This second floor remodel transformed a 1960's antiquated floor plan into the 21st century. We gutted and enlarged the master bathroom and the hall bath; enlarged the master closet and added a second master walk-in closet off the bathroom. The master bedroom and hall carpet was replaced with hardwood floors and the remaining 3 bedrooms were carpeted, painted, had new light fixtures installed and all the doors and millwork was refurbished bringing this newly renovated gem into the 21st century!.

Citation preview

Page 1: LJT DESIGNS 2010 Second Floor Remodel

LJT DESIGNS

2010

Second Floor Remodel

Page 2: LJT DESIGNS 2010 Second Floor Remodel

Master bedroom: Before:

THE master Bathroom was enlarged by taking 34” from the back wall of the

master bedroom which included the window below thereby providing natural

light in the bath.

Page 3: LJT DESIGNS 2010 Second Floor Remodel

After...

we removed wallpaper, painted walls, installed hardwood floors

and added New bedroom furniture

Page 4: LJT DESIGNS 2010 Second Floor Remodel

before... Master bedroom Closet on left was Expanded by taking 2 feet from bedroom #3

which allowed for additional hanging space. The sliding door was

replaced with a new hinged door and shelves added for audio/tv equipment.

Page 5: LJT DESIGNS 2010 Second Floor Remodel

Before...

After...

Installed new closet system and

shelving for audio equipment and

shoes

Page 6: LJT DESIGNS 2010 Second Floor Remodel

After... Same tv wall

Page 7: LJT DESIGNS 2010 Second Floor Remodel

During... Left photo shows shelving for shoes and

equipment; right photo shows openings for equipment which

was covered by a door which matched the walls

Page 8: LJT DESIGNS 2010 Second Floor Remodel

During... Master bathroom: retrofitted new dresser as vanity

Page 9: LJT DESIGNS 2010 Second Floor Remodel

During...

installed above counter

sinks, wall mounted faucets

and sconces on mirror

which is bordered in mosaic

tiles.

Page 10: LJT DESIGNS 2010 Second Floor Remodel

During... On left: converted former bathtub/toilet area

to second walk-in closet and shower

Page 11: LJT DESIGNS 2010 Second Floor Remodel

After...

Recessed lights were

installed.

Toilet and plumbing was

relocated to immediate

right in photo next to half

wall

Page 12: LJT DESIGNS 2010 Second Floor Remodel

During and after...

Converted toilet room with tub into shower and additional walk-in closet

Page 13: LJT DESIGNS 2010 Second Floor Remodel

During... Left photo: Shower Floor. Right photo: shower

walls with intricate Mosaic and tile set at a 45 degree angle

Page 14: LJT DESIGNS 2010 Second Floor Remodel

After... shower on left and mirrored Closet door on right

Page 15: LJT DESIGNS 2010 Second Floor Remodel

During and after...

Relocated toilet next to half wall and entrance to

bath

Page 16: LJT DESIGNS 2010 Second Floor Remodel

During... created a tile ‘rug’

Page 17: LJT DESIGNS 2010 Second Floor Remodel

During... Another shot of the tile rug from opposite direction

Page 18: LJT DESIGNS 2010 Second Floor Remodel

After...

Page 19: LJT DESIGNS 2010 Second Floor Remodel

Before...

Second floor hall bath

completely gutted

Page 20: LJT DESIGNS 2010 Second Floor Remodel

after...

new vanity, mirror, toilet,

wall sconces plus

recessed cans were

installed in the ceiling

Page 21: LJT DESIGNS 2010 Second Floor Remodel

After... New floor on left – new tub and tile using a

honed/dull finished 12 x 12 tile bordered by a polished mosaic

Page 22: LJT DESIGNS 2010 Second Floor Remodel

After... Bedroom #2 pictured. all second floor bedrooms were updated with

carpet, paint, new light fixtures, and the doors and woodwork were refinished.