Gambar 4.1

Hydrologist Hydrologist

Surveyor Hydrologi (1 OB)Surveyor Hydrologi (1 OB)

Geodetic EngineerGeodetic Engineer

Surveyor Topografi (4 OB)Surveyor Topografi (4 OB)

Bridge Engineer Bridge Engineer

CAD Operator (1 OB)CAD Operator (1 OB)

Cost Quality Engineer Cost Quality Engineer Geotechnical Engineer Geotechnical Engineer

Surveyor Soil/Mat (1 OB)Surveyor Soil/Mat (1 OB)

Team LeaderTeam Leader

Hamonangan AS

Surya Wardana Sutriono Hadi Carsa Kusumaatmaja Tasim

Efendi Rauppu.

Herlambang Susatya

Marthen Motulo.Tri Kartono.Fredy M.

ORGANISASI PELAKSANAAN PEKERJAAN

PERENCANAAN TEKNIS JEMBATAN LAHAR MALA, LAHAR NAHA (200 M)

Saleh.

Nasrul.

Agustinus Banti

LEMBAR ASSISTENSI

PEKERJAAN : : Perencanaan R/P Jalan Wil Manado, Minahasa, Bitung, TomohonTAHUN ANGGARAN : 2008KONSULTAN : CV. KARSA UTANA

NO HARI / TGL URAIAN PARAF KET

Manado, 2008

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

NO.

A

1

2

3

4

B

1

2

3

4

C

1

2

DAFTAR PERSONIL

NAMA KETNo POSISI / JABATAN

A TENAGA AHLI

1 Team Leader / Highway Engineer Ir.DONALD M.P.SUPIT

2 Geodetic Enginer Ir.TEGUH MULYADI

3 Hidrologi Engineer Ir.SEMMY S.W.RUMAMPUK

4 Soil Material Engineer Ir .BAMBANG GUSTRIARSO

5 Cost / Quantity Engineer Ir.SOEWOTO

B TENAGA TEKNIS PENDUKUNG

1 Surveyor Topografi.1 JENDRY MASINAMBOW, ST

2 Surveyor Topografi.2 JAMES ALEX TAMPI

3 Surveyor Hidrologi MARSON SASENGA, AMaTs

4 Surveyor Soil Material TOMMY TENGKER, AMaTs

5 Surveyor Inventarisasi Jalan Ir.FREDDY KURNIAWAN

6 Surveyor Lalu Lintas Ir.HENDRY SUJAPPRI

7 Surveyor Kondisi Jalan JOSEPH MONTOLALU

NO.

A

1

2

3

4

B

1

2

3

4

C

1

2

JADWAL PENUGASAN TENAGA AHLI DAN STAF

BULAN.1 BULAN.2 BULAN.3 BULAN.4OBNo POSISI / JABATAN

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

A TENAGA AHLI

1 Team Leader 1 4.00

2 Ahli Perencana Jalan 1 4.00

3 Ahli Geologi 1 4.00

4 Ahli Geodesi 1 4.00

5 Ahli Hidrologi 1 4.00

6 Ahli Kwantitas 1 4.00

7 Ahli Kontrak 1 2.00

8 Ahli Lingkungan 1 2.00

B TENAGA TEKNIS PENDUKUNG

1 Ass. Geologist 1 2.00

2 Ass. Geodesi 1 4.00

3 Ass. Surveyor 3 12.00

4 Operator Komputer (CAD) 2 8.00

C STAF PENDUKUNG

1 Operator Komputer 4 16.00

2 Administrasi 2 8.00

3 Office Boy 1 4.00

4 Driver 2 8.00

Jumlah (Org)

NO.

A

POSISI /

JABATAN

TENAGA AHLI

1

2

Team Leader

Highway Engineer

3 Soil & Material Engineer

4 Quantity & Cost Estimator

B

1

TENAGA TEKNIS PENDUKUNG

Surveyor 1

2

3

Surveyor 2

Surveyor 3

4 Operator Komputer + CAD

C

1

STAF PENDUKUNG

Sekretaris

2 Operator Komputer

RENCANA KERJA

BULAN KENo URAIAN KEGIATAN I 2 3 4 KETERANGAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A Persiapan1 Mobilisasi dan Pendalaman KAK Tgl.SPMK ….Januari 20122 Koordinasi & Konsultasi3 Persiapan Survey Lapangan ( Formulir Survey,

Data Ruas Jalan, dll )

B Pengumpulan Data Lapangan1 Survai Pendahuluan (Reconnaissance Survey)2 Survai Topografi3 Survey DCP, Geoteknik dan Survey Material4 Survey Hidrologi dan Lingkungan

C Perencanaan Teknis Jalan

1 Perencanaan Perkerasan Jalan

2 Perencanaan Geometrik Jalan

3 Penggambaran4 Perhitungan Kuantitas & Biaya Pelaksanaan fisik

D Pelaporan1 Laporan Pendahuluan 2 Laporan Antara

3 Laporan Perhitungan Biaya ( EE )

4 Laporan Akhir5 Dokument Lelang

NO.

A

POSISI /

JABATAN

NAMA

KET

TENAGA AHLI

1

2

Team Leader

Ir. Philips .F. Lohonauman

Highway Engineer

Ir. Philips .F. Lohonauman

3 Soil & Material Engineer

Ir. Rahmat Setiadi

4 Quantity & Cost Estimator

Ir. Rahmat Setiadi

B TENAGA TEKNIS PENDUKUNG

1

2

3

Surveyor 1

Muh. Yunus Nassa

Surveyor 2

Ir. Daryono

Surveyor 3

Ahlidar.R

4 Operator Komputer + CAD

Risat N. Lengkey,ST

C

1

STAF PENDUKUNG

Sekretaris

Srie Astuti Suwondo

2 Operator Komputer

Srie Astuti Suwondo

Keterangan :: Garis Pengendalian/Pengawasan: Garis Koordinasi Satu Arah:Garis Koordinasi Dua Arah

ProjectOfficer ProjectOfficer

Ass. Ahli Jalan RayaAss. Ahli Jalan Raya Ass Ahli JembatanAss Ahli Jembatan Surveyor / TeknisiSurveyor / Teknisi Op Komputer ( Inputing Data )Op Komputer ( Inputing Data )

Team LeaderTeam Leader

Ir.Agus Suroso, MSc

Ir.Toni KiswartonoIr. Kadiar Yunas, MTPaul Sumampouw,

STIr. Paulus Worotican

Ir. Adi NugrohoIr. Widya AntariksaIr. Letty Angkouw

Agustinus.G.Sumampouw, ST

Ir. Johny RumenganThomas Patandungan,

BERonald Stefanus, STEnrico Moniaga, ST

Frankie Mokoginta, STAntonius.D.Angkouw, ST

Charles NangoiDeborah Najoan, ST

Debby Rachmadjanto, ST

ORGANISASI PELAKSANAAN PEKERJAAN

SURVEY IRMS DAN BMS

KepalaSNVT Perencanaan Dan Pengawasan Jalan Dan Jembatan

(P2JJ) Sulawesi Utara

KepalaSNVT Perencanaan Dan Pengawasan Jalan Dan Jembatan

(P2JJ) Sulawesi Utara

Pengguna JasaKonsultan

Konsultan PerencanaKonsultan Perencana

PT. Palma Sejati

SekretarisSekretaris

Operator Komputer

Pesuruh

NO. POSISI / JABATAN NAMA

A TENAGA AHLI

1 Team Leader Ir. Philips .F. Lohonauman

2 Highway Engineer Ir. Philips .F. Lohonauman

3 Soil & Material Engineer Ir. Rahmat Setiadi

4 Quantity & Cost Estimator Ir. Rahmat Setiadi

B

1 Surveyor 1 Muh. Yunus Nassa

2 Surveyor 2 Ir. Daryono

3 Surveyor 3 Ahlidar.R

4 Operator Komputer + CAD Risat N. Lengkey,ST

C STAF PENDUKUNG

1 Sekretaris Srie Astuti Suwondo

2 Operator Komputer Srie Astuti Suwondo

TENAGA TEKNIS PENDUKUNG

R C I Kondisi Visual Type Permukaan Tipikal

8 – 10 Sangat rata dan halus

7 – 8 Sangat baik, umumnya rata.

6 – 7 Baik Hotmix Lama Nacas/Lasbutag baru

5 – 6

4 – 5

3 – 4

2 – 3

< 2

HotMix ( AC dan HRS ) yang baru dibuat/ditingkatkan dengan beberapa lapisan aspal.

HotMix setelah dipakai beberapa tahun atau lapisan tipis HotMix diatas penetrasi Macadam.

Cukup, sedikit/tak ada lubang, permukaan tidak rata.

Penetrasi Macadam, Nacas baru atau Lasbutag berumur beberapa tahun

Jelek, kadang-kadang berlubang, tidak rata.

Penetrasi Macadam berumur 2-3

tahun,Nacas lama, jalan kerikil tak

terawat

Rusak, bergelombang banyak lubang.

Penetrasi Macadam lama, Nacas lama, jalan kerikil tak terawat.

Rusak berat, banyak lubang dan seluruh daerah perkerasan hancur.

Semua type perkerasan yang sudah lama tidak terpelihara

Tidak dapat dilalui kecuali oleh Jeep 4 WD

Jalan tanah dengan drainase jelek, semua type permukaan jalan yang diabaikan sama sekali

KET

Recommended