34
5401 Ridgeline Drive, Suite 160, Kennewick, Washington 99338 | 509.222.0959 PHONE.com knutzenengineering.com 100% Structural Calculations Pioneer Packaging 5818 Industrial Way, Pasco, WA 99301 April 12, 2021

100% Structural Calculations Pioneer Packaging 5818

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 100% Structural Calculations Pioneer Packaging 5818

5401 Ridgeline Drive, Suite 160, Kennewick, Washington 99338 | 509.222.0959 PHONE.com

knutzenengineering.com

100% Structural Calculations Pioneer Packaging 5818 Industrial Way, Pasco, WA 99301

April 12, 2021

mohsb
Stamp
Page 2: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging Project #: 20061

i April 12, 2021

Table of Contents

Design Criteria and Materials ...................................................................................... 1001 to 1005

Gravity Calculations .................................................................................................... 2001 to 2018

Lateral Calculations ..................................................................................................... 3001 to 3009

Page 3: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging Project #: 20061

1001 April 12, 2021

DESIGN CRITERIA AND MATERIALS STRUCTURAL DESIGN CRITERIA

Project Locat ion

The new commercial construction of an approximately 50,600 square foot single-story Pre-engineered Metal Building and approximately 5,300 square foot single-story office building located at 5818 Industrial Way, in Pasco, Washington.

Codes and Standards

All construction shall be in accordance with the 2015 International Building Code (IBC 2015) and the 2010 American Society of Civil Engineers Minimum Design Loads for Buildings and Other Structures (ASCE 7-10). The publications listed below are the governing codes and standards and are referenced by the basic designation. In case of conflicting requirements, the IBC shall govern.

Code/Standard Description

IBC 2015 International Building Code, 2015

ASCE 7-10 American Society of Civil Engineers Minimum Design Loads for Buildings and Other Structures, 2010

ACI 318-14 American Concrete Institute Building Code Requirements for Structural Concrete, 2014 Edition

AISI S100-16 North American Specification for the Design of Cold-formed Steel Structural Members, 2016 Edition

AISC 15th Ed. American Institute of Steel Construction, Fifteenth Edition

DESIGN CRITERIA FACTORS

Probable Dead Loads ( IBC Sect ion 1606)

In-place flooring, cladding, walls, weights of permanent elements probable dead loads in addition to the self-weight of the structure beams and columns are as follows:

Page 4: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging Project #: 20061

1002 April 12, 2021

Roof Assembly 15 psf

Interior walls 8 psf

Light Frame Exterior Walls 14 psf

L ive Loads ( IBC Sect ion 1607)

Office 50 psf

Roof Live Load, where snow & wind do not govern 20 psf-Not reduced

Warehouse 125 psf

Snow Loads ( IBC Section 1608)

ASCE 7-2010: (Section 7.0)

Constants used in determination of design snow loads are:

pg (Ground Snow Load) – 20.0 psf

Ce (Exposure Factor) – 0.9 per Table 7-2 for fully exposed roof and Terrain Category C

Cs (Roof Slope Factor) – 1.0 per Figure 7-2a for 3/8 on 12 roofs

Ct (Thermal Factor) – 1.0 per Table 7-3

Is (Snow Importance Factor) – 1.0 per Table 1.5-2

pf (Flat-Roof Snow Load) – 20.0 psf

Maximum of: pf = 0.7 Ce Ct Is pg = 12.6 psf

pf = 20(Is) = 20.0 psf

Rain-On-Snow Surcharge – 5.0 psf

Partial Loading, Unbalanced Roof Snow Loading, Sliding Snow and Snow Drifting will also be taken into account. These calculations will be done on specific areas based on the roof profiles developed during the architectural design. ASCE 7-10, Sections 7.4 through 7.12 will be used for these calculations.

Constants used for Snow Drifting Calculations:

D or (Snow Density) – 16.6 pcf

Page 5: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging Project #: 20061

1003 April 12, 2021

Wind Loads ( IBC Sect ion 1609)

Wind design loads per IBC 2015 reference ASCE 7-10, Minimum Design Loads for Buildings and Other Structures. The building is considered to be fully enclosed per the definitions in ASCE 7-10. The roofs are sloped at 3/8 on 12.

ASCE 7-10: Envelope Procedure - Part 2: Enclosed Simple Diaphragm Low-Rise Building (Section 28.5 and 28.6)

This method will be used due to the structure being a regular-shaped low-rise building. The design procedure of Section 28.5 requires the determination of a number of constants. The values for these constants are:

Risk Category – II from Table 1.5-1

V (Basic Wind Speed) – 110 mph from Figure 26.5-1A

Exposure Category – C from Section 26.7.3

Kzt (Topographic Factor) – 1.0 per Section 26.8.2 (Since not located in upper half of hill) h (Mean Roof Height) – 18 feet

Enclosure Classification – Enclosed per Section 26.2

λ (Adjustment Factor due to Building Height and Exposure) – 1.26 per Figure 28.6-1

Ps30 (Simplified Design Wind Pressure) – per Figure 28.6-1

Seismic Loads ( IBC Sect ion 1613 and ASCE 7-10 Sect ion 11 through 23)

Risk Category – II per Table 1.5-1

Ie (Seismic Importance Factors) – 1.0 per Table 1.5-2

Site Class D per Section 20.1

SS (Spectral Response Acceleration at Short Period) = 0.384g per Geotech

S1 (Spectral Response Acceleration at 1-second Period) = 0.148g per Geotech

Fa (Short Period Site Coefficient) = 1.493 per Table 11.4-1

Fv (Long Period Site Coefficient) = 2.206 per Table 11.4-2

SMS = Fa SS = 0.574 per Eqn. 11.4-1

SM1 = Fv S1 = 0.327 per Eqn. 11.4-2

SDS (Spectral Response Coefficient at Short Period) = 0.382g per Eqn. 11.4-3

SD1 (Spectral Response Coefficient at 1-second Period) = 0.218g per Eqn. 11.4-4

Seismic Design Category (Table 11.6-1and 11.6-2): Category D

Page 6: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging Project #: 20061

1004 April 12, 2021

Seismic Force Resisting System (Table 12.2-1):

Bearing Wall Systems:

Light-Framed Walls with Shear Panels of All Other Systems

R=2, Ωo=2.5, Cd=2

ASCE 7-10: Method 2 – Equivalent Lateral Force Procedure (Section 12.8)

Cs = SDS / (R/Ie) = 0.191 per Eqn. 12.8-2

V = Cs W = 0.191 W

W per Eqn. 12.8-1

Ev = 0.2 SDS D per Eqn. 12.4-4

MATERIALS

Concrete

f’C = 2,500 psi for all concrete unless otherwise noted

Normal Weight = 145 pcf typical

Concrete Reinforcing Steel

ASTM A615 Grade 60 fY = 60,000 psi

FOUNDATIONS

CONVENTIONAL SPREAD FOOTINGS

Allowable soil bearing capacity of 2,000 psf will be used per Geotechnical Engineering Study by Baer Testing, Inc. dated January 27, 2020. Isolated spread footings will need to be a minimum of 24 inches wide and continuous footings will be 16 inches wide minimum. Footing frost depth shall be 24 inches. For frictional capacity, a coefficient of friction value of 0.45 will be used and the passive earth pressure of 260 psf/f will also be used per Geotechnical Engineering Study.

Page 7: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging Project #: 20061

1005 April 12, 2021

FRAMING

ROOF FRAMING

Roof framing will consist of metal over pre-engineered open web steel trusses.

MAIN FLOOR FRAMING

Main floor framing will consist of concrete slab on grade.

WAREHOUSE FLOOR

Warehouse floor will consist of concrete slab on grade.

LATERAL SYSTEMS

The roof with its metal deck is considered a flexible diaphragm and distributes its lateral forces uniformly to the vertical shear elements.

LIGHT-FRAMED WALLS WITH SHEAR PANELS OF ALL OTHER SYSTEMS

This system utilizes vertical structural panels connected to steel studs to resist both gravity and lateral forces. Resistance is provided by means of horizontal shear resistance of the sheathing panels. Members are proportioned to limit the horizontal movements for the structure under horizontal forces. Such systems are considered more flexible than other systems.

Page 8: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging Project #: 20061

2001 April 12, 2021

GRAVITY CALCULATIONS

Page 9: 100% Structural Calculations Pioneer Packaging 5818

2.4.1.1 D

2.4.1.2 D + L

2.4.1.3 D + (Lr or S or R)

2.4.1.4 D + 0.75L + .75(Lr or S or R)

2.4.1.5a D + 0.6W

2.4.1.5b D + 0.7E

2.4.1.6a D + 0.75L + 0.75(0.6W) + 0.75(Lr or S or R)

2.4.1.6b D + 0.75L + 0.75(0.7E) + 0.75S

2.4.1.7 0.6D + 0.6W

2.4.1.8 0.6D + 0.7E

Column COL 1 COL 2 COL 3 COL 1 COL 2 COL 3

Load Group Y Y Y 2.4.1.1 4 5 5

Dead 3 3 3 2.4.1.2 4 5 5

Collateral 1 2 2 2.4.1.3 14 20 17

Roof Live 3 5 5 2.4.1.4 11.5 16.25 14

Snow 10 15 12 2.4.1.5a 2.2 3.2 8.6

Roof Snow 5 5 5 2.4.1.5b 4.7 5.7 13.4

W C1 R ‐4 ‐6 ‐13 2.4.1.6a 10.15 14.9 16.7

W C1 L ‐3 ‐3 6 2.4.1.6b 12.025 16.775 20.3

W C2 R ‐5 ‐9 ‐15 2.4.1.7 ‐0.6 ‐2.4 ‐6

W C2 L ‐4 ‐5 3 2.4.1.8 1.7 2.3 ‐5.4

L W1 B ‐5 ‐9 ‐8

L W1 F ‐5 ‐9 ‐8 Min Ftg Width (ft) 2.6 3.2 3.2

L W2 B Uplift Ftg Width (ft) 3 4 6

L W2 F

S R 1 1 ‐12

S L ‐1 ‐1 12

Alt Snow 1 2 4 4

Alt Snow 2 3 1 1

Load Combinations

Load Combinations

Frame Line 1

eanderson
Typewritten Text
PEMB Building Footings
eanderson
Typewritten Text
2002
Page 10: 100% Structural Calculations Pioneer Packaging 5818

Column COL 4 COL 5 COL 6 COL 4 COL 5 COL 6

Load Group Y Y Y 2.4.1.1 5 5 5

Dead 3 3 3 2.4.1.2 5 5 5

Collateral 2 2 2 2.4.1.3 19 21 18

Roof Live 5 5 5 2.4.1.4 15.5 17 14.75

Snow 14 16 13 2.4.1.5a 6.2 2.6 3.8

Roof Snow 5 5 5 2.4.1.5b 13.4 5.7 5.7

W C1 R 2 ‐4 ‐2 2.4.1.6a 16.4 15.2 13.85

W C1 L ‐9 ‐5 ‐6 2.4.1.6b 21.8 17.525 15.275

W C2 R ‐1 ‐6 ‐5 2.4.1.7 ‐4.2 ‐1.8 ‐1.8

W C2 L ‐12 ‐7 ‐8 2.4.1.8 ‐5.4 2.3 2.3

L W1 B ‐8 ‐8 ‐8

L W1 F ‐8 ‐8 ‐8 Min Ftg Width (ft) 3.3 3.2 3.0

L W2 B Uplift Ftg Width (ft) 6 4 4

L W2 F

S R 12 1 ‐1

S L ‐12 ‐1 1

Alt Snow 1 6 3 1

Alt Snow 2 1 4 6

Column COL 7 COL 8 COL 9 COL 7 COL 8 COL 9

Load Group Y Y Y 2.4.1.1 4 5 4

Dead 3 3 3 2.4.1.2 4 5 4

Collateral 1 2 1 2.4.1.3 16 17 11

Roof Live 3 5 5 2.4.1.4 13 14 9.25

Snow 12 12 7 2.4.1.5a 2.2 3.8 2.8

Roof Snow 5 5 4 2.4.1.5b 4.7 5.7 4.7

W C1 R ‐3 ‐2 ‐2 2.4.1.6a 11.65 13.1 8.35

W C1 L ‐5 ‐5 ‐3 2.4.1.6b 13.525 14.525 9.775

W C2 R ‐5 ‐4 ‐3 2.4.1.7 ‐2.4 ‐1.8 ‐0.6

W C2 L ‐7 ‐7 ‐4 2.4.1.8 1.7 2.3 1.7

L W1 B ‐8 ‐8 ‐5

L W1 F ‐8 ‐8 ‐5 Min Ftg Width (ft) 2.8 2.9 2.3

L W2 B Uplift Ftg Width (ft) 5 4 3

L W2 F

S R ‐1 ‐1 ‐1

S L 1 1 1

Alt Snow 1 1 1 1

Alt Snow 2 3 3 4

Load Combinations

Load Combinations

Frame Line 1

Frame Line 1

eanderson
Typewritten Text
2003
Page 11: 100% Structural Calculations Pioneer Packaging 5818

Column COL 1 COL 2 COL 1 COL 2

Load Group Y Y 2.4.1.1 42 40

Dead 29 27 2.4.1.2 42 40

Collateral 13 13 2.4.1.3 112 110

Roof Live 28 28 2.4.1.4 94.5 92.5

Snow 70 70 2.4.1.5a 33 31

Roof Snow 48 48 2.4.1.5b 43.4 41.4

W C1 R ‐32 ‐15 2.4.1.6a 87.75 85.75

W C1 L ‐15 ‐32 2.4.1.6b 95.55 93.55

W C2 R ‐53 ‐36 2.4.1.7 ‐6.6 ‐7.8

W C2 L ‐36 ‐53 2.4.1.8 23.8 22.6

L W1 B ‐28 ‐19

L W1 F ‐19 ‐28 Min Ftg Width (ft) 7.5 7.4

L W2 B ‐49 ‐40 Uplift Ftg Width (ft) 6 6

L W2 F ‐40 ‐49

S R ‐2 2

S L 2 ‐2

Alt Snow 1 33 20

Alt Snow 2 23 36

Column COL 1 COL 2 COL 1 COL 2

Load Group Y Y 2.4.1.1 50 59

Dead 32 34 2.4.1.2 50 59

Collateral 18 25 2.4.1.3 114 139

Roof Live 38 40 2.4.1.4 98 119

Snow 47 80 2.4.1.5a 39.2 47

Roof Snow 64 68 2.4.1.5b 52.1 61.1

W C1 R ‐43 ‐20 2.4.1.6a 89.9 110

W C1 L ‐18 ‐45 2.4.1.6b 99.575 120.575

W C2 R ‐74 ‐52 2.4.1.7 ‐14.4 ‐10.2

W C2 L ‐49 ‐76 2.4.1.8 27.9 33.3

L W1 B ‐37 ‐26

L W1 F ‐24 ‐40 Min Ftg Width (ft) 7.5 8.3

L W2 B ‐68 ‐57 Uplift Ftg Width (ft) 8 7

L W2 F ‐55 ‐71

S R ‐3 3

S L 3 ‐3

Alt Snow 1 46 28

Alt Snow 2 27 50

Load CombinationsFrame Line 2

Load CombinationsFrame Line 4‐8

eanderson
Typewritten Text
2004
Page 12: 100% Structural Calculations Pioneer Packaging 5818

Column COL 1 COL 2 COL 1 COL 2

Load Group Y Y 2.4.1.1 35 52

Dead 21 24 2.4.1.2 35 52

Collateral 14 28 2.4.1.3 84 106

Roof Live 30 31 2.4.1.4 71.75 92.5

Snow 38 45 2.4.1.5a 29 39.4

Roof Snow 49 54 2.4.1.5b 37.1 54.1

W C1 R ‐37 ‐21 2.4.1.6a 67.25 83.05

W C1 L ‐10 ‐33 2.4.1.6b 73.325 94.075

W C2 R ‐61 ‐45 2.4.1.7 ‐15.6 ‐3

W C2 L ‐34 ‐57 2.4.1.8 18.9 29.1

L W1 B ‐34 ‐24

L W1 F ‐17 ‐26 Min Ftg Width (ft) 6.5 7.3

L W2 B ‐58 ‐48 Uplift Ftg Width (ft) 8 5

L W2 F ‐41 ‐50

S R ‐3 3

S L 3 ‐3

Alt Snow 1 35 27

Alt Snow 2 16 40

Column COL 1 COL 2 COL 1 COL 2

Load Group Y Y 2.4.1.1 31 48

Dead 19 22 2.4.1.2 31 48

Collateral 12 26 2.4.1.3 73 97

Roof Live 25 26 2.4.1.4 62.5 84.75

Snow 42 49 2.4.1.5a 26.2 37.2

Roof Snow 42 46 2.4.1.5b 33.1 50.1

W C1 R ‐31 ‐18 2.4.1.6a 58.9 76.65

W C1 L ‐8 ‐28 2.4.1.6b 64.075 86.325

W C2 R ‐52 ‐38 2.4.1.7 ‐12.6 ‐0.6

W C2 L ‐29 ‐49 2.4.1.8 16.5 26.7

L W1 B ‐28 ‐21

L W1 F ‐14 ‐22 Min Ftg Width (ft) 6.0 7.0

L W2 B ‐49 ‐41 Uplift Ftg Width (ft) 8 3

L W2 F ‐35 ‐42

S R ‐3 3

S L 3 ‐3

Alt Snow 1 30 23

Alt Snow 2 13 35

Frame Line 13 Load Combinations

Frame Line 9‐12 Load Combinations

eanderson
Typewritten Text
2005
Page 13: 100% Structural Calculations Pioneer Packaging 5818

Column COL 1 COL 2 COL 3 COL 1 COL 2 COL 3

Load Group Y Y Y 2.4.1.1 4 5 5

Dead 2 3 3 2.4.1.2 4 5 5

Collateral 2 2 2 2.4.1.3 11 23 19

Roof Live 3 8 6 2.4.1.4 9.25 18.5 15.5

Snow 7 18 14 2.4.1.5a 2.8 2.6 3.2

Roof Snow 3 8 6 2.4.1.5b 4.7 5.7 5.7

W C1 R ‐4 ‐10 ‐8 2.4.1.6a 8.35 16.7 14.15

W C1 L ‐2 ‐4 ‐3 2.4.1.6b 9.775 19.025 16.025

W C2 R ‐5 ‐13 ‐11 2.4.1.7 ‐0.6 ‐5.4 ‐3.6

W C2 L ‐3 ‐8 ‐6 2.4.1.8 2.4 2.3 3

L W1 B ‐5 ‐14 ‐11

L W1 F ‐5 ‐14 ‐11 Min Ftg Width (ft) 2.3 3.4 3.1

L W2 B Uplift Ftg Width (ft) 3 6 5

L W2 F

S R 1 1 1

S L 0 ‐1 0

Alt Snow 1 2 6 4

Alt Snow 2 1 2 2

Column COL 4 COL 5 COL 6 COL 4 COL 5 COL 6

Load Group Y Y Y 2.4.1.1 7 5 7

Dead 4 3 4 2.4.1.2 7 5 7

Collateral 3 2 3 2.4.1.3 28 19 28

Roof Live 9 6 9 2.4.1.4 22.75 15.5 22.75

Snow 21 14 21 2.4.1.5a 11.8 8 4

Roof Snow 9 6 9 2.4.1.5b 9.8 7.8 7.7

W C1 R ‐22 5 ‐5 2.4.1.6a 26.35 17.75 20.5

W C1 L 8 ‐18 ‐11 2.4.1.6b 24.85 17.6 23.275

W C2 R ‐26 3 ‐9 2.4.1.7 ‐11.4 ‐9 ‐5.4

W C2 L 4 ‐20 ‐15 2.4.1.8 1.4 0.2 3.5

L W1 B ‐15 ‐12 ‐16

L W1 F ‐15 ‐12 ‐16 Min Ftg Width (ft) 3.7 3.1 3.7

L W2 B Uplift Ftg Width (ft) 8 7 6

L W2 F

S R ‐4 4 ‐1

S L 4 ‐4 1

Alt Snow 1 9 5 2

Alt Snow 2 2 4 11

Frame Line 14 Load Combinations

Frame Line 14 Load Combinations

eanderson
Typewritten Text
2006
Page 14: 100% Structural Calculations Pioneer Packaging 5818

Column COL 7 COL 7

Load Group Y 2.4.1.1 12

Dead 3 2.4.1.2 12

Collateral 9 2.4.1.3 24

Roof Live 4 2.4.1.4 21

Snow 12 2.4.1.5a 10.2

Roof Snow 5 2.4.1.5b 12

W C1 R ‐3 2.4.1.6a 19.65

W C1 L ‐5 2.4.1.6b 21

W C2 R ‐4 2.4.1.7 3.6

W C2 L ‐6 2.4.1.8 6.5

L W1 B ‐6

L W1 F ‐6 Min Ftg Width (ft) 3.5

L W2 B Uplift Ftg Width (ft) NA

L W2 F

S R ‐1

S L 0

Alt Snow 1 2

Alt Snow 2 5

Frame Line 14 Load Combinations

eanderson
Typewritten Text
2007
Page 15: 100% Structural Calculations Pioneer Packaging 5818

Column COL 2 ‐ 5 COL 2 ‐ 6 COL 2 ‐ 5 COL 2 ‐ 6

Load Group Y Y 2.4.1.1 59 59

Dead 34 34 2.4.1.2 59 59

Collateral 25 25 2.4.1.3 139 139

Roof Live 40 40 2.4.1.4 119 119

Snow 80 80 2.4.1.5a 116 116

Roof Snow 68 68 2.4.1.5b 119.9 119.9

W C1 R ‐20 ‐20 2.4.1.6a 161.75 161.75

W C1 L ‐45 ‐45 2.4.1.6b 164.675 164.675

W C2 R ‐52 ‐52 2.4.1.7 ‐21.6 ‐21.6

W C2 L ‐76 ‐76 2.4.1.8 ‐25.5 ‐25.5

L W1 B ‐26 ‐26

L W1 F ‐40 ‐40 Min Ftg Width (ft) 9.1 9.1

L W2 B 95 ‐95 Uplift Ftg Width (ft) 10 10

L W2 F ‐95 95

S R 87 ‐87

S L ‐87 87

Alt Snow 1 28 28

Alt Snow 2 50 50

Column COL 2 ‐ 9 COL 2 ‐ 10 COL 2 ‐ 9 COL 2 ‐ 10

Load Group Y Y 2.4.1.1 52 52

Dead 24 24 2.4.1.2 52 52

Collateral 28 28 2.4.1.3 106 106

Roof Live 31 31 2.4.1.4 92.5 92.5

Snow 45 45 2.4.1.5a 69.4 69.4

Roof Snow 54 54 2.4.1.5b 70.9 70.9

W C1 R ‐21 ‐21 2.4.1.6a 105.55 105.55

W C1 L ‐33 ‐33 2.4.1.6b 106.675 106.675

W C2 R ‐45 ‐45 2.4.1.7 ‐3 ‐3

W C2 L ‐57 ‐57 2.4.1.8 12.3 12.3

L W1 B ‐29 29

L W1 F 29 ‐29 Min Ftg Width (ft) 7.3 7.3

L W2 B ‐48 ‐48 Uplift Ftg Width (ft) 5 5

L W2 F ‐50 ‐50

S R ‐27 27

S L 27 ‐27

Alt Snow 1 27 27

Alt Snow 2 40 40

Frame Line 5 & 6 Load Combinations

Frame Line 9 & 10 ‐ 11 & 12 Load Combinations

eanderson
Typewritten Text
2008
Page 16: 100% Structural Calculations Pioneer Packaging 5818

Column COL 1 ‐ 5 COL 1 ‐ 6 COL 1 ‐ 5 COL 1 ‐ 6

Load Group Y Y 2.4.1.1 50 50

Dead 32 32 2.4.1.2 50 50

Collateral 18 18 2.4.1.3 114 114

Roof Live 38 38 2.4.1.4 98 98

Snow 47 47 2.4.1.5a 39.2 39.2

Roof Snow 64 64 2.4.1.5b 87.1 87.1

W C1 R ‐43 ‐43 2.4.1.6a 89.9 89.9

W C1 L ‐18 ‐18 2.4.1.6b 125.825 125.825

W C2 R ‐74 ‐74 2.4.1.7 ‐44.4 ‐44.4

W C2 L ‐49 ‐49 2.4.1.8 ‐7.1 ‐7.1

L W1 B ‐37 ‐37

L W1 F ‐24 ‐24 Min Ftg Width (ft) 7.9 7.9

L W2 B ‐124 ‐124 Uplift Ftg Width (ft) 10 10

L W2 F ‐55 ‐55

S R ‐53 ‐53

S L 53 53

Alt Snow 1 46 46

Alt Snow 2 27 27

Column COL 1 ‐ 9 COL 1 ‐ 10 COL 1 ‐ 9 COL 1 ‐ 10

Load Group Y Y 2.4.1.1 35 35

Dead 21 21 2.4.1.2 35 35

Collateral 14 14 2.4.1.3 84 84

Roof Live 30 30 2.4.1.4 71.75 71.75

Snow 38 38 2.4.1.5a 29 29

Roof Snow 49 49 2.4.1.5b 72.1 72.1

W C1 R ‐37 ‐37 2.4.1.6a 67.25 67.25

W C1 L ‐10 ‐10 2.4.1.6b 99.575 99.575

W C2 R ‐61 ‐61 2.4.1.7 ‐47.4 ‐47.4

W C2 L ‐34 ‐34 2.4.1.8 ‐16.1 ‐16.1

L W1 B ‐34 ‐34

L W1 F ‐17 ‐17 Min Ftg Width (ft) 7.1 7.1

L W2 B ‐114 ‐114 Uplift Ftg Width (ft) 10 10

L W2 F ‐41 ‐41

S R ‐53 ‐53

S L 53 53

Alt Snow 1 35 35

Alt Snow 2 16 16

Load Combinations

Load Combinations

Frame Line 9&10

Frame Line 5 & 6

eanderson
Typewritten Text
2009
Page 17: 100% Structural Calculations Pioneer Packaging 5818

1/23/2021

CO

LUM

N S

PR

EA

D F

OO

TIN

G D

ES

IGN

:P

RO

JEC

TP

ioneer Packaging

DA

TE

:1-23-2021

EN

GIN

EE

R:

EA

A

AS

SU

MP

TIO

NS

:1.

Footings are designed for m

aximum

bearing pressure using global load factor.2.

Pedestal base w

idth is assumed for each footing. F

ooting calculations are based on this pedestal width. W

idth is computed as sqrt(bh)

3.D

istance d equals footing depth - 4 inches.4.

Factored one-w

ay shear is determined at a distance d from

face of pedestal.5.

Nom

inal one-way shear strength of concrete is determ

ined using AC

I 318, eq. (11-3).6.

Factored tw

o-way shear is determ

ined at a distance d/2 from face of pedestal.

7.N

ominal tw

o-way shear strength of concrete is determ

ined using AC

I 318, eq. (11-38).8.

Factored m

oment is determ

ined at face of pedestal.9.

Nom

inal flexural strength of footing is determined according to A

CI 318, sec. 10.3

10.5%

under for footing flexural strength is considered adequate since load factor is conservative and footing will never see full design load.

INP

UT

Fy

60ksi

F'c

2.5ksi

Allow

able Bearing

2000psf

Load Factor

1.55

DE

SIG

NF

LEX

UR

EA

LLOW

.F

TG

LEN

GT

HW

IDT

HT

HIC

KF

TG

WT

Pedestal

db

boLO

AD

Wu

Vu

0.85Vc

.85Vc

Vu

0.85Vc

.85Vc

Mu

As (req)

As (m

in)A

s (des)A

s Used

Bars U

sed0.9M

n M

nLd

LOA

DM

AR

K(ft)

(ft)(in)

(kips)W

idth (in)(in)

(in)(in)

(psf)(kips)

(kips)V

u(kips)

(kips)V

u(k-ft)

(in2)(in2)

(in2)B

AR

S(in^2)

#S

ize(k-ft)

Mu

(kips)

A4.0

4.012.0

2.48

8.048.0

64.03100

12.432.6

2.644.1

87.02.0

17.20.487

1.0371.037

(10) #31.24

4#

542.6

2.50.6

32B

5.05.0

16.05.0

812.0

60.080.0

310018.1

61.23.4

68.9163.2

2.436.4

0.6831.728

1.728(4) #6

1.866

#5

96.82.7

0.850

C6.0

6.018.0

8.18

14.072.0

88.03100

27.985.7

3.1101.2

209.42.1

66.11.066

2.3332.333

(3) #82.64

6#

6160.2

2.40.8

72D

7.07.0

18.011.0

814.0

84.088.0

310043.4

100.02.3

141.5209.4

1.5108.8

1.7642.722

2.722(9) #5

3.087

#6

186.91.7

1.098

E8.0

8.024.0

19.28

20.096.0

112.03100

49.6163.2

3.3181.5

380.82.1

166.71.878

4.1474.147

(7) #74.20

7#

7366.3

2.20.8

128F

9.09.0

24.024.3

820.0

108.0112.0

310069.8

183.62.6

234.2380.8

1.6242.2

2.7404.666

4.666(3) #11

4.808

#7

418.41.7

0.9162

G10.0

10.027.0

33.88

23.0120.0

124.03100

85.3234.6

2.8289.3

484.81.7

337.63.318

5.8325.832

(19) #56.00

10#

7601.9

1.81.0

200

0.9Mn

Fact

Unfact

Max

As U

seda

(k-ft)Load W

uLoad W

uLoad

A4.0

4.012.0

2.48

8.048.0

64.00.74

026

46893025

32B

5.05.0

16.05.0

812.0

60.080.0

1.491

786647

428850

C6.0

6.018.0

8.18

14.072.0

88.02.20

1134

62974062

72D

7.07.0

18.011.0

814.0

84.088.0

3.081

1875324

343598

E8.0

8.024.0

19.28

20.096.0

112.03.36

1295

54843538

128F

9.09.0

24.024.3

820.0

108.0112.0

4.391

3844911

3168162

G10.0

10.027.0

33.88

23.0120.0

124.06.00

1602

55283566

200

CO

LUM

N F

OO

TIN

G S

IZE

SE

CT

. PR

OP

.O

NE

-WA

Y S

HE

AR

TW

O-W

AY

SH

EA

R

Footing Design 2 (B)

eanderson
Typewritten Text
2010
Page 18: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging .

20061 .

EAA .

Design Parameters

Number of Stories 1 Deck No

Mean Roof 18 ft

Roof Pitch 0.375 /12

Concrete Slab‐On‐Grade Yes Tall Wall Yes

Main Floor Long Dimension 122 ft Main Floor Short Dimension 45.5 ft

Main Floor Area 5229 SF Main Floor Plate Height 16 ft

Main Floor Exterior Wall Length 335 ft Main Floor Interior Wall Length 1184 ft

Number of Roof Profiles 1

Main‐Truss Span 45.5 ft

Main‐Truss Area 5,229 SF

Interior Wall Loading 8 PSF Design Floor Loading 65 PSF

Exterior Wall Loading 14 PSF

Roof Dead Load 15 PSF Design Roof Load 40 PSF

Floor Dead Load 15 PSF Ground Snow & Rain Load 25 PSF

Floor Live Load 50 PSF

Seismic Wind

Risk Category II Risk Category II

Importance Factor 1.0 Importance Factor 1.0SDS 0.382 Kzt = 1.00

R‐Factor 2.0 λ = 1.26

CS 0.191

eanderson
Typewritten Text
2011
Page 19: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging .

20061 .

EAA .

20 PSF

25 PSF WT = (15 + 25)(22.75) = 910.0 PLF

WL = (25)(22.75) = 568.8 PLF

Framing Design

Roof Live Load =

Snow Load =

Main‐Truss Span

Main Roof

eanderson
Typewritten Text
2012
Page 20: 100% Structural Calculations Pioneer Packaging 5818

Knutzen Engineering

Eric Anderson

20061

Pioneer

SK - 1

Apr 14, 2021 at 5:29 PM

Post & Beam.r3d

N1

N2

N3 N4

N5 N6

N7 N8

N9

N10

N11

N12 N13

N14 N15

N16 N17

N18

N19

N20

N21

N22

N23

N24

N25

N26

N27

N28

N29

N30

P1

P2

P3

P4

P5

P6

P7 P

8

P9

B10

B11

B12

B13

B14

P15

P16

P17

P18

P19

P20

B21

B22

B23

B24

B25

Y

XZ

eanderson
Typewritten Text
2013
Page 21: 100% Structural Calculations Pioneer Packaging 5818

Knutzen Engineering

Eric Anderson

20061

Pioneer

SK - 2

Apr 14, 2021 at 5:32 PM

Post & Beam.r3d

N1

N2

N3 N4

N5 N6

N7 N8

N9

N10

N11

N12 N13

N14 N15

N16 N17

N18

N19

N20

N21

N22

N23

N24

N25

N26

N27

N28

N29

N30

P1

P2

P3

P4

P5

P6

P7 P

8

P9

B10

B11

B12

B13

B14

P15

P16

P17

P18

P19

P20

B21

B22

B23

B24

B25

-350lb/ft

-350lb/ft

-350lb/ft

-350lb/ft

-350lb/ft

-350lb/ft

-350lb/ft

-350lb/ft

-350lb/ft

-350lb/ft

Y

XZ

Loads: BLC 1, Dead

eanderson
Typewritten Text
2014
Page 22: 100% Structural Calculations Pioneer Packaging 5818

Knutzen Engineering

Eric Anderson

20061

Pioneer

SK - 3

Apr 14, 2021 at 5:33 PM

Post & Beam.r3d

N1

N2

N3 N4

N5 N6

N7 N8

N9

N10

N11

N12 N13

N14 N15

N16 N17

N18

N19

N20

N21

N22

N23

N24

N25

N26

N27

N28

N29

N30

P1

P2

P3

P4

P5

P6

P7 P

8

P9

B10

B11

B12

B13

B14

P15

P16

P17

P18

P19

P20

B21

B22

B23

B24

B25

-600lb/ft

-600lb/ft

-600lb/ft

-600lb/ft

-600lb/ft

-600lb/ft

-600lb/ft

-600lb/ft

-600lb/ft

-600lb/ft

Y

XZ

Loads: BLC 2, Snow

eanderson
Typewritten Text
2015
Page 23: 100% Structural Calculations Pioneer Packaging 5818

Company : Knutzen Engineering Apr 14, 20215:33 PMDesigner : Eric Anderson

Job Number : 20061 Checked By:_____Model Name : Pioneer

Member AISC 15th(360-16): ASD Steel Code Checks (By Combination)LC Member Shape UC Max Loc[ft] Shear ... Loc[ft] Dir Pnc/om...Pnt/om ...Mnyy/o... Mnzz/o... Cb Eqn

1 2 P1 HSS4X4X3 .531 0 .000 0 y 23809.0...77245.5...9156.6879156.687 1 H1-1a2 2 P2 HSS4X4X5 .720 0 .000 0 y 35042.6...122754....13947.1...13947.1... 1 H1-1a3 2 P3 HSS4X4X3 .531 0 .000 0 y 23809.0...77245.5...9156.6879156.687 1 H1-1a4 2 P4 HSS4X4X3 .416 0 .000 0 y 23809.0...77245.5...9156.6879156.687 1 H1-1a5 2 P5 HSS4X4X3 .416 0 .000 0 y 23809.0...77245.5...9156.6879156.687 1 H1-1a6 2 P6 HSS4X4X3 .521 0 .000 0 y 23809.0...77245.5...9156.6879156.687 1 H1-1a7 2 P7 HSS4X4X3 .521 0 .000 0 y 23809.0...77245.5...9156.6879156.687 1 H1-1a8 2 P8 HSS4X4X3 .409 0 .000 0 y 23809.0...77245.5...9156.6879156.687 1 H1-1a9 2 P9 HSS4X4X3 .409 0 .000 0 y 23809.0...77245.5...9156.6879156.687 1 H1-1a10 2 B10 W16X31 .592 12.75 .143 0 y 208036....273353....17539.92 134730.... 1 H1-1b11 2 B11 W16X31 .592 12.75 .143 0 y 208036....273353....17539.92 134730.... 1 H1-1b12 2 B12 W16X26 .443 10 .138 20 y 176481....229940....13672.6...110279.... 1 H1-1b13 2 B13 W16X31 .569 12.5 .140 25 y 209176....273353....17539.92 134730.... 1 H1-1b14 2 B14 W16X26 .427 9.823 .136 0 y 177036....229940....13672.6...110279.... 1 H1-1b15 2 P15 HSS4X4X3 .301 0 .000 0 y 20006.2...77245.5...9156.6879156.687 1 H1-1a16 2 P16 HSS4X4X5 .657 0 .000 0 y 29445.5...122754....13947.1...13947.1... 1 H1-1a17 2 P17 HSS4X4X5 .908 0 .000 0 y 29445.5...122754....13947.1...13947.1... 1 H1-1a18 2 P18 HSS4X4X5 .908 0 .000 0 y 29445.5...122754....13947.1...13947.1... 1 H1-1a19 2 P19 HSS4X4X5 .908 0 .000 0 y 29445.5...122754....13947.1...13947.1... 1 H1-1a20 2 P20 HSS4X4X3 .670 0 .000 0 y 20006.2...77245.5...9156.6879156.687 1 H1-1a21 2 B21 W16X26 .159 6 .083 0 y 181193....229940....13672.6...110279.... 1 H1-1b22 2 B22 W16X31 .664 13.5 .151 0 y 204522....273353....17539.92 134730.... 1 H1-1b23 2 B23 W16X31 .664 13.5 .151 0 y 204522....273353....17539.92 134730.... 1 H1-1b24 2 B24 W16X31 .664 13.5 .151 0 y 204522....273353....17539.92 134730.... 1 H1-1b25 2 B25 W16X31 .664 13.5 .151 0 y 204522....273353....17539.92 134730.... 1 H1-1b

RISA-3D Version 17.0.4 Page 1 [C:\Users\eanderson.KE\Desktop\Post & Beam.r3d]

eanderson
Typewritten Text
2016
eanderson
Callout
Less Than 1.0 Therefore OK
eanderson
Line
Page 24: 100% Structural Calculations Pioneer Packaging 5818

Company : Knutzen Engineering Apr 14, 20215:34 PMDesigner : Eric Anderson

Job Number : 20061 Checked By:_____Model Name : Pioneer

Joint Reactions (By Combination)LC Joint Label X [lb] Y [lb] Z [lb] MX [lb-ft] MY [lb-ft] MZ [lb-ft]

1 2 N1 0 12653.465 0 0 0 02 2 N2 0 25247.416 0 0 0 03 2 N3 0 12653.465 0 0 0 04 2 N4 0 9906.19 0 0 0 05 2 N5 0 9906.19 0 0 0 06 2 N6 0 12408.199 0 0 0 07 2 N7 0 12408.199 0 0 0 08 2 N8 0 9733.845 0 0 0 09 2 N9 0 9733.845 0 0 0 010 2 N10 0 0 0 0 0 011 2 N11 0 0 0 0 0 012 2 N12 0 0 0 0 0 013 2 N13 0 0 0 0 0 014 2 N14 0 0 0 0 0 015 2 N15 0 0 0 0 0 016 2 N16 0 0 0 0 0 017 2 N17 0 0 0 0 0 018 2 N18 0 0 0 0 0 019 2 N19 0 6014.825 0 0 0 020 2 N20 0 19352.335 0 0 0 021 2 N21 0 26739.944 0 0 0 022 2 N22 0 26739.944 0 0 0 023 2 N23 0 26739.944 0 0 0 024 2 N24 0 13402.435 0 0 0 025 2 N25 0 0 0 0 0 026 2 N26 0 0 0 0 0 027 2 N27 0 0 0 0 0 028 2 N28 0 0 0 0 0 029 2 N29 0 0 0 0 0 030 2 N30 0 0 0 0 0 031 2 Totals: 0 233640.243 032 2 COG (ft): X: 58.889 Y: 17.164 Z: 23.068

RISA-3D Version 17.0.4 Page 2 [C:\Users\eanderson.KE\Desktop\Post & Beam.r3d]

eanderson
Typewritten Text
2017
Page 25: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging .

20061 .

EAA .

Exterior Section 1312 PLF

0.87 ‐> use 16" Continous Footings

Type I 0 < P < 8000 lb

2.00 ‐> use 24" x 24" x 8" Spread Footings

Type II 8000 < P < 12500 lb

2.50 ‐> use 30" x 30" x 8" Spread Footings

Type III 12500 < P < 18000 lb

3.00 ‐> use 36" x 36" x 10" Spread Footings

Type IV 18000 < P < 24500 lb

3.50 ‐> use 42" x 42" x 10" Spread Footings

Type V 24500 < P < 32000 lb

4.00 ‐> use 48" x 48" x 12" Spread Footings

Foundation Design

Spread Footing

W= 910+(18)(14)+150 =

=> 1312 / 1500 =

Continous Footing

=> √(12500 / 2000) =

=> √(32000 / 2000) =

=> √(8000 / 2000) =

=> √(18000 / 2000) =

=> √(24500 / 2000) =

eanderson
Typewritten Text
2018
Page 26: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging Project #: 20061

3001 April 12, 2021

LATERAL CALCULATIONS

Page 27: 100% Structural Calculations Pioneer Packaging 5818
eanderson
Typewritten Text
3002
eanderson
Typewritten Text
Shear Wall Marks Layout
eanderson
Typewritten Text
SW1
eanderson
Typewritten Text
SW2
eanderson
Typewritten Text
SW3
eanderson
Typewritten Text
SW4
eanderson
Typewritten Text
SW5
eanderson
Typewritten Text
SW6
eanderson
Typewritten Text
SW7
eanderson
Typewritten Text
SW8
eanderson
Typewritten Text
SW9
Page 28: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging .

20061 .

EAA .

Seismic Base Shear

Building Weight:

Roof: 78473.3 lb

Wall Trib: 113296.0 lb

Roof:Total = lb

V = (0.059)(191769.3) = 11270.1 lb

Vasd = (0.7)(11270.1) = 7889.1 lb

(15)(5229)(12.01/12) =

(14)(335)(8) + (8)(1184)(8) =

191769.3

eanderson
Typewritten Text
3003
Page 29: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging .

20061 .

EAA .

Roof: 0 SF 0 SF

327.6 SF 36.4 SF

Roof: 0 SF 0 SF

903.2 SF 72.8 SF

Roofing Area:

Wall Area:

α Roofing Area:

α Wall Area:

L ‐ 2α 2α

2α Wall Area:Wall Area:

Wind Areas

2α Roofing Area:

W ‐ α α

Roofing Area:

eanderson
Typewritten Text
3004
Page 30: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging .

20061 .

EAA .

Kzt = 1.0 α =0.1)(45.5)= 4.55 ft <‐ Controls

P= (1.26)(1)Ps30 (0.4)(18)= 7.2 ft

2α = 9.1 ft

Ps30A = 23.32 => PsA = 29.38

Ps30B = 7.32 => PsB = 9.22

Ps30C = 17.34 => PsC = 21.85

Ps30D = 6.45 => PsD = 8.13

R ‐> L: 8,227.5 lb

F ‐> B: 21,873.8 lb

4,936.5 lb

13,124.3 lb

Roof: (ASD) R ‐> L: Seismic Governs

F ‐> B: Wind Governs

(29.38)(72.8) + (21.85)(903.2) + (9.22)(0) + (8.13)(0) =

(29.38)(36.4) +(9.22)(0)+ (21.85)(327.6) + (8.13)(0) =

Wind Base Shear

Roof: (ASD) (0.6)(8227.492) = R ‐> L:

(0.6)(21873.784) = F ‐> B:

Roof:

eanderson
Typewritten Text
3005
Page 31: 100% Structural Calculations Pioneer Packaging 5818

Notes:

1. Per 2015 SDPWS Table 4.3C, 5/8 sheathing with 6d cooler nails at 4" is 400 #/ft. With ASD reduction = 200#/ft.

2. DensGlass racking strength is 654 #/ft per technical guide.

SW7 Roof 11.00 16 1.45 1240 112.7 4/7

SW8 Roof 14.00 18 1.29 2483 177.4 4/7

8.00

4/7

4/7

112.7

198.8

16.00 16

17

4/7

4/7

SW5 Roof

SW6 Roof

Wall Shear

(lb/ft)

198.8

198.8

112.7

16

18

2.00

1.20

1803

1.55

2983

Page________ of _______

SW9 Roof

H/L Ratio

Lateral Tributary

Wall Force (lbs)Shearwall Mark Length (ft) Height (ft)

SW1 Roof

SW2 Roof

SW3 Roof

SW4 Roof

902

11.00 2187

1.00

Edge Nail

Spacing (in)

23.00 4/7

4/7

15.00

108.00 18

7.00

0.17 3945 36.5

4079

1392

4/7

0.74

2.43

177.417

17

5401 Ridgeline Drive Suite 160

Kennewick, WA 99338 509.222.0959

Customer Job Description

Proposal No Project No Date By Ck. By

eanderson
Typewritten Text
3006
Page 32: 100% Structural Calculations Pioneer Packaging 5818

Notes:

1. Holdown force resisted by the weight of stem wall & foundation by inspection.

SW7 Roof 19838 338 20401 0 NA

SW8 Roof 44693 338 34692 714 HDU4

5401 Ridgeline Drive Suite 160

Kennewick, WA 99338509.222.0959

NA

HDU4

HDU4

SW5 Roof 28855 338 43162 0 NA

SW9 Roof 53689 338 39825 924

HDU4

HDU4

SW6 Roof 14427 338 10790 455

SW4 Roof 37185 0 10303 2444 HDU4

SW1 Roof 71003 338 2064528 0

Moment Resisting

(#‐ft)

Holdown Force

(lbs)

SW3 Roof 23663 0 4557 2729

SW2 Roof 69344 0 41248 1222

Page________ of _______

Shearwall Mark

Overturning

Moment (#‐ft)

Weight of

Roof/Flr on

Wall (#/ft) Holdown/Strap

Ck. ByBy

Job Description

Date Project No

Customer

Proposal No

eanderson
Typewritten Text
3007
Page 33: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging .

20061 .

EAA .

Fpx = 11270.1 lb

Fpmin = 14651.17 lb

Fpmax = 29302.35 lb

FpASD = 10255.8 lb

Wind (ASD): R ‐> L: 4936.5 lb

F ‐> B: 13124.3 lb

Chord Forces:

R ‐> L: W = 40.46 PLF

M = 75275.8 lb‐ft

T/C = 1654.4 lb

F ‐> B: W = 288.45 PLF

M = 74645.45 lb‐ft

T/C = 611.9 lb74645.45 / 122 =

(288.45)(45.5)^2 / 8 =

13124.3 / 45.5 =

> Seismic Controls

Roof:

75275.83 / 45.5 =

(40.46)(122)^2 / 8 =

4936.5 / 122 =

(0.4)(1.0)(0.382)(191769.3) =

(0.2)(1.0)(0.382)(191769.3) =

(0.7)(14651.17) =

Roof:

Diaphragm Design

eanderson
Typewritten Text
3008
Page 34: 100% Structural Calculations Pioneer Packaging 5818

Pioneer Packaging .

20061 .

EAA .

198.8 PLF

707 PLF => Roof OK

Diaphragm Shear

Per Sheet 3006, Max Shear at Roof:

Roof Capacity per Verco Steel Roof Deck:

eanderson
Typewritten Text
3009