    Well Name: Location: Rig: CDG 15 Date: Engineer:

    Well TD ft 12000 Hole Size in 7 7/8 Drill Collars OD in 6 1/4 Drill Collar Length ft 600

    Drill Pipe OD in 4 1/2 Drill Pipe ID in 3 7/8 Drill Pipe Wt. lb/ft 16.4 Mud Weight ppg 15.00

    Last Csg ID in 8 1/8 Csg Wt. Lb/ft 24.00 Last Csg Set at TD ft 9000 Leak OffGradient psi/ft 1.00

    SIDPP psi 500 SICPpsi 1040 Pit Gain bbl 20.0 BOPpsi 5000

    Pump Efficiency 96.0% Slow P.strks/min 1 Slow Speed P.Pressure psi 700 Mud Tank Volumebbl 800

    Pump Liner Szin 5 1/2 Pump Rod Szin 0 Stroke Length in 12 Working Pumps No 1 pum

    0.0146 0.613 175.0 7352

    0.0406 1.704 121.7 5112

    0.0445 1.867 400.1 16805

    696.9 29269

    800.0 33600

    1496.9 62869

    61.0 2563

    0.010816 1092.683 PumpOutput= 0.0846 bbl/min

    Initial Kick Fluid Gradient: 0.072 psi/ft I. C. Pressure (RSPP + SIDDP) = 1200 psiPossibleKick type: Gas Final Circulating Pressure= 737 psiHydrostatic Pressure at TD = 9360 psi Mud Wt. Increase= 0.80 ppg

    Formation Press= 9860 psi Kill Mud Wt.= 15.80 ppgCsg Shoe Fracture Pressure= 9000 psi Baryte Addition= 1.45 ppg

    MACPwith Original mud in csg= 1986 psi Total Baryte = 90912 lbsNew MACPwith Kill Mud = 1610 psi Number of40kgSacksRequired = 1031 sacks

    Csg Shoe Pressure at Shut-in= 8055 psi Mixing Rate of= 0.06 5 lbs/mCsg Shoe Pressure with kick at Csg Shoe= 7966 psi Volume Gainfrom Baryte Addition= 61.0 bbls

    Rate ofD.P. Pressure Drop fromSurface to the Bit = 10 psi per 43 strokes

    < Pump Strokes, Time in Minutes, D.P. Pressure (inpsi) Reduction Schedule

    1200 ICP 1154 1107 1061 1015 969 922 876 830 784 737 FCP 737 737 73

    strokes 0 199 397 596 794 993 1191 1390 1588 1787 1986 bit 2676 3366 csg 79

    min 0 199 397 596 794 993 1191 1390 1588 1787 1986 2676 3366 79

    500 1040 1200 1040 737 1017 0 1017 944 951 737 1922 0 0

    8055 Pump is Kill Mud at Old Mud Wt. 7966 at Pump Stks The P

    The Well is started the Bit. 5919 Sto

    Shut-in & and I.C. and Final Pump's Off Kick's out an

    Pressures Pressure Circulating and the at Pump Stks at Pump Stks W

    Pump Stks Stabilized Pump Stks established Pump Stks Pressure Pump Stks Well is Pump Stks 3366 Pump Stks 7905 Pump Stks SHU

    set @ 40 1986 is in Effect 1986 Shut-in 1100 New MAC 4757 KillMud'sup 7905

    Csg Annulus

    Vass Karatzas99-10-22

    bblVolumegalbbl/ft Capacitygal/ft Time (min)1986

    1381

    12000

    > Bit < Steady D.P. Press to Surfac

    692

    4539

    7905

    9075

    16980

    4539

    40kg Sacks/minor

    KICK at Csg SHOE GAS to SURFACE

    692

    Hole TotalsMud Tanks

    TOTAL MUDBaryte Vol. Gain

    7905

    9075

    16980

    or . .

    Length ftDrill PipeOH Annulus

    Pump Strokes1986

    1381

    VOLUMES and PUMPING TIMEs

    Sundance 2-5-40-19W4

    CALCULATIONS for KILLING THE WELL

    3000

    9000

    001922737951944101701017737104012001040500

    79668055

    1154p

    si

    1107p

    si

    1061

    psi

    1015p

    s

    i

    969

    psi

    922

    psi

    876p

    si

    830

    psi

    784

    psi

    737

    psi

    737

    psi

    737

    psi

    3

    500

    600

    700

    800

    900

    1000

    1100

    1200

    1300

    0 199 397 596 794 993 1191 1390 1588 1787 1986 2676 3366 79

    DRILLPIPEPRESSURE,psi

    PUMP STROKES

    DRILL PIPE PRESSUREREDUCTION SCHEDULE

    Written byVass KaratzasWHITE TOWER CONSULTING Ltd.Comments:[email protected]