CHEC 270 SAFETY REPORT
SAFETY INSPECTION/ MEETING
Four (4) Joint inspection with Jacobs/ AECOM/ ALL sub-contractors on
every Tuesday morning followed by Safety meeting . (6,13,20,27 Mar)
SAFETY STATISTIC 2012
Month: March
Total Accumulated man-hour:134021
Man-hour without lost time injury: 134021
Lost time injury frequency rate: 0
Days worked since project commenced: 143
Days since last Time lost accident N/A
POSITIVE POINTERS
AREA TO BE IMPROVED / PROMPT RECTIFICATION
TRAINING
Induction Training: 103 attendees ( 25raining)
TOOL BOX TALK
“Checking before/after vacation“: 12attendees
“Accident Recall”: 81attendees “Noise Control Ord./Permit to work”: 24 attendees
“House keeping” 47 attendees “Prevention of Air pollution” 46attendees
“Chemical Waste” 78 attendees “Inclement Weather safety” 59 attendees
Total: 334
FIRE DRILL & RESCUE DRILL ON 13.3.2012
The ‘fire’ started at 11:40 and all workers /staffs /
clients gathered at 11:56 upon their signing of
attendance. (143 had signed for their
attendance)
PRESENTATION OF SAFETY WORKER AWARD
Working team of Robertson (for their PPE + 110V hand
tool) & CNCEC (for their rigid temp Ladder case) awarded
in March2012. Super-market coupon of $200 to each
team.
ACCIDENT / GOVERNMENT BODY VISIT
NO reported injury accident had happened and all
subcontractors had been asked and admitted in the
weekly meeting with CHEC/AECOM/ Jacob.
CEDD had visited this site on 30.3.2012 NO adverse
regaring safety had been raised.