33

3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …
Vilas
Text Box
3D MODEL
Vilas
Text Box
PROJECT - COURTYARD MARRIOTT PROJECT LOCATION- 313 RIVERSIDE AVE. SANTA CRUZ, CA 95060
Vilas
Pen
Page 2: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

G.3

H

4

A A

H

4

G.3

G.3

H

4

G.3

H

4

TRUE NORTH PROJECT NORTH

1)FOR SECTION A-A, B-B REFER DWG NO. E1007 AND SECTION C-C REFER DWG E10082)FOR SECTION D & E. AND DETAIL 1 & 2 REFER DWG NO. E1015

NOTES:1. FIELD VERIFY ALL CONDITIONS, DIMENSIONS & ELEVATIONS.2. APPROVER TO VERIFY ALL CLOUDED PORTION

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1006

STAIR-1 PLAN

1193

PARKING LEVEL PLAN AT EL.+0'-4"STAIR-1

B B

1ST MID LANDINGAT EL.+4'-734/

PAR

KIN

G L

EVEL

PAL

N

AT E

L.+0

'-4"

UP

UP

ST2004

ST2003

WR2002ST2001

ST2002

LN2003EL.+ 4'-414/

16'-738/

43'

-10

22'-7

7@11=6'-5

8'-89'-3

1 8/

7'-8

CLE

AR

GR2001

C C2'-1012/

C2002

HSS3X3X

1 4/

GR2012

(312/ CONC. WITH METAL DECK)

4'-11

D D

D

D

4'-3

1 8/

DET. 1GR

2010

5'-1158/

1 4/

2'-6

1ST FLOOR PLAN AT EL.+9'-6"STAIR-1

PL2002

PL2003

PL2007

PL2004

8'-89'-3

1 8/

23'-022'-7

8@11=7'-4

3'-1

0

8'-0

D D

C C

B B

A A

OPEN TO BELOW

1ST

FLO

OR

PAL

N

AT E

L.+9

'-6

1ST MID LANDINGAT EL.+4'-734/

EDGE OF SLAB

DNUP

DN

LN2003EL.+ 4'-414/

ST2006

WR2002

ST2001

ST2002 ST2005

ST2003

ST2004

2'-1012/

4'-11

C2002

HSS3X3X

1 4/

(312/ CONC. WITH METAL DECK)

6

GR2012GR2008

GR2004

1'-0

4'-11

D

D

3'-1

04

1'-5

2'-1138/

6

9'-5

1 4/

GC TO VERIFY SLAB EDGE FROM GRID-4

2ND FLOOR PLAN AT EL.+22'-0"STAIR-1

8'-89'-3

1 8/

17'-038/

8'-0

3'-1

0

10@11=9'-2

18'-434/

GR2002

C C

B B

A A

PL2006ST2010

ST2009

ST2008

ST2005

3'-312/

4'-5

(312/ CONC. WITH METAL DECK)

GR2013

OPEN TO BELOW

2ND MID LANDINGAT EL.+15'-9"

LN2002EL.+ 15'-512/

C2003

HSS3X3X

1 4/

GR2007

GR2005

6

6

4'-5

E E

E

E

DN

WR2003

ST2006

4'-934/

DN

PL2007

PL2003

ST2007

3'-1

04

6

2'-1138/1'-438/

1 4/

5'-834/

1'-5

GC TO VERIFY SLAB EDGE FROM GRID-4

2ND FLOORAT EL.+22'-0"

UP

PL2001

EDGE OF SLAB

3RD FLOOR PLAN AT EL.+31'-8"STAIR-1

8'-0

8'-8

8@11=7'-4

9'-3

1 8/

18'-434/

17'-038/

E E

C C

B B

A A

GR2003

ST2012

ST2010

WR2001

3'-312/

6'-3

C2003

HSS3X3X

1 4/

OPEN TO BELOW

3RD MID LANDINGAT EL.+26'-10"

LN2001EL.+ 26'-612/

(312/ CONC. WITH METAL DECK)

1'-5

GR2006

GR2009

6

5'-4

E

E ST2009

DN

4'-934/

GC TO VERIFY WOOD BEAM SIZE & LOCATION

PL2005

PL2008

ST2011

PSL_3-12/ X11-78/WOOD BEAM

DN 3'-1

0

3'-714/

1'-438/

DET. 2

GR2011

3RD FLOORAT EL.+31'-8"

COURTYARD MARRIOTT

Page 3: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

4 4

NOTES:1. FIELD VERIFY ALL CONDITIONS, DIMENSIONS & ELEVATIONS.2. APPROVER TO VERIFY ALL CLOUDED PORTION

1)FOR SECTION MARK A/B. REFER DWG NO. E10062)FOR DETAILS REFER DWG NO. E1015

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1007

3'-678/

11'-3

3'-0 1'-0

5'-834/

4'-5 10@11=9'-2

9'-5

6'-3

JOIST

34/ " PLYWOOD

WR2003

PL2002

WR2002

ST2001

ST2006

A - A

4'-1

014/

7@11=6'-54'-11

3'-0 1'-0

12

7716/

12

7116/

7- TR2002 TR2001

LN2003

TR2009

10- TR2008

LN2002

TR2009

TR2007

8@61

2/ =4'

-33 4/

1'-4

CMU WALL

TYPDET. 3

11@

613 16/

=6'-3

STUD WALL

3'-0

3'-0

TYP

2'-6

DET. 4

3'-0

TYP

3'-02'-0

3'-0

1'-0

5'-4 8@11=7'-4

4'-1

0

TR2009

TR2002

TR2013

WR2001

PL2001

ST2009

9@67

16/=4

'-10

LN2001

3'-0

TYP

12

7

3'-0

2'-0

TYPDET. 5

3'-6

PSL_3-12/ X11-78/

GR2011

11

STUD WALL

SLAB

BASEMENT LANDING

EL.+4

BASEMENT LEVEL

1ST MID LANDING

1ST FLOOR

2ND MID LANDING

EL.+9'-6

EL.+4'-734/

EL.-1'-0

EL.+15'-9

10

SLAB2ND FLOOR

3RD MID LANDING

3RD FLOOR EL.+31'-8

EL.+22'-0

EL.+26'-10

11'-3

12

7716/

3'-6

3'-0

4'-5 10@11=9'-2

10'-4

9'-5

11@

613 16/

=6'-3

STUD WALL

JOIST

34/ " PLYWOOD

B - B

7@11=6'-5

3'-8

1 16/

12

7116/

3'-0

8@11=7'-45'-4

10@11=9'-2

9@61

2/ =4'

-101

4/

TR2010

10- TR2008

ST2003

7- TR2002ST2002

4'-11

8@61

2/ =4'

-33 4/

1'-4

CMU WALL

LN2003

TR2004

TR2009

4'-5

11@

613 16/

=6'-3

STUD WALL

GR2004

TR2009LN2002 ST2005

3'-6

3'-0

GR2001

TR2001

12

7716/

3'-6

3'-0

GR2002

8- TR2005

TR2007

PL2007

TR200612

7116/

3'-6

3'-0 12

7

8@11=7'-4

8@11=7'-46'-3

9@67

16/=4

'-10

8- TR2002ST2010

5'-4

9@67

16/=4

'-10

GR2005

TR2014

TR2009

LN2001

3'-6

3'-0

12

7

4'-934/

5'-834/GR2003

TR2013

10- TR2011ST2007

PL2007TR2012

3'-6

3'-0

4'-934/

8- TR2005ST2011 TYP

DET. 6TR2015

11

SLAB

EL.-1'-0

EL.+4

EL.+4'-734/

EL.+9'-6

EL.+15'-9

BASEMENT LEVEL

BASEMENT LANDING

1ST MID LANDING

1ST FLOOR

2ND MID LANDING

10

SLAB EL.+22'-0

EL.+26'-10

EL.+31'-8

2ND FLOOR

3RD MID LANDING

3RD FLOOR

STAIR-1 SECTIONS A-A & B-B

Page 4: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

4

NOTES:1. FIELD VERIFY ALL CONDITIONS, DIMENSIONS & ELEVATIONS.2. APPROVER TO VERIFY ALL CLOUDED PORTION

1)FOR SECTION MARK C- C REFER DWG NO. E10062)FOR DETAILS REFER DWG NO. E1015

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1008

1'-4

GR2008

C - C

11

3'-0

6'-3 8@11=7'-4

10@11=9'-2

5'-4

9@67

16/=4

'-10

(4) 34/ X 0'-4 12/KB-TZ BOLTTYP

C2001HSS3X3X14/

DET. 6 JOIST

TR2010

LN2003

TR2015PL2005

TR2006

8- TR2005

6'-3

2'-1012/

512/

3'-6

3'-0

9@61

2/ =4'

-101

4/4'

-33 4/

14/TYP

C2002HSS3X3X14/

GR2012

CMU WALL

STUD WALL

3'-6

4'-5

4'-1

011

@61

3 16/=6

'-3 GR2013

C2003HSS3X3X14/

11

3'-03'

-6

3'-312/

10'-4

10'-4

STUD WALL

SLAB

SLAB

PL2003

8- TR2005ST2012

TR2014

2'-134/

8@11=7'-4

12

7116/

GR2010ST2004

PL2003

TR2004

3'-6

11

3'-0 3'

-6

TYPDET. 5

1'-234/

3'-0 3'

-6

4'-934/

12

7

GR2007

TR2012

12

7716/

ST2008

10- TR2011

11

10

512/

EL.-1'-0

EL.+4

EL.+4'-734/

EL.+9'-6

BASEMENT LEVEL

BASEMENT LANDING

1ST MID LANDING

1ST FLOOR

EL.+15'-9

EL.+22'-0

EL.+26'-10

2ND MID LANDING

2ND FLOOR

3RD MID LANDING

4'-934/

EL.+31'-83RD FLOOR

34/ " THK. PLYWOOD

GR20061'-234/

3'-0 3'

-6

STAIR-1 SECTIONS C - C

Page 5: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

11

G.3

HC C

B B

A A

G.3

H

11

G.3

H

11

G.3

H

11

G.3

H

11

1)FOR SECTION A/B/C. REFER DWG NO. E10102)FOR SECTION D & E. AND DETAIL 1,2 REFER DWG NO. E1015

NOTES:1. FIELD VERIFY ALL CONDITIONS, DIMENSIONS & ELEVATIONS.2. APPROVER TO VERIFY ALL CLOUDED PORTION

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1009

UPPER PARKING LEVEL PLANSTAIR-2

(312/ CONC.WITH METAL DECK)

D D

1ST MID LANDINGAT EL +4'-9"

GR100812/

9'-412/

5'-458/

18'-10

4'-0

3'-63'

-10

11

11

10'-658/5'-8

8'-0

9'-0

9'-3

1 8/

(2) 12/ X 0'-3 12/KB-TZ BOLT

(2) 12/ X 0'-3 12/KB-TZ BOLT

GR1009

CLEAR OPENING

LN1001EL.+ 4'-512/

ST1001

ST1002

WR1003

GR1012

4'-9

4'-3

1 8/1 4/

DET. 1

BASEMENT LEVELAT EL -1'-0"

1 4/

CMU WALL

TRUE NORTH PROJECT NORTH

8'-338/

D

D

DET. 1LN1004EL.+ 4'-512/

ST1008

ST1007

UPGR1002

GR1001 GT1001

3'-1

0

3'-012/

934/

4'-0

C1002

HSS3X3X

1 4/

1'-0

6 4'-5

8'-338/9@11=8'-3 4'-11

D

D

UP

1ST FLOOR PLAN AT EL.+ 9'-6"STAIR-2

D D

C C

B B

A A

5'-6 8@11=7'-4

8'-0

3'-1

0

10'-658/

5'-6

8'-4

9'-0

9'-3

1 8/

PL1001 ST1004 GR1012ST1002

PL1004

PL1003

1ST FLOOR LEVELAT EL -9'-6"

43'

-10

41 4/

STUD WALL

PL1002

6'-0

1'-7LN1004

ST1007

ST1008

GR1001

GR1002

DN

3'-012/

C1002

HSS3X3X

1 4/

(312/ CONC.WITH METAL DECK)

1ST MID LANDINGAT EL +4'-9"

6

4'-118'-538/

D

D

LN1001EL.+ 4'-512/

WR1003

ST1003 ST1001

DNUP

GR1014

2ND FLOOR PLAN AT EL.+22'-0"STAIR-2

E E

C C

B B

A A

4'-0

65'-6 10@11=9'-2

19'-0

6'-5

8'-4

9'-0

9'-3

1 8/

10'-658/

3'-1

0

PL1008GR1003ST1004ST1010

43'

-10

4

PL1009

PL1008

2ND FLOOR LEVELAT EL -22'-0"

PSL_3-12/ X11-78/WOOD BEAM

4'-1014/

1 4/

PL1010

(312/ CONC.WITH METAL DECK)

2ND MID LANDINGAT EL +15'-9"

ST1005

ST1006

GR1013

GR1004

DN

3'-212/

1'-0

4'-0

64'-4

C1003

HSS3X3X

1 4/

6 3'-104'-4

8'-538/

E

E

LN1002EL.+ 15'-512/

WR1002

ST1003

UP DN

ST1011

3RD FLOOR PLANAT EL.+31'-8"STAIR-2

E E

C C

B B

A A

6

5'-6 8@11=7'-4

6'-510'-658/

19'-0

8'-4

9'-0

9'-3

1 8/

3'-1

0

4'-0

PL1007PL1006

PL1008

ST1010GR1005

ST1009

3RD FLOOR LEVELAT EL -31'-8"

PSL_3-12/ X11-78/WOOD BEAM

43'

-10

4

4'-1014/

1 4/

PL1010

3'-212/1'-5

6'-2

4'-0C10

04HSS3X

3X1 4/ GR1015

(312/ CONC.WITH METAL DECK)

3RD MID LANDINGAT EL +26'-10"

ST1012 GR1006

GR1016

ST1014

DN

5'-3

8'-538/

E

E

WR1001

LN1003EL.+ 26'-612/

ST1011ST1011

UP DN

4TH FLOOR PLAN AT EL.+ 41'-4"STAIR-2

8'-4

9'-0

A A

B B

C C4TH FLOOR LEVELAT EL -41'-4"

9'-3

1 8/

4'-3

1 8/

4'-978/

1 4/3'

-10

43'

-10

1'-0

8'-538/

19'-0

6'-2

4'-0

5'-3

E

E

LN1003EL.+ 36'-212/

GR1011

PSL_3-12/ X11-78/WOOD BEAM

DN

DN

4TH MID LANDINGAT EL +36'-6"

8@11=7'-45'-6

6 1'-5PL1008

ST1013

ST1014

GR1010

ST1009GR1005

1 2/67

8/ 1'-6

1014/

43'

-10

1'-0

PL1005

112/

11GR1007

4'-1014/

112/

6

1 2/

10'-658/

DET. 2

TYP

WR1001

ST1011

(312/ CONC.WITH METAL DECK)

E E

4'-0

STAIR-2 PLAN

Page 6: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

1111 11

1)FOR SECTION MARK A/B/C. REFER DWG NO. E10092)FOR DETAILS REFER DWG NO. E1015

NOTES:1. FIELD VERIFY ALL CONDITIONS, DIMENSIONS & ELEVATIONS.2. APPROVER TO VERIFY ALL CLOUDED PORTION

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1010

6'-3

LN1003

TR10028- TR1011

PSL_3-12/ X11-78/WOOD BEAM

TR1015

LN1002

10- TR1009

TR1002

8- TR1011

PSL_3-12/ X11-78/WOOD BEAM

PSL_3-12/ X11-78/WOOD BEAM

A - A

3

1'-1

3'-0

TYP

10@11=9'-2

9@11=8'-3 4'-11

3'-0

TYP

4'-9

12

7716/

(4) 34/ X 0'-5 12/KB-TZ BOLT

WR1002

LN1001

TR1013

9- TR1007

TR1004

TR1006

3'-0

11

5'-8

10@

678/ =

5'-9 CMU WALL

DET. 4

(2) 34/ X 0'-4 12/KB-TZ BOLTTYP

L3X3X14/

ST1001

WR1003

43

11

3'-0

5'-6

11@

613 16/

=6'-3

STUD WALL

TYP

PL1002

JOIST

ST1003

12

712/

3'-01'-0

CMU WALL

TYPDET. 3

EL.-1'-0BASEMENT LEVEL

EL.+4'-91ST MID LANDING

3'-01'-0

4'-4

STUD WALL

EL.+9'-61ST FLOOR

EL.+15'-92ND MID LANDING

8@11=7'-4

10'-658/19'-0

6'-5

3'-0

TYP

11

3'-0

8@11=7'-4

4'-1

09@

6716/

=4'-1

04'

-10

TR1015

TR1015

LN1003

6'-5

PL1010

PL1010PLYWOOD

PLYWOOD

JOIST

ST1011

ST1011

9@67

16/=4

'-10

11

3'-0

3'-0

TYP

4'-1014/

3'-6

PLYWOOD

JOIST

1'-0

12

7

3'-0

5'-3

12

7

EL.+22'-02ND FLOOR

EL.+26'-10

EL.+31'-83RD FLOOR

3RD MID LANDING

WR1001

8'-538/

1'-0

5'-3

3'-0

EL.+36'-6

EL.+41'-4

4TH MID LANDING

4TH FLOOR

WR1001

10@11=9'-25'-6

TR1002

B - B

1'-1 3'-6 234/

9@11=8'-3

10@11=9'-2

5'-6 8@11=7'-4

11@

613 16/

=6'-3

9@65

16/=4

'-9

GR1003

TR1016

LN1001TR1013

3'-6

TYP

3'-6

3'-0

TYP

5'-8

10@

678/ =

5'-9

PL1004

TR1006

ST1007

8- TR1008

GR1012

GR1009

3'-0

12615 16/

5'-6

3'-9

3 4/

TR1014

10- TR1010

TR1004

11@

613 16/

=6'-3

JOIST

3'-0

12

7716/ST1005

3'-6

9

3'-0 3'

-6

12

712/

4'-11

DET. 7

1ST MID LANDING

BASEMENT LEVEL

EL.-1'-0

EL.+4'-9

ST10029- TR1007

3'-0

4'-4

3'-8

3 16/

TR1003

TR1015LN1002

ST1004

GR1013

GR1001

12

7716/

10- TR1009

1ST FLOOR EL.+9'-6

2ND MID LANDING

EL.+15'-9

10'-658/

9@67

16/=4

'-10 5'-3

8@11=7'-4

8@11=7'-4

9@11=8'-3

3'-6

6'-5 8@11=7'-4

9@67

16/=4

'-10

9@67

16/=4

'-10

19'-0

8- TR1011LN1003TR1015

6'-5

5'-6

3'-6

12

7

PL1009

PL1006

8- TR1012

TR1014

TR1002

9@67

16/=4

'-10

PLYWOOD

PLYWOOD JOIST

3'-0

GR1005

3'-0

ST1012

5'-6

3'-03'

-6

3'-0

TYP 3'-6

TYP

PL1005JOIST

PLYWOOD

GR1005

ST1013

GR1010

TR1014

8- TR1012

12

7

6'-2

3'-0 3'

-6

TR1001

ST1010

12

7

8- TR1011LN1003

TR1015

12

7

GR1006

ST1009

3RD MID LANDING

2ND FLOOR EL.+22'-0

EL.+26'-10

3RD FLOOR EL.+31'-8

8'-538/5'-3

3'-0 3'

-6

4TH MID LANDING

4TH FLOOR

EL.+36'-6

EL.+41'-4

TR1001

112/TYP

5'-9

(4) 34/ X 0'-4 12/KB-TZ BOLTTYP

LN1003

TR1001

LN1003

C - C

5'-6

6'-2

9@65

16/=4

'-911

@61

3 16/=6

'-36'

-39@

6716/

=4'-1

04'

-10

9@67

16/=4

'-10

4'-1

0

GR1015

PL1008JOIST

ST10148- TR1012

TR1014

3'-0

4'-4

3'-0 3'

-6

6'-2

4'-5

3'-10

11

C1001HSS3X3X14/

GR1008

LN1002TR1003

11

8@11=7'-4

3'-6

ST1008

4'-9

GR1009

1'-634/

5'-6

3'-03'

-6

PL1003

TYPDET. 5

TR1016

12615 16/

TR10058- TR1008

LN1001

GR1002

1'-634/

5'-6

10@11=9'-2

3'-6

3'-0

3'-0

TYP 3'-6

TYP

PLYWOOD

ST1006

GR1004

10- TR1010TR1014PL1008

TYPDET. 6

JOIST

12

7716/

12

7

11

TR1001

3'-012/

14/TYP

C1002HSS3X3X14/

BASEMENT LEVEL

1ST MID LANDING

1ST FLOOR

EL.-1'-0

EL.+4'-9

EL.+9'-6

3'-0

C1003HSS3X3X14/

GR1014

2ND MID LANDING

2ND FLOOR

3RD MID LANDING

EL.+15'-9

EL.+22'-0

EL.+26'-10

5'-3

3'-0

8'-538/10'-658/

3RD FLOOR

4TH FLOOR

4TH MID LANDING

PLYWOOD

PLYWOOD

JOIST

EL.+31'-8

EL.+36'-6

EL.+41'-4

8- TR1012

ST1014TR1014

GR1016

9@11=8'-3

12

7

8@11=7'-4

11

GR1007

1'-634/

3'-03'

-6

1'-634/

3'-03'

-6

5'-6

PL1008

3'-6

TYP

3'-0

TYP

C1004HSS3X3X14/

STAIR-2 SECTION A/B/C

Page 7: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1011

STAIR-3 PLANS

COURTYARD MARRIOTT

1193

PARKING LEVEL PLAN AT EL.-1'-0"STAIR-3

A

B

6

1ST FLOORL PLAN AT EL.+9'-6"STAIR-3

6

B

A

2ND FLOORL PLAN AT EL.+22'-0"STAIR-3

6

B

A

3RD FLOORL PLAN AT EL.+31'-8"STAIR-3

A

B

6

4TH FLOORL PLAN AT EL.+41'-4"STAIR-3

6

B

A

PROJECT NORTHTRUE NORTH

1)FOR SECTION A/B/C. REFER DWG NO. E10122)FOR SECTION D & E. AND DETAIL 1 & 2 REFER DWG NO. E1015

NOTES:1. FIELD VERIFY ALL CONDITIONS, DIMENSIONS & ELEVATIONS.2. APPROVER TO VERIFY ALL CLOUDED PORTION

18'-7

4'-24'-2 4 4'-2

14'-0

7 16/

D D

A

A

B

B

C

C

LN3001EL.+ 5'-112/

5'-3

12/

14/ 14/

4'-6

9 16/

11 11

4'-4

4'-634/

DET. 1

UP

ST3002

ST3001

BASEMENT PLANAT EL.-1'-0"

GR3009

ST3016ST3015

GR3007

WR3004

UP

610

@11

=9'-2

4'-4 4'-48'-8 1'-534/

119 16/

(312/ CONC. WITH METAL DECK)

D

D

1ST MID LANDINGAT EL.+5'-5"

4'-2

4'-2

14'-0

7 16/

D D GT3001

A

A

B

B

C

C11" THK.CONC. SLAB

8'-1

16@

11=5

'-6

5'-3

4'-6

9 16/

GC TO VERIFY SLAB EDGE FROM GRID-B

1ST FLOORAT EL.+9'-6"

ST3013

ST3001ST3002

GR3007

WR3005

GR3001

ST3016

ST3015

B3001EL.+ 9'-378/

LN3001EL.+ 5'-112/

2716/

14/14/

11

8'-8

4'-2 4 4'-2

66

66

PL3010PL3008 PL3009

PL3007

UP

DN

DN

WR

3004

ST3003

8'-8 1'-534/

119 16/

(312/ CONC. WITH METAL DECK)

D

D

1ST MID LANDINGAT EL.+5'-5"

4'-7

14'-5

7 16/

4'-7

E E

A

A

B

B

C

C

7'-1

4'-6

9 16/5'-3

10@

11=9

'-2

2ND FLOORAT EL.+22'-0"

GR3004

WR3002

ST3014

ST3012

PL3006PL3005

PL3002PL3001

WOOD BEAMPSL_3-12/ X11-78/

LN3002EL.+ 15'-512/

GC TO VERIFYWOOD BEAM SIZE & LOCATION

6

14/14/

4'-2 4 4'-2

8'-8

6

ST3005

ST3004

ST3003

ST3013

WR3003

GR3006

UPUP

8'-8 1'-534/

6916/

E

E2ND MID LANDINGAT EL.+15'-9"

4'-7

4'-7

14'-5

7 16/

E E

C

C

B

B

A

A

7'-1

7'-1

8@11

=7'-4

4'-6

9 16/

GC TO VERIFYWOOD BEAM SIZE & LOCATION

3RD FLOORAT EL.+31'-8"

WR3001

ST3007ST3006

WR3001

GR3002

GR3008

ST3009

ST3011

ST3005

ST3004

PL3001

PL3006

PL3005PL3002

DN

UP

DN

WOOD BEAMPSL_3-12/ X11-78/

LN3002EL.+ 26'-612/

1'-011

8'-8

4'-218/ 378/ 4'-2

66

8'-8 1'-534/

6916/

E

E3RD MID LANDINGAT EL.+26'-10"

4'-7

14'-5

7 16/

4'-218/ 378/ 4'-2

4'-7

GC TO VERIFYWOOD BEAM SIZE & LOCATION

C

C

B

B

A

A

6'-4

7 8/

4'-6

9 16/

7'-1

1'-0

DET. 2

4TH FLOORAT EL.+41'-4"

WOOD BEAMPSL_3-12/ X11-78/

GR3010

ST3007ST3006

WR

3001

GR3005D

N

DN

GR3003

ST3010

WR3001

ST3008

LN3002EL.+ 36'-212/

2'-0

6

34/4'-7

1'-012/

111 8/

6 1'-0

8@11

=7'-4

11

6916/

8'-8 1'-534/4'-4 4'-4

E

E

E E

4TH MID LANDINGAT EL.+36'-6"

Page 8: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

A B

A B

A B

NOTES:1. FIELD VERIFY ALL CONDITIONS, DIMENSIONS & ELEVATIONS.2. APPROVER TO VERIFY ALL CLOUDED PORTION

1)FOR SECTION MARK A/B/C. REFER DWG NO. E10112)FOR DETAILS REFER DWG NO. E1015

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1012

STAIR-3 SECTIONS

COURTYARD MARRIOTT

1193

12

7 9@67

16/=4

'-10

3'-0

EL.+22'-034/ " PLYWOOD

A - A

3'-014/ 12

7716/

12

758/

1'-1

11@

613 16/

=6'-3

6'-3

4'-1

10@11=9'-2

3'-0

TYP

3'-0

TYP

3'-0

10@11=9'-2

GT3001 SLAB

1'-0

3'-0

4'-2

CMU WALL

TYP

DET. 7

DET. 3

1ST MID LANDING

BASEMENT LEVEL

EL.-1'-0

EL.+5'-5TR3007

10- TR3014

LN3001

1'-0

4'-7

3'-0

STUD WALL

2ND MID LANDING

1ST FLOOR EL.+9'-6

EL.+15'-9TR3009

10- TR3013

LN3002

11@

7=6'

-5

11

3'-0

5'-3

CMU WALL

PL3010

DET. 4 TR3001

ST3002

WR3004

5'-3

PL3001

TR3003

ST3003

JOIST

11

WR3003

TR3015

STUD WALL

12

7 9@67

16/=4

'-10

8@11=7'-4

3'-0

TYP

3'-0

TYP

8@11=7'-47'-1

LN3002

ST3007

1'-0

4'-7

3'-0

3RD FLOOR

3RD MID LANDING

2ND FLOOR

EL.+26'-10

EL.+31'-8

8- TR3012

8- TR3012

LN3002

TR3009

WR3001

ST3004

1'-0

3'-0

4'-7

4TH FLOOR

4TH MID LANDING

EL.+36'-6

EL.+41'-4

TR3009

WR3001

4'-1

0

7'-1

34/ " PLYWOOD

11

11

3'-0

PL3001

TR3005

JOIST3'

-6

6'-478/

JOIST34/ " PLYWOOD

GR3010

4'-1

0

3'-0

7'-1

5'-3

9@67

16/=4

'-10

EL.+22'-0 TR3010

2ND FLOOR 34/ " PLYWOOD

B - B

12

758/

12

758/

10@11=9'-2

10@11=9'-2

10@11=9'-2

4'-7 6@11=5'-6

8'-11

11@

613 16/

=6'-3

1'-1

6- TR3014

GR3006

TR3008

SLAB

4'-2

CMU WALL

EL.-1'-0

EL.+5'-5TR3002

TR3007

10- TR3014

ST3001

1ST MID LANDING

BASEMENT LEVEL

3'-0

3'-0

4'-7

4'-7

STUD WALL

EL.+15'-9

TR3009

TR30042ND MID LANDING

EL.+9'-61ST FLOOR

12

7716/10- TR3013

ST3013

GR3001

GR3004

3'-0

5'-3

7@7=

4'-1

11@

7=6'

-5CMU WALL

ST3015

B3001

GR3007

5'-3

STUD WALL

TR3015

PL3005

3'-0

12

7716/ 10- TR3013

ST3012

11@

613 16/

=6'-3

JOIST

12

7

12

7

8@11=7'-4

7'-18@11=7'-4

4'-7

8@11=7'-4

8@11=7'-4

TR3009

3'-0

4'-7

4'-7

GR3002

TR3006

TR30098- TR3012

ST3005

3RD FLOOR

3RD MID LANDING

EL.+26'-10

EL.+31'-8

12

7

12

7

8- TR3012ST3006

3'-6

TYP

3'-0

TYP

4'-7

EL.+41'-4 GR3003

TR3006 EL.+36'-6

4TH MID LANDING

4TH FLOOR

3'-0

7'-1

9@67

16/=4

'-10

8- TR3012

TR3005

TR3011

ST3009

34/ " PLYWOODJOIST

GR3008

3'-0

PL3005

9@67

16/=4

'-10

3'-6

3'-0

7'-1

TR301034/ " PLYWOOD

JOIST

8- TR3012

PL3004ST3008

GR3005 9@67

16/=4

'-10

3'-0

TYP

10@11=9'-2 5'-3

4'-71'-0

3'-0

4'-1

0

DET. 6

EL.+41'-4

EL.+36'-6

EL.+31'-8

EL.+26'-10

EL.+22'-0

EL.+15'-9

EL.+9'-6

EL.+5'-51ST MID LANDING

1ST FLOOR

2ND MID LANDING

4TH FLOOR

2ND FLOOR

3RD FLOOR

4TH MID LANDING

EL.-1'-0

TR3010

34/ " PLYWOOD

C - C

3'-0

TYP

4'-7 6@11=5'-6 4'-2 4'-9

12

7716/

1'-0

3'-0

6'-3

DET. 5

6- TR3014

WR3005TR3008 SLAB

3'-0

11

6'-5

7@7=

4'-1

LN3001

ST3016

TR3002

11

3'-011

@61

3 16/=6

'-3

LN3002TR3004

ST3014

12

758/

3'-6

4'-4

1'-1

PL3007B3001

GR3009

TYP

PL3006

10- TR3013

JOIST

3'-0

TYP

12

7

12

7

3'-0

8@11=7'-4 7'-1

4'-1

0

8@11=7'-4

3'-0

11

4'-7

9@67

16/=4

'-10

TR3006

WR3001

ST3011

LN3002

3'-0

9@67

16/=4

'-10

11

4'-7

LN3002

TR3006

WR3001

ST3010

PL3006

8- TR3012

WR3002

34/ " PLYWOODJOIST3'

-0TY

P

1'-0

DET. 6

TR3011

7'-1

DET. 6PL3006

34/ " PLYWOOD

8- TR3012

1'-0

3'-0

TR3010 JOIST

BASEMENT LEVEL

3RD MID LANDING

Page 9: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1013

STAIR-4 PLAN

COURTYARD MARRIOTT

1193

PARKING LEVEL PLAN AT EL.-1'-0"STAIR-4

C

D

8

1ST FLOORL PLAN AT EL.+9'-6"STAIR-4

D

C

8

2ND FLOORL PLAN AT EL.+22'-0"STAIR-4

8

C

D

3RD FLOORL PLAN AT EL.+31'-8"STAIR-4

C

D

8 8

4TH FLOORL PLAN AT EL.+41'-4"STAIR-4

C

D

ROOF LEVEL PLAN AT EL.+51'-0"STAIR-4

C

D

8

PROJECT NORTHTRUE NORTH

NOTES:1. FIELD VERIFY ALL CONDITIONS, DIMENSIONS & ELEVATIONS.2. APPROVER TO VERIFY ALL CLOUDED PORTION

1)FOR SECTION A/B/C REFER DWG NO. E10142)FOR SECTION D & E. AND DETAIL 1 & 2 REFER DWG NO. E1015

UP

UP

ST4009

ST4010 ST4001

ST4002

LN4001EL.+ 3'-1112/

WR4005

6'-5

12/4'-918/

3'-8

6

8'-10 1'-914/

3'-8

8@11

=7'-4

7'-4

18'-4

2'-1

011 16/

15'-0

5516/

14/14/

4'-2 6 4'-2

1'-0

(312/ CONC.WITH METAL DECK)

D D

D

D

DET. 1

C

C

B

B

A

A

BASEMENT PLANAT EL.-1'-0"

1ST MID LANDINGAT EL.+4'-3"

GR4008

GR4012

C

C

EDG

E O

F SL

AB

DN

UP

DN

ST4004ST4003

ST4009

ST4010

WR4005WR4005

ST4002ST4001

LN4001EL.+ 3'-1112/

6'-4

1116/

8'-10

15'-0

18'-9

14/4'-2 6

1'-4

7'-9

(312/ CONC.WITH METAL DECK)

D D

B

B

A

A1ST MID LANDINGAT EL.+4'-3"

PL4001PL4002

6

2'-1

011 16/

6

3'-8

8@11

=7'-4

105 16/

3'-8

6

D

D

GR4008

GR4004

1'-914/

14/4'-2

5'-1

1

GC TO VERIFYSLAB EDGE FROM GRID-C

1ST FLOORAT EL.+9'-6"

GC TO VERIFY WOOD BEAM SIZE & LOCATION

C

C

2'-4

7'-9

8'-10

18'-9

15'-0

4'-2

4'-2

11

B

B

A

A

2ND MID LANDINGAT EL.+15'-9"

PL4006PL4003

PL4008PL4004

WOOD BEAMPSL_3-12/ X11-78/

DN

UP

DN

ST4012

WR4004

ST4005ST4006

ST4011

WR4004

ST4004ST4003

LN4004EL.+ 15'-512/

2'-1

011 16/

6

3'-8

10@

11=9

'-2

(312/ CONC.WITH METAL DECK)

14/

105 16/

6

5'-1

1

63'

-8

4'-2E E

6

1'-0

E

E

GR4005

GR4007

14/

1'-914/

4 4'-4

2ND FLOORAT EL.+22'-0"

C

C

DN

UP

DN

LN4004

WOOD BEAMPSL_3-12/ X11-78/ST4014

ST4013

WR4002

ST4005ST4006

WR4003

ST4007

ST4008

PL4004 PL4008

PL4003 PL4006

8'-10

11

7'-9

18'-9

15'-0

7'-9

14/14/

4'-2 4 4'-4

B

B

A

A3RD MID LANDINGAT EL.+26'-10"

66

2'-1

011 16/

3'-8

8@11

=7'-4

(312/ CONC.WITH METAL DECK)

105 16/

1'-0 6

3'-8

6

GC TO VERIFY WOOD BEAM SIZE & LOCATION

E E

E

E

GR4003

GR4009

1'-914/

3RD FLOORAT EL.+31'-8"

C

C

PL4007PL4004

PL4005

PL4009

WR4001

ST4014

ST4013

UP

ST4016ST4015

ST4008

ST4007WR4001

LN4004EL.+ 36'-212/

WOOD BEAMPSL_3-12/ X11-78/

DN

DN

4'-2

4'-2 8 4'-0

7'-6

7'-9

15'-0

18'-9

14/14/

8'-10

B

B

A

A4TH MID LANDINGAT EL.+36'-6"

6

8@11

=7'-4

3'-8

2'-1

011 16/

6

(312/ CONC.WITH METAL DECK)

105 16/

4 4'-4

3

1'-0 6

3'-8

GC TO VERIFY WOOD BEAM SIZE & LOCATION

E E

E

E

GR4006GR4002

1'-914/

4TH FLOORAT EL.+41'-4"

C

C

6'-8

7 8/

34/

4'-1118/

111'

-0

4'-0

14/4'-07'

-5

15'-0

18'-9

8'-10

B

B

A

A

5THMID LANDINGAT EL.+46'-2"

GR4011PL4004PL4005

WR4001

ST4014

ST4016ST4015

WR

4001GR4010

WOOD BEAMPSL_3-12/ X11-78/

DN

DN

LN4002EL.+ 45'-1012/

66

4'-0

8@11

=7'-4

2'-1

011 16/

(312/ CONC.WITH METAL DECK)

105 16/

1'-0

10 4'-0 4'-0

6

GC TO VERIFY WOOD BEAM SIZE & LOCATION

E E

E

E

DET. 2

GR4001

ST4013

1'-914/

ROOF LEVELAT EL.+51'-0"

Page 10: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

C D D.1C D D.1

C D D.1

1)FOR SECTION MARK A/B/C. REFER DWG NO. E10132)FOR DETAILS REFER DWG NO. E1015

NOTES:1. FIELD VERIFY ALL CONDITIONS, DIMENSIONS & ELEVATIONS.2. APPROVER TO VERIFY ALL CLOUDED PORTION

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1014

STAIR-4 SECTIONS

COURTYARD MARRIOTT

1193

3'-0

TYP

3'-0

7'-9

8@11=7'-4

4'-1

0

TR4008 EL.+26'-10

A - A

3'-0

TYP

12

7716/11

3'-0

5'-1110@11=9'-2

8@11=7'-4

11@

613 16/

=6'-3

DET. 4

DET. 4

TR4016

ST4005

ST4004

1'-1

11

3'-0

7'-4

9@7=

5'-3

5'-3

CMU WALL

SLAB

TR4014

TR4012

1ST FLOOR

1ST MIDLANDING

BASEMENT LEVEL

EL.-1'-0

EL.+4'-3

EL.+9'-6

6'-3

STUD WALL

DET. 6 PL4006JOIST

34/ " PLYWOOD

WR4004

2ND FLOOR

2ND MIDLANDING

EL.+15'-9

EL.+22'-0

9@67

16/=4

'-10

11

3'-0

TYP

12

758/

1'-0 3'-0

3'-8

CMU WALLTYPDET. 3

TR4006

LN4001

8- TR4001

WR4005

ST4002

3'-0

3'-8

STUD WALL

8- TR4003

LN4004

LN4004

TR4006

10- TR4002

3'-0

TYP

1'-0

12

7

3'-0

TYP

12

7

11

3'-0

8@11=7'-4

8@11=7'-4

7'-5

9@67

16/=4

'-10

GR4011

TR4020

TR4018

EL.+41'-4

11

3'-0

7'-9

9@67

16/=4

'-10

34/ " PLYWOOD

JOIST

34/ " PLYWOOD

JOIST

4TH FLOOR

4TH MIDLANDING

3RD FLOOR

3RD MIDLANDING

EL.+31'-8

EL.+36'-6

4'-1

0

PL4006

PL4007

6'-878/

4'-1

0

JOIST

34/ " PLYWOODROOF LEVEL

5TH MIDLANDING

EL.+46'-2

EL.+51'-0

3'-0

TYP

12

7

1'-0

1'-0

3'-0

3'-8

3'-8

LN4004

TR4009

8- TR4003

WR4001

ST4008

WR4003

1'-0

3'-0

4'-0

LN4002

TR4011

8- TR4005

WR4001

ST4016

3'-6

3'-0

9@67

16/=4

'-10

3'-8

GR4009

EL.+26'-10

B - B

12

7716/

3'-6

3'-0

10@11=9'-2

8@11=7'-4

8@11=7'-4

8@11=7'-4

11@

613 16/

=6'-3

5'-11 10@11=9'-2

10- TR4002

ST40098- TR4001

TR4012

GR4008

7'-9

7'-4

TR4014

TR4007

PL4002

EL.-1'-0

EL.+4'-3

EL.+9'-6

BASEMENT LEVEL

1ST MIDLANDING

1ST FLOOR

9@7=

5'-3

9@7=

5'-3

3'-6

3'-0

5'-1111

@61

3 16/=6

'-3

7'-9

TR4016

PL4003 ST4011

34/ " PLYWOOD

JOIST

EL.+15'-92ND MIDLANDING

9@67

16/=4

'-10

EL.+22'-02ND FLOOR

GR4007

3'-6

3'-0

TR4021

3'-6

3'-0

3'-8

3'-8

12

758/

GR4004

TR4013

TR4006

ST4001

8- TR4001

12

758/

3'-6

3'-8

3'-8

TR4008

TR4015

TR400610- TR4002

ST4003

12

7716/

3'-0

12

7

8- TR4003ST4006

GR4005

12

7

12

7

3'-6

3'-0

8@11=7'-4

8@11=7'-4

8@11=7'-4

8@11=7'-4

7'-5 8@11=7'-4

9@67

16/=4

'-10

8- TR4004

8- TR4004

GR4006

ST4013

EL.+41'-4

3'-6

3'-0

7'-9

7'-9

7'-9

9@67

16/=4

'-10

34/ " PLYWOOD

JOIST

34/ " PLYWOOD

JOIST

EL.+31'-8

3RD MIDLANDING

3RD FLOOR

9@67

16/=4

'-10

EL.+36'-64TH MIDLANDING

4TH FLOOR

PL4003

TR4018

TR4021

PL4005

TR4020

TR4022 ST4013

7'-5

TR4010

34/ " PLYWOOD

JOIST

EL.+46'-2

EL.+51'-0

5TH MIDLANDING

ROOF LEVEL

9@67

16/=4

'-10

8- TR4005

PL4005

ST4013

3'-6

3'-0

3'-6

3'-8

3'-8

3'-8

TR4017

TR40098- TR4003

TR4017

12

7

ST4007

12

7

GR4003

3'-0

GR4002

3'-6

4'-0

4'-0TR4011

TR40193'-0

12

7

ST40158- TR4005

GR4001

4'-1

0

STUD WALL

TR4017

C - C

6'-3

10@11=9'-2

1'-0

7'-9 8@11=7'-4

3'-8

3'-0

DET. 7

DET. 5

TR4021

TR4007

10- TR4002

8- TR4001

WR4005

WR4004

GT4001

3'-6

6'-5

5'-3

9@7=

5'-3

CMU WALL

TYP

EL.-1'-0

EL.+4'-3

EL.+9'-6

PL4001

BASEMENT LEVEL

1ST MIDLANDING

1ST FLOOR

11@

613 16/

=6'-3

5'-11

6'-714/

STUD WALL

PL4004

34/ " PLYWOOD

JOIST

2ND MIDLANDING

2ND FLOOR

EL.+15'-9

EL.+22'-0 3'-0 1'-0

TYPDET. 6

3'-0

TYP

12

758/ 11

3'-0

CMU WALL

LN4001

TR4013

ST4010

3'-0

TYP

3'-8

11

3'-012

7716/

LN4004

TR4015

LN4004

ST4012

3'-0

TYP

3'-0 1'-0

7'-9 8@11=7'-4

3'-8

7'-9 8@11=7'-4

1'-0

4'-1

0

8@11=7'-4

EL.+41'-4

TR4010

TR4022

TR4021

34/ " PLYWOOD

3'-0

4'-1

0

34/ " PLYWOOD

3RD MIDLANDING

3RD FLOOR

4TH MIDLANDING

9@67

16/=4

'-10

EL.+26'-10

EL.+31'-8

9@67

16/=4

'-10

EL.+36'-6

PL4004JOIST

PL4004JOIST

9@67

16/=4

'-10

7'-5

PL4004

34/ " PLYWOOD

JOIST

4TH FLOOR

5TH MIDLANDING

EL.+46'-2

EL.+51'-0ROOF LEVEL

3'-0 1'-0

11

3'-8

1112

7

12

7

ST4014

LN4004

8- TR4004

8- TR4004

ST4014

WR40023'-0

TYP

3'-0

3'-0

3'-0

TYP

11

3'-012

7

4'-0

TR4019

8- TR4005

ST4014

LN4002

WR4001

WR4001

Page 11: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

FOR SECTION MARK AND DETAIL MARK REFER DWG NO E1006 THRU E1014

NOTES:1. FIELD VERIFY ALL CONDITIONS, DIMENSIONS & ELEVATIONS.2. APPROVER TO VERIFY ALL CLOUDED PORTION

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1015

SECTION & DETAILS

COURTYARD MARRIOTT

1193

42'-6

3'-6

3'-0

3'-6

112/ EMBEDMENT

(2) 12/ X 0'-1 14/HILTI KWIK BOLT TZ

SPRING HINGE ON BACK SIDE

CLEAR OPENING

NOT AN EXIT

DETAIL 7

112/ EMBEDMENT

(2) 12/ X 0'-2 12/HILTI KWIK BOLT TZ

12/

9

GT1001

LACH

631

2/6

46

34/

12/ WALLHINGE

112/

311

2/

33

Z1Z1

14/ " THK. BENT PLATE

14/ " THK. PLATE

34/ " PLYWOOD SHEATHING

WOOD BEAMPSL_3-12/ X11-78/

FOR MARK SEE PLANMC12X10.6

(2) 34/ X 0'-1 12/A307

(2) 34/ X 0'-5A307

DETAIL 6

1'-1

34

CONCRETE SLAB

12/ " THK. BENT PLATE

HH

(4) 34/ X 0'-5 12/KB-TZ BOLT

(2) 34/ X 0'-1 34/A307

L3X3X316/

DETAIL 5

112/3

FOR MARK SEE PLANMC12X10.6

112/

3

312/

6

GC TO VERIFY

FOR MARK SEE PLAN

FOR MARK SEE PLAN

MC12X10.6

C8X11.5

DETAIL 3

112/ 3 112/

8

FOR MARK SEE PLAN

L3X3X14/ (2) 34/ X 0'-4 12/KB-TZ BOLT

MC12X10.6

DETAIL 4

6X BLOCKINGSTUD WALL

(1) 34/ X 0'-5 12/LAG SCREWSAT 8" O.C. TYPW/ 412/ EMBEDED

C8X11.5

E - E

CMU & CONCRETE WALL

C8X11.5

(1) 34/ X 0'-5 12/KB-TZ BOLTAT 16" O.C. MAX TYPW/ 412/ EMBEDED

D - D

7

112/

411

2/

FOR MARK SEE PLANFB12/ "X7

(4) 34/ X 0'-5 12/KB-TZ BOLT

H - H

1 4/

12/

4TH FLOOREL.+41'-434/ " PLYWOOD

STUD WALL

PSL_3-12/ X11-78/WOOD BEAM

FB34/ "X34/

(2) 12/ X 0'-4LAG_BOLT

G - G

111

4/21

2/21

4/

3112/ 112/

1 2/

G

G

PSL_3-12/ X11-78/WOOD BEAM

(2) 12/ X 0'-4LAG_BOLT

FB14/ "X3

DETAIL 2

1 4/

(2) 12/ X 0'-3 12/KB-TZ BOLT

FB34/ "X34/

F - F

3

6

112/

112/

114/ 312/ 114/

F F(2) 12/ X 0'-3 12/KB-TZ BOLT

FB14/ "X3

DETAIL 1

11TREAD

RIS

ER2

12GA TREAD

2" CONCRETE FILL

MC12X10.6STRINGER

TYPICAL TREAD DETAIL3

112/

4X MIN. BLOCKING

STUD WALL

(1) 38/ X 0'-3 14/LAG_BOLT

TYPICAL WALL RAIL TO STUD WALL CONNECTION DETAIL

3

112/CMU & CONCRETE WALL

(1) 38/ X 0'-3 14/HILTI KWIK BOLT TZ

TYPICAL WALL RAIL TO CMU WALL CONNECTION DETAIL

214/

Z1 - Z1

Page 12: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

D

D

C

C

B B

A A

C

D

D.1

54.2

54.2

54.2

DD.1

DD.1

TRUE NORTH PROJECT NORTH

1)FOR DETAILS REFER DWG NO. E1019

NOTES:1. FIELD VERIFY ALL CONDITIONS, DIMENSIONS & ELEVATIONS.2. APPROVER TO VERIFY ALL CLOUDED PORTION

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1018

STAIR-5 PLAN

COURTYARD MARRIOTT

1193

LEVEL 1 PLAN AT EL.+9'-6"STAIR-5

5'-1

1316/ 5'-0

15'-0

24'-10

2'-5

3 8/

5'-0

17@1'-0=17'-0TREADS

UP

B5001C8X11.5EL.+ 11'-534/

PL5001

LEVEL 2AT EL.+22'-0"

ST5002

2'-0

512/

1 4/PL5002

ST5001

6'-0

WR5001

UP

GR5001

B5001C8X11.5EL.+ 11'-534/

GR5002

ST5004

LEVEL 1 AT EL.+9'-6"

32'

-65 8/

3@1'

-0=3

'-0

14/

ST5003

(31/2 CONC.WITH METAL DECK)

C5001

MID LANDINGAT EL+11'-9 14/ ''

WR5002

3'-6

3'-0

512/ 334/

6'-0714/

512/ 17@1'-0=17'-0

2'-3

1 4/18

@61

3 16/=1

0'-2

3 4/

GR5001EL.+22'-0

A - A

17- TR5006

ST5002

PL5001TR5004

613 16/

12

4'-0

3 16/

LEVEL 1EL.+9'-6

TR5005

MID LANDINGEL.+11'-914/

LEVEL 2

1112/

6'-914/

3'-0

512/ 17@1'-0=17'-0

DET. 3

(1) 34/ X 0'-4 34/WEDGE_ANC

B - B

613 16/

12

2'-3

1 4/18

@61

3 16/=1

0'-2

3 4/

14/TYP TR5005

3'-0

TYP.

1'-03'-0

714/

DET. 1

PL5002

17- TR5006

TR5004

5'-9GC TO VERIFY STAIR SUPPORT POST SIZE

DET. 2

C5001HSS4X4X14/

C5002HSS4X4X14/

5'-1012/

(1) 14/ X 0'-3 14/LAG_BOLTTYP

WR5002

ST5001

LEVEL 1EL.+9'-6

LEVEL 2 EL.+22'-0

MID LANDINGEL.+11'-914/

613 16/

12

5'-03@1'-0=3'-0

DET. 4

3- TR5002ST5004

C - C

3'-1

1516/

4@61

3 16/=2

'-31 4/

3'-0

GR5002

TR5003 C5002

LEVEL 1EL.+9'-6

MID LANDINGEL.+11'-914/

4'-1012/ 112/

878/ 3@1'-0=3'-0 5'-0

B5001

WR5001

TR5001

D - D

613 16/

12

3'-0

TYP.

3'-0

4@61

3 16/=2

'-31 4/

1'-538/

ST5003

3- TR5002

TR5003

3'-0

B5001

C5001

BASEMENT LANDING

EL.+9'-6

MID LANDINGEL.+11'-914/

Page 13: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

GC TO VERIFY CONNECTION DETAIL

GC TO VERIFY CONNECTION DETAIL

NOTES:1. FIELD VERIFY ALL CONDITIONS, DIMENSIONS & ELEVATIONS.2. APPROVER TO VERIFY ALL CLOUDED PORTION

FOR SECTION & DETAIL MARKREFER DWG NO E1018

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1019

STAIR-5 SECTION

COURTYARD MARRIOTT

1193

14/

MC12X10.6

14/14/

TYP.

HSS4X4X14/

DETAIL 3

3 4/

HSS4X4X14/

BB

(2) 34/ X 0'-4 34/WEDGE_ANC

DETAIL 2

2R

ISER

1'-0TREAD

2'' CONCRETE FILL

MC12X10.6STRINGER

12GA TREAD

TYPICAL TREAD DETAIL

MC12X10.6

L3X3X14/

MC12X10.6 MC12X10.6

C

C

DETAIL 4

1'-0

34

3

112/

311

2/

AA FOR MARK SEE PLAN12/ '' THKBENT PLATE

14/14/

TYP.L3X3X316/

(4) 34/ X 0'-5 12/KB-TZ BOLT

(2) 34/ X 0'-1 12/A307

MC12X10.6

DETAIL 1

7

114/

323

4/

FOR MARK SEE PLANFB12/ "X7

(4) 34/ X 0'-5 12/KB-TZ BOLT

A - A

112/ 312/ 312/ 112/

22

1 4/

FB34/ "X4 HSS4X4X14/

B - B

716/ 114/

112/

212/

2

(1316/ "x1 116/ ") SLOTS2 - 34/ Ø x 0'-1 34/ A325N

L3X3X14/

FB14/ "X3 14/

C - C

Page 14: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

A

A

B B

F.9

G

G.3

H

87

D

D

1098

F.9GG.3H

8

GG.3H

TRUE NORTH PROJECT NORTH

NOTES:1. FIELD VERIFY ALL CONDITIONS, DIMENSIONS & ELEVATIONS.2. APPROVER TO VERIFY ALL CLOUDED PORTION

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1020

TERRACE STAIR & TERRACE RAMP RAILING PLAN

COURTYARD MARRIOTT

1193

30'-015'-0

3'-0

4'-0

4'-0

4'-0

1'-0

1 16/21

4/

4'-11

C C

TERRACE STAIR & TERRACE RAMP LOCATION PLAN

DN

SLOPE

SLO

PE

EL+2'-9 12/ "

6'-2

1 4/

1'-0

1'-0

1'-0

4'-912/

1'-0

1'-0 4'-912/

1'-8

5'-0

1'-0

6'-0

5'-0 10'-1

CURB SURFACE MOUNTE RAMP LIGHT.S.E.D

HR6008

WR60039'

-31 8/

4'-3 4'-912/

3

HR6007

5'-0

1'-0

UP

1:12

3'-6

4'-0

4'-0

3

3'-1

1

SLO

PE

HR6002

3114'

-0

5

3 4'-912/

1'-0

UP

1:12SLOPE

HR6003

HR6001

14@

1'-0

=14'

-0

3'-7

6'-0

2'-0

2'-0

3

WR6002WR6001

5'-0

2'-1

7 16/

1'-0 4'-3

3'-7

3'-7

3'-7

10'-8

1 2/

3

UP

1:12

HR6010

HR6009

7'-4 11'-7

1'-0

2'-0

2'-0

1'-0

1'-0

3 4'-0 4'-0 4'-0 2'-10

9'-1 6'-0

3

8'-2 1'-0

33

DN

LEVEL 1AT EL.+9'-6"

UP

HR6005

1:12

WR6004

SLOPE

SLOPE

3'-034/ 3'-1158/ 3'-1158/ 3'-1158/ 3'-1158/ 3214/ 3'-0

612/

1'-0

1'-0

6'-0 16'-412/ 6'-0

5'-0

15'-214/

4'-11

HR6015

HR6016

5'-0 5'-0

4'-11 4'-11 4'-11 4'-11

UP

L OF SPLICE

L OF SPLICE

1:12

C

C

HR6013

HR6012

5'-0 5'-0 5'-0 4'-0 1'-214/

3

1'-0

912/

4'-2

1 2/

5'-0 5'-0 5'-0

UPCL OF SPLICE 1:12

HR6014

HR6004

HR6011

HR6006

214/

1'-2

1 2/4'

-0

214/

5'-0

EL+9'-6

30'-0

35'-0

30'-0

C OF SPLICE

B - B

3'-0

8'-10WR6002

LEVEL 1

WR6001

12

1

HR6008HR6005

1'-0

HR6012HR6013

5'-0

12

1

10 TYP.

16'-412/

25'-1

30'-0

HR6004

HR6016HR6015

6'-0

3'-0

12

1

6'-0

10 TYP.

4

EL.+2'-934/

HR6006

DRILL & GROUT

9'-318/

A - A

2'-1112/ 13@1'-0=13'-0

534/

122'-0

2'-0TYP.

1'-0TYP.

3'-0

14@

534/ =

6'-8

1 2/

T.O. LANDING

WR6001PIPE112/ Ø O.D.

EL.+1'-734/

534/

534/

6'-214/ 3'-6 3'-0916/

10'-0 1'-0

678/

12

2'-0 3'-0

1 4/ 12

3'-0

1'-0

3'-0 LEVEL 1

WR6003PIPE112/ Ø O.D.

EL.+9'-6

10 TYP.

1'-0 3

3'-0

1'-334/ 4'-0 4'-0 4'-0 2'-812/

3'-0

12

1

HR6005PIPE112/ Ø O.D.

C - C

T.O. LANDINGEL.+8'-4

T.O. LANDINGEL.+7'-61516/

9'-318/ 6'-214/

1'-111516/ 3'-7 3'-7 3'-7 3'-7 6116/

3'-0

3'-0

12

1 HR6009PIPE112/ Ø O.D.

D - D

T.O. LANDINGEL.+6'-818/ T.O. LANDING

EL.+7'-61516/

Page 15: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1001

BALCONY RAILING - 3D VIEW

COURTYARD MARRIOTT

1193

E

F

F.9

GG.3

H

1

CD

D.1

8

7

6

5

4.2

4

3

A

B

2

12

11

10

9

BALCONY RAILING - 3D VIEW

BLR1001

BLR1001

BLR1002

BLR1002

BLR1001

BLR1002

BLR1001

BLR1001

BLR1001BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001BLR1002

BLR1002

BLR1001

BLR1002

SF262

SF262

BLR1001

BLR1001

SF261

BLR1001

BLR1001

SF263

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001 BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

BLR1001

Page 16: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1002

2nd FLOOR - BALCONY RAILING LOCATION PLAN

COURTYARD MARRIOTT

1193

A

B

C

D

D.1

E

F

F.9G

G.3

H

121110987654.24321

FOR BALCONY RAILING TYPICAL DETAIL REFER DWG E1005

8'-0 2'-10 8'-0 72'-634/ 8'-0 3'-012/ 8'-0

8'-0 14'-4

2'-91316/

8'-0

15'-0

30'-0

(2nd FLOOR PLAN AT EL.+ 22'-0")

BALCONY RAILING LOCATION PLAN

9'-3

1 8/6'

-21 4/

3'-6

27'-0

14'-6

28'-0

2'-0

15'-0

30'-0

24'-0 22'-0 30'-0 10'-8 24'-10 32'-6

BLR1001BLR1001

BLR1001

BLR1001

PROJECT NORTHTRUE NORTH

8'-0 3'-6

BLR1001

9'-1

1116/14'-0

BLR1001

8'-0

2'-1

08'

-08'

-8

8'-0

2'-1

18'

-012

'-715

16/

BLR1001

8'-0

2'-1

18'

-01'

-615

16/

BLR1001

BLR1001

30'-0 18'-6

BLR1001BLR1001BLR1001BLR1001

30'-0 30'-0 30'-0

Page 17: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1003

3rd FLOOR - BALCONY RAILING LOCATION PLAN

COURTYARD MARRIOTT

1193

2 3 4 4.2 5 6 7 8 9 10 11 12

H

G.3

GF.9

F

E

D.1

D

C

B

A

FOR BALCONY RAILING TYPICAL DETAIL REFER DWG E1005

30'-0

15'-0

BALCONY RAILING LOCATION PLAN (3rd FLOOR PLAN AT EL.+ 31'-8")

BLR1001BLR1001

8'-0

5'-1

0116/

14'-6

BLR1001

BLR1001

BLR1001

8'-0

2'-1

1

27'-0

3'-6

6'-2

1 4/9'

-31 8/

1'-5

1 16/

30'-0

15'-0

2'-0

28'-0

8'-0

2'-1

08'

-0

BLR1001

6'-6

8'-0 3'-0 8'-0

78'-02'-108'-0

22'-0 30'-0 10'-8 24'-10 32'-6

BLR1001BLR1001

12'-7

1516/8'-8

BLR1001

BLR1001

TRUE NORTH PROJECT NORTH

BLR1001

BLR1001

3'-68'-0

8'-0

2'-1

18'

-09'

-111

16/

8'-0

2'-1

08'

-014

'-0

BLR1001

1'-6

1516/

8'-0

2'-1

18'

-0

BLR1001

BLR1001

30'-0

BLR1001 BLR1001

8'-03'-012/8'-02'-634/

30'-0 30'-0

8'-0

2'-91316/

14'-48'-0

30'-0 18'-6

BLR1001BLR1001

Page 18: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1004

4th FLOOR - BALCONY RAILING LOCATION PLAN

COURTYARD MARRIOTT

1193

A

B

C

D

D.1

E

F

F.9G

G.3

H

121110987654.2432

FOR BALCONY RAILING TYPICAL DETAIL REFER DWG E1005

BALCONY RAILING LOCATION PLAN PROJECT NORTHTRUE NORTH

2'-91316/15'-0

30'-0

4th FLOOR PLAN AT EL.+ 41'-4

BLR1001

BLR1001

BLR1002

14'-6

28'-0

BLR1001

BLR1002

BLR1001

BLR1001

6'-0 6'-9

9'-3

1 8/6'

-21 4/

3'-6

27'-0

BLR1002

2'-0

15'-0

30'-0

6'-0

3'-7

1 4/

6'-0 1'-2

8'-0

2'-1

08'

-0

5'-1

0116/

8'-03'-08'-0

6'-6

BLR1001

32'-624'-1010'-830'-022'-0

14'-0

8'-0

2'-1

08'

-08'

-8

12'-7

1516/

BLR1002

BLR1002

BLR1001

BLR1001

BLR1001

6'-0

3'-6

1116/

BLR1001

BLR1001

8'-0 3'-6

6'-0 14'-46'-0 8'-9

9'-1

1116/

8'-0

2'-1

18'

-0

BLR1002

8'-0

2'-1

18'

-01'

-615

16/

30'-0

BLR1001 BLR1001 BLR1001 BLR1001

2'-634/ 8'-0 3'-012/ 8'-0

30'-030'-0

8'-0 8'-0 14'-4

18'-630'-0

Page 19: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLD : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX ELECTRODE

FINISH : AS NOTED

E1005

BALCONY RALING TYP DETAILS

COURTYARD MARRIOTT

1193

10'-4

1'-1

11'

-1

AA

3'-0

4TYP

8'-0

2'-4

5'-0

GC TO VERIFY TUBE THICKNESS

GC TO VERIFY TUBE THICKNESS

WIN

DO

W O

PEN

INGWINDOW OPENING

BLR1001 - TYPICAL DETAIL

EL.+41'-4

2nd FLOOR

3rd FLOOR

4th FLOOR

EL. +31'-8

EL. +22'-0

C

C

TYPROD58/

TS114/ X114/ X 18/

BLR1001TS114/ X114/ X 18/

8'-4

6'-0

GC TO VERIFY TUBE THICKNESS C

C

TS114/ X114/ X 18/

BLR1002TS114/ X114/ X 18/

BB

1'-1

11'

-1

3'-0

BLR1002 - TYPICAL DETAIL

4TYP

2'-4

5'-0

GC TO VERIFY TUBE THICKNESS

WIN

DO

W O

PEN

ING

WINDOW OPENING

EL.+41'-4

EL. +22'-0

EL. +31'-8

4th FLOOR

3rd FLOOR

2nd FLOOR

TYPROD58/

6'-0 1'-2

4'-2 4'-2

WINDOW OPENING

(2) 12/ X 0'-4 LAG_BOLTTS114/ X114/ X 18/

B - B

8

1'-28'-0

4'-0

WINDOW OPENING

TS114/ X114/ X 18/

A - A

1'-2

3'-2

8

1'-2

3'-2

TYP(2) 12/ X 0'-4 LAG_BOLT

4

8

3'-0

1'-1

1

TS114/ X114/ X 18/

ROD58/

TYP(2) 12/ X 0'-4 LAG_BOLT

TYP

GC TO VERIFY TUBE THICKNESS

2nd FLOOR

3rd FLOOR

4th FLOOR

EL. +31'-8

EL. +22'-0

EL.+41'-4

WOOD BLOCKINGTYP BEHIND ALL RAILING ANCHORS, S.S.D.

TS114/ X114/ X 18/

TS114/ X114/ X 18/

C - C

4

Page 20: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

LINE GRADE SCOPE QTY DESCRIPTION LENGTH MARK REMARK

GR10019'-6 5/8"PIPE1"1/2 Ø O.D.

1A53

GUARDRAIL1 GR1001

- SHOP PRIME

gr10031 PIPE1"1/2 Ø O.D.A53 1'-3 15/16"gr10041 PIPE1"1/2 Ø O.D.A53 0'-8 3/16"gr10181 PIPE1"1/2 Ø O.D.A53 1'-0 1/4"gr10261 PIPE1"1/2 Ø O.D.A53 0'-3"p10241 FB3/4"X3/4"A36 3'-4 7/16"p10252 FB3/4"X3/4"A36 3'-3 1/4"p10591 FB3/4"X3/4"A36 0'-5"p10601 FB3/4"X3/4"A36 0'-3 11/16"p10611 FB3/4"X3/4"A36 9'-6 7/16"p10621 FB3/4"X3/4"A36 0'-9 11/16"p10631 FB3/4"X3/4"A36 4'-11 11/16"p10831 FB3/4"X3/4"A36 0'-3 7/8"p10841 FB3/4"X3/4"A36 0'-5 1/2"p10861 FB3/4"X3/4"A36 0'-1 5/8"p10871 FB3/4"X3/4"A36 0'-4 3/4"p11081 FB3/4"X3/4"A36 4'-6 5/16"

p11281 FB3/4"X3/4"A36 0'-9 1/2"pt10084 FB1/2"X1/2"A36 2'-11 3/4"pt101127 FB1/2"X1/2"A36 3'-0 1/4"rd10032 ROD3/4"A36 0'-3 9/16"rd10061 ROD3/4"A36 0'-3 11/16"

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLT : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX

FINISH :

GR1001

GUARDRAILGR1001 -

MATERIALW SHAPES = A992TUBES = A500 (46 KSI)SHOP PREP PER SPECS

DATE:

SHOP PRIME

ONE - GUARDRAIL - GR1001

8

2'-2

1116/

2'-6

5 16/

10'-234/

4'-71316/

3'-6

3'-0

3'-6

278/

3'-0

6516/

312/

5

A

A

gr1026

p102

5

p102

5

GR1001

p1087

p1062

p102

4

p1128

p1108

p1060

p1063

p1061

pt10

08

pt10

08

3'-4

38/

312/

2

112/

gr1004

rd1003

pt10

08pt1008

2

38/4'-81516/

312/

12

615 16/

2'-234/

3'-6

TYP

3'-0

TYP

434/

91116/

14-p

t101

1

12-p

t101

1

316/TYP

TYP

TYP

pt10

11

gr1003

rd1003

rd1006

44

234/

4

10'-234/

p1059

gr1018

gr1003gr1004

gr1026

GR1001

p1084

734/10

3 4/

112/

p1061

214/

112/

614/

38/

3'-0

1 2/31

2/2

3'-6

3'-0

gr1018

pt10

08

p1084

p1083

p102

5

p1087

A - A

512/

3

578/

112/

234/

COURTYARD MARRIOTT

Page 21: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

LINE GRADE SCOPE QTY DESCRIPTION LENGTH MARK REMARK

GR10029'-6"PIPE1"1/2 Ø O.D.

1A53

GUARDRAIL1 GR1002

- SHOP PRIME

gr10151 PIPE1"1/2 Ø O.D.A53 1'-6 3/4"gr10211 PIPE1"1/2 Ø O.D.A53 0'-2"gr10231 PIPE1"1/2 Ø O.D.A53 0'-7 3/8"gr10241 PIPE1"1/2 Ø O.D.A53 0'-1 5/8"p10062 FB1/4"X1 1/2"A36 0'-1 1/2"p10242 FB3/4"X3/4"A36 3'-4 7/16"p10251 FB3/4"X3/4"A36 3'-3 1/4"p10271 FB3/4"X3/4"A36 3'-4"p10611 FB3/4"X3/4"A36 9'-6 7/16"p10631 FB3/4"X3/4"A36 4'-11 11/16"p10641 FB3/4"X3/4"A36 3'-6 1/16"p10691 FB3/4"X3/4"A36 1'-3 9/16"p10701 FB3/4"X3/4"A36 0'-4 13/16"p10711 FB3/4"X3/4"A36 0'-9 11/16"p10782 FB3/4"X3/4"A36 0'-4 5/8"p11051 FB3/4"X3/4"A36 0'-11 7/8"

p11181 FB3/4"X3/4"A36 0'-9 7/16"p11281 FB3/4"X3/4"A36 0'-9 1/2"pt10087 FB1/2"X1/2"A36 2'-11 3/4"pt101127 FB1/2"X1/2"A36 3'-0 1/4"rd10031 ROD3/4"A36 0'-3 9/16"rd10042 ROD3/4"A36 0'-3 11/16"

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLT : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX

FINISH :

GR1002

GUARDRAILGR1002 -

MATERIALW SHAPES = A992TUBES = A500 (46 KSI)SHOP PREP PER SPECS

DATE:

SHOP PRIME

ONE - GUARDRAIL - GR1002

p1105

pt10

08

pt10

08

pt10

08

p1118

pt10

08

pt10

08

p102

4

p1064

p1128

p1063

p1061

p1070

3'-0

514/

1'-9

7 16/2'

-65 16/

3'-6

3'-0

312/

10'-7116/

4'-81516/

1'-3916/

4

3'-6

614/

1'-6916/

27-p

t101

1 316/TYP

TYP

TYP

GR1002

p102

7

p102

5

p1071

p1006

gr1024

rd1003

p1006

rd1004

gr1015

rd1004

p1069pt

1008

p1078

pt10

08

p102

4

3'-4

91316/3

312/

2

115 16/

12

615 16/

312/

4 258/

258/ 3

318/

234/

91116/

3'-6

TYP

3'-0

TYP

38/1'-818/3'-01316/

11

1014/

214/

112/

10'-7116/

p1078 gr1021

GR1002gr1015gr1023

p1069p1061

p1071p1006

738/

1 4/

COURTYARD MARRIOTT

Page 22: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

LINE GRADE SCOPE QTY DESCRIPTION LENGTH MARK REMARK

GR100311'-6 9/16"PIPE1"1/2 Ø O.D.

1A53

GUARDRAIL1 GR1003

- SHOP PRIME

gr10081 PIPE1"1/2 Ø O.D.A53 0'-10 11/16"gr10111 PIPE1"1/2 Ø O.D.A53 0'-3 1/2"gr10181 PIPE1"1/2 Ø O.D.A53 1'-0 1/4"p10181 FB3/4"X3/4"A36 3'-4 3/8"p10211 FB3/4"X3/4"A36 3'-4 3/8"p10231 FB3/4"X3/4"A36 3'-4 13/16"p10251 FB3/4"X3/4"A36 3'-3 1/4"p10351 FB3/4"X3/4"A36 0'-7 1/2"p10401 FB3/4"X3/4"A36 11'-3 5/16"p10412 FB3/4"X3/4"A36 3'-11 5/16"p10421 FB3/4"X3/4"A36 3'-3 13/16"p10831 FB3/4"X3/4"A36 0'-3 7/8"p10841 FB3/4"X3/4"A36 0'-5 1/2"p10851 FB3/4"X3/4"A36 0'-3 3/16"p10861 FB3/4"X3/4"A36 0'-1 5/8"p11271 FB3/4"X3/4"A36 0'-6 7/16"

pt100331 FB1/2"X1/2"A36 3'-0 1/8"pt10083 FB1/2"X1/2"A36 2'-11 3/4"rd10023 ROD3/4"A36 0'-3 11/16"rd10031 ROD3/4"A36 0'-3 9/16"

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLT : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX

FINISH :

GR1003

GUARDRAILGR1003 -

MATERIALW SHAPES = A992TUBES = A500 (46 KSI)SHOP PREP PER SPECS

DATE:

SHOP PRIME

ONE - GUARDRAIL - GR1003

734/

103 4/

3

214/

10'-812/

p1084

gr1018

rd1002 rd1002 rd1002 rd1003gr1008GR1003

p1040

214/

p1035

21316/

3'-9

3 4/

3'-0

613 16/

p1127

pt10

03

gr1008

gr1011

rd1003

rd1002

rd1002

rd1002

gr1018

p102

5

pt10

08

p1040

pt1008

GR1003

p102

3

p102

1

p1035

2

2'-1

1 8/2'

-11 8/

1'-7

9 16/3'

-6

712/

3'-0

21316/

10'-812/

3'-4916/

82-

pt10

03

2-pt

1003

2-pt

1003

2-pt

1003

11-p

t100

3

11-p

t100

3

316/TYP

TYP

TYP

pt10

08

p1041

p101

8

p1041

p1042

3'-0

TYP

3'-6

TYP

2 34/

21316/21316/

21316/21316/

312/

12

7716/

3'-4916/3'-4916/38/

312/

112/

38/

COURTYARD MARRIOTT

Page 23: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLT : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX

FINISH :

LN1001

LANDINGLN1001 -

MATERIALW SHAPES = A992TUBES = A500 (46 KSI)SHOP PREP PER SPECS

DATE:

SHOP PRIME

ONE - LANDING - LN1001

LINE GRADE SCOPE QTY DESCRIPTION LENGTH MARK REMARK

LN100113'-0"C8X11.5

1A36

LANDING1 LN1001

- SHOP PRIME

ch10011 C8X11.5A36 4'-5"ch10041 C8X11.5A36 13'-0"ch10112 C8X11.5A36 4'-4 9/16"ch10141 C8X11.5A36 4'-5"p11991 PL3/8"X2 1/16"A36 0'-7 5/8"

18 3/4"Ø KB-TZ BOLT BOLT 0'-5 1/2" FIELD BOLT-

6RD

1'-10 3'-2 4'-6 5'-10 7'-2 8'-6 9'-10 11'-2 12'-613'-0

4

44

44

4

B

B ch1004ch1001 ch1011 10 - 1316/ "Ø

ch1014

ch1011

A - A

1'-4 1'-4 1'-4 1'-4 1'-4 1'-4 1'-4 1'-4 6

41'

-31'

-31'

-34

13'-0

4'-5

4'-5

C C

p1199

14/14/

TYP

ch10

14

ch1011

A A

ch1001

0

TYP

ch1011

ch1004

LN1001

4'-0RD 7'-934/ 13'-0

1'-4

1 4/3 8/

71'

-01'

-01'

-010

6 1'-4

1'-31'-31'-34 4

44

4 - 1316/ "Ø

B - B

p1199

ch1011

14/14/

3 SIDE

C - C

COURTYARD MARRIOTT

Page 24: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLT : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX

FINISH :

LN1002

LANDINGLN1002 -

MATERIALW SHAPES = A992TUBES = A500 (46 KSI)SHOP PREP PER SPECS

DATE:

SHOP PRIME

ONE - LANDING - LN1002

LINE GRADE SCOPE QTY DESCRIPTION LENGTH MARK REMARK

LN10028'-0"C8X11.5

1A36

LANDING1 LN1002

- SHOP PRIME

ch10021 C8X11.5A36 3'-10"ch10061 C8X11.5A36 3'-10"ch10101 C8X11.5A36 3'-9 5/16"ch10121 C8X11.5A36 8'-0"p11991 PL3/8"X2 1/16"A36 0'-7 5/8"

18 3/4"Ø LAG_SCREWS BOLT 0'-5 1/2" FIELD BOLT-

4 8 8 8 8 8 8 8 8 8 8 8 4

EL15

'-51 2/

44

8'-0

p1199

A

A

6 - 1316/ "Ø6 - 1316/ "Ø LN1002ch1012

7516/

3 8/

4'-0RD 8'-0

3'-1

0

8'-0

3'-1

0

p1199

6 - 1316/ "Ø

6 - 1316/ "Ø6 - 1316/ "Ø

14/14/

TYP

0

TYP

ch1012

LN1002ch

1010

ch10

06

ch10

02

10101010

44

3 33'-10

ch1002

6 - 1316/ "ØA - A

COURTYARD MARRIOTT

Page 25: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLT : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX

FINISH :

LN1003

LANDINGLN1003 -

MATERIALW SHAPES = A992TUBES = A500 (46 KSI)SHOP PREP PER SPECS

DATE:

SHOP PRIME

2 - LANDINGS - LN1003

LINE GRADE SCOPE QTY DESCRIPTION LENGTH MARK REMARK

LN10038'-0"C8X11.5

2A36

LANDINGS2 LN1003

- SHOP PRIME

ch10072 C8X11.5A36 4'-9"ch10082 C8X11.5A36 4'-9"ch10092 C8X11.5A36 4'-8 9/16"ch10122 C8X11.5A36 8'-0"p11992 PL3/8"X2 1/16"A36 0'-7 5/8"

38 3/4"Ø LAG_SCREWS BOLT 0'-5 1/2" FIELD BOLT-

44

4RD

1'-0 1'-8 2'-4 3'-0 3'-8 4'-4 5'-0 5'-8 6'-4 7'-0 7'-88'-0

EL26

'-61 2/

8'-0

p1199

A

Ach1009

ch1012

LN1003

6 - 1316/ "Ø6 - 1316/ "Ø

8 8 8 8 8 4

412/

88

88

88

412/

4'-0RD 8'-0

8'-0

4'-9

B B

p1199

14/14/

TYP

6 - 1316/ "Ø6 - 1316/ "Ø

7 - 1316/ "Ø

0

TYP

ch1012

ch10

09

ch10

08

LN1003

ch10

07

1'-6

5 16/3 8/

4 8 8 8 8 8 8

412/ 8 8 8 8 8 8 412/

4'-9

44

ch10087 - 1316/ "Ø

A - A

p1199

ch1007

14/14/

3 SIDE

B - B

COURTYARD MARRIOTT

Page 26: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures REVISIONS

NO DESCRIPTION DATE

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLT : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX

FINISH :

LN1004

LANDINGLN1004 -

MATERIALW SHAPES = A992TUBES = A500 (46 KSI)SHOP PREP PER SPECS

DATE:

SHOP PRIME

ONE - LANDING - LN1004

LINE GRADE SCOPE QTY DESCRIPTION LENGTH MARK REMARK

LN10049'-3"C8X11.5

1A36

LANDING1 LN1004

- SHOP PRIME

ch10131 C8X11.5A36 4'-11 3/4"ch10171 C8X11.5A36 9'-3"ch10182 C8X11.5A36 4'-11 5/16"

11 3/4"Ø KB-TZ BOLT BOLT 0'-5 1/2" FIELD BOLT-

6RD

1'-10 3'-2 4'-6 5'-10 7'-2 8'-6 9'-3

44

44

9'-3

EL4'

-51 2/

7 - 1316/ "Ø

TYP

A

A

ch1017LN1004

578/

1'-4

1'-4

1'-4

578/

9'-3

3'-1RD 6'-2 9'-3

4'-1

134/

0

TYP

7 - 1316/ "Ø

4 - 1316/ "Ø

ch1017

LN1004

ch1018ch1018ch1013

R 1 4/2516/

2516/

14/

3 4/3 4/

2516/

14/

2516/

3 4/3 4/

4'-1134/

TYP

14/14/

TYPLN1004ch1017

ch1018

A - A

COURTYARD MARRIOTT

Page 27: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

LINE GRADE SCOPE QTY DESCRIPTION LENGTH MARK REMARK

ST100110'-5"MC12X10.6

1A36

STRINGER1 ST1001

- SHOP PRIME

a10011 L3X3X1/4A36 0'-6"a10129 L2X2X3/16A36 0'-10"a10131 L2X2X3/16A36 0'-4 1/8"p10111 FB1/4"X1 1/2"A36 0'-6 3/8"p10121 FB1/4"X1 1/2"A36 0'-5 1/2"st10211 MC12X10.6A36 0'-6 11/16"

2 3/4"Ø KB-TZ BOLT BOLT 0'-4 1/2" FIELD BOLT-

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLT : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX

FINISH :

ST1001

STRINGERST1001 -

MATERIALW SHAPES = A992TUBES = A500 (46 KSI)SHOP PREP PER SPECS

DATE:

SHOP PRIME

ONE - STRINGER - ST1001

418/ 214/

9'-214/

TYP

TYP

14/3 SIDES TYP

14/

14/

M

0

FULL PENETRATION TYP

316/TYP

TYPTYP

TYP

9- a1012

a1013

2 - 1316/ "ØGOL 112/ (N/S)

p1012

a1001p1011

st1021

ST1001

14/234/

9@11=8'-3 8 14/

61 16/9'-11

8'-10

7'-9

6'-8

5'-71 16/

4'-61 16/

3'-51 16/

2'-41 16/

1'-31 16/

RD

10'-5

6

8@1'-1=8'-77 8/

1'-31 8/

37 16/

61116/

3716/

638/

512/

3 12/

1

14/

614/ 3

EL-1

0EL

4'-1

1

2

512/

1'-0

12

712/

2

9@67

8/ =5'

-21 8/

878/

1'-0716/

138/ 10

9'-214/

112/

614/ 3a1001

ST1001

2 - 1316/ "Ø

COURTYARD MARRIOTT

Page 28: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

LINE GRADE SCOPE QTY DESCRIPTION LENGTH MARK REMARK

ST100210'-5"MC12X10.6

1A36

STRINGER1 ST1002

- SHOP PRIME

a10011 L3X3X1/4A36 0'-6"a10129 L2X2X3/16A36 0'-10"a10131 L2X2X3/16A36 0'-4 1/8"p10111 FB1/4"X1 1/2"A36 0'-6 3/8"p10121 FB1/4"X1 1/2"A36 0'-5 1/2"st10221 MC12X10.6A36 0'-6 11/16"

2 3/4"Ø KB-TZ BOLT BOLT 0'-4 1/2" FIELD BOLT-

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLT : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX

FINISH :

ST1002

STRINGERST1002 -

MATERIALW SHAPES = A992TUBES = A500 (46 KSI)SHOP PREP PER SPECS

DATE:

SHOP PRIME

ONE - STRINGER - ST1002

14/

14/3 SIDES TYP

14/

M

0

FULL PENETRATION TYP

316/ TYP

TYP

TYP

TYP

TYP

TYP

9- a1012

a1013

2 - 1316/ "ØGOL 112/ (F/S)

p1012

a1001

p1011

st1022

ST1002

61 16/9'-11

10'-5

6

8@1'-1=8'-77 8/

1'-31 8/

37 16/

3

658/

978/

12

712/

418/ 214/178/

1'-0

3 12/

1

2

638/

512/

2

138/ 10

614/

1'-0716/

14/234/

9@11=8'-3 8 14/

9@67

8/ =5'

-21 8/

878/

EL-1

'-0EL

4'-1

1

9'-214/

512/

8'-10

7'-9

6'-8

5'-71 16/

4'-61 16/

3'-51 16/

2'-41 16/

1'-31 16/

RD

9'-214/

112/

614/ 3a10012 - 1316/ "Ø ST1002

COURTYARD MARRIOTT

Page 29: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

LINE GRADE SCOPE QTY DESCRIPTION LENGTH MARK REMARK

ST100312'-0 7/8"MC12X10.6

1A36

STRINGER1 ST1003

- SHOP PRIME

a10061 L3X3X3/16A36 0'-5 11/16"a101210 L2X2X3/16A36 0'-10"a10131 L2X2X3/16A36 0'-4 1/8"p10121 FB1/4"X1 1/2"A36 0'-5 1/2"st10181 MC12X10.6A36 0'-6 11/16"

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLT : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX

FINISH :

ST1003

STRINGERST1003 -

MATERIALW SHAPES = A992TUBES = A500 (46 KSI)SHOP PREP PER SPECS

DATE:

SHOP PRIME

ONE - STRINGER - ST1003

10'-334/

ST1003

TYP

TYP

TYP

TYP

TYP

14/3 SIDES TYP

316/TYP

M

0

FULL PENETRATION TYP

14/

a1006

10- a1012

a1013

1 - (1"x1316/ ") SLOTS

p1012st1018

381

16/

1'-13 8/

1'-015 16/

138/ 10

2

1'-4

3 8/9@

613 16/

=5'-1

3 8/81

3 16/

EL8'

-87 16/

EL15

'-11

12'-07 8/

1'-15 16/

9@1'-015 16/ =9'-8

1 2/

1'-31 8/

37 16/

1'-0

418/ 214/

12

7716/

112/

512/

512/ 10@11=9'-2 8 14/

2

512/

3716/

61116/

3 12/

1

9'-109 16/

1'-015 16/

7'-811 16/

1'-015 16/

5'-613 16/

1'-015 16/

3'-415 16/

1'-015 16/

1'-31 16/

RD

10'-334/

st1018ST1003

COURTYARD MARRIOTT

Page 30: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

LINE GRADE SCOPE QTY DESCRIPTION LENGTH MARK REMARK

ST100412'-0 7/8"MC12X10.6

1A36

STRINGER1 ST1004

- SHOP PRIME

a10071 L3X3X3/16A36 0'-5 11/16"a101210 L2X2X3/16A36 0'-10"a10131 L2X2X3/16A36 0'-4 1/8"p10121 FB1/4"X1 1/2"A36 0'-5 1/2"st10191 MC12X10.6A36 0'-6 11/16"

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLT : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX

FINISH :

ST1004

STRINGERST1004 -

MATERIALW SHAPES = A992TUBES = A500 (46 KSI)SHOP PREP PER SPECS

DATE:

SHOP PRIME

ONE - STRINGER - ST1004

214/

512/

14/

M

0

FULL PENETRATION TYP

316/ TYP

14/3 SIDES TYP

TYP

TYP

TYP

TYP

TYP

10- a1012

a1013

a10071 - (1"x1316/ ") SLOTS

p1012

st1019

ST1004

EL8'

-87 16/

EL15

'-11

1'-4

3 8/9@

613 16/

=5'-1

3 8/81

3 16/

12'-07 8/

1'-15 16/

9@1'-015 16/ =9'-8

1 2/

1'-31 8/

61116/

512/

3716/

37 16/

12'-07 8/

1'-015 16/

9'-109 16/

8'-95 8/

7'-811 16/

6'-73 4/

5'-613 16/

4'-57 8/

3'-415 16/

2'-4

1'-31 16/

RD

138/ 10

12

7716/

418/

2

1'-0

3 12/

1

112/

381

16/

2

512/ 10@11=9'-2 8 14/

10'-334/

10'-334/st1019ST1004

COURTYARD MARRIOTT

Page 31: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

LINE GRADE SCOPE QTY DESCRIPTION LENGTH MARK REMARK

WR10019'-6 1/2"PIPE1"1/2 Ø O.D.

2A53

WALL RAILS2 WR1001

- SHOP PRIME

p10064 FB1/4"X1 1/2"A36 0'-1 1/2"w272 PIPE1"1/2 Ø O.D.A53 0'-1 5/8"w282 PIPE1"1/2 Ø O.D.A53 0'-2"w10012 PIPE1"1/2 Ø O.D.A53 1'-0 3/16"w10022 PIPE1"1/2 Ø O.D.A53 0'-2"wb10016 BOIA36

6 3/8"Ø LAG_BOLT BOLT 0'-3 1/4" FIELD BOLT-

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLT : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX

FINISH :

WR1001

WALL RAILWR1001 -

MATERIALW SHAPES = A992TUBES = A500 (46 KSI)SHOP PREP PER SPECS

DATE:

SHOP PRIME

2 - WALL RAILS - WR1001

6316/ 6

3'-0

TYP

3'-0

8'-6

6

4'-713 16/

4'-411 16/

6716/

7 8/

112/

1'-0

1'-0316/

7 16/

716/

9'-61 2/

7

12

3TYP

3'-0

11

9'-3

wb1001

(1) 38/ X 0'-3 14/LAG_BOLTTYP

w1001p1006

wb1001

wb1001

w27p1006

WR1001

9'-3

112/

214/

21 4/

21 4/

p1006p1006

WR1001w1001

w1002w28

COURTYARD MARRIOTT

Page 32: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

LINE GRADE SCOPE QTY DESCRIPTION LENGTH MARK REMARK

WR100211'-10 1/8"PIPE1"1/2 Ø O.D.

1A53

WALL RAIL1 WR1002

- SHOP PRIME

p10062 FB1/4"X1 1/2"A36 0'-1 1/2"w281 PIPE1"1/2 Ø O.D.A53 0'-2"w291 PIPE1"1/2 Ø O.D.A53 0'-1 5/8"w10011 PIPE1"1/2 Ø O.D.A53 1'-0 3/16"w10021 PIPE1"1/2 Ø O.D.A53 0'-2"wb10014 BOIA36

4 3/8"Ø LAG_BOLT BOLT 0'-3 1/4" FIELD BOLT-

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLT : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX

FINISH :

WR1002

WALL RAILWR1002 -

MATERIALW SHAPES = A992TUBES = A500 (46 KSI)SHOP PREP PER SPECS

DATE:

SHOP PRIME

ONE - WALL RAIL - WR1002

1'-0316/

6316/ 6

613 16/

1'-0

7716/

12

3'-0

TYP

3TYP

13 16/

112/

3'-0

11

10'-97 16/

7 16/

6

3'-105 16/

3'-105 16/

3'-77 16/

11'-101 8/

716/

3'-0

11'-1

wb1001

3- wb1001 (1) 38/ X 0'-3 14/LAG_BOLTTYP

w1001p1006

p1006w29

WR1002

214/

112/

11'-1

21 4/

21 4/

w28

w29

p1006w1002

p1006

WR1002w1001

COURTYARD MARRIOTT

Page 33: 3D MODELPROJECT - COURTYARD MARRIOTT PROJECT …

Tekl

a st

ruct

ures

REVISIONS

NO DESCRIPTION DATE

LINE GRADE SCOPE QTY DESCRIPTION LENGTH MARK REMARK

WR100310'-9 5/8"PIPE1"1/2 Ø O.D.

1A53

WALL RAIL1 WR1003

- SHOP PRIME

p10062 FB1/4"X1 1/2"A36 0'-1 1/2"w10011 PIPE1"1/2 Ø O.D.A53 1'-0 3/16"w10022 PIPE1"1/2 Ø O.D.A53 0'-2"w10061 PIPE1"1/2 Ø O.D.A53 0'-1 5/8"wb10014 BOIA36

4 3/8"Ø HILTI KWIK BOLT TZ BOLT 0'-3 1/4" FIELD BOLT-

ARCH

JOB

ITEM

CONTR

DWN : VHS

JOB NO.

DATE: CHK'D: VHS

DWG NO.

BOLT : 3/4" A325N UNO

HOLES : 13/16" UNO

WELD : E-70XX

FINISH :

WR1003

WALL RAILWR1003 -

MATERIALW SHAPES = A992TUBES = A500 (46 KSI)SHOP PREP PER SPECS

DATE:

SHOP PRIME

ONE - WALL RAIL - WR1003

9'-87 8/

3TYP 3'

-0TY

P

3'-63 16/

3'-63 16/10'-9

5 8/

10'-2

(1) 38/ X 0'-3 14/TAP_BOLTTYP

p1006

p1006w1006

WR1003

3- wb1001

678/

13 16/

112/

6

3'-0

11

6316/ 6

1'-0316/

712/

12

1'-0

3'-0

716/

7 16/

3'-35 16/

wb1001

w1001

214/

112/

10'-2

21 4/

21 4/

p1006

w1002

p1006

WR1003w1001

w1002

COURTYARD MARRIOTT