Page 1: Structural glazing details

Concrete KickerSupporting FoundationReinforced to Engineers Spec

DPM/Radon barrier

Hollowcore Floor 200mmUsed on Ground fl Level with thebuild up of the floor supported by theconcrete kicker/upstanding

DPM Secured tightly to floor andup around the proprietary Ins

Reinforced Structural screedmixed with polypropylene fibres

Proprietary Ins 50mmLimiting thermal bridging @Floor Junction Internally & Externally-nally

200mm CHS hot rolledsecondary structure to supportStructural glazing

75mm reinforced structuralscreed to engineers specification

Suspended ceiling Held onby C channels

12.5mm Gyproc Plasterboard,Plasterboard to comply with hygienicstandards for health care center

Aluminum spider clamps holdingstructural glazing in place

Aluminum Plate joining CHS columnto structural glazing plate

Structural glazing glass2400x2400mm panel sizes

Expansion bolt tying structuralglazing in place with foundationkicker (Concrete), giving glazingstability

Flashing around glazingstopping excess watergetting inside

Concrete Paver - Sloped 1:50 away from basementventilation boxed to a designated drain

30mm Sand blinding - allowing paving to rest on

Rigid floor insulation

Proprietary Drainage channel

Compacted aggregate base

compacted Subgrade

375

200

200

50 300

200

7515

0

5Structural Glazing 3D

NTS

Steel plate connecting CHSbase to ground and giving itstability

Trench heaingpreventing condensationon structural glazing

Suspended ceiling 600x600mmCorrosive resistant, ceiling type to beapplicable with health care buildingsanti bacterial growth/build up

Steel plate fixed to purling above

Steel Universal I beamcarrying loads transferredfrom roof to ground

Structural steel deck

Hot rolled steel Z profile& rockwool filled insulation &supporting PIR Ins above

Vapor barrier

PIR Rigid Ins Rigid Polyurethane InsThermal Con: 0.025Wm2KLimiting thermal bridging at roof

40mm Halter to suit zinc profile

C channel profile , supportingZinc roof and Ins gutter

Forticrete rainscreen claddingPanel

Air flow ventilationthrough out the building

Spider clamp fitting

Silicone sealant with backer rod

cold rolledoutrigger bolted to Universal I Beamtaking loadsfrom roof

cold rolled outrigger supportingOverhanging

VM Zinc finish

Gutter sloped awayand brought to a drainillustrated

Vapour Barrier

VM Zinc sheet clipVM Zinc continues eavesapronstip & continues folded strip

Light guage steel profilesfilled with rock wool Ins

18mm Marine plywood formingTyvek weather barrier

Zinc pressing

Z profilessupported byC channels

Scale

LECTURER

Drawn by

Date

Project number

Institute of Technology CarlowBSc. in Architectural Technology

Year 3 2015-2016

BSc in Architectural Technology Year 3: 2015 - 2016

1 : 5

26/0

4/20

16 2

0:07

:00

Structural Glazing details

Project Number 3

Carlow Primary Health Care Centre

22/04/2016

Xhevdet Haliti

Dan O Sullivan, Noel Dunne,Mark Duffy

A124

1 : 5Structural Glazing @ Ground floor & Intermidiate floor

1

1 : 5Structural Glazing @ Eaves/Roof

2

1 : 5Key Plan section - Structural Glazing

3

200mm CHS hot rolledsecondary structure to supportStructural glazing

perimeter plasterboard corner detailallowing minimal movement

3D Structural Glazing4

1:50