ETAEnvironmental Health and Safety Monthly Metrics
March, 2015
ETA Accidents- 3/15
Type Date Div Description Severity Status
Right shoulder strain
3/10/15 ESDR Pain in right shoulder from use of hand press in 70-108 glove box.
First aid Clinic visit. Accident investigation by ergonomist.
Contusion/fracture of toe
3/13/15 DIV Laptop fell on foot while working from home
OSHA Recordable
Clinic visit. Restricted work. Accident investigation pending.
ETA Accidents- By Type
Mar '14 Apr '14 May '14 Jun '14 Jul '14 Aug '14 Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '15
Strain-Arm/Hand NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN 1
Strain-Back/Leg NaN NaN NaN NaN NaN 1 NaN NaN NaN NaN NaN NaN NaN
Repetitive NaN NaN NaN NaN NaN NaN NaN 1 NaN NaN NaN NaN NaN
Fracture/Break NaN NaN NaN 1 NaN NaN NaN NaN NaN NaN NaN NaN 1
Chem Contact NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Burn NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Contusion 1 NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Cut/Abrasion NaN NaN 1 NaN NaN NaN NaN 1 NaN NaN NaN 1 NaN
Eye NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Respiratory NaN NaN NaN NaN NaN NaN 1 NaN NaN NaN NaN NaN NaN
Other NaN NaN NaN 1 NaN NaN NaN NaN NaN NaN NaN NaN NaN
0.5
1.5
2.5
Contusion Cut/Abrasion
Cut/Abrasion
Cut/AbrasionFracture/Break
Fracture/BreakOther
Strain-Back/LegRespiratory Repetitive
ETA Accidents- Severity
Mar
'14
Apr
'14
May
'14
Jun
'14
Jul '
14
Aug
'14
Sep
'14
Oct
'14
Nov
'14
Dec
'14
Jan
'15
Feb
'15
Mar
'150
1
2
3
First Aid Recordable Lost Work
Emergency Incidents- 3/15
Date Incident Area Status
There were no ETA-related emergency incidents in March 2015.
Ergonomic Assessments- By Month
Mar '14 Apr '14 May '14 Jun '14 Jul '14 Aug '14 Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '15
Completed 9 4 3 7 6 6 3 4 6 3 2 2 1
Open 0 0 0 0 0 0 0 0 0 0 1 2 1
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
Ass
essm
ents
Open EETD Ergonomic Assessments
Date Requested
Dept. Type Status
3/1/15 BTUS Discomfort Actions Pending
2/20/15 EAEI Discomfort Actions Pending
2/19/15 EAEI Discomfort Actions Pending
1/9/15 BTUS Discomfort Actions Pending
22
Open Assessments by Dept.
BTUSEAEIESDRDIV
ETA Job Hazard Analysis (JHA)- Pending
Jan '14 Feb '14 Mar '14 Apr '14 May '14
Jun '14 Jul '14 Aug '14 Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '15
New Hire <30 Days
2 4 14 2 1 9 2 4 10 2 0 3 4 3 6
New Hire >30 Days
0 1 0 2 1 0 1 0 0 0 0 0 0 0 0
Ex-pired <30 Days
1 1 2 0 0 1 3 2 0 0 0 0 0 0 0
Ex-pired >30 Days
0 0 0 0 0 0 0 1 0 0 0 0 0 0 0
1
3
5
7
9
11
13
15
17
JHA
’s D
ue
New Hire vs. Expired Metric Started Sep ‘13
Job Hazard Analysis- % Completion
Feb '14 Mar '14 Apr '14 May '14 Jun '14 Jul '14 Aug '14 Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '1580
82
84
86
88
90
92
94
96
98
10099
97
9999.5
9899 99
98
99.5100
99.599
99.599
92
9091
9091 91
9091 91 91 91 91
90 90
ETA % LBNL %
%
ETA Incomplete Training Assignments
Feb '13
Mar '13
Apr '13
May '13
Jun '13 Jul
'13Aug
'13Sep
'13Oct '1
3Nov
'13Dec '
13Jan
'14Feb
'14Mar '
14Apr '
14
May '14
Jun '14 Jul
'14Aug
'14Sep
'14Oct '1
4Nov
'14Dec '
14Jan
'15Feb
'15Mar '
150
50
100
150
93
66
76
59
91
78
66 64
92
73
48
89 88
78
52
93
81
65
9297
69
84
75
91
73
42
Incomplete AssignmentsAll-time low in training assignments due in March 2015!
Training % Completion Status
Jan '14 Feb '14 Mar '14 Apr '14 May '14 Jun '14 Jul '14 Aug '14 Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '1580
82
84
86
88
90
92
94
96
98
10098.5 98.5
9999.5
98.599 99
98.5 98.599
98.599
98.599
99.5
95 95 95 95 9594
95 95 9594
93 93 9394 94
ETA % LBNL %
%
Incomplete Training by Course Type(Total Incomplete Assignments = 42 )
Ergonomics; 13
Cyber Security; 7
Fire Extinguisher; 5UC COI/Ethics; 3
Supervisor; 3
Hosting Foreign; 2
Electrical/LOTO; 2
Chemical Hygiene; 1
Overview of EHS; 1
GERT; 1
New Employee; 1Pressure; 1
Trafficking; 1Cryo; 1
Training Assignments Due (Total = 42)
Open Assignments by Division Open Assignments by Hire Date
< 1 Month 2 to 6 Months > 6 Month0
5
10
15
20
25
30
35
9
4
29
Assignments
ESDR; 16
EAEI; 12
BTUS; 11
DIV; 3
ETA Training Assignments Due
Career
Affiliate
Limite
d
Student A
sst.
Facu
lty
Term Appt.
Post Doc.
GSRA
Reh Retire
Visit R
esearch
Contracto
r0
2
4
6
8
10
12
14
16
1513
3 3 32 2
10 0 0
Assignments due by Job Type
<1 Month
1-2 Months
>2 Months
0 2 4 6 8 10 12 14
12
1
3
Renewal Training Assignments- 16 Total
Electrical Equipment Inspection Failure Status (Red Dot)
Nov '14 Dec '14 Jan '15 Feb '15 Mar '150
2
4
6
8
10
12
14
16
18
>180 Days Due31-180 Days Due<30 Days Due
Equipment listed in the EEIP database as “failed” and requires repair prior to use.
ETA Failed Electrical Equipment Status (3/30/15)
Equipment Date Days Failed
Dept. Area Status
Fixture Current Sensor 1/9/09 2271 BTUS 46-231 Unable to locate unit
Waveform Generator 4/7/11 1453 BTUS 46-115 Unable to locate unit
Dual Seal Vacuum Pump 4/27/11 1433 EAEI 63-101 Unable to locate unit
Aethalometer 4/28/11 1432 EAEI 63-101 Unable to locate unit
AC Line Conditioner 6/6/12 1027 EAEI 70-278 Power cord needs to be replaced
Blower 6/11/12 1022 EAEI 70-289 Power cord needs strain relief
Appliance Monitors 10/18/12 893 ESDR 90-1141 Units may never have been built. Request closure.
Tracer Emitter Units (Multiple) 11/20/12 860 BTUS 70-217 Units placed out of service
Particle Samplers (multiple units) 2/5/13 783 EAEI 71-106 Units placed out of service
Residential Furnace 10/18/13 528 BTUS 70-173 Unit being used for parts
Turbine Meter Readout 10/21/13 525 BTUS 70-173 Unable to locate unit
MFC Pump 12/2/13 474 EAEI Sacto Waiting for pump to be brought back from field
Power Supply #1 11/7/14 143 EAEI 70-278 Uncovered AC terminal strip
Power Supply #2 11/7/14 143 EAEI 70-278 Power cord needs replacement
Power Supply 12/10/14 110 ESDR 70-173 Unlanded conductors, ground bond not attached
Safety Concerns Submittals- ETAJu
l '12
Aug
'12
Sep
'12
Oct
'12
Nov
'12
Dec
'12
Jan
'13
Feb
'13
Mar
'13
Apr
'13
May
'13
Jun
'13
Jul '
13A
ug '1
3S
ep '1
3O
ct '1
3N
ov '1
3D
ec '1
3Ja
n '1
4F
eb '1
4M
ar '1
4A
pr '1
4M
ay '1
4Ju
n '1
4Ju
l '14
Aug
'14
Sep
'14
Oct
'14
Nov
'14
Dec
'14
Jan
'15
Feb
'15
Mar
'150
1
2
3
4
5
6
7
8
9
10
Completed Open
ETA Safety Concerns Status
# Date Concern Type Status
1180 9/23/14 Need steps from B90 shuttle stop up to sidewalk. Uneven surface.
Traffic- Ped CATS submitted for funding
1189 10/22/14 Poor lighting near B90 stairways Building Maint.
Open- Waiting for FWR closure.
1198 11/22/14 Trash bin located at B63 is causing damage to exterior water pipe. Also blocking access ramp.
Building Maint.
Open- Facilities needs to find a new location.
1211 1/23/15 Flashing crosswalk on Cyclotron Rd. is not operating properly
Traffic Open- Waiting for FWR closure
Corrective Action Reports (CATS)- 3/15
CAT # Date Description Lead Status
9675 7/29/14 Seismically secure the laser table near the 70-157 entrance. DOE assessment follow-up item.
X. Mao Facilities work request submitted for installation.
9785 3/12/15 Follow-up to 70-264 fire incident. Ensure lab areas 70-103, 70-134, 70-163, 70-173, 70-217, 70-226, 70-269, and 70-289 improve housekeeping practices.
R. Scholtz Safety alert issued to ETA personnel. Areas 70-103, 70-134, 70-269 are actively cleaning out old equipment.
Audits and Inspection Status- 3/15
Type Date Lead Status
DOE-BSO Walkthrough of B70 2nd floor
3/3/15 K. Abbott/R. Scholtz
Completed
Quarterly SAA Inspections
TBD- End of April
R. Scholtz Scheduling
Significant Safety Achievements- 3/15• Continue Work Planning and Control (WPC) projects/activity set-up
for ETA divisions. We have begun adding personnel to activities.• A draft ETA Integrated Safety Management Plan was distributed to
the Safety Committee for review. This includes major revisions.• The glove box self assessment project continues. Data has been
collected and is being compiled into a report.• A preliminary electrical inspection of the B60 air conditioner test
chamber was completed.• The major chemical container/sample clean-out of the B62 (Kerr)
lab areas is nearly completed. Only a few trays of samples remain.• A Safety Alert was issued to all ETA personnel regarding fire
prevention through improved housekeeping in their work areas.• I completed additional chemical clean-outs in B63-101, B70-134,
B70-264A, and 70-269 (behind hood area).• I completed a 12-hour NFPA-45 Laboratory Fire Protection training
course.
Short Term Safety Outlook- 4/15
• Continue the set-up of the Work Planning and Control (WPC) “projects” and “activities” framework for ETA.
• Complete the Glove Box Operation Self-Assessment project report for submittal.
• Complete the annual review and update of the ETA Integrated Safety Management (ISM) Plan.
• Complete an old chemical/sample clean-out in the 70-264 lab area.
• Continue to address ETA equipment on the electrical equipment “fail” list
• Assist with the set-up for new lab areas 70-143, B33 JCESR, and B60 test chambers.
• Conduct a quarterly SAA hazardous waste inspection.• Address the recent issue involving perchlorate use in the labs.• Hold an ETA Safety Committee meeting on 4/2/15.