027 Fast-Tracked Projects-Materials

Embed Size (px)

Citation preview

Page 1: 027 Fast-Tracked Projects-Materials

[email protected]://www.construction-productivity.co.uk

FAST-TRACK MATERIAL

MANAGEMENT

Page 2: 027 Fast-Tracked Projects-Materials

MATERIAL MANAGEMENT1. A key factor adversely affecting project

performance is the improper handling and management of materials for that project.

2. Materials management is more important on fast-track projects.

3. Design and procurement decisions are made concurrently with construction activities.

Page 3: 027 Fast-Tracked Projects-Materials

MATERIAL MANAGEMENT

Page 4: 027 Fast-Tracked Projects-Materials

MATERIAL MANAGEMENT

Page 5: 027 Fast-Tracked Projects-Materials

MATERIAL MANAGEMENT

Page 6: 027 Fast-Tracked Projects-Materials

MATERIALS MANAGEMENT

Page 7: 027 Fast-Tracked Projects-Materials

MATERIAL MANAGEMENT

Page 8: 027 Fast-Tracked Projects-Materials

MATERIAL MANAGEMENT

Page 9: 027 Fast-Tracked Projects-Materials

MATERIAL MANAGEMENT

Page 10: 027 Fast-Tracked Projects-Materials

MATERIAL MANAGEMENT

Page 11: 027 Fast-Tracked Projects-Materials

MATERIAL MANAGEMENT

Page 12: 027 Fast-Tracked Projects-Materials

MATERIAL MANAGEMENT

Page 13: 027 Fast-Tracked Projects-Materials

MATERIAL MANAGEMENT

Page 14: 027 Fast-Tracked Projects-Materials

MATERIAL MANAGEMENT

Page 15: 027 Fast-Tracked Projects-Materials

MATERIAL MANAGEMENT

Page 16: 027 Fast-Tracked Projects-Materials

MATERIAL MANAGEMENT

Page 17: 027 Fast-Tracked Projects-Materials

Material management route

Fig. 2.11 Typical adverse material management (Thomas et al, 1989)

Poor organisation of storage area on site

Extensive multiple handling of materials

Material badly stored or marked

Poor House Keeping

Wastage on Site

Access to storage area obscured by debris

Lack of planning of material deliveries

Lack of co-ordination between the time of deliveries and erection

Remobilization and re-familiarisation after a lengthy delay

Running out of materials

Lack of anticipation about material shortage

Material management

Page 18: 027 Fast-Tracked Projects-Materials

Sequentialmanner storing

Materialstorage &

coding

Sustainabledevelopment

Improveproductivity

MaterialManagement

Reducewaste

Quantitysurveyors

(theestimator)

ArchitectsDesign

complexity

DeliveryJIT

If left over

Contractormaterialhandling

Useelsewhere

Or recyclingWork hour losses resulting from

poor material management causedcost overrun of 18%.

Reduce > Reuse > Recycle

Architects-Use standard sizesand quantities of materials,

and plan ahead toreduce off cuts.

Avoidover-ordering

CULTUREOF

WASTEREDUCTION

Material management

Page 19: 027 Fast-Tracked Projects-Materials

Site materialsstrategy and

wastemanagement

policy

MonitoringStorageDeliveriesQuantitiesOrdering

Wastecontrol Plant

choice

Material management

Page 20: 027 Fast-Tracked Projects-Materials

PLANNING

Page 21: 027 Fast-Tracked Projects-Materials

PLANNING

Page 22: 027 Fast-Tracked Projects-Materials

PLANNING

Page 23: 027 Fast-Tracked Projects-Materials

PROCUREMENT

Page 24: 027 Fast-Tracked Projects-Materials

PROCUREMENT

Page 25: 027 Fast-Tracked Projects-Materials

EFFECTIVE MATERIAL HANDLING

Page 26: 027 Fast-Tracked Projects-Materials

EFFECTIVE MATERIAL HANDLING

Page 27: 027 Fast-Tracked Projects-Materials

EFFECTIVE MATERIAL HANDLING

Page 28: 027 Fast-Tracked Projects-Materials

EFFECTIVE MATERIAL HANDLING

Page 29: 027 Fast-Tracked Projects-Materials

EFFECTIVE MATERIAL HANDLING

Page 30: 027 Fast-Tracked Projects-Materials

EFFECTIVE MATERIAL HANDLING

Page 31: 027 Fast-Tracked Projects-Materials

EFFECTIVE MATERIAL HANDLING

Page 32: 027 Fast-Tracked Projects-Materials

EFFECTIVE MATERIAL HANDLING

• Delivery of bulk materials in large: transportation for large quantities by rail (e.g. reinforcement/steelwork) or barge (e.g. ballast from a dredger) and for large volume by pipeline (e.g. water/gas/oil/ chalk/cement/concrete) or conveyor (e.g. excavated material/fill).