Architecture
Tutor : Miss Iffa Nayan
Architect ? WHO???
A person who designs buildings and supervises construction
GENERAL INFORMATION
- Licensed and Qualified profession - Transforming Vision into Reality
- Construction Guider - Make sure everything is functional, safe, economical and suit
the needs of people
ARCHITECT ARCHITECT ARCHITECT ARCHITECT ARCH
DURING
CONSTRUCTION
BEFORE
CONSTRUCTION
CONSULTATION
C PRELIMINARY IDEA
EXECUTION PHASE
HAND-OVER
AFTER
CONSTRUCTION
DESIGN
BEFORE CONSTRUCTION
Initial discussion with clients to understand the need and requirement
Ar show them their port-folios
Give opinion
to client about
the project
Ar do their own
Feasibility Study
suitable
materials
used,
setback, cost
Sketches
CONSULTATION
SKETCH DONE
- Sketches done by architect to show client about the
conceptual idea
PRELIMINARY IDEA
Feasibility Study Sketching
Might be changed according to client’s need
Do a Schematic Design to show
how the construction looks
like
shows
Preliminary
Designs to
clients
PLANNING PHASE
Option on design
for client to
choose
All in diagram,
graphic and
sketches, not an
architectural
drawing yet Responsible to
make any
changes before
finalise it
Architect changes
sketches into
schematic &
architectural drawing
Consult
Structural
Engineer and QS
for more
information
share schematic
drawing with
other
professions
- After collected all
data from other
consultants, a detail
drawing should be
drawn.
- The data should
include relevant
details, code
information,
placement of object,
light intensity, etc.
- Compilation- Send the
Submission Drawing
DESIGN DEVELOPMENT
DRAWING BEFORE CONSTRUCTION DRAWING
Shows client
the overall
view of
building
Subject to
change
according
to client’s need
DESIGN DEVELOPMENT
SUBMISSION DRAWING
SUBMISSION DRAWING
SUBMISSION DRAWING
DURING
CONSTRUCTION
CONSTRUCTION
Execution Phase
CONSTRUCTION DRAWING (CD)
CONSTRUCTION
EXECUTION PHASE
Provide administration of contract for construction
Monitor the progress on site regular intervals
make sure construction of the building runs smoothly
-review shop drawings, product data and samples for general
conformance to the design intent.
Report the Owner about the progress of the work
- provide supplemental documents to clarify
design intent for the contractor.
Review then accept or reject the contractor's application payment.
Inspect the work
Interpret and dedicate the matters if there are any changes
AFTER
CONSTRUCTION
HAND-OVER
1.Architects stop working on the site.
2.Transfer every resources to other organisation.
3.Even though the job is terminated, operation and maintenance should be carried out frequently.
4.Contractor will then produce an As-Built Drawing for the built construction.
HAND-OVER
Interrelationship between Ar and other
professions
Builders Quantity Surveyor Engineers
Moving forward to Owner's mind
Architect design project & make materials choice
integral to the design and construction of structures
Architect gives instruction to the builder.
QS judgement and regarding the choice & estimate the budget
Communicate ideas through Blueprint & Technical drawing
Builder moves quickly & efficiently with the critical decision
Deals with the
running costs of a
construction project, materials &
contractors
Responsibility is to ensure the design is safe & meet all the building codes
The Differences between Architect & Landscape Architect
and Interior Architect
-Designs and arranges land
forms and develops
outdoor spaces.
-Design things such as
residential area, public
parks, playground, garden,
college campuses.
-create decorative layouts
plans.
-Specialise in designing &
building interiors for
safety, functionality and
aesthetic.
Landscape Architect Interior Architect
v
v
Resources
1. ming3d.com
2. www.teaching.eg.org
3. www.architecturecourse.org
4. ottawa.ca
5. www.keywordpicture.com
6. quinlo2003.wordpress.com
7. www.wrightdesign.ca
8. www.designskill.org
9. stevendwright.home.comcast.net