23
จัดทําโดย สถานกงสุลใหญ นครโฮจิมินห กันยายน 2557 1 BA RIA – VUNG TAU PROVINCE 1 Basic information 1.1 Geographical position 1 Ba Ria – Vung Tau (BR – VT) Province was established by a decision of the National Assembly dated 12/8/1991. The province lies in the Trans-Asia axis, having sea port, airport, and a convenient network of riverrain and maritime waterways. National Roads nos. 51, 55, 56 together with provincial and district roads are the main vessels linking BR - VT with other provinces and countries. - Area (km 2 ) 1,982 - Population (2011) 1,027,210 * Men/Women 513,410 (49.98%)/513,800 (50.01%) * Population of labor age (2010) 429,686 - Administrative units: Ba Ria city, Vung Tau city, 6 districts, - GDP growth in 2013 (estimated) 5.37 - GDP in 2012 (at current price) (bil. VND) Average GDP per capita (at current price, US$), (2010) 5,872 - Total accumlated FDI projects until December 2013 296 * Total registered capita (mil. US$) 27,107 1 http://www.dongnai.gov.vn/portaldn/en/Pages/glp-intro-tongquanvekinhtexahoi-glpstatic-10-glpdyn-0-glpsite- 1.html and Socio-economic Report of BR-VT, 2013 Dong Nai Province National Road (NR) no. 56 to Ho Chi Minh City: 110 km Dong Nai Province II 2 4 5 I 3 EAST SEA I Ba Ria City II Vung Tau City Districts 1 Long Dien 4 Xuyen Moc 2 Tan Thanh 5 Dat Do 3 Chau Duc 6 Con Dao Binh Thuan Province EAST SEA NR no. 55 to Binh Thuan Province 1 6

BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

  • Upload
    doannhi

  • View
    228

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

1

BA RIA – VUNG TAU PROVINCE 1 Basic information 1.1 Geographical position 1 Ba Ria – Vung Tau (BR – VT) Province was established by a decision of the National Assembly dated 12/8/1991. The province lies in the Trans-Asia axis, having sea port, airport, and a convenient network of riverrain and maritime waterways. National Roads nos. 51, 55, 56 together with provincial and district roads are the main vessels linking BR - VT with other provinces and countries. - Area (km2) 1,982 - Population (2011) 1,027,210 * Men/Women 513,410 (49.98%)/513,800 (50.01%) * Population of labor age (2010) 429,686 - Administrative units: Ba Ria city, Vung Tau city, 6 districts, - GDP growth in 2013 (estimated) 5.37 - GDP in 2012 (at current price) (bil. VND) Average GDP per capita (at current price, US$), (2010) 5,872 - Total accumlated FDI projects until December 2013 296 * Total registered capita (mil. US$) 27,107

1 http://www.dongnai.gov.vn/portaldn/en/Pages/glp-intro-tongquanvekinhtexahoi-glpstatic-10-glpdyn-0-glpsite-1.html and Socio-economic Report of BR-VT, 2013

Dong Nai Province

National Road (NR) no. 56 to Ho Chi Minh City: 110 km

Dong Nai Province

II

2 4

5

I

3

EAST SEA

I Ba Ria City II Vung Tau CityDistricts 1 Long Dien 4 Xuyen Moc 2 Tan Thanh 5 Dat Do 3 Chau Duc 6 Con Dao

Binh Thuan

Province

EAST SEA

NR no. 55 to Binh Thuan

Province

1

6

Page 2: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

2

- Export turnover (mil. US$, 2012) N/A (sea products, cashew nut rubber, enamelled tiles, cashew nut oil, imitation leather products, oil and gas, mechanic products, etc.) - Import turnover (mil. US$), (2012) 2,575 Ba Ria – Vung Tau is located in the Southern Key Economic Zone. The province shares its border with Dong Nai Province to the north: 116 km, Binh Thuan Province to the east: 29.26 km, Ho Chi Minh City (HCMC) to the west: 16.33 km, and the East Sea to the south – east: 305.4 km. The coast length is 305.4 km with over 100,000 km2 of continental shelf. Despite accounting only 0.6% and 1.2% in terms of area and population as of the whole country, BR – VT Province creates 11% GDP and nearly 27% of national budget revenue. 2 The provincial key economic activity is oil and gas production. The continental shelf of BR – VT waters is estimated to contain 1.5 billion tons of oil and 1,000 billion m3 of gas; thus the province has become the oil and gas centre of Vietnam and is home to gas-fuelled industries like electricity, liquefied petroleum gas, fertiliser, steel and construction materials. There are many large oil fields of commercial value such as Bach Ho (the largest in Vietnam), Rong, Dai Hung, Rang Dong. Consequently, oil export contributes an important part in the provincial GDP. BR-VT is the center of energy, heavy industry, tourism, and sea ports of the whole country. At present, Ba Ria - Vung Tau province has eight power plants with a combined capacity 4,224 MW and accounts for nearly 40 percent of the country’s electricity production. Phu My Power Center and Ba Ria Power Plant (4,000 MW on nearly 10,000 MW of the country). Heavy industries include production of nitrogenous urea fertilizer (800,000 tons/year), polyetylen (100,000 tons/year), steel. 3 The province’s deepwater seaport system with a designed capacity of 250 million tons a year is the national general port and an international gateway port capable of receiving vessels of 160,000 DWT. Goods exported from Thi Vai - Cai Mep Port are shipped directly to the United States, other countries and territories around the world without via transit ports. The deepwater seaport system creates advantages for BR – VT to develop commercial services, industry and import and export activities. 4 1.2 Population 5 Please see Annex 1: Population of BR – VT Province, 1995, 2000-2011, page 13. According to the Population Census on 1/4/2011, the population is 1,027,200 with a population density of 516 people/km². The numbers of urban and rural population are respectively 512,100 (accounting for 49.8% of provincial population) and 515,100 (50,2%.). The yearly increase of population is about 30,000, mainly emigrants from other provinces coming for settlement.

Year 1995 1999 2000 2005 2006 2007 2008 2009 2010 Population x 1,000

708.9 805.1 829.9 938.8 955.700 970.2 983.6 998.5 1,012

2 http://www.vietrade.gov.vn/vung-kinh-te-trong-diem-phia-nam/2452-ba-ria-vung-tau-tiem-nang-va-phat-trien-phan-1.html 3 http://www.baria-vungtau.gov.vn/web/guest/goi-thieu/-/brvt/extAssetPublisher/content/43526/tiem-nang-phat-trien 4 http://en.vietnamplus.vn/Home/Ba-Ria--Vung-Tau-strives-to-become-industrial-hub-port/20144/48354.vnplus 5 http://vi.wikipedia.org/wiki/B%C3%A0_R%E1%BB%8Ba_-_V%C5%A9ng_T%C3%A0u

Page 3: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

3

There are 28 ethnic minorities, comprising 972,095 Kinh (the dominant ethnic group in Vietnam) who scatter in all districts, town, and communes, and a small percentage of Chinese (10,040), Cho Ro (7,632), Khmer (2,878), Tay (1,352), Nung (993), Muong (693), Thai (230), and So Dang, Ha Nhi, Chu Ru, Co Lao (each has 1 inhabitant).

Year Population Laborer Ethnic group

Total Density Growth 1/4/2010 1,009,719 1.28 429,686 Viet (Kinh), Hoa, Cho Ro,

Khmer. 2011 1,027,000 516 1.28

According to data of the Vietnam General Statistics, there are 272,342 people confirming their belief until 1/4/2009.

Religion Believer Monk/Nun/Clergyman Worship establishment 1 Buddhism 290,000 32,255 334 2 Catholic 249,345 995 144 3 Caodaism 9,148 458 19 4 Tinh Do Cu si 5,049 15 8 5 Protestant 7,000 8 7 6 Buu Son Ky Huong 1,800 7 Other religions 43,334 Total 605,676

1.3 Administration There are two cities i.e. Ba Ria and Vung Tau and 6 districts: Tan Thanh, Chau Doc, Xuyen Moc, Dat Do, Long Dien, and Con Dao. Ba Ria is split from Vung Tau by a river crossed by Co May Bridge. This is the de jure seat of the province since most of the provincial administration agencies are located here. Ba Ria officially became the provincial capital of Ba Ria – Vung Tau from May 2, 2012, replacing that role of Vung Tau. Provincial People’s Committee: (since 2011) 6 + Chairman Mr. Tran Minh Sanh - Native village Long Tan Commune, Dat Do District, Ba Ria – Vung Tau Province - Date of birth 05/6/1956 - Education Bachelor of Economics - Current position Deputy Secretary of Provincial Party Committee Chairman of Provincial People’s Committee, Member of Provincial People’s Council - Party admission date 25/12/1977 Official admission date 20/8/1979 Service record - 1956 – 1973 Student of Dat Do High School - 1973 – 1975 Participating in the anti-American resistance in Long Dat District - 3/1975 - 8/1976 In charge of communication and culture of Long Tan Commune - 8/1976 – 1977 Secretary of the Ho Chi Minh Youth Union, Long Tan Commune

6 http://www.chinhphu.vn/portal/page/portal/chinhphu/cactinhvathanhpho/tinhbaria-vungtau

Page 4: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

4

- 1977 – 1980 Member of the Standing Committee of HCMC Youth Union, Long Dat District

- 1980 – 1981 Studying at the CPV School of Dong Nai Province - 1981 – 1984 Chairman of Long Tan Commune, Long Dat District - 1984 – 1987 Member of the District Party Committee – Head of the Agriculture

– Forestry Office of Long Dat District. - 1987 - 10/1991 Member of the District Party Committee – Vice Chairman of the

Long Dat District People’s Committee. - 10/1991 - 01/1994 Member of the Provincial Party Committee, Vice Director of the

Agriculture – Forestry Department cum Head of the Provincial Forest Management.

- 01/1994 - 9/1999 Member of the Provincial Party Committee, Director of the Agriculture – Forestry Department cum Head of the Provincial Forest Management

- 9/1999 - 01/2000 Secretary of the Tan Thanh District Part Committee - 01/2000 - 5/2004 Vice Chairman of the BR-VT People’s Committee - 5/2004 – present Chairman of the BR-VT People’s Committee. + Vice Chairman Mr. Ho Van Nien + Vice Chairman Mr. Tran Ngoc Thoi + Vice Chairman Mr. Le Thanh Dung 1.3.2 Provincial Party Committee + Secretary Mr. Nguyen Tuan Minh 2 Topography and climate 7 The provincial topography inclines gently towards the shore. Narrow deltas, mountains, hills, mounds, continental shelf characterize the provincial topography. However, there are some mountains at the coast, of which the highest is about 500m. The mainland (accounting for 96% of provincial area) belongs to the step of Di Linh plateau. There are 4 main zones: (i) islands, (ii) peninsula, (iii) mountainous and hilly semi-midland, (iv) valley and coastal deltas. The continental shelf covers an area of over 100,000 km2 The narrow Vung Tau peninsula stretches for 82.86 km, with an average elevation of 3-4 m. Islands comprise the Con Lon and Lon Son archipelago. The Con Son archipelago (accounting for 4% of provincial area) consists of 12 islands of various size, of which the largest Con Son, 180 kms from Vung Tau, has an area 57.5km2 The mountainous and hilly semi-midland is located in the north and northeast, mostly in districts of Tan Thanh, Chau Duc, and Xuyen Moc. The valley and coastal deltas comprise a part of districts of Tan Thanh, Long Đien, Ba Ria, and Dat Do where there are paddy fields alternating with low hills and coastal sand beaches. Mountains, hills, and low valleys cover 3/4 of the provincial area . There are 50 mountains having height over 100 m, creating many bays, peninsulas, and islands. Mountains with height from 400 to 500 m are Trinh, Chua, Thanh Gia.

7 http://www.baria-vungtau.gov.vn/web/guest/goi-thieu/-/brvt/extAssetPublisher/content/168573/dieu-kien-tu-nhien

Page 5: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

5

Climate Ba Ria – Vung Tau lies in the tropical monsoon region under ocean effects. The average temperature is about 27oC and its variation is slight throughout the year. Hours of sunlight vary from 2,370 to 2,850 and distribute regularly throughout the year. The average annual rainfall is about 1,600 mm and distributes irregularly, forming two distinct seasons: rainy season from May to November, accounting 90% of the annual rainfall, the remaining 10% concentrates in dry season and remaining months of the year. The weather is cool in general, suitable for tourism and favorable for long-term industrial plants such as pepper, cashew, rubber plant and a diversified forestry. 3 Resources 3.1 Land resources The natural area is 1,989 km2 or 198,900 ha, of which - Highly fertile soil, mainly alluvial and gray soil : 19.6% 38,984 ha - Good quality soil: 26.4% 52,510 ha - Average quality soil: 14.4% 28,642 ha - Remaining soil, saline and acidic soil, eroded soil: 39.6% 78,764 ha The soil category of significant importance for agriculture accounts for 60%, comprising alluvial, soil, gray soil, black soil, and red-yellow soil. Such advantage permits a strong agricultural development.

Plant 8 Rubber Coffee Cashew Pepper Fruit tree Area (ha) 19,150 12,000 12,360 2,400 7,800

3.2 Water resources The surface water of Ba Ria – Vung Tau is provided mainly by three big rivers, i.e. Thi Vai River, Dinh River, and Ray River with respective lengths of 25-km, 30 km, and 120 km crossing the province. Besides, the underground water is abundant, with a daily exploiting volume of 70,000m3/day-night, concentrating in three main areas, i.e. Ba Ria – Long Dien: 20,000 m3/day-night, Phu My – My Xuan: 25,000 m3/day-night, and Long Dat – Long Đien 15.000 m3/day-night. Other usable underground water of 10,000m3/day-night volume is scattered elsewhere in the province. The underground water exploitation is relatively easy because it is at a depth of 60-90m, having a flowing volume 10-20m3/second. The entire underground water can provide 500,000m3/day-night, ensuring sufficient water for agriculture, industry, and living. Ba Ria – Vung Tau Province has a coast of 305 km, of which 70 km can be used as bathing beach. Gianh Rai bay is about 50 km2, suitable for maritime port building. The continental shelf of over 100,000 km2 has about 661 species of fish, 35 species of shrimp, 23 species of squid, and thousand species of seaweed. The maritime reserve can be exploited at an amount of 150,000 – 170,000 tons a year. 9 Furthermore, there are about 13,559 ha of salt water and brackish area which can be developped to raise various kinds of aquatic products.

There are 20 ports in Ba Ria – Vung Tau, having a total capacity of 34 million tons/year, of which 11 in the Cai Mep – Thi Vai port cluster and 9 in Vung Tau. The Cai Mep – Thi Vai is a

8 http://sokhdt.baria-vungtau.gov.vn/News/497/Tiềm%20năng%20phát%20triển.html 9 http://www.vietrade.gov.vn/vung-kinh-te-trong-diem-phia-nam/2453-ba-ria-vung-tau-tiem-nang-va-phat-trien-phan-2.html

Page 6: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

6

seaport group situated at the river mouth of Thi Vai River and Cai Mep River. The area of Sao Mai – Ben Dinh at the mouth of two rivers, i.e. Dinh and Long Tau of Sai Gon Port, is suitable for deep water port construction to accommodate vessels of 80,000-100,000 tons. Ben Dam bay at Con Dao District (length: 4 km, average width: 1.6 km, depth: 6-18m) is only 60 km from the international maritime lines. It is quite convenient to build a port for intermediary transport of goods to other countries.

3.3 Mineral resources 10 + Oil and gas The most important resource of the 100,000km2-continetal shelf is oil and gas. Many oil fields with large commercial value have been exploited such as Bach Ho (White Tiger), Rong (Dragon), Dai Hung (Great Bear), Thanh Long (Blue Dragon), Rang Dong (The Dawn), etc. The reserve is about 300 million m3 of oil and the ratio of accompanied gas is 100 billion m3 of gas, accounting respectively for 93.29% and 16.2% of the whole country. The oil and gas distribute mainly at Cuu Long Basin and South Con Son Basin. The accompanied and natural gas with substantial reserve allows exploiting of 6 billion m3 per year. This is the gas supplying for the Ba Ria – Vung Tau Power Station, the Phu My Power Center, and a part of the Dinh Co Liquefied Gas Plant (LGP). Particularly, in the on Con Son hollow area, two natural oil fields named Lan Tay and Lan Do with gas reserve of 58 billion m3 were discovered.

Basin Cuu Long South Con Son White Tiger Dragon Oil reserve (mil. ton) 170 100 10 Gas reserve (bil. m3) 28-41 25-27 2

Oil and Gas fields

(exploitable reserve) Dai

Hung Thanh Long

Lan Tay Lan Do

Hong Ngoc and Rang Dong

Moc Tinh

Rong Bay

Oil reserve (mil. ton) 30-50 50-70 Gas reserve (bil. m3) 6-10 42 14 10

+ Construction stone, ashler facing stone, cement additive, glass sand, bentonite, clay, kaolin (china clay), construction sand, peat, immenit ore (titan), etc.

Mine Quantity Reserve Site Ashler facing stone 8 1,324 mil. m3 Mainly in Con Dao District Cement additive 6 44 mil. tons 2 districts of Long Dat, Xuyen Moc Glass sand 3 44 mil. tons 2 districts of Xuyen Moc and Tan Thanh

3.4 Forest resources Land suitable for afforestation is 38,850 ha, accounting for 19.5% of natural area, of which the forest area is 30,186 ha (natural forest: 15,993 ha, forested are: 14,253 ha). So, the remaining area of 8,664 ha has no forest. There are two primeval forests in BR-VT, i.e. Binh Chau – Phuoc Buu natural preservation area of 11,392 ha and the Con Dao national park of 5,998ha. The forest resource is declining because rich forest having reserve of 180m3/ha has disappeared. In the past, there were over 700 species of plants and over 200 species animals including many precious and rare species in the forest but they have almost been no more.

10 http://www.vietrade.gov.vn/vung-kinh-te-trong-diem-phia-nam/2453-ba-ria-vung-tau-tiem-nang-va-phat-trien-phan-2.html

Page 7: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

7

3.5 Tourism resources 11 BR – VT Province is a large tourist center. It has over 100km of seashore with beautiful swimming beaches, as well as many lakes and thermal springs. In Vung Tau City there are Thuy Van, Chi Linh, Back, Front, and Dau beaches; Long Dien District has Long Hai Beach; Xuyen Moc District has Ho Tram and Ho Coc beaches. In Con Dao Island, tourists are able to swim in Dam Trau, Hon Cau, and Hon Tre beaches, etc. then climb in Thanh Gia Mountain, Nho Mountain. Other interesting sites to improve tourists’ health are Binh Chau Hot Spring, the temperature of which comes up to 80oC and Binh Chau- Phuoc Buu Natural Preservation Zone. Other popular places are Communal House of Dao Ong Tran, Ben Da Church, Bach Dinh vestige, Long Phuoc Tunnels, Minh Dam Revolutionary Area, etc. and over one hundred Buddhist pagodas and temples such as Niet Ban Monastery, Thang Tam Communal House, Linh Son Pagoda, Dinh Co Temple. Located in the 90km southern part of Vung Tau, Con Dao Island has a dense forest, which is Con Dao National Park with rich flora and fauna. The sea in this area is home to various valuable marine species. Especially, tourists have a chance of watching the turtle laying the eggs. It also used to host a convict prison during French colonial era, and later, during the American War. Vung Tau is an important tourist destination, being particularly well known for its beaches, for its colonial-era architecture, and the Jesus Christ of Vung Tau, a large statue built by Vietnam's Catholic minority. It was completed in 1974, with the height of 32 m. and two outstretched arms spanning 18.4 m. It is among the tallest statues of Jesus Christ in Asia. Among the most famous tourist destinations are the existing very popular and crowded beaches of Vung Tau and Long Hai and the new up and coming destinations of Ho Tram and Ho Coc located further along the South China Sea coast.12 3.6 Human resources N/A 4 Education and health 4.1 Education Please see Annex 2: Health data 2005 – 2011, page 14. Until 30/9/2011 the province has 254 schools, including 144 primary schools, 79 lower secondary schools, 27 upper secondary schools, 4 high schools. Besides, there are 125 kindergartens. 4.2 Health care According to medical statistics in 2011 BRVT has 98 public health facilities including 10 hospitals, 6 provincial polyclinics, and 82 communal health stations. The number of hospital bed is 1,444, staffed by 478 doctors, 363 assistant physicians, 644 nurses and about 261 midwives.

11 http://www.vietnamtourism.com/e_pages/country/province.asp?mt=8464&uid=1197 12 http://en.wikipedia.org/wiki/B%C3%A0_R%E1%BB%8Ba%E2%80%93V%C5%A9ng_T%C3%A0u_Province

Page 8: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

8

5 Infrastructure 5.1 Transportation 13 On transport infrastructure connectivity, BR – VT has favourable traffic systems for international trade, it enjoys national highways linking to industrial zones, ports and tourism sites in the province. Apart from Ho Chi Minh City-based Tan Son Nhat International Airport in operation, the Long Thanh International Airport in Dong Nai Province, expected to go into operation in 2020, is only 30 km away from Cai Mep - Thi Vai port complex. Currently, according to the plan, key national transport projects will be invested and put into operation before 2020, including expressways and Bien Hoa - Vung Tau railway. + Roads 14 BR-VT has 3 main roads. NR no. 51 connects Vung Tau City with HCMC through Long Thanh District. NR no. 55 links Ba Ria City via Binh Thuan Province to Bao Loc City of Lam Dong Province. NR no. 56 was a provincial level road formerly, connecting Ba Ria City of BRVT Province to Long Khanh District of Dong Nai Province. A section of 50 km of NR no. 51A with 8 traffic lanes crosses the province. The provincial traffic network is relatively complete, connecting all districts and townlets.

National Road Provincial Road District-, Commune-level , and Rural Road

Road density as of natural area

Length (km) 119.84 363.46 2,090 1.257 km/km2

Currently 100% of road network in Vung Tau City was asphalted. The communication line Ha Long – Quang Trung – Tran Phu stretching along Bai Truoc Beach is the “beautiful road” of Vietnam, recognized by the Ministry of Transport. Communication linking regions and other urban areas have been planned for investment and enlargement, such as the 90-km section of NR No 51 (Vung Tau City – Bien Hoa City), new project of Bien Hoa- Vung Tau expressway connecting to North South Expressway, and Vung Tau – Bien Hoa – HCMC express railway linking the proposed North – South Express Railway. + Railways At present the railway is unavailable in BR-VT but according to 2015 Railway Plan, a section of express railway will be built. The double track of wide size (1.435 m) with designed speed of 300km/h will be built to connect HCMC and Vung Tau City. + Waterways Hydrofoil boats can transport passenger on the journey from HCMC to Vung Tau and vice versa. + Airways Vung Tau Heliport primarily provides helicopter service for petroleum exploration and production offshore of Vung Tau City. It is planned for relocating Vung Tau Heliport to suburban Go Gang area in the outskirts and converting it to an international airport with auxiliary services of petroleum industry. In the future Long Thanh International Airport will be built in

13 http://vi.wikipedia.org/wiki/B%C3%A0_R%E1%BB%8Ba_-_V%C5%A9ng_T%C3%A0u and http://en.vietnamplus.vn/Home/Ba-Ria--Vung-Tau-strives-to-become-industrial-hub-port/20144/48354.vnplus 14 http://vi.wikipedia.org/wiki/V%C5%A9ng_T%C3%A0u

Page 9: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

9

Dong Nai Province, located approximately 70 km from Vung Tau City and 20 km from the province’s boundary. 5.2 Electricity and water 15 + Elecricity There are 8 power plants under operation in BR - VT: - Ba Ria Power Plant, capacity: 327.8 MW - Phu My Power Plant 1 is of the greatest size in Vietnam, with capacity of of about 3,859

MW, generating over 23 billion KWh a year. - Phu My Power Plant 2-2.1: 448 MW - Phu My Power Plant 2.1: 436 MW - Phu My Power Plant 4: 450 MW - Phu My BOT Power Plant 3: 716.8 MW - Phu My Power BOT Plant 2.1: 715 MW - Interntational KIDWELL Power Plant: 40 MW - WARSILA Power Plant: 120 MW + Water There are 6 water plants belonging to Ba Ria – Vung Tau Water Supply Company

Waterwork Capacity (m3/day-night) Service areas 1 Song Dinh 30,000 Ba Ria City and Vung Tau City 2 Ba Ria

(underground water) 15,000

3 My Xuan (underground water)

10,000 Tan Thanh District, mainly for the industrialparks of Phu My, My Xuan, and the port system along the Thi Vai River

4 Xuyen Moc 500 Phuoc Buu Town, Xuyen Moc District 5 Ngai Giao 1,500 Ngai Giao Town, Chau Duc District 6 Con Dao 1,500 Con Dao District, Co Ong, Ben Dam Total 58,500

The other 2 waterworks belonging to Hai Chau Company, Ltd., and Phu My Waterworks Joint-stock Company supply about 40,000 m3 of water to the province per day and night. 5.3 Communications In 2005, the province has 54 post units, including 1 central post office, 7 district-level post offices, and 46 zone-level post offices, 56 telephone stations, 36 telex machines, 170,190 telephones, of which the mobile phone number is 47,620. The average telephone density is 20/200 people. 6 Economy 16 BR – VT economic activities include petroleum (the most important), electricity at Phu My Power Center and Ba Ria Power Plant (accounting for approximate 40% of the country's total power capacity), petrochemicals: Phu My Urea Plant (800,000 metric tonnes per year, polyethylene (100,000 metric tons/year), steel production, and cement production. Tourism, commerce and fishing are also important economic activities of the province.

15 Vietnam and APEC Trade, Satatistics Publishing House, October 2006 16 http://en.wikipedia.org/wiki/B%C3%A0_R%E1%BB%8Ba%E2%80%93V%C5%A9ng_T%C3%A0u_Province

Page 10: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

10

BR-VT contributes greatly to the country's budget. In 2005, it accounted for around 24% of Vietnam's budget (42,000 billion VND) of a total of 180,000 billion VND, ranking second, after HCMC before Hanoi (28,000 billion VND in 2005). The provincial GDP per capita ranks second to none in the country, over 4,000 US$, if excluding petroleum GDP, it is over 2,000 US$ (HCMC ranks second with this index 1,850 US$). In term of living standards, BR – VT ranks the third, behind HCMC and Hanoi. 6.1 Economic results implemented in 2011-2013

Indicators 2011-2013 Est. 2013 - Gross Domestic Product (billion VND) (at current price) - Gross Domestic Product (billion VND) (at constant price 1994)

- Gross Domestic Product growth (%) 7.1 5.37 - Increased output value of agriculture – forestry – fishery (%) 5.87 4.98 - Increased output value of industry and construction (%), excluding

oil and gas 7.46

6.02

- Increased output value of service (%) 20.04 13.61 - Average per-capita GDP (US$, 1 US$ = 21,100VND) - GDP structure (at current price) + Sector I : Agriculture – Forestry – Aquaculture (%) + Sector II: Construction and industry (%) 59.31 + Sector III: Service (%) - Total export value (mil. US$) 6,002 - Total import value (mil. US$) - Total revenue in area (billion VND) 361,566 124,177 - Total budget expenditure in area (billion VND) 31,250 12,145 - Tourism activities

Tourism turnover (estimated, billion VND) Total visitor (thousand visitor arrival), of which International visitor (thousand visitor arrival) Domestic visitor (thousand visitor arrival)

- Investment activities Newly registered enterprises 2,960 845 Newly regsitered capital (billion VND) 3,954 Accumulative number of operating enterprises Accumulative registered capital (billion VND)

- Skilled labor rate (%) 64 64 - Job creation (men) 35,605 of which export labor (men) N/A - Population growth rate (o/oo) 1.13 - Total poor household N/A - Poor household rate (o/o, national poverty standard) 1.06 - Under 5 children mortality rate (o/oo) N/A - Rate of under-5 malnourished children (%) 9 9 - Rural population accessing fresh water (%) 97 - Rural population using power (%) - Forest coverage rate (%) 44

6.2 Agriculture- Aquaculture – Forestry Please see Annex 3: Data of Agriculture, Forestry, Fishery, 1995, 2000-2011, page 15. 6.3 Export and import N/A

Page 11: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

11

6.4 Tourism BR-VT is among the top tourism hub. There are some large scale tourism projects which have been licensed and evaluated by the Government such as Saigon Atlantis with total capital of 300 million USD, Bau Trung Entertainment Park and Nghinh Phong Aquarium with capital of 500 million USD, 200 million USD Xuyen Moc Safari Zoo Project, etc. 6.5 Industry N/A 6.6 Investment + Foreign Direct Investment 17 There are 295 foreign projects in effect until 2011 in BR – VT, with a registered capital of nearly 28.1 billion US$, comprising 118 projects in industrial parks with a registered capital of 11.14 billion US$ and 117 projects outside industrial parks with a registered capital of nearly 17 billion US$. The implemented capital has reached 6.43 billion US$ so far. BR – VT ranks top-3 after HCMC and Ha Noi in terms of State budget contribution. 18 The most effective FDI project so far is the Vietnam – Russia Vietsovpetro. It is planned to build infrastructure of 29 industrial clusters in 2012-2020 by an investment capital of 4,570 billion VND. The capital will be mobilized from all economic sectors but mainly from competent investors. Five main branches needed for the industrial clusters are: i.e. (i) manufacturing mechanic, (ii) electricity and electronics, (iii) processing agriculture, aquaculture, and sea products, (iv) garment – textile, shoes – footwear, (v) production of construction materials. The province spent billions of VND in the development of infrastructure to attract FDI. Besides NR nos. 51, 55, and 56 connecting the province to HCMC, Dong Nai, and Binh Duong, BR - VT also boasts a 110-km waterway with a line-up of tens of ports constituting one of the important traffic systems. Inter-district roads are built up to help increase the value of licensed tourism projects and attract new ones. BR - VT has surpassed its goal for 2011-2015 based on the successes from strategies and performances in attracting foreign investment in the period 2010-2011. The goals include quality, sustainable development, profit, environmental protection and repositioning of multinational investors in the country. The marine economy will be given special attention. Investment will flow into supporting industries with high added value to enable the marine economy to become more efficient. Seaports will be expanded to allow Vung Tau to become a national and regional transshipment hub within 5 years. Logistics will be the main growth engine where infrastructure and human resources in this sector will be blessed with abundant capital. Financial resources will be channeled into new agricultural segments such as industrial-agricultural complexes aimed at transforming farm labour profiles and modernizing rural areas.

17 http://www.tapchitaichinh.vn/Kinh-te-dia-phuong/Ba-Ria-Vung-Tau-Tim-giai-phap-khac-phuc-thu-hut-FDI/13970.tctc 18 http://www.baria-vungtau.gov.vn/web/guest/goi-thieu/-/brvt/extAssetPublisher/content/43526/tiem-nang-phat-trien

Page 12: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

12

+ Thai investment in BR - VT Please see Annex 4, Thai FDI Projects in BR - VT Province, page 17 6.7 Border economy There is no border gate in BR – VT Province 7 Industrial Parks Please see Annex 5: Industrial Parks and Industrial Clusters in Ba Ria – Vung Tau Province, page 18. 8 Date: June 2013 Updated: 12 May 2014 Prepared by: Mai Viet Hung The report is prepared mainly on the basis of publicly available information, analysis, and comments retrieved from the internet and available provincial documents. All sources are cited and data stated in this report are for information purposes only. Users of this report should note that in the event of any inconsistency of data and facts between the English translations and the original Vietnamese text the latter shall prevail.

Page 13: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

13

Annex 1: Population of BR – VT Province, 1995, 2000-2011 Source General Statistics Office http://gso.gov.vn/default.aspx?tabid=714 1995 2000 2005 2006 2007 2008 2009 2010 2011 (*) Population (x 1,000)

708,900 829,900 938,800 955,700 970,200 983,600 998,500 1,012,000 1,027,200

Male (x 1,000)

354,800 415,000 470,000 479,000 486,000 493,000 499,100 505,800 513,400

Female (x 1,000)

354,100 414,900 468,800 476,700 484,200 490,600 499,400 506,200 513,800

Urban (x 1.000)

246,500 353,000 435,700 451,300 466,300 481,000 497,800 504,500 512,100

Rural (x 1.000)

462,400 476,900 503,100 504,400 503,900 502,600 500,700 507,500 515,100

Total Fertility Rate (TFR): no. of children per woman

2.06 2.09 2.13 2.01 1.88 1.82

Crude birth rate (o/oo)

18.5 16.9 17.1 17.7 15.6 15.2

Crude death rate (o/oo)

    4.4 4.4 4.1 6.6 6.5 6.3

Natural increase rate (o/oo)

    14.2 12.5 13.0 11.2 9.1 8.9

Death rate of newborn under 1 (o/oo)

    10.3 11.0 10.0 10.0 8.9 8.5

Population increase rate (%)

    2.16 1.51 1.39 1.52 1.34 1.51

In immigration rate (o/oo)

    8.7 9.1 5.4 12.5 13.3 16.5

Out immigration rate (o/oo)

    6.1 8.8 7.6 8.2 8.9 10.8

Net immigration rate (o/oo)

    2.6 0.3 -2.3 4.3 4.4 5.7

Labor over 15 years old (1,000)

    446,600 497,600 519,000 513,000 531,100 553,900

Labor over 15 years old working in the State sector ( 1,000)

    38,9 39,0 38,7 40,4 42,3

Labor over 15 years / total population (%)

    45,2 48,8 49,9 48,8 50,6 52,6

Labor over 15 years old being trained (%)

    16,7 18,7 15,6 16,1

Note (*): Preliminary data

Page 14: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

14

Annex 2: Health data 2005 – 2011 Source: General Statistics Office of Vietnam http://gso.gov.vn/default.aspx?tabid=714

2005 2006 2007 2008 2009 2010 2011 1 Health care unit Total 87 89 92 96 98 98 98 1.1 Hospital 7 9 10 10 10 10 10 1.2 Regional polyclinic 6 6 6 6 6 6 6 1.3 Convalescent and Functional

Rehabilitation Hospital 0 0 0 0 0 0 0

1.4 Health stations at communes, wards, agencies, enterprises

74 74 76 80 82 82 82

2 Hospital bed Total 1,224 1,402 1,436 1,446 1,434 1,444 1,444 2.1 Hospital 930 1,160 1,190 1,190 1,250 1,260 1,260 2.2 Regional polyclinic 60 60 60 60 20 20 20 2.3 Convalescent and Functional

Rehabilitation Hospital 0 0 0 0 0 0 0

2.4 Health stations at communes, wards, agencies, enterprises

234 182 186 196 164 164 164

3 Medical staff 3.1 Doctor 386 386 386 387 469 478 478 3.2 Assistant doctor 296 296 295 295 354 363 363 3.3 Nurse 419 571 544 544 643 644 644 3.4 Midwife 164 188 187 187 258 261 261 4 Pharmacist 4.1 Pharmacist of university

graduate 44 44 44 44 30 39 39

4.2 Pharmacist of high school level

189 189 193 193 115 118 118

4.3 Druggist 38 38 39 39 39 39 39 5 HIV Patient in 2011 5.1 Newly acquired cases 250 5.2 AID patients detected 123 5.3 HIV patient living until

31/12/2011 (accumulated) 4,926

5.4 AID patients living until 31/12/2011 (accumulated)

623

5.5 HIV death cases 42

Page 15: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

15

Annex 3: Data of Agriculture, Forestry, Fishery, 1995, 2000-2011 Source: General Statistics Office http://gso.gov.vn/default.aspx?tabid=717

Item 1995 2000 2005 2006 2007 2008 2009 2010 2011 (*) 1 No. of farm 811 967 658 658 691 715 718 199 2 Production value of

agriculture (bil. VND) (at constant price 1994)

680 970 1,307.80

1,367.50

1,495.00

1,576.40

1,723.40

1,716.40

1,857.00

3 Area of cereals

36,700 46,100 39,700 42,400 41,600 43,000 43,600 40,500 41,300

3.1 Output of cereals (1,000 ton)

92,8 148,1 144,7 152,5 158,2 165,8 176,3 162,1 170,9

4 Food output per capita (kg)

130.91 180.2 154.1 159.6 163.1 168.6 176.6 160.2 166.4

5 Paddy planted area 22,400 26,800 21,300 23,400 22,300 24,100 24,700 22,400 24,100 5.1 Paddy yield

(quintal/ ha) 26.8 29.8 33.1 31.8 34.9 35.5 38.6 37.7 39.8

5.2 Paddy output (1,000 tons)

60.1 79.9 70.4 74.4 77.9 85.5 95.3 84.5 95.8

6 Paddy planted area (1,000 ha), Spring Crop

3,7 4,8 2,4 4,5 4,6 5,0 5,2 5,4 5,4

6.1 Paddy yield (quintal/ ha) Spring crop

35.9 37.1 39.2 40.4 42.2 42.8 46.5 48 48.1

6.2 Paddy output (1,000 ton, Spring Crop

13,3 17,8 9,4 18,2 19,4 21,4 24,2 25,9 26,0

7 Paddy planted area (1,000 ha), Autumn crop

5 5.8 5.4 5.8 5.1 6.6 7.7 5.4 7.4

7.1 Paddy yield (quintal/ ha) Autumn crop

27.6 30.9 33.1 33.1 32.5 33.9 35.3 33.9 40

7.2 Paddy output (1,000 tons) Autumn crop

13.8 17.9 17.9 19.2 16.6 22.4 27.2 18.3 29.6

8 Paddy planted area (1,000 ha) Winter crop

13.7 16.2 13.5 13.1 12.6 12.5 11.8 11.6 11.3

8.1 Paddy yield (quintal/ ha) Winter crop

24.1 27.3 31.9 28.2 33.3 33.4 37.2 34.7 35.6

8.2 Paddy output (1,000 tons) Winter Crop

33,0 44,2 43,1 37,0 41,9 41,7 43,9 40,3 40,2

9 Corn area (1,000 ha) 14,3 19,3 18,4 19,0 19,3 18,9 18,9 18,1 17,2 9.1 Corn yield

(quintal/ha) 22.9 35.3 40.4 41.1 41.6 42.5 42.9 42.9 43.7

9.2 Corn output (1,000 tons)

32.7 68.2 74.3 78.1 80.3 80.3 81 77.6 75.1

10 Sweet potato area (1,000 ha)

1,4 1,3 0,5 0,3 0,3 0,2 0,1 0,1 0,2

10.1 Sweet potato yield (1,000 tons)

4 1.6 1 1 0.8 0.4 0.5 0.7

11 Manioc area (1,000 ha)

.. .. .. .. .. .. .. .. ..

11.1 Manioc output (1,000 tons)

.. .. .. .. .. .. .. .. ..

12 Sugarcane area (1,000 ha)

.. .. .. .. .. .. .. .. ..

12.1 Sugarcane output .. .. .. .. .. .. .. .. ..

Page 16: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

16

Item 1995 2000 2005 2006 2007 2008 2009 2010 2011 (*) (1,000 tons)

13 Peanut area (1,000 ha)

.. .. .. .. .. .. .. .. ..

13.1 Peanut output (1,000 tons)

.. .. .. .. .. .. .. .. ..

14 Soybean area (1,000 ha)

.. .. .. .. .. .. .. .. ..

14.1 Soybean output (1,000 tons)

.. .. .. .. .. .. .. .. ..

15 Buffalo 2,100 1,300 0.8 1,300 0.7 0.7 0.6 0.6 0.6 16 Cattle 24,400 25,600 48,100 53,800 67,800 52,700 42,800 37,900 33,800 17 Pig 108,000 138,900 206,400 221,200 264,200 278,100 286,000 275,600 303,200 18 Poultry

(1,000 heads) 1,443 1,644 1,663 1,501 1,857 2,257 2,497 3,111

19 Forest status 19.1 Total forest area

(1,000 ha) 26,8 26,8 26,7

19.2 Natural forest (1,000 ha)

14,9 14,5 14,4

19.3 Planted forest (1,000 ha), of which

11,9 12,3 12,3

19.4 Newly planted forest (1,000 ha)

0,5 .. 1,0

19.5 Forest coverage rate (%)

13.2 12.9 12.9

20 Forest area (1,000 ha)

2,4 1,1 1,0 1,0 1,0 0,5 0,1 0,8 0,9

21 Forestry production value (bil. VND)

50,60 26,90 34,40 38,00 39,90 42,00 21,20 29,90 10,20

22 Wood output (1,000 m3)

6,00 8,10 2,20 2,20 2,20 23,80 47,20 84,00 88,90

23 Burnt forest area (1,000 ha)

58,0 72,0 5,8 0,5 .. 6,0 2,1 44,2 1,5

24 Deforestation area (ha)

6,0 4,0 0,4 0,4 .. 0,3 6,2 0,6 0,1

25 Fishery area (1,000 ha)

3,10 4,20 7,40 7,80 7,80 7,50 6,60 6,70 6,90

26 No. of fishing boat (boat)

54 2,932 3,231 2,918 2,601 3,011 3,206 3,284

27 Horse power (HP) 18,020 403,100 447,000 322,900 281,000 298,100 676,200 690,700 28 Production value of

fishery (bil VND) 832.8 864.7 1,571.4 1,646.0 1,645.7 1,756.8 1,872.6 1,932.9 1,813.0

29 Fishery output (tons)

97,268 130,117 214,642 222,171 229,853 240,250 255,945 261,022 258,121

30 Maritime Fish output (1,000 tons)

65,22 104,38 180,80 184,00 194,00 199,10 208,60 211,90 206,80

31 Aquaculture output ( tons)

1,061 1,436 10,661 11,128 9,531 7,544 94 10,687 10,503

32 Fish Farming output ( tons)

814 955 5,926 5,910 4,571 4,817 5,722 6,604 8,633

33 Shrimp farming output (ton)

208 454 3,702 3,981 3,322 2,495 2,951 3,657 1,259

Note: (*): Preliminary data

Page 17: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

17

Annex 4: Thai FDI Projects In Ba Ria - Vung Tau Province (as of June 2012) Source: the Department of Planning and Investment, Ba Ria Vung Tau Province

# Licence number

and date Project Title

Investment Form

Capital (USD) Sectors Investment Legal Vietnam Foreign

3,795,530,000 1,515,828,000 437,548,000 1,078,280,000 1 492022000144,

12/11/2008 Martitime Mermaid Co., Ltd.

100% foreign capital

7,000,000 Repairing, maintenance of sea vessel equipment & oil drilling rig

2 0311/GP 18/01/1992 OSC - TRAVEL Co.

Joint-venture

1,000,000 528,000 228,000 300,000 Trading in international tourism

3 633A/GPĐC5-ĐN, 10/8/2005 Affiliate of SCT Gas Vietnam Co., Ltd.

100% foreign capital

1,800,000 1,800,000 0 1,800,000 Production of gas

4 633A/GPĐC5-ĐN, 10/8/2005 Gas Filling Station of SCT Gas Vietnam Co., Ltd.

100% foreign capital

4,500,000 4,500,000 0 4,500,000 Gas filling

5 491043000012 18/01/2007 Da Nang Co.

100% foreign capital

3,000,000 1,000,000 0 1,000,000 Processing of agriculture and sea product

6 492022000118 11/1/2012 Southern Petrochemical Complex

Joint-venture

3,770,000,000 1,508,000,000 437,320,000 1,070,680,000 Petrochemistry

7 492032000152 11/03/2010 Maritime Semco, Ltd.

100% foreign capital

230,000 0 Production and processing of mechanic products

8 49112000361 30/11/2011 Fish Breeding Farm, CP Incorporated Animal Feeding Company

100% foreign capital

8,000,000 0 Production of fingerlings

Page 18: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

18

Annex 5: Industrial Parks and Industrial Clusters in Ba Ria – Vung Tau Province http://banqlkcn.baria-vungtau.gov.vn/index.php?option=com_content&view=category&layout=blog&id=61&Itemid=181 http://viipip.com/provincevn/?proid=7&module=listip

http://techftc.com/index.php?option=com_content&view=article&id=217:danh-sach-cac-khu-cong-nghip-tnh-ba-ra-vng-tau-&catid=51:danh-b-kcn-vit-nam&Itemid=155

No. Industrial Park (IC) and

Industrial Cluster (IC) Location Infrastructure and

Investment sector Industrial Park (IP)

1 Long Son IP - Area 1,250 ha Industrial land 890 ha Leased area 440 ha Available land 450 ha Occupancy rate 49.44% - Investment project Domestic 32 Foreign 20 - Total registered capital 4 bil. VND - Investor: Dau Khi – IDICO Long Son IP Joint-

stock Co.

Long Son Commune, Vung Tau City

+ Completed infrastucture + Investment sector - Oil refinery industry,

petrochemical industry, - Thermal power, - Building material industry, - Rig repairing, and steel and

aluminum industry

2 Dong Xuyen IP - Area 160 ha Industrial land 129 ha Leased area 125 ha Available land 4 ha Occupancy rate 97% - Investment project Domestic 40 Foreign 28 - Total registered capital 1,281.9 bil. VND - Investor: Vietnam Urban and IP Investment

and Development Corp.

Rach Dua Ward, Vung Tau City Distance from - Vung Tau City 6 km

+ Completed infrastructure with inner sea port capable of handling 15,000 ton vessel.

+ Investment sector: - Petroleum Industry service - Manufacturing mechanic - Shipbuilding and ship

repair industry and maritime service

- Non-pollution industry

3 Phu My 1 IP - Area 959.38 ha Industrial land 695 ha Leased area 644 ha Available land 51 ha Occupancy rate 93% - Investment project Domestic 39 Foreign 20 - Total registered capital Domestic 23,674 bil. VND Foreign 1.9 bil. US$ - Investor: Phu My 1 & Dong Xuyen Industrial

Zone Infrastructure Investment & Operation Co. (IDICO)

Phu My Townlet, Tan Thanh District, Vung Tau City Along NR 51 Distance from - Vung Tau City 40 km - HCMC 75 km - Tan son nhat Airport 44 km - Long Thanh Airport

47 km - Binh Duong train station

25 km

+ Completed infrastructure + Investment sector - Heavy industry including

building material production,

- Steel production and chemical and fertilizer production.

4 Phu My 2 IP - Area 1,023 ha Industrial land 697 ha Leased area 182 ha Available land 455 ha Occupancy rate 29% - Investment project Domestic N/A Foreign 5 - Total registered capital

Phu My Townlet, Tan Thanh District

+ Infrastructure - Land clearance is finished,

leveling works, inner roads, water supply system and electricity system are under implementation.

+ Investment sector - Heavy industry such as

metallurgy, petrochemical and construction material

Page 19: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

19

No. Industrial Park (IC) and Industrial Cluster (IC)

Location Infrastructure and Investment sector

Domestic N/A Foreign 1.9 bil. US$ - Investor: Phu My 1 & Dong Xuyen Industrial

Zone Infrastructure Investment & Operation Company (IDICO)

production.

5 Phu My 3 IP - Area 994 ha Industrial land 630 ha Leased area 00 ha Available land 630 ha Occupancy rate 0% - Investment project Domestic N/A Foreign 0 - Total registered capital Domestic N/A Foreign 0 US$ - Investor: Thanh Binh - Phu My Joint-stock Co.

Phuoc Hoa Commune, Tan Thanh District Distance from - Vung Tau City 35 km - HCMC 60 km - Bien Hoa City 50 km - Binh Duong 50 km - Thi Vai – Cai Mep Port 4 km

+ Infrastructure - Under construction + Investment sector - Petrochemicals, chemicals

and basic materials manufacturing,

- Industrial support, mechanical molds production,

- High technology, and ports and logistic service

6 My Xuan A IP - Area 301 ha Industrial land 228 ha Leased area 193 ha Available land 35 ha Occupancy rate 85% - Investment project Domestic 12 Foreign 22 - Total registered capital Domestic 3,825 bil. VND 5 mil. US$ Foreign 621 mil. US$ - Investor: N/A

+ Completed infrastructure + Investment sector - Building material, - Precision mechanics, - Textile and dyeing industry

and food processing.

7 My Xuan A2 IP - Area 312 ha Industrial land 292 ha Leased area 274 ha Available land 17 ha Occupancy rate 94% - Investment project Domestic 1 Foreign 28 - Total registered capital Domestic 5,000 bil. VND 0 mil. US$ Foreign 1.5 mil. US$ - Investor: Formosa Intl’ Development Co., Ltd.

My Xuan Commune, Tan Thanh District, BRVT Distance from - HCMC 50 km - Vung Tau City 20 km - Proposed Long Thanh Airport 40 km - Go Dau Port 2 km

+ Completed infrastructure + Investment sector - Mechanical engineering, - Electronics, - Wood processing and

leather industry.

8 My Xuan B1 IP - Area 200 ha Industrial land 157 ha Leased area 59 ha Available land 98 ha Occupancy rate 37% - Investment project Domestic 5 Foreign 5 - Total registered capital Domestic 123.5 bil. VND

Tan Thanh District Distance from - Vung Tau City 45 km - HCMC 55 km - Tan Son Nhat Airport 70 km - Proposed Long Thanh Airport 20 km - Go Dau Port 7 km

+ Completed infrastructure + Investment sector - Precision mechanics, - Steel and fertilizer

production.

Page 20: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

20

No. Industrial Park (IC) and Industrial Cluster (IC)

Location Infrastructure and Investment sector

Foreign 129.5 mil. US$ - Investor: IDICO Oil and Gas Construction

Joint-stock Corp. 9 Cai Mep IP

- Area 670 ha Industrial land 449 ha Leased area 187 ha Available land 261 ha Occupancy rate 42% - Investment project Domestic 11 Foreign 2 - Total registered capital Domestic 3,842.2 bil. VND 219.7 mil. US$ Foreign 175 mil. US$ - Investor: Saigon Construction.

Tan Phuoc Commune, Tan Thanh District Distance from - HCMC 60 km - Vung Tau City 40 km - Go Dau Port 2 km

+ Infrastrucure NA + Investment sector - LPG (Liquefied Petroleum

Gas) Production, - Logistic service, - Plastic, chemicals,

metallurgy, - Food processing.

10 Dai Duong IP - Area 145 ha Industrial land 929 ha Leased area 6 ha Available land 86 ha Occupancy rate 7% - Investment project Domestic 2 Foreign 0 - Total registered capital Domestic 558 bil. VND Foreign 0 mil. US$ - Investor: Dai Duong Co..

Tan Thanh District Distance from - Phu My Port 12 km - HCMC 70 km - Vung Tau City 40 km

+ Infrastrucure NA + Investment sector - Food and beverage, - Electronic assembly, - Building material, - Light industry such as

stationery and plastic production.

11 Tien Hung IP - Area 200 ha Industrial land 139 ha Leased area 25 ha Available land 114 ha Occupancy rate 18% - Investment project Domestic 2 Foreign 2 - Total registered capital Domestic 751.9 bil. VND 31 mil. US$ Foreign 4,000 mil. US$ - Investor: Tien Hung Productin and Trade Co.,

Ltd.

Tan Thanh District Distance from - HCMC 70 km - Vung Tau City 40 km - Phu My Port 8 km - Go Dau Port 7 km - Long Thanh Airport 20 km

+ Infrastrucure NA + Investment sector - Mechanical engineering - Agricultural products

processing - Textile and leather.

12 Chau Duc IP - Area 1,550 ha Industrial land 968 ha Leased area 4 ha Available land 964 ha Occupancy rate 0.38% - Investment project Domestic 1 Foreign 0 - Total registered capital Domestic 249 bil. VND Foreign mil. US$

Nghia Thanh Commune, Chau Duc District Distance from - HCMC 100 km - Vung Tau City 40 km - Long Thanh Airport 54 km - Go Dau Port 21 km

+ Completed infrastructure + Investment sector - Computer, semi-conductor,

electronic component, - Car and motorbike

assembly, - Pharmaceuticals and

medical equipment.

Page 21: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

21

No. Industrial Park (IC) and Industrial Cluster (IC)

Location Infrastructure and Investment sector

- Investor: Sonadezi Joint-stock Co.

13 Dat Do IP - Area 496 ha Industrial land 330 ha Leased area 0 ha Available land 350 ha Occupancy rate 08% - Investment project 0 - Total registered capital N/A - Investor: Phuong Dong Co., Ltd.

Dat Do District Distance from - HCMC 70 km - Bien Hoa City 68 km - Vung Tau City 23 km - Go Dau Port 25 km - Long Thanh Airport 38 km

+ Infrastructure is unfinished. Land clearance under implementation

+ Investment sector: N/a

14 Long Huong IP - Area 400 ha Industrial land 280 ha Leased area 0 ha Available land 280 ha Occupancy rate 0% - Investment project 0 - Total registered capital N/A - Investor: N/A

Tan Thanh District Distance from - HCMC 75 km - Vung Tau City 15 km - Long Thanh Airport 40km

+ Unfinished infrastructure + Investment sector: N/A

Industrial Cluster (IC) 1 Kim Dinh IC

- Area 496 ha - Investor: Khang Thong Group

Kim Dinh Ward, Ba Ria City

2 Lang Lon 1 IC Tan Thanh District 3 Lang Lon 2 IC Tan Thanh District 4 Kim Long 2 IC 5 Tan Phuoc 3 IC 6 Long Huong 1 IC

- Area 150 ha Tan Hai Commune, Tan Thanh District

7 Long My IC - Area 50 ha

Long My Commune, Dat Do District

8 Long Dien 1 IC - Area 98 ha

An Ngai Commune, Long Dien District

9 Long Dien 2 IC An Ngai Commune, Long Dien District

10 Long Huong 2 IC 11 Tam Phuoc 1 IC

- Area 75 ha Tam Phuoc Commune, Long Dien District

12 Tam Phuoc 2 IC - Area 45 ha

Tam Phuoc Commune, Long Dien District

13 Tam Phuoc 2 IC - Area 40 ha

Tam Phuoc Commune, Long Dien District

14 Hac Dich 1 IC - Area 29 ha

Hac Dich Commune, Tan Thanh District

15 Hac Dich 2 IC Hac Dich Commune, Tan Thanh District

16 Hac Dich 3 IC

Hac Dich Commune, Tan Thanh District

17 Hac Dich 4 IC

Hac Dich Commune, Tan Thanh District

18 Toc Tien 1 IC - Area 29 ha

Toc Tien Commune, Tan Thanh District

19 Toc Tien 2 IC

Toc Tien Commune, Tan Thanh District

Page 22: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

22

No. Industrial Park (IC) and Industrial Cluster (IC)

Location Infrastructure and Investment sector

20 Toc Tien 3 IC

Toc Tien Commune, Tan Thanh District

21 Toc Tien 4 IC

Toc Tien Commune, Tan Thanh District

Total effective projects as of late 2010: 22

Page 23: BA RIA – VUNG TAU PROVINCE 1 Basic · PDF fileจัดทําโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557 2

จัดทาํโดย สถานกงสุลใหญ ณ นครโฮจิมินห กันยายน 2557

23