15
WELCOMES TO THE LIVELYHOOD ENHANCEMENT THROUGH DBI INTERVENTION

Swati dbi-2nd phase

Embed Size (px)

Citation preview

Page 1: Swati dbi-2nd phase

WELCOMES TO THE LIVELYHOOD

ENHANCEMENT THROUGH

DBI INTERVENTION

WELCOMES TO THE LIVELYHOOD

ENHANCEMENT THROUGH

DBI INTERVENTION

Page 2: Swati dbi-2nd phase

Background…

Availability of Natural Water Sources Crises of Irrigation during irregular /erratic rainfall

during Kharif and Rabi season and scarcity of water for household use in summer.

Huge Demand from the Community for replication of DBI in their respective villages after 1st Phase.

Maximum Unutilized Perennial Water Resources Small tribal pockets in remote areas debars from

Govt. Water Supply Schemes DBI – A low External input based Technology DBI – Low investment and High utility, Easy to

manage and maintain by the villagers.Swati_DBI

2

Page 3: Swati dbi-2nd phase

Good Experience

of SWATI Pipe based Water Supply System Stone Bed and Guard wall in Hilly Areas to Protect the Pipes Mobilization of Community Contribution (In shape of Labour and

Material) & their active Participation in installation. Bucket Purification System for Clean Drinking Water Involvement of Youth and women and all section of the community

during Planning, Implementation and Development Phase. Development of land availed under FRA Convergent Plan for FRA Land Title Holders. Convergent with other Govt. Schemes and Programme like

MGNREGS, NHM, ATMA.

Swati_DBI3

Page 4: Swati dbi-2nd phase

Coverage under DBI During 2nd Phase of

Completion Project March’13 to Feb’14

YearNo of

Villages

Total Household

Households

Benefited

Acres irrigate

d in Rainy

Season

Acres irrigate

d in Winter Season

Remarks

2013 5 274 220 175 85

Sarumaha 37 37 35 17

Paderipada 97 73 30 18

Mundasahi 32 22 40 13

Kanibidika 90 70 35 27

Nahudimah

a

18 18 35 10 Swati_DBI4

Page 5: Swati dbi-2nd phase

Challenges faced during till

date… Post Management of Assets By the VDC due to

communal and ethnic fillings. Strengthening of VDC/WUA and collection of water

users charges. Involvement of the all community and equitable

distribution of the water for agriculture and Day to Day household use.

Extension of Hand holding support to meet the requirement of VDC during the Gap period.

Mobilization of Funds from ITDA to replicate the DBI in other villages.

Swati_DBI5

Page 6: Swati dbi-2nd phase

Plan for Post Management

Phase… Continuation Mobilization of community. Participation, Contribution and their ownership and collection of

water users fees. Strengthening of Village Level Institution-SHG,VDC Organizing regular meeting with VDC/WUA.. Extending hold holding support as and when required by the

community. Regular monitoring and utilization of the DBI and Revolving Fund

by Community and VDC. Introduction of Onion and Dhania (New Crops) in the DBI. Technical support for Off Season Vegetable Cultivation and

Development of Crop Plan season wise. Linkage with the other Govt. Schemes and Programme.

Swati_DBI 6

Page 7: Swati dbi-2nd phase

Leveraged

Resources…

Convergent with other Govt. Programmes like Line Sowing (20 Acres) under RKVY, Maize and Potato Cultivation ( 10 Acres each) with support IWMP and Development of Mango Orchard (25 Acres) and Hill Broom Planation under MGNREGS.

FRA Land development under MGNREGS Implementation of INRM Programme in all DBI villages. Construction of IHL in the Panchayat Plan under BNA. More Focus on Malaria Control and MNCHN issues.

Swati_DBI7

Page 8: Swati dbi-2nd phase

Lesson Learned for Improvement

Right Selection of site and village and give sufficient time for community mobilizaiton.

Proper Design and Estimate and Plan for Livelihood enhancement

More Engagement with the Community in the Post Implementation Phase

Proper Planning for use of waste water by promotion of Kitchen Garden and linking with Soakpit.

Leverage of resources to the DBI village from mainstream development programs

Swati_DBI8

Page 9: Swati dbi-2nd phase

Photo Glimpses…..

Swati_DBI 9

Social & Resource mapping Technical Survey at Sarumaha

Construction of Water storage tank Pipe Fitting at Barepanga

Page 10: Swati dbi-2nd phase

Stone Bounding by the villagers Stone Bed for pipe connection

Water storage tank in stream Water Bucket for Drinking water supplySwati_DBI 10

Page 11: Swati dbi-2nd phase

Drinking Water supply to Houses Water for Irrigation Purpose

Seed Distribution to farmers Farmers Training camp Swati_DBI11

Page 12: Swati dbi-2nd phase

Road Ahead……. DBI plus to carry forward the initiative to a sustainable approach Follow up action in the community on crop diversification and

rotation. Increase of Net and Gross Cropping Areas. Promotion of more NACDIP and Vermi Compost and Drip Irrigation. Maintenance and repairing of structures/ assets affected due to flash

flood by the Community Protection of Catchment through Plantation and loose boulder str. Structural Change as per the requirement of Site situation. (Intake

Structure) Replication of the other type of DBI (Hy dram and Picco Hydro) in

our Areas. Water Quality Testing and establishment of Water Treatment Plant. Soil Testing and Promotion of Organic Farming More Convergent with other Govt. supported Program. Leverage of Funds from OTELP and ITDA for New DBI. Tracking of Expenditure out of surplus income through MIS.

Swati_DBI12

Page 13: Swati dbi-2nd phase

Experience of Farmers

Purandar Bindhani, Biraguda, Phiringia says that he has been able to double the production of paddy, grow 5 quintals of potato, tomato for household consumption, cauliflower and cabbage that yielded an income of Rs. 7000, maize worth Rs. 2400 and 15 kgs of mustard for household consumption.

Swati_DBI 13

Page 14: Swati dbi-2nd phase

Experience of Women

Lembati Pradhan, an inhabitant of Nahudimaha, K. Nuagaon says, “DBI facility has been a much awaited succour for the women who faced a lot of problems especially when there were guests in the house or torrential rain”.

Swati_DBI 14

Page 15: Swati dbi-2nd phase

THANK U

Swati_DBI15