8/10/2019 06. Pick Up Drill Pipe
http://slidepdf.com/reader/full/06-pick-up-drill-pipe 1/5
Author: Arabian DrillingCompany
REF: 06
Checked By: ARS BADER Rig Specifcrocedure
age
Appro!ed By: R"S #ASSA$A% #&%A% AD ' () &**ued: Sept )0+0
Subject: Rig SpecificProcedures
ick up Drillpipe
,er*ion )
1.1 OBJECTIVE.
A key objective of ADC Procedures is to set up a step by step way of handling the job. It is also an analysis of associated hazards pertaining to the jobs and measures to
minimize the risks.
his procedure has developed to be applied and discussed before each job listed in
the contents.
1.2 SCOPE.
his procedure applies to !ig AD-"#
1.3 RESPONSIBILITY.
It is the responsibility of the ool$pusher and !ig %anager to insure all listed
operations are e&ecuted in a safe and efficient manner. It is the oolpusher
responsibility to conduct a Pre$job 'afety %eeting and discuss and review the related
('A) prior to starting each operation.
ool$pusher is responsible to ensure that each work permit has its dedicated ('A
attached to.
('A to be reviewed and updated at least annually or
• *hen e+uipment is modified
• *hen processes are changed
• *hen material are changed
• *hen changing people,contractors
• *hen there is an accident or near miss.
he !ig 'up. is accountable for keeping this document up$to -date.
he ('A date and the crew should be same as *ork Permit date and crew.
8/10/2019 06. Pick Up Drill Pipe
http://slidepdf.com/reader/full/06-pick-up-drill-pipe 2/5
Author: Arabian DrillingCompany
REF: 06
Checked By: ARS BADER Rig Specifcrocedure
age
Appro!ed By: R"S #ASSA$A% #&%A% AD ' () &**ued: Sept )0+0
Subject: Rig SpecificProcedures
ick up Drillpipe
,er*ion )
Table of Contents
TASK ANALYSIS
Is Procedure relevant for the operation?YES
What can interfere with the operation (Simop’s)?
Who is going to be in charge position?! "#$ % $&I''E&
Who is giving instructions#signals who replace him?! ' % $E&&I*+", % "#$
-ow man. people are re/uired to do the 0ob?
! &#" Position! &#" Position! ' Position! ' Position! ' Position! $E&I*+", Position
$o .ou need a P1W# Isolation (loc2out 1ag out)?! YES
What is the PPE re/uired?! S"E1Y S-3ES -E'E1! S"E1Y 4'"SSES *35E& "''
What tools#e/uipment do .ou need?! "I& 1644E& 'I1I,4 *"P! PIPE SPI,,E& "S1 'I,ES $&I1! SI,4'E E'E5"13&
!$o .ou need a third part. crane and for2lift?
! 3&+'I1
Who else needs to 2now what .ou are doing?!
!$o .ou need to barrier off the area?!
What are the safest access#escape routes?
!
8/10/2019 06. Pick Up Drill Pipe
http://slidepdf.com/reader/full/06-pick-up-drill-pipe 3/5
Author: Arabian DrillingCompany
REF: 06
Checked By: ARS BADER Rig Specifcrocedure
age
Appro!ed By: R"S #ASSA$A% #&%A% AD ' () &**ued: Sept )0+0
Subject: Rig SpecificProcedures
ick up Drillpipe
,er*ion ) "dditional *omments7
Preparation
Review JSA number 06 related
Hold a pre-job safety meeting prior to commencement job with all personnel involved
including the crane and forklift operators all personnel involved in the job.
Make out PTW.
Check Tong Dies.
Inspect tongs dies and spinner rollers.
Prepare trip sheet, function test trip tank, check flow show and level sensor.
Prepare tracking sheet for amount of pipe to be picked up, one copy with driller, and one
copy with roustabout pusher. Ideally bring right amount of pipe required to avoid mistakes.
Make sure pipe racks are pinned to catwalk and between them end to end.
Prepare a basket for the rig floor to collect all protectors.
Tools
or2lift
'ifting caps#single 0oint elevators
Protectors male and female
1ugger
Slips
&ig tongs Iron &oughnec2
ast line and sheave8
ousehole spacer8
9ea 9: pipe to roll pipe
Procedure
Keep a track on how many joints are picked up, physical count, and cross check with deck
crew.
;8 &oustabout to install rabbit in pipe and screw lifting cap on pipe rac28
8/10/2019 06. Pick Up Drill Pipe
http://slidepdf.com/reader/full/06-pick-up-drill-pipe 4/5
Author: Arabian DrillingCompany
REF: 06
Checked By: ARS BADER Rig Specifcrocedure
age
Appro!ed By: R"S #ASSA$A% #&%A% AD ' () &**ued: Sept )0+0
Subject: Rig SpecificProcedures
ick up Drillpipe
,er*ion )98 &oll on 0oint of drill pipe onto catwal2 (one man at each end of pipe)8
<8 If the single 0oint elevator is used the 0oint will be rolled onto two pieces of woof on thecatwal2 and then the single 0oint elevator will be latched after confirmation with the airwinch operator that he will not move an.more8
=8 When dec2 crew clear out of catwal28 1ugger operator pic2s up 0oint to the rig floor8 Watchfor upward obstructions 1$S cable trapped in mon2e. board fingers etc88
>8 $rill crew tail in pipe at 5!$oor with ;: rope and remove protector recover rabbit8
8 'ower drill pipe in mousehole@ ma2e sure catwal2 is clear and send rabbit down via stringline8
A8 6nscrew lifting cap# unlatch single 0oint elevator lower to catwal2 for neBt 0oint8
C8 $riller lowers elevators and latch elevator (with lin2 tilt) on pipe in mousehole8
D8 Pic2 up 0oint chec2 cleanliness of thread appl. drill pipe dope and stab in the boB of the 0oint in the rotar.8
;8 *hec2 and clean the 1hreads8
;;8 In the mean time one more 0oint is pic2ed up ma2e sure that nobod. stands between themousehole and the drill pipe set on slips when pic2 up pipe through 5!$oor8
;98 Watch pinch points in pipe spinner or roughnec2
;<8 'atch pipe spinner or Iron &oughnec2 and spin and ma2e up connection8
;=8 Pull slips and lower pipe set slips8
;>8 &epeat steps ; to ;;
;8 aintain 4ood *ommunication8
;A8 &oustabout pusher to chec2 amount of 0oints pic2ed up8
;C8 &epeat steps ; 9<=> $riller to chec2 and record steel volume on trip tan2 sheet andchec2 with calculated figures8
;D8 "t the end of the operation both $riller and &oustabout pusher to meet and compareamount of pipe la. out8
8/10/2019 06. Pick Up Drill Pipe