This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF1 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
HIG
HLA
ND R
OA
D
County A
Park.
between County A and Peninsula State
shared-use path would extend
shared-use path limits. The potential
south from the Village of Ephraim
Door County will add a path extending
Further study is needed to determine if
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
Deborah Eckert
ALIGNMENT
258 259 260 261 262263
264
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF2 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
Park.
between County A and Peninsula State
shared-use path would extend
shared-use path limits. The potential
south from the Village of Ephraim
Door County will add a path extending
Further study is needed to determine if
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
John Balistreri
Deborah Eckert
Ryan Belonger
Marilee Hickey
Steven & Kaaren Oreck
Andrew & Tami Moore
(WIDNR)
Peninsula State Park
ALIGNMENT
264
265
266
267 268
269
270
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF3 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
MAPLE G
RO
VE R
OA
D
Park.
between County A and Peninsula State
shared-use path would extend
shared-use path limits. The potential
south from the Village of Ephraim
Door County will add a path extending
Further study is needed to determine if
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
Andrew & Tami Moore
Marilee Hickey
David & Lucy Thompson
Albert & Barbara Fox
Rebmann
Robert & Virginia
Revocable Trust
Cunnigham Family
ALIGNMENT
270
271
272
273
274275
276
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF4 34
WIS 42 (WATER STREE
T) SOUTHBOUND
WIS 42 (WATER STREE
T) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
Park.
between County A and Peninsula State
shared-use path would extend
shared-use path limits. The potential
south from the Village of Ephraim
Door County will add a path extending
Further study is needed to determine if
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Marilee Hickey
Cunnigham Family Revocable Trust
Rebmann
Robert & Virginia
Ephraim Historical Foundation
(WIDNR)
Peninsula State Park
(WIDNR)
Peninsula State Park
(WIDNR)
Peninsula State Park
ALIGNMENT
276
277
278 279
280
281
282
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF5 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
HO
LA
ND R
OA
D
SH
OR
E R
OA
D
PROPOSED RIGHT OF WAY
TEMPORARY EASEMENT
Park.
between County A and Peninsula State
shared-use path would extend
shared-use path limits. The potential
south from the Village of Ephraim
Door County will add a path extending
Further study is needed to determine if
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
(WIDNR)
Peninsula State Park
New Par 3 Golf Course
(WIDNR)
Peninsula State Park
ALIGNMENT
283 284 285 286 287 288
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF6 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
Holand R
oad
PROPOSED RIGHT OF WAY
PROPOSED RIGHT OF WAY
TEMPORARY EASEMENT
Drive could be moved to here
Golf course, the crossing at Shore
future between Peninsula State Park
If an underpass of WIS 42 is built in the
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
(WIDNR)
Peninsula State Park
(WIDNR)
Peninsula State Park
Berjouhi Vartanian
Lake Shores Condo
ALIGNMENT
289 290 291 292 293 294 295
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF7 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
HO
LA
ND R
OA
D
CR
YST
AL S
PRIN
GS R
OA
D
PROPOSED RIGHT OF WAY
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Lowel & Betsy Wolf
Five J's Trust
Berjouhi Vartanian
Daniel & Deborah Shannon
(Village of Ephraim)
Ephraim Wetlands Preserve
ALIGNMENT
295 296 297 298 299 300
301
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF8 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
TEMPORARY EASEMENT
PROPOSED RIGHT OF WAY
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
John & Grace Held
Sip
William, Jr. & Elizabeth
Hedvig Heise
Cushing Family Trust
Harbor
Ephraim Yacht
Harbor
Ephraim Yacht
Shannon
Daniel & Deborah
Cushing Family Trust
Hedvig HeiseSip
& Elizabeth
William, Jr.
Shannon
Daniel & Deborah
NEW BOX CULVERTALIGNMENT
PROPOSED RIGHT OF WAY
301
302303 304 305 306
307
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF9 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
TEMPORARY EASEMENT
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY EXISTING RIGHT OF WAY
EAGLE HARBOR
TEM
PORARY EAS
EMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Ephraim Yacht Harbor
Old Banking Grounds Condominium
Old Banking Grounds Condominium
Marilee & Dean Hickey
Bay Breeze Resort Properties LLC
Marilee Hickey
Judith Walch
Ephraim Condominium
ALIGNMENT
307
308
309 310 311 312 313
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF10 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
TEMPORARY EASEMENT
EXISTING RIGHT OF WAY
EAGLE HARBOR
BR
OO
KSID
E L
AN
E
RIG
HT O
F W
AY
PR
OP
OSE
D
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Russel Bath
Ephraim Condominium
Ephraim Condominium
Katherine Pyeatt
Gary & Lisa Carlson
Stoehr Cottage Trust
BTC Holdings II LLC
Robert Evanson
Christian & Kirsten Bungener
Schwengel
James & Judy
(Village of Ephraim)
Ephraim Public Beach (Village of Ephraim)
Ephraim Public Beach
ALIGNMENT
313 314 315 316 317318
319
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF11 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
TEMPORARY EASEMENT
EXISTING RIGHT OF WAY
EAGLE HARBOR
PROPOSED RIGHT OF WAY
( + 9 Parking Spaces )
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Schwengel
James & Judy
Ann Abbott
Cottages LLC
Ephraim Village
United Ventures Luv LLC
BTC Holdings I LLC
John & Victoria Cultra Jeffrey Price
David Schroeder
Tony & Barbara Schmeltz
David & Elizabeth Chomeau
Bernal Chomeau
Geoffrey & Anna Lardiere
Lawrence & Anne Crowe
Russell Zabler
(Village of Ephraim)
Ephraim Public Beach
ALIGNMENT
320
321
322 323
324
325
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF12 34
WIS 42 (WATER STREET) SOUTHBOUNDWIS 42 (WATER STREET) NORTHBOUND
TEMPORARY EASEMENTPROPOSED RIGHT OF WAY
EXISTING RIGHT OF WAY
EAGLE HARBOR
HID
DEN S
PRIN
G R
OA
D
TEMPORARY EASEMENT
Pedestrian activated crossing
( + 3 Parking Spaces )
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Russell Zabler
Lawrenve & Anne Crowe James Crane
Eagle Harbor Inn Condominium
Log Craft Condo Kerstin Conner
Log Craft CondoShorewood Village Condominiums
Shorewood Inn Partners LLCThomas Munns
Carol Gresko-Bacigalupo
Roy & Leslie Harsch
Bridenhagen
Fredric & Stacy
ALIGNMENT
326 327 328 329330
331
332
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF13 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
TEMPORARY EASEMENT
PROPOSED RIGHT OF WAY
EXISTING RIGHT OF WAY
EAGLE HARBORLEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Fredric & Stacy Bridenhagen
Roy & Leslie Harsch
Kevin & Wanda McDonald
Hotel Ephraim LLC
Evergreen Beach Real Estate LLCRoppuld
Paul & Marianne
Roppuld
Paul & Marianne
Patricia Fess
Patricia Fess
John & Amy Murphy
Murphy
John & Amy
ALIGNMENT
332
333334 335
336
337
338
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF14 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
TEMPORARY EASEMENT
PROPOSED RIGHT OF WAY
EXISTING RIGHT OF WAY
EAGLE HARBOR
GE
RM
AN R
OA
D
MORAVIA STREET
PROPOSED RIGHT OF WAYTEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
John & Amy Murphy
John & Amy Murphy
Ephraim Foundation Inc
Moravian Church
Ephraim
Village of
Trust
Family
Webb
Village of Ephraim
Roland OlsonOlson
Roland
Webb Family Trust
Village of Ephraim
ALIGNMENT
Village of EphraimVillage of Ephraim
338
339
340 341
342
343
344
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF15 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EAGLE HARBOR
MORAVIA STREET
EXISTING RIGHT OF WAY
PROPOSE
D RI
GHT OF
WAY
PROPOSE
D RIG
HT OF W
AY
PROPOSED RIGHT OF WAYTE
MPORARY
EASEM
ENT
TEM
PORARY EAS
EMENT
TEMPORARY EASEMENT
impacts to Moravia Street
Retaining wall needed to reduce
to Morvia Street
Possible future path to connect WIS 42
( + 10 Parking Spaces )
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Roland Olson
Olson
Roland
Village of Ephraim
Webb Family Trust
Village of Ephraim
Village of Ephraim
South Shore Pier LLC
Roy & Diane Elquist
Timothy & Nancy Christofferson
Village of Ephraim
Village of Ephraim
Mary Knowles
ALIGNMENT
(Village of Ephraim)
Harborside Park
344
345
346
347
348
349
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF16 34
WIS 42 (WATER ST
REET) SOUTHBOUND
WIS 42 (WATER ST
REET) NORTHBOUND
EXISTING RIG
HT OF WAY
EAGLE HARBOR
CHER
RY ST
REE
T
PIO
NEE
R L
ANE
PROPOSED RIGHT OF WAY
TEMPORARY EASEMENT
OF W
AY
PROPOSED RIG
HT
TEMPORARY EASEMENT
( + 10 Parking Spaces )
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Village of Ephraim
Village of Ephraim
Oneson Trust of 1994
Mary Knowles
Village of Ephraim
Village of Ephraim
of 1994
Oneson Trust
Brad & Amy Russell
Brad & Amy Russell
Ephraim Shores Inc
Ephraim Shores Inc
(Village of Ephraim)
Olson Park
Onseson Trust of 1994
ALIGNMENT
349
350
351
352
353
354
355
356
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF17 34
WIS 4
2 (WATE
R STR
EET)
SOUTHBOUND
WIS 4
2 (WATE
R STR
EET)
NORTHBOUND
EXISTING RIGHT OF WAY
EAGLE HARBOR
CH
UR
CH S
TR
EET
PIO
NEE
R L
AN
E
EXISTING RIGHT OF WAY
PROPOSED RIGHT OF WAY
PROPOSED RIGHT OF WAY
TEMPORARY EASEMENT
TEMPORARY EASEMENT
Pedestrian activated crossing
( - 23 Parking Spaces )
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Shores Inc
Ephraim
Edgewater Resort Condo
Edgewater Resort CondoEphraim
Village of
Ephraim
Village of
Ephraim
Village of
Ephraim Foundation Inc
Anne Tuohy
Ephraim Yacht Harbor Inc
(Village of Ephraim)
Visitor Information CenterALIGNMENT
356
357
358
359
360361 362
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF18 34
WIS 42 (WATER STREET) SOUTHBOUNDWIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EAGLE HARBOR
SP
RU
CE S
TR
EET
CE
DA
R S
TR
EET
EXISTING RIGHT OF WAY
PROPOSED RIGHT OF WAY
PROPOSED RIGHT OF WAY
TEMPORARY EASEMENT
TEMPORARY EASEMENT
street.
Ephraim Yacht Harbor across the
spots would need to be removed from
acquistion from this parcel, parking
In order to avoid Right of way
( - 6 Parking Spaces )
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTIONEphraim Yacht Harbor Inc
Ephraim Yacht Harbor Condominium
Village of Ephraim
Door County Dev LLC
Door County Dev LLC
Schoendorf Door County RSDNC Trust
Beetle and Poker Condominium
RETAINING WALL
ALIGNMENT
363
364
365366
367 368
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF19 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EAGLE HARBOR
PROPOSED RIGHT OF WAY
TEMPORARY EASEMENT
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Condominium
Beetle and Poker
Charles & Elinor Pearson
Wendell & Shana Ellsworth
Paul & Judith Flottman
Paul & Judith Flottman
Village of Ephraim
Ephraim Foundation Inc
Anderson Family Properties LLC
Anderson Family Properties LLC
Bruce Timmons
Bruce Timmons
ALIGNMENT
369
370
371
372
373
374
375
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF20 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EAGLE HARBOR
EXISTING RIG
HT OF WAY
AN
DE
RS
ON L
AN
E
PROPOSED RIGHT OF WAY
TEMPORARY EASEMENT
TEMPORARY EASEMENT
Pedestrian activated crossing
roadway instead of impacting the west side.
ROW is required from the east side of the
and the addition of sidewalk/shared use path,
Due to constraints on the west side of WIS 42
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Bruce Timmons
Bruce Timmons
Enterprise Realty Group LLC
Cynthia Reifenrath
Catherine O'Brien
Thomas & Mary Afflerbach
Enterprise Realty Group LLC
Pfeifer QUAL PRSNL RSDNC TRST
Door County Land Trust Inc
Steele
& Elizabeth
Jeffrey
ALIGNMENT
376
377378 379 380 381
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF21 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
MORAVI
A ST
REET
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Jeffrey & Elizabeth Steele
Wendy Tinnon Yeomans Cottages LLC
Knudson House Condo
Javier & Maria Sandoval
Carol Slusser
Mary Hernecheck
Plouff
Thomas
ALIGNMENT
382
383 384
385
386
387
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF22 34
WIS 42 (WATER STRE
ET) SOUTHBOUND
WIS 42 (WATER STRE
ET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
MORAVIA STR
EET
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Carol Slusser
Richard Volkmann
Thomas Plouff
Jeffrey & Elizabeth Steele
Bonnie Watlington
Watlington
Bonnie
Richard & Susan Christensen
Pamela MacMullen
Larry & Conalee Herbst
William Gleiss
ALIGNMENT
388
389
390
391392 393 394
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF23 34
WIS 42 (WATER ST
REET) SOUTHBOUND
WIS 42 (WATER ST
REET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
ME
AD
OW L
AN
E
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Larry & Conalee Herbst
Hellmuth & Doris Dieterle
William Gleiss
David, Jr. & Julia Uihlein
Aring Ephraim Prtnr
Kevin & Lori Free
Crum Trust
David & Julia Uihlein
Struart F Trst Exog
Struart F Trst Exog
Thomas & Amie Brey
ALIGNMENT
394
395
396
397
398 399
400
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF24 34
WIS 42 (WATER STR
EET) SOUTHBOUND
WIS 42 (WATER STR
EET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
AMUNDSON ROAD
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Crum Trust
Robert & Joy Talsma
Thomas & Amie Brey
Kathy Hollister
Astrada Silins
Jon Von Briesen
ALIGNMENT
400
401
402403
404
405
406
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF25 34
WIS 42 (WATER STR
EET) SOUTHBOUND
WIS 42 (WATER STR
EET) NORTHBOUND
EXISTING RIGHT OF WAY
AM
UN
DSO
N R
OAD
BR
OD
D L
AN
E
EXISTING RIGHT OF WAY
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Astrada Silins
Frances E Marital Trust
Robert & Joy Talsma
Jon Von Briesen
Morrie & Leslee Goldman
Michael & Sarah Novotny
Richard & Claire Bierman
ALIGNMENT
406
407
408 409 410 411 412
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF26 34
WIS 42 (WATER STR
EET) SOUTHBOUND
WIS 42 (WATER STR
EET) NORTHBOUND
EXISTING RIGHT OF WAY
N C
OR
AL HIL
L R
OA
D
EXISTING RIGHT OF WAY
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
William P Trust
Bierman
Richard & Claire
Richard & Claire Bierman
Margaret Lott
Jon & Elizabeth Dahlman
Jon & Elizabeth Dahlman
Nicholas Hilmers
Richard & Claire Bierman Trust
ALIGNMENT412 413 414 415 416 417 418
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF27 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Nicholas Hilmers
Richard & Karen Bierman
Richard & Claire Bierman Trust
Larry & Jane Long
Blue Dolphin LTD
Waterbury Inn Condo
ALIGNMENT
418
419
420
421 422
423
424
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF28 34
EXISTING RIGHT OF WAY
EXISTIN
G RIGHT O
F WAY
OR
CH
AR
D S
TREET
OR
CH
AR
D S
TREET
PROPOSED RIGHT OF WAY WIS 4
2 (WATER
STRE
ET) SO
UTHBOUND
WIS 4
2 (WATER
STRE
ET) NORT
HBOUND
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Blue Dolphin LTD
Waterbury Inn Condo
Paul & Frances Burton
Cliffhanger LLC
ALIGNMENT
424 425 426 427 428 429
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF29 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY EXISTING RIGHT OF WAY
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Cliffhanger LLC
Paul & Frances Burton
Paul & Frances Burton
Unitarian Universalist Fllshp DC
Green Gables Condominium
Salvador & Karen Cruz
ALIGNMENT
430 431 432 433 434 435 436
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF30 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Salvador & Karen Cruz
Paul & Frances Burton
Francis Chen
Connie Hatch
High Point Inn Condominium
of Door County LLC
A & M Properties
Francis Chen
ALIGNMENT
436 437 438 439 440 441 442
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF31 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTIONHigh Point Inn Condominium
A & M Properties of Door County LLC
Robert Yttri
Inn the Door LLC
Robert Yttri
ALIGNMENT
442 443 444 445 446 447 448
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF32 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Inn the Door LLC
Joseph Hammer
Robert Yttri
Richard & Kathleen Luther
Armando Jauregui
Carol Gresko-Lyons
Richard & Celeste Wegman
ALIGNMENT
449 450 451 452 453 454
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF33 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane
N
SCALE, FEET
LIMITS OF CONSTRUCTION
Richard & Celeste Wegman
North Ephraim Condo
Associated Bank of Green Bay
Field Property IRR Trust
McKeefry & Yeomans Landscaping LLP
ALIGNMENT
455 456457
458
459
460
461
through the National Environmental Policy Act evaluation process.
This preliminary concept is for planning purposes only and may be revised in later design phases WIS 42 (Water Street)
Village of Ephraim Preliminary Concept
0 10 20
SHEET OF34 34
WIS 42 (WATER STREET) SOUTHBOUND
WIS 42 (WATER STREET) NORTHBOUND
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
TOW
LINE
RO
AD
TOW
LINE
RO
AD
Village Li
mits
TEMPORARY EASEMENT
LEGEND
Limits of Construction
Crosswalk
Grading Easement
Estimated Temporary
Estimated Right of Way Acquisition
Sidewalk/Shared-Use Path
Parking
Roadway/Bicycle Lane