YVR Master Plan

2017-2037

BC Construction Roundtable

March 8, 2016

John J. Lenahan, P.Eng., FEC

Director, Engineering Projects

YVR FACTS AND STATS

• A private, not-for-profit Authority

• #1 Airport in North America for 6

consecutive years - Skytrax

• Canada’s 2nd busiest airport

Vancouver Airport Authority & YVR

• 2015: 20.3M passengers

• 271,772 tonnes cargo

• 316,000+ take-offs & landings

• Employs more than 23,000 people

56 airline partners

118+ non-stop destinations

YVR HISTORY

1929

1931

1968

1992

2015

1950s vs. 2015

Master Plan

2027 Master Plan

Futures and Forecasts

Development of Options

and Evaluation Criteria.

Recommendations and

Draft Plan

Phase 1:

Started May 14, 2015

Phase 2:

Spring 2016

Phase 3:

Summer 2016

The Plan For The Plan

3 Hours

at Shipper in Richmond

6 Hours

at China Customs

2 Hours

Airport to Seafood Market

Total

27 Hours

5%-10%

mortality

12 Hours

Flight From YVR -China 4 Hours

at YVR

Supply Chains

BC Fresh Crab to China

Vancouver

Richmond

Densification in Richmond City Centre and South Van

100,000 New Neighbours

• Higher average temperatures

• More frequent hot days and higher max

temperatures

• More intense rainfall events, more often

• Sea-level rise and storm surge

Climate Change

Aging Population

Airside: Runways and Taxiways

How will people and goods move

around the island?

Ground Access

Where do we put

the services that

the terminal

displaces?

Terminal Options and Land Allocation

DTB Seismic Upgrade

Domestic Expansion

Expand

Customs Hall

ITD

Terminal

International Expansion

TB Expansion

COMPLETED

Transborder HBS

Project

Domestic HBS/Sort

International HBS/Sort

West Bag Hall

Major Baggage System Projects 2016-2020

Pier C Baggage

RESAs Phase I

Deicing Pads

Expansion

RESAs Phase II

Major Airside Projects 2016-2020

Pavement Rehabilitation

North South Taxiway

Future Airside Infrastructure

1. South FEC $9M

2. DTB Seismic $41M

3. Emergency Water Supply $24M

4. Dykes & Pumps $31M

5. Airside Pavement $27.8M

6. IT Systems $48.8M

7. Dinsmore Bridge Seismic Upgrade $25M

8. Electrical Upgrades $35M

9. Templeton Interchange $37M

Major Infrastructure Upgrades 2016-2020

1. District Energy for Terminal

2. Emergency Water Supply

3. Electrical Upgrades

4. Second Parkade

5. Dykes and Pumps

6. IT Systems

1. South FEC $9M

2. DTB Seismic $41M

3. Emergency Water Supply $24M

4. Dykes & Pumps $31M

5. Airside Pavement $27.8M

6. IT Systems $48.8M

7. Dinsmore Bridge Seismic Upgrade $25M

8. Electrical Upgrades $35M

9. Templeton Interchange $37M

Ground Access Projects

Templeton/Grant McConachie Way Intersection

Improve Russ Baker Way

Replace Dinsmore Bridge

Increase Canada Line Capacity

Replace

Swing

Bridge

More lane capacity to Vancouver for airport traffic

Questions?