND

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

EXISTING RIGHT OF WAY

TOW

LINE

RO

AD

TOW

LINE

RO

AD

Village Li

mits

TEMPORARY EASEMENT

LEGEND

Limits of Construction

Crosswalk

Grading Easement

Estimated Temporary

Estimated Right of Way Acquisition

Sidewalk/Shared-Use Path

Parking

Roadway/Bicycle Lane