Project name Part name Part number CAD Version Moldflow CAD Doctor 3.0 Date 2015.4.20 Moldflow REV MF 6.1 Mould / Product Company Moldflow Analyst Moldflow Analysis Report

Moldflow analysis for plastic injection mold parts

Embed Size (px)

Text of Moldflow analysis for plastic injection mold parts

  1. 1. Project name Part name Part number CAD Version Moldflow CAD Doctor 3.0 Date 2015.4.20 Moldflow REV MF 6.1 Mould / Product Company Moldflow Analyst Moldflow Analysis Report
  2. 2. Part information Appearance Requirements No information Structural Requirements No information Deflection Requirements No information Part Volume 554.6500 cm^3 Nominal Wall Thickness mm Product Material PP Tool Description One cavities Injection machine Tonnage Part Details and Tool Description
  3. 3. Process setup Simulation Material PP Melt Temperature (oC) 240oC Mold Temperature (oC) 40oC Filling Control (Automatic / Fill Time / Ram Speed) Automatic Velocity/Pressure Transfer (% volume) 97.34% Packing Pressure (MPa) Profiled, see picture at P44 Project Area (cm2) 1393.7500 cm^2
  4. 4. Analysis results Cycle time 31.79s Maximum injection pressure 44MPa Clamp tonnage during filling/packing maximum clamp force 293tonne/ 433tonne Maximum Melt Front Temperature 230.7 Minimum Melt Front Temperature 111
  5. 5. Preprocess and mesh statistics Specification: ,
  6. 6. Material Data General: Recommended Processing: Rheology: PVT properties: Specification: Material is pp simulation infromation can find in Moldflow material data sheet.
  7. 7. Initial Nozzle/Gate Locations and sizes Gate dimension 1.5MM Cold/Hot runner& dimension Hotrunner 10 Gate type : 2 cavities hot runner Valve control No Specification: Gate location and size decide is based on mold design experience, Part modify refer to moldflow analysis and T0 samples. D1.5 D10
  8. 8. Fill time - Animate Shift+F5 watch the animation Short shot No short shot, fill is keep balance Specification: Blue to red stand filling order, for evaluate filling balance, red area is the finished at the end.
  9. 9. Fill time - Contour Short shot No short shot, fill is keep balance Specification: Blue to red stand filling order, for evaluate filling balance, red area is the finished at the end.
  10. 10. Bulk temperature at end of fill Specification: Temp keep balance, no obvious temp difference.
  11. 11. Pressure at V/P switchover V/P control Filling control Volume % at V/P 97.33% Specification: From thebmV/P pressure, pressure keep balance
  12. 12. Pressure at the end of fill Specification: Analysis by synthesis, pressure keep balance
  13. 13. System Pressure(Nozzle Pressure & Packing pressure Max. Pressure Time 1.62s Max. Pressure 55MPa Packing time 10s Packing pressure 44MPa Specification: Max. pressure 55MPa
  14. 14. Flow Front Temp Flow front Temp. Difference Temp. Diff. at A surf. (230.7-111 Recommended material Temp. 220 -260 Specification: Flow front Temp in the range of recommended material temp.
  15. 15. Clamp Force Max. clamp force 433tonne Clamp force limit tonne Specification: injection machine tonne meet to molding requirement.
  16. 16. Air Traps Specification: The part red circle pink point it indicate prelim air trapping location, all the place should be considerate add air veting.
  17. 17. Weld Lines Specification: Color lines indicate weld lines location.
  18. 18. Volumetric shrinkage at ejection Specification: The max. shringkage is 13.18%, Min shringkage is -0.4% at ejection. if increase the gate size , extend packing time can reduce volumetric shrinkage.
  19. 19. Sink Mark Depth Specification: The part sink mark is not clear, max sink mark index 4.5%, min sink mark index -5.6%
  20. 20. Deflection all effects Measurement datum Deflection scale 1 Total deflection 5.2mm Specification: Adopt MF baseline, above picture content for reference. actual distortion compare need stay the same with actual measurement.
  21. 21. Deflection X component Measurement datum Deflection scale 1 Total deflection 1.37mm Specification: Adopt MF baseline, above picture content for reference. actual distortion compare need stay the same with actual measurement.
  22. 22. Deflection Y component Measurement datum Deflection scale 1 Total deflection 1.79mm Specification: Adopt MF baseline, above picture content for reference. actual distortion compare need stay the same with actual measurement.
  23. 23. Deflection Z component Measurement datum Deflection scale 1 Total deflection 5.2mm Specification: Adopt MF baseline, above picture content for reference. actual distortion compare need stay the same with actual measurement.
  24. 24. Analysis result summary Item Description Result Note 1 Inejction time 1.73S 2 Injection pressure 55MPa 3 Clamping force 433T 4 Total distort 5.2mm 5 Weld lines yes Welcome any inquires to Forwa Precise Plastic Mould Uploda by Daisy Dong daisy(at)forwa-mould(dot)com www.forwa-mould.com