Download pdf - Kenya Ports Authority

Transcript
Page 1: Kenya Ports Authority

w w w . k p a . c o . k e

Page 2: Kenya Ports Authority

Kenya Ports Authorityw w w . k p a . c o . k e

www.essentialbusinessmag.com 2

Page 3: Kenya Ports Authority

www.essentialbusinessmag.com3

LogisticsLogisticsLogisticsLogisticsLogisticsLogistics

The Port of Mombasa is the largest in East Africa and provides

direct connectivity to over 80 ports worldwide. Kenya Ports Authority (KPA) has been at the helm since 1978 and has

seen traffic increase at a rate faster than the global average. Here,

Managing Director Gichiri Ndua talks about expansion, growth

and the challenges that come with managing such a large facility.

Page 4: Kenya Ports Authority

www.essentialbusinessmag.com 4

In the fi rst half of 2015 alone, the Port of Mombasa handled 13,212,379 tons of throughput – an 11% increase on the previous

year that places Mombasa ahead of the 3.5% global average for port traff ic growth. As impressive as this is, it has created a challenge in the form of additional pressure on its facilities. With berth occupancy now at 80%, swift expansion is key to the future of the Port of Mombasa, as well as the broader Kenyan economy.

“We can attribute this growth in cargo volume to the confi dence that shipping lines have in the eff iciency of the Port of Mombasa, particularly following the various development projects that we’ve put in place” says Ndua. “We now receive bigger ships and our transshipment traff ic is growing.”

Mombasa ship chandlers Ltd All Supply Mombasa Shipchandlers is a long-standing family business offering a wide range of services to ships calling at the Port of Mombasa, where it has been operating as a ship supplier for over 40 years. The only dedicated ship chandler in Mombasa accredited with the ISSA (International Ship Suppliers and Services Association) quality standard, it has a well-established reputation for supplying high quality products and services.

The company serves all commercial shipping segments – cruise liners, tankers, cargo ships, Naval ships as well as offshore and research vessels. Services include provision of admiralty charts, fresh and dry stores, fresh water and any technical equipment and all supplies a ship may require.

All Supply Mombasa Shipchandlers supply chain stretches all the way from the European Union and South Africa to the Port of Mombasa where it imports a wide range of internationally recognised food brands, specific for the Ship Supply industry and, in the process, creates a unique selling proposition to its wide range of customers.

The company has built a steady and growing customer base through working closely with strategic partners in the vegetable and meat industry in order to guarantee the highest quality fresh produce that is processed and packed in strict hygiene conditions.

We can attribute this growth in cargo volume to the confidence that shipping lines havein the efficiencyof the Port of Mombasa

In fact, the port recently handled the largest vessel to ever visit the facility – and indeed, the only vessel with a 6000 twenty-foot equivalent unit (TEU) capacity to ever call on the East African coastline – the Maersk operated MV Clemence Schulte, a 255 meter-long container ship built in 2014.

Page 5: Kenya Ports Authority
Page 6: Kenya Ports Authority

www.essentialbusinessmag.com 6

This would not have been possible a few years back. On its mission to achieve World Class Seaports of Choice status, KPA began implementing the Mombasa Port Development Project (MPDP), a huge endeavor consisting of multiple plans with the ultimate goal to increase capacity among others.

“KPA is constructing a Second Container Terminal by reclaiming 100 hectares of land from the sea. The terminal is being put up in three phases. Phase one involves the construction of two berths, No.20 (220 metres quay length) and No.21 (350 metres quay length).” The first phase is currently 92% complete.

“It will have a capacity of 550,000 TEUs per year and will be operated by a private firm,” Ndua tells us. “The process of identifying the operator is in tender evaluation stages.”

Looking forward“The government of Kenya came up with Vision 2030 — a development agenda with a vision of being a newly industrialized country by the year 2030,” he continues. “Consequently the Port of Mombasa was identified as an important catalyst in this vision and the Mombasa Port Development Project (MPDP) became a flagship part of Vision 2030.”

Given the scale of the port’s traffic, as well as its global reach, this should be no great surprise. As it stands, this means that KPA is a central point in the government’s plans boost to medium-term growth in what is

Kenya is emerging as one of Africa’s key growth centres with sound economic policies in place for future improvement

Suresh Solanki | AEHS International Ltd | Mombasa | [email protected]

T +254 (02) 02019 728 | M +254 (0) 722 831 469 | F +254 (02) 554528

Address: P.O.Box 82066-80100, Behind Mombasa Law Courts, Off David Kayanda Road, 3 - Kizingo Courts Limited, Mombasa, Kenya

AEHS INTERNATIONAL LTD

AEHS International are suppliers of Electrical, Hardware, Marine, Crane & Forklift Spares to Kenya Ports Authority, Kenya Pipeline Co. Limited,

Kenya Ferry Services Ltd. Kenya Power & Lighting Co. Ltd, Kenya Airport Authority & Technical University of Mombasa.

Dealers In:Electrical Accessories | Switchgear | Marine Parts | Forklift Spares | Hardware & Building Materials | Crane Spares

Agents For:STINIS - Auto Twist Spreaders/Long Twin Spreaders & Spares

Drahtseilwerk - Wire Ropes (Germany)GE Lighting - All Types for Lighting Fixtures from USA

Page 7: Kenya Ports Authority

Suresh Solanki | AEHS International Ltd | Mombasa | [email protected]

T +254 (02) 02019 728 | M +254 (0) 722 831 469 | F +254 (02) 554528

Address: P.O.Box 82066-80100, Behind Mombasa Law Courts, Off David Kayanda Road, 3 - Kizingo Courts Limited, Mombasa, Kenya

AEHS INTERNATIONAL LTD

AEHS International are suppliers of Electrical, Hardware, Marine, Crane & Forklift Spares to Kenya Ports Authority, Kenya Pipeline Co. Limited,

Kenya Ferry Services Ltd. Kenya Power & Lighting Co. Ltd, Kenya Airport Authority & Technical University of Mombasa.

Dealers In:Electrical Accessories | Switchgear | Marine Parts | Forklift Spares | Hardware & Building Materials | Crane Spares

Agents For:STINIS - Auto Twist Spreaders/Long Twin Spreaders & Spares

Drahtseilwerk - Wire Ropes (Germany)GE Lighting - All Types for Lighting Fixtures from USA

Page 8: Kenya Ports Authority

www.essentialbusinessmag.com 8

now one of sub-Saharan Africa’s fastest growing economies.

As well as increased domestic demand, shipments to nearby landlocked countries such as Uganda, Rwanda, South Sudan and the Democratic Republic of Congo, are also on the rise.

This has meant that a host of new roads, railways and power projects – including transport links from Kenya to South Sudan and Ethiopia – will be built over the coming years, many of which are being funded by overseas investors. A second port in Lamu, north of Mombasa, is also under construction and, once completed, will have a capacity of 23 million tonnes per year. Compared to many global economies the outlook is very favourable indeed.

Earlier this year, a report from the World Bank estimated that Kenya will see growth increase by 6-7% by the end of 2017, compared to an increase of 5.4% in 2014. This was attributed to the planned infrastructure spending program as well as the benefits of continuingly low oil and gas prices.

The rail handles less than 5% of the cargo that moves out of the port, while the rest relies on road trucks. This leads to traffic snarl-up, especially with our underdeveloped road network

“Kenya is emerging as one of Africa’s key growth centres with sound economic policies in place for future improvement,” it stated, adding that “the country’s fiscal expansion [has] allowed it to finance major infrastructure projects without putting excessive pressure on domestic financing”.

However in order to sustain this growth, it continued, Kenya must “boost productivity and improve the business environment to regain and increase its competitiveness”. In order to achieve this it called for the country to carry widespread business reforms, as well as completing work at the port of Mombasa, improving the efficiency of its massive infrastructural projects and strengthening governance”.

EQUIPMENT OPERATOR TRAINING COURSES

www.dsedens.com

D Edens Ltd are pleased to inform you that we can o�er training on your site we have trainers available for short and long-term contracts covering a vast array of machinery.

Each instructor is capable of operating the machine for demonstration purposes we have just completed a one-year contract in Mombasa with productivity increasing whilst accidents and incidents are reducing due to training.

Contact: DAVID S. EDENSEmail: [email protected]: +44 (0) 75005 96080

D. EDENS LTD INTERNATIONAL EQUIPMENT TRAINER

Page 9: Kenya Ports Authority

EQUIPMENT OPERATOR TRAINING COURSES

www.dsedens.com

D Edens Ltd are pleased to inform you that we can o�er training on your site we have trainers available for short and long-term contracts covering a vast array of machinery.

Each instructor is capable of operating the machine for demonstration purposes we have just completed a one-year contract in Mombasa with productivity increasing whilst accidents and incidents are reducing due to training.

Contact: DAVID S. EDENSEmail: [email protected]: +44 (0) 75005 96080

D. EDENS LTD INTERNATIONAL EQUIPMENT TRAINER

Page 10: Kenya Ports Authority

www.essentialbusinessmag.com 10

Scaling upThe scale of the MPDP program is impressive to say the least. This project is being funded largely by the Japan International Corporation Agency (JICA) – a body responsible for the overseas investments of the country’s government – and will see the port expanded to an annual capacity of 1.3 million twenty-foot containers.

So far, this work program has included dredging the channel to minus 15 metres and widening its turning basins to 300 metres at its narrowest points – all in aid of preparing the port for bigger vessels so that the region can reap the benefits of economies of scale.

Mombasa’s yards have been expanded too and exit and entry gates have been widened with additional lanes. Equipment has also been updated with Mombasa acquiring several new twin-lifting ship-to-shore cranes. A new versatile ICT program has been implemented backing increased ship turnaround time and an updated security system, the world-class Integrated

Security System, is now in operation at the port.

“Other port development projects included the construction of Berth No.19 to expand the container terminal by 240 metres quay. This was commissioned in August 2013 and the port immediately started to receive vessels of above 220 metres which has now become the common size,” Ndua tells us.

“MV Tia was 261 metres long but quite narrow in width with the capacity to handle 4500 TEUs. Maersk Cairo was 249 metres with a capacity of 5000 boxes and Maersk Clemence Schulte – our biggest visitor yet – was 255 metres long with a capacity of 6000 TEUs.

As well as increased domestic demand, shipments to nearby landlocked countries such as Uganda, Rwanda, South Sudan and the Democratic Republic of Congo, are also on the rise

Page 11: Kenya Ports Authority
Page 12: Kenya Ports Authority

www.essentialbusinessmag.com 12

Another crucial part of the scheme is the construction of the planned US$346.2 million Dongo Kundu bypass, a road that will connect Mombasa’s mainland to the south coast by a bridge, reducing heavily congested freight and transport routes. For the port, this smoother fl ow will considerably improve connectivity, while it will also ease the burden of bottlenecks at the Likoni ferry. This is used by over 300,000 people and 5,000 vehicles each day, and has long been seen as challenge to the region’s growth.

“The Mombasa Port Development Project is one of the biggest single

ODA projects in Japan’s history of economic cooperation with Kenya. Development of the Mombasa Port is critical for the coastal region and for Kenya to realise its long-term plan of the Vision 2030,” said Japan’s ambassador to Kenya, Toshihisa Takata, earlier this year. “We agreed with the government of Kenya that it was crucial to construct a link road that connects the new container terminal of the Mombasa port, with a northern corridor. We also agreed that a link road was necessary to connect to the Dongo Kundu area to enable the south coast of Mombasa to develop.”

The presence of a number of cargo interveners, such as government agencies with conflicting mandates and objectives, mean that progress isn’t always as quick as KPA would like

SGS is the world’s leading Inspection, Verification, Testing and Certification company.

SPECIALTIESINSPECTION, VERIFICATION,TESTING, CERTIFICATION,AUDIT, CONSULTANCY,OUTSOURCING, TRAINING

CONTACT USSGS Kenya LimitedVictoria TowersKilimanjaro Ave Upper HillNairobi, 00200Kenya

t +254 20 273 3690f +254 20 273 3664

www.sgs.co.ke

[email protected]

Page 13: Kenya Ports Authority

SGS is the world’s leading Inspection, Verification, Testing and Certification company.

SPECIALTIESINSPECTION, VERIFICATION,TESTING, CERTIFICATION,AUDIT, CONSULTANCY,OUTSOURCING, TRAINING

CONTACT USSGS Kenya LimitedVictoria TowersKilimanjaro Ave Upper HillNairobi, 00200Kenya

t +254 20 273 3690f +254 20 273 3664

www.sgs.co.ke

[email protected]

Page 14: Kenya Ports Authority

www.essentialbusinessmag.com 14

Sailing aheadWith all this in mind, the challenges KPA faces at Mombasa make the port’s recent advances even more impressive. The presence of a number of cargo interveners, such as government agencies with conflicting mandates and objectives, mean that progress isn’t always as quick as KPA would like.

“We have Kenya Revenue Authority whose main agenda is to maximize tax collection irrespective of whether it will slow down trade or not” says Ndua. “Then we have the private sector bodies including Clearing and Forwarding Agents; Ships Agents; Transporters; and Container Freight Stations (CFSs).”

Recently, it emerged that the local Mombasa government is pushing to increase taxes for branded containers and vehicles leaving the port, raising the fees by US$97 and US$29 respectively. Currently, these rates already stand at $293 and US$117. Other charges such as for tonnage and inspection have also been increased.

There are other difficulties, too. A number of agencies are often slow in embracing IT, Ndua adds, whereas KPA has been going paperless for a while now. Due to this, communication is not as efficient as it could be.

Meanwhile off-take of cargo is slow due to the quality of the transport network.

“Off-take of cargo is slow. The rail handles less than 5% of the cargo that moves out of the port, while the rest relies on road trucks. This leads to traffic snarl-up, especially with our underdeveloped road network,” Ndua explains. At the same time, the company has been forced to lay off some members of staff due to

Kenya will see growth increase by 6-7% by the end of 2017,

compared to an increase of 5.4% in 2014

concerns that their academic qualifications had been forged.

These issues aside, the future is looking bright for the Authority. Phase two of the expansion is underway, with KPA in the process of identifying an operator. The winning bidder will operate 51% of berths 20 and 21, with local investors taking up the remaining 49%.

This, it is hoped, will cement Mombasa’s position as East Africa’s leading port, particularly as it is a time of increased competition due to major investments in port infrastructure over in Tanzania and Djibouti.

Interest in the tender has been strong too, with 12 firms

Page 15: Kenya Ports Authority

citi.com/progress

Around the world, it’s not just portauthorities, but customs, logistics and freight agents, who need fi nancial solutions to facilitate trade. Like e-banking to automate collectionsand payments, and guarantees, bonds and letters of credit to fi nancegantry cranes and security systems. What if a bank made that its job?Working with the Kenya Ports Authority, we’ve made it ours.

© 2

015

Cit

igro

up In

c. C

iti a

nd C

iti w

ith

Arc

Des

ign

are

regi

ster

ed s

ervi

ce m

arks

of C

itig

roup

Inc.

FROM CLEARING CUSTOMS TO CLEARING THE WAY TO TRADE.

www.essentialbusinessmag.com15

Logistics

Page 16: Kenya Ports Authority

www.essentialbusinessmag.com 16

shortlisted earlier this year. These include international names such as APM Terminals, DP World, China Merchant Holdings, and Cosco Pacifi c, along with joint ventures between Toyota Tsusho Corporation and Grup TCB and Mitsubishi Corporation and Freight Forwarders Kenya.

The fi rst phase of the project is also well ahead of schedule, with KPA saying earlier this year that it will be commissioned by November rather than its original March 2016 deadline. The tender of a new oil jetty, which will be able to handle as many as four vessels at a time, is also set to take place in the fourth quarter of this year.

Tuning upIn the meantime, KPA’s drive for eff iciency is also bearing fruit. According to a recent report by Kenya’s Standard newspaper, costs for traders at Mombasa has dropped by half over the past decade due to the company modernization program, as well as increased capacity.

“The cost of freight has dropped drastically in the last ten years,” said Juma Tellah, chief executive of the Kenya Ships Agents Association. “We used to pay an average of Sh450,000 to transport a 40 foot container from Europe to Mombasa but currently it costs Sh250,000.

A 40 foot container of tea from Mombasa to Karachi currently costs Sh45000 or Sh40000.”

Much of this, he added, was due to an increase in offl oading and loading of cargo, as well as a signifi cant fall in the time importers use to clear their freight at the port.

Back in August KPA said that between 2013 and 2014, the “dwell time” – the average time a container stays in port between the time it lands at quayside and exits at the gate - had fallen by a day, to 3.9 days. Meanwhile the average turnaround time remained the same at 3.5 days from 2013 to 2014, despite a signifi cant jump in activity. These fi gures compare favourably to Europe’s major ports, where dwell times are typically less than a week. For other sub-Saharan countries though these number are much, much higher, with vessels usually confi ned at port for 19 days in Douala, Cameroon, and 20 in Tema, Ghana.

Still, the company is hoping to improve further. Yet, says Ndua, its progress should not just be measured in terms of capacity and throughput.

“Last year we handled a record one million TEUs and this year we are set to handle 1.2 million TEUs,” he continues. “At the same time though we are continuing to improve our services to customers, grow business and enrich lives in the region, which is just as important.”

SGR line

C O N N E C T I N G N AT I O N S … P R O S P E R I N G P E O P L E

State-of-the-Art stations Cargo train: Doublestacking of containers thus increased hauling

capacity

A PROMISE OF A HIGH CAPACITY, COST EFFECTIVE RAIL TRANSPORT SOLUTION FOR EAST AFRICA

With an initial design capacity of 22 million tones per annum, the Standard Gauge Railway (SGR) line will decongest the Port of

Mombasa and shift the bulk of cargo transport from roads onto the railway line.

Seamless connectivity across the borders of Kenya, Rwanda, Uganda, South Sudan, Eastern DRC, and Ethiopia will guarantee

easy access to the Port of Mombasa

KENYA RAILWAYS

RAILWAYThe Standard Gauge

Page 17: Kenya Ports Authority
Page 18: Kenya Ports Authority

www.essentialbusinessmag.com

Kenya Ports AuthorityP.O. Box 95009 – 80104Mombasa, Kenya

Tel: +254 (0) 41 211 3999Fax: +254 (0) 41 231 1867Mobile: +254 (0) 720 312 211, 0734 221 211, 0735 337 941 – 6Wireless: +254 (0) 20 357 588 – 5

w w w . k p a . c o . k e

©Essential Business Magazine 2015


Recommended