19
Group Name: CACAC CRYSLYN ADELE CYONG ALWIN CHLOE

Ici and itd

Embed Size (px)

Citation preview

Group Name: CACAC

CRYSLYN

ADELE

CYONG ALWIN

CHLOE

QUANTITY SURVEYOR

DAY TO DAY RESPONSIBILITIES

meeting with clients preparation of contractson-going cost analysis of

maintenance and repair work

feasibility studies of client requests

analysing completed work and arranging payment to

contractorssite visits

assessment and projections for

future work

STAGES OF COST PLANNING DURING THE DESIGN AND CONSTRUCTION PHASES

1.PRELIMINARY ESTIMATION2.COST PLANNING3.COST CHECKING

4.TENDER RECONCILIATION5.POST-CONTRACT COST CONTROL

RESPONSIBILITIES OF A QUANTITY SURVEYOR

STAGE ONE

DURING CONSTRUCTION

STAGE TWO

POST-CONSTRUCTION

STAGE THREE

DRAWINGS THAT QUANTITY SURVEYORS READ

PHASES AND DRAWINGS OF CONSTRUCTION

COST PLANNING

COST CHECKING

ARCHITECTURAL DRAWING

COSTRUCTION DRAWING

TENDER DRAWINGTENDER RECONCILIATION

POST-CONTRACT COST CONTROL CONTRACT DRAWING

PRELIMINARY ESTIMATION

ARCHITECTURAL DRAWING

CONSTRUCTION DRAWING

CONTRACT DRAWING

TENDER DRAWING

DOCUMENTS PRODUCED BY QUANTITY SURVEYORS

BILL OF QUANTITIES

REFERENCES‘Willis’s Practice and Procedure for the Quantity Surveyor’ by Allan Ashworth and Keith Hogg

www.careerinconstruction.com/article/the-role-of-a-quantity-surveryor.org

targetjobs.co.uk/career-sectors/quantity-surveying-and-building-surveying/326497-application-tip-for-quantity-surveyor-know-how-consultancy

THANK YOU