17
Simpler & Faster Deployment of Small Cell Networks: LampSite Case Studies with iBwave Planning

Simpler & Faster Deployment of Small Cell Networks 2

Embed Size (px)

Citation preview

Page 1: Simpler & Faster Deployment of Small Cell Networks 2

Simpler & Faster Deployment of Small Cell Networks: LampSite Case Studies with iBwave Planning

Page 2: Simpler & Faster Deployment of Small Cell Networks 2

2

ContentsHuawei LampSite Solution and Case Study1

iBwave Tools Solution 32

Page 3: Simpler & Faster Deployment of Small Cell Networks 2

3

LampSite: Innovative Solution for Indoor MBB

Busy hour

Traditional solution

MBB traffic

Busy hour

Current Situation of Indoor MBB

Unleash The Suppressed Traffic

BBU RHUB pRRU

Superiority Challenge

Larger & Flexible Capacity pRRU level Capacity Allocation. Dynamic Capacity Adjustment.

Easier Deployment Simple Architecture. Smaller & Lighter.

Accurate Design Simplify by Professional

Tool, for example:

Enhanced SON feature.

Specification Checklist / Validation Tools.

Integrated to Design Tools.

More Product Specifications

Complex Configuration

Page 4: Simpler & Faster Deployment of Small Cell Networks 2

4

Case1: LampSite Deployed in Stadium Scenario

Initial Period(SFN) - Cell resources saved. - Interference reduced.

Later Period(Cell splitting) - Remote expansion. - Capacity N times increased.

Cell 1

Cell 2

Cell 3

Cell 4

Cell 1 Cell 2

Cell 3

Cell 4Cell 5Cell 6

Cell 7

Cell 8

Dynamic Capacity

Description High complexity and functionality in Europe. Support nearly 15,000 spectators.

System design: 30 hours. Venue construction: 7 days.

Time cost of LampSite solution

Minsk-Arena Complex in Belarus

Page 5: Simpler & Faster Deployment of Small Cell Networks 2

5

Case1: Accurate Design with iBwave Tools

Interference analyze. Antenna type select.

Interference

Step 2

Quick location and routing design. Coverage confirm by simulations.

Topology check & correct.

Performance OptimizationInterference

Shaped Antenna

Directional Antenna

Step 1 Step 3

Step 4

Call completion rate 100%

HSDPA peak rate 28Mbps

PS call drop rate 0.18%

PS traffic increased to 336%

Page 6: Simpler & Faster Deployment of Small Cell Networks 2

6

Case2: LampSite Deployed in Hotel Scenario

BBU

pRRU

RHUBCarrier 1

Carrier 2

LTE 2CCs CA On 1 pRRU

Description The first integrated resorts in Singapore. LampSite target: 2 basement in MBS Retail area.

System design: 16 hours. Venue construction: 14 days.

Time cost of LampSite solution

Marina Bay Sands

Page 7: Simpler & Faster Deployment of Small Cell Networks 2

7

Basement1

Basement2

Case2: Simpler & Faster Design

Simulation: Good Coverage Performance: Excellent

Average DL speed: 239Mbps CSFB success rate: 100% VoLTE & SRVCC handover

success rate: 100%

Average RSRP -76dBm

Page 8: Simpler & Faster Deployment of Small Cell Networks 2

8

ContentsHuawei LampSite Solution and Case Study1

iBwave Tools Solution 32

Page 9: Simpler & Faster Deployment of Small Cell Networks 2

WORLDWIDE STANDARDfor in-building network design and documentation

TRUSTED BY 700+ CUSTOMERSin more than 87 countries

CONTINUOUS INNOVATIONadapting quickly to a dynamic and rapidly-evolving industry

INDOOR WIRELESSPLANNING & DESIGN

FIELD-BASED SURVEYSCOLLABORATION PLATFORM

EXPERT TRAINING & CERTIFICATION

About iBwave

Page 10: Simpler & Faster Deployment of Small Cell Networks 2

Enabling in-building networking excellence

Feb 22, 2016 10

Enterprises Large venuesTransportationHospitality

SC design case studies

Page 11: Simpler & Faster Deployment of Small Cell Networks 2

Network architecture with automated RF calculations

Floor plans with propagation results

Small cell deployment process

11

DOCUMENT

SURVEY

Client &Site info

DESIGN

Planning& Design

MAINTAIN

MaintenanceUpgrades

BUILD

Install &Commission

Feb 22, 2016SC design case studies

Page 12: Simpler & Faster Deployment of Small Cell Networks 2

Design tool objectives for small cells

12

PORTABLE: Easy to carry on-site

INTUITIVE: RF expertise not required

AFFORDABLE: Accessible to all field personnel

COMPLETE & ACCURATE: Getting it right the 1st time

INTEGRATED: Complete end-to-end workflow

LOW TCOSCALING

Feb 22, 2016SC design case studies

Page 13: Simpler & Faster Deployment of Small Cell Networks 2

Product Suite

IN-BUILDINGCOLLABORATIONPLATFORM

FIELD-BASED SURVEYS &DESIGNS

TRAINING & CERTIFICATION

DATABASE OF COMPONENTS(20,000 +)

RF PLANNING AND DESIGN SOFTWARE

13Feb 22, 2016SC design case studies

Page 14: Simpler & Faster Deployment of Small Cell Networks 2

Network architecture with automated RF calculations

Floor plans with propagation results

Case study – sports complex

14

Minsk Arena Complex, Belarus(15,000 seats)

Primary criteria: capacity

Number of small cells: 4 8

Design time: 30 hrs (50% less)

Tool: iBwave Design

Feb 22, 2016SC design case studies

Page 15: Simpler & Faster Deployment of Small Cell Networks 2

Network architecture with automated RF calculations

Floor plans with propagation results

Case study – shopping mall

15

Shopping mall, Manila (240K sq ft)

Number of small cells: 8

Survey & design time: 4.5 hrs

Time savings: 5 hrs (55%)

Tool: iBwave Mobile Planner

Feb 22, 2016SC design case studies

Page 16: Simpler & Faster Deployment of Small Cell Networks 2

Network architecture with automated RF calculations

Floor plans with propagation results

Summary

16

• 4-step deployment process for enterprise small cells

• Key objective for design toolkit: Low TCO & ability to scale

• Design case studies: single sites to nationwide deployments

• Benefits: >50% time savings & getting it right the 1st time

• Collaboration & documentation needed for maintainability

Feb 22, 2016SC design case studies

Page 17: Simpler & Faster Deployment of Small Cell Networks 2

Benoit [email protected]

[email protected] (Toll free)

Support [email protected] (Toll free)

AMERICAS

[email protected]+ 33 3 44 57 75 90 (office)+ 33 6 19 19 97 13 (mobile)

Support [email protected]+ 20 111 0777 833

EMEA

[email protected]+ 60 3 2298 7298 (office)+ 60 3 2298 7333 (fax)

Support [email protected]+ 6012 285 6875

APAC

THANK YOU !STAND 7C71 | HALL 7