Transcript
Page 1: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Pipe Express® -

Ideal for pipeline installations in environmentally

sensitive areas.

Herrenknecht AG.

Dr. Gerhard Lang – Business Development Manager UT Division

Page 2: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Founded in 1977

Conversion to Herrenknecht AG in 1998

Today around 4,600 employees worldwide, 2,000 in Schwanau,

around 200 young people in training

HERRENKNECHT

IN SCHWANAU

Page 3: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Herrenknecht worldwide.

Headquarter Schwanau, Germany

Subsidiaries

Representativess

Page 4: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Changsha

Fuzhou

Liaoning

Shaanxi Province

Changsha

Fuzhou

Liaoning

Shaanxi Province

HERRENKNECHT

IN CHINA

Page 5: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Road Railway Metro

EPB Shield Gripper TBM Single Shield TBM Double Shield TBM Mixshield

APPLICATIONS.

MACHINE RANGE.

All Around Tunnelling Solutions.

Our core products for Traffic Tunnelling.

Page 6: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

New diameter world record.

Hong Kong: Tuen Mun – Chek Lap Kok Link (TM-CLKL).

Mixshield, shield-Ø 17.6m (57.8 ft)

2 parallel road tunnels with two road levels each

Page 7: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

HERRENKNECHT

EXPLORATION

Vertical drilling rigs for the exploration

of new energy deposits

Page 8: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Geothermal energy.

Potential for a clean and stable energy supply.

››››

›› ››››››

3,000 − 5,000m deep

80 − 200m deep

››››

›› ››››››

Near-surface

geothermal energy

Deep geothermal

energy

9843 − 16,405ft deep

262 − 656ft deep

Page 9: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

HERRENKNECHT

MINING

Innovative tunnelling technology for infrastructures in mining

Page 10: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Herrenknecht Mining.

Product portfolio.

Raise Boring Rig

Gripper TBM Multi-service vehicles Boxhole Boring Machine

Shaft Drilling Jumbo Shaft Sinking Machines

Page 11: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

HERRENKNECHT GROUP | UTILITY TUNNELLING.

BUSINESS SEGMENTS.

Utility Tunnels & Shafts Pipeline Energy

Auger Boring

Machine VSM

HDD Rig Direct Pipe®

Pipe Express®

AVN & AVND Partial-face Excavation Machine

EPB Shield Gripper TBM Single Shield Double Shield

MACHINE RANGE.

Page 12: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Trailer Rigs, e.g. HK250T (550,000lbs) Crawler Rigs, e.g. HK150C (330,000lbs)

Frame Rigs, e.g. HK250F (550,000lbs) Modular Rigs, e.g. HK400M (880,000lbs)

UTILITY TUNNELLING | PIPELINE.

RANGE OF MAXI AND MEGA HDD RIGS.

Page 13: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

AMU DARJA RIVER CROSSING | TURKMENISTAN |

LARGEST HDD EVER REALIZED WITH HK TECHNOLOGY |

56“ GAS PIPELINE | LENGTH: 1,705m (5,594 ft).

Page 14: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

UTILITY TUNNELLING | PIPELINE.

SLANTED DRILLING | HK250C-SDD | ENTRY ANGLE: 7°- 90°.

.

Application fields: oil & gas exploration

Oil-Sands

Coal-Seam-Gas

Shale Gas

Shallow Oil

Gas Cavern Storage

….

Page 15: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Slant Directional Drilling.

SDD-Rig | HK250C-SDD | up to 45° drilling angle.

Page 16: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Herrenknecht New Fullface Hole-Opener Technology.

From Pilotebore to final diameter in one step.

Page 17: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

PIPE THRUSTER TECHNOLOGY as key innovation:

POWERFUL TOOL FOR 5 DIFFERENT APPLICATIONS.

1. PIPE ASSIST TOOL FOR HDD DURING PIPE PULL-IN.

2. RECOVERY OF STUCK OR DAMAGED PIPELINE.

3. INSERTION OF PRODUCT PIPELINE IN EXISTING TUNNEL.

4. THE DIRECT PIPE® -METHOD.

5. PIPE EXPRESS®

Page 18: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

PIPE THRUSTER as Pipe Assist Tool.

Long or difficult HDD CROSSINGS.

HDD-RIG ON

RIG-SIDE PIPE THRUSTER ON

PIPE-SIDE

Page 19: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Amudarja River Crossing in Turkmenistan.

The ultimate pipeline crossing.

Pipeline length 1,705m (5,594ft); pipeline diameter 56“ and 8“

2 x HDD Rig + Pipe Thruster

Page 20: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

DIRECT PIPE® Technology.

Page 21: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

HDD vs. DIRECT PIPE ®– Downhole pressure with HDD.

Page 22: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

THE DIRECT PIPE® METHOD - Advantages

Applicable in almost all geological conditions.

Borehole is supported at all times.

One pass installation from one side.

Slurry discharge through the pipeline.

High alignment accuracy compared to HDD.

Minimum ’frac-out’ risk.

Page 23: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

REFERENCE LIST OF DIRECT PIPE® PROJECTS. 42 Projects to date.

Page 24: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

PROJECT DETAILS.

42” Direct Pipe ® Crossings in the USA

Project: Aquashicola Creek Crossing, Northeast Supply Link Project

Location: Palmerton, Pennsylvania, USA

Constr. Company: Laney Directional Drilling co.

Client: Williams Pipeline

Machine: AVN1000XB Direct Pipe

Geology: Clay with Stones, Gravel, Shale

Pipeline length: 410m (1,345 feet)

Pipeline-: 42“ (1,067mm)

Coating: FBE

Purpose: Gas Pipeline

Breakthrough: June 21, 2013

Page 25: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

410m (1,345ft) LONG ALIGNMENT UNDER A CREEK & A STREET.

410m

1,345ft

Page 26: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Casing with

inner coating

THE LAUNCH SITUATION.

Page 27: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Crossing Rio Grand into Mexico with Direct Pipe ®.

Michels Directional Crossings – July 2014.

Page 28: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Crossing Rio Grand into Mexico with Direct Pipe ®.

Michels Directional Crossings – July 2014.

Page 29: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Crossing Rio Grand into Mexico with Direct Pipe ®.

Power Modul System for longer crossing distances.

Page 30: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Pipe Express® Technology.

Equipment components.

Operator vehicle Launch pit

with

Pipe Thruster

Excavation unit

Page 31: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Pipe Express® technology.

Excavation process – dry excavation

Page 32: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Pipe Express® Technology.

Installation methods.

Page 33: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

conventional

100%

Pipe Express®

~30%

Pipe Express® Technology.

Benefits - Minimum right of way.

Page 34: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Environmentally sensitive areas

Swampy areas with high groundwater level

Areas with unstable ground conditions

Areas with water-bearing layers

Page

36

Pipe Express® Technology.

Further Benefits – Application in wetlands

Page 35: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Crane for

supply lines

Power pack,

Lubrication

bentonite tank

Operator cabin

Pipe Express® Technology.

Components of equipment – operator vehicle.

Page 36: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Cutterhead

Articulation joint

Trench cutter

Screw conveyor

Conveyor Belt

Buggy

TBM

Trenching unit

Pipe Express® Technology.

Components of equipment – excavation unit.

Page 37: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Reduction of friction between borehole and pipeline

Protection of pipeline coating

Bentonite lubrication ring

Pipe Express® Technology.

Components of equipment – lubrication.

Page 38: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

MAX

2.50m

STANDARD

1.50m

MIN

0.50m

PIPE EXPRESS® TECHNOLOGY.

Components of Equipment | EXCAVATION UNIT.

Trench cutter hydraulically adjustable -> variable overburden

(8.2 ft)

(4.9 ft) (1.6 ft)

Page 39: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Optical guidance system (Total station)

Fuzzy logic control for automatic steering (Autopilot)

Pipe Express® Technology.

Components of equipment – navigation.

Page 40: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Pipe Express® Technology.

Trench Compacting unit.

Page 41: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Requirements:

Soil compaction simultaneous to advance

Overburden of min. 0,5 m (1.6ft)

Compaction on machine section.

Reutilization of the excavated ground

Pipe Express® Technology.

Trench Compacting unit.

Page 42: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Drive length: up to 2,000m (6,562ft)

Pipeline diameter: 28“- 60“

Overburden: 0.5 – 2.5m (1.6 – 8.2ft)

Advance rates of up to: 1.2m/min (5ft/min.)| 500 – 1,000m/day (1,640 – 3281ft/day)

Page

44

Pipe Express® Technology.

Application range.

Page 43: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Working under groundwater, no lowering of ground water table

Simultaneous trenching and pipe laying

Minimum impact on flora and fauna

No components & cutting transport inside the pipeline

No drilling fluid for transport of cuttings -> no separation plant necessary

Less pipe-laying equipment needed on jobsite

Pipe Express® Technology.

Summary of benefits.

Page 44: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Start of

development

2010 2008 2009 2011 2012 2013

Concept &

testing 1

Concept

Design and

construction of test

facility 1

First tests

Feasibility study

Patent application

Apply for funding

Pipe friction test at

university

Testing 2

Design and

construction of test

facility 2 | prototype |

36”

First

presentation to

public

Operation of test

facility 2 | 36” | 42m

Innovation Day with

clients & contractors

Modifications and

redesign

Reference project

48” gas pipeline with

Gasunie on North-

South Route in The

Netherlands

Redesign & 1st

project

Bauma,

Innovation

Award

Presentation of the

technology in Munich,

Bauma 2013

Winner of the

innovation award for

Pipe Express

technology

Winner of the IPLOCA

New Technology

Award 2013

Pipe Express® Technology.

History overview.

Page 45: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Project: North-South Gas Pipeline

Location: Odiliapeel-Melick, The Netherlands

Client: Gasunie

Customer: Visser & Smit Hanab

Pipeline length: 500m (1,640ft)

Pipeline diameter: 48“

Pipeline coating: PE

Geology: fine sand, sand

Advance rate: 1.2m/min (5ft/min)

Pipe Express® pilot project.

48“ gas pipeline in the Netherlands.

Page 46: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Pipe Express® pilot project.

48“ gas pipeline in the Netherlands.

Page 47: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Project: Fourth Transmission Pipeline KP112-KP111

Location: Chon Buri, Thailand

Client: PTT

Customer: Punj Lloyd

Pipeline length: 703m (2,306ft)

Pipeline diameter: 42“

Pipeline coating: PE

Geology: clay, landfill, road

Advance rate: 0.8m/min (3ft/min)

Pipe Express®.

42“ gas pipeline in Thailand – Nov 2013.

Page 48: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Refilling of the trench Buggy with chain conveyor

Pipe Express®.

42“ gas pipeline in Thailand – Nov 2013.

Page 49: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Project: Albysjön 48“ water pipeline

Location: Stockholm, Sweden

Client: Stockholm Water

Contractor: Züblin Scandinavia

Pipeline Length: 1.036m (3,400ft)

(4 pipe sections à ~250m/820ft)

Pipeline Ø: 48“

Pipeline coating: PP

Geology: sand with clay, sand with gravel

Groundwater: up to 2m (6ft) above invert

Launch: planned for end 2014, beginning 2015

Pipe Express® - next project in Sweden

48“ water pipeline in Stockholm.

Page 50: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

PeX Demo Movie.

Page 51: Pipe Express Ideal for pipeline installations in ...c.ymcdn.com/sites/ · PDF fileIdeal for pipeline installations in environmentally sensitive areas. Herrenknecht AG. ... EPB Shield

Herrenknecht. Pioneering Underground Technologies

Winner of the ISTT

NO DIG AWARD

2008

at the NO DIG 2008

in Moscow.

Top 5 nominée for the

HERMES AWARD 2008

at Hannover Fair.

Thank You!

WINNER OF THE

TECHNOLOGIE AWARD AT

THE IPLOCA CONVENTION

2009 IN SAN FRANCISCO.

Winner of the

NSTT NO DIG AWARD

2010

in the Netherlands.


Recommended