View
57
Download
2
Category
Tags:
Preview:
Citation preview
MOHSIN RAZAB.Sc (Petroleum) Engineer
Cell: +971554437668/+923215983133 email: mohsin.raza1983@hotmail.com
Abilities
Self-motivated, flexible and able to work in a rapidly changing environment Strong analytical and procedural approach towards a problem. Able to work independently and as a team member. Strong & hard worker. Having keen interest in drilling and field works.
Professional Experience
6+ years Overall experience.
Working as Project Engineer since January 2009Weatherford Drilling International, Dubai UAE.
Skidding System Project Chad 2014- 2015 Construction of skidding system as per design & schedule in the fabrication yard Assembly of skidding system in the yard Testing and commissioning of skidding system in the yard Shipping & delivery of skidding system in Chad Actual testing, commissioning & assembly in the field
Iraq BP Project, New Build 1000 HP Work over Rigs April 2013 to June 2014
Reviewing Client Contract & technical requirements of the equipment needed. Creating AFPs, sending out Approved AFPs for quote, upon getting different quotes from vendors Sending final AFP with technical & commercially finalized quote for getting approval for purchase
from Project Manager Updating MEL & AFP Log on SharePoint with AFPs, POs, Delivery of the equipment ordered &
shipping records Material handling & chasing Vendors for in time delivery Posting GR using SAP System upon & Reversal of GR using SAP System Getting technical certification & equipment documentation. Compiling as per WBS System Commissioning of the New Build Camps in Redsea Yard
Refurbishment Projects:Rig 803 Refurbishment Project Qatar – Rasgas Project. March 2012 to September 2012 Rig 806/807 Refurbishment Project Lamprell Yard – Sharjah. September 2012 to April 2013
Creating AFPs, sending out Approved AFPs for quote, reviewing Bid Analysis Sending final AFP with attached technical & commercially finalized quote for getting approval
from Project Manager Updating MEL & AFP Log with AFPs, POs, shipping records Material handling & chasing Vendors for in time delivery Posting GR using SAP System upon delivery of equipment ordered GR Reversal using SAP System Using RAMS System for getting technical information about any WDI Rig
Rig 870/871 3000 HP New Build Rigs at Lamprell Yard Jebel Ali – KOC ProjectFrom October 2010 to March 2012
Observing all steel cutting procedure for Substructure, Mast, Mud Tanks & skids Supervising sandblasting & painting of the steel Observing installation of Agitators, Shale Shaker, Degasser & Auger Observing Rig Commissioning (24 hrs Test) & FAT Supervising High Pressure Hydro Testing of Piping & other equipment Supervising painting jobs on substructure, Mast & Mud Tanks Witnessing installation of Iron Roughneck & Commissioning Weekly Safety Walk Through & Work Observation on daily basis during project life cycle Documentation & filing of technical certification of all equipment Creating AFPs, sending out Approved AFPs for quote, reviewing Bid Analysis Sending final AFP with attached technical & commercially finalized quote for getting approval
from Project Manager Updating MEL & AFP Log with AFPs, POs, shipping records Material handling & chasing Vendors for in time delivery
Trainee Project Engineer – January 2009 - October 2010
After Finishing Rig Pass & Safe Start Couse First hitch (4 Weeks) I worked as Roust about on WDI Rig 812 in Sindh Pakistan. Getting knowledge about different kinds of Drill Pipe, Drill Collar, Casing, Different kind of Drilling equipment like BOP, Koomey Accumulator Unit, Mud Pumps, Generators, VFD House, Poor Boy Degasser & Mud Cleaning Equipment etc. I observed Rig Up & Down Process and also Rig Move from one location to another
During my second hitch worked as a Floor man on WDI Rig 812, working as floor man I physically worked on rig floor, got knowledge about Iron Roughneck operation, how TDS works, run in & pull out of drill string, casing job & cementing job as well. Slip & Cut process for drill string
Working as Derrick man I got knowledge about different drilling operations, making of drilling fluid, mud pump operation and also maintenance of the Mud Pump, changing seat & valve at discharge end of the pump
During my next hitch worked with Assistant Driller to see different drilling operations, rig down, dismantling of the rig, rig move & rig up process
Worked with Mechanics & Electricians to get knowledge about different mechanical & electrical equipment at rig
Worked 2 hitches in office with Contracts & Commercial department Reviewing tender and the technical & commercial requirements of the contract Creating technical gap analysis on excel sheet b/w our rig Specs. & Client requirements Getting knowledge about Weatherford BMS System Worked with Logistic Department in Weatherford Yard Hamriyah Free zone Sharjah, took part in
loading & offloading of equipment, moving and rearranging of the equipment in the Yard Assisting Weatherford Hamriyah Logistic Team in different tasks as well
On Drilling Sites During Academic Period:
OGDCL Pakistan (June 2006 – July 2006) 1 MonthWell Site: Ballo Uthwal 01 Chakwal. Rig N3 OGDCLTasks:
Getting Knowledge about drilling, mud logging and drilling fluids, Knowledge of bottom hole assembly (heavy weight drill pipes, drilling jars, stabilizers, near
bit stabilizers, crossovers, drill collars, etc.) Knowledge of drilling bits (tricone, pdc bits) Blowout preventers (Annular BOP, Single & Double Ram BOP)
PPL Pakistan (July 2006_August 2006) 1 MonthWell Site: Sarang X-1 Chakwal. Rig N15 SCHLUMBERGERTasks:
Getting Knowledge of new drilling technique Top Drive System (TDS) Knowledge of mud(drilling fluid) Knowledge about drilling, cementing job, casing job, mud logging and drilling fluids Knowledge about different rig components Monitoring the efficiency of types of bits (Tricone, pdc bits) Knowledge about dull grading of bits Casing and cementing job (float shoe, float collar, stage collar, top and bottom plugs) Mud logging
Final Year Project in University
Drilling Problems and Their Control:Case study of lost circulation by MOL, in this project we did research work that how drilling fluids with different densities were used to control the lost circulation problem.
Computer SkillsOperating System & Softwares
Microsoft windows 9x/2000/XP Microsoft office (Word, Excel and Power Point) SAP System RAMS
Academics
2003-2007 B.Sc Petroleum Engineering with A Grade from U.E.T Lahore, Pakistan
2000-2002 F.Sc from Govt Post Graduate College Chakwal, Pakistan (RBISE) (A Grade)
1999 Matric from Govt. High School No.1 Chakwal, Pakistan (RBISE) (A Grade)
Personal Data
Father’s Name Zahoor Hussain
D.O.B 01-January-1984N.I.C. No. 37201-9817800-5
Passport no. BR 9898002
UAE Driving License 1766585Nationality PakistaniReligion IslamMarital Status MarriedAvailability Available
HobbiesPlaying Cricket, football, internet surfing
ReferencesCraig Coles (Project Manager)craig.coles@me.weatherford.com Cell: +971566813656
Recommended