Work Package 4.1: End-user Components Months 6-25 D4.1.1 Design of the End-user components (Month 13) D4.1.2 Prototype of the End-user components (Month 20) D4.1.3 Report on implementation of the End- user components (Month 25)

Work Package 4.1: End-user Components Months 6-25 D4.1.1Design of the End-user components (Month 13) D4.1.2Prototype of the End-user components (Month

  • View
    218

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Work Package 4.1: End-user Components Months 6-25 D4.1.1Design of the End-user components (Month 13) D4.1.2Prototype of the End-user components (Month

Work Package 4.1:End-user

ComponentsMonths 6-25

D4.1.1 Design of the End-user components (Month 13)

D4.1.2 Prototype of the End-user components (Month 20)

D4.1.3 Report on implementation of the End-user components (Month 25)

Page 2: Work Package 4.1: End-user Components Months 6-25 D4.1.1Design of the End-user components (Month 13) D4.1.2Prototype of the End-user components (Month

Objectives• Create a reference implementation of the

software components on end-user terminal

• Identify the functional components required

• Identify components from the previous Simplicity project that can be reused

• Identify end-user components required to support security and privacy

• Design ‘Interaction applets’ supporting customized end-user interactions with services

• Implement prototype versions

Page 3: Work Package 4.1: End-user Components Months 6-25 D4.1.1Design of the End-user components (Month 13) D4.1.2Prototype of the End-user components (Month

Components will...• Be based on the requirements from WP 2 and the high

level architecture spec from WP 3 & offer...

• Provide authentication, user input, ambient combination, interaction dialogues

• Model the current location, task and context

• Interact with the platform to discover and select services

• Create a portable runtime for creation of task oriented ‘interaction applets’

• Offer task oriented ‘clipboard’ allowing information to persist facilitating the creation of composite services by the end-user

Page 4: Work Package 4.1: End-user Components Months 6-25 D4.1.1Design of the End-user components (Month 13) D4.1.2Prototype of the End-user components (Month

Discussion Topics• From WP3/ Athens we note the following important

topics:

• “8 second rule” - fast access to relevant services (discovery, approx. matching, ranking results)

• Where is the data? (persistence, identity, references, sessions, user id, context)

• Bandwidth and latency efficient interaction (long sessions)

• Task and context selection and modelling

• Usability (link to WP4.4), UI and interaction design

• Multi-modality (delegation, floor control, multi-participants)