35
September 2014 Upgrade of Jamal Abdul Nasser Street and Jahra Road Project Highlights

14.30 tarek shuaib, pace

Embed Size (px)

DESCRIPTION

PACE

Citation preview

Page 1: 14.30 tarek shuaib, pace

September 2014

Upgrade of Jamal Abdul Nasser Street and Jahra RoadProject Highlights

Page 2: 14.30 tarek shuaib, pace

Introduction

Introduction

The Ministry of Public Works has employed the joint venture of Pace and Louis Berger to undertake the design and construction supervision of Jamal Abdul Nasser Street and Jahra Road Development projects – part of the Ministry’s strategic plans to develop roads and motorways in the State of Kuwait.

Page 3: 14.30 tarek shuaib, pace

Introduction

Jahra Road and Jamal Abdul Nasser Street Developement Project

Client:

The Ministry of Public Works

Summary:

The project aims to transform the existing roads into expressways that include 80-120 km/h multi leveled highway designed in accordance to international standards, plus upgrading the existing service roads to provide additional traffic lanes with enhanced utilities infrastructure.

Page 4: 14.30 tarek shuaib, pace

Jamal Abdul Nasser & Ghazali Road Interchange

Page 5: 14.30 tarek shuaib, pace

Site Location

Page 6: 14.30 tarek shuaib, pace

Site Location

Jamal Abdul Nasser Street

Kuwait City

1st RR

4th RR

Shaab

SulaibikhatJahra Road

Page 7: 14.30 tarek shuaib, pace

Land use

Educational

Residential

Hospitals

Government Agencies

Industrial/Commercial

Page 8: 14.30 tarek shuaib, pace

Extent of Project

Jamal Abdul Nasser Street

Jahra Road

Page 9: 14.30 tarek shuaib, pace

Expected commuting traffic

1st RR

Causeway

East-West c

ommuting traffic

Additional traffic from

transversal roads

Ghazali

Road 602

2 nd RR

4th RR

Airport Road

Page 10: 14.30 tarek shuaib, pace

Planning and Design

Planning and DesignMajor Considerations:

• Ensuring high design standards for road users.

• Traffic model and traffic forecast.

• Minimise land-take.

• Maintaining existing accesses.

• Minimise affect on existing utilities.

Page 11: 14.30 tarek shuaib, pace

Planning and Design

Project ObjectivesThe Solutions:

• Segregate through traffic from local

• Grade separation at Interchanges

• Improve road facilities and services

• Improveroadsafetystandards

Page 12: 14.30 tarek shuaib, pace

Resulting Solutions

Resulting SolutionsLocal Traffic Network- At Grade

Page 13: 14.30 tarek shuaib, pace

Resulting Solutions

Resulting SolutionsLocal Traffic Network- At Grade

Main Line Through Traffic - Depressed

Page 14: 14.30 tarek shuaib, pace

Resulting Solutions

Resulting SolutionsLocal Traffic Network- At Grade

Main Line Through Traffic - Depressed

Main Line Through Traffic - At Grade

Page 15: 14.30 tarek shuaib, pace

Resulting Solutions

Resulting SolutionsLocal Traffic Network- At Grade

Main Line Through Traffic - Depressed

Main Line Through Traffic - At Grade

Main Line Through Traffic - Elevated

Page 16: 14.30 tarek shuaib, pace

Project Execution PackagesThe project is delivered in two packages: Package 1 (RA/166) Jahra Highway; Package 2 (RA/167) Jamal Abdul Nasser Highway.Each package required to be executed in 5 phases, due to:• Traffic diversions• Utility diversions• The installation of bridge segments

Project Execution Packages

145

32

Package 2: RA/167

Package 1: RA/166

Page 17: 14.30 tarek shuaib, pace

Jahra Road and UN Roundabout Interchange

Page 18: 14.30 tarek shuaib, pace

Jahra Road264.76 million KD

At Grade Roads (upgraded):Length: 16.4 km 2-3 lanes

Elevated Roads:Length: 17.7 km 2-3 lanes

Depressed Roads:Length: 620 m 3 lanes

Number of Interchanges:5

Foot Bridges:10

Roundabouts:6

Data Sheet

Jamal Abdul Nasser Street242.42 million KD

At Grade Roads (upgraded):Length: 13.2 km 2-3 lanes

Elevated Roads:Length: 18.6 km 2-3 lanes

Depressed Roads:Length: 700 m 3 lanes

Number of Interchanges:3

Foot Bridges:8

Roundabouts:9

Page 19: 14.30 tarek shuaib, pace

Jahra RoadMain contractor:

The Arab Contractors

Subcontractors:

• KuwaitBrucknerConstructionCo.(pillingworks)• EdrasisMiddleEast(pillingworks)• SharafFoundations(pillingworks)• KhajahGroup(waterproofingworks)• Al-GhanimSpecialtiesCo.W.L.L(waterproofing works)• Al-HajrafCompany(asphaltworks)• KCPC-KuwaitCompanyforProcessPlant Construction & Contracting (asphalt works)• Al-RayaAl-ArabiyaforGeneralTrading&Contracting (road marking & signs)• ZaidanCompany(pilecapframework)

List of Contractors

• Al-MohannadGulf(concreteworks)• M.C.C(pilecap/foundationworks)• AlghurairConstructions(foundationworks)• TheContractorGen.Trad.&Cont.(utilitiesand services diversion)• ZalzalaforServices&Contracting(landscaping& irrigation)

Page 20: 14.30 tarek shuaib, pace

Main contractors - Joint Venture of:

• RizzaniDeEccher-SPA-Italy• ObrasconHuarteLain-SA-Spain• TREVI-SPA-Italy• BoodaiConstruction-Kuwait

Subcontractors:

• FurqanKuwaitiCo.(Detours,DismantlingofSteel Bridges)• Salem Al Nisf (Electrical Works: Street Lighting)• Prime Group (Soft Landscaping)• FugroMiddleEast(TestPilesbyOsterbergMethod)• Gulf International Co. (Third Party Inspection - Ductile Pipes)• KadhemaScientificConsultancy(EPAConsultant)• ZalzalahAgriculturalServices(SoftLandscaping)

List of Contractors

• Green Line Co (Sanitary Sewer Lines and Storm Water Drainage)• KCC(ElectricalWorks:StreetLighting)• Al-Raya Al Arabia (Detours)• ConstructionManagementandBuildingCO.CMBC (Concrete Culverts & Galleries)• Canar Trading & Contracting Co. (Fresh & Brackish Water Lines)• Trak Al Wataniya Co. (Removal and Construction and Maintenace of External Walls)

Jamal Abdul Nasser Street

Page 21: 14.30 tarek shuaib, pace

List of Contractors

• KhajahSpecialitesCompany(WaterProofingWorks)• FreyssinetKuwaitW.L.L(StabiliziedEarthWall)• Ahmadiah Contracting & Trading (workmanship of Reinf Concrete Works in Trough and Gallery No-3)• KuwaitNetworkElectronicTechnologyCompany (Section E5 - PTT works)• EgytechCables-ElSewedy(HighTensionCables)• M/S Tony Gee and Partners LLP (Engineering Design Consultant)• M/S Fheid Ingenieros (Design Third Party)• SalemMAlNisfElectricalCo(LowVoltageCables)• M/S Al -Sager General Trading and Contracting (Removal of Gas Lines)• TENSACCIAI (Specialized Works - Bearings)• Cicon Co. (Steel Rebars Fabrication)• Jassim Transport & Stevedoring Co. W.L.L (Segment Transportation)• Arabi Company W.L.L (Pump Station Mechanical and Electrical Works Phase 1)

Page 22: 14.30 tarek shuaib, pace

Concrete Precast Segment

Concrete Precast SegmentFabrication Facilities in Doha Area

RA/166 Area: 150,000 m2 RA/167 Area: 130,000 m2

Page 23: 14.30 tarek shuaib, pace

Concrete Precast SegmentViaduct Erection via Overhead Launching Truss.

It is the biggest viaduct project currently under construction in GCC (16,091 segments).

Concrete Precast Segment

Page 24: 14.30 tarek shuaib, pace

Construction of the Jahra Road

Page 25: 14.30 tarek shuaib, pace

Construction of the Jamal Abdul Nasser Road

Page 26: 14.30 tarek shuaib, pace

Execution Challenges

1. Right of way limitations for construction

2. Relocating the huge number of existing utilities

3. The live traffic volume occupying the existing roads

4. Coordinating with the various stakeholders

Execution Challenges

Page 27: 14.30 tarek shuaib, pace

Solutions

1. Employing construction techniques that require minimum space

2. Standarized detours to maintain ease of traffic flow and accessibility

3. Avoidance of working in rush and peak hours

4. Effective outreach and communication programs for all stakeholders and parties

Solutions

Page 28: 14.30 tarek shuaib, pace

Jahra Road70 % Completed

77 %41 %63 %47 %36 %36 %51 %17 %

6 %55 %50 %29 %70 %

76 %8 %

84 %73 %71 %66 %54 %35 %

28 %84 %36 %96 %70 %

StructuresPiles (trough)Trough slab & wallsBridge PilesBridge Pile CapsPiers & AbutmentDiaphragmsSeg. Prod.Seg. Erec.

UtilitiesStorm Water PipeWater Supply PipeSanitary Water PipeLT HT CablesDetour Works

Current Progress

Jamal Abdul Nasser Street43 % Completed

Page 29: 14.30 tarek shuaib, pace

Construction of the Jahra Road

Page 30: 14.30 tarek shuaib, pace

Construction of the Jahra Road

Page 31: 14.30 tarek shuaib, pace

Construction of the Jahra Road

Page 32: 14.30 tarek shuaib, pace

Construction of the Jamal Abdul Nasser Street

Page 33: 14.30 tarek shuaib, pace

Construction of the Jamal Abdul Nasser Street

Page 34: 14.30 tarek shuaib, pace

Construction of the Jamal Abdul Nasser Street

Page 35: 14.30 tarek shuaib, pace

Thank You