52
ZPHB™ (ZERO POND™,ZERO POLLUTION™ , ZERO LOSS™, ZERO CARBON FOOT PRINT™ & HIGHER BIOGAS™ ) Sustainable & Profitable. A Total Green Technology CASE STUDY OF 6 SUCCESS STORIES OF POME TO HIGHER BIOGAS™/ BIOPOWER™ & EXPORT OF BIOPOWER™ TO PLN GRID. & Multiple Benefits of ZPHB™

(ZERO POND™,ZERO POLLUTION™ ZERO LOSS™, 01 11 Final - ASIA Biogas... · Another 14 palm oil mill effluent treatment ... Post Treatment by Secondary and Tertiary ... Due to Methane

  • Upload
    doannhu

  • View
    219

  • Download
    1

Embed Size (px)

Citation preview

ZPHB™(ZERO POND™,ZERO POLLUTION™ , ZERO LOSS™,

ZERO CARBON FOOT PRINT™ & HIGHER BIOGAS™ )

Sustainable & Profitable. A Total Green Technology

CASE STUDY OF 6 SUCCESS STORIES OF POME TO

HIGHER BIOGAS™/ BIOPOWER™ & EXPORT OF BIOPOWER™

TO PLN GRID.

&

Multiple Benefits of ZPHB™

PIONEER AND LEADERS IN GREEN TECHNOLOGIES

for various industries like Distillery, Palm Oil, Sugar, Food

and Rubber industries

MORE THAN 350 EFFLUENT TREATMENTS / BIOGAS PROJECTS IN

MANY COUNTRIES AROUND THE WORLD.

YEAR 2007, WE FIRST INTRODUCED THE CONCEPT OF “ZERO POND,

ZERO POLLUTION, HIGHER BIOGAS”, A SUSTAINABLE SOLUTION TO

PALM OIL INDUSTRY. A PROFITABLE SOLUTION.

NOW TOP TECHNOLOGY PROVIDER FOR “POME” TO BIOGAS

SOLUTION FOR PALM OIL INDUSTRY. A BIG THANK YOU TO ALL OUR

FORWARD THINKING CUSTOMERS.

REPEAT ORDERS ARE BEST TESTIMONY AND CURRENTLY

WE HAVE 4 REPEAT ORDERS FOR POME SOLUTION.

GLOBAL FOOT PRINT, WITH OFFICES IN INDIA, INDONESIA,

MALAYSIA,SINGAPORE, COLOMBIA & BRAZIL.

STRONG LOCAL TEAM IN INDONESIA. & MEMBER “RSPO” 2

BRIEF ABOUT KIS GROUP

6 projects operating successfully In Indonesia & 2 in India. Another 14 palm oil mill effluent treatment projects under construction in Indonesia/PNG/Ivory Coast.

FIRST PONDLESS system to capture biogas in our Unique ZPHB™ Technology More than 85 to 90% of BOD and COD Removal. Sludge management system to manage sludge.

Post Treatment by Secondary and Tertiary Treatment, plus color improvement system.

The final discharge meets the local environmental standards. Meets any changes in regulations in future.

BOD less than 100 or 20 mg/l.

HIGHER METHANE CONTENT(more than 65%) & HIGHER BIOGAS(0.5m3/kg COD)

3

ZPHB™ - PROVEN & FUTURISTIC

4

ZPHB™ References – Palm Oil Mill

Operating projects :

1. AP palm Oil Mill – India ( Past 6 years)

2. Nav Bharat palm Oil Mill – India (Past 6 years)

3. PT Meskom (Sarimas Group)–Indonesia

4. PT Agro Muko (SIPEF Group) – Indonesia CDM-POA REGISTERED

5. PT Poliplant – Indonesia- UNDER CDM-POA

6. Astra Agro Lestari-

7. PT.UMW- -UNDER CDM-POA

8) Hargy POM- PNG- Under commissioning- CDM-REGISTERED

We have 14 operating biomass projects(10 CDM registered)

in Malaysia.

5

ZPHB™ References – Palm Oil Mill

Under Constructions :

SINARMAS- SMART TBK- LIBO Mill – Indonesia.

SINARMAS- SMART TBK- LIBO Mill- Indonesia.

BAREMA (SIPEF Group) – Papua New Guinea.

EVYAP SABUN Malaysia SDN BHD – Malaysia

PT.ASL- Indonesia.

PT.AAI – Indonesia.

PT.PSA – Indonesia.

DEKEL OIL - Ivory Coast

PT. INHILL & COCOMAS - Indonesia & Another 6 projects

POME Characteristics

* Volume 100 to 1,800 m3/d

* Temp 85 to 90oC

* pH 4.0 to 4.5

* COD 50,000 to 100,000 mg/l

* BOD Approx. 30,000 mg/l

* O&G 4,000 to 10,000 mg/l

Treatment options available

Open Pond / Lagoon system

Aerobic Process

Combination of Anaerobic and Aerobic Treatment

Most of the mills have ponding

system /lagoon system but

only few mills are equipped

with biogas recovery systems

6

Palm Oil Mill-Effluent

7

ZPHB™ Improvements

8

ZPHB™ ANIMATION

Due to Methane emissions from POME & diesel used in Palm oil mill the carbon emission per ton of CPO produced is almost 1 ton.

1 ton of CPO = Approx 0.8 to 0.9 ton of Carbon Emission , making it every KG of CPO produced emits one KG of carbon! ( Estimation).

With ZPHB™ , the carbon emission in palm oil mill becomes almost zero. Making Palm oil as most clean edible oil.

Achieve the status of Zero Carbon foot print in profitable way with ZPHB™

Carbon Emission in Palm Oil Mill

9

ZPHB™ - Power Of Zero

ENVIRONMENTAL BENEFITS

Zero Pond™ & Zero Loss™ :No

Under ground water pollution as

no ponds used for treatment. No

Bad odor at all

Zero Pollution™ :Methane is

captured at higher efficiency and

used for productive use to

generate revenue.

Only 80 x 80m required for 60

TPH mill, up to 5 hectares land is

saved

ZERO CARBON FOOT PRINT™

This technology takes care of

any future change of govt

regulations /laws on environment

10

WEALTH OUT OF WASTE (WOW!).

$ROI- 3 to 5 years By using Biogas

in Boiler. ( Depends on

location/size of Mill).

$Recovery of sludge oil from POME

( if oil in POME more)

$Profits from sale of BIOMASS (PKS

& Fiber Briquette Revenue) saved

by using biogas in boiler

$Savings on Diesel cost

$Sludge available for fertilizer

$Revenue from Carbon Credit

& EXPORT POWER TO PLN

(As One of our project in Indonesia)

11

ZPHB™=WOW™

Your waste & cost

center becoming a

Revenue Center &

Complete Solution

for POME in

profitable way.

12

ZPHB™- COMPLETE SOLUTION

1st SUCCESS STORY IN

SOUTH EAST ASIA/ INDONESIA

13

First Success Story In Indonesia

*Name- PT. MESKOM, Sarimas Group, Indonesia

*Capacity- 45/75 TPH Mill

*POME Flow- 900m3/day

*POME Parameters: COD 80,000 (POME+EFB liquid)

*ZPHB reactor volume is 9170 m3

*Construction started in Dec 2011

*Project completed in Dec 2012

*Successfully & very efficiently operating from Jan

2013

14

First Successful Project in Indonesia-

During Construction

15

Overall View of Project

World’s & Indonesia’s first ZERO POND, ZERO POLLUTION ,ZERO LOSS™ &

HIGHER BIOGAS PROJECT! IN BENGKALIS , RIAU,INDONESIA

™ ™

16

First Success Story In Indonesia

Completed Project

17

First Success story in Indonesia-

Completed Project

18

Biogas Use In Boiler

19

Summary of Performance

*ZPHB reactor efficiency >90%

*Biogas/M of POME 35-45M

*Final Discharge

•COD:<250 Mg/L

•BOD:<100 Mg/L

•TSS:<100 Mg/L

•O&G: 0 Mg/L

•Methane Content AVERAGE Around 70%.

3 3

20

21

2nd SUCCESS STORY IN SOUTH EAST ASIA/ INDONESIA

*Name-PT.AGRO MUKO, Sipef Group, Indonesia

*CDM - POA REGISTERED PROJECT.

*Capacity - 60 TPH Mill

*POME Flow - 720m3/day

*POME Parameters - COD 56,000 BOD 30,000

*ZPHB reactor volume is 6763m3

*Construction started in Sept 2012

*1st phase of Project Completed in April 2013

*Inaugurated on May 16th 2013

*Commissioned in July 2013.

2nd Success Story in Indonesia

22

2nd Success Story

During Construction

23

2nd Success Story in Indonesia-

Completed Project

24

Inauguration Of The Project

25

26

2nd Success Story in Indonesia-

Successfully operating

3rd & 4TH SUCCESS STORY IN SOUTH EAST ASIA/ INDONESIA

27

3rd & 4th Success Story in Indonesia

*Name: ASTRA Group,Indonesia UMW

* Capacity: 60 TPH Mill 60 TPH

* POME Flow : 702m3/day 780m3/day

* POME Parameters:

* COD 65,000 65,000

* BOD 30,000 30,000

* ZPHB reactor volume : 7600m3 8500m3

* Construction started in April 2013 May 2013

* Project successfully commissioned in Feb 2014 April 2014

28

3rd & 4th Success Story in Indonesia-

Completed Project

29

30

5th & 6th SUCCESS STORY IN SOUTH EAST ASIA/ INDONESIA

5th & 6th Success Story

Name HARGY OIL PALMS LTD A.P CO-OPERATIVE

SOCEITY

Capacity: 45 TPH MILL 30TPH

POME Flow: 540m3/day 360m3/day

POME Parameters:

COD 65,000 65,000

BOD 30,000 30,000

ZPHB reactor volume 5860m3 2413m3

Construction started in November 2013 Jan 2010

Project successfully commissioned in May 2014 Nov 2010

* Capacity- 45TPH Mill

* POME Flow- 540m3/day

* POME Parameters- COD 65,000 ; BOD 30,000

* ZPHB reactor volume is 7500m3

* Construction started in November 2013

* Name-A.P OIL , UNDER CDM-POA.

* Capacity- 55 TPH Mill

* POME Flow- 726m3/day

* POME Parameters- COD 65,000 BOD 30,000

* ZPHB reactor volume is 7500m3

* Construction started in August 2012

* Project successfully commissioned in July 2013

31

32

5th & 6th Success Story in Indonesia-

Completed Project

33

14 Under

constructions

MAJOR PROJECTS UNDER CONSTRUCTION

SINARMAS/DEKEL OIL,IVORY COAST& OTHERS

ZPHBTM –UNIQUE DESIGN & ACCESSORIES

34

Lateral agitators

Robust design

Solid SS 304.

All parts outside.

Low RPM.

RECIRCULATION

DESIGN FOR ANY

EVENTUALITY.

ZPHBTM –UNIQUE DESIGN & ACCESSORIES

35

Central Agitator- All parts outside. Easy lifting arrangements .

ZPHB™ -Easy to operate/robust design

36

BIOGAS GENERATION

*NEUTRIENTS/Chemicals used ONLY at the time of commission.

* Designed to use No chemicals for operation & generation of BIOGAS

* Above 7 PH water at the lamella overflow is recycled to neutralize the

acidic PH of fresh POME.

* As operates in MESOPHILC temperature range. Easy to operate.

MAINTENANCE

* Mainly lubrication and replacing of consumables like bearings/belts etc

*All components supplied are of reputed international brands ( Critical

are KIS designed/proprietary Agitators). Again for this agitators all

consumables are commonly used bearings etc.

*No dependence on KIS for any spares. All available locally , however

KIS has strong Local Indonesian team of engineers for any

process/maintenance issues.

Methane (CH4) : 60-75%

Carbon dioxide (CO2) : 26-30%

Nitrogen (N2) : 0-1 %

Hydrogen Sulphide (H2S) : 0-0.3 %

Hydrogen (H2) : 0-1 %

Oxygen (O2) : 0-2 %

BIOGAS COMPOSITION

37

ZPHB™ CAN BE OPERATED IN BOTH MESOPHILIC OR

THERMOPHILIC MODE

WHAT DECIDES IS THE AMBIENT TEMPERATURE

THERMOPHILIC NEEDS VERY SKILLED MANPOWER AS

CONTROL OF PROCESS IS CRITICAL

ZPHB™ - Versatile

Mesophilic or thermophilic

38

39

PLC SYSTEM:

As it’s a big project PLC system provided for Operation and monitoring.

Alarm messages

Report Generation and storage

Remote accessibility

ZPHB™- Salient Features

40

AUTOMATION/SIMPLE CONTROLS:

VFDs provided for Gas blower operation as GAS volume high.

Automation/Limit switches /level provided for tanks to monitor the levels

and interlocked with pump for on and off.

Biogas meter ( flow meter cum methane

sensor) provided on gas line to monitor

the flow and methane and temp.

AGS I &II ( High Rated Clarifier ) provided

after Lamella and Clarifier – B for better

removal of solids, Color and COD.

ZPHB™- Salient Features

41

MEMBRANE TYPE GAS HOLDER

For Bigger Size projects l, Plus poor soil condition

The cost of Membrane type gas holder is less compared to the MS Floating

type gas holder.

It is also easy operation for large volume handling.

Easy maintenance.

Execution & erection is also easy.

Not so economical for Smaller size projects.

Option to reduce civil cost

In Bad condition of soil

42

Space required is very less, very easy to operate &

control. PLANT PALM TREE ON 8 HECTARES OF LAND

SAVED.

As efficiency & Biogas produced & methane content is

more, this excess Biogas( after using in GAS engine for

kernel crushing plant) can be burnt in Boiler to save Palm

kernel shell OR export to PLN in future OR bottle & sell

GAS in future.

CDM-POA – is free/no hassles.

ZERO CARBON FOOT PRINT™.

Higher efficiency, Higher levels of Methane content

compared to any other technology.

Multiple Benefits of ZPHB

43

Another Major Advantage

Reduces/Eliminates Black smoke

Boiler chimney with Biogas Boiler chimney without Biogas

44

Success Story

EXPORT OF POWER TO PLN.

45

PT.KIS Indonesia is only Technology provider in

Indonesia doing the CDM-POA covering all Biogas

projects in Indonesia.

Our CDM-PoA, Reg.No 7864 is REGISTERED in

UNFCCC on 29th Oct 2012.( "Recovery and

Avoidance of Methane from Industrial Wastewater

Treatment Projects“

UNIQUE FEATURES:

As we are the only technology provider to have our

own CDM-PoA. This makes all our suitable projects

qualify for CDM automatically.

UNIQUE CDM-PoA

46

AWARDS

47

APPLICATON /COMMERCIALISATION

OF BIOGAS

* OPTION 1:USE OF BIOGAS IN BOILER-

LOW COST, REASONABLLY GOOD BENEFITS.

* OPTION 2: USE OF BIOGAS IN GAS ENGINE:

1) POWER FOR DOMESTIC USE.

2) EXPORT TO GRID.

HIGHER COST COMPARED OPTION 1 & GOOD RETURNS.

* OPTION 3: BOTTLING.

1) LOW PRESSURE BOTTLING- USE IN COMMERCIAL VEHICLES

2) HIGH PRESSURE BOTTLING- USE IN INDUSTRIAL APPLICATION.

DEPENDING UPON LOCATION THIS COULD OFFER BETTER RETURNS

WE OFFER COMPLETE SOLUTION FROM GENERATION TO

APPLICATON OF BIOGAS.

48

Office in Singapore, Kuala Lumpur &Jakarta.

Strong 10 member local Malsyaian/Indonesian team &

supported by team of Expatriates

Local engineers are trained & supported by team of

expatriate to handle all after sales & project

management.

STRONG TEAM IN SOUTH EAST ASIA

REPEAT ORDER FROM SIPEF GROUP (AGRO MUKO )

2nd Repeat Order : PT UMW INDONESIA.

3rd Repeat Order : HARGY OIL LTD.

PAPUA NEW GUINEA

49

Best testimony- Repeat Order

REPEAT ORDER FROM POLIPLANT GROUP

3 Repeat Orders : PT.PSA, - 60 TPH, PT.ASL- 60

TPH and PT.AAI- 90 TPH

50

Best testimony- Repeat Order

51

Best testimony- Repeat Order

1st contract : September 2011 2nd contract : February 2013.

IT WILL BE LARGEST BIOGAS

PLANT IN SOUTH EAST ASIA &

WORLD AT SINGLE LOCATION. 7.5

MW. POME & COCUNUT EFFLUENT.

Commission in November 2014.

WE THANK YOU

FOR YOUR

VALUABLE TIME Video of Successful Project

52