22
Structure Engineering F-ing Group Member: Ng Kim Wing Lim Ting Le Lee Jia Kiam Ngo Jia Haur Sim Chia Ting Esther Chuah Ning Sie Tutor : Ms.Iffa

Ici & itd

  • Upload
    jiahaur

  • View
    28

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Ici & itd

Structure Engineering

F-ing Group Member: Ng Kim Wing Lim Ting Le Lee Jia Kiam Ngo Jia Haur Sim Chia Ting Esther Chuah Ning Sie Tutor : Ms.Iffa

Page 2: Ici & itd

Roles f Structural EngineersRoles of Structural Engineers● They analyze, design, plan, and research structural

component and structural systems to achieve the design goals of physical objects.

● Design or fit the structure to the architecture with the structural systems with suitable materials to support the building according that nature imposes on it .

● Working with geotechnical engineers to investigate soil conditions and analyze results of soil sample and in site tests.

● Develop structural solutions to resist loads and other forces.

Page 3: Ici & itd

Responsibility of Structure Engineering ● Structural engineers carry out strength calculations and

prepare drawings of structures to ensure they are strong enough to avoid collapse when loaded.

● Through research and the testing of both form and material, new solutions are developed which promote safer, more environmentally friendly buildings and structures.

● Analyzing configurations of the basic structural components of a building or other structure.

● Inspect on-site construction works, materials and equipment management.

● Coordinate work with other disciplines such as architectural, mechanical and electrical engineer.

● Inspects the foundation, infrastructure, curtain wall, insulation and building envelope.

Page 4: Ici & itd

Phases Of Building Process

Pre-construction

Phase

During Construction

Phase

Post Construction

Phase

Page 5: Ici & itd

Pre-construction Phase

•Identify the type of soil with the geotechnical engineering and decide which foundation is more suitable to use.•Structural Planning And Designing•Develop specifications•Develop tender drawing•Submit the tender drawing to the architects•Approval granted by the authorities, construction drawing to be presented.

Once architect completed the building plan, engineers started to analyze the drawing and come out with a structural drawing.

Architect building plan is complete

Construction Drawing

Waiting for Approval

Submit back to the

Architect

Structure Engineer

Drawing (Tender Drawing)

Page 6: Ici & itd

Tender Drawing-It is necessary for an engineer to decide the extent of preliminary design to be carried out at the briefing/report stage. Once formalities are over and the final selection has been cleared, an engineer must prepare a set of engineering drawings called Tender Drawings.

-Tender drawings together with the other tender documents, bill of quantities, specification

-Tender drawing are the first evidence of the project scheme regarding type and quality of the work involved and hence these are prepared by engineers with clarity and understanding.

-Tender drawings are prepared to various scales using convention and concepts of engineering drawing for production, manufacture and

construction etc.

Page 7: Ici & itd

Construction Drawing-Construction drawing is a means of showing in a graphical form the shape, size, and position of a building on a site, together with the composition of the materials used and the way the building is to be constructed or put together.

-The information on construction drawings has to be presented in a precise, unambiguous way so that it can be understood by anyone with a knowledge of draughtsmanship and construction.

-The term ‘Construction drawing’ includes not only drawings produced by architects, which generally make up the majority of the drawings for a building project, but also structural drawings which are the province of the structural engineers, and building engineering services drawings which are commonly prepared by building services engineers.

Page 8: Ici & itd

During Construction Phase

● Engineers need to ensure that all construction element, such as the beams are well constructed and connected in a proper way.

● Before pouring concrete into form work they needed to run a concrete test.

● Ensure a proper quantity and quality material are used, to prevent collapsing structure due to reduction of material.

Page 9: Ici & itd

PilePile being hit into

the groundForm work of pile cap

Back filling Pile cap is form Pouring concrete into the form work

During Construction Phase

Page 10: Ici & itd

● Final Load test required to ensure the building from collapsing or damage.

Post Construction Phase

Page 11: Ici & itd

Structural Drawings

Foundation plans

Wall sections and framing

details

Structural steel framing and details

Beam and column

drawings and details

Page 12: Ici & itd

Architecture Drawing

Page 13: Ici & itd

Dimensiondetail

It show the measurement between 1 point to 1 point

Foundation Foundation is the lowest and supporting layer of a structure.

Staircase Symbol

Grid Line It has horizontal Grid line and vertical Grid line

Beamsupport the roof or floor above.

zig zag line

Symbol and the meaning

Represent multiple building is in between it

Page 14: Ici & itd

Structural Drawing

Page 15: Ici & itd

Structural Drawing (General Drawing of Beam and Roof)

Page 16: Ici & itd

Beam’s Details

This is Beam

Page 17: Ici & itd

Column Schedule And Typical R.C Staircase

Detail

Page 18: Ici & itd
Page 19: Ici & itd

Example Of Wind Load Test

Page 20: Ici & itd
Page 21: Ici & itd

Structural Engineer Drawing’s SoftwareGreta-around (RM3500)

Analyses the stability of a gravity retaining wall and determines the bending moments and shear forces within the wall.

GSA Building-around (RM20000)

Is the software of choice for structural engineers around the world. It gives them all the tools they need to design and analyse even the most complex buildings.

Pile software-around (RM4000)

uses new and traditional techniques to calculate the vertical load carrying capacities of piles in a layered soil deposit. It works with drained (frictional) and undrained (cohesive) soils and shows the results in a clear graphical format that can be exported easily.

Page 22: Ici & itd

END

THE END

Thank You Very Much !!!