Upload
small-cell-forum
View
2.301
Download
2
Embed Size (px)
Citation preview
Simpler & Faster Deployment of Small Cell Networks: LampSite Case Studies with iBwave Planning
2
ContentsHuawei LampSite Solution and Case Study1
iBwave Tools Solution 32
3
LampSite: Innovative Solution for Indoor MBB
Busy hour
Traditional solution
MBB traffic
Busy hour
Current Situation of Indoor MBB
Unleash The Suppressed Traffic
BBU RHUB pRRU
Superiority Challenge
Larger & Flexible Capacity pRRU level Capacity Allocation. Dynamic Capacity Adjustment.
Easier Deployment Simple Architecture. Smaller & Lighter.
Accurate Design Simplify by Professional
Tool, for example:
Enhanced SON feature.
Specification Checklist / Validation Tools.
Integrated to Design Tools.
More Product Specifications
Complex Configuration
4
Case1: LampSite Deployed in Stadium Scenario
Initial Period(SFN) - Cell resources saved. - Interference reduced.
Later Period(Cell splitting) - Remote expansion. - Capacity N times increased.
Cell 1
Cell 2
Cell 3
Cell 4
Cell 1 Cell 2
Cell 3
Cell 4Cell 5Cell 6
Cell 7
Cell 8
Dynamic Capacity
Description High complexity and functionality in Europe. Support nearly 15,000 spectators.
System design: 30 hours. Venue construction: 7 days.
Time cost of LampSite solution
Minsk-Arena Complex in Belarus
5
Case1: Accurate Design with iBwave Tools
Interference analyze. Antenna type select.
Interference
Step 2
Quick location and routing design. Coverage confirm by simulations.
Topology check & correct.
Performance OptimizationInterference
Shaped Antenna
Directional Antenna
Step 1 Step 3
Step 4
Call completion rate 100%
HSDPA peak rate 28Mbps
PS call drop rate 0.18%
PS traffic increased to 336%
6
Case2: LampSite Deployed in Hotel Scenario
BBU
pRRU
RHUBCarrier 1
Carrier 2
LTE 2CCs CA On 1 pRRU
Description The first integrated resorts in Singapore. LampSite target: 2 basement in MBS Retail area.
System design: 16 hours. Venue construction: 14 days.
Time cost of LampSite solution
Marina Bay Sands
7
Basement1
Basement2
Case2: Simpler & Faster Design
Simulation: Good Coverage Performance: Excellent
Average DL speed: 239Mbps CSFB success rate: 100% VoLTE & SRVCC handover
success rate: 100%
Average RSRP -76dBm
8
ContentsHuawei LampSite Solution and Case Study1
iBwave Tools Solution 32
WORLDWIDE STANDARDfor in-building network design and documentation
TRUSTED BY 700+ CUSTOMERSin more than 87 countries
CONTINUOUS INNOVATIONadapting quickly to a dynamic and rapidly-evolving industry
INDOOR WIRELESSPLANNING & DESIGN
FIELD-BASED SURVEYSCOLLABORATION PLATFORM
EXPERT TRAINING & CERTIFICATION
About iBwave
Enabling in-building networking excellence
Feb 22, 2016 10
Enterprises Large venuesTransportationHospitality
SC design case studies
Network architecture with automated RF calculations
Floor plans with propagation results
Small cell deployment process
11
DOCUMENT
SURVEY
Client &Site info
DESIGN
Planning& Design
MAINTAIN
MaintenanceUpgrades
BUILD
Install &Commission
Feb 22, 2016SC design case studies
Design tool objectives for small cells
12
PORTABLE: Easy to carry on-site
INTUITIVE: RF expertise not required
AFFORDABLE: Accessible to all field personnel
COMPLETE & ACCURATE: Getting it right the 1st time
INTEGRATED: Complete end-to-end workflow
LOW TCOSCALING
Feb 22, 2016SC design case studies
Product Suite
IN-BUILDINGCOLLABORATIONPLATFORM
FIELD-BASED SURVEYS &DESIGNS
TRAINING & CERTIFICATION
DATABASE OF COMPONENTS(20,000 +)
RF PLANNING AND DESIGN SOFTWARE
13Feb 22, 2016SC design case studies
Network architecture with automated RF calculations
Floor plans with propagation results
Case study – sports complex
14
Minsk Arena Complex, Belarus(15,000 seats)
Primary criteria: capacity
Number of small cells: 4 8
Design time: 30 hrs (50% less)
Tool: iBwave Design
Feb 22, 2016SC design case studies
Network architecture with automated RF calculations
Floor plans with propagation results
Case study – shopping mall
15
Shopping mall, Manila (240K sq ft)
Number of small cells: 8
Survey & design time: 4.5 hrs
Time savings: 5 hrs (55%)
Tool: iBwave Mobile Planner
Feb 22, 2016SC design case studies
Network architecture with automated RF calculations
Floor plans with propagation results
Summary
16
• 4-step deployment process for enterprise small cells
• Key objective for design toolkit: Low TCO & ability to scale
• Design case studies: single sites to nationwide deployments
• Benefits: >50% time savings & getting it right the 1st time
• Collaboration & documentation needed for maintainability
Feb 22, 2016SC design case studies
Benoit [email protected]
[email protected] (Toll free)
Support [email protected] (Toll free)
AMERICAS
[email protected]+ 33 3 44 57 75 90 (office)+ 33 6 19 19 97 13 (mobile)
Support [email protected]+ 20 111 0777 833
EMEA
[email protected]+ 60 3 2298 7298 (office)+ 60 3 2298 7333 (fax)
Support [email protected]+ 6012 285 6875
APAC
THANK YOU !STAND 7C71 | HALL 7