Upload
ca-technologies
View
1.417
Download
0
Embed Size (px)
Citation preview
Case Study: Manheim Implements Test Data Management to Reduce Testing Time and Costs
Chris Crews
DevOps: Continuous Delivery
Manheim
Advisory Test Engineer
DO4T16S
David Guimbellot
Orasi
AVP, CD/TDM Practice
2 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
© 2015 CA. All rights reserved. All trademarks referenced herein belong to their respective companies.
The content provided in this CA World 2015 presentation is intended for informational purposes only and does not form any type
of warranty. The information provided by a CA partner and/or CA customer has not been reviewed for accuracy by CA.
For Informational Purposes Only
Terms of this Presentation
3 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Abstract
At Manheim, CA Test Data Manager (fka Grid-Tools Datamaker) was used to provide teams with the data they needed and when they needed it. Synthetic data generation reduced human interaction by 80% in the data provisioning process, while Data Subset was used to achieve low-cost, rapid extraction of test data from production databases.
Chris Crews
Manheim
Advisory Test Engineer
4 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Agenda
WHO IS MANHEIM
TRANSFORMATION PROJECT
ROI & BIGGEST WIN
TEST WAS A BOTTLENECK
SUCCESS & ENGAGEMENT MODEL
SAMPLE
1
2
3
4
5
6
Manheim Test Data ManagementAn Overview
Who is Manheim
6
7
Transformation Project
How we create data
Old way to provision test data…
• Manual
• Automated functional tools
• Bulk copy data from production
• Custom programs to provision
data
What we wanted…
• Fast
• Flexible
• Scalable
• Automated
• Platform agnostic
New approach
The prove it moment
10
iSeries
iSeries Oracle
Queue
Queue
11
Success!
Utilizing CA Test Data Manager (fka. GridTools), we can populate the following
application databases
• AS/400/DB2Auction and data warehouse
• OracleOperational Data Store (ODS)
• Tibco and Camel topics and queuesBusiness Event Engine
• OracleOne View of the Customer (OVC)
• OracleOne View of the Transaction (OVT)
• DB2/Oracle/MySQLManheim.com/Simulcast/OVE.com
• OracleOracle E-Business Suite (EBS)
ROI 2015
Covering time period 1/1/2015 to 11/6/2015
Requests fulfilled: 291
Total records provisioned: +200,000
Time to manually provision: +11,000 hours
Time to provision via CA Test Data Manager (fka GridTools Data Maker): 542 hours
Cost to provision manually: $1.1 million
Money saved: $1 million
12
13
What’s Next?
Increase the number of applications we can create data for
Increase the usage of subsetting
Leverage Data Visualization
– Early experience, we have decreased the time it took to analyze what we have in our data sets
from 2 weeks to hours
Leverage Agile designer
14 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Q & A
15 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Recommended Sessions
SESSION # TITLE DATE/TIME
DO4T03S Leading Your DevOps Enterprise Journey – Gene Kim 11/19/2015 at 10:30 am
DO4T27TTech Talk: Building Regression Tests to Increase Velocity
and Prevent Things from “Going Boom” in the Night11/19/2013 at 11:30 am
DO4T17S
Case Study: T-Mobile’s DevOps and Continuous Delivery
Journey – Building a Foundation for a Future Built for
Agility
11/19/2013 at 2:00 pm
16 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Must-See Demos
Test Data Manager
DevOps
Theater 4
DevOps Sim
DevOps
Theater 3
Test Case Optimizer
DevOps
Theater 4
TDM Integrations
DevOps
Theater 4
17 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Follow Conversations At…
Smart Bar
Theaters 3 & 4
Tech Talks
Theaters 3 & 4
18 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
For More Information
To learn more, please visit:
http://cainc.to/Nv2VOe
CA World ’15