22
! l ! l ! ( ! ( ! ( ! ( N4-S15 N4-S16 Tower 93 E-368191, N-5824139 Tower 94 E-368097, N-5820473 N4-Aqua-130 N4-Aqua-129 N4-Hert-108 Coordinate System: UTM Zone 14N NAD83 Data Source: MB Hydro, ProvMB, NRCAN Date Created: April 10, 2014 Version: Draft ± 1:10,000 0 250 500 125 Metres Map 195 Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N4 Environmentally Sensitive Site Locations ESS Features Heritage ! ( Archaeological Water ! ( Water Crossing Wildlife ! ( Birds and Habitat Points of Access* ! ( Proposed Access Point ! ( Major Stream Crossing Abandoned Rail Crossing Rail Crossing " ) Transmission Line Crossing Project Infrastructure Proposed Access Route Land Base 66 m Right of Way BPIII Final Preferred Route Angle Tower Locations # # *Labels correspond to BPIII Access Management Database Mining ! ! Transmission Line Highway Major Road Local Road Winter Road Railway (Operational) Railway (Discontinued) First Nation Provincial Forest Draft: For Discussion Purposes Only

BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

!l

!l

!l

!l

!(

!(!(

!(

!(

WUSKWISIPIHK

N4-S

15

N4-S14

N4-S

15

N4-S16

N4-S17

Tower 92

E-366479, N-5824188

Tower 93E-368191, N-5824139

Tower 94E-368097, N-5820473

Tower 95E-367999, N-5820041

N4-Aqua-1

28

N4-Aqua-130

N4-Aqua-129

N4-Hert-108

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: April 10, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 195

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N4Environmentally Sensitive Site Locations

ESS FeaturesHeritage!( Archaeological

Water!( Water Crossing

Wildlife!( Birds and Habitat

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes Only

Page 2: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

Version: Draft

ESS Group: Archaeological

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone

N4-S16 N4-Hert-108 Waywayanagan River 368110 5820684 14N Potential Effects: potential disturbance to heritage Resources Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Identify and flag prior to start of work • Conduct site investigation with Archaeologist post clearing and prior to construction • Minimize surface disturbance around the site to the extent possible • Inspect excavated materials or surface disturbance for heritage resources and report any finds to Environmental

Inspector • Implement additional mitigation from site investigation ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

N4-S16 N4-Aqua-129

Unnamed Tributary of Bell Creek 367023 5824173 14N N/A N/A None None

N4-S16 N4-Aqua-130

Wawayanagan River 368103 5820699 14N 2m 3m Moderate Important

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from April 1 to June 30

MAP NUMBER: 195

Page 3: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

!l

!l

!l

!l

!(

!(

!(

!(

!(

N4-S17

N4-S18Tower 94

E-368097, N-5820473

Tower 95E-367999, N-5820041

N4-Aqua-130N4-Hert-108

N4-Aqua-131

N4-Hert-109

WUSKWI SIPIHK FIRST NATION INDIAN RESERVE NO. 1

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: April 10, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 196

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N4Environmentally Sensitive Site Locations

ESS FeaturesHeritage!( Archaeological

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes Only

Page 4: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

 

 

 

 

 

 

 

 

 

 

 

 

This page is intentionally left blank.

Page 5: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

!l

!l

!(!(

!(

!( N4-S18

N4-Aqua-131

N4-Aqua-133N4-Aqua-132

N4-Hert-109

WUSKWI SIPIHK FIRST NATION INDIAN RESERVE NO. 1

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: April 10, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 197

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N4Environmentally Sensitive Site Locations

ESS FeaturesHeritage!( Archaeological

Water!( Water Crossing

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes Only

Page 6: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

Version: Draft

ESS Group: Archaeological

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone

N4-S16 N4-Hert-109 Creek 367904 5816287 14N Potential Effects: potential disturbance to heritage Resources Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Identify and flag prior to start of work • Conduct site investigation with Archaeologist post clearing and prior to construction • Minimize surface disturbance around the site to the extent possible • Inspect excavated materials or surface disturbance for heritage resources and report any finds to Environmental

Inspector • Implement additional mitigation from site investigation ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

N4-S18 N4-Aqua-131

Unnamed Creek 367905 5816290 14N N/A N/A Low No Fish Habitat

N4-S18 N4-Aqua-132

Fishtown Creek 367842 5813788 14N N/A N/A Low Marginal

N4-S18 N4-Aqua-133

Unnamed agricultural drain 367817 5812793 14N N/A 4m Low Important

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from April 1 to June 30

MAP NUMBER: 197

Page 7: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

!l!(

!(

!(

!(

!(!(

!(

!(

!(

N4-S18N4-S18N4-Aqua-204

N4-A

qua-2

04

N4-Aqua-133

N4-Aqua-134N4-Aqua-135

N4-Hert-113

N4-Hert-112N4-Hert-111N4-Hert-110

79

MAP SHEET FULLY WITHIN THE N4-AQUA-204 FEATURE

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: April 10, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 198

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N4Environmentally Sensitive Site Locations

ESS FeaturesHeritage!( Archaeological

Water!( Water Crossing

WaterGroundwater

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes Only

Page 8: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

Version: Draft

ESS Group: Archaeological

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone

N4-S18 N4-Hert-110 Former Creek Bed 367780 5811292 14N

N4-S18 N4-Hert-111 Former Creek Bed 367770 5810847 14N

N4-S18 N4-Hert-112 Creek 367759 5810041 14N

N4-S18 N4-Hert-113 Former River Bed 367705 5808865 14N Potential Effects: Potential disturbance to heritage Resources Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Identify and flag prior to start of work • Conduct site investigation with Archaeologist post clearing and prior to construction • Minimize surface disturbance around the site to the extent possible • Inspect excavated materials or surface disturbance for heritage resources and report any finds to Environmental

Inspector • Implement additional mitigation from site investigation ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

N4-S18 N4-Aqua-134

Swede Creek 367784 5811514 14N N/A 7m Low Important

N4-S18 N4-Aqua-135

Unnamed agricultural drain 367775 5811166 14N N/A 2m Low Marginal

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from April 1 to June 30

ESS Group: Groundwater

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM

Zone Distance

N4-S18 N4-Aqua-204

Aquifers Vulnerable to contamination

Site: 79 to 80

E-367779 N-5811322

E-367686 N-5807954 14N 3370m

Potential Effects: Potential groundwater contamination from a contingency event (e.g., spill) Specific Mitigation:

• Marshalling yards will be located on upland sites where possible. • An Emergency Preparedness and Spill Response Plan will be developed and an emergency response spill kit will be kept

on-site at all times in case of fluid leaks or spills from machinery. • Qualified driller with appropriate experience will be contracted to work in areas affected by artesian conditions. • Emergency response plans for sealing/grouting and pumping will be implemented as required.

MAP NUMBER: 198

Page 9: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

!(

! l

! l

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

N4-S18

N4-S18

N4-S19

N4-S19

WoodyRivercrossing

Tower 96E-367686, N-5807954

Tower 97

E-372545, N-5807819

N4-Aqua-204

N4-Wild-108

N4-Hert-113

N4-Hert-112

N4-Wild-109

N4-Aqua-137

N4-Aqua-139

N4-Aqua-136

N4-Aqua-138

N4-Hert-116

N4-Hert-115

N4-Hert-114

N4-Aqua-140N4-Hert-117

80

81

WOODY RIIVER

SWAN RIVER

Swan River(Oxbow Lake)

MAP SHEET FULLY WITHIN THE N4-AQUA-204 FEATURE

POPLAR CREEK

L19L20

L21 L22

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: April 10, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 199

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N4Environmentally Sensitive Site Locations

ESS FeaturesHeritage!( Archaeological

Water!( Water Crossing

WildlifeBirds and Habitat

WaterGroundwater

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes Only

Page 10: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

Version: Draft

ESS Group: Archaeological

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone

N4-S19 N4-Hert-114 Woody River 369392 5807907 14N

N4-S19 N4-Hert-115 Creek 370890 5807865 14N

N4-S19 N4-Hert-116 Creek 371335 5807852 14N Potential Effects: Potential disturbance to heritage Resources Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Identify and flag prior to start of work • Conduct site investigation with Archaeologist post clearing and prior to construction • Minimize surface disturbance around the site to the extent possible • Inspect excavated materials or surface disturbance for heritage resources and report any finds to Environmental

Inspector • Implement additional mitigation from site investigation ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

N4-S19 N4-Aqua-136

Unnamed tributary of Woody River 368893 5807920 14N N/A N/A Low Marginal

N4-S19 N4-Aqua-137

Woody River 369365 5807906 14N 30m 28m High Important

N4-S19 N4-Aqua-138

Tributary of Woody River 370909 5807864 14N 11.7m 9.7m Moderate Marginal

N4-S19 N4-Aqua-139

Tributary of Woody River 371353 5807852 14N N/A N/A Low Marginal

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from April 1 to June 30

ESS Group: Birds and Habitat

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S19 N4-Wild-108 Waterfowl sensitivity area Site: L19 to L20 E-369335 N-5807908

E-369386 N-5807906 14N 50m

N2-S19 N4-Wild-109 Waterfowl sensitivity area Site: L21 to L22 E-370876 N-5807865

E-370935 N-5807863 14N 59m

Potential Effects: Higher risk of wire collision, Risk of wire collision is localized to the right-of-way Specific Mitigation:

• Adhere to reduced risk timing windows for protection of birds (August 1- April 30) • Maintain applicable setback during nesting and breeding timing window • Conduct priority assessment for bird diverters and other measures prior to transmission line stringing • Install bird diverters or other measures at high priority sites ESS Group: Groundwater

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM

Zone Distance

N4-S18 N4-Aqua-204

Aquifers Vulnerable to contamination

Site: 79 to 80

E-367779 N-5811322

E-367686 N-5807954 14N 3370m

N4-S19 N4-Aqua-204

Aquifers Vulnerable to contamination

Site: 81 to 82

E-367686 N-5807954

E-372545 N-5807818 14N 4860m

Potential Effects: Potential groundwater contamination from a contingency event (e.g., spill) Specific Mitigation:

• Marshalling yards will be located on upland sites where possible. • An Emergency Preparedness and Spill Response Plan will be developed and an emergency response spill kit will be kept

on-site at all times in case of fluid leaks or spills from machinery. • Qualified driller with appropriate experience will be contracted to work in areas affected by artesian conditions. • Emergency response plans for sealing/grouting and pumping will be implemented as required.

MAP NUMBER: 199

Page 11: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

!(

!(

!l

!l

!l

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

N4-S

19

N4-S

19

N4-S20

SwanRiver

(oxbow lake) crossing

SwanRivercrossing

Tower 97E-372545, N-5807819

N4-Aqua-204

N4-Wild-112

N4-Wild-110

N4-W

ild-10

9N4

-Aqu

a-139

N4-A

qua-1

38

N4-H

ert-11

6

N4-H

ert-11

5

N4-Wild-111

N4-Aqua-140N4-Aqua-141

N4-Aqua-142 N4-Aqua-143

N4-Aqua-145

N4-Aqua-146

N4-Aqua-144

N4-Hert-125N4-Hert-124N4-Hert-123

N4-Hert-122N4-Hert-121

N4-Hert-120

N4-Hert-119N4-Hert-118N4-Hert-117

N4-Wild-110

N4-Aqua-147N4-Hert-126

8283

SWAN RIVER

Swan River(Oxbow Lake)

MAP SHEET FULLY WITHIN THE N4-AQUA-204 FEATURE

MAP SHEET FULLY WITHIN THE N4-AQUA-204 FEATURE

POPLAR CREEK

L23L24

L25 L26L27

L28

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: April 10, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 200

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N4Environmentally Sensitive Site Locations

ESS FeaturesHeritage!( Archaeological

Water!( Water Crossing

WildlifeBirds and Habitat

WaterGroundwater

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes Only

Page 12: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

Version: Draft

ESS Group: Archaeological

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone

N4-S20 N4-Hert-117 Poplar Creek 372288 5807826 14N

N4-S20 N4-Hert-118 Poplar Creek 372517 5806746 14N

N4-S20 N4-Hert-119 Poplar Creek 372513 5806601 14N

N4-S20 N4-Hert-120 Poplar Creek 372506 5806363 14N

N4-S20 N4-Hert-121 Swan River 372495 5805936 14N

N4-S20 N4-Hert-122 Swan River 372475 5805556 14N

N4-S20 N4-Hert-123 Swan River 372481 5805409 14N

N4-S20 N4-Hert-124 Swan River 372478 5805314 14N

N4-S20 N4-Hert-125 Swan River 372475 5805195 14N Potential Effects: Potential disturbance to heritage Resources Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Identify and flag prior to start of work • Conduct site investigation with Archaeologist post clearing and prior to construction • Minimize surface disturbance around the site to the extent possible • Inspect excavated materials or surface disturbance for heritage resources and report any finds to Environmental

Inspector • Implement additional mitigation from site investigation ESS Group: Birds and Habitat

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S19 N4-Wild-110 Waterfowl sensitivity area Site: L23 to L24 E-372497 N-5806018

E-372495 N-5805949 14N 68m

N2-S19 N4-Wild-111 Waterfowl sensitivity area Site: L25 to L26 E-372480 N-5805395

E-372478 N-5805337 14N 54m

N2-S19 N4-Wild-112 Waterfowl sensitivity area Site: L27 to L28 E-372476 N-5805260

E-372475 N-5805206 14N 57m

Potential Effects: Higher risk of wire collision, Risk of wire collision is localized to the right-of-way Specific Mitigation:

• Adhere to reduced risk timing windows for protection of birds (August 1- April 30) • Maintain applicable setback during nesting and breeding timing window • Conduct priority assessment for bird diverters and other measures prior to transmission line stringing • Install bird diverters or other measures at high priority sites

ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

N4-S20 N4-Aqua-140

Poplar Creek 372265 5807827 14N N/A N/A Low Marginal

N4-S20 N4-Aqua-141

Poplar Creek 372516 5806728 14N 27m N/A Low No Fish Habitat

N4-S20 N4-Aqua-142

Poplar Creek 372513 5806612 14N 14m N/A Low No Fish Habitat

N4-S20 N4-Aqua-143

Poplar Creek 372507 5806380 14N 17m N/A Low No Fish Habitat

N4-S20 N4-Aqua-144

Oxbow lake/wetland of Swan River 372497 5805981 14N N/A N/A Low Marginal

N4-S20 N4-Aqua-145

Oxbow lake/wetland of Swan River 372480 5805375 14N N/A N/A Low No Fish

Habitat

N4-S20 N4-Aqua-146

Swan River 372476 5805227 14N 50m 50m Moderate Important

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from April 1 to June 30

MAP NUMBER: 200

Page 13: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

Version: Draft

ESS Group: Groundwater

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM

Zone Distance

N4-S19 N4-Aqua-204

Aquifers Vulnerable to contamination

Site: 81 to 82

E-367686 N-5807954

E-372545 N-5807818 14N 4860m

N4-S20 N4-Aqua-204

Aquifers Vulnerable to contamination

Site: 83 to 84

E-372545 N-5807818

E-372374 N-5801434 14N 6387m

Potential Effects: Potential groundwater contamination from a contingency event (e.g., spill) Specific Mitigation:

• Marshalling yards will be located on upland sites where possible. • An Emergency Preparedness and Spill Response Plan will be developed and an emergency response spill kit will be kept

on-site at all times in case of fluid leaks or spills from machinery. • Qualified driller with appropriate experience will be contracted to work in areas affected by artesian conditions. • Emergency response plans for sealing/grouting and pumping will be implemented as required.

MAP NUMBER: 200

Page 14: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

 

 

 

 

 

 

 

 

 

 

 

 

This page is intentionally left blank.

Page 15: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

!l

!l

!l

!(!(

!( N4-S20

N4-Aqua-204N4-Wild-110N4-Aqua-147

N4-Hert-12684

L29 L30

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: April 10, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 201

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N4Environmentally Sensitive Site Locations

ESS FeaturesHeritage!( Archaeological

Water!( Water Crossing

WildlifeBirds and Habitat

WaterGroundwater

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes Only

Page 16: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

Version: Draft

ESS Group: Archaeological

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone

N4-S20 N4-Hert-126 Kitzul Drain 372435 5803752 14N Potential Effects: potential disturbance to heritage Resources Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Identify and flag prior to start of work • Conduct site investigation with Archaeologist post clearing and prior to construction • Minimize surface disturbance around the site to the extent possible • Inspect excavated materials or surface disturbance for heritage resources and report any finds to Environmental

Inspector • Implement additional mitigation from site investigation ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS

Name Easting Northing UTM Zone

Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

N4-S20 N4-Aqua-147

Kitzul Drain 372436 5803765 14N 10m 10m Low Marginal

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction

ESS Group: Birds and Habitat

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N2-S20 N4-Wild-113 Waterfowl sensitivity area Site: L29 to L30 E-372437 N-5803782

E-372435 N-5803718 14N 64m

Potential Effects:

Higher risk of wire collision, Risk of wire collision is localized to the right-of-way Specific Mitigation:

• Adhere to reduced risk timing windows for protection of birds (August 1- April 30) • Maintain applicable setback during nesting and breeding timing window • Conduct priority assessment for bird diverters and other measures prior to transmission line stringing • Install bird diverters or other measures at high priority sites ESS Group: Groundwater

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM

Zone Distance

N4-S20 N4-Aqua-204

Aquifers Vulnerable to contamination

Site: 83 to 84

E-372545 N-5807818

E-372374 N-5801434 14N 6387m

Potential Effects: Potential groundwater contamination from a contingency event (e.g., spill) Specific Mitigation:

• Marshalling yards will be located on upland sites where possible. • An Emergency Preparedness and Spill Response Plan will be developed and an emergency response spill kit will be kept

on-site at all times in case of fluid leaks or spills from machinery. • Qualified driller with appropriate experience will be contracted to work in areas affected by artesian conditions. • Emergency response plans for sealing/grouting and pumping will be implemented as required.

MAP NUMBER: 201

Page 17: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

!l

!l

!(

!(

!(!(N4-S21N4-S20

N4-S21

Tower 98E-372284, N-5798072

Tower 99E-372431, N-5795650

N4-Ruse-204

N4-Aqua-14885

86

87

LENSWOOD COMMUNITY PASTURE

LENSWOOD COMMUNITY PASTURE

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: April 10, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 202

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N4Environmentally Sensitive Site Locations

ESS FeaturesWater!( Water Crossing

Resource UseFood/Medicinal

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes Only

Page 18: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

Version: Draft

ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

N4-S21 N4-Aqua-148

Unnamed agricultural drain 372284 5798058 14N N/A N/A Low Marginal

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from April 1 to June 30 ESS Group: Food/Medicinal

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N4-S21 N4-Ruse-204 Plant Harvest Site: 85 to 86 E-372360 N-5796820

E-372430 N-5795650 14N 1172m

Potential Effects: Loss of vegetation as a result of clearing, construction, maintenance and decommissioning activities. Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Minimize surface disturbance around the site to the extent possible • Remove trees by low-disturbance methods • No Herbicide to be applied during construction • Confine vehicle traffic to established trails to the extent possible

MAP NUMBER: 202

Page 19: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

!(

!l

!l

!l

!l

!(

!(

!(

!(!(

!(

47

N4-S21 N4-S21

N4-S22N4-S22

N4-S

23

47T

Tower 99E-372431, N-5795650

Tower

100E-3

72315,

N-57916

41

Tower

101

E-3744

37, N-57

91587

N4-Ruse-204

N4-A

css-1

01

N4-Aqua-149

N4-Hert-128N4-Hert-127

86

87 88 C3

LENSWOOD COMMUNITY PASTURE

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: April 10, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 203

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N4Environmentally Sensitive Site Locations

ESS FeaturesHeritage!( Archaeological

Water!( Water Crossing

AccessIntersection

Resource UseFood/Medicinal

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes Only

Page 20: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

Version: Draft

ESS Group: Archaeological

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone

N4-S22 N4-Hert-127 Trails 372417 5794787 14N

N4-S22 N4-Hert-128 Trails 372400 5794552 14N Potential Effects: potential disturbance to heritage Resources Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Identify and flag prior to start of work • Conduct site investigation with Archaeologist post clearing and prior to construction • Minimize surface disturbance around the site to the extent possible • Inspect excavated materials or surface disturbance for heritage resources and report any finds to Environmental

Inspector • Implement additional mitigation from site investigation ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

N4-S22 N4-Aqua-149

Unnamed agricultural drain 372359 5793158 14N N/A 9m Low marginal

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from April 1 to June 30

ESS Group: Intersection

Sec-Seg ID ESS ID Location ESS Name Crossing Coordinates UTM Zone

N4-S22 N4-Acss-101 C3 Snowmobile Trail E-372405 N-5794764 14N

Potential Effects:

Potential interference with snowmobilers; safety issues Specific Mitigation:

• Identify and flag prior to start of work • Avoid surface damage to and obstruction of access route • Post warning markers and signs at snowmobile trail location • Notify snowmobile club/users and local authorities regarding construction activities and schedule, and address concerns

prior to construction

ESS Group: Food/Medicinal

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N4-S21 N4-Ruse-204 Plant Harvest Site: 85 to 86 E-372360 N-5796820

E-372430 N-5795650 14N 1172m

N4-S22 N4-Ruse-204 Plant Harvest Site: 87 to 88 E-372430 N-5795650

E-372411 N-5794977 14N 672m

Potential Effects: Loss of vegetation as a result of clearing, construction, maintenance and decommissioning activities. Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Minimize surface disturbance around the site to the extent possible • Remove trees by low-disturbance methods • No Herbicide to be applied during construction • Confine vehicle traffic to established trails to the extent possible

MAP NUMBER: 203

Page 21: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

! l

! l

! l

!(

!(!(

48

N4-S22

N4-S22

N4-S23

N4-S24

48T

Tower 100E-372315, N-5791641

Tower 101E-374437, N-5791587

N4-Ruse-208

N4-Ruse-301

N4-Ruse-204

N4-Aqua-149

8990

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: April 10, 2014 Version: Draft

±

1:10,000

0 250 500125Metres

Map 204

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N4Environmentally Sensitive Site Locations

ESS FeaturesResource Use

Food/Medicinal

Points of Access*!( Proposed Access Point!( Major Stream Crossing

Abandoned Rail CrossingRail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)First Nation

Provincial Forest Draft: For Discussion Purposes Only

Page 22: BPIII CEnvPP N4 Mapbook PR 195to204 - Province of Manitoba · N4-Aqua-130 N4-Aqua-129 N4-Hert-108 C ordi na t eSys m: UTM Z 14 NAD83 D at S ou rce: MBHyd ,P v NRCA D ateC rd: Ap il

 

 

 

 

 

 

 

 

 

 

 

 

This page is intentionally left blank.