How the Dutch Keep Their Feet Dry (and not move to Germany)

Adaptation, Risk Mitigation & National Will

Arjan BraamskampSenior Economic OfficerNetherlands Consulate General in NY

12-04-2023

Page 2: 13ArjanBraamskamp_NICHI_BusinessSummit

2

The Netherlands: a delta landscape, penetrated by rivers, subject to sea and river flooding

Page 3: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris3

The Netherlands, at risk• 400 miles of rivers (Rhine, Meuse)

draining NW Europe• 60% of land at/below sea level• 17 million people, 9 million of which live

below flood level• GDP 600 bln euro (70% of which

produced at/below sea-level)• 2100 miles of flood defences, hundreds

of locks, sluices, pumping stations

• storm surge, wet weather, heavy river discharge, subsiding, drought

• changing climate. SLR: 1 – 2.5 ft ~2100

• water mgmt is a matter of national survival and an opportunity

100 km

AHR

Page 4: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Area potentially flooded at water level 6.0 m below MSL

Page 5: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Area potentially flooded at water level 4.0 m below MSL

Page 6: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Area potentially flooded at water level 2.0 m below MSL

Page 7: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Area potentially flooded at water level 0.0 m below MSL

Page 8: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Area potentially flooded at water level 0.5 m above MSL

Page 9: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Area potentially flooded at water level 1.0 m above MSL

Page 10: 13ArjanBraamskamp_NICHI_BusinessSummit

12-04-2023

10

Page 11: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Focus of past mitigation: shorten the coastline

11

300 45 km

750 50 km

Page 12: 13ArjanBraamskamp_NICHI_BusinessSummit

12

1958 flood risk/safety standards established“Never Again” mentality

Risk = Consequences x Probability = areas with most risk have highest levels of protection

Cost-Benefit Analysis for all major infra projects (models recently updated given 40 rys of demographic and econ changes)

Caveat for US: Weather and landscape differences• Slow-moving winter storms vs fast-moving

tropical storms (wetter)• Max storm wind speeds different• Rainfall manageable• Small- to- mid-sized rivers

1/10,000 = 1/500?

Page 13: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

There…all done…….Now we’re safe!

13 12-04-2023

Page 14: 13ArjanBraamskamp_NICHI_BusinessSummit

Subsidence

Mining Gas + salt

Geological

Peat oxidation

Page 15: 13ArjanBraamskamp_NICHI_BusinessSummit

The Delta Under Pressure: future challenges, measured

15

Sealevel rise(20 cm-->

60-85 cm/100y)

More /extreme storms?

More/intense rainfall

Spatialdevelopments

Increased erosion

Subsidence10 cm/100yr

Salt intrusion

Decreasedriver

discharge- 60%

Increased river

discharge+ 10%

Page 16: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Present Flood Risk Management policy (2009)(flood resistance to flood accomodation)

Multi-layered approach:

1. Robust Protection

2. Smart land-use planning

Room for the River

Living with Water: spatial planning, urban design, multiple layers of defense and green infra

3. Disaster management (Katrina effect)

Page 17: 13ArjanBraamskamp_NICHI_BusinessSummit
Page 18: 13ArjanBraamskamp_NICHI_BusinessSummit

Room for the River

Page 19: 13ArjanBraamskamp_NICHI_BusinessSummit

Depoldering, the plan3

river MeuseTo the sea

river Merwede

Bottleneck Gorinchem

Page 20: 13ArjanBraamskamp_NICHI_BusinessSummit

12-04-202320

Page 21: 13ArjanBraamskamp_NICHI_BusinessSummit

waterdynamic3

Page 22: 13ArjanBraamskamp_NICHI_BusinessSummit

3waterdynamic

Page 23: 13ArjanBraamskamp_NICHI_BusinessSummit

3waterdynamic

Page 24: 13ArjanBraamskamp_NICHI_BusinessSummit

3waterdynamic

Page 25: 13ArjanBraamskamp_NICHI_BusinessSummit

3waterdynamic

Page 26: 13ArjanBraamskamp_NICHI_BusinessSummit

3waterdynamic

Page 27: 13ArjanBraamskamp_NICHI_BusinessSummit

Waal River / Nijmegen Project• River bottleneck, channel restriction from 1500m width to

450 m width

Options:

• Ag / undeveloped land available to north

• Northern river bank land targeted for development

• Key road / rail / harbor infrastructure

12-04-202327

Page 28: 13ArjanBraamskamp_NICHI_BusinessSummit

Bottleneck

Page 29: 13ArjanBraamskamp_NICHI_BusinessSummit

2

1

R 3294 N ijm ege n02

Page 30: 13ArjanBraamskamp_NICHI_BusinessSummit

Dike set-back strategy: safety, increased storage / flow capacity, and new land opportunities

12-04-202330

Page 31: 13ArjanBraamskamp_NICHI_BusinessSummit
Page 32: 13ArjanBraamskamp_NICHI_BusinessSummit

Before / After (impression)

12-04-202332

Page 33: 13ArjanBraamskamp_NICHI_BusinessSummit

the bad news

public involvement

salomons judgement

2000 2002 2004 2006 2008 2010 2012 2014

first scenario’s

fright fight acquiescence building trust pride

Nijmegen takes lead

definite plan

start realization

Stages

Page 34: 13ArjanBraamskamp_NICHI_BusinessSummit

Rotterdam: 4 threats (or an opportunity?)

12-04-2023

34

Page 35: 13ArjanBraamskamp_NICHI_BusinessSummit

URBAN FLOODPLAIN

Page 36: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Water Storage Capacity “Rotterdam”

Page 37: 13ArjanBraamskamp_NICHI_BusinessSummit

UNDERGROUND WATER STORAGE

Page 38: 13ArjanBraamskamp_NICHI_BusinessSummit

Source: The Urbanists

Page 39: 13ArjanBraamskamp_NICHI_BusinessSummit

Source: The Urbanists

Page 40: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Scheveningen Blvd: improve mandated protection and urban amenity (2006 safety assessment)

40

Page 41: 13ArjanBraamskamp_NICHI_BusinessSummit

Bouldevard Scheveningen De Solà - Morales

Page 42: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Page 43: 13ArjanBraamskamp_NICHI_BusinessSummit
Page 44: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Rising seas

• Increasing sea level• Increasing population and economic value in coastal

zones world wide

IPCC, 2007 National Geographic , Sept

2013

Photo: Stephen Wilkes

Page 45: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Building with Nature?

young dune formationyoung dune formationyoung dune formationyoung dune formation

let nature do partof the work ...

while creating newnew eco-opportunities

Page 46: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Dutch Context, coastal erosion

Shortage of natural sediment

Consequence: Structural erosion, 1996 coastline fixed

Solution: Nourishments

City of Egmond

Page 47: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Development of nourishment strategy

Increase in volume

Annual added sand volumes: • Since 1990: 6 mln m3/yr• Since 2001: 12 mln m3/yr

Prospect future : 40-85 mln m3/yr !!

Change in design

Page 48: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

~2

km

~ 1 km

Objectives:1. Extra Safety2. Nature area / ‘Quality of living’3. Innovation

‘Hook’ alternative

70 M Euro.21 M m3 of sand

The Sand Engine!

Page 49: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Predictions morphological behaviorDeltares (Delft3D) numerical model forecast

Initial design

Page 50: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Initial

After 3 year

After 5 years

After 10 years

After 20 years

Source: Rijkswaterstaat / Shore Monitoring & Research

MEASURED / PREDICTED EVOLUTION (DELFT3D)

Page 51: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Constructed peninsula

Page 52: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Aerial photo Oct. 2011, after 3 mnths

Page 53: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Aerial photo Jan. 2012, after 6 mnths

Page 54: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Aerial photo July. 2012, after 1 yr

Page 55: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

Aerial photo July. 2013, after 2 yrs

Page 56: 13ArjanBraamskamp_NICHI_BusinessSummit

Sand Motor: Pros & ConsPros:

1. Reduced costs in nourishment & maintenance

2. Reduced environmental Impact (use natural processes)

3. One-time pricetag @ $ 90 mln

4. Offers recreational and R&D opportunities

Cons:

5. Pilot process – Unproven Technology long-term– Difficult to replicate

6. Reduced impact on environment and ecology may be overstated

Stakeholders:

Waterboard DelflandRijkswaterstaatProvince South HollandVan Oord DredgingDeltares

Page 57: 13ArjanBraamskamp_NICHI_BusinessSummit

2nd Delta Commission: 2007/08 (Katrina inspired)Working together with water: a living land builds for its future

12-04-2023

57

Page 58: 13ArjanBraamskamp_NICHI_BusinessSummit

The Delta Program: safe and productive over 100 years (how to not move to Germany)

Independent Delta Commissioner (and small staff)

2011 – 2014: Research program to identify and quantify challenges

2014: Delta Decisions

2015 – 2020: Develop projects

2020 -2050: 1 billion euro/yr for project implementation

04/12/2023Delta Programme Commissioner58

Cost-benefit analysis for every project

Tipping points approach

No-regret measures

Adaptive management

Page 59: 13ArjanBraamskamp_NICHI_BusinessSummit

Dutch – American Collaborations• Post-Katrina Louisiana• Mississippi River Floods (St Louis)• Los Angeles River• SLR in San Francisco Bay (early-stage)• Integrated Delta Management (CA Bay Delta)• Galveston (Ike Dike)• SLR Norfolk• SLR Miami• Post-Sandy Region (NY-NJ-CT)

12-04-2023

59

Page 60: 13ArjanBraamskamp_NICHI_BusinessSummit

Deltacommissaris

New Orleans: Urban Water Plan for a Living Water System

12-04-2023

Page 61: 13ArjanBraamskamp_NICHI_BusinessSummit

PILOT PROJECT: MirabeauGreater New Orleans Water Management Strategy

Page 62: 13ArjanBraamskamp_NICHI_BusinessSummit

FILMORE DRAINAGE IMPACTGreater New Orleans Water Management Strategy

Page 63: 13ArjanBraamskamp_NICHI_BusinessSummit

Super-Storm SandyThey said: “We need Dutch barriers!”

We said: “Wait a minute…”

Rebuild by Design

04/12/2023

63

Page 64: 13ArjanBraamskamp_NICHI_BusinessSummit

Rebuild by Design• Innovating together to create a resilient region• Initiative by Hurricane Sandy Rebuilding Task Force and HUD• Address regional vulnerabilities and develop fundable solutions• Promote resilience through innovative planning and design

“Don’t ask for answers to pre-defined challenges – allow for creative process and for industry expertise

to develop and design multiple solutions that will maximize resilience in the region and reduce

climate-change related risks.”

12-04-2023

64

Source: RebuildbyDesign.org

Page 65: 13ArjanBraamskamp_NICHI_BusinessSummit

Design as tool towards resiliency• BIG – The Big U around Manhattan

“Cross-breeding public infrastructure with social programs”• Interboro Team – Regional protection on community level L.I.

“Building with nature: Living with the Bay”• OMA / HaskoningDHV – Hoboken resilient waterfront

“Resist – delay – Store - Discharge”• MIT / ZUS & Urbanisten – New Meadowlands

“Combine functions of Economy – Ecology – Transport – Energy”• Unabridged – A new future of Bridgeport, CT

“Blueprint for coastal community development”• West 8 / WXY / Arcadis – Blue Dunes

“Restoration of coastal barrier functions”

12-04-2023

65

Page 66: 13ArjanBraamskamp_NICHI_BusinessSummit

Picking sides…..

12-04-2023

66

Page 67: 13ArjanBraamskamp_NICHI_BusinessSummit

For more info about:

• The Art of Flood Fighting• Multiple Layers of Defense• Regional Approach• Dutch soccer• Wooden Shoes, Bikes,

Windmills etc etc

Arjan Braamskamp

[email protected]

12-04-2023 67

Thank You