2015_01_17 EKO2 Workshop Presentation 13th January 2015 Rev.07b

Embed Size (px)

Citation preview

1

I. HEALTH & SAFETY

II. ORGANIZATION CHART

III.FORECAST CURVE OF MANPOWER

IV. PROGRAM OF WORKS

a) General Planning

b) Planning Civil Works Typical Level

c) Rotation Structural Works Typical Floor d) Planning Secondary Trades e) Rotation Guest Room

f) Planning Civil Works Typical Level

2

g) Lifts h) Optional & Excluded Works i) Design Status

V. FAÇADE: OKYANUS INTRODUCTION

VI. MEP: PROGRESS STATUS BY LEM

3

I. HEALTH & SAFETY

4

5

II. ORGANIZATION CHART

6

III. FORECAST CURVE OF MANPOWER

7

IV. PROGRAM OF WORKS a) General Planning

8

9

b) Planning Civil Works Typical Level

10

c) Rotation Structural Works Typical Floor

11

12

13

14

15

16

17

18

19

20

21

22

d) Planning Secondary Trades

23

24

e) Rotation Guest Room

1. Mock-up Room

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

2. Whole Typical Floor

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

f) Planning Civil Works Typical Level

1. Masonry Works (Program of block wall delivery and block wall execution)

60

61

62

63

2. Plastering Works

64

65

66

3. Forecast Screed Works

67

68

69

4. Wall and False Ceiling Works

70

71

g) Lifts

72

2014 2015

Today

Aug Sep Oct Nov Dec 2015

1 20 Aug

2 12 Sep

3 23 Sep

4 21 Nov

5 1 Dec

6 23 Dec

7 1 Jan

Groupe Package

Dates acc. Workshop

09.2014

Milestones acc.Program

of Works Remark

1

Access Card Control System & Intruder System

20/08/2014

15/10/2014 BMS 15/10/2014 Car Park Vehicle Counting System 15/10/2014 CCTV System 15/10/2014 Centralized Emergency Exit Management System 15/10/2014 Digital Lighting Control System 15/10/2014 Fire Alarm system 15/10/2014 Intercommunication System -PABX 15/10/2014

Public Address and Sound Sysytems 11/11/2014

15/10/2014 Telecommunication System

2 UPS

12/09/2014 15/10/2014

Additional Cubicle on MV SWITCHGEARS 15/10/2014

3

Analogic Clock System

23/09/2014

15/10/2014 ANSUL Suppression System 11/11/2014 FM200 Suppression System 11/11/2014 Kitchen Equipments 15/10/2014 Nurse Call System 15/10/2014

4 UPS Panel Boards 21/11/2014 15/10/2014 5 MV connection 01/12/2014 03/11/2014

6

Generators 23/12/2014

11/11/2014 IP Television 11/11/2014 Totalizing Panel 11/11/2014

7 Scanners & metal Detectors 12/01/2015 12/01/2015

1. Status of Optional Works

Access Card Control System & Intruder System

h) Optional & Excluded Works

Intercommunication System -PABX

Telecommunication System

NOT YET AWARDED

Analogic Clock System

73

2. Excluded Works (EKO)

f) UPS (for lifts) 2 proposals submitted

g) Bore Hole & Water treatment plant

i) Swimming pool already contracted by EKO

Dates according Program of the Works

h) Sewage treatment plant

b) All services related to medical zones (white partitions, plumbed

partitions,equipments, specific lighting,..) c) All material and installations related to kitchen zones and restaurant

d) Fixed furnitures (ex. Placards, desks, …hall equipment and sport court)

e) Mobile furnitures (ex.: beds, tables,…)COBEL declined for this Trade

a) Roads, lanscaping and other external works

01.10.2014

01.08.2014

04.07.2014

74

Received 26 Aug

Received 04 Sep

Received 07 Nov

2014 2015 Aug Sep Oct Nov Dec 2015

Coordinated PRO

2014 as per POW

11 Aug

Today

21 Jan

22 Aug Layouts

Basement to L08

22 Aug Layouts L09

to L25

12 Sep Elevations &

Sections

19

Sep

Stairs and

swimming Pool

26 Sep External ceilings

and Fences

26 Sep

Other

architectural

drawings

26 Sep Fire Zoning

Received

Rev.D

23.10.2014

Rev.E still

to be

received (Status 20.01.15 11:00)

1. Architectural Design PRO 2014 Planned to be received 11.08.2014 acc. POW

f. Design Status

75

Received

31.10.2014

Received

07.11.2014

Receive

27.11.2014

2014 2015 Aug Sep Oct Nov Dec 2015

Milestone PRO 2014 as per POW 11 Aug

Today 21 Jan

22 Sep - 1 Oct Serie 200 Flooring

2 Oct - 10 Oct Serie 300 Flase Ceilings

22 Sep - 1 Oct Serie 500 Wall covering

14 Oct - 24 Oct Serie 400 & 600 Part 1

27 Oct - 14 Nov Serie 400 & 600 Part 2

17 Nov - 28 Nov Serie 400 & 600 Part 3

1 Dec - 12 Dec Serie 400 & 600 Part 4

12 Dec Serie 700, 800 & 900

1 Oct Serie 100

2. Interior Design Planned to be received 30.08.2014 acc. POW

Received

revision

16.01.2015

Except Plumbing and Sanitary Fixtures

700: Zoning 800: Access Control 900: Floor Boxes

76

3. Status of Documents Submitted

77

78

4. Variations Status

1 CEILINGS Verbal Approval

3 WALL COVERING Rejected

11 INTERIOR PAINTS Verbal Approval (No Floor & Wall painting in

Parking)

• QTY & LOCATION OF CEILING TILES 99%HR

a) PRICING TRANSMITTED FOR INTERIOR DESIGN

TO BE CONFIRMED BY EKO:

REVISION ACCORDING TO REVISED ID PACKAGES RECEIVED

22.08.2014 - SUBMITTED 28.10.2014 Rejected

NEW REVISION – SUBMITTED 19.12.2014

(1)VARIATION 4 PACKAGES/14 SUB-PACKAGES SUBMITTED 12.05.2014

2 FLOORINGS & SKIRTINGS Rejected (except alternative rubber

flooring for sport room)

• COLOR OF FLOOR TILES & WALL CERAMICS

• COLOR OF PAINT

• UPDATED ID CONSIDERING THESE CHANGES

• ACCEPTANCE OF VARIATION

16.01.2015

16.01.2015

16.01.2015

79

(2)VARIATION 2 PACKAGES SUBMITTED 08.08.2014

RESUBMISSION 27.10.2014 Rejected 16.12.2014

NEW REVISION ( ALTERNATIVE ROCA )SUBMITTED 05.12.2014

13 PLUMBING & SANITARY FIXTURES 14 SANITARY&HOSPITALITY ACCESSORIES

ACCEPTANCE OF VARIATION TO BE CONFIRMED BY EKO

80

b) OTHER VARIATIONS SUBMITTED

(1)FACADE NEW WINDOW AT SPORT ROOM

(2)FACADE BULLET PROOF GLASS

(3)FACADE MAINTENANCE PLATFORMS

(4)SWIMMING POOL (STRUCTURAL WORKS ONLY)

81

c) PENDING VARIATIONS

5. STONE & SOLID SURFACES Stone Thresholds cancelled

6. PARTITIONS

9. METAL WORKS

10. GLAZING WORKS Waiting updated Work Package

(2)SHAFT ACCESS HATCHES (New Schedule Received 28.08.2014)

(1)ID FINISHES (5, 6, 9 & 10) ACC. UPDATED ID PRO 2014 TO BE RECEIVED

(3)DOORS (Last Revised Schedule Received 17.12.2014) still to be coordinated

with ELV Packages/ waiting for selection of colours (4)NEW SECURITY ROOM (IN PLACE OF 2 PARKING) Received 20.08.2014 –

waiting design (5)NEW LAYOUT OF THE BATHROOMS OF THE GUEST ROOMS FROM LEVEL

G+15 TO LEVEL G+24 Received 09.09.2014

(6)FACADES WATERPROOFING SYSTEM

(7)ROOF PAVEMENT According To New Concept Pro 2014 Received

23.10.2014

82

(8)DRAINING SCREED AND SLOPES IN BASEMENT According Concept Received

15.10.2014

(10)EXTERNAL WORKS

(9)LIFTS EMERGENCY DOORS According To Arch. File Received 28.10.2014

83

V. FAÇADE: OKYANUS INTRODUCTION

84

VI. MEP: PROGRESS STATUS BY LEM

85