Upload
nhixy
View
224
Download
0
Embed Size (px)
Citation preview
8/10/2019 CHAPTER 4 Technical Information
1/14
CHAPTER 4: TECHNICAL INFORMATION
The DormiPod is the first dorm capsule pod that will be built in the Metro. We want to
make a sophisticated and unique dorm that is affordable for the students. We will use high
quality materials to ensure the strong foundation and safety of the occupants.
The technical information provides the proper service process of the business, its
production facilities, their respective prices and depreciation value, and the proper waste disposal
program of our venture.
A.
Service Process
The services that our business provides is rental services to the students who
wants to reside in a dormitory. The service starts by inquiring in our DormiPod.
B. Service Facilities
As a new venturing business in the rental industry, we want to promote a unique
and new kind of living in dormitories. To achieve this we must offer facilities that will
cater to the more demanding needs of the students and we must able to differentiate our
service and convince the potential occupants that they should choose DormiPod.
The following are the proposed design of DormiPod, floor plan and lay-out
designs:
8/10/2019 CHAPTER 4 Technical Information
2/14
FLOOR PLAN
The total lot area is 410 square meters; the renovated building has a total floor
area of 405 square meters which will be use for the proponents business. The lot is
located near a school which house 17, 000 students and is surrounded by other
establishments. The place is great for doing business because it contains a sure target
market.
8/10/2019 CHAPTER 4 Technical Information
3/14
LAY-OUT
Depicts the arrangement of the furniture inside a house
View of the building-side, front & back
HOUSE DESIGN (SAMPLE)
C. Raw Materials
The proponents decided to hire a contractor who will buy the materials needed for
the renovation of the building and will be responsible for supervising the overall
operation. The design of the building will be from the proponents idea; the budget for
the renovation will be P2, 00, 000. Also theyre in charge for compensating the labor
workers.
8/10/2019 CHAPTER 4 Technical Information
4/14
The furniture and fixtures will be personally choose by the proponents and will be
purchase in the local market. We tend to patronize the local products to help its market
and community. The following are the furniture and fixtures that will be needed to polish
the building:
FURNITURE AND FIXTURES
Sofa Set
LED TV
8/10/2019 CHAPTER 4 Technical Information
5/14
TV Stand
Dining Table
Refrigerator
8/10/2019 CHAPTER 4 Technical Information
6/14
LED lights & Bulbs
CCTV CAMERA
Air-conditioner
8/10/2019 CHAPTER 4 Technical Information
7/14
Washing Machine with Dryer
SMALL APPLIANCES
Ceiling and Stand Fan
8/10/2019 CHAPTER 4 Technical Information
8/14
Flat Iron and Board
CABINET AND LOCKERS
FOAMS AND PILLOWS
8/10/2019 CHAPTER 4 Technical Information
9/14
KITCHEN TOOLS AND COOKWARE
8/10/2019 CHAPTER 4 Technical Information
10/14
HOME IMPROVEMENTS
Door Mats Blinds Curtains
OTHERS
Shoe Rack
Trash bins
Mop
Hangers and clothespin
Basins and pails
Toilet brushes
Single bed with foam
8/10/2019 CHAPTER 4 Technical Information
11/14
Schedule_____ Furni tur e and Fi xtures
Furniture and Fixtures Quantity Prices
Sofa Set 1 P 10, 990. 00
LED TV 1 P 8, 475. 00
TV Stand 1 P 2, 500. 00
Dining Table 1 P 6, 800. 00
Refrigerator 1 P 9, 999.00
LED lights and Bulbs 14 P 5, 198. 75
CCTV Cameras 2 P 29, 998. 00
Air-conditioner 2 P 166, 296. 00
Washing Machine 1 P 7, 998. 00
Ceiling and Stand Fan 3 P 3, 524. 00
Flat Iron and Board 1 P 678. 00
Cabinet and Lockers 5 P 24, 700. 00
Foams and Pillows 21 P 46, 620. 00
Kitchen utensils and Cookware P 4, 493. 00
Home Improvements P 2, 750. 00
Others P 9, 209. 00
Total P 340, 288. 75
8/10/2019 CHAPTER 4 Technical Information
12/14
Schedule ___ Depreciation Expense of F urni tur e and Fix tur es
Furniture and Fixtures Life Span (Years) Depreciation Value
Sofa Set 10 P 989. 10
LED TV 7 P 1, 089. 64
TV Stand 5 P 450. 00
Dining Table 15 P 408. 00
Refrigerator 9 P 999. 90
LED lights and Bulbs 2 P 2, 339. 44
CCTV Cameras 6 P 4, 499. 70
Air-conditioner (2) 7 P 21, 380. 91
Washing Machine 8 P 899. 78
Ceiling and Stand Fan 5 P 634. 32
Flat Iron and Board 5 P 122. 04
Cabinet and Lockers 15 P 1, 482. 00
Foams and Pillows 8 P 5, 244. 75
Kitchen utensils and Cookware 7 P 577. 67
Home Improvements 3 P 825. 00
Others 5 P 1, 657. 62
Total 111 P 43, 599. 87
8/10/2019 CHAPTER 4 Technical Information
13/14
Schedule _____ Uti li ties Expense
Utilities Estimated cost (monthly)
Light P 15, 000. 00
Water P 1, 500. 00
Internet Connection (Globe) P 1, 200. 00
Total P 17, 700. 00
The monthly estimated cost for utilities would be P17, 700. We assume that even
though we use LED lights and a 3 phase air-condition, electricity will still consume the highest
costs.
D. Waste Disposal Program
According the first section of Presidential Decree No. 825 a part iof it states that
all commercial establishments such as hotels, restaurants, hospitals, cinema houses,
public market, department stores, groceries and other establishments of any kind, shall
undertake the cleaning of their own surroundings, their yards and gardens as the canals,
roads, streets or their immediate premises. We should be responsible for every waste we
will produce; we will impose proper waste disposal and proper waste segregation of
garbage in the dormitory. We will provide three garbage bins and will educate our
occupants to be discipline in segregating their wastes.
8/10/2019 CHAPTER 4 Technical Information
14/14
NOTE:
SERVICE PROCESS AND FACILITIES
FLOOR PLAN & FINAL HOUSE DESIGN