Technical Memorandum #7 Existing Plus Committed Projects February 7, 2015

2040 LRTP Tech Memo #7: Existing Plus Committed Projects

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: 2040 LRTP Tech Memo #7: Existing Plus Committed Projects

Technical Memorandum #7 Existing Plus Committed Projects

February 7, 2015

Page 2: 2040 LRTP Tech Memo #7: Existing Plus Committed Projects

 

Page 3: 2040 LRTP Tech Memo #7: Existing Plus Committed Projects

Path Forward 2040 Long Range Transportation Plan

COMPLETED AND COMMITTED CONSTRUCTION TO ESTABLISH A BASELINE FOR DETERMINING FUTURE NEEDS, PROJECTS THAT WERE COMPLETED SINCE THE LAST LRTP AND PROJECTS WITH COMMITMENTS FOR CONSTRUCTION WITHIN THE NEXT FIVE YEARS WERE IDENTIFIED. An analysis of the progress made in completing the Envision 2035 LRTP was performed to establish the baseline for this Cost Feasible Plan. Major projects completed since the adoption of the 2035 LRTP are shown on Figure 1 and summarized in Table 1.

The major projects with commitments for construction are summarized in Table 2 and Table 3. The commitments were obtained from the following planning documents and through coordination with our partner agencies.

North Florida TPO’s Transportation Improvement Program for the Fiscal Years 2015-2019 as Amended 10/27/14.

FDOT’s 2015-2019- Adopted with Amended dated October 30, 2014.

Local government Capital Improvement Programs. Jacksonville Transportation Authority’s Transit

Development Plan.

The projects identified with commitments for construction or capital improvements are part of the Cost Feasible Plan to provide the flexibility to implement projects commensurate with future funding availability.

Projects in Baker and Putnam Counties are shown in the list of committed projects based on the regional development of this plan and their inclusion in the travel demand forecasting model for North Florida.

All values in this plan for revenues and costs are reported in year of expenditure dollars.

Technical Memorandum #7 – Existing Plus Committed Projects is included in the attachments to this report.

1

Page 4: 2040 LRTP Tech Memo #7: Existing Plus Committed Projects

)"ÊÒ

)"ÊÒ)"ÊÒ

)"ÊÒ

¾¾¿¾¾¿¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿¾¾¿

¾¾¿¾¾¿¾¾¿

¾ ¾¿¾¾¿

¾¾¿

¾¾¿

¾¾¿¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿¾¾¿ ¾¾¿

¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿ ¾¾¿

¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿

)"ÊÒ

)"ÊÒ

)"ÊÒ

)"ÊÒ

)"ÊÒ

)"ÊÒ

)"ÊÒ

)"ÊÒ

)"ÊÒ

)"ÊÒ

)"ÊÒ

)"ÊÒ )"ÊÒ

)"ÊÒ)"ÊÒ

)"ÊÒ

èéëìí

èéëìíèéëìí

èéëìí

èéëìíèéëìí

)"WÒ

)"WÒ

)"WÒ£¤90£¤90

£¤1

£¤301

£¤17

£¤17

£¤27

£¤301

£¤301

£¤441

£¤17

£¤1

£¤1

¬«100

¬«A1A

¬«13

¬«10

¬«16

¬«A1A

¬«A1A

¬«A1A

¬«326¬«326

¬«221

¬«105

¬«500

¬«23

¬«16

¬«A1A

¬«200

¬«26

¬«207

¬«200

¬«21

¬«116

¬«105

¬«A1A

¬«134

¬«19

¬«25

¬«A1A

¬«2

¬«206

¬«16

¬«5

¬«20

¬«228

§̈¦295

§̈¦10

§̈¦75

§̈¦95

§̈¦295

§̈¦295

§̈¦95

§̈¦95

")335

")21

")320

")315

")326")326

")318

")2")127

")200A

")225A

")124

")209

")228

")122

")13A

")250A

")220

")316

")315

")107

")13

")204

")125

")119

")115

")208

")214

")335

")130

")310

")305

")308

")108

")200A")25A

")309

")225

")329

")250

")315

")214

")218

")108

3045

65

67

973

422

3051

3018

3003

3041

3006

1027

3052

3050

3040

505

3046

966

961

45

3002

504

54

711

7

66

64

62

60

59

27

71

13

3016 3007

30083010

3009

3017

3015

3014

30123012

301130

01

18

5

55

36

42

39

51

6

43

37

433

23

34

38

53

17

6121

105

3021

Legendèéëìí Intersection Projects)"ÊÒ Interchange Projects

¾¾¿ ¾¾¿ ¾¾¿ ¾¾¿ ¾¾¿ ¾¾¿ Bus Rapid Transit

Types of ProjectsReconstruct 2 LanesWiden to 3 LanesWiden to 4 LanesWiden to 5 LanesReconstruct 6 LanesContext Sensitive SolutionsNew 2 Lane RoadNew 3 Lane RoadNew 4 Lane RoadNew 6 Lane RoadExpress LanesRoadway System

XÃ FEC ProjectWater BodiesConservation LandsSix Counties Boundaries

Figure 1 Committed Plus Completed Projects ¯ 0 4 8 Miles

0 10,560 Feet

)"ÊÒ

)"ÊÒ

3040

64

63019

Date: 3/13/2015

¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿

¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿¾¾¿

¾¾¿¾¾¿¾¾¿¾¾¿

¾¾¿¾¾¿¾¾¿¾¾¿

¾¾¿¾¾¿¾¾¿

¾ ¾¿¾ ¾¿

¾¾¿¾¾¿

¾¾¿

¾¾¿

¾¾¿ ¾¾¿

¾¾¿¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿

¾¾¿¾¾¿

¾¾¿

¾¾¿¾ ¾¿

¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿

¾¾¿¾¾¿¾¾¿

¾¾¿¾¾¿¾¾¿

¾¾¿

¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿

¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿

¾¾¿ ¾¾¿

¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿

¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿¾¾¿

)"ÊÒ

)"ÊÒ

)"ÊÒ

)"ÊÒ

)"ÊÒ

)"ÊÒ

)"ÊÒ

èéëìí

èéëìí

èéëìí

£¤90

£¤1

¬«13

¬«10

¬«A1A

§̈¦95

§̈¦295961

126

66

30142

5£¤301

¬«16

¬«23

¬«16

¬«21

¬«134¬«228

§̈¦295

")220")218

305036

51

33

34

32

50

30053004

3020

3043

53

1020

502

422

¯¯

¯

3047

970

11

40

44

3020

2

Page 5: 2040 LRTP Tech Memo #7: Existing Plus Committed Projects

Path Forward 2040 Long Range Transportation Plan

Table 1. Major Projects Under Construction or Completed Since the 2035 Plan Was Adopted Facility ID From To Improvement Phase 2035 Cost Feasible

Plan Status 1 Alt. US 1 Martin Luther King Jr. Parkway

7 at 21st Street/ Talleyrand Avenue

New Interchange Complete Committed Project

Chaffee Road 3047 SR 134 103rd Street Chaffee Road New 2 Lane Complete Committed Project Clark Road Extension 1020 Clark Road Broward Road New 2 Lane Complete Committed Project Collins Road 3048 Old Middleburg Road Shinder Drive New 2 Lane Complete Locally Funded Concourse Loop Road 711 Gene Lassere Boulevard Nassau Center

Court New 2 Lane Under

Construction Locally Funded

CR 210 21 US 1 FEC Railroad Overpass Under construction

2035 Cost Feasible Plan #19

CR 210 Extension 3046 Valley Ridge Boulevard Nocatee Parkway New 2 Lane Complete Private Davis Parkway 961 at 9B Extension New Interchange and New

2 Lane Road Under construction

Privately Funded

I-10 3051 Halsema Road Lane Avenue Add 2 Lane Complete Committed Project I-10 3052 I-295 SR 111 Cassat

Avenue Add Auxiliary Lanes Under

construction Operations Improvement

I-10 3043 3042

at Hammond Boulevard (Marietta)

New Interchange and Remove Existing

Under construction

Committed Project

I-295 62 at SR 208 Wilson Boulevard

Interchange Modification Under construction

Operations Improvement

I-295 3010 at SR 228 Normandy Boulevard

Interchange Modification Complete Operations Improvement

I-295 11 I-10 Commonwealth Avenue

Add Auxiliary Lanes Under construction

2035 Cost Feasible Plan #6

I-295 3009 at Commonwealth Avenue

Interchange Modification Under construction

Operations Improvement

I-295 60 at Pritchard Road Interchange Modification Under construction

2035 Cost Feasible Plan #7

I-295 67 at SR 104 Dunn Avenue Interchange Modification Complete Operations Improvement

I-295 1022 SR 13 (Buckman Bridge) I-95 Add 4 Express Lanes Under 2035 Cost Feasible

1 Projects identified in the list of committed projects in the Envision 2035 Cost Feasible Plan are show as “Committed Project”. Projects identified as Operations Improvement were not part of the 2035 Cost Feasible Plan.

3

Page 6: 2040 LRTP Tech Memo #7: Existing Plus Committed Projects

Path Forward 2040 Long Range Transportation Plan

Table 1. Major Projects Under Construction or Completed Since the 2035 Plan Was Adopted Facility ID From To Improvement Phase 2035 Cost Feasible

Plan Status 1 construction Plan #5

I-295 431 SR 21 Blanding Boulevard

Collins Road Interchange Modification Complete Committed Project

I-295 59 at SR 105 Heckscher Drive

Interchange Modification Under construction

Committed Project

I-95 65 at Bowden Road Interchange Modification Complete Operations Improvement

I-95 71 at SR 202 J.T. Butler Boulevard

Interchange Modification Under construction

2035 Cost Feasible Plan #22

I-95 3041 Emerson Street (Overland Bridge)

Fuller Warren Bridge

Bridge Replacement Under construction

Operations Improvement

I-95 13 at I-295 North Phase 1 Interchange Modifications Complete 2035 Cost Feasible Plan #21

Max Leggett Parkway 35 I-95 Owens Road Widen to 4 Lanes Complete Privately Funded Max Leggett Parkway 3040 Owens Road SR 5 US 1 New 4 Lane Under

Construction Privately Funded

SR 104 Dunn Avenue 3011 Garden Boulevard Walgreens Intersection Improvement Complete Operations Improvement

SR 200 37 I-95 CR 107 Widen to 6 Lanes Under Construction

2035 Cost Feasible Plan #9

SR 202 J. T. Butler Boulevard 3007 Hodges Boulevard Intersection Improvement Complete Operations Improvement

SR 21 Blanding Boulevard 33 SR 23 Branan Field Road

Old Jennings Road Widen to 4 Lanes Complete Locally Funded

SR 21 Blanding Boulevard 3050 Old Jennings Road Knight Boxx Road Widen to 6 Lanes Complete Locally Funded SR 23 First Coast Expressway 3006 Old Jennings Road Oakleaf Plantation

Parkway Build Frontage Roads Complete Committed Project

SR 23 First Coast Expressway 36 SR 21 Blanding Boulevard

I-10 New Limited Access Toll Road

Under construction

Committed Project

SR 9B 4 I-95 US 1 SR 5 Philips Highway

New Limited Access Roadway

Under construction

2035 Cost Feasible Plan #11

SR 9B 126 US 1 SR 5 Philips Highway

I-295 New Limited Access Roadway

Complete Committed Project

US 17 Park Avenue 3020 Wells Road I-295 Add Lanes and Reconstruct Complete Operations Improvement

4

Page 7: 2040 LRTP Tech Memo #7: Existing Plus Committed Projects

Path Forward 2040 Long Range Transportation Plan

Table 1. Major Projects Under Construction or Completed Since the 2035 Plan Was Adopted Facility ID From To Improvement Phase 2035 Cost Feasible

Plan Status 1 US 301 SR 200 23 Baldwin Bypass

South of Baldwin Baldwin Bypass North of Baldwin

New 4 Lane Road Under construction

2035 Cost Feasible Plan #12

US 301 SR 200 301 North of Baldwin Callahan Widen to 4 Lanes Under construction

2035 Cost Feasible Plan #13

Note: All Cost Feasible Plan project number references are as shown in the plan summary brochure.

5

Page 8: 2040 LRTP Tech Memo #7: Existing Plus Committed Projects

Path Forward 2040 Long Range Transportation Plan

Table 2. Major Projects with Construction Funds Committed Facility ID From To Improvement County Fund Source Phase Fiscal Year Amount

Chester Road 973 SR 200 SR A1A Green Pine Road Add Lanes and Reconstruct Nassau FDOT CST 2018 $10.30 CR 216 504 SR 100 US 17 Widen to 4 Lanes Putnam FDOT CST 2016 $0.78 CR 220 Doctors Inlet Road 50 CR 209 Russell Road Knight Boxx Road Widen to 4 Lanes Clay FDOT CST 2015 $0.81 CR 739 Henley Road/ Russell Road 51 CR 218 CR 220 Doctors Inlet Road Widen to 4 Lanes Clay Clay CST 2018 $0.00 Crawford Road 42 CR 121 Old Alabama Trail Road Reconstruction Nassau FDOT CST 2015 $0.29 Crawford Road 43 Old Alabama Trail US 301 SR 200 Road Reconstruction Nassau FDOT CST 2015 $3.38 Florida East Coast Railway 3021 RAILEX Rail Capacity Project Duval FDOT CAP 2015 $1.14 Fort Gates Ferry Road 502 SR 19 Mount Royal Ave Road Reconstruction Putnam FDOT CST 2015 $2.25 Girvin Road 44 SR 10 Atlantic Boulevard Ashley Melisse Widen to 5 Lanes Duval Duval LOGT CST 2018 $5.74 Girvin Road 45 Ashley Melisse Wonderwood Drive Widen to 3 Lanes Duval Duval LOGT CST 2018 $7.36 Holloway Road 3003 SR 100 Tinsley Road New Road Construction Putnam FDOT CST 2015 $1.26 I-10 at I-95 27 US 17 Roosevelt Boulevard San Marco Avenue Interchange Improvement Duval FDOT DSB 2016 $118.77 I-10 3045 SR 23 First Coast Expressway US 90 Interchange Improvement Duval FDOT CST 2018 $48.10 I-295 5 SR 9B SR 202 J.T. Butler Boulevard Add 4 Express Lanes Duval FDOT CST 2015 $103.35 I-295 3016 SR 134 103rd Street Firestone Road Interchange Improvement Duval FDOT CST 2017 $6.90 I-95 13 at I-295/SR 9A North Phase 2 Interchange Ramp (New) Duval FDOT DSB 2017 $165.02 I-95 64 at SR 102 Airport Road Interchange Improvement Duval FDOT CST 2018 $6.60 I-95 66 at Old St. Augustine Road Interchange Improvement Duval FDOT CST 2018 $0.90 Kolas Ferry Road 3018 Murrhee Road Kings Ferry Road Road Reconstruction Nassau FDOT CST 2017 $3.64 Lake Susan Road 55 Alachua County Line CR 21 Widen to 4 Lanes Putnam FDOT CST 2017 $1.91 Old St Augustine Road 53 Greenland Road / Loretto Road I-295 Widen to 6 Lanes Duval Duval LOGT CST 2018 $0.60 Parramore Road Extension 970 Youngerman Circle Collins Road New 2 Lane Road Duval Duval LOGT CST 2018 $5.00 Pecan Park Road 3019 SR 243 JIA North Access Road I-95 Widen to 4 Lanes Duval FDOT CST 2016 $11.83 Radio Avenue 40 US 17 Minor Road New Road Construction Nassau FDOT CST 2016 $0.24 SR 10 Atlantic Boulevard 105 SR 115 Arlington Expressway Monument Road Intersection Improvement Duval FDOT CST 2017 $6.84 SR 10 US 90 Beaver Street 3004 CR 121 Brandy Branch Road Add Right Turn Lane(s) Duval FDOT CST 2018 $0.40 SR 10 US 90 Beaver Street 3005 CR 119 Otis Road Add Right Turn Lane(s) Duval FDOT CST 2018 $0.19 SR 109 University Boulevard 3012 Bartram Drive Cesery Boulevard Intersection Improvement Duval FDOT CST 2019 $3.77 SR 115 Southside Boulevard 3014 Deercreek Club Road Intersection Improvement Duval FDOT CST 2017 $0.52 SR 134 103rd Street 3015 at Firestone Road Intersection Improvement Duval FDOT CST 2017 $2.20 SR 152 Baymeadows Road 3017 Freedom Commerce Parkway Country Day School Drive Intersection Improvement Duval FDOT CST 2018 $6.72 SR 20 422 Alachua County Line SW 56th Avenue Add Lanes and Reconstruct Putnam FDOT CST 2019 $54.35 SR 200 SR A1A 38 Still Quarters Road Rubin Lane Add Lanes and Reconstruct Nassau FDOT CST 2016 $0.65 SR 200 SR A1A 39 Rubin Lane CR 107 Scott Road Add Lanes and Reconstruct Nassau FDOT CST 2018 $32.54 SR 202 J. T . Butler Boulevard 966 SR 115 Southside Boulevard Interchange Improvement Duval FDOT CST 2018 $1.83 SR 21 Blanding Boulevard 32 CR 218 Black Creek Add Lanes and Reconstruct Clay FDOT CST 2019 $9.23 SR 21 Blanding Boulevard 33 Branan Field Road Old Jennings Road Add Lanes and Reconstruct Clay FDOT CST 2017 $15.28 SR 21 Blanding Boulevard 34 CR 220 Long Bay Road Allie Murray Road Add Lanes and Reconstruct Clay FDOT CST 2019 $19.77 SR 212 Beach Boulevard 3008 F.O.P. Way Ryar Road Intersection Improvement Duval FDOT CST 2018 $5.41 SR 23 First Coast Expressway 18 Argyle Forest Boulevard I-10 New 4-Lane Road Construction Clay/Duval FDOT DSB 2015 $12.61 SR 23 First Coast Expressway 17 Clay County Line Argyle Forest Boulevar Widen to 6 Lane Limited Access Toll Road Clay/Duval FDOT DSB 2015 $7.21 SR 243 JIA North Access Road 6 SR 102 Airport Road Pecan Park Road New Road Construction Duval FDOT CST 2018 $17.20 SR 9B 126 US 1 Philips Highway I-95 New Road Construction Duval FDOT DSB 2015 $95.43 SR 9B 3002 CR 2209 Duval County Line New Road Construction St. Johns FDOT CST 2015 $111.37

6

Page 9: 2040 LRTP Tech Memo #7: Existing Plus Committed Projects

Path Forward 2040 Long Range Transportation Plan

Table 2. Major Projects with Construction Funds Committed Facility ID From To Improvement County Fund Source Phase Fiscal Year Amount

SR 9B 126 South of SR 9A I-95 New Road Construction Duval FDOT DSB 2015 $0.05 US 17 SR 15 54 Horse Landing Road Boundary Road in San Mateo Widen to 4 Lanes Putnam FDOT CST 2015 $17.65 US 301 SR 200 23 South of Baldwin North of Baldwin New 4 Lane Roadway - Baldwin Bypass Duval FDOT CST 2017 $37.18

Table 3. Major Bicycle, Pedestrian and Transit Projects with Construction Funding Committed County Facility From To Improvement Phase Fund Source First Year Amount Clay CR 218 Mimosa Avenue SR 21 Blanding Boulevard Bike Path Trail CST FDOT 2015 $0.74 Pine Avenue Old Flemming Grove Road Raggedy Point Road Sidewalk CST FDOT 2017 $1.30 Duval FEC Railway RAILEX Rail Capacity CAP 2 FDOT 2015 $1.14 North First Coast Flyer Downtown Jacksonville (Duval County) 3 I-295 Bus Rapid Transit CAP Jacksonville Transportation Authority 2016 $33.50 Sherry Drive Atlantic Beach Elementary Sidewalk CST FDOT 2019 $0.45 Southeast First Coast Flyer 4 Downtown Jacksonville (Duval County) Avenues Mall Bus Rapid Transit CAP Jacksonville Transportation Authority 2016 $23.80 SR 10 Atlantic Boulevard Intracoastal Waterway Bridge Sidewalk CST FDOT 2017 $1.20 SR 115 Arlington Expressway Service Roads Sidewalk CST FDOT 2017 $0.30 Timuquan Trail Kingsley Connector Bike Path Trail CST FDOT 2016 $2.00 Nassau Bailey and Simmons Road Sports Complex Fletcher Avenue Sidewalk CST FDOT 2018 $1.30 Putnam Main Street Junction Road End of Existing Trail Bike Path Trail CST FDOT 2016 $0.77 St. Johns Avenue Sports Complex SR 19 Bike Path Trail CST FDOT 2019 $0.75 St. Johns River Sea Loop Trail Bike Path Trail CST FDOT 2019 $0.95 SR 13 Holley Berry Lane Roberts Road Sidewalk CST FDOT 2014 $0.15 SR 207 Armstrong Trail Heads Bike Path Trail CST FDOT 2015 $0.32 Hastings Trail Heads Bike Path Trail CST FDOT 2015 $0.37 Grand Total $69.04

2 CAP represents capital improvements. 3 2035 Cost Feasible Plan Project #B 4 2035 Cost Feasible Plan Project #D

7

Page 10: 2040 LRTP Tech Memo #7: Existing Plus Committed Projects

Path Forward 2040 Long Range Transportation Plan

This page is intentionally left blank.

8